An optimization scheduling method and system for an electricity-gas-heat integrated energy system
By introducing a stepped carbon trading mechanism into the electricity-gas-heat integrated energy system, building a low-carbon economic dispatch model and optimizing the output of coal-fired units, gas units and power-to-gas equipment, the problem of insufficient reduction in system carbon emissions has been solved. Achieving more efficient low-carbon dispatch and economic optimization.
Patent Information
- Application Number
- CN202011193603.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing electricity-gas-heat integrated energy system has shortcomings in reducing carbon emissions. In particular, the application of the stepped carbon trading mechanism in the integrated energy system has not been fully explored, resulting in the system's economy and low-carbonity not reaching the Optimal.
A stepped carbon trading mechanism is used to construct an electricity-gas-heat low-carbon economic dispatch model. By constructing the objective function and constraint conditions of the low-carbon optimization model, the output parameters of coal-fired units, gas units, power-to-gas equipment and wind turbine units are solved. To achieve low-carbon scheduling of the system.
Through the application of the ladder carbon trading mechanism, the carbon emissions of the system are effectively reduced, and the rationality and economy of low-carbon dispatch are improved. Compared with the traditional carbon trading mechanism, carbon emissions are reduced by 19.49%, while ensuring economics. The system operating cost under the condition dropped by 0.85%.
Smart Images

Figure CN112417652B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy optimization and scheduling, and in particular to an optimization and scheduling method and system for an electricity-gas-heat integrated energy system. Background Art
[0002] Carbon emissions are increasing day by day in the world today, and reducing carbon emissions has become a consensus among countries. my country has pledged in the Paris Agreement to achieve a 60% to 65% reduction in carbon emission intensity by 2030. To this end, my country has proposed a series of policy mechanisms such as carbon tax and carbon trading market. The concept of integrated energy system provides a new idea for carbon emission reduction. Integrated energy system refers to an integrated energy production, supply and marketing system that integrates energy generation, transmission, distribution, conversion and consumption into a unified and coordinated planning. Against the background of increasingly prominent energy and environmental issues, integrated energy system is considered to be an effective measure to reduce carbon emissions. The operation optimization of electricity-gas-heat integrated energy system has always been a research hotspot in this field.
[0003] At present, the research on the integrated power-gas-heat energy system focuses on economic dispatch. The paper "Coordinated dispatch of power-gas-heat system with power-to-gas conversion and analysis of wind power consumption benefits" considers the role of power-to-gas equipment in wind power consumption in the integrated power-gas-heat energy system, which is conducive to improving the economic efficiency of the system.
[0004] Carbon trading is considered to be one of the effective measures to reduce carbon emissions. It is mainly divided into traditional carbon trading mechanisms and step-by-step carbon trading mechanisms. The paper "Multi-objective low-carbon economic dispatch of wind power systems based on scenario probability" proposes a low-carbon economic dispatch model with wind power considering scenario probability. The traditional carbon trading mechanism is introduced in the paper, which proves that it can effectively reduce carbon emissions and promote the output of low-carbon units. The paper "Optimal dispatch of composite energy storage containing large-scale photovoltaic power generation systems based on carbon trading" introduces a step-by-step carbon trading mechanism in the dispatch of power systems containing photovoltaics, proving that the step-by-step carbon trading mechanism has stricter control over carbon emissions. In terms of integrated energy systems, the paper "Low-carbon economic dispatch of electric-heat-gas integrated energy systems based on carbon trading" considers introducing step-by-step carbon trading in the dispatch of integrated energy systems. Considering the purchase of thermal power, the economic and low-carbon nature of the integrated energy system is coordinated, but the purchase of thermal power cannot make the global system economically optimal. In summary, it can be seen that the carbon trading mechanism is currently mainly introduced into the integrated energy system, and the principle of the step-by-step carbon trading mechanism has not been introduced into the integrated energy system. Summary of the invention
[0005] Based on this, the purpose of the present invention is to provide an optimization scheduling method and system for an electricity-gas-heat integrated energy system to achieve the purpose of reducing the carbon emissions of the system.
[0006] To achieve the above object, the present invention provides an optimization scheduling method for an electricity-gas-heat integrated energy system, the method comprising:
[0007] Step S1: construct an electricity-gas-heat low-carbon economic dispatch model based on a stepped carbon trading mechanism;
[0008] Step S2: constructing an objective function of a low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model;
[0009] Step S3: constructing constraints of the low-carbon optimization model;
[0010] Step S4: Solving the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
[0011] Optionally, the objective function of the low-carbon optimization model is constructed based on the electricity-gas-heat low-carbon economic dispatch model, and the specific formula is:
[0012] min F=min(C h +C r +F p -I P2G )
[0013]
[0014] Where: F is the total cost of system operation, C h is the cost of coal-fired units, C r is the cost of purchasing natural gas, F p is the carbon trading fee to be paid, I P2G is the revenue from power-to-gas conversion, ρ gas is the natural gas price, q g is the calorific value of natural gas, Q RZ P is the heat energy that can be converted into per unit electrical energy. he,i,t is the output power of coal-fired unit i connected to the grid during period t, a i , b i 、c i are the cost coefficients of coal-fired units, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rg,i,t is the thermal power output of gas boiler i during period t, η rg is the efficiency of the gas boiler, η rq is the electrical efficiency of the gas turbine, n rg is the total number of gas boilers, n rq is the total number of gas turbines, ρ H2 is the selling price of hydrogen, Y H2 is the amount of hydrogen produced, Y CH4 is the amount of natural gas produced, n h is the number of coal-fired units.
[0015] Optionally, the constraints for constructing the low-carbon optimization model specifically include:
[0016] Step S31: construct load balancing constraint conditions;
[0017] Step S32: constructing P2G device power constraint conditions;
[0018] Step S33: construct wind turbine constraint conditions;
[0019] Step S34: constructing constraints for coal-fired units;
[0020] Step S35: constructing gas turbine constraints;
[0021] Step S36: constructing gas boiler constraint conditions;
[0022] Step S37: constructing gas tank constraint conditions;
[0023] Step S38: constructing DC power flow constraint conditions;
[0024] Step S39: construct natural gas network constraints;
[0025] Step S310: constructing heat network constraints.
