Continuous pressure cementing sliding sleeve and fracturing method thereof

By introducing a guide sleeve and a pressurized oil chamber into the cementing sliding sleeve, the continuous pressure opening of the sliding sleeve is solved, the problems of cement slurry condensation and low construction efficiency are improved, and the sealing and construction reliability of the cementing sliding sleeve are achieved. Fracturing operations after multiple consecutive compressions.

CN111997565BActive Publication Date: 2024-11-19CHONGQING SHUANGBIAO PETROLEUM ENG TECH SERVICE CO LTD

Patent Information

Application Number
CN202010648471.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-08
Publication Date
2024-11-19
Estimated Expiration
2040-07-08

AI Technical Summary

Technical Problem

In cementing environment, the cement slurry of conventional pressure differential sliding sleeve is prone to condense, resulting in the sliding sleeve being unable to open normally. During the construction of the first layer of fracturing, there is a closed space inside the sleeve, and the pump ball operation cannot be carried out, and there is difficulty in downflow of continuous oil pipes. Problems, resulting in long construction time and high cost.

Method used

A continuous pressure cementing slip sleeve is designed. By setting a guide sleeve and an oil pressure chamber between the sliding sleeve and the connecting jacket, the sliding sleeve is subjected to secondary pressure after the sliding sleeve is moved downward, and the sliding sleeve is controlled. After moving the sliding sleeve downward for a certain distance, pressurize three times, cut off the scissors on the side wall of the lower sleeve until the sliding sleeve is fully opened, and fracturing operations are carried out after multiple continuous compressions.

Benefits of technology

It effectively avoids cement slurry condensation, simplifies the sliding sleeve opening process, improves construction efficiency and cost-effectiveness, realizes fracturing operations after multiple continuous compressions, and improves the sealing and construction reliability of the cementing sliding sleeve.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111997565B_ABST
    Figure CN111997565B_ABST
Patent Text Reader

Abstract

The invention discloses a continuous pressure cementing sleeve, comprising an upper joint, a lower joint, a connecting sleeve and a second connecting sleeve, wherein the upper side wall of the connecting sleeve is evenly distributed with connecting holes, the connecting sleeve is internally mounted with the connecting sleeve, the upper and middle parts of the sliding sleeve are equipped with an installation sleeve and a guide sleeve, an oil pressure bunker is formed between the sliding sleeve, the installation sleeve, the guide sleeve and the connecting sleeve, the side wall of the connecting sleeve is evenly distributed with oil pressure holes, the lower part of the sliding sleeve extends into the second connecting sleeve, the bottom of the second connecting sleeve is equipped with a lower stop sleeve, and shear nails are arranged in the lower stop sleeve; the invention also discloses a continuous pressure cementing sleeve fracturing method; the invention is provided with a guide sleeve and an oil pressure bunker, and after the sliding sleeve is pressurized and moved downward once, a second pressurization is performed, and after the sliding sleeve moves downward a certain distance, it hits the lower stop sleeve, and pressurization is performed three times to cut the shear nails on the side wall of the lower stop sleeve until the sliding sleeve is in a fully open position from a closed position, and fracturing operation can be performed after multiple continuous pressures are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of valve devices for wellbores or wells, and in particular relates to a continuous pressure cementing sliding sleeve fracturing method. Background Art

[0002] At present, with the promotion and application of staged fracturing technology, cementing sleeve pressure division process has been more and more widely used in oil and gas fields due to its advantages of fixed-point fracturing, high construction efficiency and less equipment occupation. The main ways to open cementing sleeves are ball throwing, hydraulic pressure and special tools for continuous tubing. When the first layer of fracturing is carried out, the casing is a closed space and ball pumping cannot be carried out. When the horizontal section is long, there are problems such as difficulty in running the continuous tubing, and the construction time is long and the operation cost is high. Therefore, the first-level sleeve at the bottom is generally opened by pressure difference. In the cementing environment, the conventional pressure difference sleeve cement slurry is easy to condense on the inner wall of the sleeve hydraulic cavity, which makes the sleeve unable to open normally. Summary of the invention

