Cement conveying device

By designing a cement conveying device with a high-stiff bucket base plate and an open hopper mechanism, combined with a vibrator and a screw conveyor, the problems of low efficiency and easy pipe blockage of existing cement conveying equipment are solved, and fast, safe and environmentally friendly cement conveying is achieved. , improve construction efficiency and equipment stability.

CN112112430BActive Publication Date: 2024-12-03ZHEJIANG YIZU MASCH EQUIP MFG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011165458.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-27
Publication Date
2024-12-03
Estimated Expiration
2040-10-27

AI Technical Summary

Technical Problem

In pile foundation construction, existing cement conveying equipment has problems such as low cement conveying efficiency, long time to enter the cabin, uneven material separation, large dust and easy pipe blockage, which affects construction efficiency and quality.

Method used

A cement conveying device is designed, including upper and lower cement siloes, upper and lower conveyors, vertical conveyors, feed pipes, recycling siloes and control systems. It adopts a high-stiff bucket bottom plate structure and an openable hopper mechanism, combined with a vibrator and screw conveyors to achieve rapid, safe and even conveying of powder cement, and adjust the conveying volume through the control system to avoid backlog and retention.

Benefits of technology

It improves cement conveying efficiency, ensures the stability and safety of construction, saves construction site space, meets transportation requirements, and realizes environmental protection and efficient operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112112430B_ABST
    Figure CN112112430B_ABST
Patent Text Reader

Abstract

A cement conveying device includes upper and lower cement silos, upper and lower conveyors, a vertical conveyor, upper and lower silo feed pipes, a recovery silo, a plurality of vibrators and a control system; the upper cement silo is stacked on the lower cement silo; the upper and lower silo hoppers are respectively arranged at the lower part of the upper and lower silo bodies along the length direction of the upper and lower cement silos; the upper and lower hopper opening mechanisms are respectively arranged at the bottom of the inner cavity of the upper and lower silo hoppers; the upper and lower conveyors are respectively fixed at the bottom of the upper and lower silo hoppers; the vertical conveyor is arranged on the right side of the upper and lower cement silos; and the vibrator is arranged at the bottom of the outer wall of the upper and lower silo hoppers. The present invention realizes the separate conveying and discharging of the upper and lower cement silos by superimposing the cement silos, which is convenient for the flow and transportation of cement in the silos; the upper and lower hopper opening mechanisms can facilitate maintenance; the control system realizes the control of the powder cement conveying amount to avoid cement backlog and retention. The present invention has the characteristics of high construction efficiency, good stability, saving construction site space and meeting transportation requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cement conveying equipment, in particular to a cement conveying device suitable for a mud making and supplying system in pile foundation construction. Background Art

[0002] At present, with the continuous expansion of national infrastructure projects, cement soil mixing piles, SMW method piles (i.e. cement soil mixing pile walls), TRD method piles (i.e. underground continuous walls of equal thickness) and DCM method (i.e. deep cement mixing method) have been widely used and promoted in pile foundation construction and foundation improvement and reinforcement. In pile foundation construction and foundation treatment, slurry making and cement conveying and mixing devices are involved. At present, there are common technical defects such as low cement conveying efficiency and long cement entry time, which directly affect the operation efficiency and construction progress of pile foundation construction. The existing cement tank structure has the risks of uneven material distribution, large cement dust and easy pipe clogging, which causes cement output delay and affects the quality and operation efficiency of pile foundation construction. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides a cement conveying device, which can quickly unload the powdered cement in the bulk cement tank truck into the cement silo in a fast, safe and environmentally friendly manner. The upper and lower cement silos are provided with a bucket bottom plate structure with high rigidity to facilitate the flow and transportation of cement in the silo. The gate opening mechanism of the upper and lower cement silo hoppers is convenient for the maintenance, inspection and maintenance of the conveyor below. The control system realizes the powdered cement pumping into the silo and the screw conveying volume control to avoid cement backlog. The present invention has the characteristics of high construction efficiency, good stability, saving construction site space and meeting transportation requirements. In addition, the stacked cement silos effectively save construction site space and avoid the cement silos being unable to meet road transportation requirements due to excessive height.

[0004] The technical solution adopted by the present invention to solve its technical problem is:

[0005] A cement conveying device comprises an upper cement silo, a lower cement silo, an upper conveyor, a lower conveyor, a vertical conveyor, an upper silo feed pipe, a lower silo feed pipe, a recovery silo, a plurality of vibrators and a control system, wherein:

[0006] The upper cement silo includes an upper silo body, a plurality of upper silo hoppers with upper silo opening mechanisms, an upper silo bottom plate with a plurality of first support plates, a first rib plate, a first silo plate groove, and an upper silo discharge port; wherein the upper silo opening mechanism includes a first gate plate, a first push-pull rod, a first seat tube, and a first connecting rod;

[0007] The lower cement silo includes a lower silo body, a plurality of lower silo opening mechanisms, a lower silo bottom plate having a plurality of second support plates, a second rib plate, a second silo plate groove, and a lower silo discharge port; wherein the lower silo opening mechanism includes a second gate plate, a second push-pull rod, a second seat tube, and a second connecting rod;

[0008] The upper conveyor comprises an upper barrel having a plurality of upper barrel feed openings and upper barrel discharge openings, an upper screw and a driving device fixedly mounted at the end of the upper screw;

[0009] The lower conveyor comprises a lower barrel having a plurality of lower barrel feed ports and a lower barrel flange, a lower screw and a driving device fixedly mounted on the end of the lower screw;

