A risk early warning method and system for inter-provincial spot market

By calculating real-time risk indicators in the electricity market and comparing them with historical indicators, risk warnings are issued, which solves the problem of unstable operation in the electricity spot market and ensures the stable operation of the power grid and the stability of power supply.

CN112633655BActive Publication Date: 2024-11-15CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011481707.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-14
Publication Date
2024-11-15
Estimated Expiration
2040-12-14

AI Technical Summary

Technical Problem

The lack of effective risk warning methods in existing technologies leads to instability in the operation of the electricity spot market, making it impossible to effectively manage risks and affecting the stable operation of the power grid and the stability of power supply.

Method used

By receiving real-time data from the power grid, real-time risk indicators of the electricity market are calculated, compared with historical risk indicators in the threshold database, and risk warnings are issued. This includes a comprehensive evaluation of market structure, market operation, and power grid security, as well as the release of risk warning information and updates to the threshold database.

Benefits of technology

It enables real-time risk monitoring and early warning of the electricity market, ensures the stable operation of the market, supports the construction of inter-provincial electricity spot markets, and maximizes the stability of electricity supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112633655B_ABST
    Figure CN112633655B_ABST
Patent Text Reader

Abstract

The present invention discloses a risk early warning method and system for inter-provincial spot markets, the method comprising the following steps: after receiving an inter-provincial spot market risk early warning analysis request, obtaining real-time data of the power grid, calculating a real-time risk index X of the power market according to the real-time data of the power grid; comparing the real-time risk index X with the historical risk index Y in the threshold library, and performing risk early warning. The present invention can monitor the market operation status in real time, identify various types of market operation risks, assess the degree of damage that may be caused by the risk and issue an alarm, manage and control risks in a planned and purposeful manner, ensure the smooth and healthy operation of the power grid, and maximize the stability of power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power market, and in particular relates to an inter-provincial spot market risk early warning method and system. Background Art

[0002] In recent years, the construction of power grids with UHV power grid as the backbone and coordinated development of power grids at all levels has been accelerated, the power grid structure has been gradually strengthened, and the transmission capacity between regions and provinces has been continuously improved, providing a strong material basis and carrier for the large-scale optimization of resource allocation. In particular, with the continuous increase in the proportion of clean energy installed capacity, considering the intermittent and volatile characteristics of renewable energy such as wind power and photovoltaic power generation, using inter-provincial spot trading platforms to promote the large-scale consumption of clean energy is one of the important goals of the construction of the power spot market.

[0003] Risk control in the electricity spot market is an important part of the operation of the electricity spot market and an important guarantee for the orderly operation of the electricity spot market. However, existing technologies do not have effective risk warning methods. Summary of the invention

[0004] The purpose of the present invention is to provide a risk early warning method and system for the inter-provincial spot market, to monitor the market operation status in real time, to identify various market operation risks, to assess the degree of damage that may be caused by the risks and to issue warning prompts, to manage the risks in a planned and purposeful manner, to ensure the smooth and healthy operation of the power grid, and to maximize the stability of the power supply.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A method for early warning of inter-provincial spot market risks, the method comprising the following steps:

[0007] After receiving the inter-provincial spot market risk warning analysis request, obtain the real-time data of the power grid, and calculate the real-time risk index X of the power market based on the real-time data of the power grid;

[0008] Compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to issue a risk warning.

[0009] A further improvement of the present invention is that the real-time data of the power grid includes operation data, market declaration data and market clearing results.

