An experimental device and experimental method for RC hyperbolic shell destruction test

By designing experimental equipment for RC hyperbolic shells, using an integrated casting experimental body module and hydraulic loading system, the analysis of the stress characteristics and damage characteristics of hyperbolic shells under multiple loads is achieved, and the difficulty in the prior art is solved. The problem of stress characteristics and damage characteristics of cooling tower barrels under multiple loads was analyzed, and the rationality of the calculation parameters of the cooling tower prototype structure and the correctness of the numerical simulation results were verified.

CN112229730BInactive Publication Date: 2024-11-01ZHENGZHOU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011012002.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-23
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively analyze the stress characteristics and damage characteristics of large hyperbolic cooling towers under multiple loads through model tests, especially the stress characteristics and damage characteristics of the tower under wind loads, which makes it impossible to verify the prototype structure of the cooling tower. The rationality of the calculation parameters and the correctness of the numerical simulation results.

Method used

An experimental equipment for RC hyperbolic shell failure test was designed. Through an integrated casting of the experimental body module and hydraulic loading system, the bidirectional axial force and bending moment loading of the hyperbolic shell under multiple loads was realized, and the prototype structure was simulated. The stress characteristics and damage characteristics under multiple loads, and the corresponding load is applied through the control system.

Benefits of technology

Accurate experimental analysis of the stress characteristics and damage characteristics of the hyperbolic shell model was realized, the rationality of the calculation parameters of the prototype structure of the cooling tower and the correctness of the numerical simulation results were verified, and the shortcomings of existing model experiments were made up.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112229730B_ABST
    Figure CN112229730B_ABST
Patent Text Reader

Abstract

The invention discloses an experimental device for RC hyperbolic shell destruction test, comprising a bottom plate, the bottom plate is arranged horizontally, a vertically arranged fixed column is arranged at a relative position on the front side of the bottom plate, a tie rod fixed plate is arranged at the rear side of the fixed column, a plurality of tie rod hydraulic devices are arranged at the rear side of the tie rod fixed plate, and each tie rod hydraulic device is provided with a longitudinally arranged horizontal hydraulic tie rod; a fixed frame is arranged at a relative position on the rear side of the bottom plate, a top hydraulic module is arranged at the top of the inner side of the fixed frame, a square wood is arranged at the bottom of the top hydraulic module, a left hydraulic module is arranged on the left side of the fixed frame, a gasket is arranged on the right side of the left hydraulic module, a right hydraulic module is arranged on the right side of the fixed frame, and a gasket is arranged on the left side of the right hydraulic module; an integral cast experimental body module is arranged at a relative position inside the fixed frame. The beneficial effects of the invention are: the force characteristics and failure characteristics of the hyperbolic shell under multiple loads can be accurately analyzed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of RC hyperbolic shells, and in particular relates to an experimental device and an experimental method for a RC hyperbolic shell destruction test. Background Art

