A method for exploiting groundwater in a low-permeability thin aquifer

By constructing a horizontal seepage well structure of a highly permeable aquifer, a water collection well, and an overflow prevention aquifer in a low-permeability thin aquifer, the existing technology problems in the development and utilization of groundwater resources are solved, and a larger amount of groundwater extraction and pollutant treatment are achieved. , the water intake is many times more than that of conventional vertical water wells.

CN111945825BActive Publication Date: 2024-10-25甘肃省地质调查院
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010825479.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-17
Publication Date
2024-10-25
Estimated Expiration
2040-08-17

AI Technical Summary

Technical Problem

In low-permeability thin aquifers, existing vertical water well mining methods are difficult to effectively obtain large amounts of groundwater resources, resulting in unsatisfied water supply needs.

Method used

By constructing a highly permeable aquifer, a water collection well and an overflow prevention aquifer, a horizontal seepage well structure is formed. The highly permeable aquifer is used to increase the groundwater hydraulic gradient and seepage area, and the groundwater seepage is collected at the water collection well, thereby achieving a larger amount of water. Groundwater extraction.

Benefits of technology

It realizes the extraction of large amounts of groundwater from strata with low permeability, thin aquifers and weak water richness, solves the problem of water supply demand, and has the function of pollutant control. The water intake is many times more than that of conventional vertical water wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0002636048520000011
    Figure HDA0002636048520000011
  • Figure HDA0002636048520000012
    Figure HDA0002636048520000012
  • Figure HDA0002636048520000021
    Figure HDA0002636048520000021
Patent Text Reader

Abstract

The present invention discloses a method for exploiting groundwater in a low-permeability thin aquifer. The horizontal infiltration well structure includes a strong permeability aquifer, a water collection well, and an overflow prevention aquifer. The water collection well is arranged between the strong permeability aquifer and the overflow prevention aquifer, and the three are closely connected in sequence; the strong permeability aquifer is composed of a first gravel layer at the bottom and a backfill soil layer on the top, and the first gravel layer is adjacent to the backfill soil layer; the overflow prevention aquifer is composed of a uniform thickness section and a gradual section at the bottom and a backfill soil layer on the top, and the uniform thickness section and the gradual section are adjacent to the backfill soil layer. By constructing a strong permeability aquifer, the structure can increase the hydraulic gradient and overflow area of ​​groundwater in the low-permeability thin aquifer, so that groundwater can infiltrate into the horizontal trough-shaped strong permeability aquifer, and the seepage is gathered to the downstream water collection well, from which a large amount of groundwater is extracted, thereby achieving the purpose of engineering design.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hydrogeological engineering, and relates to a technical method for exploiting groundwater by using a horizontal infiltration well, in particular to a method for exploiting groundwater in a low-permeability thin aquifer. Background Art

[0002] Groundwater is one of the most important resources supporting social and economic development. In many places, the thickness of the aquifer containing groundwater is thin and the permeability is poor, making it difficult to develop and utilize groundwater resources. For example, the lithology of the Quaternary aquifer in a certain place is muddy gravel and pebble, with poor permeability, aquifer thickness of 2.5-12m, poor water-richness, and a hydrogeological unit with a relatively stable aquifer recharge source. In order to realize the development and utilization of the above-mentioned groundwater resources and build a large water supply source for production and life services, new engineering technology methods must be adopted.

[0003] At present, groundwater resources are extracted by conventional vertical wells. However, groundwater resources in many places are stored in thin aquifers mainly composed of mud, gravel and pebbles. Such strata have poor permeability. When vertical wells are used for extraction, the amount of water is very small or the water output is discontinuous, which does not meet the water supply requirements or is meaningless.

[0004] Therefore, a new water well structure and mining method are urgently needed to achieve the purpose of mining and obtaining a larger amount of groundwater resources in low-permeability thin aquifers. Summary of the invention

[0005] The purpose of the present invention is to propose a method for exploiting groundwater in a low-permeability thin aquifer. By constructing a strong permeability aquifer, the hydraulic gradient and seepage area of ​​groundwater in the weak aquifer can be increased, so that more groundwater can seep into the horizontal trough-shaped strong permeability aquifer and the seepage flow is collected in the downstream water collection well, from which a larger amount of groundwater can be extracted to achieve the engineering design purpose.