[0010] A further improvement of the present invention is that the risk index includes a market structure index; the market structure index includes: the total reported external power transmission at the sending end P G 、The total amount of electricity purchased by the receiving end is P L , each area at the sending end reports the amount of electricity transmitted P DG,v , each area of ​​the receiving end declares the purchased electricity P DL,v , peak supply-demand ratio R P, Trough Supply-Demand Ratio L ;

[0011] Total reported power delivered at the sending end P G :

[0012]

[0013] Where N G is the total number of provinces at the sending end, P G,i The amount of electricity transmitted reported by the sending province i;

[0014] Total power purchase reported by the receiving end P L :

[0015]

[0016] Where N L is the total number of receiving provinces, P L,i The purchased electricity reported by the receiving province i;

[0017] The amount of electricity delivered P reported by each area at the sending end DG,v :

[0018]

[0019] Where P DG,v Report the outbound power for the sending region v, N S is the total number of provinces contained in region v, P DG,v,w The amount of electricity transmitted reported by province w in the sending region v;

[0020] The amount of electricity purchased P reported by each area of ​​the receiving end DL,v :

[0021]

[0022] Where P DL,v Declare the purchased electricity for the receiving area v, N T is the total number of provinces contained in region v, P DL,v,w The purchased electricity reported by province w in receiving region v;

[0023] Peak supply-demand ratio R P :

[0024]

[0025] In the formula, R TGP is the total power delivered at the peak sending end, R TLP is the total purchased electricity at the peak receiving end;

[0026] Trough supply-demand ratio R L :

[0027]

[0028] In the formula, R TGL is the total power transmitted from the sending end during the valley period, R TLL It is the total power purchased by the receiving end during the trough period.

[0029] The present invention is further improved in that: the risk index includes a market operation index; the market operation index includes: the inter-provincial medium- and long-term transaction power P ML , the proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML , medium- and long-term average prices among provinces The amount of electricity sold on the spot before the provincial day P DA 、The proportion of spot cleared electricity volume R DA , intra-provincial spot clearing power P ID 、Ratio of spot clearing electricity volume in the day ID , average price of inter-provincial spot market The amount of electricity sold in the regional peak load ancillary service market P RAS , Regional peak load ancillary service market transaction fee M RAS , Average transaction price of regional peak load ancillary service market Channel j Inter-provincial medium- and long-term transaction power P CML,j 、Channel a: Inter-provincial medium- and long-term transaction power P CML,a , the proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j 、Channel j inter-provincial spot trading volume P CEM,j 、Channel a inter-provincial spot trading power P CEM,a , the proportion of spot trading electricity between provinces in each channel R CEM,j ;

[0030] The proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML :

[0031]

[0032] Where P ML P is the medium- and long-term inter-provincial transaction power. E To trade electricity in the inter-provincial market;

[0033] Average price between provinces in the medium and long term

[0034]

[0035] Where M TML For the medium- and long-term electricity trading between provinces, P ML For medium- and long-term inter-provincial trading of electricity;

[0036] The proportion of spot cleared electricity volume RDA :

[0037]

[0038] Where P DA The amount of electricity that is cleared on the spot between provinces on the day before, P EM It is the total electricity cleared in the inter-provincial market;

[0039] The proportion of spot clearing electricity in the day R ID :

[0040]

[0041] Where P ID To clear the electricity volume for intra-day spot sales between provinces;

[0042] Average price of inter-provincial spot market

[0043]

[0044] Where M TEM Transaction electricity charges for spot market;

[0045] Average transaction price of regional peak load ancillary service market

[0046]

[0047] Where M RAS is the transaction price of regional peak load ancillary service market, P RAS The amount of electricity traded in the regional peak load ancillary service market;

[0048] The proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j :

[0049]

[0050] In the formula, R CML,j is the proportion of medium- and long-term transaction electricity between provinces in channel j, P CML,j is the medium- and long-term transaction power between provinces in channel j, N C is the total number of trading channels, P CML,a The medium- and long-term transaction electricity volume between provinces in channel a;

[0051] The proportion of spot trading electricity between provinces in each channel R CEM,j :

[0052]

[0053] In the formula, R CEM,j is the proportion of spot trading electricity between provinces in channel j, P CEM,jis the inter-provincial spot trading volume of channel j, P CEM,a It is the inter-provincial spot trading electricity volume of channel a.

