Enhanced Multi-Voltage Sag Ride-Through for Renewable Energy Power Plants with Battery Storage Systems

By monitoring and controlling the power dissipation system and battery storage system, the slow active power recovery of renewable energy power plants under weak grid conditions is achieved, solving the problems of grid instability and voltage oscillation, and improving the grid's resilience.

CN112368901BActive Publication Date: 2024-10-18VESTAS WIND SYSTEMS AS
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN201980042970.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-03
Publication Date
2024-10-18
Estimated Expiration
2039-06-03

AI Technical Summary

Technical Problem

Existing renewable energy power plants have difficulty performing slow active power recovery during multiple grid failures, especially in weak grid situations, which can easily lead to instability and voltage oscillations.

Method used

By monitoring the status of the power dissipation system, a lifting active power recovery method is adopted, and based on the monitoring results, the battery storage system is controlled to absorb the power generated by the generator to ensure slow recovery of active power and avoid overloading of the power dissipation system.

Benefits of technology

Slow active power recovery during multiple grid faults is achieved, reducing voltage oscillations, improving grid stability and extending the service life of power dissipation systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112368901B_ABST
    Figure CN112368901B_ABST
Patent Text Reader

Abstract

A method for operating a renewable energy power plant is provided, the renewable energy power plant comprising a plurality of renewable energy generators, a plurality of power dissipation systems and a battery storage system. The method comprises the following steps: monitoring the status of the power dissipation system; performing a step-up and step-down active power recovery operation after a voltage deviation; and controlling the battery storage system to absorb power generated by the renewable energy generators during the step-up and step-down active power recovery operation according to the monitored status of the power dissipation system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a control method for enhancing the performance of a renewable energy power plant, particularly a wind power plant, in a weak grid environment. Background Art

[0002] Wind power plants (WPPs) as well as other renewable energy plants are expected to comply with special requirements of the electricity network or external grid to which they are connected. One of these requirements is the requirement to remain connected to the grid during multiple or recurring grid faults (such as voltage dips) and to support the restoration of voltage levels to pre-fault levels by providing continuous active power.

[0003] During a voltage sag, active power drops and must therefore be raised back to pre-fault levels after the grid recovers from the fault. In some cases, it may be possible to raise active power back to pre-fault levels relatively quickly without any adverse effects on the grid. However, in some cases, especially where there are weak grid interconnections (e.g., connections with a short circuit ratio below 3 at the relevant bus), even relatively small changes in active power output may lead to instability and undesirable voltage oscillations. Ideally, therefore, a WPP should be able to raise active power back to pre-fault levels in a sufficiently slow and controlled manner to avoid causing instability and voltage oscillations.

[0004] One possible solution is to dissipate the power generated by the wind turbine generators (WTGs) by operating a power dissipation system or resistor system (called a chopper circuit) on the WTGs to control the increase in active power until the active power returns to pre-fault levels. However, if the WPP experiences multiple voltage dips in a short period of time, the chopper circuits may be overloaded. When one or more of the chopper circuits are overloaded, it may no longer be possible to maintain all WTGs connected while still achieving the desired active power recovery ramp rate.

[0005] The object of the present invention is to overcome the disadvantages associated with existing renewable energy power plants, in particular to increase the capability of the WPP to perform slow active power restoration during multiple grid faults, especially in weak grid situations. Summary of the invention

[0006] According to one aspect of the present invention, a method for operating a renewable energy power plant is provided, the renewable energy power plant comprising: a plurality of renewable energy generators configured to supply electricity to an external power grid; a plurality of power dissipation systems operable to dissipate the electricity generated by the renewable energy generators; and a battery storage system operable to absorb the electricity generated by the renewable energy generators; the method comprising the following steps: monitoring the status of the power dissipation system; performing a ramped active power recovery operation after a voltage deviation; and controlling the battery storage system to absorb the electricity generated by the renewable energy generators during the ramped active power recovery operation based on the monitored status of the power dissipation system.

[0007] The renewable energy generators may be wind turbine generators. However, in some cases, one or more of the renewable energy generators may be a different type of generator (eg, a solar generator).

[0008] The power dissipation system may be a resistor system (e.g., a chopper circuit) that may be configured to dissipate excess energy as heat. Each renewable energy generator may be provided with its own separate power dissipation system, which may be provided in a power converter system of the renewable energy generator. However, in some cases, a single power dissipation system may be configured to dissipate power generated by two or more renewable energy generators. Each power dissipation system may include one or more chopper resistors, and one or more semiconductor switches for controlling the operation of the chopper resistors.

