A method for predicting power grid load

By combining the POMDP and OMP algorithms, the accuracy and calculation speed of nonlinear problems in power grid load forecasting are solved, fast and accurate load inspection and short-term forecasting are achieved, the wind curtailment rate is reduced, and the power grid operation is optimized.

CN112101663BActive Publication Date: 2024-10-29STATE GRID LIAONING ELECTRIC POWER CO LTD +2
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202010975702.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-16
Publication Date
2024-10-29
Estimated Expiration
2040-09-16

AI Technical Summary

Technical Problem

Existing power grid load forecasting methods are not very accurate when dealing with nonlinear problems, and the calculation speed of classic forecasting methods is slow. Modern methods have a large amount of calculations, making it difficult to achieve fast and accurate load inspection and short-term forecasting.

Method used

Partially Observable Markov Decision Process (POMDP) ​​and Orthogonal Matching Tracking Algorithm (OMP) are used to establish a mathematical model, classify and short-term the power grid load, and generate a day-ahead load analysis report.

Benefits of technology

It achieves accurate modeling and short-term prediction of nonlinear loads, reduces the wind curtailment rate, and improves the economic operation efficiency of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0002685716460000022
    Figure BDA0002685716460000022
  • Figure BDA0002685716460000023
    Figure BDA0002685716460000023
  • Figure BDA0002685716460000024
    Figure BDA0002685716460000024
Patent Text Reader

Abstract

A power grid load forecasting method involves a study of a power grid load verification and forecasting strategy based on big data and partially observable Markov decision processes. It is based on the historical load data collected by the power grid data center, and considers the classification of load types: such as valley load and transferable load. It takes the partially observable Markov decision process as the objective function, combines the orthogonal matching tracking algorithm, establishes a mathematical model, and performs current load analysis, verification, and short-term load forecasting to generate a day-ahead load analysis report. This study enables power grid load verification and short-term power grid load forecasting to be realized. The dispatching center can verify the collected load data and effectively dispatch some controllable loads on the day-ahead according to the results, thereby achieving optimal economic operation of users and power grids.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a research on a power grid load inspection and prediction strategy based on big data and partially observable Markov decision process. Background Art

[0002] With the continuous development of the new energy industry, the proportion of new energy in the power grid has increased year by year. Large-scale new energy ground power stations, mainly based on wind and solar, are mainly concentrated in the northwest region (mainly including Gansu, Ningxia, Xinjiang and western Inner Mongolia). However, due to the limited local absorption capacity and the lack of sufficient power transmission channels, while the installed capacity has grown rapidly in the past few years, the situation of abandoned photovoltaic power generation and power rationing has worsened year by year. In 2015, photovoltaic power generation in most parts of the country was in good operation, with an average annual utilization of about 1,133 hours. In contrast, the average utilization hours in the power-restricted areas in the northwest did not reach the national average. The average utilization hours in Gansu and Xinjiang Autonomous Regions were only 1,061 hours and 1,042 hours throughout the year, and the abandonment rates were as high as 31% and 26%. In the first quarter of 2016, the degree of abandoned photovoltaic power generation further intensified. Among the 1.9 billion kWh of abandoned photovoltaic power generation in the first quarter of the country, Ningxia, Xinjiang and Gansu provinces abandoned photovoltaic power generation of 1.8 billion kWh, accounting for nearly 95% of the total abandoned photovoltaic power generation. Among them, Xinjiang and Gansu abandoned photovoltaic power generation accounting for 40% and 44% of the national total, respectively, and the abandonment rates were as high as 52% and 39%. As of the end of 2016, the installed capacity of renewable energy power generation in Liaoning Province increased by 917,000 kilowatts, and the total installed capacity exceeded the 10 million kilowatt mark (10.482 million kilowatts); the net increase in renewable energy power generation was 4.4 billion kilowatt-hours, and the total power generation was close to 20 billion kilowatt-hours (19.49 billion kilowatt-hours). Both indicators exceeded expectations. Although the proportion of wind power abandonment in the province is lower than that of the previous year, the abandonment problem is still the main problem facing the current large-scale new energy grid connection. The grid load inspection and forecasting includes modeling the system based on the user's historical electricity consumption data, and effectively analyzing the user's electricity consumption behavior according to the model. It can effectively inspect the user's electricity consumption behavior, the amount of electricity consumption, and whether there is electricity theft and leakage, and simulate the future short-term electricity load according to the model to form a day-ahead report, so as to prepare for the power grid dispatch in advance, thereby optimizing the grid operation and maximizing economic benefits.