[0054] A further improvement of the present invention is that the risk index includes a power grid safety index; the power grid safety index includes: daily overload rate R HP , peak load reserve rate R B ;

[0055] Daily reload rate R HP :

[0056]

[0057] Where N HP is the number of heavy-load transmission channels, N C is the total number of transmission channels;

[0058] Peak load reserve rate R B :

[0059]

[0060] Where P B is the peak load standby unit capacity, P T is the total capacity of the generator set.

[0061] A further improvement of the present invention is that the real-time risk indicator X is compared with the historical risk indicator Y in the threshold library to perform risk warning, specifically including:

[0062] Take a real-time risk indicator X and retrieve the corresponding historical risk indicator Y from the threshold library for comparison; if If there is a risk, a risk warning message corresponding to the risk indicator will be issued; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding historical risk indicator Y in the threshold database is updated; U is the threshold.

[0063] A further improvement of the present invention is that the historical risk indicator Y is an average value of all corresponding real-time risk indicators X recorded in the historical database.

[0064] A further improvement of the present invention is that U=0.1-0.3.

[0065] An inter-provincial spot market risk early warning system, comprising:

[0066] A determination module is used to obtain real-time data of the power grid after receiving a risk warning analysis request of the inter-provincial spot market, and determine the real-time risk index X of the power market according to the real-time data of the power grid;

[0067] The risk warning module is used to compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to issue a risk warning.

[0068] A further improvement of the present invention is that the real-time risk indicator X is compared with the historical risk indicator Y in the threshold library to perform risk warning, specifically including:

[0069] Take a real-time risk indicator X and retrieve the corresponding historical risk indicator Y from the threshold library for comparison; if If there is a risk, a risk warning message corresponding to the risk indicator will be issued; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding historical risk indicator Y in the threshold database is updated; U is the threshold.

[0070] Compared with the prior art, the present invention has the following beneficial effects:

[0071] The inter-provincial spot market risk early warning method proposed in the present invention can effectively reflect the short-term electricity supply and demand situation, ensure the stable and healthy operation of the market, and support the construction of the inter-provincial electricity spot market; monitor the market operation status in real time, identify various market operation risks, assess the degree of damage that may be caused by the risk and issue warning prompts, manage risks in a planned and purposeful manner, ensure the stable and healthy operation of the power grid, and maximize the stability of power supply.

[0072] The inter-provincial spot market risk early warning method proposed in the present invention proposes real-time risk indicators for the power market and conducts a comprehensive evaluation from three dimensions: market structure, market operation, and power grid security. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0074] Figure 1 The present invention is a flow chart of an inter-provincial spot market risk early warning method. DETAILED DESCRIPTION

[0075] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0076] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.

[0077] Explanation of relevant terms:

[0078] Electricity spot market: A general term for electricity trading activities that are carried out on the trading platform before the day before and within a shorter period of time, from the next day to the day before and before real-time dispatch. The subject matter of spot market transactions includes electric energy, frequency regulation services, backup services, etc.

[0079] Day-ahead market: The electric energy market that determines the unit combination status and power generation plan on the operating day (D-day) one day in advance of the operating day (D-1).

[0080] Intraday market: The electric energy market that is traded in the next few hours of the operating day (D-day) on a rolling basis.

[0081] Example 1

[0082] See also Figure 1 The present invention proposes a risk early warning method for inter-provincial spot markets, the specific steps of which include:

[0083] S1. Receive an inter-provincial spot market risk warning analysis request, where the request is used to request an inter-provincial spot market risk analysis;

[0084] S2. In response to the request, obtain real-time grid data. The real-time grid data includes operation data, market declaration data and market clearing results. Calculate the real-time risk index X of the power market based on the real-time grid data. The risk index includes market structure, market operation and grid security.

[0085] (a) Market structure

[0086] The degree of market competition is reflected through market supply and demand indicators.

[0087] Table 1 Market structure indicators

[0088]

[0089] The calculation formula for the total reported external power at the sending end is:

[0090]

[0091] Where P G N is the total reported power delivered by the sending end, G is the total number of provinces at the sending end, P G,iThe power transmitted reported by the sending province i.