[0003] In view of this, the purpose of the present invention is to provide a continuous pressure cementing sleeve. The continuous pressure cementing sleeve is provided with a guide sleeve and an oil pressure tank between the sleeve and the connecting outer sleeve. After the sleeve is pressurized and moved downward once, a second pressurization is performed, so that the oil in the oil tank controls the movement speed of the sleeve through the oil pressure hole. After the sleeve moves down a certain distance, it hits the lower stopper sleeve and pressurizes three times to cut off the shear pins on the side wall of the lower stopper sleeve until the sleeve is in a fully open position from a closed position. After multiple continuous pressurizations, fracturing operations can be performed.

[0004] In order to achieve the above-mentioned purpose, the present invention provides a continuous pressure cementing sliding sleeve, comprising an upper joint, a lower joint and a connecting sleeve, one end of the connecting sleeve is connected to the upper joint, the other end of the connecting sleeve is connected to a second connecting sleeve, the second connecting sleeve is connected to the lower joint, and the upper side wall of the connecting sleeve is around;

[0005] The upper and middle parts of the sliding sleeve are provided with a mounting sleeve and a guide sleeve, and an oil pressure bin or an exhaust bin is surrounded by the sliding sleeve, the mounting sleeve, the guide sleeve and the connecting sleeve. The side walls of the connecting sleeve are evenly provided with oil pressure holes or exhaust holes connected to the oil pressure bin or the exhaust bin, and the guide sleeve is mounted on the diameter-changing part of the sliding sleeve.

[0006] The lower part of the sliding sleeve extends into the second connecting sleeve, the bottom of the second connecting sleeve is sleeved with a lower stop sleeve, and the inner side wall of the second connecting sleeve is provided with shear nails for fixing the lower stop sleeve.

[0007] Furthermore, anti-backward teeth are evenly distributed on the middle side wall of the sliding sleeve, and a gear ring engaged with the anti-backward teeth is arranged on the inner wall of the mounting sleeve.

[0008] Furthermore, the top of the second connecting sleeve is connected to the connecting outer sleeve by threads, and the mounting sleeve is fixedly connected to the connection between the second connecting sleeve and the connecting outer sleeve by a positioning sleeve.

[0009] Furthermore, a gap is provided between the guide sleeve and the inner wall of the connecting sleeve, which is connected to the oil pressure chamber or the exhaust chamber and is used for draining oil or exhaust.

[0010] Furthermore, the gear ring is provided with 3-4 rows of conical teeth engaging with the anti-backward teeth.

[0011] Furthermore, a seal II for sealing with the inner wall of the second connecting sleeve is provided on the lower side wall of the sliding sleeve, and a positioning groove I and a positioning groove II for accommodating the seal II are provided on the inner wall of the second connecting sleeve, and the positions of the positioning groove I and the positioning groove II respectively correspond to the starting position of the guide sleeve movement and the starting position of the sliding sleeve hitting the lower stop sleeve.

[0012] Furthermore, the upper joint and the connecting sleeve as well as the lower joint and the second connecting sleeve are connected by threads and static sealing rings are provided at the connection points.

[0013] Furthermore, a sealing member I is provided at the connection between the second connecting sleeve and the connecting outer sleeve.

[0014] Furthermore, sealing members are provided between the connecting sleeve and the sliding sleeve on both sides of the communicating hole.