[0002] Large hyperbolic cooling towers are an important part of the circulating water cooling system of thermal power plants and nuclear power plants. The hyperbolic shell is part of the shell of the cooling tower. During the entire service process, the cooling tower is mainly subjected to deadweight, temperature (winter temperature and summer temperature), wind load and earthquake. Since the cooling tower is high, has a large span and a very thin wall thickness, the wind load is often used as the control load in the structural design. The tower shell unit of the cooling tower is subjected to complex forces under the combination of deadweight + temperature + wind load or deadweight + wind load, and its force characteristics are somewhat different from those of the shear walls, floor slabs and shells in the building. Under the above loads, the hyperbolic shell unit mainly bears the axial force and bending moment in the meridian (vertical) direction and the axial force and bending moment in the hoop (horizontal direction), but the analysis of the tower shape and failure characteristics of the cooling tower under the above working conditions is mostly carried out by numerical simulation, and model tests are very rare. If the model test analysis results are available, the rationality of the parameters taken in the calculation of the prototype structure of the cooling tower can be verified, and the correctness of the numerical simulation results of the prototype structure can be verified. However, at present, the model tests of cooling towers at home and abroad are mainly wind tunnel tests and vibration table tests, and there are few laboratories in China that can conduct the above tests. For wind tunnel tests, only non-RC materials are generally used to make scaled models, and the surface wind pressure distribution characteristics are obtained through wind tunnel tests. There is no wind tunnel test using reinforced concrete materials to make scaled models to analyze the stress characteristics of the cooling tower tube and the lower support, and the cost of wind tunnel tests is high; and although there are cases of cooling tower vibration table tests in China, they are only a combination of deadweight and earthquake, and the stress characteristics and damage characteristics of each area of ​​the tower tube under the control load of wind load cannot be obtained. Therefore, it seems that the existing model tests in China have not yet achieved the content described in the present invention; without reasonable model tests, the rationality of the calculation parameters of the numerical model of the prototype structure of the cooling tower and the correctness of the simulation results cannot be verified, and the stress characteristics and damage characteristics of the hyperbolic shell under the test cannot be obtained. Therefore, in this paper, a reasonable scheme for the test and analysis of the hyperbolic shell model is designed based on the stress characteristics of the hyperbolic shell and the required load conditions. The corresponding boundary conditions and loading schemes are applied to the large-scale RC hyperbolic shell, which can realize the loading of hyperbolic bidirectional (horizontal and vertical) axial forces and moments. The stress characteristics and failure characteristics of the prototype structure under multiple loads can be reasonably simulated, and a certain reference can be provided for subsequent numerical simulations. Summary of the invention

[0003] The invention provides an experimental device for RC hyperbolic shell destruction test, which can accurately analyze the stress characteristics and destruction features of the hyperbolic shell under multiple loads.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0005] An experimental device for RC hyperbolic shell destruction test, comprising a bottom plate, the bottom plate is arranged horizontally, a vertically arranged fixed column is arranged at a relative position on the front side of the bottom plate, a tie rod fixed plate is arranged at the rear side of the fixed column, a plurality of tie rod hydraulic devices are arranged at the rear side of the tie rod fixed plate, and each tie rod hydraulic device is provided with a longitudinally arranged horizontal hydraulic tie rod; a fixed frame is arranged at a relative position on the rear side of the bottom plate, a top hydraulic module is arranged at the top of the inner side of the fixed frame, a square wood is arranged at the bottom of the top hydraulic module, a left hydraulic module is arranged on the left side of the fixed frame, a gasket is arranged on the right side of the left hydraulic module, a right hydraulic module is arranged on the right side of the fixed frame, and a gasket is arranged on the left side of the right hydraulic module; an integrally cast experimental body module is arranged at a relative position inside the fixed frame, and the integrally cast experimental body module includes a double A curved shell wall, wherein the top of the hyperbolic shell wall is provided with a plurality of top horizontal concrete loading beams, the bottom of the hyperbolic shell wall is provided with a plurality of bottom horizontal concrete loading beams, the left side of the hyperbolic shell wall is provided with a plurality of left horizontal steel loading beams, the right side of the hyperbolic shell wall is provided with a plurality of right horizontal steel loading beams, and the inside of the hyperbolic shell wall is provided with a plurality of embedded hook modules, the embedded hook modules include a front hook and a small square steel plate, the embedded hook modules are fixedly connected to the horizontal hydraulic pull rod, the top surface of the top horizontal concrete loading beam contacts the bottom surface of the square wood, the bottom surface of the bottom horizontal concrete loading beam contacts the top surface of the bottom plate, the left side of the left horizontal steel loading beam contacts the gasket on the left hydraulic module, and the right side of the right horizontal steel loading beam contacts the gasket on the right hydraulic module.

[0006] Furthermore, the top horizontal concrete loading beam, the bottom horizontal concrete loading beam, the left horizontal steel loading beam, and the right horizontal steel loading beam are all integrally cast with the integrally cast experimental body module.

