A calculation method, storage medium and device for transient instability safety control cutting quantity
A method for calculating transient instability safety control shutdowns using power angles and generator dynamics addresses the inefficiencies in existing methods, enabling quick and accurate determination of safety control measures in power systems.
Patent Information
- Application Number
- CN202010698143.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-20
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-07-20
AI Technical Summary
Existing methods for determining transient stability limit in power systems lack a systematic process and are slow, making it difficult to efficiently calculate safety control measures.
A method for calculating transient instability safety control shutdown amount using formulas based on initial transmission power, power angles, and generator dynamics to quickly determine the required safety control measures.
The method allows for rapid calculation of safety control measures with minimal error, improving efficiency and providing accurate references for engineering applications.
Smart Images

Figure CN111969587B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a calculation method, a storage medium and a device for transient instability safety control cutting quantity, and belongs to the technical field of power system. Background Art
[0002] Transient stability transmission power limit is an important indicator for measuring the stability of power systems. In power system transient stability analysis and safety control analysis, it is often necessary to calculate this critical system parameter. Estimation and judgment of transient stability transmission power limit is an important basis for arranging the operation mode of power systems and grasping the transient stability capability of the system. Its acquisition is conducive to providing extremely valuable information for system safety and economic dispatch and preventive control.
[0003] The transmission capacity of the tie line is limited by the thermal stability limit, dynamic stability limit, transient stability limit and static stability limit. In the actual power grid, for the large regional power grid with weak connection, the load fluctuation has a great impact on the tie line, which may damage the synchronous stability of the system; in addition, the significant increase in the inertia of the receiving end system after the grid interconnection will cause a significant decrease in the transient stability limit of some lines or sections in the grid. Therefore, in order to ensure the transient stability of the whole system, the transient stability constraint must be considered when determining the maximum transmission power of the tie line, and the transmission section must be controlled to operate within the transient stability limit value. Therefore, the calculation of the transient stability limit value is particularly important.
[0004] The method of determining the safety control quantity in engineering is generally to select the appropriate safety control strategy through repeated integral trials, and consider all possible operating conditions and disturbance scenarios. This traditional method does not have a systematic process to follow when determining the safety control quantity, and the calculation speed is slow. Summary of the invention
[0005] The present invention provides a method for calculating the amount of transient instability safety control machine cutting, which can quickly calculate the amount of safety control measures with a small error.
[0006] To achieve the above object, the technical solution adopted by the present invention is: a method for calculating the transient instability safety control shutdown amount, comprising the following steps: reading the initial transmission power P of the transmission channel M ; According to the initial transmission power P of the transmission channel M , the static stability limit transmission power before the transmission channel fault is calculated by the practical algorithm of static power angle stability The static stability limit transmission power after N-2 fault According to the and Calculate the initial power angle δ0 of the generator under normal operation and the mechanical power after the fault is removed. When the corresponding generator power angle is equalst ; According to the δ0, the power angle δ when the generator is removed from the fault is calculated c , according to δ c Calculate the power angle δ when taking safety control measures to cut off the machine m ; According to the δ0, δ st , δ m The amount of machine cutting for safety control is calculated.
[0007] Furthermore, the safety control cutting amount is calculated by formula (1):
[0008] ΔP M =K(P M -P st ) (1)
[0009] Among them, P st is the transient stability limit transmission power, K is the proportionality coefficient,
[0010] Furthermore, the initial power angle δ0 of the generator under the normal operation mode is calculated by formula (2):
[0011]
[0012] Furthermore, after the fault is cleared, the mechanical power is When the corresponding generator power angle is equal st Calculated by formula (3):
[0013]
[0014] Furthermore, the power angle δ of the generator when the fault is removed c Calculated by formula (4):
[0015]
[0016] Among them, P N is the power standard value, ω0 is the initial generator speed, T j is the generator inertia time constant, t is the fault time, and ΔM is the unbalanced torque.
