Annular cooler cooling and waste heat recovery system
By dividing the annular cooler into multiple temperature zones and combining it with a circulating fan and a waste heat boiler system, the problems of insufficient waste heat utilization and high cooling energy consumption of the annular cooler are solved, achieving the effect of maximizing waste heat recovery and minimizing cooling energy consumption.
Patent Information
- Application Number
- CN202011118393.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-10-19
AI Technical Summary
The existing waste heat recovery system of the annular cooler fails to make full use of the waste heat of sintered ore, and the load adjustment of the cooling fan is inconvenient, resulting in energy waste and high cooling energy consumption.
The circular cooler is divided into a high-temperature section, a sub-high-temperature section, a medium-temperature section, a first cooling section, and a second cooling section. Circulating air is used to recover waste heat from the high-temperature and sub-high-temperature sections, and cooling fans directly cool the first and second cooling sections. The number of fans is adjusted according to the temperature. Combined with the circulating fans and the waste heat boiler system, waste heat recovery and cooling temperature control are achieved.
It maximizes the energy recovery of sintered ore and minimizes cooling power consumption, ensuring that the cooling effect meets the process requirements, improving the amount of waste heat recovery and reducing cooling energy consumption.
Smart Images

Figure CN112197598B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sintered ore cooling, in particular to a ring cooler cooling and waste heat recovery system. Background Art
[0002] Annular cooler is a necessary equipment for cooling sintered ore. Its function is to cool the high-temperature sintered ore coming out of the sintering machine. An annular cooling fan is set at the bottom of the annular cooler. The annular cooling fan blows air into the annular cooler. The air removes the sensible heat of the sintered ore through heat exchange, and finally cools the sintered ore to below 150℃.
[0003] The cooling of sintered ore on the ring cooler is a heat transfer process, and the temperature of the air increases after heat exchange. Usually, the ring cooler is equipped with 4 to 6 cooling fans, which divide the ring cooler into 4 to 6 cooling sections. When working, the fan pressurizes the air and sends it into the lower air duct of the ring cooler. After being distributed in the air duct, it flows upward through the sintered ore, taking away the sensible heat of the sintered ore, and the temperature of the air itself increases.
[0004] In order to save energy, the waste heat of sintered ore is currently recovered. According to the distribution of cooling sections of the ring cooler, the sensible heat of the sintered ore is usually recovered in cooling sections 1 and 2, which are closer to the discharge port. The sensible heat temperature of the sintered ore here is higher. The temperature of the air recovered in cooling section 1 is about 400°C, and the temperature of the air recovered in cooling section 2 is about 280°C. The waste heat boiler is used to generate steam of different qualities for power generation or other purposes.
[0005] The existing waste heat utilization of the ring cooler is based on the cooling process of the sintered ore with the ring cooler, that is, the waste heat recovery and sintering cooling are considered separately, and the two are not organically combined. The waste heat recovery of the ring cooler cannot fully utilize the waste heat of the sintered ore. This is mainly due to the use of the existing sintered ore cooling process, that is, only the sensible heat of the sintered ore in cooling stage 1 and cooling stage 2 is recovered. After cooling stage 2, the sensible heat of the sintered ore is still 200℃~300℃, and it still has waste heat recovery value.
[0006] As for the cooling process of the ring cooler, 4 to 6 large cooling fans are usually configured. The cooling area corresponding to each cooling fan is large, the air volume of a single fan is large, and the load adjustment is inconvenient. When the terminal mine temperature is slightly higher than the cooling temperature required by the process, for example, 20°C higher than the required temperature of the process, the terminal fan is turned on, but because the air volume of a single cooling fan is large and there is no recycling, it will cause a large waste of energy.
[0007] In view of this, in order to solve the above technical problems existing in the prior art, a ring cooler cooling and waste heat recovery system is proposed to meet the cooling ore temperature to meet the process requirements while maximizing the sintering ore energy recovery and minimizing the cooling power consumption. Summary of the invention
[0008] The present invention is made to solve the above-mentioned technical problems, and its purpose is to provide a ring cooler cooling and waste heat recovery system that can maximize the energy recovery of sintered ore and minimize the cooling power consumption while meeting the ore temperature of the cooling ring cooler to meet the process requirements.
[0009] In order to achieve the above object, a ring cooler cooling and waste heat recovery system is provided, and the ring cooler cooling and waste heat recovery system comprises:
[0010] The sintered ore cooling module comprises a wind box connected to the bottom of the ring cooler and a fume hood connected to the top of the ring cooler. The fume hood is divided into a plurality of temperature sections according to the temperature of the cooling air. An exhaust valve is arranged on the fume hood of each temperature section. The wind box of each temperature section is connected to a cooling fan.