[0009] The battery storage system may be connected to each of the renewable energy generators, for example via a local grid of a renewable energy power plant, and may be operable to absorb electricity generated by each of the renewable energy generators.

[0010] Monitoring the status of the power dissipation systems may include receiving sensor data relating to one or more parameters of each power dissipation system, and / or querying pre-programmed models and / or look-up tables.

[0011] The step of monitoring the status of the power dissipation systems may include performing a heat and / or energy mapping operation for each power dissipation system, for example based on thermal sensor data of each power dissipation system.

[0012] The step of monitoring the status of the power dissipation systems may include determining a thermal capacity of each power dissipation system, ie the capacity of each power dissipation system to absorb energy or power during a subsequent step-up active power recovery operation.

[0013] The step of monitoring the status of the power dissipation systems may include monitoring the capacity of each power dissipation system to participate in a boost active power recovery operation following a voltage excursion.

[0014] The step of monitoring the status of the power dissipation systems may comprise monitoring which of the power dissipation systems (and hence which of the renewable energy generators) are currently available to participate in step-up and step-down active power recovery operations following a voltage deviation.

[0015] The step of monitoring the status of the power dissipation systems may comprise determining the number of power dissipation systems (and hence the number of renewable energy generators) that are currently available or unavailable to participate in step-up and step-down active power recovery operations following a voltage excursion.

[0016] The step of monitoring the status of the power dissipation system may be repeated at timed intervals, such as 10 second timed intervals.

[0017] The step of controlling the battery storage system during the step-up active power recovery operation may include: determining a reference level of energy or electricity to be absorbed by the battery storage system based on the monitored state of the power dissipation system; and operating the battery storage system to absorb the electricity generated by the renewable energy generator based on the determined reference level of energy or electricity.

[0018] The step of controlling the battery storage system during the boost active power recovery operation may include: determining a reference level of energy or power to be absorbed by the battery storage system based on the number of power dissipation systems (and therefore the number of renewable energy generators) that are currently available or unavailable to participate in the boost active power recovery operation; and operating the battery storage system to absorb power generated by the renewable energy generator based on the determined reference level of energy or power.

[0019] The step of performing a ramp-up and ramp-down active power restoration operation may include applying a ramp-up and ramp-down rate to each power dissipation system according to a state of the power dissipation system.

[0020] The step of performing a ramp-up active power recovery operation may include: for each power dissipation system, if it is determined that the power dissipation system is available to participate in the ramp-up active power recovery operation, applying a first ramp rate, and if it is determined that the power dissipation system is not available to participate in the ramp-up active power recovery operation, applying a second ramp rate, the second ramp rate being faster than the first ramp rate. The first ramp rate may be a ramp rate for slow active power recovery. The first ramp rate may be a single constant ramp rate applied to each available power dissipation system, or alternatively, the first ramp rate may be a variable ramp rate and / or an adaptive ramp rate set individually for each available power dissipation system. The second ramp rate may be a default ramp rate that is significantly faster than the first ramp rate, which is applied to minimize the thermal load applied to the power dissipation system during the ramp-up active power recovery operation.

[0021] The method may further comprise the step of monitoring the renewable energy power plant, the external grid and / or a connection between the renewable energy power plant and the external grid to detect a predetermined grid condition.

[0022] The predetermined grid condition may be a weak grid condition.

[0023] The predetermined grid condition may be detected based on a short circuit ratio of the external grid. Alternatively or additionally, the predetermined grid condition may be detected based on one or more of: a) phase angle differences at different points in the power network; b) voltage level changes at one or more points in the network; and c) receipt of a command signal from an external protection system.

[0024] The step of monitoring the status of the power dissipating system may be performed only when a predetermined grid condition is detected.

[0025] The step of monitoring the status of the power dissipating system may be stopped upon determining that the predetermined grid condition no longer applies.

[0026] The method may further include the step of switching the battery storage system to a fast charging mode when a predetermined grid condition is detected.

[0027] The method may further include the step of returning the battery storage system to a normal operating mode when it is determined that the predetermined grid condition is no longer applicable.

[0028] According to another aspect of the present invention, there is provided a controller configured to control the operation of a renewable energy power plant according to the first aspect of the present invention.

[0029] According to another aspect of the present invention, there is provided a computer program which can be downloaded from a communication network and / or stored on a machine-readable storage medium, the computer program comprising program code instructions for implementing the method according to the first aspect of the present invention.