[0007] Furthermore, the quantity and position of the horizontal hydraulic pull rods correspond to the quantity and position of the embedded hook modules.

[0008] Furthermore, a control system is provided at a relative position on the bottom plate, and the top hydraulic module, the right hydraulic module, the left hydraulic module, and a plurality of pull rod hydraulic devices are all electrically connected to the control system and controlled by the control system.

[0009] Furthermore, the casting positions of multiple top horizontal concrete loading beams are adapted to the surface curvature of the top of the hyperbolic shell wall, the casting positions of multiple bottom horizontal concrete loading beams are adapted to the surface curvature of the bottom of the hyperbolic shell wall, the casting positions of multiple left horizontal steel loading beams are adapted to the surface curvature of the left side of the hyperbolic shell wall, and the casting positions of multiple right horizontal steel loading beams are adapted to the surface curvature of the right side of the hyperbolic shell wall.

[0010] Furthermore, the above-mentioned experimental method of the experimental equipment for RC hyperbolic shell destruction test is characterized by comprising the following steps:

[0011] S1. First, according to the existing static limit load calculation results of cooling towers at home and abroad, the tower tube in a certain area of ​​the tower tube first cracking and final destruction position is used as the prototype structural geometric reference to produce the hyperbolic shell wall, determine the detailed dimensions of the hyperbolic shell wall, related parameters and two-way reinforcement ratio, and prepare the required amount of concrete, number of steel bars, templates and loading accessories, mainly including the preparation of the left horizontal steel loading beam and the right horizontal steel loading beam on both sides of the hyperbolic shell wall, the preparation of the top horizontal concrete loading beam and the bottom horizontal concrete loading beam, and the preparation of the embedded hook module required inside the hyperbolic shell wall;

[0012] S2. After the materials and accessories required for model making are prepared, the integral casting experimental body module is made, and the hyperbolic shell wall, the top horizontal concrete loading beam, the bottom horizontal concrete loading beam, the left horizontal steel loading beam, the right horizontal steel loading beam, and the embedded hook module are integrally cast; since this device does not involve the specific construction details of concrete pouring, it will not be described in detail;

[0013] S3, then install the bottom horizontal concrete loading beam and the fixed frame, place the cast integrated casting experimental body module in the relative position inside the fixed frame, install square wood on the top surface of the top horizontal concrete loading beam, install gaskets on the left side of the left horizontal steel loading beam and the right side of the right horizontal steel loading beam, and then install the top hydraulic module, the right hydraulic module, and the tie rod fixing plate;

[0014] S4. The next step is to conduct a vertical test on the integral casting experimental body module. Before the test, it is necessary to check whether the top horizontal concrete loading beam, the bottom horizontal concrete loading beam and the device are in uniform contact. Ensure that the shell and the device have a stable connection without stress concentration. First, start the top hydraulic module to preload the vertical force and bending moment of the hyperbolic shell, observe the situation of the integral casting experimental body module, and make sure that the top horizontal concrete loading beam and the bottom horizontal concrete loading beam are in uniform contact with the corresponding position. Otherwise, turn off the preloading and readjust the position of the top horizontal concrete loading beam and the bottom horizontal concrete loading beam. When the preloading is successfully used to determine that the top horizontal concrete loading beam and the bottom horizontal concrete loading beam are uniformly stressed, the integral casting experimental body module can be formally loaded. The control system can be used to adjust the top hydraulic module to apply the pre-calculated pressure or tension to meet the needs of the experimenter.

[0015] S5. The next step is to start the right hydraulic module and the left hydraulic module to realize the loading experiment of the hoop bending moment of the integral casting test body module; similarly, pre-loading is required to ensure that the left horizontal steel loading beam and the right horizontal steel loading beam are evenly stressed, and then the control system is used to adjust the left horizontal steel loading beam and the right horizontal steel loading beam to apply the pre-calculated pressure or tension to meet the tester's needs;

[0016] S6. Then, a longitudinal loading test is conducted on the integral casting test body module, which needs to be achieved by loading multiple pre-embedded hook modules on the surface. Multiple pre-embedded hook modules are welded to their corresponding horizontal hydraulic tie rods. Then, the tension of each tie rod hydraulic device is adjusted by the control system, and the pre-calculated tension is applied to each different horizontal hydraulic tie rod to meet the tester's needs.

