A super-thin high-type rock tunnel chamber and its construction method
By adopting the "wide upper and narrow upper" structure in tunnel construction and the initial support of anchor spraying combined with the oblique wall support group technology, the problem of poor stability of the surrounding rock in high span is solved, and safe and efficient Construction effect.
Patent Information
- Application Number
- CN202011304109.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-11-19
AI Technical Summary
In tunnel construction, high-span ratio ultra-fine high-type rock tunnel chambers have poor stability in surrounding rocks, which are prone to collapse, have high construction safety risks, and are low in efficiency of conventional support measures, making it difficult to achieve rapid and safe construction .
The "wide upper and narrow lower" structure consisting of vaults, oblique walls and straight edge walls is adopted, combined with the initial support and oblique wall support group of anchor spraying, and the alternating arrangement of anchor cables and anchor rods to form the initial anchor spraying stage. The support layer and drainage system will gradually implement the web spray concrete and secondary lining structure to achieve stable support effect.
It effectively controls the deformation of high side walls, reduces construction risks, improves construction safety and efficiency, is suitable for weak surrounding rock conditions, and realizes rapid, safe and efficient construction of ultra-fine and high-end tunnel chambers.
Smart Images

Figure CN112282797B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to an ultra-thin high-type rock tunnel chamber and a construction method thereof. Background Art
[0002] Since the 21st century, my country has built a large number of mountain railway, highway and other tunnels, and long-distance tunnels with small and medium-sized cross-sections account for a large proportion. The height span of the designed tunnel section is relatively small, mostly below 2, which belongs to conventional caverns, while there are fewer ultra-slender tunnel chambers.
[0003] In recent years, with the development of urban construction and the vigorous development and utilization of underground space in my country, in order to meet various special functions, more and more high-rise and slender underground caverns with large height-to-width ratios are being built. This type of cavern has a large height-to-span ratio. Compared with conventional caverns, the plastic zone of the side walls and the top surrounding rock after excavation has increased significantly in depth and width, which has a significant impact on the stability of the cavern surrounding rock. It is difficult to excavate and support, and it is easy to collapse in weak and poor geology, and the construction safety risk is relatively high. Summary of the invention
[0004] In order to solve the above problems, the present invention provides an ultra-thin high-type rock tunnel chamber and a construction method thereof, so as to realize the safe excavation of the ultra-thin high-type rock tunnel chamber.
[0005] To achieve the above object, the technical solution adopted by the present invention is as follows: a method for constructing an ultra-thin high-profile rock tunnel chamber, comprising the following steps:
[0006] S1: Tunnel chamber design: The tunnel chamber is composed of a vault, sloping side walls and straight side walls connected in sequence;
[0007] S2: Tunnel chamber step division: The tunnel chamber is divided vertically into several steps;
[0008] S3: Excavate the steps at the arch top, install the arch top anchor rods after the excavation is completed, and then construct the mesh shotcrete and anchor shotcrete initial support layer in sequence;
[0009] S4: Excavate the steps at the sloping wall. After the excavation is completed, construct the sloping wall support group, and then construct the mesh shotcrete and anchor shotcrete initial support layer in sequence;
[0010] S5: Excavate the steps at the straight side wall. After the excavation is completed, install the straight side wall anchor rods, and then construct the mesh shotcrete and anchor shotcrete initial support layer in sequence;
[0011] S6: After the initial anchor spraying support layer is deformed and stabilized, the drainage system layer is laid;
[0012] S7: After the waterproofing and drainage system layer is laid, the secondary lining structure is poured to form an ultra-thin high-profile rock tunnel chamber.
[0013] Furthermore, the tunnel chamber width is less than 10m, and the ratio of height to width is greater than 4.
[0014] Furthermore, the sloping side wall support group includes sloping side wall anchor cables and sloping side wall anchor rods, and the sloping side wall anchor cables and the sloping side wall anchor rods are alternately arranged.
[0015] Furthermore, the length of the bevel wall anchor cables is 9 to 25 m, the horizontal spacing is 3 to 5 m, and the vertical spacing is 3 to 5 m.
[0016] Furthermore, the step height is 3 to 8 m, and the step staggered distance is 5 to 10 m.
[0017] Furthermore, in step S3: the arch is divided into 1 to 2 steps, which are excavated from top to bottom in sequence. After each step is excavated, the arch anchor is installed, and then the mesh shotcrete and anchor shotcrete initial support layer are constructed in sequence.