[0030] It is expressly intended that within the scope of this application, the various aspects, embodiments, examples and alternatives set forth in the preceding paragraphs, claims and / or the following description and drawings (particularly individual features thereof) may be used independently or in combination. That is, all embodiments and / or features of any embodiment may be combined in any manner and / or combination, unless such features are incompatible. Applicants reserve the right to change any originally filed claim or to file any new claim accordingly, including the right to amend any originally filed claim to be subordinate to any other claim and / or to combine any features of any other claim, even though not originally claimed to be protected in that manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] One or more embodiments of the present invention will now be described, by way of example only, with reference to the accompanying drawings, in which:

[0032] Figure 1 A wind power plant, its connection to the main grid and its control system are schematically illustrated;

[0033] Figure 2 Schematically illustrates Figure 1 A front view of a wind turbine generator of a wind power plant is shown;

[0034] Figure 3 Schematically illustrates Figure 2 The arrangement of the power generation and converter system of the wind turbine generator is shown;

[0035] Figure 4 The diagram shows a method for operating according to a possible embodiment of the present invention. Figure 1 Method steps for a wind power plant; and

[0036] Figure 5 Graphs illustrating various examples of active power ramping curves that may be implemented during ramping active power restoration operations following a voltage excursion are shown. DETAILED DESCRIPTION

[0037] Figure 1 The diagram shows a wind power plant (WPP) connected to a main transmission grid which is part of a wider electricity grid. Figure 3A typical architecture of a wind turbine generator (WTG), or more simply a "wind turbine", is illustrated. As will be appreciated by those skilled in the art, a WPP includes at least one WTG and is also referred to as a wind power plant or wind farm. The examples shown are representative only, and those skilled in the art will appreciate that other specific architectures are possible with respect to wind power plants, power plants for other renewable energy sources, wind turbine generators, and other renewable energy generation sources. Therefore, the present invention also relates generally to renewable energy power plants and renewable energy generators, rather than specifically to wind power plants and generators as shown. In addition, those skilled in the art will appreciate that the methods, systems, and techniques also described below are applicable to many different configurations of power networks. It is expected that in addition to Figure 1 and Figure 3 In addition to or as an alternative to the components shown and described in the drawings, other known components may be combined. Such changes will be within the capabilities of technicians.

[0038] Figure 1 There is shown an electric power network 10 incorporating a WPP 12. The WPP 12 comprises a plurality of WTGs 14 connected together by a local grid. Each of the plurality of WTGs 14 converts wind energy into electrical energy which is passed as active current from the WTG 14 to a main transmission network or main grid 16 for distribution.

[0039] Each of the WTGs 14 is associated with a corresponding WTG controller 15. In some embodiments, a group of WTGs may share a single, semi-centralized WTG controller such that there are fewer WTG controllers than WTGs. As will be appreciated by those skilled in the art, the WTG controller 15 may be viewed as a computer system capable of operating the WTG 14 in the manner specified herein, and may include multiple modules that control the various components of the WTG or may include only a single controller. The computer system of the WTG controller 15 may operate according to software downloaded via a communications network or software programmed thereon from a computer-readable storage medium.

[0040] During normal operation of the WPP 12, the WTG controller 15 operates to implement active and reactive current requests received from the power plant controller (PPC) 13. In abnormal situations, the WTG controller 15 operates to meet predetermined network requirements and also functions to protect the WTG 14 from any potentially harmful conditions.

[0041] Figure 2 A typical WTG 14 is shown in FIG. Figure 3A typical WTG architecture 28 with an associated controller 15 is shown in FIG. 1. The WTG 14 comprises a rotor 18 including a hub 20 to which are attached three blades 22. The rotor 18 is rotatably supported by a nacelle 24 which is mounted to the top of a tower 26 in the usual manner.

[0042] The nacelle 24 houses and supports the WTG 14. Figure 3 Various power generation components are described. As is well known, wind flow acting on blades 22 causes rotor 18 to rotate, which drives power generation equipment housed in nacelle 24.

[0043] Figure 2 The WTG 14 shown is an onshore WTG, although the invention is equally applicable to offshore WTGs. Here, the WTG 14 is a horizontal axis wind turbine (HAWT) with three blades, which is a common type of system, although there are other types with different numbers of blades to which the invention is also applicable.

[0044] Figure 3 Picture shows Figure 2 The system architecture of WTG 14 is 28. Figure 2 In the WTG 14 of FIG. 1 , the rotor 18 drives a transmission 30 by means of an input drive shaft 32. Although the transmission 30 is shown here in the form of a gearbox, it is also known that the WTG has a direct drive architecture that does not include a gearbox. The transmission 30 has an output shaft 34 that drives a generator 36 to generate three-phase power. In this way, the rotor 18 drives the generator 36 through the transmission 30.