[0011] The flue gas circulation module includes a first circulation fan, a second circulation fan, a third circulation fan, a high-temperature waste heat boiler, a sub-high-temperature waste heat boiler, and a medium-temperature waste heat boiler. The first circulation fan, the second circulation fan, and the third circulation fan are connected to the wind boxes of the three highest temperature sections according to the temperature, and the high-temperature waste heat boiler, the sub-high-temperature waste heat boiler, and the medium-temperature waste heat boiler are connected to the smoke hoods of the three highest temperature sections according to the temperature. A shut-off valve is arranged between each waste heat boiler and the smoke hood. The exhaust gas of the high-temperature waste heat boiler is sent to the medium-temperature waste heat boiler and mixed with the medium-temperature flue gas, and then mixed with the exhaust gas of the sub-high-temperature waste heat boiler and circulated to the first circulation fan, the second circulation fan, and the third circulation fan, and the water supply generates high and low pressure steam after passing through the medium-temperature waste heat boiler, the sub-high-temperature waste heat boiler, and the high-temperature waste heat boiler.
[0012] Optionally, it further comprises a circulating water module, the circulating water module comprises a high-pressure drum and a low-pressure drum, the medium-temperature waste heat boiler is provided with a low-pressure economizer and a low-pressure evaporator, the sub-high-temperature waste heat boiler is provided with a high-pressure economizer and a high-pressure evaporator, and the high-temperature waste heat boiler is provided with a low-pressure superheater and a high-pressure superheater.
[0013] The water supply is connected to the inlet of the low-pressure economizer, the outlet of the low-pressure economizer is connected to the riser of the low-pressure drum, the downcomer of the low-pressure drum is divided into two paths, one is connected to the inlet of the low-pressure evaporator, the outlet of the low-pressure evaporator is connected to the low-pressure drum, the other is connected to the inlet of the high-pressure economizer, the outlet of the high-pressure economizer is connected to the riser of the high-pressure drum, the downcomer of the high-pressure drum is connected to the inlet of the high-pressure evaporator, and the outlet of the high-pressure evaporator is connected to the high-pressure drum,
[0014] The saturated steam discharged from the low-pressure drum is sent to the low-pressure superheater to form low-pressure steam, and the saturated steam discharged from the high-pressure drum is sent to the high-pressure superheater to form high-pressure steam.
[0015] Optionally, the smoke hood is divided into a high temperature section, a sub-high temperature section, a medium temperature section, a cooling section one, and a cooling section two, and each cooling fan is connected to no more than three corresponding wind boxes, and each wind box in the high temperature section, the sub-high temperature section, and the medium temperature section is connected to a cooling fan.
[0016] Optionally, the exhaust temperature of the high temperature section is 500°C to 550°C, the exhaust temperature of the second high temperature section is 350°C to 420°C, and the exhaust temperature of the medium temperature section is 180°C to 300°C.
[0017] Optionally, corresponding to the flue gas emission mode, each exhaust valve is opened, and the shut-off valve between each waste heat boiler and the smoke hood is closed, and the air enters the ring cooler through the cooling fan to cool the ore, and then enters the smoke hood, and is discharged through the exhaust valve on the smoke hood;
[0018] Corresponding to the waste heat recovery mode, the exhaust valves of the three temperature sections with the highest temperature are closed, and the shut-off valves between each waste heat boiler and the smoke hood are opened. The circulating air passes through the first circulation fan, the second circulation fan, and the third circulation fan to enter the ring cooler to cool the mineral material and then enter the smoke hood, and then returns to the first circulation fan, the second circulation fan, and the third circulation fan after passing through the flue gas circulation module. In addition, the air passes through the cooling fans of other temperature sections to cool the mineral material and then enters the smoke hood and is discharged through the exhaust valve on the smoke hood.
[0019] Optionally, a mineral material temperature measuring device is provided at the mineral material outlet of the first cooling stage and the second cooling stage respectively. When the mineral material temperature at the outlet of the first cooling stage exceeds 200°C, the number of cooling fans opened in the first cooling stage and the second cooling stage is increased; when the mineral material temperature at the outlet of the second cooling stage is lower than 150°C, the number of cooling fans opened in the second cooling stage is reduced.
[0020] Optionally, the pressure head of the first circulation fan is 50Pa to 100Pa greater than the pressure head of the third circulation fan.
