Virtual resource allocation method, device, system, electronic device and storage medium
By matching the target population and automatically matching resource promotion projects by user information, the problem of low virtual resource allocation efficiency in the existing technology is solved, and efficient allocation and rationality of resource promotion projects are achieved.
Patent Information
- Application Number
- CN202011270013.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-13
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-11-13
AI Technical Summary
The resource allocation execution efficiency of existing virtual resource allocation methods is low, and the resource promoter needs to set up complex allocation rules for each resource promotion project, which leads to time-consuming and labor-consuming.
By detecting the matching of user information and target population, based on the pre-set correspondence between target population and resource promotion project, the resource promotion project is automatically matched, the resource acquisition task is updated, and the promotion resource information is added to the task to improve the efficiency of resource allocation and rationality.
It reduces the difficulty of preliminary preparations for resource promotion projects, shortens preparation time, improves resource allocation execution efficiency, and improves the rationality of resource allocation.
Smart Images

Figure CN112330367B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present invention relate to the field of warehousing and logistics, and in particular to a virtual resource allocation method, device, system, electronic device and storage medium. Background Art
[0002] Existing virtual resource allocation methods usually allocate resources according to fixed allocation rules, such as user address or user gender. Therefore, resource promoters are required to set corresponding allocation rules for each resource promotion project. When multiple resource promotion projects are carried out at the same time, resource promoters usually need to comprehensively and repeatedly consider various factors when setting the priority of each resource promotion project. Therefore, the promotion of each resource promotion project is a time-consuming and labor-intensive project.
[0003] The inventors discovered during the process of implementing the present invention that the virtual resource allocation method in the prior art at least has the problem of low resource allocation execution efficiency. Summary of the invention
[0004] The embodiments of the present invention provide a virtual resource allocation method, device, system, electronic device and storage medium, which solve the problem of low resource allocation execution efficiency in the existing virtual resource allocation method.
[0005] In a first aspect, an embodiment of the present invention provides a virtual resource allocation method, comprising:
[0006] When a current resource acquisition task is detected, user information of the current resource acquisition task is extracted;
[0007] Matching the user information with each target population in the target population set to determine the target population corresponding to the current resource acquisition task;
[0008] According to the preset correspondence between the target population and the resource promotion project, determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task;
[0009] The updated current resource acquisition task is sent to the task execution device, so that the task execution device performs a shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0010] In a second aspect, an embodiment of the present invention further provides a virtual resource allocation device, including:
[0011] The acquisition module is used to extract user information of the current resource acquisition task when detecting the current resource acquisition task;
[0012] A population matching module, used to match the user information with each target population in the target population set to determine the target population corresponding to the current resource acquisition task;
[0013] An updating module, for determining the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to the preset correspondence between the target population and the resource promotion project, and adding the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task, so as to update the current resource acquisition task;
[0014] The post-processing module is used to send the updated current resource acquisition task to the task execution device, so that the task execution device executes the shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0015] In a third aspect, an embodiment of the present invention further provides a resource acquisition task processing system, the system comprising:
[0016] The crowd selection unit is used to store the correspondence between the target crowd and the resource promotion project;
[0017] A matching unit is used to extract user information of the current resource acquisition task when a current resource acquisition task is detected; match the user information with each target population in a target population set to determine the target population corresponding to the current resource acquisition task; determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to a pre-set correspondence between the target population and the resource promotion project, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task; send the updated current resource acquisition task to the task execution device, so that the task execution device performs a shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0018] In a fourth aspect, an embodiment of the present invention further provides an electronic device, the electronic device comprising:
[0019] one or more processors;
[0020] A storage device for storing one or more programs;
[0021] When the one or more programs are executed by the one or more processors, the one or more processors implement the virtual resource allocation method as described in any embodiment.
[0022] In a fifth aspect, an embodiment of the present invention further provides a storage medium comprising computer executable instructions, wherein the computer executable instructions are used to execute the virtual resource allocation method as described in any embodiment when executed by a computer processor.