[0045] The generator 36 is connected to a power converter 38 via a suitable three-phase electrical connector, such as a cable or bus. The power converter 38 converts the output frequency of the generator 36 to a frequency suitable for supply to the main grid 16. The output of the power converter 38 is transmitted to the grid 16 via a transformer 40. The operation of the power converter 38 is controlled by the WTG controller 15.

[0046] The power converter 38 includes a generator-side (or "machine-side") AC-DC converter 42 and a line-side (or "grid-side") DC-AC converter 44, which are connected via a DC link 46 (at Figure 3The DC link 46 includes a smoothing capacitor 48 and a power dissipation system or resistance system 50 (also referred to as a chopper circuit). The smoothing capacitor 48 operates to smooth the DC output, while the chopper circuit 50 acts as a dump load, enabling the dissipation of excess energy. The chopper circuit 50 combines a switch resistor (which includes a resistor 52, which is generally referred to as a "chopper resistor") and a semiconductor switch 54. By operating the switch 54 to include the chopper resistor 52 in the circuit 50, the active power output from the WTG 14 can be adjusted and limited as needed. The semiconductor switching device achieves regulation of the active power output by switching between "on" and "off" states at a high frequency and a specific duty cycle to produce the desired output. For example, using a 50% duty cycle will result in an output active power equal to half of the output power from the generator side converter being dissipated by the chopper resistor 52. For this purpose, suitable switching devices include integrated gate bipolar transistors (IGBTs) or metal oxide semiconductor field effect transistors (MOSFETs). The operation of chopper resistors (also called "dump loads") is well known to those skilled in the art, and therefore, for the sake of clarity, further discussion of such devices will not be included here. For example, chopper resistors are discussed in detail in the book "Wind Turbines" published by Erich Hau in 2006. Specifically, their operation is discussed in Chapter 10.4.

[0047] However, dissipating a large amount of excess energy in the chopper resistor 52 may result in a temperature increase that the chopper resistor 52 cannot handle, so it is particularly important to consider the capacity of the chopper resistor 52 .

[0048] return Figure 1 , the WPP 12 is provided with a battery storage system or BSS 17, which is connected to the WTG 14 via the local grid of the WPP 12. The BSS 17 is operable to absorb the active power generated by the WTG 14, and to supply power to the main grid 16. The operation of the BSS 17 may be controlled directly by the PPC 13, or alternatively by a separate control system provided at the WPP 12. For simplicity, the BSS 17 consists of Figure 1 12. However, it should be understood that the BSS 17 may include multiple battery storage modules at multiple separate locations in some cases and may be located at any suitable location within the WPP 12 and / or between the WPP 12 and the main grid 16.

[0049] As described above, each WTG 14 of the WPP 12 is connected to a local grid that links the WTGs 14. The WPP 12 is in turn suitably connected to a collector bus 56 via a feeder 58. The collector bus 56 may be at a voltage level suitable for relatively short distance power transmission (e.g., in the range of 10 kV to 150 kV, most typically between 110 kV and 150 kV). Although only a single WPP 12 is shown here for simplicity, the collector bus 56 may also provide a point of common coupling (PCC) for multiple wind farms.

[0050] The collector bus 56 is connected to a medium voltage bus 60, which in turn is connected to a main step-up transformer 62. The collector bus 56, the medium voltage bus 60, and the main step-up transformer 62 are connected by transmission lines 64, 66. The main transformer 62 is in turn connected to the main grid 16 at a point of interconnection (PoI) 68 via another transmission line 70. The PoI 68 is an interface between the WPP 12 and the main grid 16, and includes a PoI bus 72 having a higher nominal voltage level than the collector bus and the medium voltage buses 56, 60.

[0051] Although the collector bus and the medium voltage bus 56, 60 may need to span distances of up to about 100 km, the main grid 16 and the PoI bus 72 may be international, national, or regional grids (e.g., the National Grid of the United Kingdom), and thus may need to span distances of up to about 250 km or more. Therefore, for better transmission efficiency, the voltage levels of the main grid 16 and the PoI bus 72 may be much higher than the voltage levels of the collector bus and the medium voltage bus 56, 60. Thus, the main transmission grid 16 may include multiple substations and additional buses operating at different voltages, as well as additional transformers for increasing the voltage to improve the delivery of power. Figure 1 The illustrated transmission grid 16 includes at least one substation 74 and an associated feeder bus 76 connected to the PoI bus 72 via a transmission line 78 .