[0003] Since the user's electricity consumption behavior follows certain rules, the key to load forecasting lies in the accurate collection of a large amount of historical data and the establishment of scientific and effective models and algorithms to reflect the law of load changes. The current forecasting methods can be roughly divided into two categories: classical forecasting methods and modern forecasting methods.

[0004] Classic forecasting methods: including trend extrapolation, time series method, regression analysis, etc. The advantages of the classic forecasting method are mature methods, simple algorithms, and rapid processing of large amounts of data in the power grid. However, the traditional method uses a linear model, so when encountering nonlinear problems, the accuracy will be greatly reduced.

[0005] In the late 1980s, with the rapid development of computers, grey theory and neural networks were widely used, and new modern load forecasting methods were also widely studied, including grey mathematical theory, expert system, neural network theory and fuzzy load forecasting. The advantages of modern load forecasting methods are high accuracy and freedom from linear and nonlinear model restrictions. The disadvantages are large amount of calculation and too long time for a large number of short-term load forecasts.

[0006] The present invention adopts a partially observable Markov decision process (POMDP) ​​and an orthogonal matching pursuit algorithm (OMP) to realize modeling of nonlinear loads, thereby realizing fast and accurate load inspection, classification and short-term load forecasting. Summary of the invention

[0007] In view of the shortcomings of the prior art, the present invention relates to a power grid load verification and prediction strategy based on the Markov decision process. It is based on the historical load data collected by the power grid data center, and takes into account the classification of load types: such as valley load and transferable load. It uses a partially observable Markov decision process as the objective function, combined with the orthogonal matching tracking algorithm, to establish a mathematical model and perform current load analysis, verification and short-term load forecasting, and generate a day-ahead load analysis report. This research enables power grid load verification and short-term power grid load forecasting to be realized. The dispatching center can verify the collected load data and effectively dispatch some controllable loads on the day-ahead according to the results, thereby achieving optimal economic operation of users and power grids.

[0008] The purpose of the present invention is to combine OMP modeling with the problem of low accuracy of calculation results of nonlinear load models compared with classical prediction methods, so as to perform more accurate modeling and analysis of load type analysis, load verification and short-term load forecasting (one to two days) of nonlinear loads.

[0009] To achieve the above object, the present invention adopts the following technical solution:

[0010] A grid load inspection and prediction strategy based on big data and partially observable Markov decision process, its steps are:

[0011] 1) Data extraction

[0012] The load curve of the power grid load to be analyzed is extracted and preliminarily classified, with the first step of classification being based on power size: users with power less than or equal to 50kW are medium-power users, users with power greater than 50kW and less than or equal to 100kW are high-power users, and users with power greater than 100kW are ultra-high-power users.

[0013] 2) Establish the objective function

[0014] According to the first step, the same type of user data extracted from the classification results is used to establish a power grid load model based on partially observable Markov decision process and orthogonal matching pursuit algorithm:

[0015] Propose the target user load s and estimate a series of other loads in the same group, formula (1)

[0016]

[0017] x k is the target load curve, k is the user load number, x k is the user load curve;

[0018] Make formula (2) minimum, and f is a linear function

[0019]

[0020] Find x i The maximum correlation r under user load s is as follows:

[0021]

[0022] x i It is to select the user target load;

[0023] Calculation formula (4)

[0024]

[0025] α is the proportionality coefficient;

[0026] Calculation formula (5)

[0027] res=sx i α i (5)

[0028] res is the residual value;

[0029] After the result is calculated, set the result of formula (5) as the new s value and repeat the steps of formula (2), (3), (4) and (5).

[0030] When f is a nonlinear function, the basic functions g1, g2, ..., g are created for each load in formula (1).m , the orthogonal matching pursuit algorithm is used to perform linear regression calculation on the nonlinear basis function, as shown in formula (6)

[0031]

[0032] Empirical Mode Decomposition (EMD) is used for s, and the s curve is divided into segmented maximum and minimum points to form curves, and then the average of the maximum and minimum values ​​is taken to form the intrinsic mode function 1. The above decomposition is performed on the intrinsic mode function 1 to form the intrinsic mode function 2. The above steps are repeated to form the intrinsic mode functions 3, 4, 5, etc. And the intrinsic mode functions 1, 2, 3, 4, 5... are used as basic functions.