[0026] Optionally, the specific formula for constructing the load balancing constraint condition is:
[0027]
[0028] Where: P el,t is the electrical load during period t, P we,t is the available wind power in period t, P p2g,t is the power consumed by the power-to-gas device during period t, P he,i,t is the output power of coal-fired unit i connected to the grid during period t, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rl,t is the heat load during period t, P rh,i,t is the thermal power output of gas turbine i during period t, P rg,i,t is the thermal power output of gas boiler i during period t, P loss,t is the heat network loss in period t, n rg is the total number of gas boilers, n rq is the total number of gas turbines, n h is the number of coal-fired units.
[0029] Optionally, the specific formula for constructing the natural gas network constraint condition is:
[0030]
[0031] Where: Q Yi,t is the gas production of the gas source at node i in period t, Q Hi,t is the gas consumption of node i in period t, Q P2Gi,t is the gas production of the P2G device at node i in period t, Q INi,t is the air intake volume of the pipeline at node i, Q OUTi,t is the pipeline gas output of node i, L ij,t is the gas flow from node i to j in the pipeline, L p ij,t Refers to the average airflow rate in pipe ij, C ij,t is the pipeline inventory of pipeline ij at time t, l ij is the length of the pipe ij, K ij , S ij are fixed parameters related to pipeline length, etc., p i,t is the air pressure at node i during period t, L ijmin and L ijmax are the minimum flow limit and maximum flow limit of pipeline ij, respectively, min and p max are the minimum and maximum air pressure limits of node i, respectively, Q Yimin and Q Yimax are the minimum and maximum limits of gas production of the gas source at node i respectively.
[0032] Optionally, the specific formula for constructing the DC power flow constraint condition is:
[0033]
[0034] Where: f ij,t is the transmission capacity between nodes i and j in period t; x ij is the reactance between nodes i and j; θ i,t is the phase angle value of node i in period t; f ij max is the maximum limit of transmission line capacity; θ imax is the maximum limit of the node phase angle; θ ref is the equilibrium node phase angle.
[0035] Optionally, the specific formula for constructing the heat network constraint condition is:
[0036]
[0037] Where: T sout is the temperature of water flowing through pipe ij in the water supply network, T rout is the temperature of the return water network flowing through pipe ij, T sis the temperature of water entering pipe ij in the water supply network, T r is the temperature of the return water entering the pipe ij, T a is the ambient temperature, U is the heat transfer coefficient, L ij is the length of the pipe ij, C p is the specific heat capacity of water, M ij is the flow rate through pipe ij, M OUT,n is the water flow rate of the nth output pipe at the node, M IN,n1 is the water flow rate of the n1th input pipe at the node, T NODEOUT is the temperature of the water flow in the output pipe at the node, T NODEIN,n1 is the temperature of the water flow in the n1th input pipe at the node, H RY is the output thermal power of the heating unit, H FH is the load thermal power, M RY is the water flow through the heating unit, M FH is the water flow through the load, T S is the water supply temperature through the heating unit, T R is the return water temperature of the heating unit, T SF is the supply water temperature passing through the heat load, T RF is the return water temperature passing through the heat load.
[0038] The present invention also provides an electricity-gas-heat integrated energy system optimization scheduling system, the system comprising:
[0039] A low-carbon economic dispatch model construction module, which is used to construct an electricity-gas-heat low-carbon economic dispatch model based on a stepped carbon trading mechanism;
[0040] An objective function building module, used to build an objective function of a low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model;
[0041] Constraint building module, used to build constraints for low-carbon optimization models;
[0042] The optimization solution module is used to solve the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
[0043] Optionally, the objective function of the low-carbon optimization model is constructed based on the electricity-gas-heat low-carbon economic dispatch model, and the specific formula is:
[0044] min F=min(C h +C r +F p -I P2G )
[0045]
[0046] Where: F is the total cost of system operation, C h is the cost of coal-fired units, C r is the cost of purchasing natural gas, F p is the carbon trading fee to be paid, I P2G is the revenue from power-to-gas conversion, ρ gas is the natural gas price, q g is the calorific value of natural gas, Q RZ P is the heat energy that can be converted into per unit electrical energy. he,i,t is the output power of coal-fired unit i connected to the grid during period t, a i , b i 、c i are the cost coefficients of coal-fired units, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rg,i,t is the thermal power output of gas boiler i during period t, η rg is the efficiency of the gas boiler, η rq is the electrical efficiency of the gas turbine, n rg is the total number of gas boilers, n rq is the total number of gas turbines, ρ H2 is the selling price of hydrogen, Y H2 is the amount of hydrogen produced, Y CH4 is the amount of natural gas produced, n h is the number of coal-fired units.
[0047] Optionally, the constraint condition construction module specifically includes:
[0048] A first constraint condition building unit, used to build a load balancing constraint condition;
[0049] A second constraint condition building unit, used to build a P2G device power constraint condition;
[0050] A third constraint condition building unit is used to build wind turbine constraint conditions;
[0051] The fourth constraint condition building unit is used to build the constraint condition of the coal-fired unit;
[0052] a fifth constraint condition building unit, used for building a gas turbine constraint condition;
[0053] The sixth constraint condition building unit is used to build the gas boiler constraint condition;
[0054] A seventh constraint condition building unit, used for building a gas storage tank constraint condition;
[0055] An eighth constraint condition building unit, used for building a DC power flow constraint condition;
[0056] The ninth constraint condition building unit is used to build the natural gas network constraint condition;
[0057] The tenth constraint condition building unit is used to build the heat network constraint condition.