[0092] The calculation formula for the total amount of purchased electricity reported by the receiving end is:

[0093]

[0094] Where P L N is the total electricity purchased by the receiving end. L is the total number of receiving provinces, P L,i The amount of purchased electricity reported by the receiving province i.

[0095] The calculation formula for the amount of electricity delivered to each area at the sending end is:

[0096]

[0097] Where P DG,v Report the outbound power for the sending region v, N S is the total number of provinces contained in region v, P DG,v,w It is the power transmission amount reported by province w in sending area v.

[0098] The calculation formula for the amount of purchased electricity reported by each area at the receiving end is:

[0099]

[0100] Where P DL,v Declare the purchased electricity for the receiving area v, N T is the total number of provinces contained in region v, P DL,v,w It is the purchased electricity declared by province w in receiving area v.

[0101] The peak supply-demand ratio is calculated as:

[0102]

[0103] In the formula, R P is the peak supply-demand ratio, R TGP is the total power delivered at the peak sending end, R TLP It is the total purchased electricity at the peak receiving end.

[0104] The formula for calculating the trough supply-demand ratio is:

[0105]

[0106] In the formula, R L is the trough supply-demand ratio, R TGL is the total power transmitted from the sending end at the low valley, R TLL It is the total power purchased by the receiving end during the trough period.

[0107] (b) Market Operation

[0108] Through inter-provincial medium- and long-term transactions, inter-provincial spot transactions, and regional auxiliary service market conditions, it reflects the composition of the entire inter-provincial market system and the connection between inter-provincial medium- and long-term and spot transactions.

[0109] Table 2 Market operation indicators

[0110]

[0111] The calculation formula for the proportion of medium- and long-term inter-provincial electricity volume in inter-provincial market transactions is:

[0112]

[0113] In the formula, R ML is the proportion of medium- and long-term electricity volume in inter-provincial market transactions, P ML is the inter-provincial medium- and long-term transaction electricity, P E It is the market-based electricity trading between provinces.

[0114] The formula for calculating the medium- and long-term average price among provinces is:

[0115]

[0116] In the formula, is the medium- and long-term average price among provinces, M TML For the medium- and long-term electricity trading between provinces, P ML It is the medium- and long-term electricity trading between provinces.

[0117] The calculation formula for the proportion of spot electricity cleared on the previous day is:

[0118]

[0119] In the formula, R DA is the proportion of spot cleared electricity volume on the previous day, P DA P is the amount of electricity that is cleared on the spot before the province arrives. EM It is the total electricity cleared in the inter-provincial market.

[0120] The calculation formula for the proportion of spot electricity cleared during the day is:

[0121]

[0122] In the formula, R ID is the proportion of spot clearing electricity in the day, P ID To clear the electricity volume on a daily basis between provinces.

[0123] The formula for calculating the average price of the inter-provincial spot market is:

[0124]

[0125] In the formula, is the average price of the inter-provincial spot market, M TEM The electricity price is traded in the spot market.

[0126] The calculation formula for the average transaction price of the regional peak load ancillary service market is:

[0127]

[0128] In the formula, is the average transaction price of the regional peak load ancillary service market, M RAS is the transaction price of regional peak load ancillary service market, P RAS Electricity volume traded in the regional peak-shaving auxiliary service market.

[0129] The calculation formula for the proportion of medium- and long-term inter-provincial transaction electricity in each channel is:

[0130]

[0131] In the formula, R CML,j is the proportion of medium- and long-term transaction electricity between provinces in channel j, P CML,j is the medium- and long-term transaction power between provinces in channel j, N C is the total number of trading channels, P CML,a It is the medium- and long-term inter-provincial transaction electricity volume of channel a.

[0132] The calculation formula for the proportion of inter-provincial spot trading electricity in each channel is:

[0133]

[0134] In the formula, R CEM,j is the proportion of spot trading electricity between provinces in channel j, P CEM,j is the inter-provincial spot trading volume of channel j, P CEM,a It is the inter-provincial spot trading electricity volume of channel a.