[0018] Furthermore, in step S4: the bevel wall is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, a bevel wall support group is constructed, and then mesh shotcrete and anchor shotcrete initial support layers are constructed sequentially.
[0019] Furthermore, in step S5: the straight side wall is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, straight side wall anchor rods are installed, and then mesh shotcrete and anchor shotcrete initial support layers are constructed sequentially.
[0020] The present invention also provides an ultra-thin high-type rock tunnel chamber, comprising an arch, a sloping side wall and a straight side wall connected in sequence, an arch anchor rod is anchored on the arch, a sloping side wall support group is anchored on the sloping side wall, the sloping side wall support group is composed of a sloping side wall anchor cable and a sloping side wall anchor rod, and a straight side wall anchor rod is anchored on the straight side wall;
[0021] The mesh shotcrete, anchor shotcrete initial support layer, drainage system layer and secondary lining structure are arranged in sequence on the excavation wall of the tunnel chamber.
[0022] Furthermore, the connection end of the oblique side wall and the straight side wall is arranged closer to the central axis of the arch than the connection end of the oblique side wall and the arch, and the slope of the oblique side wall is 1:0.1 to 1:0.25.
[0023] The ultra-thin high-type rock tunnel chamber and the construction method thereof of the present invention have the following beneficial effects:
[0024] 1. In the present invention, the width of the ultra-thin high-type tunnel chamber is less than 10m, the ratio of height to width is greater than 4, the overall width is small, and the height is high. It is configured as a "wide at the top and narrow at the bottom" structure consisting of an arch, a sloping side wall and a straight side wall, and the slope of the sloping side wall is 1:0.1-1:0.25. The "wide at the top" increases the working space, facilitates the operation, and improves the work efficiency. In particular, the overall working surface decreases from top to bottom, which is conducive to ensuring the smooth transition of the cavern stress field and avoiding the sudden change of the cavern stress field caused by the straight-tube cavern operation.
[0025] 2. The present invention sets an initial anchor-sprayed support layer, that is, adopts an anchor-sprayed support form, which can effectively control the large deformation of the high side wall, especially under the surrounding rock conditions of soft, soft on the top and hard on the bottom, or uneven soft and hard. It has strong applicability, reduces construction risks, and ensures construction safety.
[0026] 3. The present invention sets a slant side wall support group, which is composed of a combination of slant side wall anchor cables and slant side wall anchor rods arranged alternately. The combined support of anchor cables and anchor rods can provide strong pull-out resistance, fully utilize the anchoring capacity deep in the surrounding rock, and effectively control the adverse effects of the enlarged plastic zone and increased surrounding rock deformation during the excavation of the super-high side wall. Change the defects of poor support capacity, large labor loss, and large investment of temporary support measures such as conventional steel arch frames and steel sections.
[0027] 4. The present invention provides a high side wall cavern structure type of "wide at the top and narrow at the bottom, oblique and straight combination", adopts the "anchor cable + long and short anchor rod" combined support parameter design, realizes the fast, safe and efficient construction of ultra-thin high-type tunnel caverns, and solves the technical difficulty that high-span ratio ultra-thin high-type rock tunnel caverns are prone to instability during construction.
[0028] 5. The present invention has clear tunnel chamber construction procedures and simple operation, and can realize small, medium and large-scale mechanized operations with strong feasibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0030] Figure 1 A schematic diagram of the structure of an ultra-thin high-profile rock tunnel chamber according to an embodiment of the present invention;
[0031] Figure 2 for Figure 1 Schematic diagram of the enlarged structure of part A.
[0032] Description of reference numerals:
[0033] 1-arch; 11-arch anchor rod; 2-bevel side wall; 21-bevel side wall support group; 211-bevel side wall anchor cable; 212-bevel side wall anchor rod; 3-straight side wall; 4-net shotcrete; 5-anchor shotcrete initial support layer; 6-drainage system layer; 7-secondary lining structure; 8-drainage pipe; 9-drainage ditch. DETAILED DESCRIPTION
[0034] In order to better understand the purpose, structure and function of the present invention, the following is a further detailed description of an ultra-thin high rock tunnel chamber of the present invention in conjunction with the accompanying drawings.