[0052] Connection lines such as transmission lines and feeders 58, 64, 66, 70, 78 may each include a protection system 80 to protect the various components from damage during or after extreme conditions. For example, it is contemplated to include at least an appropriate circuit breaker module or system in each line.

[0053] In the following, unless otherwise stated, references to connected components or connections between components shall be assumed to include suitable feeders or transmission lines as described above.

[0054] A power plant controller (PPC) 13 is connected to the power network at a point of measurement (PoM) 82 and is also directly connected to the WPP 12. The role of the PPC 13 is to act as a command and control interface between the WPP 12 and the power grid 16, more specifically between the WPP 12 and the grid operator or transmission system operator (TSO) 84. The PPC 13 is a suitable computer system for executing control and commands as described above, and therefore incorporates a processing module 86, a connection module 88, a memory module 90 and a sensing module 92. The PPC 13 may also receive information about the power grid 16 and / or local buses, substations and networks from an energy management system (not shown).

[0055] The PPC 13 is connected to the transmission line 70 between the main transformer 62 and the PoI bus 72 at the PoM 82 to allow monitoring and regulation of the output of the WPP 12 and to properly interpret the power demand. The PPC 13 is also connected to the medium voltage bus 60 to measure various parameters representing the state of the grid 16 and the WPP 12, which can be used to improve the output of the WPP 12 to best meet the requirements of the TSO 84 or the requirements set forth in a set of grid-specific requirements.

[0056] The PPC 13 is equipped to measure various parameters including a representative power output to be supplied by the WPP 12 to the main grid at the PoI 68. Since the PoM 82 is not located at the PoI 68, the parameters measured are only representative, as losses in the lines between the PoM 82 and the PoI 68 and between the PoM 82 and the PPC 13 may affect the measurements. Appropriate compensation may be performed to account for the losses, thereby ensuring that the measurements are accurate.

[0057] The PPC 13 measures parameters of the power output, such as reactive and active power exchange between the WPP 12 and the main grid 16, and the voltage level of the main grid 16. The PPC 13 compares the measured parameters with specific grid requirements and transmits control commands to specific components of the WPP 12 accordingly in an appropriate manner. The WPP 12 is able to change its power or voltage output in response to commands received from the PPC 13. It should be noted that Figure 1 The diagram is schematic and therefore does not explicitly depict the manner in which control commands are communicated. However, it will be appreciated that suitable cables may be provided to interconnect the PPC 13 and the WTG 14 or WTG controller 15 and to the BSS 17. The interconnection may be a direct or "point-to-point" connection, or may be part of a local area network (LAN) operating with a suitable protocol (e.g., CAN bus or Ethernet). Furthermore, it will be appreciated that, in addition to the use of cables, the interconnection may be accomplished via a suitable wireless network (e.g., WiFi). TM or ZigBeeTM The control commands are wirelessly transmitted using wireless networks operating with IEEE 802.11 and 802.15.4 standards, respectively.

[0058] As described above, the PPC 13 manages the WPP 12 according to a set of grid requirements specific to the main grid 16. Specific situations require different modes of operation. In particular, the operation of the PPC 13 and WPP 12 in response to grid faults is particularly important and requires careful control of voltage and power output to support the grid 16 and enable efficient and safe restoration to normal operating levels.

[0059] As will be appreciated by those skilled in the art, a grid fault (also referred to as a voltage deviation or excursion) is generally defined as a period during which the voltage level of the grid 16 or the wider power network drops to a level outside the acceptable normal operating boundaries. During a grid fault, the PPC 13 operates the WPP 12 in a low-voltage ride through (LVRT) mode to avoid disconnection of the WPP 12 from the grid and to support the grid 16 through the fault. In the LVRT mode, the PPC 13 and the WPP 12 support the grid 16 during the fault by supplying reactive power to stimulate an increase in the voltage level. The WPP 12 needs to supply reactive power until the voltage level returns to a level within the normal operating band. In many cases, this operating band is between voltage levels of 0.9 unit (pu) voltage and 1.1 pu voltage.

[0060] A unit voltage is an expression of a voltage relative to a base value used as a reference. Using a system of units allows values ​​to be standardized across transformers and other components that may change the magnitude of the value.

