A kind of water bag on the float glass melting furnace

By designing a choke water bag including a U-shaped slow-flow liquid port and a slag removal wheel on the float glass melting furnace, real-time collection and discharge of scum is achieved, which solves the problems of short maintenance cycles and production interruptions in the existing technology. , improving production efficiency and safety.

CN111943482BActive Publication Date: 2024-10-29咸宁南玻玻璃有限公司 +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010986382.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-18
Publication Date
2024-10-29
Estimated Expiration
2040-09-18

AI Technical Summary

Technical Problem

The existing float glass melting furnace's stuck neck water bag has a short maintenance cycle, and the disassembly and assembly process is cumbersome and labor-intensive, resulting in production interruption and uneven corrosion of the tank wall.

Method used

A clamp-neck water bag including a body, a connecting arm and a scum collection cover is designed. It adopts a U-shaped slow-flow liquid port, a slag removal wheel and a scraper structure, and realizes real-time collection and discharge of scum by driving the screw with a reduction motor. Reduce liquid flow impact and scum inventory.

Benefits of technology

It extends the maintenance cycle of the stuck neck water bag, reduces labor costs, avoids production suspension and pool wall corrosion problems, and improves installation accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111943482B_ABST
    Figure CN111943482B_ABST
Patent Text Reader

Abstract

The present invention provides a neck-locking water bag on a float glass melting furnace, belonging to the technical field of float glass. It includes a body, a connecting arm and a scum collecting hood, the upper end of the body is connected to the connecting arm through a contraction part located in the middle of the body, and a U-shaped slow-flow liquid port is formed on both sides of the contraction part, and the scum collecting hood is located behind the body, and the scum collecting hood includes a bottom plate located below the liquid surface of the melting furnace, a baffle extending above the liquid surface of the melting furnace, a slag removal wheel rotatably connected to the slag collection hood, and a scraper sliding on the bottom plate, the slag removal wheel has a spiral convex rib, the scraper is located behind the slag removal wheel, and the slag removal wheel has a push block in front, the push block is fixedly connected to the scraper, the bottom plate has a guide rail parallel to the axis of the slag removal wheel, the push block has a guide groove matched with the guide rail, and the push block can push the slag removal wheel to rotate under the guidance of the convex rib when it moves horizontally on the guide rail, and the slag removal wheel is partially located above the liquid surface of the melting furnace. The present invention has the advantages of long maintenance cycle and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of float glass and relates to a neck water bag on a float glass melting furnace. Background Art

[0002] To meet production needs, the process requires a temperature gradient in the float furnace, so a large water bag must be installed at the neck of the furnace, which mainly plays a role in reducing the temperature of the cooling part, blocking slag, and saving energy and reducing consumption. Under high-temperature glass liquid, the steel material of the large water bag must be replaced less than 15 months.

[0003] With the improvement of the quality requirements for float glass, the frequency of cleaning the scum of the large water bag with a bottleneck has increased. The cumbersome disassembly and assembly process of the existing water bag with a bottleneck greatly wastes manpower costs. After the large water bag is cleaned, it is difficult to locate the inner edge of the brick on both sides during the installation process in a high-temperature environment. If the distances between the two sides of the large water bag and the inner edge of the refractory material are not equal, there will be a difference in the flow rate of the glass liquid on both sides, and the degree of damage to the pool walls on both sides will change greatly, especially at the intersection of the three substances near the liquid surface. The uneven corrosion problem poses a major hidden danger to the safety of the pool wall. Summary of the invention

[0004] The purpose of the present invention is to provide a neck water bag on a float glass melting furnace in view of the above problems existing in the prior art. The technical problem to be solved by the present invention is how to extend the maintenance period of the neck water bag.