[0017] Furthermore, the power angle δ when the safety control measures are taken to cut off the machine m Calculated by formula (5):
[0018]
[0019] Among them, t c is the difference between the machine cutting time and the fault clearing time, ω c P is the electrical angular velocity of the generator rotor at the moment of fault removal,N is the power standard value, ω0 is the initial generator speed, T j is the generator inertia time constant.
[0020] A computer-readable storage medium storing one or more programs, characterized in that: the one or more programs include instructions, and when the instructions are executed by a computing device, the computing device performs any one of the methods according to claims 1 to 6.
[0021] A computing device, characterized in that it includes one or more processors, a memory and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, and the one or more programs include instructions for executing any one of the methods according to claims 1 to 6.
[0022] The present invention reads the initial transmission power of the power transmission channel and calculates the safety control shutdown amount through the initial transmission power, so that the safety control measure amount can be quickly calculated, which effectively improves the efficiency of determining the safety control measure amount. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 is the power angle characteristic curve of the single machine system in the present invention;
[0024] Figure 2 This is a diagram of the power grid structure in a certain area. DETAILED DESCRIPTION
[0025] In order to better understand the essence of the present invention, the present invention is further described below in conjunction with specific embodiments and drawings.
[0026] The present invention provides a method for calculating the amount of safety control cutting when there is a transient instability, which is particularly suitable for calculating the amount of safety control cutting when there is a transient instability after a fault in the transmission channel line N-2. The method specifically includes the following steps:
[0027] Step 1: Read the initial transmission power P of the transmission channel M , specifically, the mechanical power during the period from the time when the fault is cleared to the time before the machine is cut off. M , the static stability limit transmission power before the transmission channel fault is calculated by the practical algorithm of static power angle stability The static stability limit transmission power after N-2 fault
[0028] The static stability limit after the fault adopts the method of stable disconnection line, that is, in the stability program, the transient stability limit constraint fault is simulated first, and the static stability limit is calculated after the fault is quelled. In normal operation, the power of the sending end unit is gradually increased, and the power of the receiving end unit is correspondingly reduced until the system has non-periodic out-of-step. At this time, the maximum transmission power of the transmission section is the static stability limit transmission power before the transmission channel fault. The N-2 fault is simulated using a time domain simulation program. After the fault is resolved, the power of the sending unit is gradually increased, and the power of the receiving unit is correspondingly reduced to obtain the static stability limit transmission power after the fault.
[0029] According to the initial transmission power of the transmission channel and the static limit power of the transmission channel before the fault, the initial power angle δ0 of the generator under normal operation can be obtained:
[0030]
[0031] According to the initial transmission power of the transmission channel and the static stability limit power after the fault, the mechanical power and When the corresponding generator power angle is equal st :
[0032]
[0033] Step 2: Calculate the power angle δ when taking safety control measures to cut off the machine m , the power angle δ' when the system reaches the transient stability limit after the generator is cut off m .
[0034] 1. Power angle δ when taking safety control measures to cut off the machine m .
[0035] According to the generator rotor motion equation and the fault removal time, the power angle δ when the generator removes the fault is calculated by the following formula c :
[0036]
[0037] Among them, P N is the power standard value, ω0 is the initial generator speed, T j is the generator inertia time constant, t is the fault time; ΔM is the unbalanced torque, which is the difference between the prime mover mechanical torque and the engine electromagnetic torque.
[0038] Calculate the generator rotor electrical angular velocity ω at the moment of fault removal c :
[0039]
[0040] According to the generator rotor motion equation, the power angle δ when taking safety control measures to cut off the generator can be obtained. m :
[0041]
[0042] Among them, P M is the initial transmission power of the transmission channel, t c is the difference between the machine-cutting time and the fault-clearing time, P E It is the electromagnetic power during the period from fault removal to machine shutdown.
[0043] For quick estimation and solution, replace P in formula (5) M -P E Approximately equivalent to Therefore, formula (5) can be transformed into:
[0044]
[0045] Among them, t c is the difference between the machine cutting time and the fault clearing time, ω c It is the electrical angular velocity of the generator rotor at the moment of fault clearing.