[0006] To achieve the above-mentioned purpose, the present invention discloses a horizontal infiltration well for exploiting groundwater in a low-permeability thin aquifer, comprising a strong permeability aquifer, a water collection well, and an overflow prevention aquifer. The water collection well is arranged between the strong permeability aquifer and the overflow prevention aquifer, and the three are closely connected in sequence according to the groundwater runoff direction; the strong permeability aquifer is composed of a water-free rock and soil layer at the bottom, a first gravel layer in the middle, and a backfill soil layer on the top, and the water-free rock and soil layer, the first gravel layer, and the backfill soil layer are adjacent to each other from bottom to top; the overflow prevention aquifer is composed of a water-free rock and soil layer closely connected in sequence from bottom to top. The anti-overflow aquifer is composed of a soil layer, a low-permeability weak aquifer, a second gravel layer and a backfill soil layer on the top surface, wherein a horizontal section and a raised section are arranged in the low-permeability weak aquifer; the horizontal section is parallel to the water-free rock and soil layer, and an upward inclined slope is formed between the raised section and the water-free rock and soil layer; the second gravel layer in the anti-overflow aquifer is correspondingly arranged as a uniform thickness section and a gradual section, the uniform thickness section and the water-free rock and soil layer are parallel to the horizontal section, and the gradual section is closely connected with the raised section; the gravel of the first gravel layer is gravel, and the particle size of the gravel is 3-20mm; the backfill soil layer is the rock and soil body excavated from the original construction site.

[0007] A seepage pipe is arranged in the highly permeable aquifer, and the end of the seepage pipe is connected with the wall of the water collection well.

[0008] The method for exploiting groundwater in a low-permeability thin aquifer described in the present invention comprises the following steps:

[0009] 1) Constructing a highly permeable aquifer: excavating in the construction site area to the water-free rock and soil layer of the construction site, the construction site area is excavated into a regular long trough with a rectangular or trapezoidal cross section; the area below the original groundwater level in the regular long trough is backfilled with gravel, and the area above the original groundwater level in the regular long trough is backfilled with the original excavated rock and soil to form a backfill soil layer, thereby constructing a highly permeable aquifer;

[0010] 2) Construction of a water collection well: A water collection well is constructed at the downstream end of the highly permeable aquifer, the depth of which is greater than the thickness of the highly permeable aquifer, and the water collection well is set in a water-free rock and soil layer, which is excavated into a cylindrical or truncated cone-shaped groove;

[0011] 3) Construction of overflow prevention aquifer: excavate the low-permeability weak aquifer in the unexcavated area on one side of the water collection well, and excavate it into a regular long groove with a rectangular or trapezoidal cross-section; the upstream section of the excavated low-permeability weak aquifer close to the water collection well is excavated as a horizontal section, and the downstream section of the overflow prevention aquifer is excavated as a bottom uniformly sloped uplift section; the area above the low-permeability weak aquifer and below the original groundwater level is backfilled with gravel, and the area above the original groundwater level is backfilled with the rock and soil excavated from the original construction site, and the construction is completed. Overflow-proof aquifer: The newly constructed strong permeability aquifer in this horizontal infiltration well has strong permeability, while the low permeability weak aquifer in the original stratum has poor permeability. Groundwater seeps and flows downstream. At the end of the strong permeability aquifer and the collection well, due to the weak permeability of the original stratum, this section will cause the aquifer to overflow due to a sudden drop in permeability, causing groundwater to overflow the surface. In order to prevent groundwater from overflowing the surface at the collection well, an overflow-proof aquifer is constructed. When not in production, the groundwater can be guided to the outside of the construction site (downstream area) through the overflow-proof aquifer.

[0012] The seepage pipe is arranged in the middle of the bottom of the first gravel layer.