[0023] Compared with the prior art, the technical solution of the virtual resource allocation method provided by the embodiment of the present invention automatically matches the resource promotion project for the current resource acquisition task through the resource promotion project corresponding to the target population corresponding to the user information, so that the resource promoter only needs to set the corresponding relationship between each resource promotion project and the corresponding target population, thereby reducing the difficulty of the preliminary preparation work for each resource promotion project and shortening the preparation time for each resource promotion project, thereby improving the resource allocation execution efficiency of the resource promotion project. Moreover, by matching the resource promotion project for each resource acquisition task through the corresponding relationship between the target population and the resource promotion project, the rationality of resource allocation can also be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 is a flow chart of a virtual resource allocation method provided by an embodiment of the present invention;
[0026] Figure 2A is a flow chart of a virtual resource allocation system provided by an embodiment of the present invention;
[0027] Figure 2B is a flow chart of another virtual resource allocation system provided by an embodiment of the present invention;
[0028] Figure 3 is a flow chart of a virtual resource allocation device provided by an embodiment of the present invention;
[0029] Figure 4 is a structural block diagram of a resource acquisition task processing system provided by an embodiment of the present invention;
[0030] Figure 5 It is a structural block diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described through implementation methods with reference to the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Embodiment 1
[0033] Figure 1 is a flow chart of a virtual resource allocation method provided by an embodiment of the present invention. The technical solution of this embodiment is applicable to the case of automatically allocating virtual resources promoted by a resource promotion project. The method can be implemented in software and / or hardware and configured in a processor of a virtual resource allocation system. Figure 2A As shown, the virtual resource allocation system at least includes a crowd selection unit 11 and a matching unit 12 connected to the crowd selection unit 11. The method includes:
[0034] S101. When a current resource acquisition task is detected, extract user information of the current resource acquisition task.
[0035] This embodiment preferably obtains the current resource acquisition task in the task fulfillment phase from the task processing center, and extracts the user information of the current resource acquisition task, wherein the user information at least includes the user's age and gender, and preferably also includes the user's address, occupation, whether there are children, purchasing power, etc.
[0036] S102: Match the user information with each target population in the target population set to determine the target population corresponding to the current resource acquisition task.
[0037] Among them, the target population set includes one or more target populations corresponding to resource promotion projects, each resource promotion project corresponds to one or more target populations, and each target population corresponds to one or more resource promotion projects. When determining the target population of each resource promotion project, first obtain the promotion resource information of each resource promotion project, such as resource category. Then match the existing user data with at least the promotion resource information to determine the target population of each resource promotion project. The existing user data includes user behavior data, user tag data and risk control data. User behavior data includes user browsing, purchasing, adding purchases, searching behaviors, and data tags; user tag data includes age, gender, education, marital status, occupation, whether there are children, promotion sensitivity, activity, and purchasing power; risk control data is a user score calculated according to various risk control models, which intuitively represents the risk level of the user. In this embodiment, the population selection unit 11 preferably performs a matching operation between the existing user data and the promotion resource information of each resource promotion project to obtain the target population corresponding to each resource promotion project.
[0038] After determining the user information and the target population set of the current resource acquisition task, each target population in the target population set is matched with the user information of the current resource acquisition task to determine the target population with the highest matching degree with the user information of the current resource acquisition task.
[0039] In one embodiment, the target population set is a set of target populations corresponding to all current resource promotion projects.
[0040] In one embodiment, the target population set is the set of target populations corresponding to the current partial resource promotion projects. Specifically, the set of all current resource promotion projects is taken as the first resource promotion project set; the first resource promotion project set is traversed to detect whether each resource promotion project in the first resource promotion project set has remaining virtual resources, and one or more resource promotion projects with remaining virtual resources in the first resource promotion project set are taken as the second resource promotion project set; the second resource promotion project set is traversed to take one or more resource promotion projects in the second resource promotion project set whose resource acquisition task strategy is consistent with the current resource acquisition task as the third resource promotion project set; the combination of target populations corresponding to each resource promotion project in the third resource promotion project set is taken as the target population set.
[0041] In one embodiment, see Figure 2BThe virtual resource allocation system is also provided with an inventory unit 14 for managing various promotion resources, a strategy unit 15 for managing resource acquisition task strategies, and an activity unit 13 for managing resource promotion projects. The inventory unit 14 is specifically used to record the increase and decrease records of various promotion resources in real time; the activity unit 13 is specifically used to receive resource promotion project information input by users, such as promotion period, promotion resource information, and resource acquisition task strategies; it is also used for users to review resource promotion projects to be opened, and monitor and modify opened resource promotion projects.
[0042] Among them, the resource acquisition task strategy includes but is not limited to the category matching principle, the regional matching principle, etc. The so-called category matching principle means that the resource category of the virtual resources contained in the current resource acquisition task must be the same as the resource category of the promotional resources of the corresponding resource promotion project. Exemplarily, if the current resource acquisition task includes infant formula, it is consistent with the resource promotion project of infant formula, but not consistent with resource promotion projects of other categories. The so-called regional matching principle means that the delivery address of the current resource acquisition task must be consistent with the key delivery area of the corresponding resource promotion project. Exemplarily, if the current resource acquisition task includes specialties of the Northeast region, it is consistent with the resource promotion project of specialties of the Northeast, but not consistent with resource promotion projects of other regions.