[0005] The object of the present invention can be achieved through the following technical solutions: A neck-holding water bag on a float glass melting furnace, characterized in that it includes a body, a connecting arm and a scum collecting hood, the upper end of the body is connected to the connecting arm through a contraction portion located in the middle of the body, and a U-shaped slow-flow liquid port is formed on both sides of the contraction portion, the scum collecting hood is located behind the body, the scum collecting hood includes a bottom plate located below the liquid level of the melting furnace, a baffle extending above the liquid level of the melting furnace, a slag removal wheel rotatably connected to the slag collection hood, and a scraper sliding on the bottom plate, the slag removal wheel has a spiral convex rib, the scraper is located behind the slag removal wheel, and the slag removal wheel has a push block in front, the push block is fixedly connected to the scraper, the bottom plate has a guide rail parallel to the axis of the slag removal wheel, the push block has a guide groove matched with the guide rail, the push block can push the slag removal wheel to rotate under the guidance of the convex rib when it translates on the guide rail, and the slag removal wheel is partially located above the liquid level of the melting furnace.

[0006] Furthermore, both ends of the slag collecting hood are respectively provided with a supporting portion that can lean against the top of the side wall of the melting furnace, a mounting frame is fixedly arranged above the melting furnace, and a screw rod rotatably connected to the mounting frame is provided above the slag collecting hood, a sliding sleeve is threadedly connected to the screw rod, an insertion rod is fixedly arranged on the sliding sleeve, a sleeve is fixedly arranged on the scraper, and the insertion rod is slidably connected in the sleeve.

[0007] Furthermore, one end of the screw is connected to a reduction motor.

[0008] Furthermore, a surrounding plate parallel to the baffle plate at the support portion is fixedly provided on the bottom plate at the support portion, and the surrounding plate and the side plate form a slag discharge trough at the support portion.

[0009] Furthermore, a return spring is connected between the insertion rod and the sleeve, and the return spring can ensure that the scraper is in a compressed state.

[0010] The scum collecting cover is located behind the slow flow liquid port, but does not block the slow flow liquid port. It is only located at the upper part of the slow flow liquid port, which does not affect the large flow cross section of the liquid flow in this part and can effectively collect the scum.

[0011] The setting of the slow-flow liquid inlet, on the one hand, can increase the liquid flow cross-section above the main body, so that the intensity of the liquid impacting the side wall of the melting furnace at the liquid surface position is greatly reduced, thereby alleviating the corrosion of the side wall of the melting furnace by the liquid flow in the liquid surface area, and the situation where the corrosion degree of the side wall of the melting furnace is different due to the unequal distance between the two sides of the main body and the two walls of the melting furnace is also alleviated, thereby reducing the installation accuracy requirement of the main body in the melting furnace; on the other hand, the slag on the liquid surface can enter the vicinity of the slag removal wheel through the slow-flow liquid inlet, so that the rotation of the slag removal wheel can make the slag enter the slag collection cover formed by the bottom plate and the baffle.

[0012] Affected by the flow direction of the glass liquid, the scum can be pushed from the front of the scum wheel to the back of the scum wheel by the ribs under the rotation of the scum wheel, that is, pushed to the bottom plate behind the scum wheel, and the scum entering the back of the scum wheel tends to be close to the baffle due to the impact force of the liquid flow, that is, it is not easy to be sent to the front of the scum wheel again by the ribs. During the translation of the scraper, the scum is pushed to the two ends of the scum collecting cover and can be discharged outside the scum collecting cover through the scum discharge groove.

[0013] The reduction motor drives the screw to intermittently rotate forward and reversely, so that the scraper moves back and forth above the bottom plate, and the scum collected in the scum collection cover is removed in real time.

[0014] The setting of the slag removal wheel can not only prevent the liquid flow from impacting the slag in the slag collection cover, so that the collected slag will not continue to flow on the liquid surface with the liquid flow, but also, on the other hand, the slag on the surface of the liquid flow is restricted by the ribs on the slag removal wheel, and the slag before entering the collection cover will not easily flow away from the slow-flow liquid outlet with the liquid flow, thereby reducing the amount of slag in the glass liquid behind the neck water bag.