[0033] Each load X k The respective intrinsic mode functions 1 are taken as the first set of data. The first nonlinear basis function g1 is calculated by the OMP algorithm using this set of data. The formulas are as follows (7) and (8):

[0034]

[0035]

[0036] Using this method, we can calculate the values ​​of other basic functions (g1, g2, ..., g m )

[0037] The load forecast curve generated by the POMDP method can be compared with the target actual load curve to check whether there is any abnormal power consumption behavior of the target load.

[0038] 3) Short-term load forecasting

[0039] Based on the historical data of 100 days as a data window, the established load model is used to predict the power grid user load one to two days after the window, and the data in the window is updated according to the actual data of the prediction results, thereby realizing short-term power grid user load prediction.

[0040] 4) Load classification

[0041] Taking the data sampling period of 5 minutes as an example, a user load curve is formed. When the user load power is less than 2 times or more than the average load power of the same group in 6 or more consecutive sampling periods, or the load power is greater than or equal to 5 times or more of the average load, this load is classified as valley load.

[0042] Taking the data sampling period of 5 minutes as an example, a user load curve is formed. When the growth rate of the user load value P1 and the load value P0 of the previous cycle is as shown in formula (9):

[0043]

[0044] When the growth rate R is greater than or equal to 0.2 or less than or equal to -0.2, it is defined as a transferable load starting or stopping. The load that increases or decreases during this time period is defined as a transferable load.

[0045] The beneficial effects of the present invention are:

[0046] 1. A new short-term power grid load forecasting method is proposed, which not only has the advantages of classical forecasting methods, but also has small algorithm calculation amount and high accuracy.

[0047] After a large amount of load data is quickly pre-classified, the load types are distinguished, which is convenient for the classification management of user loads and the formation and prediction of day-ahead reports by the power grid dispatching center. This is conducive to the economic optimization of the power grid and reduces the wind curtailment rate. DETAILED DESCRIPTION

[0048] A grid load inspection and prediction strategy based on big data and partially observable Markov decision process, its steps are:

[0049] 1) Data extraction

[0050] The load curve of the power grid load to be analyzed is extracted and preliminarily classified, with the first step of classification being based on power size: users with power less than or equal to 50kW are medium-power users, users with power greater than 50kW and less than or equal to 100kW are high-power users, and users with power greater than 100kW are ultra-high-power users.

[0051] 2) Establish the objective function

[0052] According to the first step, the same type of user data extracted from the classification results is used to establish a power grid load model based on partially observable Markov decision process and orthogonal matching pursuit algorithm:

[0053] Propose the target user load s and estimate a series of other loads in the same group, formula (1)

[0054]

[0055] X k is the target load curve, k is the user load number, x k is the user load curve;

[0056] Make formula (2) minimum, and f is a linear function

[0057]

[0058] Find x i The maximum correlation r under user load s is as follows:

[0059]

[0060] x i It is to select the user target load;

[0061] Calculation formula (4)

[0062]

[0063] α is the proportionality coefficient;

[0064] Calculation formula (5)

[0065] res=sx i α i (5)

[0066] res is the residual value;

[0067] After the result is calculated, set the result of formula (5) as the new s value and repeat the steps of formula (2), (3), (4) and (5).

[0068] When f is a nonlinear function, the basic functions g1, g2, ..., g are created for each load in formula (1). m , the orthogonal matching pursuit algorithm is used to perform linear regression calculation on the nonlinear basis function, as shown in formula (6)

[0069]

[0070] Empirical Mode Decomposition (EMD) is used for s, and the s curve is divided into segmented maximum and minimum points to form curves, and then the average of the maximum and minimum values ​​is taken to form the intrinsic mode function 1. The above decomposition is performed on the intrinsic mode function 1 to form the intrinsic mode function 2. The above steps are repeated to form the intrinsic mode functions 3, 4, 5, etc. And the intrinsic mode functions 1, 2, 3, 4, 5... are used as basic functions.

[0071] Each load X k The respective intrinsic mode functions 1 are taken as the first set of data. The first nonlinear basis function g1 is calculated by the OMP algorithm using this set of data. The formulas are as follows (7) and (8):

[0072]

[0073]

[0074] Using this method, we can calculate the values ​​of other basic functions (g1, g2, ..., g m )

[0075] The load forecast curve generated by the POMDP method can be compared with the target actual load curve to check whether there is any abnormal power consumption behavior of the target load.