[0058] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0059] The present invention discloses an optimization scheduling method and system for an electricity-gas-heat integrated energy system, the method comprising: constructing an electricity-gas-heat low-carbon economic scheduling model based on a step-by-step carbon trading mechanism; constructing an objective function and constraint conditions of a low-carbon optimization model based on the electricity-gas-heat low-carbon economic scheduling model; solving the low-carbon optimization model to obtain low-carbon optimization parameters, so as to perform low-carbon scheduling on the integrated energy system according to the low-carbon optimization parameters, thereby proving the rationality of the step-by-step carbon trading mechanism for low-carbon scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0061] Figure 1 This is a flow chart of a method for optimizing scheduling of an electricity-gas-heat integrated energy system according to an embodiment of the present invention;
[0062] Figure 2 This is a schematic diagram of the traditional carbon trading and the tiered carbon trading;
[0063] Figure 3 This is a cost analysis chart for coal-fired units;
[0064] Figure 4 This is a schematic diagram of the structure of an electric-gas-heat integrated energy system according to an embodiment of the present invention;
[0065] Figure 5 This is a carbon trading impact analysis diagram of an embodiment of the present invention;
[0066] Figure 6 A flow chart for solving a model of an embodiment of the present invention;
[0067] Figure 7 This is a topological structure diagram of the system according to an embodiment of the present invention;
[0068] Figure 8 This is a schematic diagram of the situation of each unit when carbon trading is not considered in the embodiment of the present invention;
[0069] Fig. 9This is a schematic diagram of the situation of each unit when considering traditional carbon trading in an embodiment of the present invention;
[0070] Fig.10 This is a schematic diagram of the situation of each unit when considering the tiered carbon trading in an embodiment of the present invention;
[0071] Fig.11 Schematic diagram of the output of heat load units in three scenarios of the embodiment of the present invention;
[0072] Fig.12 Schematic diagram of the output of various units in three scenarios of the embodiment of the present invention;
[0073] Fig.13 This is a schematic diagram of the impact of carbon trading prices on carbon emissions according to an embodiment of the present invention;
[0074] Fig.14 This is a schematic diagram of the impact of carbon trading prices on system costs in an embodiment of the present invention;
[0075] Fig.15 This is a schematic diagram of the effect of transmission line capacity on carbon emissions according to an embodiment of the present invention;
[0076] Fig.16 Schematic diagram of the effect of transmission line capacity on system cost according to an embodiment of the present invention. DETAILED DESCRIPTION
[0077] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0078] The purpose of the present invention is to provide an optimized scheduling method and system for an electricity-gas-heat integrated energy system, so as to achieve the purpose of reducing the carbon emissions of the system.
[0079] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0080] like Figure 1 As shown, the present invention discloses an optimization scheduling method for an electricity-gas-heat integrated energy system, the method comprising:
[0081] Step S1: Construct an electricity-gas-heat low-carbon economic dispatch model based on the stepped carbon trading mechanism.
[0082] Step S2: constructing an objective function of a low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model.
[0083] Step S3: Constructing the constraints of the low-carbon optimization model.
[0084] Step S4: Solving the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
[0085] The following is a detailed discussion of each step:
[0086] 1. Analysis and comparison of carbon trading mechanisms
[0087] Carbon trading is essentially a trading mechanism for controlling carbon dioxide emissions by establishing legal carbon emission rights and allowing them to be traded through the market.
[0088] 1.1 Carbon trading quota
[0089] China's carbon trading mechanism is currently in the exploratory stage, and the free quotas for different power plants are also different. Therefore, the specific formula for calculating the carbon emission quota of coal-fired units is:
[0090] D i =λ h P Gi ;
[0091] Where: D i is the carbon emission quota of the i-th coal-fired unit, λ h is the quota coefficient of coal-fired units, P Gi is the output power of the i-th coal-fired unit.
[0092] Gas units include gas turbines and gas boilers. The carbon emission quota for the power supply of gas turbines can be converted according to the heat supply, that is, the power supply is converted into heat and added to the original heat supply to get the total heat, and then the quota is calculated according to the total heat. For gas boilers, only the heat quota is calculated. Therefore, the specific formula for calculating the carbon emission quota of gas units is:
[0093]
[0094] Where: D j is the carbon emission quota of the j-th gas unit, λ r is the quota coefficient of the gas unit, P Rj is the output heat of the jth gas unit, P Ej is the output power of the jth gas generator set, and β is the electricity conversion coefficient.
[0095] 1.2 Carbon trading mechanism
[0096] Carbon trading mechanisms in China are mainly divided into two forms: one is traditional carbon trading; the other is tiered carbon trading.
[0097] Traditional carbon trading means that within a certain scheduling period, when the carbon dioxide emissions of the system subject do not exceed the emission quota, the trading quota can be obtained and the part can be sold to obtain income. Otherwise, the excess part needs to be purchased, which can be expressed as follows:
[0098]
[0099] Where: F p is the carbon trading fee to be paid, σ is the unit carbon emission rights trading price, E c is the actual carbon emissions of the system, n h is the number of coal-fired units, n r is the number of gas units.
[0100] Tiered carbon trading means dividing carbon dioxide emissions into multiple intervals. The more carbon emissions there are in the interval, the higher the price of unit carbon emission rights trading (carbon trading), and the more the system costs. The carbon trading cost is shown in the following formula:
[0101]
[0102] Where: n h is the number of coal-fired units, n r is the number of gas units, E c is the actual carbon emissions of the system, D i is the carbon emission quota of the i-th gas turbine, D j is the carbon emission quota of the j-th gas turbine, σ() is the unit carbon emission right trading price, p is the carbon emission interval for carbon trading, which is 25t in this paper, and δ is the growth rate of the carbon trading price, which is 25% in this paper.
[0103] Assuming that the carbon emissions of 80MW conventional coal-fired units form a ladder at 48.5t (50MW), the difference between traditional carbon trading and ladder-type carbon trading can be represented by the following figure:
[0104] Figure 2 The relationship between the unit cost of conventional coal-fired units and the system benefits under traditional carbon trading and tiered carbon trading. The system benefits in this article refer to the benefits obtained from power-to-gas conversion. Figure 2 It can be seen that the difference between traditional carbon trading and tiered carbon trading mainly lies in the existence of a unit cost (comprehensive cost required for each unit of electricity) segmentation point at 50MW.
[0105] When the system revenue is 210 yuan / MWh (revenue 1), there is no segmentation point in traditional carbon trading. As long as the output power of this coal-fired unit is greater than 44MW, it will be fully generated as much as possible to obtain maximum benefits. At this time, the system has no suppression ability for coal-fired units greater than 44MW.
[0106] There are segmentation points in the tiered carbon trading. When the power of the coal-fired unit is between 44 and 50 MW, the system revenue is greater than the unit cost of the coal-fired unit. If the power of the coal-fired unit is greater than 44 MW, it can be increased to 50 MW at most, which optimizes the system revenue. At this time, the system can limit the output of the coal-fired unit to within 50 MW, thereby suppressing carbon dioxide emissions.
[0107] When the system revenue is 214 yuan / MWh (revenue 2), under the condition of meeting the basic load constraint, as long as the output power of the traditional carbon trading coal-fired unit is greater than 30MW, the system will have no ability to suppress this coal-fired unit, resulting in an increase in carbon emissions.