[0135] (c) Grid security

[0136] Table 3 Power grid security indicators

[0137] First-level evaluation index Secondary evaluation indicators Transmission Channel Daily overload rate (%) Peak load standby Peak load reserve ratio (%)

[0138] The daily reload rate is calculated as:

[0139]

[0140] In the formula, R HP is the daily overload rate, N HP is the number of heavy-load transmission channels, N C is the total number of transmission channels.

[0141] The calculation formula for the peak load reserve rate is:

[0142]

[0143] In the formula, R B is the peak load reserve rate, P B is the peak load standby unit capacity, P T is the total capacity of the generator set.

[0144] S3. Compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to determine whether there is a risk:

[0145] like There is a risk, and the system issues a risk warning message; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding historical risk indicator Y in the corresponding threshold library is updated. The historical risk indicator Y is the average value of all the corresponding real-time risk indicators X recorded in the historical database. P , obtain all N peak supply-demand ratios R recorded in the historical database P , and then the N peak supply and demand ratios R P Add them up and divide by N to get the average value to get the historical risk indicator: peak supply-demand ratio R P , and update it in the threshold library to the latest historical risk indicator.

[0146] The threshold U can be set to different thresholds according to different risk indicators; according to experience, the universal threshold U is preferably set to 0.2.

[0147] The inter-provincial spot market risk early warning method proposed in the present invention can effectively reflect the short-term electricity supply and demand situation, ensure the stable and healthy operation of the market, and support the construction of the inter-provincial electricity spot market.

[0148] The inter-provincial spot market risk early warning method proposed in the present invention proposes real-time risk indicators for the power market and conducts a comprehensive evaluation from three dimensions: market structure, market operation, and power grid security.

[0149] Example 2

[0150] The present invention also provides an inter-provincial spot market risk early warning system, comprising:

[0151] The determination module, after receiving the inter-provincial spot market risk warning analysis request, obtains the real-time data of the power grid and determines the real-time risk index X of the power market according to the real-time data of the power grid;

[0152] The risk warning module is used to compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to issue a risk warning; if If there is a risk, a risk warning message will be issued; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding threshold U in the threshold library is updated; the threshold U can be set differently according to different risk indicators; according to experience, the threshold U is preferably in the range of 0.15-0.3, and is more preferably set to 0.2; the historical risk indicator Y is the average value of all risk indicators X recorded in the historical database.

[0153] Output module, used to output warning information.