[0015] The present invention also discloses a fracturing method for a continuous pressure cementing sleeve, the steps of which are as follows:

[0016] 1) Connect the cementing sleeve with the completion casing according to the design requirements, then lower the connected cementing sleeve and completion casing into the well and inject cement to complete the well;

[0017] 2) Clearing and washing the wellbore;

[0018] 3) Pressure test of the wellbore;

[0019] 4) Drop the ball from the wellhead so that it reaches the ball seat on the cementing sleeve;

[0020] 5) After the ball is seated, the first pressure is applied to move the reducing diameter of the sliding sleeve to the guide sleeve;

[0021] 6) Perform a second pressure holding operation to make the guide sleeve and the sliding sleeve continue to move downward until the bottom of the sliding sleeve hits the lower stop sleeve;

[0022] 7) Carry out the third pressure holding to make the sliding sleeve cut off the shear pins on the side wall of the lower stopper sleeve until the connecting hole is fully opened;

[0023] 8) Fracturing the open cementing sleeve layer;

[0024] 9) After fracturing is completed, flowback is put into production.

[0025] Furthermore, in step 5), step 6) and step 7), the three holding pressures are gradually increased, wherein the first holding pressure is 1 / 4 to 1 / 3 of the third holding pressure, and the second holding pressure is 1 / 2 to 2 / 3 of the third holding pressure.

[0026] The beneficial effects of the present invention are:

[0027] The continuous pressure cementing sliding sleeve of the present invention is provided with a guide sleeve and an oil pressure tank between the sliding sleeve and the connecting outer sleeve. After the sliding sleeve is pressurized once and moved downward, a second pressurization is performed, so that the oil in the oil tank controls the movement speed of the sliding sleeve through the oil pressure hole. After the sliding sleeve moves downward for a certain distance, it hits the lower stopper sleeve and pressurizes for the third time to cut off the shear pins on the side wall of the lower stopper sleeve until the sliding sleeve is in a fully open position from a closed position. After multiple continuous pressurizations, fracturing operations can be performed. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a front view of the continuous pressure cementing sliding sleeve of the present invention;

[0029] Figure 2 It is a side view of the continuous pressure cementing sleeve of the present invention;

[0030] Figure 3 This is a cross-sectional view of the continuous pressure cementing sleeve of the present invention during the first pressure injection;

[0031] Figure 4 This is a cross-sectional view of the continuous pressure cementing sleeve of the present invention during the second pressure injection;

[0032] Figure 5 This is a cross-sectional view of the continuous pressure cementing sleeve of the present invention during the third pressure injection;

[0033] Figure 6 It is a cross-sectional view of the continuous pressure cementing sleeve of the present invention during the second pressure-pressing process;

[0034] Figure 7 It is a partial enlarged view of the sliding sleeve in the continuous pressure cementing sliding sleeve of the present invention.

[0035] Figure markings: 1-upper joint; 2-lower joint; 3-connecting sleeve; 4-oil pressure hole; 5-connecting hole; 6-sliding sleeve; 7-second connecting sleeve; 8-anti-retraction tooth; 9-installing sleeve; 10-positioning sleeve; 11-oil pressure tank; 12-guide sleeve; 13-lower stop sleeve; 14-shear pin; 15-seal I; 16-seal II; 17-positioning groove I; 18-positioning groove II; 19-seal. DETAILED DESCRIPTION

[0036] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0037] like Figure 1-7 The figure shows a schematic diagram of the structure of the continuous pressure cementing sleeve of the present invention. The present invention is a continuous pressure cementing sleeve, comprising an upper joint 1, a lower joint 2 and a connecting sleeve 3, one end of the connecting sleeve 3 is connected to the upper joint 1, the other end of the connecting sleeve 3 is connected to a second connecting sleeve 7, the second connecting sleeve 7 is connected to the lower joint 3, the upper side wall of the connecting sleeve 3 is uniformly provided with connecting holes 5 connected to the connecting sleeve 3, the connecting sleeve 3 is internally provided with a sliding sleeve 6 for closing or opening the connecting holes,