[0043] In one embodiment, the resource library, that is, the inventory unit 14, will obtain the preset promotion quantity of the newly added resource promotion project when it detects that there is a new resource promotion project, and lock the promotion resources of the preset promotion quantity in advance before the new resource promotion project is started. The promotion resource is the virtual resource promoted by the new resource promotion project. The inventory unit 14 is connected to one or more physical resource libraries. It can be understood that when the quantity of any promotion resource in the inventory unit changes, the inventory unit will update the quantity of the promotion resource in real time. When the quantity of any promotion resource is zero, it indicates that there is no corresponding virtual resource for the resource promotion project. At this time, the resource promotion project corresponding to the promotion resource needs to be deleted from the first resource promotion project set.
[0044] S103. Determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to the pre-set correspondence between the target population and the resource promotion project, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task.
[0045] The correspondence between the target population and the resource promotion project records all resource promotion projects corresponding to each target population. For example, the target population is the elderly, and there are two current resource promotion projects corresponding to the target population, namely, elderly milk powder and elderly health products.
[0046] If the current target population corresponds to multiple resource promotion projects, then multiple resource promotion projects will be determined at the same time based on the corresponding relationship. At this time, one resource promotion project is selected from the multiple resource promotion projects according to the preset resource selection rules, and the selected resource promotion project is determined as the resource promotion project that matches the current resource acquisition task.
[0047] Among them, the preset selection rules include but are not limited to the mutual exclusion principle and the priority principle. For example, if the current resource acquisition task includes skimmed milk, and there are two resource promotion projects corresponding to the target population corresponding to the current resource acquisition task, namely skimmed milk powder and whole milk, then according to the set mutual exclusion principle of skimmed and whole milk, the resource promotion project of skimmed milk powder is used as the resource promotion project corresponding to the target population. If the current resource acquisition task includes beverages, there are two resource promotion projects corresponding to the target population corresponding to the current resource acquisition task, namely tea beverages and coffee beverages. If the priority of the resource promotion project of coffee beverages is higher than the priority of the resource promotion project of tea beverages, the resource promotion project of coffee beverages corresponding to the target population is determined.
[0048] After determining the resource promotion project corresponding to the target population, the promotion resource information of the resource promotion project is added to the current resource acquisition task to update the current resource acquisition task. It can be understood that the updated current resource acquisition task includes the virtual resources actively acquired by the user and the added resources to be acquired.
[0049] S104: Send the updated current resource acquisition task to the task execution device, so that the task execution device executes a shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0050] The updated current resource acquisition task is sent to the task execution device so that the task execution device completes the shipment processing of the updated current resource acquisition task.
[0051] In order to facilitate resource acquisition task management, this embodiment preferably also transmits the updated current resource acquisition task back to the task processing center so that the task processing center updates the current resource acquisition task. It is understandable that after the task processing center updates the current resource acquisition task, if it detects a task query request sent by the client, it sends the resource details information of the corresponding resource acquisition task to the client, and the resource details information includes the virtual resources actively acquired by the user and the resources to be acquired, so that the user can check the information of the promotional resources added by the system while checking the virtual resources actively acquired by the user.
[0052] In some embodiments, feedback information of corresponding promotional resources input by the user is received, the resource acquisition record of the new user is determined based on the record of adding the promotional resource information and the record of the existing resource acquisition tasks, the resource repeated acquisition record of the user is determined based on the record of the existing resource acquisition tasks, and the promotion analysis result of each promotional resource is determined based on at least one of the feedback information of each promotional resource, the resource acquisition record of the new user and the resource repeated acquisition record of the user.
[0053] It should be noted that the above steps can also be performed by the task processing center. In this case, the task processing center sends the updated current resource acquisition task to the fulfillment device, and the fulfillment device performs fulfillment processing on it to obtain at least one subtask, and assigns the at least one subtask to the corresponding task execution device according to the preset fulfillment conditions, so that the task execution device can complete the shipment processing of the received subtask.
[0054] It can be understood that the resources to be acquired contained in the updated current resource acquisition task are assigned to one of the at least one subtask by the fulfillment device. Specifically, the fulfillment device adds the added information of the resources to be acquired to one of the at least two subtasks according to the preset rules. For example, the fulfillment device adds the added information of the resources to be acquired to one of the at least two subtasks according to the principle of proximity of the resource library, so that the resource library addresses of all virtual resources in the subtask are the same or similar; or the fulfillment device adds the added information of the resources to be acquired to one of the at least two subtasks according to the principle of the same resource category, so that the resource category of all virtual resources in the subtask is the same.
[0055] Compared with the prior art, the technical solution of the virtual resource allocation method provided by the embodiment of the present invention automatically matches the resource promotion project for the current resource acquisition task through the resource promotion project corresponding to the target population corresponding to the user information, so that the resource promoter only needs to set the corresponding relationship between each resource promotion project and the corresponding target population, thereby reducing the difficulty of the preliminary preparation work for each resource promotion project and shortening the preparation time for each resource promotion project, thereby improving the resource allocation execution efficiency of the resource promotion project. Moreover, by matching the resource promotion project for each resource acquisition task through the corresponding relationship between the target population and the resource promotion project, the rationality of resource allocation can also be improved.