[0046] 2. Calculate the power angle δ' when the system reaches the transient stability limit after the generator is cut off m :
[0047]
[0048] Among them, ΔP M To control the cutting volume for safety.
[0049] To simplify the calculation, the amount of generator shedding is estimated quickly within the allowable error range in engineering practice. Considering that the total equivalent impedance of the generator set increases slightly after the generator shedding, the electromagnetic power of the power plant after the generator shedding is slightly lower than the electromagnetic power without safety control measures after the accident. Therefore, formula (7) can be converted into:
[0050] δ' m =δ u =π-δ st (8)
[0051] Among them, δ u is the limiting resection angle.
[0052] Step 3: Calculate and obtain the safety control cutting quantity.
[0053] like Figure 1As shown in the figure, a fault occurs in line N-2 of the transmission channel. By reducing the transmission power by cutting off the generator, both static stability and dynamic stability are guaranteed. Although this process is dynamic, the static stability limit of the interconnection line after the fault plays a decisive role. The purpose of the safety control measures is to reduce the power flow to a value allowed by static stability. For a single-machine infinite system, the equal area criterion can be applied to obtain the amount of safety control measures, which is the safety control cutting amount ΔP M .
[0054] From the time when the fault occurs to the time when the fault is cleared, the acceleration area of the generator set is:
[0055]
[0056] From the moment of fault removal to the moment of limit removal angle, the deceleration area of the generator set is:
[0057]
[0058] After the transmission channel N-2 fails, if A1>A2, the system becomes unstable. At this time, safety control measures need to be taken. The safety control measure is to cut off the machine, and the safety control cutting amount is ΔP M Based on the equal area rule: the acceleration area of the generator set should be equal to the deceleration area of the generator set, and the deceleration area A3 generated by the cutting measures is obtained, A3 = A1-A2, thus obtaining ΔP M :
[0059]
[0060] Introducing coefficient K:
[0061]
[0062] K is the proportional coefficient, which can be adjusted with the operation mode switching. For a system with a small sending end and a large receiving end, the ratio of the reduction in the power of the sending end power supply to the reduction in the tie line power is small, so the sending end cutting effect is better.
[0063] Due to the transient stability limit transmission power P st It is approximately equal to the transient stability limit power of the system when no safety control and generator disconnection measures are taken in case of transmission channel N-2 failure, and Therefore, the safety control cutting quantity can be simplified as:
[0064] ΔP M =K(P0-P st ) (13)
[0065] Among them, P st is the transient stability limit transmission power. st No safety measures are required at the transmission power.
[0066] The present invention effectively improves the efficiency of determining the amount of security control measures and provides a reference for technical personnel to determine the amount of security control measures more quickly.
[0067] Taking the actual single-plant transmission of Xinjiang power grid as an example, the present invention is verified and the PSD-BPA electromechanical transient simulation software is used to construct the following Figure 2 In the single-plant transmission system shown, power plant A is connected to the receiving system through a three-circuit transmission channel.
[0068] First read the line initial power P M , specifically the initial power of the AC section at the sending end before the N-2 fault, P M =3000MW, adopt the stability calculation program, use the fast closing valve card, gradually increase the power of the sending end unit or reduce the sending end grid load, and correspondingly reduce the power of the receiving end unit or increase the receiving end load, and obtain the maximum transmission power of the transmission line or section, which is the static power angle stability limit before the fault. In the time domain simulation program, select 0 cycle to simulate the Sanyong N-2 fault, 4.5 cycles to remove the near end of the fault side, 5 cycles to remove the far end, and 15 cycles to start calculating the static stability limit. Calculate the static stability limit transmission power of the transmission channel after the Sanyong N-2 fault
[0069] The initial power angle of the generator under normal operation is calculated by formula (1) as δ0 = 26°. The mechanical power and the power after fault removal are calculated by formula (2): When the corresponding generator power angle is equal st 39.3°.
[0070] The power angle δ when the generator is cleared of fault is calculated by formula (3): c =33.4°, the electrical angular velocity ω of the generator rotor when the generator is cleared of fault is calculated by formula (4): c =461.2rad / s.