[0017] S7. Finally, a comprehensive force test is carried out. The top hydraulic module, the right hydraulic module, the left hydraulic module, and multiple pull rod hydraulic devices are started at the same time. A comprehensive composite test of tension or thrust is carried out using pre-calculated data. The changes of the integrated casting test body module are observed and the data is recorded.

[0018] Compared with the prior art, the beneficial effects of the present invention are:

[0019] In the present invention, this experimental method can realize the experimental analysis of the stress characteristics and failure characteristics of the hyperbolic shell model, making up for the shortcomings of the existing model tests in China. It includes the loading of axial force and bending moment in the meridian (vertical) direction of the hyperbolic shell, the loading of eccentric tension and compression loads in the annular (horizontal) direction, and the application of multi-point loads on the surface of the hyperbolic shell to form a bidirectional bending moment. In combination with the test device-level prototype structure, a reasonable loading mechanism is selected and corresponding boundary conditions are designed, so that the stress characteristics and failure characteristics of the hyperbolic shell under multiple loads can be accurately analyzed. The obtained test results can verify the rationality of the parameters taken when calculating the prototype structure of the cooling tower, and can verify the correctness of the numerical simulation results of the prototype structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the present invention;

[0021] Figure 2 It is a structural schematic diagram of the fixed frame and the integrally cast experimental body module;

[0022] Figure 3 It is a cross-sectional view of the integrally cast experimental body module;

[0023] Figure 4 A structural schematic diagram of another perspective of the present invention;

[0024] Figure 5This is a schematic diagram of the structure of the embedded hook module.

[0025] In the figure: 1. fixed frame, 2. hyperbolic shell wall, 3. top horizontal concrete loading beam, 4. left horizontal steel loading beam, 5. embedded hook module, 6. small square steel plate, 7. horizontal hydraulic tie rod, 8. square wood, 9. gasket, 10. tie rod fixing plate, 11. right hydraulic module, 12. top hydraulic module, 13. bottom horizontal concrete loading beam, 14. right horizontal steel loading beam, 15. integral casting experimental body module, 16. bottom plate, 17. left hydraulic module, 18. tie rod hydraulic device, 19. fixed column, 20. front hook. DETAILED DESCRIPTION