[0021] Optionally, the exhaust temperature of the high-temperature waste heat boiler is 250°C to 300°C, and the exhaust gas of the high-temperature waste heat boiler is sent into the mixed air section at the bottom of the medium-temperature waste heat boiler through the air duct as a mixed air flow. There is a certain inclination angle between the mixed air flow direction of the mixed air section and the medium-temperature flue gas flow direction, and the angle range is 30° to 60°. The negative pressure formed by the flow of the medium-temperature flue gas flow is used to suck in and mix the mixed air flow.
[0022] Optionally, the medium-temperature waste heat boiler exhaust gas is mixed with the sub-high-temperature waste heat boiler exhaust gas and is respectively sent to the high-temperature section, the sub-high-temperature section and the medium-temperature section through the first circulation fan, the second circulation fan and the third circulation fan for heat exchange.
[0023] Optionally, the low-pressure steam drum is provided with a deaerator head, and the working pressure of the low-pressure steam drum is 0.3MPa~0.6MPa; the working pressure of the high-pressure steam drum is 1.0MPa~2.0MPa.
[0024] Optionally, a ash blocker is also provided at the inlet end of each waste heat boiler.
[0025] The annular cooler cooling and waste heat recovery system of the present invention has the following technical effects:
[0026] (1) The sinter cooling and the waste heat recovery of the ring cooler are organically combined. The ring cooler is divided into a high temperature section, a sub-high temperature section, a medium temperature section, a first cooling section, and a second cooling section. Circulating air is used to recover the waste heat of the high temperature section, the sub-high temperature section, and the medium temperature section. For the first cooling section and the second cooling section, cooling fans are used to directly cool and discharge the waste heat. Moreover, when the temperature of the cooling section is higher than the set value, one or more cooling fans of the first cooling section and the second cooling section can be started at any time to ensure the cooling process requirements.
[0027] (2) Several cooling fans are respectively set in each temperature section of the ring cooler. Compared with the conventional cooling fans with large air volume that do not distinguish between temperature sections, a single cooling fan has a small air volume, is easy to start and stop, and has low power, thereby reducing the cooling energy consumption of the ring cooler.
[0028] (3) The length of each temperature section of the ring cooler is obtained through calculation, so that each temperature section can be accurately and reasonably divided to ensure that the outlet flue gas temperature of each temperature section meets the design requirements.
[0029] (4) The ring cooler is divided into a high temperature section, a second high temperature section, and a medium temperature section for recovering waste heat. The flue gas temperature can be extracted in steps, thereby increasing the steam superheat.
[0030] (5) The conventional sintering machine recovery section consists of the first two sections, which usually only have two temperature sections, the high temperature section and the medium temperature section. The medium and low temperature sections ensure that the recovered flue gas temperature is not lower than 250°C. If the length of the medium and low temperature sections is further extended, the flue gas temperature will decrease. After the two-stage flue gas temperatures are mixed, the flue gas volume increases, but the temperature is low, and the temperature difference with the steam-water heat exchange is reduced, and the heat exchange area needs to be increased. This solution can extend the medium temperature section backward and mix the flue gas from the high temperature and medium and low temperature sections. The flue gas from the second high temperature section is mixed with the flue gas from the medium temperature section after the heat exchange with the flue gas from the high temperature section is completed and then taken out separately. The length of the medium temperature section can be relatively extended while ensuring that the recovered flue gas temperature is not lower than 250°C. Compared with the conventional ring cooler waste heat recovery, the amount of waste heat recovery is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The above-mentioned features and technical advantages of the present invention will become clearer and easier to understand by describing its embodiments in conjunction with the following drawings.
[0032] Figure 1 A process flow chart of a ring cooler cooling and waste heat recovery system according to an embodiment of the present invention is shown;
[0033] Figure 2A process flow chart of flue gas circulation of a ring cooler cooling and waste heat recovery system according to an embodiment of the present invention is shown;
[0034] Figure 3 A process flow chart of circulating water of a ring cooler cooling and waste heat recovery system according to an embodiment of the present invention is shown;
[0035] Figure 4 A schematic diagram of a ash blocker of a waste heat boiler in one embodiment of the present invention is shown;
[0036] Figure 5 A schematic diagram of a flue gas mixing section of a waste heat boiler in an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0037] The following will describe embodiments of the cooling and waste heat recovery system for annular coolers of the present invention with reference to the accompanying drawings. It will be appreciated by those skilled in the art that the described embodiments may be modified in various ways or combinations thereof without departing from the spirit and scope of the present invention. Therefore, the drawings and descriptions are illustrative in nature and are not intended to limit the scope of protection of the claims. In addition, in this specification, the drawings are not drawn to scale and the same reference numerals represent the same parts.