[0154] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0155] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0156] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0157] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0158] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A risk early warning method for inter-provincial spot market, characterized in that: The method comprises the following steps: After receiving the inter-provincial spot market risk warning analysis request, obtain the real-time data of the power grid, and calculate the real-time risk index X of the power market based on the real-time data of the power grid; Compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to conduct risk warning; specifically include: Take a real-time risk indicator X and retrieve the corresponding historical risk indicator Y from the threshold library for comparison; if If there is a risk, a risk warning message corresponding to the risk indicator will be issued; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding historical risk indicator Y in the threshold database is updated; U is the threshold; The real-time risk indicator X includes a market structure indicator, a market operation indicator or a power grid security indicator; The market structure indicators include: the total reported external power transmission at the sending end P G 、The total amount of electricity purchased by the receiving end is P L , each area at the sending end reports the amount of electricity transmitted P DG,v , each area of ​​the receiving end declares the purchased electricity P DL,v , peak supply-demand ratio R P , Trough Supply-Demand Ratio L ; The market operation indicators include: medium- and long-term inter-provincial transaction power P ML , the proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML , medium- and long-term average prices among provinces The current spot cleared electricity quantity P DA 、The proportion of spot cleared electricity volume R DA 、Intraday spot clearing quantity P ID 、Ratio of spot clearing electricity volume in the day ID , average price of inter-provincial spot market The amount of electricity sold in the regional peak load ancillary service market P RAS , Regional peak load ancillary service market transaction fee M RAS , Average transaction price of regional peak load ancillary service market The medium- and long-term transaction volume of each channel between provinces P CML,j , the proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j 、The amount of spot transactions between provinces in each channel P CEM,j , the proportion of spot trading electricity between provinces in each channel R CEM,j ; The power grid safety indicators include: daily overload rate R HP , peak load reserve rate R B ; Total reported power delivered at the sending end P G : Where N G is the total number of provinces at the sending end, P G,i The amount of electricity transmitted reported by the sending province i; Total power purchase reported by the receiving end P L : Where N L is the total number of receiving provinces, P L,i The purchased electricity reported by the receiving province i; The amount of electricity delivered P reported by each area at the sending end DG,v : Where P DG,v Report the outbound power for the sending region v, N S is the total number of provinces contained in region v, P DG,v,w The amount of electricity transmitted reported by province w in the sending region v; The amount of electricity purchased P reported by each area of ​​the receiving end DL,v : Where P DL,v Declare the purchased electricity for the receiving area v, N T is the total number of provinces contained in region v, P DL,v,w The purchased electricity reported by province w in receiving region v; Peak supply-demand ratio R P : In the formula, R TGP is the total power delivered at the peak sending end, R TLP is the total purchased electricity at the peak receiving end; Trough supply-demand ratio R L : In the formula, R TGL is the total power transmitted from the sending end during the valley period, R TLL The total amount of electricity purchased by the receiving end at the off-peak hour; The proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML : Where P ML is the inter-provincial medium- and long-term transaction electricity, P E To trade electricity in the inter-provincial market; Average price between provinces in the medium and long term Where M TML For the medium- and long-term electricity trading between provinces, P ML For medium- and long-term inter-provincial trading of electricity; The proportion of spot cleared electricity volume R DA : Where P DA P is the amount of electricity that is cleared on the spot before the province arrives. EM It is the total electricity cleared in the inter-provincial market; The proportion of spot clearing electricity in the day R ID : Where P ID To clear the electricity volume for intra-day spot sales between provinces; Average price of inter-provincial spot market Where M TEM Transaction electricity charges for spot market; Average transaction price of regional peak load ancillary service market Where M RAS is the transaction price of regional peak load ancillary service market, P RAS The amount of electricity traded in the regional peak load ancillary service market; The proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j : In the formula, R CML,j is the proportion of medium- and long-term transaction electricity between provinces in channel j, P CML,j is the medium- and long-term transaction power between provinces in channel j, N C is the total number of trading channels, P CML,a The medium- and long-term transaction electricity volume between provinces in channel a; The proportion of spot trading electricity between provinces in each channel R CEM,j : In the formula, R CEM,j is the proportion of spot trading electricity between provinces in channel j, P CEM,j is the inter-provincial spot trading volume of channel j, P CEM,a is the inter-provincial spot trading electricity volume of channel a; The real-time data of the power grid includes operation data, market declaration data and market clearing results; Daily reload rate R HP : Where N HP is the number of heavy-load transmission channels, N C is the total number of transmission channels; Peak load reserve rate R B : Where P B is the peak load standby unit capacity, P T is the total capacity of the generator set; The historical risk index Y is the average value of all corresponding real-time risk indexes X recorded in the historical database; U=0.1~0.3。 