[0010] The vertical conveyor includes a straight cylinder with a butt flange, a large screw and a driving device fixed to the end of the large screw;

[0011] The recovery silo includes a first recovery pipe, a second recovery pipe and an outlet flange;

[0012] Features:

[0013] The upper cement silo and the lower cement silo are both rectangular box structures, and the upper cement silo is stacked on the upper part of the lower cement silo;

[0014] The upper hopper is in the shape of a four-sided cone and is arranged in a straight line at the lower part of the upper hopper body along the length direction of the upper cement hopper; the upper hopper bottom plate of the upper hopper is a symmetrical angular component, the long sides of which are respectively welded to the front and rear inner walls of the upper hopper, and the short sides are respectively welded to the left and right inner walls of the upper hopper; the first hopper plate grooves are symmetrically arranged on the two side surfaces of the upper hopper bottom plate along the length direction; the first rib plates are arranged at intervals at the top corners of the upper hopper bottom plate along the length direction; the first support plates are arranged at intervals on the inner side surface of the upper hopper bottom plate along the length direction, and the other end is connected to the front and rear inner walls of the upper hopper The inner sides of the two wall plates are welded; the first gate plates of the upper bucket opening mechanism are respectively arranged on the two side surfaces of the upper bucket bottom plate; the first push-pull rods are arranged in two along the length direction of the first gate plate; the first seat tube is arranged in two along the length direction of the upper warehouse hopper on the outer sides of the two front and rear wall plates thereof; one end of the first push-pull rod passes through the through hole of the first seat tube and the first wall hole of the upper warehouse hopper respectively and is fixedly mounted with the first gate plate; the first connecting rod is fixedly mounted on the extended ends of the two first push-pull rods and connects them together; the upper warehouse discharge port is arranged at the lower part of the upper warehouse hopper, and its outer end surface is rectangular;

[0015] The lower bin hopper is in the shape of a four-sided cone and is arranged in a straight line at the lower part of the lower bin body along the length direction of the lower cement bin; the lower hopper bottom plate of the lower bin hopper is a symmetrical angular component, the long sides of which are respectively welded to the front and rear inner walls of the lower bin hopper, and the short sides are respectively welded to the left and right inner walls of the lower bin hopper; the second hopper plate grooves are symmetrically arranged on the two side surfaces of the lower hopper bottom plate along the length direction; the second rib plates are arranged at intervals at the top corners of the lower hopper bottom plate along the length direction; the second support plates are arranged at intervals on the inner side surface of the lower hopper bottom plate along the length direction, and the other end is connected to the front and rear inner walls of the lower bin hopper. The inner sides of the two wall plates are welded; the second gate plates of the lower bucket opening mechanism are respectively arranged on the two side surfaces of the lower bucket bottom plate; the second push-pull rods are arranged in two along the length direction of the second gate plate; the second seat tubes are arranged in two along the length direction of the lower bin hopper on the outer sides of the two front and rear wall plates thereof; one end of the second push-pull rod passes through the through hole of the second seat tube and the second wall hole of the lower bin hopper respectively and is fixedly mounted with the second gate plate; the second connecting rod is fixedly mounted on the protruding ends of the two second push-pull rods to connect them together; the lower bin discharge port is arranged at the lower part of the lower bin hopper, and its outer end surface is rectangular;

[0016] The upper conveyor is arranged below the upper warehouse hopper along the length direction of the upper cement silo; the upper barrel feed port of the upper barrel body is arranged at intervals on the upper arc surface of the outer wall of the upper barrel body in a manner that the same distance is between each upper warehouse discharge port of the upper warehouse hopper, and the upper barrel feed port has a rectangular outer end surface adapted to the upper warehouse discharge port, so that a sealing gasket is arranged between the upper warehouse discharge port and the upper barrel feed port and is fastened and connected with each upper warehouse discharge port of the upper warehouse hopper by bolts; the upper barrel discharge port of the upper barrel body is arranged at intervals on the lower arc surface of its outer wall along its axial direction, and is connected to the upper cover plate of the lower cement silo 2 after installing a discharge valve on its outer end surface; connected to the upper cover plate of the lower cement silo; the upper screw is installed and supported on the inner cavity of the upper barrel body, and one end of the upper screw passes through the upper barrel body and is fixedly equipped with a driving device, and during the rotation process, the powdered cement is transported to each upper barrel discharge port and then unloaded into the inner cavity of the lower warehouse body of the lower cement silo;

[0017] The lower conveyor is arranged below the lower bin hopper along the length direction of the lower cement bin; the lower barrel feed port of the lower barrel body is arranged on the upper arc surface of the outer wall of the lower barrel body in a manner that the distance is the same as that between the various lower bin discharge ports of the lower bin hopper; the lower barrel feed port has a rectangular outer end surface adapted to the lower bin discharge port, so that a sealing gasket is arranged between the lower bin discharge port and the lower barrel feed port, and is fixedly connected with the various lower bin discharge ports of the lower bin hopper through bolts; the lower barrel flange of the lower barrel body is arranged on the upper arc surface of the lower barrel body, and is located at one end of the driving device of the lower conveyor; one end of the lower barrel body is sealed and connected with the docking flange of the straight barrel body of the vertical conveyor; the lower screw is installed and supported on the inner cavity of the lower barrel body, and one end of the lower screw passes through the lower barrel body and is fixedly connected with the driving device, so that the powdered cement is transported into the straight barrel body of the vertical conveyor during rotation;