[0038] The high pressure and low pressure mentioned below are differentiated names used to distinguish between high and low steam pressures (e.g., in this embodiment, according to a certain saturated steam resource condition, the pressures of high-pressure steam and low-pressure steam are 1-2 MPa and 0.3-0.6 MPa, respectively). They are not the absolute high pressure and absolute low pressure defined in engineering. Moreover, the flow direction of steam and water below is in the direction indicated by the arrow in the figure.
[0039] Similarly, the high temperature section, sub-high temperature section, and medium temperature section mentioned below are also differentiated names for distinguishing the high and low temperatures in the smoke hood (for example, in this embodiment, the temperatures of the high temperature section, sub-high temperature section, and medium temperature section of a certain ring cooler are above 500°C, 350-420°C, and 180-300°C, respectively), and are not absolute high and low temperatures.
[0040] Figure 1 FIG. 1 shows a process flow chart of a ring cooler cooling and waste heat recovery system according to an embodiment of the present invention. Figure 1As shown, the ring cooler cooling and waste heat recovery system described in this embodiment of the present invention includes a cooling fan 2 for cooling the ring cooler 1 and recovering waste heat, a high-temperature waste heat boiler 3, a sub-high-temperature waste heat boiler 4, a sub-high-temperature waste heat boiler 5, a high-pressure drum 6, a low-pressure drum 7, a low-pressure feed water pump 8, a low-pressure circulating pump 9, a high-pressure feed water pump 10, a high-pressure circulating pump 11, a first circulating fan 12, a second circulating fan 13 and a third circulating fan 14. Among them, the lower part of the ring cooler 1 is connected to a wind box 1.3, the upper part of the ring cooler is connected to a smoke hood 1.2, and the sintered ore 1.1 enters the ring cooler 1 from the feeding port of the ring cooler ( Figure 2 The cooling fan 2 arranged at the lower part of the ring cooler 1 blows in air to cool the material. The air enters the ring cooler through the wind box 1.3 to cool the material and then enters the smoke hood 1.2, meeting the requirement that the material temperature at the discharge port is not higher than 150°C.
[0041] Figure 2 Schematic diagram of flue gas circulation system. The smoke hood on the upper part of the ring cooler 1 is divided into a high temperature section 101, a second high temperature section 102, a medium temperature section 103, a cooling section 104 and a cooling section 2 105 by a partition. Figure 1 refer to Figure 3 The temperature section is the expansion diagram of the ring cooler). The temperature sections are divided according to the physical properties of the sintered ore and the convection heat transfer characteristics to calculate the heat taken away by the air flowing through the sintered ore, that is, the temperature distribution of the air after passing through the sintered ore, so as to determine the above temperature sections. The calculation formula can be expressed as
[0042]
[0043] Where: T in , T out is the temperature of air entering and leaving the sinter
[0044] Q is air flow (can be converted into air velocity)
[0045] h is the height of sintered ore
[0046] T 矿 is the initial temperature of sintered ore;
[0047] τ is the rotation time of the ring cooler;
[0048] The coefficients a, b, c, d, and e are positive values and can be obtained by simulating the physical properties of the mineral material and then performing data fitting.
[0049] In addition, the lengths of the high temperature section 101, the sub-high temperature section 102, the medium temperature section 103, the first cooling section 104 and the second cooling section 105 can also be determined according to the speed of the ring cooler, the radius of the ring cooler and the time. Specifically, the speed ω of the ring cooler is generally a set value, usually 30 minutes to 40 minutes per revolution. According to the speed of the ring cooler, the length of each section is calculated, that is, the following formula 2:
[0050] s=ω·r·τ Formula 2
[0051] Where: s is the length of a certain segment;
[0052] r is the radius of the annular cooler;
[0053] τ is the rotation time of the ring cooler.
[0054] For example, in order to obtain the length of the high temperature section 101, the initial temperature T of the sintered ore can be used. 矿 , T in , h, Q are combined with formula 1 to obtain the relationship between the outlet flue gas temperature and time of the high temperature section 101, and the average outlet flue gas temperature T of the high temperature section 101 is set. 设定 , and then the minimum outlet gas temperature T of the high temperature section 101 is obtained by the integral average method as in Formula 3 out1 , the corresponding time τ at this time is used as τ1 of the high temperature section 101, and then the length of section 101 can be obtained by using formula 2.
[0055]
[0056] Here, Δτ is the integral symbol.
[0057] In the same way, taking the parameters at the outlet of the high temperature section 101 as the starting point, the lengths of the second high temperature section 102 and other temperature sections can be calculated.