[0061] The WPP 12 that supports the grid during a grid fault by operating in LVRT mode is also typically required to supply active power at a level proportional to the voltage level in the LVRT mode. When the voltage sags during a fault, the WPP 12 operates to reduce the active power output accordingly. This is typically accomplished by a chopper circuit 50 that allows the active power to be "dumped" almost immediately as heat through a resistor 52. The amount of active power dissipated in the chopper circuit 50 can be controlled by varying the duty cycle of the switch 54.

[0062] Therefore, during a grid fault, the active power level will drop to a level below its pre-fault operating level. Once the voltage level is restored to within its normal operating boundaries (0.9 pu voltage to 1.1 pu voltage), the WPP 12 and therefore each WTG 14 needs to "restore" its active power and reactive power levels to operational levels by increasing or decreasing the output of each of its active and reactive powers as required. In the embodiments discussed in detail below, it is assumed that the operational level to which the active power level returns after the fault is the level before the fault. It should be understood that the invention described herein can also be implemented in the case where the operational active power level after the fault is different from the level before the fault.

[0063] Typically, such as Figure 1 The main grid 16 of the main grid 16 shown in FIG. 1 is operating well within its design limits, so when the WPP 12 is operated according to the conventional voltage control method, normal operating conditions of the grid 16 are regained after the fault. If the grid 16 is operating within its design limits, the restoration of the grid 16 using the voltage control method is a stable restoration, and the active power level can be quickly returned to an operational level by reducing the duty cycle of the switch 54.

[0064] However, in situations where the grid 16 is operating close to or at its design limits, the grid 16 has a low fault level and a "weak grid interconnection" exists or may occur after a fault. In these situations, the voltage and power supply at the PoI bus 72 are variable, and small exchanges of reactive or active power at the PoI bus 72 can result in large fluctuations in grid voltage. Weak grid interconnections most often occur in facilities located in remote locations where insufficient infrastructure is provided, resulting in a high probability of reaching design limits.

[0065] In the presence of a weak grid interconnection following a fault, the variation in the generation capacity of the grid 16 and the variability introduced by the weak grid interconnection means that restoration must be carefully managed. In particular, if the rate of change in power levels is too high, the return of active and reactive power to operational levels may produce potentially harmful oscillations in the voltage levels of the grid 16.

[0066] Operating the WPP 12 in a voltage control mode typically used with a stable grid interconnection will result in step changes or very rapid rises and falls in active power after the voltage level is restored following a fault, and large oscillations in the voltage level of the grid 16 may trigger the fault protection system in the WPP 12 due to the presence of a weak grid interconnection.

[0067] Therefore, it is desirable to operate the WPP 12 to output active power such that the ramp from the fault active power level to the post-fault active power level is much slower than the rate of increase in the voltage control mode. However, slowly increasing the active power level requires the chopper circuit 50 to dissipate increased energy, thus increasing the heating effect in the chopper resistor 52. In some cases, operating the chopper circuit 50 to achieve a slow active power recovery rate may cause one or more of the chopper circuits 50 to overload and overheat, particularly if the WPP 12 needs to traverse multiple voltage excursions before the chopper circuit 50 has sufficient time to cool and recover.

[0068] Therefore, a compromise needs to be made between the requirement to achieve slow ramp rates to maintain grid voltage level stability in the presence of weak grid interconnections and the thermal capacity of the chopper resistor 52 to achieve slow ramping of active power levels.

[0069] In order to solve this problem, according to a possible embodiment of the present invention (such as Figure 4 ), the WPP 12 and the PPC 13 are configured to control the BSS 17 to absorb the active power generated by the WTG 14 during the step-up and step-down active power recovery operation after the voltage deviation.

[0070] like Figure 4 As shown, in an initial step 101, the PPC 13 receives information about the WPP 12, the main grid 16, and the connection between the WPP 12 and the main grid 16, from which it is determined whether there is a weak grid interconnection. For example, the PPC 13 can be configured to determine a short circuit ratio (SCR) associated with the PoI 72, and if the SCR is less than a threshold value (e.g., Figure 4 As shown in 3), it is determined that there is a weak grid interconnection.

[0071] If a weak grid interconnection is not detected, the method proceeds to step 102, where the PPC 13 and the WPP 12 operate in a normal operation mode. However, if a weak grid interconnection is detected, the PPC 13 switches the WTG 14 to a weak grid operation mode in step 103, and also triggers the BSS in step 104 to enable a fast charging operation mode different from its normal operation mode.