[0013] The diameter Φ of the seepage pipe is 0.20-0.50m, and the porosity is 20-30% (the porosity of the seepage pipe is the ratio of the opening area of ​​the seepage pipe water inlet surface to the surface area of ​​the pipe water inlet surface).

[0014] The highly permeable aquifer has a length L of 50-100 m, a width W of 1.0-4.0 m, and a depth H of 4.0-7.0 m;

[0015] The depth h of the water collection well is 6.0-9.0m, and the diameter D of the well pipe of the water collection well is 0.3-3.0m; the well pipe of the water collection well is set as a solid pipe above the original groundwater level line, and is set as a filter pipe below the groundwater level line, and the porosity of the filter pipe is 20-30% (here it refers to the porosity of the filter pipe, which is the ratio of the opening area of ​​the water inlet surface of the filter pipe to the surface area of ​​the water inlet surface of the pipe).

[0016] The anti-overflow aquifer has a length L' of 10-20 m, a width W' of 1.0-3.0 m, and a depth H' of 3.0-5.0 m;

[0017] The backfill position of the backfill soil layer is above the original groundwater level.

[0018] The length ratio of the uniform thickness section to the gradient section is 1:1-2:1, and the slope of the highly permeable aquifer is substantially consistent with the hydraulic slope of groundwater at the construction site; the depth of the uniform thickness section is 3.0-5.0 m, and the end depth of the gradient section is 0.5-1.0 m.

[0019] The angle between the highly permeable aquifer and the horizontal plane is 0-10 degrees, and the slope of the highly permeable aquifer is close to the hydraulic slope of the groundwater at the construction site.

[0020] The thickness of gravel filling outside the water collection well pipe is d 0.5-0.75m, and d' is 0.5-0.75m.

[0021] The particle size of the gravel is 5-15 mm.

[0022] The highly permeable aquifer, water collection well and overflow prevention aquifer are arranged in a straight line in the direction of groundwater runoff, or are arranged in a broken line or curve in the direction of the topographic conditions of the construction site and the direction of groundwater runoff.

[0023] The method for exploiting groundwater in a low-permeability thin aquifer described in the present invention has the following beneficial effects: the horizontal infiltration well described in the present invention is an engineering structure that can extract a large amount of groundwater from a low-permeability thin aquifer. By constructing a strong permeability aquifer, the hydraulic gradient and seepage area of ​​groundwater in the weak aquifer can be increased, so that more groundwater seeps into the horizontal trough-shaped strong permeability aquifer, and the seepage is collected in the downstream water collection well, from which a large amount of groundwater is extracted, thereby achieving the engineering design purpose; the horizontal infiltration well design engineering of this engineering also has the following effects:

[0024] (1) This project can extract a large amount of groundwater from strata with low permeability, thin aquifers, and weak water-richness, solving the problem of not being able to extract the required amount of water from such aquifers in the past;

[0025] (2) This project can extract multiple times more water from strata with good permeability, thin aquifers, and strong water-richness than conventional vertical well projects, thus solving the problem of large water supply demand;

[0026] (3) This project can be used to treat pollutants in strata and aquifers (especially valley-type thin aquifer pollution). The polluted groundwater in the upstream strata can be collected into a collection well through this structure, and then pumped out and discharged to external facilities for treatment (interception - collection - pumping and drainage). BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A top view of an embodiment of the present invention;

[0028] Figure 2 This is a three-dimensional diagram of the water collection well engineering design structure of the present invention;

[0029] Figure 3 A vertical cross-sectional perspective view of the horizontal infiltration well engineering design structure of the present invention;

[0030] Figure 4 It is a longitudinal cross-sectional view of the design structure of the horizontal seepage well engineering of the present invention;

[0031] Figure 5It is a longitudinal stratigraphic cross-section diagram of the construction site of the present invention before excavation;

[0032] Figure 6 This is a cross-sectional diagram of the highly permeable aquifer engineering design of the present invention;

[0033] Figure 7 This is a structural diagram of the water collection well engineering design of the present invention;

[0034] Figure 8 The cross-sectional view of the anti-overflow aquifer section engineering design of the present invention;

[0035] Fig. 9 A similar top view of an embodiment of the present invention;