[0058] The first circulation fan 12 is connected to the wind box of the high temperature section 101, the second circulation fan 13 is connected to the wind box of the sub-high temperature section 102, and the third circulation fan is connected to the wind box of the medium temperature section 103. The high temperature waste heat boiler 3 is connected to the smoke hood of the high temperature section 101, the sub-high temperature waste heat boiler 4 is connected to the smoke hood of the sub-high temperature section 102, and the medium temperature waste heat boiler 5 is connected to the smoke hood of the medium temperature section 103. In addition, a shut-off valve is provided on the connecting pipe between each waste heat boiler and the smoke hood. The exhaust gas of the high temperature waste heat boiler 3 is sent to the medium temperature waste heat boiler 5 and mixed with the medium temperature flue gas, and then mixed with the exhaust gas of the sub-high temperature waste heat boiler 4 and circulated to supply the first circulation fan 12, the second circulation fan 13, and the third circulation fan 14, and the water supply passes through the medium temperature waste heat boiler 5, the sub-high temperature waste heat boiler 4, and the high temperature waste heat boiler 3 to generate high and low pressure steam.
[0059] Figure 3It is a schematic diagram of the process of circulating water. The medium-temperature waste heat boiler 5 is provided with a low-pressure economizer h1 and a low-pressure evaporator h2. The sub-high-temperature waste heat boiler 4 is provided with a high-pressure economizer h3 and a high-pressure evaporator h4. The high-temperature waste heat boiler 3 is provided with a low-pressure superheater h5 and a high-pressure superheater h6. The water supply ws is connected to the inlet of the low-pressure economizer h1. The water supply can be demineralized water or soft water. The outlet of the low-pressure economizer h1 is connected to the riser of the low-pressure drum 7. The low-pressure drum 7 has a deaerator head. The saturated water b1 after deaeration is divided into two paths. One path is connected to the inlet of the low-pressure evaporator h2. The outlet of the low-pressure evaporator h2 is connected to the low-pressure drum 7. The other path is connected to the inlet of the high-pressure economizer h3 via the high-pressure feed water pump 10. The outlet of the high-pressure economizer h3 is connected to the riser of the high-pressure drum 6. The saturated water b1 is sent to the high-pressure drum 6 after heat exchange with the flue gas in the high-pressure economizer h3. The downcomer of the high-pressure drum 6 is connected to the inlet of the high-pressure evaporator h4 through the high-pressure circulating pump 11. The saturated water c1 from the high-pressure drum 6 is sent to the high-pressure evaporator h4 by the high-pressure circulating pump 11, and the outlet of the high-pressure evaporator h4 is connected to the high-pressure drum 6. The saturated steam s1 discharged from the low-pressure drum 7 is sent to the low-pressure superheater h5 to form low-pressure steam, and the saturated steam s2 discharged from the high-pressure drum is sent to the high-pressure superheater h6 to form high-pressure steam.
[0060] Furthermore, corresponding to the flue gas emission mode, the cooling fan 2 is turned on to blow the cold air in the environment into the wind box 1.3, each exhaust valve 1.4 is opened, and the shut-off valve between each waste heat boiler and the smoke hood is closed. The air enters the ring cooler through the cooling fan 2 to cool the ore, and then enters the smoke hood 1.2, and is discharged through the exhaust valve 1.4 on the smoke hood;
[0061] Corresponding to the waste heat recovery mode, the mineral material 1.1 in the high temperature section 101, the sub-high temperature section 102 and the medium temperature section 103 is mainly cooled by the circulating air blown in by the first circulating fan 12, the second circulating fan 13 and the third circulating fan 14, the exhaust valves of the high temperature section 101, the sub-high temperature section 102 and the medium temperature section 103 are closed, the shut-off valves between each waste heat boiler and the smoke hood are opened, the circulating air enters the ring cooler 1 through the first circulating fan 12, the second circulating fan 13 and the third circulating fan 14 to cool the mineral material 1.1 and then enters the smoke hood, and returns to the first circulating fan 12, the second circulating fan 13 and the third circulating fan 14 after passing through the smoke circulation module, and the air enters the smoke hood 1.2 after cooling the mineral material 1.1 through the cooling fan 2 of the first cooling section 104 and the second cooling section 105, and is discharged through the exhaust valve 1.4 on the smoke hood 1.2.
[0062] Specifically, the first circulation fan 12 extracts part of the air from the mixing flue Y1 and sends it into the lower wind box 1.3 of the high-temperature section 101. The air enters the high-temperature waste heat boiler 3 after heat exchange with the high-temperature mineral material 1.1. After heat exchange with the steam, the air is sent to the sub-high-temperature waste heat boiler 5. After being mixed with the medium-temperature flue gas through the flue gas mixer 16, the air is sent back to the flue Y1 after heat exchange with the heat exchange surface in the sub-high-temperature waste heat boiler 5.