[0026] Example: Figures 1 to 5As shown, it includes a bottom plate 16, which is arranged horizontally, and a vertically arranged fixed column 19 is provided at a relative position on the front side of the bottom plate 16, and a tie rod fixing plate 10 is provided on the rear side of the fixed column 19, and a plurality of tie rod hydraulic devices 18 are provided on the rear side of the tie rod fixing plate 10, and each tie rod hydraulic device 18 is provided with a longitudinally arranged horizontal hydraulic tie rod 7; a fixed frame 1 is provided at a relative position on the rear side of the bottom plate 16, and a top hydraulic module 12 is provided on the top of the inner side of the fixed frame 1, and a square wood 8 is provided at the bottom of the top hydraulic module 12, and a left hydraulic module 17 is provided on the left side of the fixed frame 1, and a gasket 9 is provided on the right side of the left hydraulic module 17, and a right hydraulic module 11 is provided on the right side of the fixed frame 1, and a gasket 9 is provided on the left side of the right hydraulic module 11; an integrally cast experimental body module 15 is provided at a relative position inside the fixed frame 1, and the integrally cast experimental body module 15 includes a hyperbolic shell Wall 2, a plurality of top horizontal concrete loading beams 3 are provided on the top of the hyperbolic shell wall 2, a plurality of bottom horizontal concrete loading beams 13 are provided on the bottom of the hyperbolic shell wall 2, a plurality of left horizontal steel loading beams 4 are provided on the left side of the hyperbolic shell wall 2, a plurality of right horizontal steel loading beams 14 are provided on the right side of the hyperbolic shell wall 2, a plurality of pre-embedded hook modules 5 are provided inside the hyperbolic shell wall 2, the pre-embedded hook module 5 includes a front hook 20 and a small square steel plate 6, the pre-embedded hook module 5 is fixedly connected to the horizontal hydraulic pull rod 7, the top surface of the top horizontal concrete loading beam 3 is in contact with the bottom surface of the square wood 8, the bottom surface of the bottom horizontal concrete loading beam 13 is connected with the top surface of the bottom plate 16, the left side of the left horizontal steel loading beam 4 is in contact with the gasket on the left hydraulic module 17, and the right side of the right horizontal steel loading beam 14 is in contact with the gasket on the right hydraulic module 11. The top horizontal concrete loading beam 3, the bottom horizontal concrete loading beam 13, the left horizontal steel loading beam 4, and the right horizontal steel loading beam 14 are all integrally cast with the integrally cast experimental body module 15. The number and position of the horizontal hydraulic tie rods 7 correspond to the number and position of the embedded hook modules 5. A control system is provided at the relative position on the bottom plate 16. The top hydraulic module 12, the right hydraulic module 11, the left hydraulic module 17, and multiple tie rod hydraulic devices 18 are all electrically connected to the control system and controlled by the control system. The casting positions of multiple top horizontal concrete loading beams 3 are adapted to the surface curvature of the top of the hyperbolic shell wall 2, the casting positions of multiple bottom horizontal concrete loading beams 13 are adapted to the surface curvature of the bottom of the hyperbolic shell wall 2, the casting positions of multiple left horizontal steel loading beams 4 are adapted to the surface curvature of the left side of the hyperbolic shell wall 2, and the casting positions of multiple right horizontal steel loading beams 14 are adapted to the surface curvature of the right side of the hyperbolic shell wall 2.

[0027] Working process: First, install the templates of the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13, and the templates of the hyperbolic shell wall 2. Since they are concrete materials cast together with the hyperbolic shell wall 2, attention should be paid to the positioning of the templates of the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13. At the same time, it should be noted that when installing the templates of the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13, a certain eccentricity should be set according to the curvature of the hyperbolic shell wall 2, so that the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13 are always aligned with the corresponding The surface of the hyperbolic shell wall 2 is relatively vertical, so that the accuracy of the bending moment effect simulation can be guaranteed during the later loading; the left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 can be directly fixed to the stress-bearing steel bars inside the hyperbolic shell wall 2 by binding or welding. At the same time, the left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 penetrate the hyperbolic shell wall 2, so the corresponding holes need to be reserved when the hyperbolic shell wall 2 is manufactured; for the positioning of the embedded hook module 5, it is also directly fixed to the hyperbolic shell wall by binding or welding. 2; for the multiple left horizontal steel loading beams 4 and multiple right horizontal steel loading beams 14 on the left and right sides of the integrally cast experimental body module 15, it is necessary to keep the load of each left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 uniform during the experiment, install square wood 8 on the top surface of the top horizontal concrete loading beam 3, and install gaskets 9 on the left side of the left horizontal steel loading beam 4 and the right side of the right horizontal steel loading beam 14 to avoid stress concentration on the vertical or horizontal loading point of the integrally cast experimental body module 15 during loading due to the small contact surface, which may damage the The loading points on the integrally cast experimental body module 15 will be damaged, and the rationality of the results will also be affected; for the reasonable realization of multi-point loads on the surface of the hyperbolic shell wall 2, what is needed is that the horizontal hydraulic tie rod 7 and the embedded hook module 5 are completely fixedly connected (generally by welding), and cannot be connected only by hanging hooks, because the loading on the surface of the integrally cast experimental body module 15 must be able to achieve the application of pressure and tension, the purpose is to compensate for and offset the deficiency and excess of the bending moment formed by the bidirectional eccentric load, so that the test loading scheme can be prepared to simulate the actual stress characteristics of the hyperbolic shell wall 2. At the same time, each loading point of the embedded hook module 5 on the surface is hydraulically loaded independently, that is, the length of each horizontal tie rod can be adjusted separately to achieve the control of the load size of different loading points.