[0036] In the figure: 1-highly permeable aquifer, 2-water collection well, 3-overflow prevention aquifer, 4-uniform thickness section, 5-gradual section, 6-first gravel layer, 7-backfill soil layer, 8-ground line, 9-low permeability weak aquifer, 10-water-free rock and soil layer, 11-groundwater level of highly permeable aquifer, 12-seepage pipe, 13-original groundwater level. DETAILED DESCRIPTION

[0037] Example 1

[0038] like Figure 1-8 As shown, a method for exploiting groundwater in a low-permeability thin aquifer according to the present invention comprises constructing a horizontal infiltration well and using the horizontal infiltration well;

[0039] The steps of constructing a horizontal infiltration well are as follows: the horizontal infiltration well comprises a highly permeable aquifer 1, a water collection well 2 and an anti-overflow aquifer 3, wherein the water collection well 2 is arranged between the highly permeable aquifer 1 and the anti-overflow aquifer 3, and the three are closely connected in sequence according to the direction of groundwater runoff; the highly permeable aquifer 1 is composed of a water-free rock and soil layer 10 at the bottom, a first gravel layer 6 in the middle and a backfill soil layer 7 on the top, and the water-free rock and soil layer 10, the first gravel layer 6 and the backfill soil layer 7 are adjacent to each other from bottom to top; the anti-overflow aquifer 3 is composed of a water-free rock and soil layer 10, a low-permeability weak aquifer 9, a second gravel layer 6-1 and a backfill soil layer 7 on the top, which are closely connected in sequence from bottom to top, and a horizontal section and a raised section are arranged in the low-permeability weak aquifer 9; the horizontal section is parallel to the water-free rock and soil layer 10, and the raised section is parallel to the water-free rock and soil layer 10 An upward inclined slope is formed between the second gravel layer 6-1 in the overflow prevention aquifer 3, which is correspondingly arranged as a uniform thickness section 4 and a gradient section 5, wherein the uniform thickness section 4 and the water-free rock and soil layer 10 are parallel to the horizontal section, and the gradient section 5 is closely connected to the uplift section; the gravel of the first gravel layer 6 is gravel, and the particle size of the gravel is 3-5 mm; the backfill soil layer 7 is the rock and soil body excavated from the original construction site.

[0040] A seepage pipe 12 is arranged in the highly permeable aquifer 1 , and the end of the seepage pipe 12 is connected to the wall of the water collection well 2 .

[0041] 1) Constructing a highly permeable aquifer 1: excavating in the construction site area to the water-free rock and soil layer 10 of the construction site, the construction site area is excavated into a regular long trough shape, and its cross section is rectangular or trapezoidal; the area below the original groundwater level 13 in the regular long trough shape is backfilled with gravel, and the area above the original groundwater level 13 in the regular long trough shape is backfilled with the original excavated rock and soil body to form a backfill soil layer 7, thereby constructing a highly permeable aquifer 1;

[0042] 2) Construction of a water collection well 2: A water collection well 2 is constructed at the downstream end of the highly permeable aquifer 1. The depth of the water collection well 2 is greater than the thickness of the highly permeable aquifer 1. The water collection well 2 is arranged in a water-free rock and soil layer 10. The water-free rock and soil layer 10 is excavated into a cylindrical groove;

[0043] 3) Construction of overflow prevention aquifer 3: excavate to low permeability weak aquifer 9 in the unexcavated site on one side of the water collection well 2, and excavate into a regular long trough, whose cross section is rectangular or trapezoidal; the upstream section of the excavated low permeability weak aquifer 9 close to the water collection well 2 is excavated and set as a horizontal section, and the downstream section of the overflow prevention aquifer 3 is excavated and set as a bottom uniformly sloped uplift section; the area above the low permeability weak aquifer 9 and below the original groundwater level 13 is backfilled with gravel, and the area above the original groundwater level 13 is backfilled with rock and soil excavated at the original construction site to build the overflow prevention aquifer 3; the newly constructed strong permeability aquifer 1 in this horizontal infiltration well has strong permeability, and the low permeability weak aquifer 9 in the original stratum has poor permeability, and the groundwater seeps out and flows downstream, at the end of the strong permeability aquifer 1 and the water collection well 2 Because the permeability of the original stratum is weak, this section will cause the aquifer (permeable) layer to suddenly drop in permeability and groundwater to overflow the surface. In order to prevent groundwater from overflowing the surface at the collection well 2, an overflow-proof aquifer 3 is constructed. When there is no production, the groundwater can be guided to the outside of the construction site (downstream area) through the overflow-proof aquifer 3.