[0035] like Figure 1-2 As shown: A method for constructing an ultra-thin high-profile rock tunnel chamber, comprising the following steps:
[0036] S1: Tunnel chamber design: The tunnel chamber is designed as a structure consisting of a vault 1, a sloping side wall 2, and a straight side wall 3 connected in sequence. The cross-sectional span of the ultra-thin high-shaped rock tunnel chamber is small, the excavation height is high, and the space is narrow. Therefore, the tunnel chamber side wall is divided into a sloping side wall 2 and a straight side wall 3 from top to bottom. The sloping side wall 2 has a large space, which is conducive to the development of the working surface and improves work efficiency. In addition, the overall working surface decreases from top to bottom, which is conducive to ensuring the smooth transition of the chamber stress field, avoiding the sudden change of the chamber stress field caused by the straight-tube chamber operation, and ensuring construction safety.
[0037] Furthermore, the tunnel chamber width is less than 10m, and the ratio of height to width is greater than 4.
[0038] S2: Tunnel chamber step division: The tunnel chamber is divided vertically into several steps; that is, the step method is adopted for excavation, which can make full use of the limited working space for efficient excavation.
[0039] Furthermore, the step height is 3 to 8 m, and the step staggered distance is 5 to 10 m.
[0040] S3: Excavation of the steps at the arch 1. After the excavation is completed, the arch anchor rod 11 is promptly applied on the excavation surface of the cavern, and then the mesh shotcrete 4 is constructed in sequence, and then the anchor shotcrete initial support layer 5 is constructed.
[0041] More specifically, the arch 1 is divided into 1 to 2 steps, which are excavated from top to bottom. After each step is excavated, the arch anchor rod 11 is promptly installed on the cavern excavation surface, and then the mesh shotcrete 4 and the anchor shotcrete initial support layer 5 are constructed in sequence.
[0042] S4: Excavation of steps at the sloping side wall 2. After the excavation is completed, the sloping side wall support group 21 is constructed, and then the mesh shotcrete 4 and the anchor shotcrete initial support layer 5 are constructed in sequence;
[0043] Furthermore, the bevel wall 2 is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, a bevel wall support group 21 is constructed, and then mesh shotcrete 4 and anchor shotcrete initial support layer 5 are constructed sequentially.
[0044] Furthermore, the slant wall support group 21 includes slant wall anchor cables 211 and slant wall anchor rods 212, and the slant wall anchor cables 211 and slant wall anchor rods 212 are alternately arranged. The support within the range of the tunnel slant wall 2 is mainly the combined support of the slant wall anchor cables 211 and the slant wall anchor rods 212. The slant wall anchor rods 212 are of different lengths. The length of the slant wall anchor cables 211 is 9 to 25 meters, the horizontal spacing is 3 to 5 meters, and the vertical spacing is 3 to 5 meters, that is, the spacing between adjacent slant wall anchor cables 211 is 3 to 5 meters. Preferably, the length of the slant wall anchor cables 211 is 15 meters, the horizontal spacing is 5 meters, and the vertical spacing is 5 meters. The coordinated arrangement of the slant wall anchor cables 211 and the slant wall anchor rods 212 greatly strengthens the support.
[0045] Further, S5: excavation of steps at 3 locations of the straight side wall, after the excavation is completed, the straight side wall anchor rods 31 are installed, and then mesh shotcrete 4 and anchor shotcrete initial support layer 5 are constructed in sequence;
[0046] Furthermore, the straight side wall 3 is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, the straight side wall anchor rod 31 is applied, and then the mesh shotcrete 4 and the anchor shotcrete initial support layer 5 are constructed sequentially.
[0047] S5: After the initial anchor spraying support layer 5 is deformed and stabilized, the drainage system layer 6 is laid;
[0048] S6: After the waterproofing and drainage system layer 6 is laid, the secondary lining structure 7 is poured to form an ultra-thin high-type rock tunnel chamber.
[0049] The present invention also provides an ultra-thin high-type rock tunnel chamber, comprising a vault 1, a sloping side wall 2 and a straight side wall 3 connected in sequence, a vault anchor rod 11 is anchored on the vault 1, a sloping side wall support group 21 composed of a sloping side wall anchor cable 211 and a sloping side wall anchor rod 212 is anchored on the sloping side wall 2, and a straight side wall anchor rod 31 is anchored on the straight side wall 3; a mesh sprayed concrete 4, an anchor sprayed initial support layer 5, a waterproof and drainage system layer 6 and a secondary lining structure 7 are sequentially arranged on the excavated wall surface of the tunnel chamber.