[0028] The experimental method based on an experimental device for RC hyperbolic shell destruction test includes the following steps:

[0029] S1. First, according to the existing static limit load calculation results of cooling towers at home and abroad, the tower tube in a certain area of ​​the tower tube first cracking and final destruction position is used as the prototype structural geometric reference to manufacture the hyperbolic shell wall 2, determine the detailed dimensions of the hyperbolic shell wall 2, related parameters and bidirectional reinforcement ratio, and prepare the required amount of concrete, number of steel bars, templates and loading accessories, mainly including the preparation of the left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 on both sides of the hyperbolic shell wall 2, the preparation of the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13, and the preparation of the embedded hook module 5 required inside the hyperbolic shell wall 2;

[0030] S2. After the materials and accessories required for model making are prepared, the integral casting experimental body module 15 is made, and the hyperbolic shell wall 2, the top horizontal concrete loading beam 3, the bottom horizontal concrete loading beam 13, the left horizontal steel loading beam 4, the right horizontal steel loading beam 14, and the embedded hook module 5 are integrally cast; since this device does not involve the specific construction details of concrete pouring, it will not be described in detail;

[0031] S3, then install the bottom horizontal concrete loading beam 13 and the fixed frame 1, place the cast integral casting experimental body module 15 in the relative position inside the fixed frame 1, install the square wood 8 on the top surface of the top horizontal concrete loading beam 3, install the gasket 9 on the left side of the left horizontal steel loading beam 4 and the right side of the right horizontal steel loading beam 14, and then install the top hydraulic module 12, the right hydraulic module 11, and the tie rod fixing plate 10;

[0032] S4. The next step is to conduct a vertical test on the integrally cast experimental body module 15. Before the test, it is necessary to check whether the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13 are in uniform contact with the device. To ensure that the shell and the device have a stable connection without stress concentration, first start the top hydraulic module 12 to preload the vertical force and bending moment of the hyperbolic shell, observe the situation of the integrally cast experimental body module 15, and determine that the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13 are in uniform contact with the corresponding positions. Otherwise, turn off the preloading and readjust the positions of the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13. When the preloading is successfully used to determine that the top horizontal concrete loading beam 3 and the bottom horizontal concrete loading beam 13 are uniformly stressed, the integrally cast experimental body module 15 can be formally loaded. The control system can be used to adjust the top hydraulic module 12 to apply the pre-calculated pressure or tension to meet the needs of the experimenter.

[0033] S5, the next step is to start the right hydraulic module 11 and the left hydraulic module 17 to realize the loading experiment of the hoop bending moment of the integral casting experimental body module 15; similarly, pre-loading is required to ensure that the left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 are evenly stressed, and then the control system is used to adjust the left horizontal steel loading beam 4 and the right horizontal steel loading beam 14 to apply the pre-calculated pressure or tension to meet the needs of the tester;

[0034] S6. An experimental device for RC hyperbolic shell destruction test, characterized in that: a longitudinal loading test of the integrally cast experimental body module 15 is then carried out, which needs to be achieved by loading a plurality of pre-embedded hook modules 5 on the surface, the plurality of pre-embedded hook modules 5 are welded to the respective corresponding horizontal hydraulic tie rods 7, and then the tension of each tie rod hydraulic device 18 is adjusted respectively by the control system, and the pre-calculated tension is applied to each different horizontal hydraulic tie rod 7 to obtain the tester's needs;

[0035] S7. Finally, a comprehensive force test is carried out. The top hydraulic module 12, the right hydraulic module 11, the left hydraulic module 17, and the plurality of pull rod hydraulic devices 18 are started simultaneously. A comprehensive composite test of tension or thrust is carried out using pre-calculated data. Changes in the integral casting experimental body module 15 are observed and the data is recorded.