[0015] By setting up an active and real-time slag removal structure, the disassembly and cleaning cycle of the stuck water bag can be greatly extended, and the production suspension caused by the idle period of disassembly and assembly of the stuck water bag can be effectively avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the neck water bag on the melting furnace.

[0017] Figure 2 It is a structural schematic diagram of the slag removal structure.

[0018] Figure 3 It is an end view of the slag collection hood.

[0019] In the figure, 11, main body; 12, connecting arm; 13, slow-flow liquid port; 2, melting furnace; 3, slag collecting hood; 31, bottom plate; 32, baffle; 33, slag removing wheel; 34, scraper; 35, convex rib; 36, push block; 37, screw; 38, enclosure; 4, reduction motor; 51, sleeve; 52, plug rod; 53, reset spring. DETAILED DESCRIPTION

[0020] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

[0021] like Figure 1 , Figure 2 and Figure 3 As shown, the slag collecting hood 3 includes a body 11, a connecting arm 12 and a slag collecting hood 3. The upper end of the body 11 is connected to the connecting arm 12 through a contraction portion located in the middle of the body 11. A U-shaped slow-flow liquid port 13 is formed on both sides of the contraction portion. The slag collecting hood 3 is located behind the body 11. The slag collecting hood 3 includes a bottom plate 31 located below the liquid level of the melting furnace 2, a baffle 32 extending above the liquid level of the melting furnace 2, a slag removal wheel 33 rotatably connected to the slag collecting hood 3, and a slag removal wheel 33 sliding on the bottom plate 3 1, the slag removal wheel 33 has a spiral convex rib 35, the scraper 34 is located behind the slag removal wheel 33, and a push block 36 is provided in front of the slag removal wheel 33. The push block 36 is fixedly connected to the scraper 34, and the bottom plate 31 has a guide rail parallel to the axis of the slag removal wheel 33. The push block 36 has a guide groove matched with the guide rail. The push block 36 can translate on the guide rail and push the slag removal wheel 33 to rotate under the guidance of the convex rib 35. The slag removal wheel 33 is partially located above the liquid surface of the melting furnace 2.

[0022] The two ends of the slag collecting hood 3 are respectively provided with a supporting portion that can lean against the top of the side wall of the melting furnace 2. A mounting frame is fixedly arranged above the melting furnace 2. A screw rod 37 rotatably connected to the mounting frame is arranged above the slag collecting hood 3. A sliding sleeve is threadedly connected to the screw rod 37. An insert rod 52 is fixedly arranged on the sliding sleeve. A sleeve 51 is fixedly arranged on the scraper 34. The insert rod 52 is slidably connected in the sleeve 51.

[0023] One end of the screw rod 37 is connected to a reduction motor 4 .

[0024] A surrounding plate 38 parallel to the baffle plate 32 at the supporting portion is fixedly arranged on the bottom plate 31 at the supporting portion, and the surrounding plate 38 and the side plate form a slag discharge trough at the supporting portion.

[0025] A return spring 53 is connected between the insertion rod 52 and the sleeve 51. The return spring 53 can ensure that the scraper 34 is in a compressed state.

[0026] The provision of the slow-flow liquid inlet 13, on the one hand, can increase the liquid flow cross-section above the main body 11, so that the strength of the liquid at the liquid surface position impacting the side wall of the melting furnace 2 is greatly reduced, thereby alleviating the corrosion of the side wall of the melting furnace 2 by the liquid flow in the liquid surface area, and the situation where the corrosion degree of the side wall of the melting furnace 2 is different due to the unequal distance between the two sides of the main body 11 and the two walls of the melting furnace 2 is also alleviated, thereby reducing the installation accuracy requirement of the main body 11 in the melting furnace 2; on the other hand, the slag on the liquid surface can enter the vicinity of the slag removal wheel 33 through the slow-flow liquid inlet 13, so that the rotation of the slag removal wheel 33 can make the slag enter the slag collection cover 3 formed by the bottom plate 31 and the baffle 32.