[0108] In the tiered carbon trading, there are two sections where the system benefits are greater than the unit cost of the coal-fired unit, namely, output power of 30-50MW and 70-80MW. When the basic constraints are met, the output power reaches more than 70MW, and the system has no suppression on carbon emissions. However, when the output power is between 30MW and 50MW, considering the unit climbing constraints, the output power will not exceed the range of 30-50MW to more than 70MW, so that the output power is limited to below 50MW, and carbon emissions are suppressed at this time.
[0109] If the traditional carbon trading price is simply raised, the ability to suppress carbon emissions will be improved, but the overall cost of the system will rise sharply. Therefore, under certain economic conditions, the tiered carbon trading has a stronger ability to suppress system carbon emissions and is conducive to reducing carbon emissions.
[0110] The above principle analysis is for a single coal-fired unit. When there are multiple coal-fired units in the whole system, the system analysis is as follows:
[0111] The carbon trading cost formula can be simplified as follows:
[0112]
[0113] Where: P Z is the total power of coal-fired units, P Gi is the output power of the i-th coal-fired unit, λ i is the carbon emission intensity of unit i, λ h is the quota coefficient of coal-fired units, n h is the number of coal-fired units, p is the carbon emission range for carbon trading, and δ is the growth rate of carbon trading prices.
[0114] The above formula simplifies the first two formulas of the step-by-step carbon trading formula. When the carbon emissions do not exceed the first interval, the carbon trading cost is related to the carbon emission coefficient of the coal-fired unit.
[0115] When carbon emissions exceed the first interval, the carbon trading cost is not only related to the carbon emission coefficient, but also to the growth range of carbon emissions and the growth rate of carbon trading prices. From the left formula in the second interval of carbon emissions, it can be seen that for different coal-fired units, units with less carbon emissions can even gain profits in the second interval of carbon emissions (relative to the first interval, the unit carbon trading cost is reduced), and units with more carbon emissions will be punished (relative to the first interval, the unit carbon trading cost is increased). The cost difference between low-carbon and high-carbon coal-fired units is further expanded. Because the goal is to minimize costs, carbon emissions can be suppressed and the development of low-carbon coal-fired units can be promoted. However, traditional carbon trading only imposes carbon penalties through carbon emission coefficients (the first interval of carbon emissions), which is not enough to restrict high-carbon units. For example Figure 3 As shown in this figure, the unit cost refers to the cost per unit of electricity. For example, the unit cost of carbon trading is the carbon trading cost under the average electricity volume, and the unit cost of coal-fired units is the fuel cost of coal-fired units under the average electricity volume.
[0116] 2. Electricity-gas-heat low-carbon economic dispatch model based on carbon trading.
[0117] Step S1: Construct an electricity-gas-heat low-carbon economic dispatch model based on the stepped carbon trading mechanism.
[0118] The present invention draws on the idea of centralized dispatching of the whole network in the document "Optimization Strategy for Dispatching Coal-Wind-Hydrogen Energy Network Considering Efficiency Characteristics of Hydrogen Production Equipment", and considers large-scale energy conversion devices to establish an electricity-gas-heat low-carbon economic dispatching model. The electricity-gas-heat low-carbon economic dispatching model is powered by coal-fired units, gas turbines and wind turbines, heated by gas turbines and gas boilers, converts electricity into hydrogen and natural gas, and stores natural gas in gas storage tanks. The overall model structure is as follows: Figure 4 shown.
[0119] like Figure 4 As shown in the figure, in order to cope with the anti-peaking characteristics of wind power, a power-to-gas (P2G) facility is set up in this system to absorb the abandoned wind power and convert the excess wind power into hydrogen and natural gas. Considering the current increase in China's hydrogen energy consumption demand, the hydrogen energy consumption in 2018 exceeded 20 million tons, while the natural gas consumption was only 278 billion cubic meters. Part of the hydrogen produced by the power-to-gas technology is sold, and the other part is converted into natural gas. Due to the poor transportability of hydrogen and the ease of nearby consumption, this article will use 10% of the hydrogen for sale, and the rest will be converted into natural gas to supply gas units. If too much natural gas is converted, the excess will be sold.
[0120] When a carbon trading mechanism is introduced into an integrated energy system, the system is affected as follows:
[0121] from Figure 5It can be seen that when the carbon trading mechanism is introduced into the integrated energy system, it will affect the cost of each unit of energy. Because the country encourages the development of gas units, the carbon emissions per unit of heat of gas units are less than the quota, so the unit cost is reduced. However, general coal-fired units will increase the unit cost, with high-carbon coal-fired power plants increasing more and low-carbon increasing less, so the carbon trading mechanism can guide the development of low-carbon coal-fired units.
[0122] Step S2: constructing the objective function of the low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model. The specific formula is:
[0123] min F=min(C h +C r +F p -I P2G )
[0124]
[0125] Where: F is the total cost of system operation, C h is the cost of coal-fired units, C r is the cost of purchasing natural gas, F p is the carbon trading fee to be paid, I P2G is the revenue from power-to-gas conversion, ρ gas is the natural gas price, q g is the calorific value of natural gas, 36MJ / m 3 , Q RZ is the heat energy that can be converted into per unit electrical energy, taking 3600MJ / (MW·h), P he,i,t is the output power of coal-fired unit i connected to the grid during period t, a i 、b i 、c i are the cost coefficients of coal-fired units, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rg,i,t is the thermal power output of gas boiler i during period t, η rg is the efficiency of the gas boiler, taking 0.8, η rq is the electrical efficiency of the gas turbine, which is taken as 0.35, and its thermal efficiency is also 0.35, n rg is the total number of gas boilers, n rq is the total number of gas turbines, n rg +n rq =n r , ρ H2 is the selling price of hydrogen, Y H2 is the amount of hydrogen produced, Y CH4 is the amount of natural gas produced, n h is the number of coal-fired units.
[0126] The present invention considers the economic dispatch problem of 24 hours a day based on the economic dispatch model of the electricity-gas-heat integrated energy system considering step-by-step carbon trading, and minimizes the difference between the carbon trading cost, the coal-fired unit cost, the cost of purchased natural gas and the income obtained from power-to-gas conversion, thereby constructing an objective function.
[0127] Step S3: Construct the constraints of the low-carbon optimization model, including:
[0128] Step S31: constructing load balancing constraints; the load balancing constraints include electrical load constraints and thermal load constraints; the specific formula for constructing the load balancing constraints is:
[0129]
[0130] Where: P el,t is the electrical load during period t, P we,t is the available wind power in period t, P p2g,t is the power consumed by the power-to-gas device during period t, P he,i,t is the output power of coal-fired unit i connected to the grid during period t, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rl,t is the heat load during period t, P rh,i,t is the thermal power output of gas turbine i during period t, P rg,i,t is the thermal power output of gas boiler i during period t, P loss,t is the heat network loss in period t, n rg is the total number of gas boilers, n rq is the total number of gas turbines, n h is the number of coal-fired units.