Claims

1. An experimental device for RC hyperbolic shell destruction test, characterized by: The invention comprises a bottom plate (16), wherein the bottom plate (16) is arranged horizontally, a vertically arranged fixed column (19) is provided at a relative position on the front side of the bottom plate (16), a tie rod fixed plate (10) is provided at the rear side of the fixed column (19), a plurality of tie rod hydraulic devices (18) are provided at the rear side of the tie rod fixed plate (10), and each tie rod hydraulic device (18) is provided with a longitudinally arranged horizontal hydraulic tie rod (7); a fixed frame (1) is provided at a relative position on the rear side of the bottom plate (16), a top hydraulic module (12) is provided at the top of the inner side of the fixed frame (1), a square wood (8) is provided at the bottom of the top hydraulic module (12), a left hydraulic module (17) is provided at the left side of the fixed frame (1), a gasket (9) is provided at the right side of the left hydraulic module (17), a right hydraulic module (11) is provided at the right side of the fixed frame (1), and a gasket (9) is provided at the left side of the right hydraulic module (11); an integral cast experimental body module (15) is provided at a relative position inside the fixed frame (1), and the integral cast experimental body module (15) comprises a hyperbolic shell wall ( 2), a plurality of top horizontal concrete loading beams (3) are provided at the top of the hyperbolic shell wall (2), a plurality of bottom horizontal concrete loading beams (13) are provided at the bottom of the hyperbolic shell wall (2), a plurality of left horizontal steel loading beams (4) are provided at the left side of the hyperbolic shell wall (2), a plurality of right horizontal steel loading beams (14) are provided at the right side of the hyperbolic shell wall (2), a plurality of pre-embedded hook modules (5) are provided inside the hyperbolic shell wall (2), the number and position of the horizontal hydraulic tie rods (7) correspond to the number and position of the pre-embedded hook modules (5), and each pre-embedded hook module (5) is fixedly connected to the horizontal hydraulic tie rod (7) at the corresponding position; the top surface of the top horizontal concrete loading beam (3) contacts the bottom surface of the square wood (8), the bottom surface of the bottom horizontal concrete loading beam (13) contacts the top surface of the bottom plate (16), the left side surface of the left horizontal steel loading beam (4) contacts the gasket on the left hydraulic module (17), and the right side surface of the right horizontal steel loading beam (14) contacts the gasket on the right hydraulic module (11); The casting positions of the plurality of top horizontal concrete loading beams (3) are adapted to the curvature of the curved surface at the top of the hyperbolic shell wall (2), the casting positions of the plurality of bottom horizontal concrete loading beams (13) are adapted to the curvature of the curved surface at the bottom of the hyperbolic shell wall (2), the casting positions of the plurality of left horizontal steel loading beams (4) are adapted to the curvature of the curved surface on the left side of the hyperbolic shell wall (2), and the casting positions of the plurality of right horizontal steel loading beams (14) are adapted to the curvature of the curved surface on the right side of the hyperbolic shell wall (2).

2. The experimental equipment for RC hyperbolic shell destruction test according to claim 1, characterized in that: The top horizontal concrete loading beam (3), the bottom horizontal concrete loading beam (13), the left horizontal steel loading beam (4), and the right horizontal steel loading beam (14) are all integrally cast and formed with the integrally cast experimental body module (15).

3. The experimental equipment for RC hyperbolic shell destruction test according to claim 1, characterized in that: A control system is provided at a relative position on the bottom plate (16); the top hydraulic module (12), the right hydraulic module (11), the left hydraulic module (17), and a plurality of tie rod hydraulic devices (18) are all electrically connected to the control system and are controlled by the control system.