[0018] The vertical conveyor is arranged on the right side of the upper cement silo and the lower cement silo, and is supported by the bottom end surface of the straight cylinder; the straight cylinder discharge port of the straight cylinder is connected to the external mixing barrel; the large screw is installed and supported in the inner cavity of the straight cylinder, and the upper end thereof passes through the straight cylinder and is fixedly equipped with a driving device, and during the rotation process, the powdered cement from the lower cylinder is conveyed to the straight cylinder discharge port and then unloaded into the external mixing barrel;

[0019] One end of the upper silo feed pipe is connected to an external powdered cement pumping device, arranged along the left side of the upper cement silo, and then enters the upper silo body of the upper cement silo and is arranged close to the inner wall of the upper cover plate, and a plurality of discharge ports are provided above the inner cavity of the upper silo body;

[0020] One end of the lower silo feed pipe is connected to an external powdered cement pumping device, arranged along the left side of the lower cement silo, and then enters the lower silo body of the lower cement silo and is arranged close to the inner wall of the upper cover plate, and a plurality of discharge ports are provided above the inner cavity of the lower silo body;

[0021] The recovery silo is arranged on the left side of the upper cement silo and the lower cement silo; the recovery silo is connected with the upper cement silo and the lower cement silo through the first recovery pipe and the second recovery pipe respectively; the outlet flange of the recovery silo is fixedly mounted on the lower cylinder flange end face of the lower cylinder body after installing a valve;

[0022] The vibrator is arranged at the bottom of the outer wall of the upper hopper of the upper cement silo and the lower hopper of the lower cement silo;

[0023] The control system operates and controls the powder cement pumping feeding in the upper cement silo and the lower cement silo, the operation states of the upper conveyor, the lower conveyor, the vertical conveyor and the vibrator.

[0024] The present invention may be that a first sealing ring is provided in the first wall countersunk hole at the end of the first wall hole connected to the first seat tube by the front and rear wall plates of the upper bin hopper, and the sealing ring is fixed by screws; a second sealing ring is provided in the second wall countersunk hole at the end of the second wall hole connected to the second seat tube by the front and rear wall plates of the lower bin hopper, and the sealing ring is fixed by screws.

[0025] The present invention may also be that the upper bucket opening mechanism First The push-pull rod is provided with a first pin hole and a second pin hole, and the first seat cylinder is provided with a first locking hole; the lower bucket opening mechanism Second The push-pull rod is provided with a third pin hole and a fourth pin hole, and the second seat cylinder is provided with a second locking hole.

[0026] The present invention may also be that the upper screw of the upper conveyor, the lower screw of the lower conveyor and the large screw of the vertical conveyor are all double-headed screws, wherein the pitch of the upper screw and the lower screw are equal, and the pitch of the large screw is 1.5-2 times that of the upper screw and the lower screw. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The cement conveying device of the present invention is further described below in conjunction with the accompanying drawings and embodiments:

[0028] Figure 1 It is a structural schematic diagram of the cement conveying device of the present invention;

[0029] Figure 2 yes Figure 1 A top view of

[0030] Figure 3 yes Figure 1 Left view of

[0031] Figure 4 yes Figure 2 Part of the AA section view;

[0032] Figure 5 yes Figure 2 Part of the BB section view;

[0033] Figure 6 yes Figure 2 A partial enlarged view of the middle E part;

[0034] Figure 7 yes Figure 2 A partial enlarged view of the middle F part;

[0035] Figure 8 yes Figure 6 A partial enlarged view of the middle A part;

[0036] Fig. 9 yes Figure 7 Partial enlargement of the middle B

[0037] Fig.10 It is a structural schematic diagram of the upper conveyor in the present invention;

[0038] Fig.11 yes Fig.10 A top view of

[0039] Fig.12 It is a structural schematic diagram of the lower conveyor in the present invention;

[0040] Fig.13 yes Fig.12 Top view of the . DETAILED DESCRIPTION

[0041] like Figure 1-13As shown, a cement conveying device includes an upper cement silo 1, a lower cement silo 2, an upper conveyor 3, a lower conveyor 4, a vertical conveyor 5, an upper silo feed pipe 6, a lower silo feed pipe 7, a recovery silo 8, a plurality of vibrators 9 and a control system; the upper cement silo 1 includes an upper silo body 11, a plurality of upper silo bottom plates 16 with upper silo opening mechanisms 13, a plurality of first support plates 161, a first rib plate 162, and a first silo plate groove 163, and an upper silo discharge port 14. The upper silo opening mechanism 13 includes a first gate plate 131, a first push-pull rod 132, a first seat tube 133 and a first connecting rod 134; the lower cement silo 2 includes a lower silo body 21, a plurality of lower silo opening mechanisms 23, a plurality of second support plates 261, a second rib plate 262, a second silo plate groove 163, and an upper silo discharge port 14. The lower bucket bottom plate 26 of 263 and the lower bin hopper 22 of the lower bin discharge port 24, the lower bucket opening mechanism 23 includes a second gate plate 231, a second push-pull rod 232, a second seat tube 233 and a second connecting rod 234; the upper conveyor 3 includes an upper barrel 30 with multiple upper barrel feed ports 301 and upper barrel discharge ports 302, an upper screw 31 and a driving device fixed to the end of the upper screw; the lower conveyor 4 includes a lower barrel 40 with multiple lower barrel feed ports 401 and a lower barrel flange 402, a lower screw 41 and a driving device fixed to the end of the lower screw; the vertical conveyor 5 includes a straight barrel 50 with a docking flange 501, a large screw 51 and a driving device fixed to the end of the large screw; the recovery bin 8 includes a first recovery pipe 81, a second recovery pipe 82 and an outlet flange 83; wherein:

[0042] The upper cement silo 1 and the lower cement silo 2 are both rectangular box structures, and the upper cement silo 1 is stacked on the upper part of the lower cement silo 2. The upper cement silo is used as a spare storage silo for bulk cement. When the bulk cement truck unloads to the cement silo, after the lower cement silo is fully pumped with powdered cement, the excess powdered cement in the bulk cement truck can continue to be pumped to the upper cement silo. The upper cement silo is stacked on top of the lower cement silo, which can effectively save construction site space and avoid the cement silo being unable to meet road transportation requirements due to excessive height.