[0038] The upper and middle parts of the sliding sleeve 6 are sleeved with a mounting sleeve 9 and a guide sleeve 12, and the sliding sleeve 6, the mounting sleeve 9, the guide sleeve 10 and the connecting sleeve 3 form an oil pressure bin 11 or an exhaust bin, and the side wall of the connecting sleeve 3 is evenly distributed with oil pressure holes 4 or exhaust holes connected to the oil pressure bin 11 or the exhaust bin, and the guide sleeve 12 is sleeved on the diameter change part of the sliding sleeve 6;

[0039] The lower portion of the sliding sleeve 6 extends into the second connecting sleeve 7 . A lower stop sleeve 13 is sleeved on the bottom of the second connecting sleeve 7 . Shear pins 14 for fixing the lower stop sleeve 13 are arranged on the inner side wall of the second connecting sleeve 7 .

[0040] In the present embodiment, a guide sleeve and an oil pressure tank are arranged between the sliding sleeve 6 and the connecting outer sleeve 2. After the sliding sleeve is pressurized and moved downward once, a second pressurization is performed, so that the oil in the oil tank controls the movement speed of the sliding sleeve through the oil pressure hole. After the sliding sleeve moves down a certain distance, it hits the lower stopper sleeve and pressurizes three times to cut off the shear pins on the side wall of the lower stopper sleeve until the sliding sleeve is in a fully open position from a closed position. After multiple continuous pressurizations, fracturing operations can be performed.

[0041] In a preferred embodiment, anti-backoff teeth 8 are evenly distributed on the middle side wall of the sliding sleeve 6, and a toothed ring engaged with the anti-backoff teeth 8 is provided on the inner wall of the mounting sleeve 9. In this embodiment, by providing anti-backoff teeth 8 on the outer wall of the sliding sleeve 6, when a ball or a well plug is thrown into the cementing sliding sleeve to pressurize it, the sliding sleeve 6 in the cementing sliding sleeve moves downward, and at the same time, the anti-backoff teeth 8 are always engaged with the toothed ring limiting teeth, so as to avoid the sliding sleeve from shaking up and down when the connecting hole 5 is opened, thereby achieving the effect of rapid fracturing.

[0042] In a preferred embodiment, the top of the second connecting sleeve 7 is connected to the connecting sleeve 3 by a thread, and the mounting sleeve 9 is fixedly connected to the connection between the second connecting sleeve 7 and the connecting sleeve 3 by a positioning sleeve 10. This structure is advantageous in that the gear ring is fixed to the mounting sleeve 9. The mounting sleeve 9 is arranged in the connecting sleeve 3 near the second connecting sleeve 7, and the structure is compact and easy to process.

[0043] In a preferred embodiment, a gap is provided between the guide sleeve 12 and the inner wall of the connecting sleeve 3, which is connected to the oil pressure chamber 11 or the exhaust chamber and is used for draining oil or exhausting air. After the connecting hole of the sliding sleeve is opened, part of the oil is pressed out through the gap, which is convenient for secondary pressing.

[0044] In a preferred embodiment, the gear ring is provided with 3-4 rows of conical teeth engaging with the anti-backward teeth 8 .

[0045] In a preferred embodiment, a sealing member II16 for sealing with the inner wall of the second connecting sleeve is provided on the lower side wall of the sliding sleeve 6, and a positioning groove I17 and a positioning groove II18 for accommodating the sealing member II are provided on the inner wall of the second connecting sleeve 7. The positions of the positioning groove I17 and the positioning groove II18 correspond to the starting position of the guide sleeve 12 and the starting position of the sliding sleeve 6 colliding with the lower stop sleeve 13, respectively. This structure is conducive to sealing the sliding sleeve 6, ensuring the sealing inside the sliding sleeve, and is conducive to pressurizing the cementing by ball throwing, so that the pressure is increased to facilitate shearing of the shear pins and move the sliding sleeve downward.

[0046] In a preferred embodiment, the upper joint 1 and the connecting sleeve 3 as well as the lower joint 2 and the second connecting sleeve 7 are connected by threads and static sealing rings are provided at the connection points.