[0056] Embodiment 2
[0057] Figure 3 : is a block diagram of a virtual resource allocation device provided in an embodiment of the present invention. The device is used to execute the virtual resource allocation method provided in any of the above embodiments, and the device can be optionally implemented in software or hardware. The device includes:
[0058] The task acquisition module 21 is used to extract user information of the current resource acquisition task when detecting the current resource acquisition task;
[0059] A crowd matching module 22 is used to match the user information with each target crowd in the target crowd set to determine the target crowd corresponding to the current resource acquisition task;
[0060] The updating module 23 is used to determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to the preset correspondence between the target population and the resource promotion project, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task;
[0061] The post-processing module 24 is used to send the updated current resource acquisition task to the task execution device, so that the task execution device executes the shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0062] Preferably, the population matching module is also used to filter out one or more resource promotion projects with remaining virtual resources from the first resource promotion project set to obtain a second resource promotion project set; filter out one or more resource promotion projects whose resource acquisition task strategies are consistent with the current resource acquisition task from the second resource promotion project set to obtain a third resource promotion project set; and take the combination of target populations corresponding to each resource promotion project in the third resource promotion project set as the target population set.
[0063] Preferably, the device also includes a population selection unit. For each resource promotion project, the population selection unit matches at least one of the existing user's behavior data, label data and risk control data with the category of the current resource promotion project, and obtains the target population corresponding to the current resource promotion project based on the matching result.
[0064] Preferably, the update module is also used to, if multiple resource promotion projects are determined according to the corresponding relationship, select a resource promotion project from the multiple resource promotion projects according to a preset resource selection rule, and determine the selected resource promotion project as a resource promotion project that matches the current resource acquisition task.
[0065] Preferably, when a new resource promotion project is detected, the preset promotion quantity of the new resource promotion project is obtained; before the new resource promotion project is started, a resource locking signal is sent to the resource library so that the resource library locks the target virtual resources of the preset promotion quantity, the target virtual resources being the virtual resources promoted by the new resource promotion project, wherein the resource locking signal includes the identifier of the virtual resource and the quantity of the virtual resource.
[0066] Preferably, the post-processing module is also used to transmit the updated current resource acquisition task back to the task processing center so that the task processing center can complete the update of the current resource acquisition task, and when a task query request sent by the client is detected, the task processing center sends the resource details information of the corresponding resource acquisition task to the client, and the resource details information includes the virtual resources actively acquired by the user and the resources to be acquired.
[0067] Preferably, the post-processing module is also used to obtain feedback information on corresponding promotional resources input by users; determine resource acquisition records of new users based on the addition records of promotional resource information and the records of existing resource acquisition tasks; determine resource repeated acquisition records of users based on the records of existing resource acquisition tasks; and determine the promotion analysis results of each promotional resource based on at least one of the feedback information of each promotional resource, the resource acquisition record of new users and the resource repeated acquisition record of users.
[0068] Compared with the prior art, the technical solution of the virtual resource allocation device provided by the embodiment of the present invention automatically matches the resource promotion project for the current resource acquisition task through the resource promotion project corresponding to the target population corresponding to the user information, so that the resource promoter only needs to set the correspondence between each resource promotion project and the corresponding target population, thereby reducing the difficulty of the preliminary preparation work for each resource promotion project and shortening the preparation time for each resource promotion project, thereby improving the resource allocation execution efficiency of the resource promotion project. Moreover, by matching the resource promotion project for each resource acquisition task through the correspondence between the target population and the resource promotion project, the rationality of resource allocation can also be improved.
[0069] The virtual resource allocation device provided in the embodiment of the present invention can execute the virtual resource allocation method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0070] Embodiment 3
[0071] Figure 2AA structural diagram of a resource acquisition task processing system provided by an embodiment of the present invention. The system includes a virtual resource allocation system, which includes a crowd selection unit 11 and a matching unit 12. The crowd selection unit 11 is used to store the correspondence between the target population and the resource promotion project; the matching unit 12 is used to extract the user information of the current resource acquisition task when the current resource acquisition task is detected; the user information is matched with each target population in the target population set to determine the target population corresponding to the current resource acquisition task; according to the correspondence between the pre-set target population and the resource promotion project, the resource promotion project corresponding to the target population corresponding to the current resource acquisition task is determined, and the promotion resource information of the resource promotion project is added to the current resource acquisition task as the resource information to be acquired, so as to update the current resource acquisition task; the updated current resource acquisition task is sent to the task execution device, so that the task execution device performs a shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0072] The user information includes at least the user's age and gender, and preferably also includes the user's address, occupation, whether or not there are children, purchasing power, etc.