[0043] The upper hopper 12 is in the shape of a four-sided cone and is arranged in a straight line at the lower part of the upper silo body 11 along the length direction of the upper cement silo 1; the upper hopper bottom plate 16 of the upper hopper 12 is a symmetrical angular component, and its long sides are respectively welded to the front and rear inner walls of the upper hopper 12, and its short sides are respectively welded to the left and right inner walls of the upper hopper 12; the first hopper plate grooves 163 are symmetrically arranged on its two side surfaces along the length direction of the upper hopper bottom plate 16; the first rib plates 162 are arranged at intervals at its top corners along the length direction of the upper hopper bottom plate 16; the first support plates 161 are arranged at intervals on its inner side surface along the length direction of the upper hopper bottom plate 16, and the other end is welded to the inner sides of the front and rear wall panels of the upper hopper 12; in this way, the rigidity and strength of the upper hopper bottom plate are effectively improved, thereby further improving the service life of the upper hopper. The first gate plate 131 of the upper bucket opening mechanism 13 is respectively arranged on the two side surfaces of the upper bucket bottom plate 16; the first push-pull rod 132 is arranged at two ends along the length direction of the first gate plate 131; the first seat tube 133 is arranged at two ends along the length direction of the upper warehouse hopper 12 on the outer sides of its front and rear wall panels; the first wall countersunk hole 1231 at the end of the first wall hole 123 of the front and rear wall panels of the upper warehouse hopper 12 communicating with the first seat tube 133 is provided with a first sealing ring 128, which is fixed by screws; in this way, the powder cement in the upper warehouse hopper is effectively prevented from falling out of the through hole of the first seat tube. One end of the first push-pull rod 132 passes through the through hole of the first seat tube 133 and the first wall hole 123 of the upper hopper 12 respectively, and then is fixed to the first gate plate 131; the first push-pull rod 132 of the upper hopper opening mechanism 13 is provided with a first pin hole 1321 and a second pin hole 1322, and the first seat tube 133 is provided with a first locking hole 1331; in this way, the movement stroke of the push-pull rod in the seat tube through hole can be controlled to ensure the effective closing and opening of the gate plate. The first connecting rod 134 is fixed to the protruding ends of the two first push-pull rods 132 and connects them together; in this way, the two first push-pull rods can achieve synchronous pushing and pulling of the first gate plate, effectively ensuring the smooth opening and closing of the upper hopper opening mechanism, which is conducive to the stable operation of the equipment. The upper hopper discharge port 14 is arranged at the lower part of the upper hopper 12, and its outer end face is rectangular; in this way, it effectively ensures docking with the upper tube feed port of the upper conveyor located below it.

[0044] The lower bin hopper 22 is in the shape of a four-sided cone and is arranged in a straight line at the lower part of the lower bin body 21 along the length direction of the lower cement bin 2; the lower hopper bottom plate 26 of the lower bin hopper 22 is a symmetrical angular component, and its long sides are respectively welded to the front and rear inner walls of the lower bin hopper 22, and its short sides are respectively welded to the left and right inner walls of the lower bin hopper 22; the second hopper plate grooves 263 are symmetrically arranged on its two side surfaces along the length direction of the lower hopper bottom plate 26; the second rib plates 262 are arranged at intervals at its top corners along the length direction of the lower hopper bottom plate 26; the second support plates 261 are arranged at intervals on its inner side surface along the length direction of the lower hopper bottom plate 26, and the other end is welded to the inner sides of the front and rear wall panels of the lower bin hopper 22; in this way, the rigidity and strength of the lower hopper bottom plate are effectively improved, thereby further improving the service life of the lower bin hopper. The second gate plates 231 of the lower bucket opening mechanism 23 are respectively arranged on two side surfaces of the lower bucket bottom plate 26; the second push-pull rods 232 are arranged along the length direction of the second gate plates 231; the second seat cylinders 233 are arranged along the length direction of the lower bin hopper 22 on the outer sides of its front and rear wall plates; the second wall countersunk holes 2231 at the ends of the second wall holes 223 of the front and rear wall plates of the lower bin hopper 22 communicating with the second seat cylinders 233 are both provided with second sealing rings 228, which are fixed by screws; in this way, it is effectively prevented Upper hopper The powder cement inside falls out from the through hole of the first seat tube. One end of the second push-pull rod 232 passes through the through hole of the second seat tube 233 and the second wall hole 223 of the lower bin hopper 22 respectively, and is fixed to the second gate plate 231; the second push-pull rod 232 of the lower bin opening mechanism 23 is provided with a third pin hole 2321 and a fourth pin hole 2322, and the second seat tube 233 is provided with a second locking hole 2331; in this way, the movement stroke of the second push-pull rod in the through hole of the second seat tube can be controlled to ensure the effective closing and opening of the second gate plate. The second connecting rod 234 is fixed to the protruding ends of the two second push-pull rods 232 to connect them together; in this way, the two second push-pull rods can achieve synchronous pushing and pulling of the second gate plate, effectively ensuring the smooth opening and closing of the lower bin opening mechanism, which is conducive to the stable operation of the equipment. The lower bin discharge port 24 is arranged at the lower part of the lower bin hopper 22, and its outer end surface is rectangular. In this way, it is effectively ensured that the lower drum feed port of the lower conveyor located below it is docked.