[0131] Step S32: construct the P2G device power constraint condition, the specific formula is:
[0132] 0≤P p2g,t ≤P p2gmax ;
[0133] Where: P p2g,t is the P2G device power, P p2gmax is the rated power of the P2G device.
[0134] Step S33: construct wind turbine constraints; wind turbine constraints include maximum power constraints and permitted wind abandonment constraints; the specific formula for constructing wind turbine constraints is:
[0135]
[0136] Where: P w,t is the predicted wind power, P we,tis the actual power generated by wind power, P w,max is the rated power of the wind farm.
[0137] Step S34: constructing coal-fired unit constraint conditions; the coal-fired unit constraint conditions include rated power upper and lower limit constraint conditions and ramp rate constraint conditions; the specific formula for constructing coal-fired unit constraint conditions is:
[0138]
[0139] Where: P himin is the minimum output value of coal-fired unit i, P himax is the maximum output value of coal-fired unit i, P Ximax is the maximum down-ramp rate of coal-fired unit i, P Simax is the maximum ramp rate of the coal-fired unit, P heit is the electrical output of gas turbine i during period t.
[0140] Step S35: construct gas turbine constraints; the gas turbine constraints include output upper and lower limit constraints, ramp rate constraints and thermal power ratio constraints; the specific formula for constructing gas turbine constraints is:
[0141]
[0142] Where: P re,i,t is the power output of gas turbine i at time period t, P rh,i,t is the thermal output value of gas turbine i at time period t, P reimin is the minimum output value of gas turbine i, P reimax is the maximum output value of gas turbine i, P reiXmax is the maximum ramp rate of gas turbine i, P reiSmax is the maximum ramp rate of gas turbine i, and α is the thermal-electric ratio of the gas turbine, which is taken as 1 in this paper.
[0143] Step S36: constructing gas boiler constraint conditions, which include output upper and lower limit constraints and ramp rate constraints; the specific formula for constructing gas boiler constraint conditions is:
[0144]
[0145] Where: P rgimin is the minimum output value of gas boiler i, P rgimax is the maximum output value of gas boiler i, P rgiXmax is the maximum ramp rate of gas boiler i, P rgiSmax is the maximum ramp rate of gas boiler i.
[0146] Step S37: constructing gas tank constraints, which include gas storage capacity upper and lower limit constraints, gas storage period equal constraints, gas charging and discharging constraints, and gas storage balance constraints. The specific formula for constructing gas tank constraints is:
[0147]
[0148] Where: E R,t is the gas storage capacity of the gas tank at time t, E Rmax is the upper limit of the gas tank capacity, E R,1 is the initial gas storage capacity of the gas tank during the cycle, E R,24 is the gas storage volume of the gas tank at the end of the cycle, E C,t is the intake air volume at time t, E D,t is the deflation volume at time t, E Cmax and E Dmax They are the upper limits of air intake and air deflation per unit time respectively, and n is a binary variable, which means that only one of the air intake and air deflation can be performed per unit time.
[0149] Step S38: constructing DC power flow constraint conditions; the DC power flow constraint conditions include transmission line capacity constraint conditions and phase angle constraint conditions; the specific formula for constructing the DC power flow constraint conditions is:
[0150]
[0151] Where: f ij,t is the transmission capacity between nodes i and j in period t; x ij is the reactance between nodes i and j; θ i,t is the phase angle value of node i in period t; f ij max is the maximum limit of transmission line capacity; θ imax is the maximum limit of the node phase angle; θ ref is the equilibrium node phase angle.
[0152] Step S39: construct natural gas network constraints; the natural gas network constraints include natural gas flow balance constraints, gas network pipeline constraints, node gas pressure constraints and gas source constraints; the specific formula for constructing the natural gas network constraints is:
[0153]
[0154] Where: Q Yi,t is the gas production of the gas source at node i in period t, Q Hi,t is the gas consumption of node i in period t, Q P2Gi,t is the gas production of the P2G device at node i in period t, Q INi,t is the air intake volume of the pipeline at node i, QOUTi,t is the pipeline gas output of node i, L ij,t is the gas flow from node i to j in the pipeline, L p ij,t Refers to the average airflow rate in pipe ij, C ij,t is the pipeline inventory of pipeline ij at time t, l ij is the length of the pipe ij, K ij , S ij are fixed parameters related to pipeline length, etc., p i,t is the air pressure at node i during period t, L ijmin and L ijmax are the minimum flow limit and maximum flow limit of pipeline ij, respectively, min and p max are the minimum and maximum air pressure limits of node i, respectively, Q Yimin and Q Yimax are the minimum and maximum limits of gas production of the gas source at node i respectively.
[0155] The non-convex problem considering the gas network constraints is solved by the continuous cone algorithm.
[0156] Step S310: constructing heat network constraints; the heat network is mainly divided into a water supply network and a return network, and the constraints include temperature constraints, water flow combination constraints, heat source heat constraints and heat load heat constraints; the specific formula for constructing heat network constraints is:
[0157]
[0158] Where: T sout is the temperature of water flowing through pipe ij in the water supply network, T rout is the temperature of the return water network flowing through pipe ij, T s is the temperature of water entering pipe ij in the water supply network, T r is the temperature of the return water entering the pipe ij, T a is the ambient temperature, U is the heat transfer coefficient, L ij is the length of the pipe ij, C p is the specific heat capacity of water, M ij is the flow rate through pipe ij, M OUT,n is the water flow rate of the nth output pipe at the node, M IN,n1 is the water flow rate of the n1th input pipe at the node, T NODEOUT is the temperature of the water flow in the output pipe at the node, T NODEIN,n1 is the temperature of the water flow in the n1th input pipe at the node, H RY is the output thermal power of the heating unit, H FH is the load thermal power, M RYis the water flow through the heating unit, M FH is the water flow through the load, T S is the water supply temperature through the heating unit, T R is the return water temperature of the heating unit, T SF is the supply water temperature passing through the heat load, T RF is the return water temperature passing through the heat load.
[0159] Considering the nonlinear problem of heating network constraints, the quality adjustment method is used for linear solution.