[0073] Among them, the target population set includes one or more target populations corresponding to resource promotion projects, each resource promotion project corresponds to one or more target populations, and each target population corresponds to one or more resource promotion projects. When determining the target population of each resource promotion project, first obtain the promotion resource information of each resource promotion project, such as resource category, and then match the existing user data with at least the promotion resource information to determine the target population of each resource promotion project. Existing user data includes user behavior data, user tag data and risk control data. User behavior data includes user browsing, purchasing, adding purchases, searching behaviors, and data tags; user tag data includes age, gender, education, marital status, occupation, whether there are children, promotion sensitivity, activity, and purchasing power; risk control data is a user score calculated according to various risk control models, which intuitively represents the user's risk level. In this embodiment, the population selection unit 11 preferably performs a matching operation between the existing user data and the promotion resource information of each resource promotion project to obtain the target population corresponding to each resource promotion project.
[0074] After determining the user information and the target population set of the current resource acquisition task, each target population in the target population set is matched with the user information of the current resource acquisition task to determine the target population with the highest matching degree with the user information of the current resource acquisition task.
[0075] In one embodiment, the target population set is a set of target populations corresponding to all current resource promotion projects.
[0076] In one embodiment, the target population set is the set of target populations corresponding to the current partial resource promotion projects. Specifically, the set of all current resource promotion projects is taken as the first resource promotion project set; the first resource promotion project set is traversed to detect whether each resource promotion project in the first resource promotion project set has remaining virtual resources, and one or more resource promotion projects with remaining virtual resources in the first resource promotion project set are taken as the second resource promotion project set; the second resource promotion project set is traversed to take one or more resource promotion projects in the second resource promotion project set whose resource acquisition task strategy is consistent with the current resource acquisition task as the third resource promotion project set; the combination of target populations corresponding to each resource promotion project in the third resource promotion project set is taken as the target population set.
[0077] Among them, the resource acquisition task strategy includes but is not limited to the resource category matching principle, the regional matching principle, etc. The so-called resource category matching principle means that the resource category of the virtual resources contained in the current resource acquisition task must be the same as the resource category of the promotional resources of the corresponding resource promotion project. Exemplarily, if the current resource acquisition task includes infant formula, it is consistent with the resource promotion project of infant formula, but not consistent with resource promotion projects of other categories. The so-called regional matching principle means that the delivery address of the current resource acquisition task must be consistent with the key delivery area of the corresponding resource promotion project. Exemplarily, if the current resource acquisition task includes specialties of the Northeast region, it is consistent with the resource promotion project of specialties of the Northeast, but not consistent with resource promotion projects of other regions.
[0078] In one embodiment, Figure 2B As shown, the virtual resource allocation system is also provided with an inventory unit 14 for managing various promotion resources, a policy unit 15 for managing resource acquisition task strategies, and an activity unit 13 for managing resource promotion projects. The inventory unit 14 is specifically used to record the increase and decrease records of various promotion resources in real time; the activity unit 13 is specifically used to receive resource promotion project information input by the user, such as promotion period, promotion resource information, resource acquisition task strategy; and is also used for users to review resource promotion projects to be opened, and monitor and modify opened resource promotion projects.
[0079] In one embodiment, the resource library, that is, the inventory unit 14, will obtain the preset promotion quantity of the newly added resource promotion project when it detects that there is a new resource promotion project, and lock the promotion resources of the preset promotion quantity in advance before the new resource promotion project is started. The promotion resource is the virtual resource promoted by the new resource promotion project. The inventory unit is connected to one or more physical resource libraries. It can be understood that when the quantity of any promotion resource in the inventory unit changes, the inventory unit will update the quantity of the promotion resource in real time. When the quantity of a promotion resource is zero, it indicates that there are no corresponding remaining virtual resources for the resource promotion project. At this time, the resource promotion project corresponding to the promotion resource needs to be deleted from the first resource promotion project set.
[0080] The correspondence between the target population and the resource promotion project records all the resource promotion projects corresponding to each target population. For example, the target population is the elderly, and there are two corresponding resource promotion projects, namely, elderly milk powder and elderly health products.
[0081] If the current target population corresponds to multiple resource promotion projects, then multiple resource promotion projects will be determined at the same time based on the corresponding relationship. At this time, one resource promotion project is selected from the multiple resource promotion projects according to the preset resource selection rules, and the selected resource promotion project is determined as the resource promotion project that matches the current resource acquisition task.