[0044] The seepage pipe 12 is arranged in the middle of the bottom of the first gravel layer 6 .

[0045] The diameter Φ of the seepage pipe 12 is 0.30 m, and the porosity is 20%.

[0046] The highly permeable aquifer 1 has a length L of 50 m, a width W of 1.5 m, and a depth H of 4.0 m;

[0047] The depth h of the water collection well 2 is 6.0 m, and the well pipe diameter D of the water collection well 2 is 0.50 m;

[0048] The anti-overflow aquifer 3 has a length L' of 10 m, a width W' of 1.0 m, and a depth H' of 3.0 m;

[0049] The backfill position of the backfill soil layer 7 is above the original groundwater level 13 .

[0050] The length ratio of the uniform thickness section 4 to the gradual change section 5 is 1:1, the depth of the uniform thickness section 4 is 3.0 m, and the end depth of the gradual change section 5 is 0.5 m.

[0051] The highly permeable aquifer 1 is parallel to the horizontal plane, and the slope of the highly permeable aquifer 1 is close to the hydraulic slope of the groundwater at the construction site.

[0052] The thickness of gravel filling on the outside of the well pipe of the water collection well 2 is d 0.5m and d' is 0.5m.

[0053] The particle size of the gravel is 3-5 mm.

[0054] The highly permeable aquifer 1, the water collection well 2, and the anti-overflow aquifer 3 are arranged in a straight line in the direction of groundwater runoff.

[0055] When in use, the horizontal infiltration well of the present invention is used, the groundwater in the original groundwater level line 13 penetrates into the first gravel layer 6 and the second gravel layer 6-1, the water gathers in the first gravel layer 6 and the second gravel layer 6-1 to form a strong permeability aquifer groundwater level line 11, the groundwater in the strong permeability aquifer 1 seeps downstream to the collection well 2, a water pump is placed at the bottom of the collection well 2, and the groundwater resources are extracted through the collection well 2.

[0056] Example 2

[0057] like Figure 1-8 As shown, a method for exploiting groundwater in a low-permeability thin aquifer according to the present invention comprises constructing a horizontal infiltration well and using the horizontal infiltration well;

[0058] The steps of constructing a horizontal infiltration well are as follows: the horizontal infiltration well comprises a highly permeable aquifer 1, a water collection well 2 and an anti-overflow aquifer 3, wherein the water collection well 2 is arranged between the highly permeable aquifer 1 and the anti-overflow aquifer 3, and the three are closely connected in sequence according to the direction of groundwater runoff; the highly permeable aquifer 1 is composed of a water-free rock and soil layer 10 at the bottom, a first gravel layer 6 in the middle and a backfill soil layer 7 on the top, and the water-free rock and soil layer 10, the first gravel layer 6 and the backfill soil layer 7 are adjacent to each other from bottom to top; the anti-overflow aquifer 3 is composed of a water-free rock and soil layer 10, a low-permeability weak aquifer 9, a second gravel layer 6-1 and a backfill soil layer 7 on the top, which are closely connected in sequence from bottom to top, and a horizontal section and a raised section are arranged in the low-permeability weak aquifer 9; the horizontal section is parallel to the water-free rock and soil layer 10, and the raised section is parallel to the water-free rock and soil layer 10 An upward inclined slope is formed between the two layers; the second gravel layer 6-1 in the overflow prevention aquifer 3 is correspondingly arranged as a uniform thickness section 4 and a gradual change section 5, the uniform thickness section 4 and the water-free rock and soil layer 10 are parallel to the horizontal section, and the gradual change section 5 is closely connected with the uplift section; the gravel of the first gravel layer 6 is gravel, and the particle size of the gravel is 5-15mm; the backfill soil layer 7 is the rock and soil body excavated from the original construction site.