[0160] Step S4: Solve the low-carbon optimization model to obtain low-carbon optimization parameters so that the comprehensive energy system can be dispatched according to the low-carbon optimization parameters, thereby proving the rationality of the step-by-step carbon trading mechanism for low-carbon scheduling; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output. Figure 6 The flowchart in the figure selects different carbon trading mechanisms, and determines the unit output size at this moment to achieve the optimal overall economy based on the comparison of the unit cost and power-to-gas revenue at different moments while satisfying the basic load and constraints.
[0161] The present invention also discloses an electricity-gas-heat integrated energy system optimization dispatching system, the system comprising:
[0162] The low-carbon economic dispatch model construction module is used to build an electricity-gas-heat low-carbon economic dispatch model based on a stepped carbon trading mechanism.
[0163] The objective function construction module is used to construct the objective function of the low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model.
[0164] The constraint building module is used to build the constraint conditions of the low-carbon optimization model.
[0165] The optimization solution module is used to solve the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
[0166] As an implementation mode, the constraint condition building module of the present invention specifically includes:
[0167] The first constraint condition building unit is used to build a load balancing constraint condition.
[0168] The second constraint condition building unit is used to build the P2G device power constraint condition.
[0169] The third constraint condition building unit is used to build the wind turbine constraint condition.
[0170] The fourth constraint condition building unit is used to build the constraint condition of the coal-fired unit.
[0171] The fifth constraint condition constructing unit is used to construct the gas turbine constraint condition.
[0172] The sixth constraint condition building unit is used to build the gas boiler constraint condition.
[0173] The seventh constraint condition building unit is used to build the gas tank constraint condition.
[0174] The eighth constraint condition building unit is used to build a DC power flow constraint condition.
[0175] The ninth constraint condition construction unit is used to construct the natural gas network constraint condition.
[0176] The tenth constraint condition building unit is used to build the heat network constraint condition.
[0177] 3. Simulation experiment analysis
[0178] This paper uses the improved IEEE-30-node power grid, 6-node heat grid, and 7-node gas grid for example analysis. The structure of the electricity-gas-heat integrated energy system is as follows: Figure 7 As shown: Among them, G1, G3, G4, and G5 are conventional coal-fired units, and their carbon emissions are 0.98t / MWh, 1.08 / MWh, 0.97tt / MWh, and 1.15t / MWh respectively. The quota is 0.7t / MWh. The unit parameters are detailed in Table 1. G2 is a gas turbine, and its upper limit of electric power output is 80MW and its lower limit is 10MW. The upper limit of thermal power output of gas boiler is 80MW and its lower limit is 10MW. The cost of gas unit is related to the selling price of natural gas. This article takes 3 yuan / m 3 . Its carbon emission is 0.065t / GJ, and the quota is 0.102t / GJ. The carbon trading price is set at 100 yuan / t. At the 11th node, the original coal-fired unit is replaced by a combination of a 200MW wind turbine and a 150MW power-to-gas device; the efficiency of hydrogen production is set at 0.7, the efficiency of hydrogen production is set at 0.85, and the comprehensive efficiency of gas production is 0.6. The market price of hydrogen is 53 yuan / kg. Considering its transportation and storage costs, the plant-end price is set at 40 yuan / kg.
[0179] Table 1 Coal-fired unit parameters
[0180]
[0181] This paper uses CPLEX for optimization and solution, and the system is simulated with a cycle of 24 hours and a step size of 1 hour.
[0182] This article analyzes the situation of the same system under different carbon trading mechanisms, which are divided into the following three scenarios. Scenario 1: In the case of tiered carbon trading, the system situation that only considers the operating cost as the objective function without considering the carbon trading cost. Scenario 2: Consider the system situation of the traditional carbon trading mechanism. Scenario 3: Consider the system situation of the tiered carbon trading mechanism.
[0183] Based on the above three scenarios, this paper obtains the system operation status as shown in Table 2.
[0184] Table 2 System operation status
[0185]
[0186] As can be seen from Table 2, the carbon emissions of scenario three are reduced by 1299.9t, or 19.49%, compared with scenario one, while scenario two is only reduced by 251.2t, or 3.77%. In terms of comprehensive operating costs, the cost of scenario two is reduced by 26,235 yuan, or 1.37%, compared with scenario one. Although the cost of scenario three is 9,986 yuan higher than that of scenario two, it is reduced by 16,249 yuan, or 0.85%, compared with scenario one. In summary, although the comprehensive operating cost of scenario three is 0.52% higher than that of scenario two, the carbon emissions are reduced by 15.72%, which proves the effectiveness of tiered carbon trading in low-carbon economic scheduling.
[0187] The following figure shows the operation status of the unit under three scenarios.
[0188] Figures 8 to 10 This is the output diagram of the electric load unit under three scenarios. It can be seen that:
[0189] Before 5 a.m., there is no difference in the output of coal-fired units and power-to-gas equipment in the three scenarios, because at this time the wind power is large, the gas turbine has a higher output due to the influence of thermal power generation, and the load power is low. At a lower output, the unit cost of the coal-fired unit is lower than the profit of the power-to-gas equipment, so the power-to-gas can maintain the rated output.
[0190] From 5 a.m. to 8 a.m., as the gas turbine output decreased and the load power increased, the power of coal-fired units began to increase in scenarios one and two, but the power of power-to-gas was reduced in scenario three. This is because the unit cost of tiered carbon trading is higher than the income from power-to-gas, which suppresses the increase in coal-fired units and reduces carbon emissions.
[0191] From 8:00 to 11:00, the load power increased and the gas turbine output decreased. The unit cost of coal-fired units in scenarios one and two was lower than the power-to-gas revenue, so the power-to-gas equipment maintained the rated output. In scenario three, considering the transmission line capacity, only 65MW of wind power can be connected to the grid, so the coal-fired units need to increase to make up for the load. At this time, the coal-fired units will not supply power to the power-to-gas, and the carbon emissions are reduced compared to scenarios one and two.
[0192] During the peak load period from 11:00 to 19:00, in scenario 1, the coal-fired units all increased their output to meet the demand for power-to-gas, but were unable to generate full power due to the limitation of the overall line transmission capacity. In scenario 2, due to the consideration of traditional carbon trading, the coal-fired unit with the highest unit cost could not supply power to the power-to-gas equipment. In scenario 3, due to the limitation of the capacity of the wind power transmission line, only 65MW could be connected to the grid, and the other loads were supplemented by coal-fired units, while the power-to-gas was only used to absorb the excess wind power, forming an adaptive peak-shaving and valley-filling system.