[0082] Among them, the preset selection rules include but are not limited to the mutual exclusion principle and the priority principle. For example, if the current resource acquisition task includes skimmed milk, and there are two resource promotion projects corresponding to the target population corresponding to the current resource acquisition task, namely skimmed milk powder and whole milk, then according to the set mutual exclusion principle of skimmed and whole milk, the resource promotion project of skimmed milk powder is used as the resource promotion project corresponding to the target population. If the current resource acquisition task includes beverages, there are two resource promotion projects corresponding to the target population corresponding to the current resource acquisition task, namely tea beverages and coffee beverages. If the priority of the resource promotion project of coffee beverages is higher than the priority of the resource promotion project of tea beverages, the resource promotion project of coffee beverages corresponding to the target population is determined.
[0083] After determining the resource promotion project corresponding to the target population, the promotion resource information of the resource promotion project is added to the current resource acquisition task to update the current resource acquisition task. It can be understood that the updated current resource acquisition task includes the virtual resources actively acquired by the user and the added resources to be acquired.
[0084] The updated current resource acquisition task is sent to the task execution device so that the task execution device completes the shipment processing of the updated current resource acquisition task.
[0085] In some embodiments, feedback information of corresponding promotional resources input by the user is received, the resource acquisition record of the new user is determined based on the record of adding the promotional resource information and the record of the existing resource acquisition tasks, the resource repeated acquisition record of the user is determined based on the record of the existing resource acquisition tasks, and the promotion analysis result of each promotional resource is determined based on at least one of the feedback information of each promotional resource, the resource acquisition record of the new user and the resource repeated acquisition record of the user.
[0086] In one embodiment, see Figure 4 The virtual resource allocation system is also provided with a scheduling unit 16, and the matching unit 12 is connected to the crowd selection unit 11, the activity unit 13, the inventory unit 14 and the strategy unit 15 through the scheduling unit 16. When the matching unit 12 obtains the newly added resource acquisition task from the fulfillment device 011, it obtains the task information of the newly added resource acquisition task, and the task information includes but is not limited to the user information and the virtual resource information actively acquired by the user; the scheduling unit 16 obtains the ongoing resource promotion project from the activity unit 13, that is, the first resource promotion project set; then the scheduling unit 16 determines in the inventory unit 14 whether each resource promotion project in the first resource promotion project set still has remaining virtual resources, and uses one or more resource promotion projects with remaining virtual resources as the second resource promotion project set; then the scheduling unit 16 matches each resource promotion project in the second resource promotion project set with each resource acquisition task strategy in the strategy unit one by one, and In the second resource promotion project set, one or more resource promotion projects whose resource acquisition task strategy is consistent with the virtual resource information actively acquired by the user are used as the third resource promotion project set; then the scheduling unit 16 matches the user information with the target population corresponding to each resource promotion project in the third resource promotion project set to determine the target population of the newly added resource acquisition task, and sends the resource promotion project corresponding to the target population to the matching unit 12, so that the matching unit 12 adds the promotion resource information of the resource promotion project to the newly added resource acquisition task, updates the newly added resource acquisition task, and sends the newly added resource acquisition task to the task execution device 012, so that the task execution device 012 completes the shipment processing of the updated newly added resource acquisition task.
[0087] In some embodiments, the resource acquisition task processing system also includes a task processing center 010 and a fulfillment device 011. The task processing center 010 is used to detect the initial resource acquisition task in real time; the fulfillment device 011 is used to receive the initial resource acquisition task issued by the task processing center and perform fulfillment processing on the initial resource acquisition task to generate a resource acquisition task, and send the resource acquisition task that meets the preset fulfillment conditions to the matching unit.
[0088] In some embodiments, the matching unit 12 is further used to send the updated current resource acquisition task to the task processing center; the task processing center 010 is used to update the current resource acquisition task in real time, and when detecting the task query request sent by the client, send the resource details information of the corresponding resource acquisition task to the client, and the resource details information includes the virtual resources actively acquired by the user and the resources to be acquired. Thus, the user can view the information of the resources to be acquired while viewing the virtual resources actively acquired on the client.
[0089] Understandably, see Figure 4 As shown, the matching unit 12 is arranged between the fulfillment device 011 and the task execution device 012, receives the resource acquisition task sent by the fulfillment device 011, and sends the updated current resource acquisition task to the task execution device 012, so that the task execution device 012 executes the shipment processing. This embodiment combines the virtual resource allocation system with the traditional resource acquisition task processing system well, and improves the efficiency of resource allocation execution. Specifically, the user only needs to set the resource promotion project information in the activity unit of the virtual resource allocation system, such as the resource category used to determine the target population of the promotion resource; the user can also review the resource promotion project to be opened through the activity unit, and monitor and modify the opened resource promotion project.