[0059] The method for exploiting groundwater in a low-permeability thin aquifer described in the present invention comprises the following steps:

[0060] 1) Constructing a highly permeable aquifer 1: excavating in the construction site area to the water-free rock and soil layer 10 of the construction site, the construction site area is excavated into a regular long trough shape, and its cross section is rectangular or trapezoidal; the area below the original groundwater level 13 in the regular long trough shape is backfilled with gravel, and the area above the original groundwater level 13 in the regular long trough shape is backfilled with the original excavated rock and soil body to form a backfill soil layer 7, thereby constructing a highly permeable aquifer 1;

[0061] 2) Construction of a water collection well 2: A water collection well 2 is constructed at the downstream end of the highly permeable aquifer 1. The depth of the water collection well 2 is greater than the thickness of the highly permeable aquifer 1. The water collection well 2 is arranged in a water-free rock and soil layer 10. The water-free rock and soil layer 10 is excavated into a truncated cone-shaped groove;

[0062] 3) Construction of overflow prevention aquifer 3: excavate to low permeability weak aquifer 9 in the unexcavated site on one side of the water collection well 2, and excavate into a regular long trough, whose cross section is rectangular or trapezoidal; the upstream section of the excavated low permeability weak aquifer 9 close to the water collection well 2 is excavated and set as a horizontal section, and the downstream section of the overflow prevention aquifer 3 is excavated and set as a bottom uniformly sloped uplift section; the area above the low permeability weak aquifer 9 and below the original groundwater level 13 is backfilled with gravel, and the area above the original groundwater level 13 is backfilled with rock and soil excavated at the original construction site to build the overflow prevention aquifer 3; the newly constructed strong permeability aquifer 1 in this horizontal infiltration well has strong permeability, and the low permeability weak aquifer 9 in the original stratum has poor permeability, and the groundwater seeps out and flows downstream, at the end of the strong permeability aquifer 1 and the water collection well 2 Because the permeability of the original stratum is weak, this section will cause the aquifer (permeable) layer to suddenly drop in permeability and groundwater to overflow the surface. In order to prevent groundwater from overflowing the surface at the collection well 2, an overflow-proof aquifer 3 is constructed. When there is no production, the groundwater can be guided to the outside of the construction site (downstream area) through the overflow-proof aquifer 3.

[0063] The highly permeable aquifer 1 has a length L of 100 m, a width W of 2.5 m, and a depth H of 7.0 m;

[0064] The depth h of the water collection well 2 is 9.0 m, and the well pipe diameter D of the water collection well 2 is 1.0 m;

[0065] The anti-overflow aquifer 3 has a length L' of 20 m, a width W' of 2.0 m, and a depth H' of 5.0 m;

[0066] The backfill position of the backfill soil layer 7 is above the original groundwater level 13 .

[0067] The length ratio of the uniform thickness section 4 to the gradient section 5 is 2:1, and the slope of the highly permeable aquifer is consistent with the hydraulic slope of the groundwater at the construction site; the depth of the uniform thickness section 4 is 5.0 m, and the end depth of the gradient section 5 is 1.0 m.

[0068] The angle between the highly permeable aquifer 1 and the horizontal plane is 10 degrees, and the slope of the highly permeable aquifer 1 is close to the hydraulic slope of the groundwater at the construction site.

[0069] The gravel filling thickness d of the outer side of the well pipe of the water collection well 2 is 0.75m, and d' is 0.75m.

[0070] The particle size of the gravel is 5-15 mm.

[0071] The highly permeable aquifer 1, the water collection well 2, and the anti-overflow aquifer 3 are arranged in a zigzag direction and at an angle according to the topographic conditions of the construction site and the direction of groundwater runoff.