[0193] From 19:00 to 24:00, as the gas turbine output increased and wind power recovered, the power-to-gas equipment in scenarios 1 and 2 maintained rated output, and the coal-fired units decreased as the load decreased. In scenario 3, the load decreased but the output of the coal-fired units remained basically unchanged, because at this time the unit cost of the coal-fired units was lower than the power-to-gas income, which increased the power-to-gas power.
[0194] from Fig.11 It can be found that the capacity of wind power transmission lines affects the output of coal-fired units, so system changes can be observed by changing the capacity of transmission lines.
[0195] from Fig.12 It can be seen that within a day's scheduling cycle, in scenario one, the coal-fired unit has the highest power output and the wind power grid-connected power is the lowest, while in scenario three, the coal-fired unit has the lowest power output and the wind power grid-connected power is the highest. This proves that tiered carbon trading is effective in improving the effectiveness of wind power grid-connected power, which is beneficial to improving the competitiveness of clean units and reducing system carbon emissions.
[0196] from Fig.11 and 12 It can be seen that carbon trading has no effect on the output of gas turbines and gas boilers. First, because the efficiency of gas boilers is higher than that of gas turbines, the heat load is mainly supplied by gas boilers and supplemented by gas turbines, resulting in the phenomenon of heat-to-electricity ratio; second, due to the insufficient price of carbon trading, the cost reduction caused by the change of gas turbine output cannot suppress the cost increase of coal-fired units and gas boilers.
[0197] Impact of carbon trading prices:
[0198] With economic development, in order to prevent environmental degradation in the future, carbon trading prices will change. Changes in carbon trading prices will affect the output of each unit in the system. The following figure shows the curve of system cost and system carbon emissions as carbon trading prices change.
[0199] Depend on Fig.13 It can be seen that as the carbon trading price increases, the carbon emissions of the two carbon trading mechanisms are decreasing, and the carbon emissions of the tiered carbon trading are lower than those of the traditional carbon trading. The reasons are as follows:
[0200] Before the carbon trading price was 400 yuan / t, it mainly suppressed the output of coal-fired units that provided power-to-gas, thereby reducing carbon emissions. After 400 yuan / t, the system suppressed coal-fired units by increasing the output of gas turbines, thereby reducing carbon emissions. For traditional carbon trading, the carbon trading price will have an impact on gas turbines only after 550 yuan / t, indicating that considering tiered carbon trading is more conducive to the access of clean units to the grid.
[0201] Depend on Fig.14 It can be seen that after the carbon trading price reaches 400 yuan / t, the system costs of traditional and tiered carbon trading gradually approach each other. The reason is that tiered carbon trading changes the output of gas turbines to suppress the output of coal-fired units, making carbon emissions gradually lower than excess carbon emissions, making the tiered carbon trading cost gradually close to the first-order carbon trading cost, but because the capacity of gas turbines is smaller than that of coal-fired units, its system carbon emissions cannot be less than the overall quota, so as the carbon trading price increases, the total cost has been on an upward trend.
[0202] Impact of wind power grid-connected transmission line capacity:
[0203] With the development of economy, the power grid is developing in a more convenient direction. In order to ensure the highest overall benefit of the system in the centralized dispatch of the whole network, the larger the transmission line capacity, the better. This paper analyzes the impact of the transmission line capacity of wind power on the carbon emissions and costs of the system. Fig.15 As shown:
[0204] Depend on Fig.15 It can be seen that with the increase in transmission line capacity, the carbon emissions of the system without carbon trading increased, the carbon emissions of the system considering traditional carbon trading decreased slightly, and the carbon emissions of the system considering step-by-step carbon trading decreased significantly, and finally stabilized. The reason is that the system without carbon trading increased the output of coal-fired units for power-to-gas conversion to reduce the system operating costs, but it would increase carbon emissions. The system considering step-by-step carbon trading can reduce carbon emissions by increasing the capacity of transmission lines to allow more wind power to be connected to the grid to suppress the output of coal-fired units.
[0205] Depend on Fig.16 It can be seen that with the increase in transmission line capacity, the system cost in all three scenarios is on a downward trend, and the difference in system costs between traditional carbon trading and ladder carbon trading is gradually decreasing. The reason is that in the ladder carbon trading system, the increase in transmission line capacity allows more wind power to be connected to the grid, reducing the total system cost. In the traditional carbon trading system, the smaller transmission line capacity (40MW) is sufficient for coal-fired units to supply power-to-gas or wind power to supply loads, so its system cost will not change after 40MW.
[0206] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0207] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. An optimization scheduling method for an electricity-gas-heat integrated energy system, It is characterized in that The method comprises: Step S1: construct an electricity-gas-heat low-carbon economic dispatch model based on a stepped carbon trading mechanism; Step S2: constructing the objective function of the low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model. The specific formula of the objective function is: minF=min(C h +C r +F p -I P2G ) Where: F is the total cost of system operation, C h is the cost of coal-fired units, C r is the cost of purchasing natural gas, F p is the carbon trading fee to be paid, I P2G is the revenue from power-to-gas conversion, ρ gas is the natural gas price, q g is the calorific value of natural gas, Q RZ P is the heat energy that can be converted into unit electrical energy. he,i,t is the output power of coal-fired unit i connected to the grid during period t, a i 、b i 、c i are the cost coefficients of coal-fired units, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rg,i,t is the thermal power output of gas boiler i during period t, η rg is the efficiency of the gas boiler, η rq is the electrical efficiency of the gas turbine, n rg is the total number of gas boilers, n rq is the total number of gas turbines, ρ H2 is the selling price of hydrogen, Y H2 is the amount of hydrogen produced, Y CH4 is the amount of natural gas produced, n h is the number of coal-fired units; Step S3: constructing constraints of the low-carbon optimization model; Step S4: Solving the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
2. The method for optimizing and dispatching the electricity-gas-heat integrated energy system according to claim 1, It is characterized in that The constraints for constructing a low-carbon optimization model include: Step S31: construct load balancing constraint conditions; Step S32: constructing P2G device power constraint conditions; Step S33: construct wind turbine constraint conditions; Step S34: constructing constraints for coal-fired units; Step S35: constructing gas turbine constraints; Step S36: constructing gas boiler constraint conditions; Step S37: constructing gas tank constraint conditions; Step S38: constructing DC power flow constraint conditions; Step S39: construct natural gas network constraints; Step S310: constructing heat network constraints.