[0071] The power angle δ when the machine is cut off by taking safety control measures is calculated by formula (6): m =111°
[0072] According to formula (12), the coefficient K = 1.6 is calculated, and according to formula (13), the machine cutting amount ΔP is calculated M =467MW.
[0073] The safety control shutdown amount calculated by PSD-BPA when the transmission channel N-2 fails and the transient instability is compared with the shutdown amount obtained by the present invention: The safety control shutdown amount ΔP calculated by PSD-BPA when the transmission channel N-2 fails and the transient instability is M=450MW, the safety control shutdown amount ΔP estimated in this paper M =467MW, the calculation error is 3.8%. Therefore, this paper provides a method for quickly estimating the amount of power generation cut-off for transient instability safety control of transmission channel line N-2 fault, the error is within 5%, the accuracy meets the requirements of engineering application, and can be used as an estimated value for engineering and technical personnel in actual engineering.
[0074] Since the actual system generally uses 0.25s for local cutting and 0.3s for remote cutting, the delay makes it very likely that the generator power angle has already reached the critical angle value during this period. Therefore, in order to pull the generator power angle back to synchronous stability, more cutting must be done. Therefore, the physical meaning of K is the power multiple required to pull the generator power angle swing curve back below the critical angle before reaching the critical angle or critical cutting time. Since the purpose of the sending end cutting is to reduce the transmission power of the sending and receiving end interconnection line below the stability limit, the cutting amount is directly related to the ratio of the cutting sending end power to the corresponding reduction in line transmission power. For a small sending end and a large receiving end system, the ratio of the reduction in the sending end power to the reduction in the interconnection line power is small, so the sending end cutting effect is better. The K value ranges from 1.5 to 2 according to actual engineering experience.
[0075] The method of quickly obtaining the temporary stable limit transmission power is applied to the scope of quickly determining the amount of security control measures, which effectively improves the efficiency of determining the amount of security control measures and provides a reference for technical personnel to determine the amount of security control measures more quickly.
[0076] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0077] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1A device that provides the functions specified in a block or multiple blocks.
[0078] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0079] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0080] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.
Claims
1. A method for calculating the amount of power cut for transient instability safety control, characterized in that: The following steps are involved: Read the initial transmission power P of the transmission channel M ; According to the initial transmission power P of the transmission channel M , the static stability limit transmission power before the transmission channel fault is calculated by the practical algorithm of static power angle stability The static stability limit transmission power after N-2 fault According to the and Calculate the initial power angle δ0 of the generator under normal operation and the mechanical power after the fault is removed. When the corresponding generator power angle is equal st ; The power angle δ when the generator is cleared of fault is calculated based on the δ0 c , according to δ c Calculate the power angle δ when taking safety control measures to cut off the machine m ; The initial power angle δ0 of the generator under the normal operation mode is calculated by formula (2): Among them, after the fault is removed, the mechanical power is When the corresponding generator power angle is equal st Calculated by formula (3): Among them, the power angle δ of the generator when the fault is removed c Calculated by formula (4): Among them, P N is the power standard value, ω0 is the initial generator speed, T j is the generator inertia time constant, t is the fault time, ΔM is the unbalanced torque; Among them, the power angle δ when taking safety control measures to cut off the machine m Calculated by formula (5): Among them, t c is the difference between the machine cutting time and the fault clearing time, ω c P is the electrical angular velocity of the generator rotor at the moment of fault removal, N is the power standard value, ω0 is the initial generator speed, T j is the generator inertia time constant; According to the δ0, δ st , δ m The safe control cutting amount is calculated; wherein the safe control cutting amount is calculated by formula (1): ΔP M =K(P M -P st ) (1) Among them, P st is the transient stability limit transmission power, K is the proportionality coefficient, 2. A computer-readable storage medium storing one or more programs, characterized in that: The one or more programs include instructions that, when executed by a computing device, cause the computing device to perform the method of claim 1 .
3. A computing device, characterized in that: The method comprises one or more processors, a memory and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, and the one or more programs include instructions for executing the method according to claim 1.