[0072] When in use, the horizontal infiltration well of the present invention is used, the groundwater in the original groundwater level line 13 penetrates into the first gravel layer 6 and the second gravel layer 6-1, the water gathers in the first gravel layer 6 and the second gravel layer 6-1 to form a strong permeability aquifer groundwater level line 11, the groundwater in the strong permeability aquifer 1 seeps downstream to the collection well 2, a water pump is placed at the bottom of the collection well 2, and the groundwater resources are extracted through the collection well 2.

[0073] Example 3

[0074] like Figure 1-8 As shown, the method for exploiting groundwater in a low-permeability thin aquifer described in the present invention is the same as Example 1. From August to December 2019, according to the requirements of the design plan of this project, a horizontal infiltration well project was constructed in Min County, Gansu Province.

[0075] The local construction site is in a debris flow valley. The rock type of the aquifer in the valley is muddy gravel and pebble (with boulders). The aquifer is about 4.0m thick, the groundwater level is 1.0m deep, and the permeability coefficient is 3.0-4.0m / d. This section of the valley is a low-permeability, weakly water-rich aquifer.

[0076] According to the hydrogeological conditions, the trough-shaped highly permeable aquifer 1 (length 100m, depth 5m, bottom 2.5m, upper width 4.5-5.0m) is designed with a trapezoidal cross section. A 100m seepage pipe 12 is arranged in the middle of the bottom of the highly permeable aquifer 1, the lower part is backfilled with gravel with a particle size of 5-10mm, and the surface layer of 1.0m is backfilled with muddy gravel and pebbles excavated from the original site; a water collection well 2 is built at the end of the highly permeable aquifer 1, and the water collection well 2 is 7.0m deep. The well diameter is 1.0m, and the well pipe is made of concrete. The upper 2m of the well pipe of the water collection well 2 is set as a solid pipe, and the lower 5m of the well pipe of the water collection well 2 is set as a filter pipe. The filter pipe is wrapped with 80-mesh nylon mesh, and the outer periphery is backfilled with gravel with a particle size of 5-10mm, which is connected to the highly permeable aquifer 1; the downstream section of the water collection well 2 is designed with an overflow-proof aquifer 3 (with a length of 30m, a bottom width of 2.0m, and an upper width of 3m), wherein the uniform thickness section 4 is 4m deep and 20m long, and the gradual section 5 gradually changes from a thickness of 4m to 2m, the lower 3.0-1.0m is backfilled with gravel with a particle size of 5-10mm, and the surface 1m is backfilled with muddy gravel and pebbles excavated from the original site; 2 observation holes are arranged in the project.

[0077] After the horizontal infiltration well project was completed according to the design, the water inflow was determined to be 360m 3 / d, exceeding the engineering design requirement of 220m 3 / d. The engineering design purpose has been achieved and the well has been converted into a water source for the proposed construction area.

[0078] Comparative test

[0079] Conventional vertical wells were built in the section with the same aquifer thickness in this construction area. The water yield was determined by pumping test to be 60m 3 / d or the water output is discontinuous (the pumping capacity of the water pump is 2.5m 3 / h).

[0080] Based on the above comparative tests, it can be seen that the extraction volume of the horizontal infiltration well for extracting groundwater in a low-permeability thin aquifer in the present invention exceeds the 220m3 required by the engineering design. 3 / d, and the water intake is more than five times that of conventional vertical wells.

[0081] Example 4

[0082] like Figure 2-9 As shown, the horizontal infiltration well for extracting groundwater in a low-permeability thin aquifer described in the present invention has the same structure as Example 1. The layout directions and angles of the highly permeable aquifer 1, the water collection well 2, and the anti-overflow aquifer 3 are arranged according to the terrain conditions of the construction site and the groundwater runoff direction curve.