3. The method for optimizing and dispatching the electricity-gas-heat integrated energy system according to claim 2, It is characterized in that The specific formula for constructing the load balancing constraint condition is: Where: P el,t is the electrical load during period t, P we,t is the available wind power in period t, P p2g,t is the power consumed by the power-to-gas device during period t, P he,i,t is the output power of coal-fired unit i connected to the grid during period t, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rl,t is the heat load during period t, P rh,i,t is the thermal power output of gas turbine i during period t, P rg,i,t is the thermal power output of gas boiler i during period t, P loss,t is the heat network loss in period t, n rg is the total number of gas boilers, n rq is the total number of gas turbines, n h is the number of coal-fired units.
4. The method for optimizing and dispatching the electricity-gas-heat integrated energy system according to claim 2, It is characterized in that The specific formula for the constraint condition of building the natural gas network is: Where: Q Yi,t is the gas production of the gas source at node i in period t, Q Hi,t is the gas consumption of node i in period t, Q P2Gi,t is the gas production of the P2G device at node i in period t, E D,t is the amount of gas released from the gas tank at time t, E C,t is the air intake of the gas tank at time t, Q INi,t is the air intake volume of the pipeline at node i, Q OUTi,t is the pipeline gas output of node i, L ij,t is the gas flow from node i to j in the pipeline, L ji,t is the gas flow from node j to pipeline i, L p ij,t Refers to the average airflow rate in pipe ij, C ij,t is the pipeline inventory of pipeline ij at time t, C ij,t-1 is the pipeline inventory of pipeline ij at time t-1, l ij is the length of the pipe ij, K ij , S ij are fixed parameters related to pipeline length, etc., p i,t is the air pressure at node i during period t, p j,t is the air pressure at node j during period t, L ijmin and L ijmax are the minimum flow limit and maximum flow limit of pipeline ij, respectively, min and p max are the minimum and maximum air pressure limits of node i, respectively, Q Yimin and Q Yimax are the minimum and maximum limits of gas production of the gas source at node i respectively.
5. The method for optimizing and dispatching the electricity-gas-heat integrated energy system according to claim 2, It is characterized in that The specific formula for constructing the DC power flow constraint condition is: Where: f ij,t is the transmission capacity between nodes i and j in time period t; x ij is the reactance between nodes i and j; θ i,t is the phase angle value of node i in period t; θ j,t is the phase angle value of node j in period t; f ij max is the maximum limit of the transmission line capacity; θ imax is the maximum limit of the node phase angle; θ ref is the equilibrium node phase angle.
6. The method for optimizing and dispatching the electricity-gas-heat integrated energy system according to claim 2, It is characterized in that The specific formula for constructing the heat network constraint condition is: Where: T sout is the temperature of water flowing through pipe ij in the water supply network, T rout is the temperature of the return water network flowing through pipe ij, T s is the temperature of water entering pipe ij in the water supply network, T r is the temperature of the return water entering the pipe ij, T a is the ambient temperature, U is the heat transfer coefficient, L ij is the length of the pipe ij, C p is the specific heat capacity of water, M ij is the flow rate through pipe ij, M OUT,n is the water flow of the nth output pipe at the node, M IN,n1 is the water flow of the n1th input pipe at the node, k is the total number of output pipes at the node, kk is the total number of input pipes at the node, T NODEOUT is the temperature of the water flow in the output pipe at the node, T NODEIN,n1 is the temperature of the water flow in the n1th input pipe at the node, H RY is the output thermal power of the heating unit, H FH is the load thermal power, M RY is the water flow through the heating unit, M FH is the water flow through the load, T S is the water supply temperature through the heating unit, T R is the return water temperature of the heating unit, T SF is the supply water temperature passing through the heat load, T RF is the return water temperature passing through the heat load.
7. An optimized dispatching system for an integrated electricity-gas-heat energy system, It is characterized in that The system comprises: A low-carbon economic dispatch model construction module, which is used to construct an electricity-gas-heat low-carbon economic dispatch model based on a stepped carbon trading mechanism; The objective function construction module is used to construct the objective function of the low-carbon optimization model based on the electricity-gas-heat low-carbon economic dispatch model. The specific formula of the objective function is: minF=min(C h +C r +F p -I P2G ) Where: F is the total cost of system operation, C h is the cost of coal-fired units, C r is the cost of purchasing natural gas, F p is the carbon trading fee to be paid, I P2G is the revenue from power-to-gas conversion, ρ gas is the natural gas price, q g is the calorific value of natural gas, Q RZ P is the heat energy that can be converted into unit electrical energy. he,i,t is the output power of coal-fired unit i connected to the grid during period t, a i 、b i 、c i are the cost coefficients of coal-fired units, P re,i,t is the electric power output of gas turbine i connected to the grid during period t, P rg,i,t is the thermal power output of gas boiler i during period t, η rg is the efficiency of the gas boiler, η rq is the electrical efficiency of the gas turbine, n rg is the total number of gas boilers, n rq is the total number of gas turbines, ρ H2 is the selling price of hydrogen, Y H2 is the amount of hydrogen produced, Y CH4 is the amount of natural gas produced, n h is the number of coal-fired units; Constraint building module, used to build constraints for low-carbon optimization models; The optimization solution module is used to solve the low-carbon optimization model to obtain low-carbon optimization parameters; the low-carbon optimization parameters include: coal-fired unit output, gas-fired unit output, power-to-gas equipment output, and wind turbine unit output.
8. The electricity-gas-heat integrated energy system optimization dispatching system according to claim 7, It is characterized in that The constraint condition building module specifically includes: A first constraint condition building unit, used to build a load balancing constraint condition; A second constraint condition building unit, used to build a P2G device power constraint condition; A third constraint condition building unit is used to build wind turbine constraint conditions; The fourth constraint condition building unit is used to build the constraint condition of the coal-fired unit; a fifth constraint condition building unit, used for building a gas turbine constraint condition; The sixth constraint condition building unit is used to build the gas boiler constraint condition; A seventh constraint condition building unit, used for building a gas storage tank constraint condition; An eighth constraint condition building unit, used for building a DC power flow constraint condition; The ninth constraint condition building unit is used to build the natural gas network constraint condition; The tenth constraint condition building unit is used to build the heat network constraint condition.