[0072] When a weak grid interconnection is detected and the WTG 14 is switched to weak grid mode, in step 105, the controller 15 of each WTG 14 is triggered to monitor the state of its corresponding chopper circuit 50. In particular, each WTG 14 monitors the thermal capacity of its chopper resistor 52, and the capacity of its chopper resistor 52 to absorb energy and participate in the step-up and step-down active power recovery operation. The monitoring of the chopper circuit 50 can be performed based on sensor data related to one or more parameters including, for example, temperature and / or temperature distribution, and can include performing heat and / or energy mapping operations on each chopper resistor 52.

[0073] Then, in step 106, based on this monitoring, each WTG 14 can assign a status to itself and its chopper circuit 50, such as "yes, available to participate in slow active power restoration" or "no, not available to participate in slow active power restoration". The status of each WTG 14 and its chopper circuit 50 is then fed back to the PPC 13 so that the PPC 13 can keep a record of which WTGs 14 and their chopper circuits 50 are currently available and which WTGs 14 and their chopper circuits 50 are currently not available to participate in slow active power restoration.

[0074] The steps of monitoring the status of each WTG 14 and its chopper circuit 50 and providing an indication of the status of each WTG 14 and its chopper circuit 50 to the PPC 13 may be repeated, for example, at 10 second intervals to provide an up-to-date record of the availability of each WTG 14 and its chopper circuit 50 to participate in slow active power restoration.

[0075] If a voltage deviation subsequently occurs, resulting in a voltage sag from which the WPP 12 needs to recover, the WTG controller 15 is configured to operate the chopper circuit 50 to participate in the slow active power recovery operation according to its availability status. For example, the slow active power recovery ramp rate can be applied to the WTG 14 / chopper circuit 50 that is currently known to be available for participating in the slow active power recovery (step 107) to control the rate at which the active power is increased. Conversely, for the WTG 14 / chopper circuit 50 that is currently listed as unavailable for participating in the slow active power recovery, a faster ramp rate can be applied (step 108) to avoid overloading those chopper circuits 50.

[0076] The slow active power recovery ramp rate may be a single constant ramp rate applied to each available chopper circuit 50. Alternatively, the slow active power recovery ramp rate may be a variable ramp rate and / or may be an adaptive ramp rate that is individually set for each available chopper circuit based on the thermal capacity of each chopper circuit. Similarly, the faster ramp rates applied to unavailable chopper circuits 50 may be a single constant ramp rate, or alternatively a variable and / or adaptive ramp rate. Examples of various possible active power ramp profiles are described in Figure 5 The diagram is shown at 201 to 204 in FIG.

[0077] Some chopper circuits 50 operate at faster ramp rates resulting in the chopper circuits 50 dissipating less power overall. However, as described above, the PPC 13 has visibility into the number of WTGs 14 / chopper circuits 50 currently available to participate in slow active power recovery and the number of WTGs 14 / chopper circuits 50 currently unavailable to participate in slow active power recovery. Based on the number of WTGs 14 / chopper circuits 50 currently available or unavailable, the PPC 13 is configured to calculate a reference level of power and / or energy to be absorbed by the BSS 17 in step 109 and communicate the reference level to the BSS 17 in step 110. The BSS 17 then operates in its fast charge operating mode in step 111 to absorb energy based on the reference level communicated from the PPC 13.

[0078] In this way, the WPP 12 and PPC 13 are able to maintain the ability of the WPP 12 to ride through multiple voltage sags even if some WTGs 14 and their chopper circuits 50 are unable to participate in the slow active power ramp rate, and the WPP 12 is able to ramp up active power at the desired slow ramp rate despite the fact that some WTGs 14 are operating at faster ramp rates to avoid overloading their chopper circuits 50. In some cases, the reference level of power and / or energy to be absorbed by the BSS 17 may be set so that the total rate of active power is the same as the rate experienced if all WTGs 14 were operating at the slow active power recovery ramp rate.

[0079] If further voltage deviations occur, the above method steps may be repeated in order to control the rate of active power recovery, wherein the number of WTGs 14 / chopper circuits 50 used for slow active power recovery and the reference level of power and / or energy to be absorbed by the BSS 17 are updated according to the state of the continuously monitored chopper circuits 50. Conversely, if no further voltage deviations occur, and the PPC 13 subsequently determines that the weak grid interconnection no longer exists, the WTG 14 may return from the weak grid mode to its normal operating mode (step 102), and the BSS 17 may return from the fast charging mode to its normal operating mode. After the fault has been cleared and the grid voltage has stabilized, the BSS 17 may be operated to release the energy absorbed during the above fault recovery process.