[0045] When it is necessary to open the upper bucket opening mechanism 13, the first connecting rod 134 located on the front and rear sides of each upper storage hopper 12 is pulled downward at the same time, and the two first push-pull rods 132 pull the first gate plate 131 to slide along the upper bucket bottom plate 16 to the inner wall of the upper storage hopper 12. At this time, the first bucket plate groove 163 is in a closed state, and a pin is inserted into the first pin hole 1321 of the first push-pull rod 132 and the first locking hole 1331 of the first seat tube 133 to lock them, so that the upper conveyor 3 can be inspected and maintained. When it is necessary to close the upper bucket opening mechanism 13, the first connecting rod 134 located on the front and rear sides of the upper storage hopper 12 is pushed upward at the same time, and the two first push-pull rods 132 push the first gate plate 131 to slide along the upper bucket bottom plate 16 to the first rib plate 162. At this time, the first bucket plate groove 163 is in an open state, and the pin is inserted into the second pin hole 1322 and the first locking hole 1331 of the first seat tube 133 to lock it. At this time, the first bucket plate groove 163 is in an open state, and the powder cement in the upper storage hopper 12 is discharged into the upper conveyor 3 through the first bucket plate groove 163.

[0046] When it is necessary to open the lower bucket opening mechanism 23, the second connecting rod 234 located on the front and rear sides of each lower bin hopper 22 is pulled downward at the same time, and the two second push-pull rods 232 pull the second gate plate 231 to slide along the lower bucket bottom plate 26 to the inner wall of the lower bin hopper 22. At this time, the second bucket plate groove 263 is in a closed state, and a pin is inserted into the third pin hole 2321 of the second push-pull rod 232 and the second locking hole 2331 of the second seat tube 233 to lock them, so that the lower conveyor 4 can be inspected and maintained. When it is necessary to close the lower bucket opening mechanism 23, the second connecting rod 234 located on the front and rear sides of the lower bin hopper 22 is pushed upward at the same time, and the two second push-pull rods 232 push the second gate plate 231 to slide along the lower bucket bottom plate 26 to the second rib plate 262. At this time, the second bucket plate groove 263 is in an open state, and the pin is inserted into the fourth pin hole 2322 and the second locking hole 2331 of the second seat tube 233 to lock it. At this time, the second bucket plate groove 263 is in an open state, and the powder cement in the lower bin hopper 22 passes through the second bucket plate groove 263 and is discharged into the lower conveyor 4.

[0047] The upper conveyor 3 is arranged below the upper silo hopper 12 along the length direction of the upper cement silo 1; the upper cylinder feed port 301 of the upper cylinder body 30 is arranged on the upper arc surface of the outer wall of the upper cylinder body 30 in a manner that the same distance is between each upper silo discharge port 14 of the upper silo hopper 12, and the upper cylinder feed port has a rectangular outer end surface adapted to the upper silo discharge port 14, so that a sealing gasket is arranged between the upper silo discharge port 14 and the upper cylinder feed port 301, and is connected to the upper silo hopper 12 by bolts. Each upper bin discharge port 14 is fastened and docked; the upper barrel discharge port 302 of the upper barrel 30 is arranged at intervals along its axial direction on the lower arc surface of its outer wall, and is connected to the upper cover plate of the lower cement bin 2 after installing a discharge valve on its outer end surface; the upper screw 31 is installed and supported on the inner cavity of the upper barrel 30, and one end of the upper screw 31 passes through the upper barrel 30 and is fixedly equipped with a driving device. During the rotation process, the powdered cement is transported to each upper barrel discharge port 302 and then discharged into the inner cavity of the lower bin body 21 of the lower cement bin 2.

[0048] The lower conveyor 4 is arranged below the lower silo hopper 22 along the length direction of the lower cement silo 2; the lower barrel feed port 401 of the lower barrel body 40 is arranged on the upper arc surface of the outer wall of the lower barrel body 40 in a manner that the same distance is between the lower silo discharge ports 24 of the lower silo hopper 22; the lower barrel feed port has a rectangular outer end surface adapted to the lower silo discharge port 24, so that a sealing gasket is arranged between the lower silo discharge port 24 and the lower barrel feed port 401, and the lower silo discharge port 24 is connected to the lower silo hopper 22 by bolts. The lower bin discharge port 24 is fixedly connected; the lower cylinder flange 402 of the lower cylinder 40 is arranged on the upper arc surface of the lower cylinder 40 and is located at one end of the driving device of the lower conveyor 4; one end of the lower cylinder 40 is sealed and connected with the docking flange 501 of the straight cylinder 50 of the vertical conveyor 5; the lower screw 41 is installed and supported in the inner cavity of the lower cylinder 40, and one end of the lower screw 41 passes through the lower cylinder 40 and is fixedly connected to the driving device, and the powdered cement is transported to the straight cylinder 50 of the vertical conveyor 5 during the rotation process.