[0090] Compared with the prior art, the technical solution of the resource acquisition task processing system provided by the embodiment of the present invention automatically matches the resource promotion project for the current resource acquisition task through the resource promotion project corresponding to the target population corresponding to the user information, so that the resource promoter only needs to set the correspondence between each resource promotion project and the corresponding target population, thereby reducing the difficulty of the preliminary preparation work for each resource promotion project, shortening the preparation time of each resource promotion project, thereby improving the resource allocation execution efficiency of the resource promotion project, and matching the resource promotion project for each resource acquisition task through the correspondence between the target population and the resource promotion project, which can also improve the rationality of resource allocation.
[0091] Embodiment 4
[0092] Figure 5 A schematic diagram of the structure of an electronic device system provided by an embodiment of the present invention is shown in FIG. Figure 5 As shown, the device includes a processor 301, a memory 302, an input device 303, and an output device 304; the number of processors 301 in the device can be one or more. Figure 5 A processor 301 is taken as an example; the processor 301, the memory 302, the input device 303 and the output device 304 in the device can be connected by a bus or other means. Figure 5 The example of connecting through bus is taken in the following.
[0093] The memory 302, as a computer-readable storage medium, can be used to store software programs, computer executable programs and units, such as program instructions / units corresponding to the virtual resource allocation method in the embodiment of the present invention (for example, the acquisition module 21, the crowd matching module 22, the update module 23 and the post-processing module 24). The processor 301 executes various functional applications and data processing of the device by running the software programs, instructions and units stored in the memory 302, that is, implements the above-mentioned virtual resource allocation method.
[0094] The memory 302 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and at least one application required for a function; the data storage area may store data created according to the use of the terminal, etc. In addition, the memory 302 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some instances, the memory 302 may further include a memory remotely arranged relative to the processor 301, and these remote memories may be connected to the device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0095] The input device 303 can be used to receive input digital or character information, and generate key signal input related to user settings and function control of the device, for example, receiving resource promotion project information input by the user.
[0096] The output device 304 may include a display device such as a display screen, for example, a display screen of a user terminal, for example, outputting the promotion analysis results of each promotion resource.
[0097] In one embodiment, the configuration interface of the activity unit described in the above embodiment is outputted through an output device; and the user configures the resource promotion project information on the configuration interface through an input device.
[0098] Embodiment 5
[0099] An embodiment of the present invention further provides a storage medium containing computer executable instructions, wherein the computer executable instructions are used to execute a virtual resource allocation method when executed by a computer processor, the method comprising:
[0100] When a current resource acquisition task is detected, user information of the current resource acquisition task is extracted;
[0101] Matching the user information with each target population in the target population set to determine the target population corresponding to the current resource acquisition task;
[0102] According to the preset correspondence between the target population and the resource promotion project, determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task;
[0103] The updated current resource acquisition task is sent to the task execution device, so that the task execution device performs a shipping operation on the resources to be acquired in the updated current resource acquisition task.
[0104] Of course, the computer executable instructions of a storage medium including computer executable instructions provided by an embodiment of the present invention are not limited to the operations of the method described above, but can also execute related operations in the virtual resource allocation method provided by any embodiment of the present invention.
[0105] Through the above description of the implementation methods, the technicians in the relevant field can clearly understand that the present invention can be implemented by means of software and necessary general hardware, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as a computer floppy disk, a read-only memory (ROM), a random access memory (RAM), a flash memory (FLASH), a hard disk or an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the virtual resource allocation method described in each embodiment of the present invention.
[0106] It is worth noting that in the embodiment of the above-mentioned virtual resource allocation device, the various modules and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.
[0107] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A virtual resource allocation method, characterized in that: include: When a current resource acquisition task is detected, user information of the current resource acquisition task is extracted; Matching the user information with each target population in a target population set to determine the target population corresponding to the current resource acquisition task, wherein the target population set is a set of target populations corresponding to some or all current resource promotion projects; According to the correspondence between the preset target population and the resource promotion project, the resource promotion project corresponding to the target population corresponding to the current resource acquisition task is determined, and the promotion resource information of the resource promotion project is added to the current resource acquisition task as the resource information to be acquired, so as to update the current resource acquisition task, and the updated current resource acquisition task includes the virtual resources actively acquired by the user and the added resources to be acquired; The updated current resource acquisition task is sent to the task execution device, so that the task execution device performs a delivery operation on the resources to be acquired in the updated current resource acquisition task and the virtual resources actively acquired by the user.
2. The method according to claim 1, characterized in that: The method for determining the target population set includes: Screening out one or more resource promotion projects with remaining virtual resources from the first resource promotion project set to obtain a second resource promotion project set; Filtering one or more resource promotion projects whose resource acquisition task strategies are consistent with the current resource acquisition task from the second resource promotion project set to obtain a third resource promotion project set; The combination of target groups corresponding to the resource promotion projects in the third resource promotion project set is taken as the target group set.