Claims

1. A method for extracting groundwater in a low-permeability thin aquifer, Features: The invention comprises a highly permeable aquifer (1), a water collection well (2), and an overflow prevention aquifer (3), wherein the water collection well (2) is arranged between the highly permeable aquifer (1) and the overflow prevention aquifer (3), and the three are closely connected in sequence according to the groundwater runoff direction; the highly permeable aquifer (1) is composed of a water-free rock and soil layer (10) at the bottom, a first gravel layer (6) in the middle, and a backfill soil layer (7) on the top, and the water-free rock and soil layer (10), the first gravel layer (6), and the backfill soil layer (7) are adjacent to each other from bottom to top; the overflow prevention aquifer (3) is composed of a water-free rock and soil layer (10), a low permeability weak aquifer (9), a second gravel layer ( The low permeability weak aquifer (9) is provided with a horizontal section and an uplift section; the horizontal section is parallel to the water-free rock and soil layer (10), and an upward slope is formed between the uplift section and the water-free rock and soil layer (10); the second gravel layer (6-1) in the overflow prevention aquifer (3) is correspondingly provided with a uniform thickness section (4) and a gradual change section (5); the uniform thickness section (4) and the water-free rock and soil layer (10) are parallel to the horizontal section, and the gradual change section (5) is closely connected to the uplift section; the gravel of the first gravel layer (6) is gravel, and the particle size of the gravel is 3-20 mm; the backfill soil layer (7) is the rock and soil body excavated from the original construction site; A water seepage pipe (12) is provided in the highly permeable aquifer (1), and the end of the water seepage pipe (12) is connected to the wall of the water collection well (2); The construction steps are as follows: 1) Constructing a highly permeable aquifer (1): excavating in the construction site area to the water-free rock and soil layer (10) of the construction site, the construction site area being excavated into a regular long trough shape, the cross section of which is a rectangle or a trapezoid; backfilling the area below the original groundwater level (13) in the regular long trough shape with gravel, and backfilling the area above the original groundwater level (13) in the regular long trough shape with the original excavated rock and soil body to form a backfill soil layer (7), thereby constructing a highly permeable aquifer (1); 2) constructing a water collection well (2): constructing a water collection well (2) at the downstream end of the highly permeable aquifer (1), wherein the depth of the water collection well (2) is greater than the thickness of the highly permeable aquifer (1), and the water collection well (2) is arranged in a water-free rock and soil layer (10), wherein the water-free rock and soil layer (10) is excavated into a cylindrical or truncated cone-shaped groove; 3) Constructing an overflow-proof aquifer (3): excavating a low-permeability weak aquifer (9) in an unexcavated area on one side of the water collection well (2), and excavating the low-permeability weak aquifer (9) into a regular long trough shape, the cross section of which is a rectangle or a trapezoid; the upstream section of the excavated low-permeability weak aquifer (9) close to the water collection well (2) is excavated to be a horizontal section, and the downstream section of the overflow-proof aquifer (3) is excavated to be a bottom uniformly sloped uplift section; the area above the low-permeability weak aquifer (9) and below the original groundwater level (13) is backfilled with gravel, and the area above the original groundwater level (13) is backfilled with the rock and soil excavated at the original construction site, so as to construct an overflow-proof aquifer (3); The seepage pipe (12) is arranged in the middle of the bottom of the first gravel layer (6); The diameter Φ of the seepage pipe (12) is 0.20-0.50 m, and the porosity is 20-30%; The highly permeable aquifer (1) has a length L of 50-100 m, a width W of 1.0-4.0 m, and a depth H of 4.0-7.0 m; The depth h of the water collection well (2) is 6.0-9.0 m, and the well pipe diameter D of the water collection well (2) is 0.3-3.0 m; The anti-overflow aquifer (3) has a length L' of 10-20 m, a width W' of 1.0-3.0 m, and a depth H' of 3.0-5.0 m; The backfill position of the backfill soil layer (7) is above the original groundwater level (13); The length ratio of the uniform thickness section (4) to the gradual change section (5) is 1:1-2:1; the depth of the uniform thickness section (4) is 3.0-5.0 m, and the end depth of the gradual change section (5) is 0.5-1.0 m; The gravel filling thickness d of the outer side of the well pipe of the water collection well (2) is 0.5-0.75m, and d' is 0.5-0.75m; The particle size of the gravel is 5-15 mm.

2. A method for extracting groundwater in a low-permeability thin aquifer as claimed in claim 1, Features: The angle between the highly permeable aquifer (1) and the horizontal plane is 0-10 degrees.