[0049] The vertical conveyor 5 is arranged on the right side of the upper cement silo 1 and the lower cement silo 2, and is supported by the bottom end surface of the straight cylinder 50; the straight cylinder discharge port 502 of the straight cylinder 50 is connected to the external mixing barrel; the large screw 51 is installed and supported in the inner cavity of the straight cylinder 50, and the upper end thereof passes through the straight cylinder 50 and is fixedly equipped with a driving device. During the rotation process, the powdered cement from the lower cylinder 40 is conveyed to the straight cylinder discharge port 502 and then unloaded into the external mixing barrel; thereby providing the mixing barrel with the powdered cement required for making various pile foundation construction muds.

[0050] The upper screw 31 of the upper conveyor 3, the lower screw 41 of the lower conveyor 4 and the large screw 51 of the vertical conveyor 5 are all double-headed screws, wherein the pitches of the upper screw 31 and the lower screw 41 are equal, and the pitch of the large screw 51 is 1.5-2 times that of the upper screw 31 and the lower screw 41. In this way, the large screw can quickly convey the powdered cement to the mixing barrel to avoid cement backlog and affect the construction efficiency.

[0051] One end of the upper silo feed pipe 6 is connected to an external powdered cement pumping device, which is arranged along the left side of the upper cement silo 1 and then enters the upper silo body 11 of the upper cement silo 1 and is arranged close to the inner wall of the upper cover plate. A plurality of discharge ports are provided above the inner cavity of the upper silo body 11; in this way, the powdered cement can be evenly unloaded into the upper cement silo.

[0052] One end of the lower silo feed pipe 7 is connected to an external powdered cement pumping device, which is arranged along the left side of the lower cement silo 2 and then enters the lower silo body 21 of the lower cement silo 2 and is arranged close to the inner wall of the upper cover plate, and a plurality of discharge ports are provided above the inner cavity of the lower silo body 21; in this way, the powdered cement can be evenly discharged into the lower cement silo.

[0053] The recovery silo 8 is arranged on the left side of the upper cement silo 1 and the lower cement silo 2; the recovery silo 8 is connected to the upper cement silo 1 and the lower cement silo 2 through the first recovery pipe 81 and the second recovery pipe 82 respectively; the outlet flange 83 of the recovery silo 8 is fixedly mounted on the The end surface of the lower cylinder flange 402 of the lower cylinder body 40. In this way, the floating cement powder from the upper cement silo and the lower cement silo can be collected. The powder in the recovery silo can be discharged into the lower conveyor by opening the outlet flange of the recovery silo.

[0054] The vibrator 9 is arranged at the outer wall bottom of the upper hopper 12 of the upper cement silo 1 and the lower hopper 22 of the lower cement silo 2. In this way, the powder cement in the upper hopper and the lower hopper is accelerated to flow, and the powder cement is quickly and completely discharged from the respective discharge ports to the upper conveyor and the lower conveyor, respectively, to reduce the accumulation of powder cement in the upper hopper and the lower hopper.

[0055] The control system controls the pumping and feeding of powdered cement in the upper cement silo 1 and the lower cement silo 2, and the operation status of the upper conveyor 3, the lower conveyor 4, the vertical conveyor 5 and the vibrator 9. When the external bulk cement tank truck arrives, first the end of the lower silo feed pipe 7 is connected to the external pumping device and then the powdered cement is pumped; when the powdered cement in the lower cement silo 2 is full, the upper silo feed pipe 6 is connected to the external pumping device and then the powdered cement is pumped to the upper cement silo 1 to complete the unloading of the bulk cement tank truck. At this time, the outlet flange 83 of the recovery silo 8 is in a closed state. When it is necessary to convey powdered cement to an external mixing barrel, the driving device of the lower conveyor 4 and the vertical conveyor 5 is turned on through the control system, and after the second gate plates 231 of the inner cavities of the lower hoppers 22 of the lower cement silo 2 are all opened, the powdered cement in the inner cavity of the lower hopper 22 is conveyed to the vertical conveyor 5 during the rotation of the lower screw 31 of the lower conveyor 4, and the large screw 51 of the vertical conveyor 5 is rotated to convey the powdered cement in the external mixing barrel for various pile foundation mud production. If the powdered cement in the lower cement silo 2 is conveyed, the discharge valve of the upper barrel discharge port 302 of the upper conveyor 3 is opened, the upper screw 31 is started to rotate, and the first gate plates 131 of the inner cavities of the upper hoppers 12 of the upper cement silo 1 are all opened, so that the powdered cement in the inner cavity of the upper hopper 12 is conveyed and unloaded into the lower cement silo 2 by the upper screw 31, and the powdered cement is conveyed to the vertical conveyor 5 by the lower conveyor 4. By controlling the working frequency of the vibrator 9 provided on the outer wall of each upper hopper 12 and lower hopper 22, the discharge speed of the powder cement in each hopper is controlled to avoid the accumulation and retention of the powder cement in the hopper and accelerate the flow of cement. In order to prevent the powder cement in the upper cement silo 1 and the lower cement silo 2 from being piled up and retained, the control system can adjust the rotation speed of each screw to realize the control of the powder cement delivery amount, so as to achieve the balanced coordination of the powder cement pumping into the silo and the delivery and unloading.

[0056] The cement conveying device of the present invention can quickly, safely and environmentally friendly unload the powdered cement from the bulk cement tank truck into the cement silo, realize the upper and lower cement silos respectively conveying and discharging, can quickly, safely and environmentally friendly input the bulk cement into the powdered cement, and facilitate the flow and transportation of cement in the silo; the upper and lower cement silo hopper opening mechanism with simple operation can facilitate the unloading of powdered cement, and is conducive to the inspection and maintenance of the cement silo, hopper and screw conveyor. The control system can set and monitor the speed and flow of the screw conveyor to achieve a balance between cement pumping into the silo and outputting and unloading. The present invention has the characteristics of high cement powder conveying efficiency, good equipment stability, environmental protection and energy saving, small equipment footprint and meeting transportation requirements. In addition, the stacked cement silos effectively save construction site space and avoid the cement silos being unable to meet road transportation requirements due to excessive height.