[0027] Affected by the flow direction of the glass liquid, the scum can be pushed from the front of the scum wheel 33 to the rear of the scum wheel 33 by the ribs 35 under the rotation of the scum wheel 33, that is, pushed to the bottom plate 31 behind the scum wheel 33, and the scum entering the rear of the scum wheel 33 tends to be close to the baffle 32 due to the impact force of the liquid flow, that is, it is not easy to be sent back to the front of the scum wheel 33 by the ribs 35. During the translation process of the scraper 34, the scum is pushed to the two ends of the scum collecting cover 3 and can be discharged from the scum collecting cover 3 through the scum discharge trough.

[0028] The reduction motor 4 drives the screw 37 to intermittently rotate forward and reversely, so that the scraper 34 reciprocates above the bottom plate 31, and the scum collected in the scum collecting cover 3 is removed in real time.

[0029] The setting of the slag removal wheel 33 can not only prevent the liquid flow from impacting the slag located in the slag collection cover 3, so that the collected slag will not continue to flow on the liquid surface with the liquid flow, but on the other hand, the slag on the surface of the liquid flow is restricted by the ribs 35 on the slag removal wheel 33, and the slag before entering the collection cover will not easily flow away from the slow-flow liquid outlet 13 with the liquid flow, thereby reducing the amount of slag in the glass liquid behind the neck water bag.

[0030] By setting up an active and real-time slag removal structure, the disassembly and cleaning cycle of the stuck water bag can be greatly extended, and the production suspension caused by the idle period of disassembly and assembly of the stuck water bag can be effectively avoided.

[0031] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A neck water bag on a float glass melting furnace, characterized in that: The invention comprises a body (11), a connecting arm (12) and a slag collecting cover (3), wherein the upper end of the body (11) is connected to the connecting arm (12) via a contraction portion located in the middle of the body (11), and a U-shaped slow-flow liquid opening (13) is formed on both sides of the contraction portion. The slag collecting cover (3) is located behind the body (11), and comprises a bottom plate (31) located below the liquid level of the melting furnace (2), a baffle plate (32) extending above the liquid level of the melting furnace (2), a slag removal wheel (33) rotatably connected to the slag collecting cover (3), and a scraper sliding on the bottom plate (31). (34), the slag removal wheel (33) has a spiral convex rib (35), the scraper (34) is located behind the slag removal wheel (33), and the slag removal wheel (33) has a push block (36) in front, the push block (36) is fixedly connected to the scraper (34), the bottom plate (31) has a guide rail parallel to the axis of the slag removal wheel (33), the push block (36) has a guide groove matching the guide rail, the push block (36) can translate on the guide rail and push the slag removal wheel (33) to rotate under the guidance of the convex rib (35), and the slag removal wheel (33) is partially located above the liquid surface of the melting furnace (2).

2. The neck water bag on the float glass melting furnace according to claim 1, characterized in that: The two ends of the slag collecting cover (3) are respectively provided with a support portion capable of leaning against the top of the side wall of the melting furnace (2); a mounting frame is fixedly arranged above the melting furnace (2); a screw rod (37) rotatably connected to the mounting frame is arranged above the slag collecting cover (3); a sliding sleeve is threadedly connected to the screw rod (37); an insertion rod (52) is fixedly arranged on the sliding sleeve; a sleeve (51) is fixedly arranged on the scraper (34); and the insertion rod (52) is slidably connected in the sleeve (51).

3. The neck water bag on the float glass melting furnace according to claim 2, characterized in that: One end of the screw rod (37) is connected to a reduction motor (4).

4. The neck water bag on the float glass melting furnace according to claim 2, characterized in that: A surrounding plate (38) parallel to the baffle plate (32) at the support portion is fixedly arranged on the bottom plate (31) at the support portion, and the surrounding plate (38) and the side plate form a slag discharge trough at the support portion.

5. The neck water bag on the float glass melting furnace according to claim 2, characterized in that: A return spring (53) is connected between the insertion rod (52) and the sleeve (51).

Citation Information

Patent Citations

  • Neck water drum on float glass melting furnace

    CN212504559U