2. An inter-provincial spot market risk early warning system, characterized in that: include: A determination module is used to obtain real-time data of the power grid after receiving a risk warning analysis request of the inter-provincial spot market, and determine the real-time risk index X of the power market according to the real-time data of the power grid; The risk warning module is used to compare the real-time risk indicator X with the historical risk indicator Y in the threshold library to issue a risk warning; Specifically include: Take a real-time risk indicator X and retrieve the corresponding historical risk indicator Y from the threshold library for comparison; if If there is a risk, a risk warning message corresponding to the risk indicator will be issued; if If there is no risk, the real-time risk indicator X is imported into the historical database, and the corresponding historical risk indicator Y in the threshold database is updated; U is the threshold; The real-time risk indicator X includes a market structure indicator, a market operation indicator or a power grid security indicator; The market structure indicators include: the total reported external power transmission at the sending end P G 、The total amount of electricity purchased by the receiving end is P L , each area at the sending end reports the amount of electricity transmitted P DG,v , each area of ​​the receiving end declares the purchased electricity P DL,v , peak supply-demand ratio R P , Trough Supply-Demand Ratio L ; The market operation indicators include: medium- and long-term inter-provincial transaction power P ML , the proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML , medium- and long-term average prices among provinces The current spot cleared electricity quantity P DA 、The proportion of spot cleared electricity volume R DA 、Intraday spot clearing quantity P ID 、Ratio of spot clearing electricity volume in the day ID , average price of inter-provincial spot market The amount of electricity sold in the regional peak load ancillary service market P RAS , Regional peak load ancillary service market transaction fee M RAS , Average transaction price of regional peak load ancillary service market The medium- and long-term transaction volume of each channel between provinces P CML,j , the proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j 、The amount of spot transactions between provinces in each channel P CEM,j , the proportion of spot trading electricity between provinces in each channel R CEM,j ; The power grid safety indicators include: daily overload rate R HP , peak load reserve rate R B ; Total reported power delivered at the sending end P G : Where N G is the total number of provinces at the sending end, P G,i The amount of electricity transmitted reported by the sending province i; Total power purchase reported by the receiving end P L : Where N L is the total number of receiving provinces, P L,i The purchased electricity reported by the receiving province i; The amount of electricity delivered P reported by each area at the sending end DG,v : Where P DG,v Report the outbound power for the sending region v, N S is the total number of provinces contained in region v, P DG,v,w The amount of electricity transmitted reported by province w in the sending region v; The amount of electricity purchased P reported by each area of ​​the receiving end DL,v : Where P DL,v Declare the purchased electricity for the receiving area v, N T is the total number of provinces contained in region v, P DL,v,w The purchased electricity reported by province w in receiving region v; Peak supply-demand ratio R P : In the formula, R TGP is the total power delivered at the peak sending end, R TLP is the total purchased electricity at the peak receiving end; Trough supply-demand ratio R L : In the formula, R TGL is the total power transmitted from the sending end during the valley period, R TLL The total amount of electricity purchased by the receiving end at the off-peak hour; The proportion of medium- and long-term electricity volume between provinces in inter-provincial market transactions R ML : Where P ML is the inter-provincial medium- and long-term transaction electricity, P E To trade electricity in the inter-provincial market; Average price between provinces in the medium and long term Where M TML For the medium- and long-term electricity trading between provinces, P ML For medium- and long-term inter-provincial trading of electricity; The proportion of spot cleared electricity volume R DA : Where P DA P is the amount of electricity that is cleared on the spot before the province arrives. EM It is the total electricity cleared in the inter-provincial market; The proportion of spot clearing electricity in the day R ID : Where P ID To clear the electricity volume for intra-day spot sales between provinces; Average price of inter-provincial spot market Where M TEM Transaction electricity charges for spot market; Average transaction price of regional peak load ancillary service market Where M RAS is the transaction price of regional peak load ancillary service market, P RAS The amount of electricity traded in the regional peak load ancillary service market; The proportion of medium- and long-term transaction electricity between provinces in each channel R CML,j : In the formula, R CML,j is the proportion of medium- and long-term transaction electricity between provinces in channel j, P CML,j is the medium- and long-term transaction power between provinces in channel j, N C is the total number of trading channels, P CML,a The medium- and long-term transaction electricity volume between provinces in channel a; The proportion of spot trading electricity between provinces in each channel R CEM,j : In the formula, R CEM,j is the proportion of spot trading electricity between provinces in channel j, P CEM,j is the inter-provincial spot trading volume of channel j, P CEM , a is the inter-provincial spot trading electricity volume of channel a; The real-time data of the power grid includes operation data, market declaration data and market clearing results; Daily reload rate R HP : Where N HP is the number of heavy-load transmission channels, N C is the total number of transmission channels; Peak load reserve rate R B : Where P B is the peak load standby unit capacity, P T is the total capacity of the generator set; The historical risk index Y is the average value of all corresponding real-time risk indexes X recorded in the historical database; U=0.1~0.3。