[0063] The second circulation fan 13 extracts part of the air from the mixing flue Y1 and sends it to the lower wind box 1.3 of the secondary high temperature section 102. The air enters the secondary high temperature waste heat boiler 4 after heat exchange with the high temperature mineral material 1.1, and is sent to the return flue Y1 after heat exchange with the heating surface in the waste heat boiler 4.
[0064] The third circulation fan 14 extracts part of the air from the mixing flue Y1 and sends it to the lower wind box 1.3 of the medium temperature section 103. The air enters the sub-high temperature waste heat boiler 5 after heat exchange with the high temperature mineral material 1.1, and is sent to the return flue Y1 after heat exchange with the heating surface in the waste heat boiler 5.
[0065] Optionally, each cooling fan 2 is connected to a plurality of wind boxes, preferably, no more than three wind boxes are connected, and each wind box in the high temperature section 101 , the second high temperature section 102 and the medium temperature section 103 is connected to a cooling fan 2 .
[0066] Optionally, the exhaust temperature of the high temperature section 101 is 500°C to 550°C, the exhaust temperature of the second high temperature section 102 is 350°C to 420°C, and the exhaust temperature of the medium temperature section 103 is 180°C to 300°C.
[0067] In an optional embodiment, an exhaust valve 1.4 is further provided on the mixing flue Y1. When the sintering condition is abnormal, for example, when the incoming material temperature of the sintered ore 1.1 is too high, in order to prevent the air temperature in the mixing flue Y1 from being too high and affecting the normal operation of the circulating fan, the cooling fan 2 corresponding to the lower bellows of the high-temperature section 101 can be opened, and the exhaust valve 1.4 on the upper part of the flue Y1 can be opened to ensure the balance of air volume in the flue gas circulation system. If the incoming material temperature continues to rise, the cooling fan 2 corresponding to the lower bellows of the sub-high-temperature section 102 is opened, and the exhaust valves 1.4 on the upper smoke hoods of the high-temperature section 101 and the sub-high-temperature section 102 are opened at the same time.
[0068] Optionally, a mineral material temperature measuring device is provided at the mineral material outlet of the cooling stage 104 and the cooling stage 2 105 respectively. When the mineral material temperature at the outlet of the cooling stage 104 exceeds 200°C, the number of cooling fans 2 opened in the cooling stage 104 and the cooling stage 2 105 is increased; when the mineral material temperature at the outlet of the cooling stage 2 105 is lower than 150°C, the number of cooling fans 2 opened in the cooling stage 2 105 is reduced.
[0069] Optionally, the pressure head of the first circulation fan 12 is 50Pa-100Pa greater than the pressure head of the third circulation fan.
[0070] Optionally, the exhaust gas temperature of the high temperature waste heat boiler 3 is 250°C to 300°C, and the exhaust gas of the high temperature waste heat boiler is sent as a mixed air flow through the air duct to the mixed air section 16 at the bottom of the medium temperature waste heat boiler 5, such as Figure 5 As shown, the air mixing section 16 includes a straight pipe section 161 and a trumpet pipe section 162 connected to both ends of the straight pipe section. At least one inclined pipe section 163 is obliquely connected to the straight pipe section 161. Any inclined pipe section 163 has an inclination angle α with the straight pipe section 161, and the range of angle α is 30° to 60°. The exhaust gas of the high-temperature waste heat boiler 3 enters the inclined pipe section 163 as the mixed air flow 51, and the exhaust gas of the medium-temperature waste heat boiler 5 enters the straight pipe section 161. There is an angle α between the direction of the mixed air flow 51 and the direction of the medium-temperature flue gas flow 52. The straight pipe section 161 is an acceleration section, and the negative pressure formed by the flow of the medium-temperature flue gas flow 52 sucks the mixed air flow 51 into the mixed air flow.