4. An experimental method for an experimental device for RC hyperbolic shell destruction test based on any one of claims 1 to 3, characterized in that The following steps are involved: S1. First, according to the existing static limit load calculation results of cooling towers at home and abroad, the tower in a certain area where the tower first cracks and finally fails is used as the prototype structural geometric reference to manufacture the hyperbolic shell wall (2), determine the detailed dimensions of the hyperbolic shell wall (2) at various locations and the bidirectional reinforcement ratio, and prepare the required amount of concrete, the number of steel bars, the template and the loading accessories, including the preparation of the left horizontal steel loading beam (4) and the right horizontal steel loading beam (14) on both sides of the hyperbolic shell wall (2), the preparation of the top horizontal concrete loading beam (3) and the bottom horizontal concrete loading beam (13), and the preparation of the embedded hook module (5) required inside the hyperbolic shell wall (2); S2. After the materials and accessories required for model making are prepared, the integral casting experimental body module (15) is manufactured, and the hyperbolic shell wall (2), the top horizontal concrete loading beam (3), the bottom horizontal concrete loading beam (13), the left horizontal steel loading beam (4), the right horizontal steel loading beam (14), and the embedded hook module (5) are integrally cast; S3, then install the bottom horizontal concrete loading beam (13) and the fixed frame (1), place the cast integral casting experimental body module (15) at a relative position inside the fixed frame (1), install the square wood (8) on the top surface of the top horizontal concrete loading beam (3), install the gasket (9) on the left side of the left horizontal steel loading beam (4) and the right side of the right horizontal steel loading beam (14), and then install the top hydraulic module (12), the right hydraulic module (11), and the tie rod fixing plate (10); S4. The next step is to conduct a vertical test on the integrally cast experimental body module (15). Before the test, it is necessary to check whether the top horizontal concrete loading beam (3) and the bottom horizontal concrete loading beam (13) are in uniform contact with the device. To ensure that the shell and the device have a stable connection and do not cause stress concentration, firstly, the top hydraulic module (12) is started to preload the vertical force and bending moment of the hyperbolic shell, and the condition of the integrally cast experimental body module (15) is observed to determine whether the top horizontal concrete loading beam (3) and the bottom horizontal concrete loading beam (13) are in uniform contact with the corresponding positions. Otherwise, the preloading is turned off and the positions of the top horizontal concrete loading beam (3) and the bottom horizontal concrete loading beam (13) are readjusted. When the preloading is successfully used to determine that the top horizontal concrete loading beam (3) and the bottom horizontal concrete loading beam (13) are uniformly stressed, the integrally cast experimental body module (15) can be formally loaded. The control system can be used to adjust the top hydraulic module (12) to apply a pre-calculated pressure or tension to meet the tester's needs. S5. The next step is to start the right hydraulic module (11) and the left hydraulic module (17) to implement the loading test of the hoop bending moment of the integral casting test body module (15); similarly, pre-loading is required to ensure that the left horizontal steel loading beam (4) and the right horizontal steel loading beam (14) are evenly stressed, and then the control system is used to adjust the left horizontal steel loading beam (4) and the right horizontal steel loading beam (14) to apply the pre-calculated pressure or tension to meet the tester's needs; S6, then a longitudinal loading test is conducted on the integrally cast experimental body module (15), which needs to be achieved by loading a plurality of pre-embedded hook modules (5) on the surface. The plurality of pre-embedded hook modules (5) are welded to their respective corresponding horizontal hydraulic tie rods (7), and then the tension of each tie rod hydraulic device (18) is adjusted by the control system, and a pre-calculated tension is applied to each different horizontal hydraulic tie rod (7) to obtain the needs of the tester; S7. Finally, a comprehensive force test is performed. The top hydraulic module (12), the right hydraulic module (11), the left hydraulic module (17), and the plurality of pull rod hydraulic devices (18) are started simultaneously. A comprehensive composite test of tension or thrust is performed using pre-calculated data. Changes in the integral casting experimental body module (15) are observed and the data is recorded.