[0050] Furthermore, the connection end of the oblique side wall 2 and the straight side wall 3 is arranged closer to the central axis of the arch 1 than the connection end thereof with the arch 1 , and the slope of the oblique side wall 2 is 1:0.1 to 1:0.25.
[0051] Furthermore, a drainage pipe 8 is provided on the drainage system layer 6 , and a drainage ditch 9 is provided in the tunnel chamber. The drainage pipe 8 is connected to the drainage ditch 9 and is used to discharge the water in the drainage system layer 6 into the drainage ditch 9 .
[0052] The present invention is further described above with the aid of specific embodiments, but it should be understood that the specific description here should not be construed as limiting the essence and scope of the present invention, and various modifications made to the above embodiments by ordinary technicians in the field after reading this specification are all within the scope of protection of the present invention.
Claims
1. A method for constructing an ultra-thin high-profile rock tunnel chamber, characterized in that: The following steps are involved: S1: Tunnel chamber design: The tunnel chamber is composed of a vault (1), a sloping side wall (2) and a straight side wall (3) connected in sequence; S2: Tunnel chamber step division: The tunnel chamber is divided vertically into several steps; S3: excavating the steps at the arch (1), installing the arch anchor (11) after the excavation is completed, and then constructing the mesh shotcrete (4) and the anchor shotcrete initial support layer (5) in sequence; S4: excavating the steps at the sloping side wall (2), constructing the sloping side wall support group (21) after the excavation is completed, and then constructing the mesh shotcrete (4) and the anchor shotcrete initial support layer (5) in sequence; S5: excavating steps at the straight side wall (3), installing straight side wall anchor rods (31) after excavation is completed, and then constructing mesh shotcrete (4) and anchor shotcrete initial support layer (5) in sequence; S6: After the initial anchor spraying support layer (5) is deformed and stabilized, the drainage system layer (6) is laid; S7: After the waterproofing and drainage system layer (6) is laid, the secondary lining structure (7) is poured to form an ultra-thin high-profile rock tunnel chamber; The tunnel chamber width is less than 10m, and the ratio of height to width is greater than 4; The sloping side wall support group (21) comprises sloping side wall anchor cables (211) and sloping side wall anchor rods (212), and the sloping side wall anchor cables (211) and the sloping side wall anchor rods (212) are arranged alternately; The length of the inclined wall anchor cables (211) is 9 to 25 m, the horizontal spacing is 3 to 5 m, and the vertical spacing is 3 to 5 m; The step height is 3~8m, and the step stagger distance is 5~10m; In step S3: the arch (1) is divided into 1-2 steps, which are excavated from top to bottom. After each step is excavated, an arch anchor rod (11) is installed, and then mesh shotcrete (4) and anchor shotcrete initial support layer (5) are constructed in sequence. In step S4: the sloping side wall (2) is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, a sloping side wall support group (21) is constructed, and then mesh shotcrete (4) and anchor shotcrete initial support layer (5) are constructed sequentially; In step S5: the straight side wall (3) is divided into 3 to 5 steps, and the steps are excavated sequentially from top to bottom. After each step is excavated, the straight side wall anchor rod (31) is installed, and then the mesh shotcrete (4) and the anchor shotcrete initial support layer (5) are constructed sequentially.
2. A method for constructing an ultra-thin high-profile rock tunnel chamber as claimed in claim 1, characterized in that: The tunnel chamber is an arch-shaped structure, comprising an arch (1), a sloping side wall (2) and a straight side wall (3) connected in sequence, the arch (1) being anchored with an arch anchor rod (11), the sloping side wall (2) being anchored with a sloping side wall support group (21), the sloping side wall support group (21) being composed of a sloping side wall anchor cable (211) and a sloping side wall anchor rod (212), and the straight side wall (3) being anchored with a straight side wall anchor rod (31); On the excavated wall surface of the tunnel chamber, mesh shotcrete (4), an anchor shotcrete initial support layer (5), a waterproof and drainage system layer (6) and a secondary lining structure (7) are sequentially arranged.
3. A method for constructing an ultra-thin high-profile rock tunnel chamber as claimed in any one of claims 1 to 2, characterized in that: The connection end of the oblique side wall (2) and the straight side wall (3) is arranged closer to the central axis of the arch (1) than the connection end of the oblique side wall (2) and the arch (1), and the slope of the oblique side wall (2) is 1:0.1-1:0.25.