[0071] Optionally, the exhaust gas of the medium-temperature waste heat boiler 5 and the exhaust gas of the sub-high-temperature waste heat boiler 4 are first mixed in the flue Y1, and then respectively sent to the high-temperature section 101, the sub-high-temperature section 102 and the medium-temperature section 103 for heat exchange through the first circulation fan 12, the second circulation fan 13 and the third circulation fan 14. Since the heat exchange between the circulating air and the sintered ore is related to the air inlet temperature, increasing the inlet temperature can increase the outlet temperature. Therefore, through this flue gas combination mode, the flue gas of the medium-temperature waste heat boiler 5 can be sufficiently low after the steam-water heat exchange and the inlet flue gas temperature can be increased by mixing and heating with the flue gas of the sub-high-temperature waste heat boiler 4, thereby reducing the overall system resistance and the system fan energy consumption. Optionally, the exhaust gas of the medium-temperature waste heat boiler 5 is sent to the high-temperature section 101 and the medium-temperature section 103 for heat exchange through the first circulation fan 12 and the third circulation fan 14 respectively, and the exhaust gas of the sub-high-temperature waste heat boiler 4 is sent to the sub-high-temperature section 102 for heat exchange through the second circulation fan 13, so as to make full use of the maximum temperature difference between the circulating air and each temperature section and improve the cooling energy efficiency.
[0072] When the air inlet temperature of the high-temperature waste heat boiler 3 exceeds 550°C, the cooling fan 2 at the bottom of the high-temperature section 101 is turned on, and the exhaust valve 1.4 of the section 101 is opened. Cold air is blown in through the cooling fan 2, which can effectively reduce the flue gas temperature in the high-temperature section. At the same time, the exhaust valve 1.4 is opened to reduce the amount of flue gas entering the high-temperature waste heat boiler 3, thereby avoiding overheating of the boiler and affecting the safety and life of the boiler.
[0073] Optionally, the low-pressure steam drum is provided with a deaerator head, and the working pressure of the low-pressure steam drum is 0.3MPa~0.6MPa; the working pressure of the high-pressure steam drum is 1.0MPa~2.0MPa.
[0074] Optionally, an ash blocker is further provided at the inlet end of each waste heat boiler, and each ash blocker is provided before the shut-off valve of the inlet section of each waste heat boiler. Figure 4The form of the ash blocker 15 at the inlet of the waste heat boiler is given. The inlet of the waste heat boiler preferably adopts a square flue. The ash blocker is a "V-shaped" steel plate structure, and the opening of the "V-shape" faces the flue gas inlet. The "V-shape" is optimally arranged in two layers, which are staggered up and down. One layer can be arranged when the sintered ore is not severely broken.
[0075] As described above, the energy-saving combustion and waste heat recovery system of the rapid aluminum melting furnace according to the present invention is described by way of example with reference to the accompanying drawings. However, those skilled in the art should understand that various improvements can be made to the energy-saving combustion and waste heat recovery system of the rapid aluminum melting furnace proposed by the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the content of the attached claims.
Claims
1. A ring cooler cooling and waste heat recovery system, It is characterized in that The ring cooler cooling and waste heat recovery system includes: The sintered ore cooling module comprises a wind box connected to the bottom of the ring cooler and a fume hood connected to the top of the ring cooler. The fume hood is divided into a plurality of temperature sections according to the temperature of the cooling air. An exhaust valve is arranged on the fume hood of each temperature section. The wind box of each temperature section is connected to a cooling fan. The flue gas circulation module includes a first circulation fan, a second circulation fan, a third circulation fan, a high-temperature waste heat boiler, a sub-high-temperature waste heat boiler, and a medium-temperature waste heat boiler. The first circulation fan, the second circulation fan, and the third circulation fan are connected to the wind boxes of the three highest temperature sections according to the temperature, and the high-temperature waste heat boiler, the sub-high-temperature waste heat boiler, and the medium-temperature waste heat boiler are connected to the smoke hoods of the three highest temperature sections according to the temperature. A shut-off valve is arranged between each waste heat boiler and the smoke hood. The exhaust gas of the high-temperature waste heat boiler is sent to the medium-temperature waste heat boiler and mixed with the medium-temperature flue gas, and then mixed with the exhaust gas of the sub-high-temperature waste heat boiler and circulated to the first circulation fan, the second circulation fan, and the third circulation fan, and the water supply generates high and low pressure steam after passing through the medium-temperature waste heat boiler, the sub-high-temperature waste heat boiler, and the high-temperature waste heat boiler.
2. The cooling and waste heat recovery system of the annular cooler according to claim 1, It is characterized in that It also includes a circulating water module, which includes a high-pressure drum and a low-pressure drum. The medium-temperature waste heat boiler is provided with a low-pressure economizer and a low-pressure evaporator. The sub-high-temperature waste heat boiler is provided with a high-pressure economizer and a high-pressure evaporator. The high-temperature waste heat boiler is provided with a low-pressure superheater and a high-pressure superheater. The water supply is connected to the inlet of the low-pressure economizer, the outlet of the low-pressure economizer is connected to the riser of the low-pressure drum, the downcomer of the low-pressure drum is divided into two paths, one is connected to the inlet of the low-pressure evaporator, the outlet of the low-pressure evaporator is connected to the low-pressure drum, the other is connected to the inlet of the high-pressure economizer, the outlet of the high-pressure economizer is connected to the riser of the high-pressure drum, the downcomer of the high-pressure drum is connected to the inlet of the high-pressure evaporator, and the outlet of the high-pressure evaporator is connected to the high-pressure drum, The saturated steam discharged from the low-pressure drum is sent to the low-pressure superheater to form low-pressure steam, and the saturated steam discharged from the high-pressure drum is sent to the high-pressure superheater to form high-pressure steam.