[0047] In a preferred embodiment, a sealing member I15 is provided at the connection between the second connecting sleeve 7 and the connecting sleeve 2.

[0048] In a preferred embodiment, sealing members 19 are provided between the connecting sleeve 2 and the sliding sleeve 6 on both sides of the connecting hole.

[0049] The present invention also discloses a fracturing method for a continuous pressure cementing sleeve, the steps of which are as follows:

[0050] 1) Connect the cementing sleeve with the completion casing according to the design requirements, then lower the connected cementing sleeve and completion casing into the well and inject cement to complete the well;

[0051] 2) Clearing and washing the wellbore;

[0052] 3) Pressure test of the wellbore;

[0053] 4) Drop the ball from the wellhead so that it reaches the ball seat on the cementing sleeve;

[0054] 5) After the ball is seated, the first pressure is applied to move the reducing diameter of the sliding sleeve to the guide sleeve;

[0055] 6) Perform a second pressure holding operation to make the guide sleeve and the sliding sleeve continue to move downward until the bottom of the sliding sleeve hits the lower stop sleeve;

[0056] 7) Carry out the third pressure holding to make the sliding sleeve cut off the shear pins on the side wall of the lower stopper sleeve until the connecting hole is fully opened;

[0057] 8) Fracturing the open cementing sleeve layer;

[0058] 9) After fracturing is completed, flowback is put into production.

[0059] In a preferred embodiment, in step 6), step 7) and step 8), the pressure of the three times of holding pressure is gradually increased, wherein the pressure of the first time of holding pressure is 1 / 4 to 1 / 3 of the pressure of the third time, and the pressure of the second time of holding pressure is 1 / 2 to 2 / 3 of the pressure of the third time. In this embodiment, through three times of pressing processes, a pressure of about 3MPa is used for driving when the sleeve initially moves. When the sleeve and the guide sleeve move and block the oil pressure hole, the hydraulic oil in the oil pressure tank forms a back pressure on the downward movement of the sleeve. It is necessary to increase the pressing pressure to make the sleeve continue to move downward. During the operation, it is necessary to increase the secondary pressure to 5-6MPa to make the sleeve overcome the pressure. The sliding sleeve moves downward under the back pressure, and the hydraulic oil in the oil pressure tank is discharged from the gap between the guide sleeve and the inner wall of the connecting sleeve through the oil pressure hole, and the moving speed of the sliding sleeve is controlled by the size of the oil pressure hole and the gap. When the sliding sleeve moves to the lower stop sleeve, it is necessary to cut off the shear nails on the side wall of the lower stop sleeve and perform the third pressure injection. The third pressure injection increases the pressure to 10MPa, which can make the sliding sleeve and the lower stop sleeve move downward together until the connecting hole is fully opened. This pressure injection method is conducive to low-pressure driving and step-by-step pressure injection. The pressure injection pressure and the moving speed of the sliding sleeve are controllable and stable, which is conducive to improving the sealing, construction reliability and stability of the cementing sliding sleeve.