3. The method according to claim 1, characterized in that The method for determining the corresponding relationship includes: For each resource promotion project, at least one of the existing user's behavior data, label data, and risk control data is matched with the resource category of the current resource promotion project, and the target population corresponding to the current resource promotion project is obtained based on the matching results.
4. The method according to claim 1, characterized in that: The method further comprises: If multiple resource promotion projects are determined according to the corresponding relationship, one resource promotion project is selected from the multiple resource promotion projects according to a preset resource allocation rule, and the selected resource promotion project is determined as the resource promotion project that matches the current resource acquisition task.
5. The method according to claim 1, characterized in that Also includes: When a new resource promotion project is detected, the preset promotion quantity of the new resource promotion project is obtained; Before the newly added resource promotion project is started, a resource locking signal is sent to the resource library to enable the resource library to lock the preset promotion quantity of target virtual resources, wherein the target virtual resources are the virtual resources promoted by the newly added resource promotion project, and the resource locking signal includes the identifier of the virtual resource and the quantity of the virtual resources.
6. The method according to claim 1, characterized in that Also includes: The updated current resource acquisition task is transmitted back to the task processing center so that the task processing center can complete the update of the current resource acquisition task, and when a task query request sent by the client is detected, the resource details information of the corresponding resource acquisition task is sent to the client, and the resource details information includes the virtual resources actively acquired by the user and the resources to be acquired.
7. The method according to any one of claims 1 to 6, characterized in that After sending the updated current resource acquisition task to the task execution device so that the task execution device executes a shipping operation on the resources to be acquired in the updated current resource acquisition task, the method further includes: Obtaining feedback information input by users on corresponding promotional resources; Determine the resource acquisition record of the new user based on the added record of the promotion resource information and the record of the existing resource acquisition tasks; Determine the user's resource duplicate acquisition record based on the existing resource acquisition task record; The promotion analysis result of each resource promotion project is determined and outputted according to at least one of the feedback information of each promotion resource, the resource acquisition record of a new user and the resource repeated acquisition record of a user.
8. A virtual resource allocation device, characterized in that: include: The acquisition module is used to extract user information of the current resource acquisition task when detecting the current resource acquisition task; A population matching module is used to match the user information with each target population in a target population set to determine the target population corresponding to the current resource acquisition task, wherein the target population set is a set of target populations corresponding to some or all current resource promotion projects; An updating module, for determining the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to the correspondence between the preset target population and the resource promotion project, and adding the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task, so as to update the current resource acquisition task, wherein the updated current resource acquisition task includes the virtual resources actively acquired by the user and the added resources to be acquired; The post-processing module is used to send the updated current resource acquisition task to the task execution device, so that the task execution device performs a delivery operation on the resources to be acquired in the updated current resource acquisition task and the virtual resources actively acquired by the user.
9. A resource acquisition task processing system, characterized in that: The system includes: The crowd selection unit is used to store the correspondence between the target crowd and the resource promotion project; A matching unit is used to extract user information of the current resource acquisition task when a current resource acquisition task is detected; match the user information with each target population in a target population set to determine the target population corresponding to the current resource acquisition task, wherein the target population set is a set of target populations corresponding to some or all current resource promotion projects; determine the resource promotion project corresponding to the target population corresponding to the current resource acquisition task according to a preset correspondence between the target population and the resource promotion project, and add the promotion resource information of the resource promotion project as the resource information to be acquired to the current resource acquisition task to update the current resource acquisition task, wherein the updated current resource acquisition task includes the virtual resources actively acquired by the user and the added resources to be acquired; send the updated current resource acquisition task to a task execution device so that the task execution device performs a shipping operation on the resources to be acquired in the updated current resource acquisition task and the virtual resources actively acquired by the user.
10. The system according to claim 9, characterized in that Also includes; The task processing center is used to detect the initial resource acquisition tasks in real time; The fulfillment device is used to receive the initial resource acquisition task issued by the task processing center and perform fulfillment processing on the initial resource acquisition task to generate a resource acquisition task, and send the resource acquisition task that meets the preset fulfillment conditions to the matching unit.
11. The system according to claim 10, characterized in that The matching unit is also used to send the updated current resource acquisition task to the task processing center; The task processing center is used to update the current resource acquisition task in real time, and when detecting a task query request sent by a client, it sends resource detail information of the corresponding resource acquisition task to the client, wherein the resource detail information includes the virtual resources actively acquired by the user and the resources to be acquired.
12. An electronic device, characterized in that: The electronic device comprises: one or more processors; A storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the virtual resource allocation method according to any one of claims 1 to 7.
13. A storage medium containing computer executable instructions, characterized in that: When the computer executable instructions are executed by a computer processor, they are used to perform the virtual resource allocation method according to any one of claims 1 to 7.