[0076] 3) Short-term load forecasting

[0077] Based on the historical data of 100 days as a data window, the established load model is used to predict the power grid user load one to two days after the window, and the data in the window is updated according to the actual data of the prediction results, thereby realizing short-term power grid user load prediction.

[0078] 4) Load classification

[0079] Taking the data sampling period of 5 minutes as an example, a user load curve is formed. When the user load power is less than 2 times or more than the average load power of the same group in 6 or more consecutive sampling periods, or the load power is greater than or equal to 5 times or more of the average load, this load is classified as valley load.

[0080] Taking the data sampling period of 5 minutes as an example, a user load curve is formed. When the growth rate of the user load value P1 and the load value P0 of the previous cycle is as shown in formula (9):

[0081]

[0082] When the growth rate R is greater than or equal to 0.2 or less than or equal to -0.2, it is defined as a transferable load starting or stopping. The load that increases or decreases during this time period is defined as a transferable load.

Claims

1. A method for predicting power grid load, It is characterized in that The following steps are involved: 1) Data extraction Extract the load curve of the power grid load to be analyzed, and perform preliminary classification on it. The first step of classification is based on power size: power less than or equal to 50kW is medium-power users, power greater than 50kW and less than or equal to 100kW is high-power users, and power greater than 100kW is ultra-high-power users; 2) Establish the objective function According to the first step, the same type of user data extracted from the classification results is used to establish a power grid load model based on partially observable Markov decision process and orthogonal matching pursuit algorithm: Propose the target user load s and estimate a series of other loads in the same group, formula (1) X k is the target load curve, k is the user load number, X k User load curve; Make formula (2) minimum, and f is a linear function Find X 1 The maximum correlation r under user load s is as follows: x i It is to select the user target load; Calculation formula (4) α is the proportionality coefficient; Calculation formula (5) res=sx i ·a i (5) res is the residual value; After the result is calculated, set the result of formula (5) as the new s value and repeat steps (2), (3), (4) and (5); When f is a nonlinear function, a basic function g is created for each load in formula (1): 1 , g 2 , ..., g m , the orthogonal matching pursuit algorithm is used to perform linear regression calculation on the nonlinear basis function, as shown in formula (6) Empirical Mode Decomposition (EMD) is used for s. The s curve is divided into segmented maximum and minimum points to form curves. Then, the average of the maximum and minimum values ​​is taken to form the intrinsic mode function 1. The above decomposition is performed on the intrinsic mode function 1 to form the intrinsic mode function 2. The above steps are repeated to form the intrinsic mode functions 3, 4, and 5. The intrinsic mode functions 1, 2, 3, 4, and 5 are used as basic functions. Each load X k The respective intrinsic mode functions 1 are used as the first set of data, and the first nonlinear basis function g is calculated by the OMP algorithm. 1 , the formulas are as follows (7) and (8): Using this method, calculate the other basic function values ​​g respectively 2 , ..., g 5 ; The load forecast curve generated by the POMDP method can be compared with the target actual load curve to check whether the target load has abnormal power consumption behavior; 3) Short-term load forecasting Based on the historical data of 100 days as a data window, the established load model is used to predict the power grid user load one to two days after the window, and the data in the window is updated according to the actual data of the prediction results, so as to realize the short-term power grid user load prediction; 4) Load classification Taking the data sampling period of 5 minutes as an example, a user load curve is formed; when the user load power is less than 2 times or more of the average load power of the same group in 6 consecutive sampling periods or more, or the load power is greater than or equal to 5 times or more of the average load, this load is classified as valley load; Taking the data sampling period of 5 minutes as an example, a user load curve is formed; when the user load value P 1 Compared with the load value P of the previous cycle 0 The growth rate is as follows: When the growth rate R is greater than or equal to 0.2 or less than or equal to -0.2, it is defined as a transferable load starting or stopping; the load that increases or decreases during this time period is defined as a transferable load.

Citation Information

Cited By

  • Power grid load prediction method and system based on large model

    CN120806292A

  • A power grid load prediction method and system based on a large model

    CN120806292B

  • Zone area load prediction system based on multi-factor model game

    CN121840575A