[0060] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A fracturing method for a continuous pressure cementing sleeve, characterized in that: The cementing sleeve used in the invention comprises an upper joint, a lower joint and a connecting sleeve, one end of the connecting sleeve is connected to the upper joint, the other end of the connecting sleeve is connected to a second connecting sleeve, the second connecting sleeve is connected to the lower joint, the upper side wall of the connecting sleeve is circumferentially uniformly provided with connecting holes connected to the connecting sleeve, and the connecting sleeve is internally provided with a sleeve for closing or opening the connecting holes; The upper and middle parts of the sliding sleeve are sleeved with a mounting sleeve and a guide sleeve, and the sliding sleeve, the mounting sleeve, the guide sleeve and the connecting sleeve form an oil pressure bin or an exhaust bin, and the side wall of the connecting sleeve is evenly provided with oil pressure holes or exhaust holes connected with the oil pressure bin or the exhaust bin, and the guide sleeve is sleeved at the diameter change part of the sliding sleeve; The lower part of the sliding sleeve extends into the second connecting sleeve, the bottom of the second connecting sleeve is sleeved with a lower stop sleeve, and the inner side wall of the second connecting sleeve is provided with shear nails for fixing the lower stop sleeve; The cementing sleeve fracturing method has the following steps: 1) Connect the cementing sleeve with the completion casing according to the design requirements, then lower the connected cementing sleeve and completion casing into the well and inject cement to complete the well; 2) Clearing and washing the wellbore; 3) Pressure test of the wellbore; 4) Drop the ball from the wellhead so that it reaches the ball seat on the cementing sleeve; 5) After the ball is seated, the first pressure is applied to move the reducing diameter of the sliding sleeve to the guide sleeve; 6) Perform a second pressure holding operation to make the guide sleeve and the sliding sleeve continue to move downward until the bottom of the sliding sleeve hits the lower stop sleeve; 7) Carry out the third pressure holding to make the sliding sleeve cut off the shear pins on the side wall of the lower retaining sleeve until the connecting hole is fully opened; 8) Fracturing the open cementing sleeve layer; 9) After fracturing is completed, flowback is put into production; In step 5), step 6) and step 7), the three holding pressures are gradually increased, wherein the first holding pressure is 1 / 4 to 1 / 3 of the third holding pressure, and the second holding pressure is 1 / 2 to 2 / 3 of the third holding pressure.

2. The fracturing method of the continuous pressure cementing sleeve according to claim 1, characterized in that: Anti-backlash teeth are evenly distributed on the side wall of the middle part of the sliding sleeve, and a toothed ring engaged with the anti-backlash teeth is arranged on the inner wall of the mounting sleeve.

3. The fracturing method of the continuous pressure cementing sleeve according to claim 2, characterized in that: The top of the second connecting sleeve is connected to the connecting outer sleeve through threads, and the installation sleeve is fixedly connected to the connection between the second connecting sleeve and the connecting outer sleeve through a positioning sleeve.

4. The fracturing method of the continuous pressure cementing sleeve according to any one of claims 1 to 3, characterized in that: A gap is provided between the guide sleeve and the inner wall of the connecting sleeve, which is connected with the oil pressure bin or the exhaust bin and is used for draining oil or exhaust.

5. The fracturing method of the continuous pressure cementing sleeve according to claim 2, characterized in that: The gear ring is provided with 3-4 rows of conical teeth meshing with the anti-backward teeth.

6. The fracturing method of the continuous pressure cementing sleeve according to claim 4, characterized in that: A seal II for sealing with the inner wall of the second connecting sleeve is arranged on the lower side wall of the sliding sleeve, and a positioning groove I and a positioning groove II for accommodating the seal II are arranged on the inner wall of the second connecting sleeve. The positions of the positioning groove I and the positioning groove II correspond to the starting position of the guide sleeve movement and the starting position of the sliding sleeve hitting the lower stop sleeve respectively.

7. The fracturing method of the continuous pressure cementing sleeve according to claim 1, characterized in that: The upper joint and the connecting sleeve and the lower joint and the second connecting sleeve are connected by threads and static sealing rings are arranged at their connections. A sealing member I is arranged at the connection between the second connecting sleeve and the connecting sleeve, and sealing members are arranged on both sides of the connecting hole between the connecting sleeve and the sliding sleeve.

Citation Information

Patent Citations

  • Switchable well cementation sliding sleeve based on fracturing of separate layers and construction method thereof

    CN104612647A

  • Time-delay type fracturing channel construction method

    CN109025943A

  • Continuous pressing type well cementation sliding sleeve

    CN212535610U

  • Delayed well cementation sliding sleeve

    CN212898427U

  • Key fracturing well cementation sliding sleeve

    CN213331024U

Cited By

  • Ball-passing jet type well cementation fracturing sliding sleeve

    CN223469252U