Claims

1. A cement conveying device, comprising an upper cement silo (1), a lower cement silo (2), an upper conveyor (3), a lower conveyor (4), a vertical conveyor (5), an upper silo feed pipe (6), a lower silo feed pipe (7), a recovery silo (8), a plurality of vibrators (9), and a control system, in: The upper cement silo (1) comprises an upper silo body (11), a plurality of upper silo opening mechanisms (13), an upper silo bottom plate (16) having a plurality of first support plates (161), a first rib plate (162), a first silo plate groove (163), and an upper silo discharge port (14); wherein the upper silo opening mechanism (13) comprises a first gate plate (131), a first push-pull rod (132), a first seat tube (133), and a first connecting rod (134); The lower cement silo (2) comprises a lower silo body (21), a plurality of lower silo opening mechanisms (23), a lower silo bottom plate (26) having a plurality of second support plates (261), a second rib plate (262), a second silo plate groove (263), and a lower silo discharge port (24); wherein the lower silo opening mechanism (23) comprises a second gate plate (231), a second push-pull rod (232), a second seat tube (233), and a second connecting rod (234); The upper conveyor (3) comprises an upper barrel (30) having a plurality of upper barrel feed openings (301) and upper barrel discharge openings (302), an upper screw (31), and a drive device fixed to the end of the upper screw; The lower conveyor (4) comprises a lower barrel (40) having a plurality of lower barrel feed openings (401) and a lower barrel flange (402), a lower screw (41), and a driving device fixed to the end of the lower screw; The vertical conveyor (5) comprises a straight cylinder (50) having a docking flange (501), a large screw (51) and a driving device fixed to the end of the large screw; The recovery silo (8) comprises a first recovery pipe (81), a second recovery pipe (82) and an outlet flange (83); Features: The upper cement silo (1) and the lower cement silo (2) are both rectangular box structures, and the upper cement silo (1) is stacked on the upper part of the lower cement silo (2); The upper hopper (12) is in the shape of a four-sided pyramid and is arranged in a straight line at the lower part of the upper silo body (11) along the length direction of the upper cement silo (1); the upper hopper bottom plate (16) of the upper hopper (12) is a symmetrical angular component, the long sides of which are respectively welded to the inner sides of the front and rear wall plates of the upper hopper (12), and the short sides of which are respectively welded to the inner sides of the left and right wall plates of the upper hopper (12); the first hopper plate grooves (163) are symmetrically arranged on the two side surfaces of the upper hopper bottom plate (16) along the length direction; the first rib plates (162) are arranged at intervals at the top corners of the upper hopper bottom plate (16) along the length direction; the first support plates (161) are arranged at intervals on the inner side surface of the upper hopper bottom plate (16) along the length direction, and the other end is welded to the inner sides of the front and rear wall plates of the upper hopper (12). side welding; the first gate plates (131) of the upper bucket opening mechanism (13) are respectively arranged on two side surfaces of the upper bucket bottom plate (16); two first push-pull rods (132) are arranged along the length direction of the first gate plate (131); two first seat tubes (133) are respectively arranged on the outer sides of the front and rear wall plates of the upper bin hopper (12) along the length direction of the upper bin hopper (12); one end of the first push-pull rod (132) passes through the through hole of the first seat tube (133) and the first wall hole (123) of the upper bin hopper (12) and is then fixed to the first gate plate (131); the first connecting rod (134) is fixed to the protruding ends of the two first push-pull rods (132) and connects them together; the upper bin discharge port (14) is arranged at the lower part of the upper bin hopper (12), and its outer end surface is rectangular; The lower hopper (22) is in the shape of a four-sided pyramid and is arranged in a straight line at the lower part of the lower hopper body (21) along the length direction of the lower cement hopper (2); the lower hopper bottom plate (26) of the lower hopper (22) is a symmetrical angular component, the long sides of which are respectively welded to the front and rear inner walls of the lower hopper (22), and the short sides of which are respectively welded to the left and right inner walls of the lower hopper (22); the second hopper plate grooves (263) are symmetrically arranged on the two side surfaces of the lower hopper bottom plate (26) along the length direction; the second rib plates (262) are arranged at intervals at the top corners of the lower hopper bottom plate (26) along the length direction; the second support plates (261) are arranged at intervals on the inner side surface of the lower hopper bottom plate (26) along the length direction, and the other end is welded to the inner sides of the front and rear wall plates of the lower hopper (22). The second gate plates (231) of the lower bucket opening mechanism (23) are respectively arranged on two side surfaces of the lower bucket bottom plate (26); two second push-pull rods (232) are arranged along the length direction of the second gate plate (231); two second seat tubes (233) are respectively arranged on the outer sides of the front and rear wall plates of the lower bin hopper (22) along the length direction of the lower bin hopper (22); one end of the second push-pull rod (232) passes through the through hole of the second seat tube (233) and the second wall hole (223) of the lower bin hopper (22) and is then fixed to the second gate plate (231); the second connecting rod (234) is fixed to the protruding ends of the two second push-pull rods (232) to connect them together; the lower bin discharge port (24) is arranged at the lower part of the lower bin hopper (22), and its outer end surface is rectangular; The upper conveyor (3) is arranged below the upper silo hopper (12) along the length direction of the upper cement silo (1); the upper cylinder feed port (301) of the upper cylinder (30) is arranged on the upper arc surface of the outer wall of the upper cylinder (30) in a manner that the distance between each upper silo discharge port (14) of the upper silo hopper (12) is the same; the upper cylinder feed port has a rectangular outer end surface that is compatible with the upper silo discharge port (14); a sealing gasket is provided between the upper silo discharge port (14) and the upper cylinder feed port (301) and is fastened to the upper silo hopper (12) by bolts. The upper cylinder discharge ports (302) of the upper cylinder (30) are arranged at intervals along the axial direction on the lower arc surface of its outer wall, and are connected to the upper cover plate of the lower cement silo (2) after a discharge valve is installed on its outer end surface; the upper screw (31) is installed and supported in the inner cavity of the upper cylinder (30), one end of which passes through the upper cylinder (30) and is fixedly equipped with a driving device, and during the rotation process, powdered cement is transported to each upper cylinder discharge port (302) and then discharged into the inner cavity of the lower silo (21) of the lower cement silo (2); The lower conveyor (4) is arranged below the lower silo hopper (22) along the length direction of the lower cement silo (2); the lower barrel feed port (401) of the lower barrel body (40) is arranged on the upper arc surface of the lower barrel body (40) in a manner that the distance between each lower silo discharge port (24) of the lower silo hopper (22) is the same; the lower barrel feed port has a rectangular outer end surface that is adapted to the lower silo discharge port (24); a sealing gasket is arranged between the lower silo discharge port (24) and the lower barrel feed port (401), and is connected to each lower silo discharge port (24) of the lower silo hopper (22) by bolts. The lower cylinder (40) is fixedly connected to the opening (24); the lower cylinder flange (402) of the lower cylinder (40) is arranged on the upper curved surface of the lower cylinder (40) and is located at one end of the driving device of the lower conveyor (4); one end of the lower cylinder (40) is sealed and connected to the connecting flange (501) of the straight cylinder (50) of the vertical conveyor (5); the lower screw (41) is installed and supported in the inner cavity of the lower cylinder (40), one end of which passes through the lower cylinder (40) and is fixedly connected to the driving device, and during the rotation process, the powdered cement is conveyed into the straight cylinder (50) of the vertical conveyor (5); The vertical conveyor (5) is arranged on the right side of the upper cement silo (1) and the lower cement silo (2), and is supported by the bottom end surface of the straight cylinder (50); the straight cylinder discharge port (502) of the straight cylinder (50) is connected to the external mixing barrel; the large screw (51) is installed and supported in the inner cavity of the straight cylinder (50), and the upper end thereof passes through the straight cylinder (50) and is fixedly mounted with a driving device, and during the rotation process, the powdered cement from the lower cylinder (40) is conveyed to the straight cylinder discharge port (502) and then discharged into the external mixing barrel; One end of the upper silo feed pipe (6) is connected to an external powdered cement pumping device, is arranged along the left side of the upper cement silo (1), enters the upper silo body (11) of the upper cement silo (1), and is arranged close to the inner wall of the upper cover plate, and is provided with a plurality of discharge ports above the inner cavity of the upper silo body (11); One end of the lower silo feed pipe (7) is connected to an external powdered cement pumping device, is arranged along the left side of the lower cement silo (2), enters the lower silo body (21) of the lower cement silo (2), and is arranged close to the inner wall of the upper cover plate, and is provided with a plurality of discharge ports above the inner cavity of the lower silo body (21); The recovery silo (8) is arranged on the left side of the upper cement silo (1) and the lower cement silo (2); the recovery silo (8) is connected to the upper cement silo (1) and the lower cement silo (2) respectively through a first recovery pipe (81) and a second recovery pipe (82); the outlet flange (83) of the recovery silo (8) is fixedly mounted on the end surface of the lower cylinder flange (402) of the lower cylinder (40) after a valve is installed; The vibrator (9) is arranged at the bottom of the outer wall of the upper hopper (12) of the upper cement silo (1) and the lower hopper (22) of the lower cement silo (2); The control system operates and controls the pumping and feeding of powdered cement in the upper cement silo (1) and the lower cement silo (2), and the operating states of the upper conveyor (3), the lower conveyor (4), the vertical conveyor (5) and the vibrator (9).