3. The cooling and waste heat recovery system of the annular cooler according to claim 1, It is characterized in that The smoke hood is divided into a high temperature section, a sub-high temperature section, a medium temperature section, a cooling section one, and a cooling section two, and each cooling fan is connected to no more than three corresponding wind boxes, and each wind box in the high temperature section, the sub-high temperature section, and the medium temperature section is connected to a cooling fan.
4. The ring cooler cooling and waste heat recovery system according to claim 3, It is characterized in that The exhaust temperature of the high temperature section is 500°C to 550°C, the exhaust temperature of the second high temperature section is 350°C to 420°C, and the exhaust temperature of the medium temperature section is 180°C to 300°C.
5. The cooling and waste heat recovery system of the annular cooler according to claim 1, It is characterized in that Corresponding to the flue gas emission mode, each exhaust valve is opened, the shut-off valve between each waste heat boiler and the smoke hood is closed, the air enters the ring cooler through the cooling fan to cool the ore, then enters the smoke hood and is discharged through the exhaust valve on the smoke hood; Corresponding to the waste heat recovery mode, the exhaust valves of the three temperature sections with the highest temperature are closed, and the shut-off valves between each waste heat boiler and the smoke hood are opened. The circulating air passes through the first circulation fan, the second circulation fan, and the third circulation fan to enter the ring cooler to cool the mineral material and then enter the smoke hood, and then returns to the first circulation fan, the second circulation fan, and the third circulation fan after passing through the flue gas circulation module. In addition, the air passes through the cooling fans of other temperature sections to cool the mineral material and then enters the smoke hood and is discharged through the exhaust valve on the smoke hood.
6. The cooling and waste heat recovery system of the annular cooler according to claim 3, It is characterized in that Ore temperature measuring devices are respectively provided at the ore outlets of the first cooling stage and the second cooling stage. When the ore temperature at the outlet of the first cooling stage exceeds 200°C, the number of cooling fans opened in the first cooling stage and the second cooling stage is increased; when the ore temperature at the outlet of the second cooling stage is lower than 150°C, the number of cooling fans opened in the second cooling stage is reduced.
7. The cooling and waste heat recovery system of the annular cooler according to claim 1, It is characterized in that The pressure head of the first circulation fan is 50Pa to 100Pa greater than the pressure head of the third circulation fan.
8. The cooling and waste heat recovery system for the annular cooler according to claim 1, It is characterized in that The exhaust gas temperature of the high-temperature waste heat boiler is 250°C to 300°C. The exhaust gas of the high-temperature waste heat boiler is sent into the mixed air section at the lower part of the medium-temperature waste heat boiler through the air duct as a mixed air flow. There is a certain inclination angle between the mixed air flow direction of the mixed air section and the medium-temperature flue gas flow direction, and the angle range is 30° to 60°. The negative pressure formed by the flow of the medium-temperature flue gas flow sucks in and mixes the mixed air flow.
9. The cooling and waste heat recovery system of the annular cooler according to claim 1, It is characterized in that The exhaust gas from the medium-temperature waste heat boiler is mixed with the exhaust gas from the sub-high-temperature waste heat boiler and is respectively sent to the high-temperature section, the sub-high-temperature section and the medium-temperature section through the first circulation fan, the second circulation fan and the third circulation fan for heat exchange.
10. The cooling and waste heat recovery system of the annular cooler according to claim 2, It is characterized in that The low-pressure drum is provided with a deaerator head, and the working pressure of the low-pressure drum is 0.3MPa-0.6MPa; the working pressure of the high-pressure drum is 1.0MPa-2.0MPa.
Citation Information
Patent Citations
Waste heat boiler for sintering circular cooler and heat-electricity combined supply system of waste heat boiler
CN101776399A
New technique for recovering heat energy of cooling waste gas
CN101865609A
System of step-by-step recycling and gradient utilization for sintering residual heat resources
CN105973016A
Waste heat recycling system for sintered hot ore and pellet cooling machine
CN111380366A
Cooling and waste heat recovery system of circular cooler
CN214009986U