[0080] In the above-described embodiment, a weak grid interconnection is detected based on an SCR associated with the PoI 72. For example, the SCR may be determined in real time at the medium voltage bus 60 by measuring a change in voltage level for a given reactive power change and establishing a ratio of the reactive power change to the voltage level change. However, those skilled in the art will appreciate that a weak grid interconnection may also be determined in a variety of other ways. For example, the PPC 13 may alternatively or additionally be configured to detect a weak grid interconnection (and activate the above-described weak grid mode) based on phase angle differences measured at different points within the network 10, based on changes in voltage levels at one or more points within the network 10, and / or based on receiving a command signal from an external protection system.

[0081] The above example relates to one possible embodiment of the present invention. However, it will be appreciated by those skilled in the art that many modifications may be made to the above example without departing from the scope of the present invention as defined by the appended claims.

Claims

1. A method for operating a renewable energy power plant, the renewable energy power plant comprising: a plurality of renewable energy generators configured to supply electricity to an external grid; a plurality of power dissipation systems operable to dissipate power generated by the renewable energy generators; and a battery storage system operable to absorb electricity generated by the renewable energy generator; the method comprising the steps of: monitoring a status of the power dissipation system; performing a step-up / step-down active power recovery operation after a voltage deviation; and controlling the battery storage system to absorb power generated by the renewable energy generator during the step-up active power recovery operation based on the monitored state of the power dissipation system; Among them, the step of controlling the battery storage system during the lifting and lowering active power recovery operation includes: determining a reference level of energy or electricity to be absorbed by the battery storage system based on the monitored status of the power dissipation system and / or the number of power dissipation systems that are currently available or unavailable to participate in the lifting and lowering active power recovery operation; and operating the battery storage system to absorb the electricity generated by the renewable energy generator based on the determined reference level of energy or electricity.

2. The method according to claim 1, wherein: The step of monitoring the status of the power dissipation systems may include performing a heat and / or energy mapping operation on each power dissipation system.

3. The method according to claim 1 or claim 2, wherein: The step of monitoring the status of the power dissipation systems includes determining a thermal capacity of each power dissipation system.

4. The method according to claim 1 or claim 2, wherein: The step of monitoring the status of the power dissipation systems includes monitoring which of the power dissipation systems are currently available to participate in a boost active power recovery operation following a voltage excursion.

5. The method according to claim 1 or claim 2, wherein: The step of monitoring the status of the power dissipation systems includes determining a number of power dissipation systems that are currently available or unavailable to participate in a boost active power recovery operation following a voltage excursion.

6. The method according to claim 1 or claim 2, wherein: The step of performing the ramp-up and ramp-down active power restoration operation includes applying a ramp-up and ramp-down rate to each power dissipation system based on a state of the power dissipation system.

7. The method according to claim 6, wherein: The steps of performing the boost-type active power recovery operation include: for each power dissipation system, if it is determined that the power dissipation system can be used to participate in the boost-type active power recovery operation, applying a first boost rate; if it is determined that the power dissipation system is not available to participate in the boost-type active power recovery operation, applying a second boost rate, wherein the second boost rate is faster than the first boost rate.

8. The method according to claim 1, wherein: The method further comprises the step of monitoring the renewable energy power plant, the external grid and / or a connection between the renewable energy power plant and the external grid to detect a predetermined grid condition.

9. The method according to claim 8, wherein: The predetermined grid condition is a weak grid condition.

10. The method according to claim 8, wherein: The predetermined grid condition is detected based on a short-circuit ratio of the external grid.

11. The method according to any one of claims 8 to 10, wherein: The step of monitoring the status of the power dissipating system is performed only when a predetermined grid condition is detected.

12. The method according to claim 8, wherein: The method further comprises the step of switching the battery storage system to a fast charging mode when a predetermined grid condition is detected.

13. A controller configured to control operation of a renewable energy power plant according to the method of any preceding claim.

14. A computer program product, which can be downloaded from a communication network and / or stored on a machine-readable storage medium, the computer program product comprising program code instructions for implementing the method according to any one of claims 1 to 12.

Citation Information

Patent Citations

  • Power management during grid faults

    CN101938138A

  • Method and apparatus for adaptively controlling wind park turbines

    CN103541860A

  • A wind power plant, and a method for increasing the reactive power capability of a wind power plant

    CN105850000A

  • Reactive power support from wind turbine facilities

    CN106795858A

  • Multifunctional management, monitoring, protection system and electronic control unit for renewable electric energy generation systems such as wind energy plants, photovoltaic plants, hydropower plants, diesel generators, storage media, load resistors, consumers and voltage converters functioning with network interfaces.

    DE202017001564U1