2. The cement conveying device according to claim 1, Features A first sealing ring (128) is provided in a first wall countersunk hole (1231) at the end of a first wall hole (123) communicating with the first seat tube (133) on the front and rear wall plates of the upper bin hopper (12), and the sealing ring is fixed by screws; a second sealing ring (228) is provided in a second wall countersunk hole (2231) at the end of a second wall hole (223) communicating with the second seat tube (233) on the front and rear wall plates of the lower bin hopper (22), and the sealing ring is fixed by screws.

3. The cement conveying device according to claim 1, Features The first push-pull rod (132) of the upper bucket opening mechanism (13) is provided with a first pin hole (1321) and a second pin hole (1322), and the first seat tube (133) is provided with a first locking hole (1331); the second push-pull rod (232) of the lower bucket opening mechanism (23) is provided with a third pin hole (2321) and a fourth pin hole (2322), and the second seat tube (233) is provided with a second locking hole (2331).

4. The cement conveying device according to claim 1, Features The upper screw (31) of the upper conveyor (3), the lower screw (41) of the lower conveyor (4) and the large screw (51) of the vertical conveyor (5) are all double-headed screws, wherein the pitches of the upper screw (31) and the lower screw (41) are equal, and the pitch of the large screw (51) is 1.5-2 times that of the upper screw (31) and the lower screw (41).