Shear connection structure for assembled steel-concrete composite beams
By prefabricating semicircular connecting ridges and slot structures on steel box girders and concrete bridge decks, the rapid installation and high shear bearing capacity of steel-mixed composite beams are achieved, and the complex construction and long cycle in the existing technology are solved. The problem has improved construction efficiency and integrity.
Patent Information
- Application Number
- CN202110153241.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-04
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-02-04
AI Technical Summary
When the existing steel-mixed composite beam bridge connection method meets the needs of high shear bearing capacity, the construction process is complex and the cycle is long, making it difficult to achieve rapid construction.
Design a shear coupling structure for prefabricated steel-concrete composite beams. The steel box girder and the concrete bridge deck are both prefabricated parts. The first connecting ridge is arranged on the flange plate of the steel box girder and the second side of the concrete bridge deck is arranged on the lower side of the concrete bridge deck. The second connecting ridge uses semicircular projections and slots to achieve prefabricated installation, and bonded mortar can be poured into it to improve shear bearing capacity.
The construction process is simplified, the construction cycle is shortened, and the shear bearing capacity of the structure is significantly improved, improving integrity and construction efficiency.
Smart Images

Figure CN112695617B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a bridge structure, in particular to a shear connection structure for assembled steel-concrete composite beams. Background Art
[0002] In the prior art, steel-concrete composite beam bridges generally use shear connectors to connect the concrete bridge deck and the steel box beam into one body so that they jointly participate in the stress-bearing process of the structure. Common shear connectors mainly include steel bar connectors, steel connectors, PBL connectors and bolt connectors. Among them, bolt connectors and PBL connectors are currently the most widely used in engineering. PBL connectors mainly resist longitudinal shear force through concrete tenons and through steel bars in the openings. The through steel bars arranged in the openings can greatly improve the ultimate bearing capacity of the connectors, but because through steel bars need to be arranged in the holes, it brings great inconvenience to the construction, and the production process is time-consuming and labor-intensive. Bolt connectors require reserved holes for concrete pouring, which will make the shear force transmission between the steel-concrete interface discontinuous, the concrete slab has a splitting zone, the amount of concrete poured in the shear slot holes is small, the number of shear slot holes is large, and the quality is difficult to guarantee. This will lead to poor integrity of the bridge deck, and the quality of wet joint concrete is difficult to guarantee, and the interface between the new and old concrete is also prone to cracking. In summary, the existing connection methods require more concrete casting processes, and the on-site construction period is long, which is not conducive to the rapid construction of steel-concrete composite structures.
[0003] Chinese Patent No. CN201510618404.1 proposes a new type of concrete slab with a groove at the bottom. By setting a groove that cooperates with the steel beam at the bottom of the concrete bridge deck, a new type of self-locking steel-concrete connector can be formed. Although this technology effectively solves the problems of corrosion of the steel-concrete interface, concrete cracking, and difficulty in controlling the quality of post-poured concrete, this technology mainly relies on the bonding force and friction between the connector and the mortar to resist shear force, and is prone to damage under large loads.
[0004] Chinese Patent No. CN201620452745.6 proposes a perforated plate connector with a boot-shaped slot, a steel beam and a positive anisotropic steel plate, wherein one side of the perforated plate connector is a straight profile, and the other side of the perforated plate connector is repeatedly arranged with raised connectors and recessed slots, and the recessed slots are boot-shaped; the shape of the raised connector is consistent with the shape and size of the recessed slot after rotating 180°; for two perforated plate connectors of the same size, after rotating one of them 180°, the raised connectors and recessed slots of the two are just fitted and connected, and are spliced into a complete strip; although the utility model effectively solves the process of interlacing and arranging steel bars and reduces the input of manpower, the utility model still does not get rid of the construction process of arranging steel bars on the connector and cast-in-place concrete bridge decks, and is still not suitable for bridges that require rapid construction.
[0005] Judging from the current situation, it is necessary to improve the connection method between the concrete bridge deck and the steel box girder so that it can meet the high shear bearing capacity requirements while simplifying the construction process and shortening the construction period. Summary of the invention
[0006] In view of the problems in the background technology, the present invention proposes a shear connection structure for an assembled steel-concrete composite beam, comprising a steel box beam and a concrete bridge deck, wherein the steel box beam and the concrete bridge deck are both prefabricated parts, and the innovation thereof lies in: a first connecting ridge is respectively arranged on two flange plates of the steel box beam, the axial direction of the first connecting ridge is parallel to the axial direction of the flange plate, and the length of the first connecting ridge is equal to the length of the flange plate; a plurality of semicircular protrusions are arranged on the upper end surface of the first connecting ridge, and the plurality of semicircular protrusions are distributed at equal intervals;
[0007] Two grooves are arranged on the lower side of the concrete bridge deck, and the grooves are connected to the front and rear end surfaces of the concrete bridge deck; the axial direction of the groove is parallel to the axial direction of the concrete bridge deck; a second connecting ridge is arranged at the bottom of the groove, the axial direction of the second connecting ridge is parallel to the axial direction of the groove, and the length of the second connecting ridge matches the length of the first connecting ridge; the positions of the two second connecting ridges are respectively opposite to the two first connecting ridges; a plurality of semicircular card grooves are arranged on the lower end surface of the second connecting ridge, and the plurality of semicircular card grooves correspond to the plurality of semicircular protrusions one by one;
[0008] During assembly, the concrete bridge deck is placed on the flange plate of the steel box girder, the lower end surface of the concrete bridge deck contacts the upper end surface of the flange plate, and the semicircular protrusion on the first connecting ridge is inserted into the semicircular groove on the corresponding second connecting ridge.
[0009] The principle of the present invention is that the first connecting ridge and the second connecting ridge can be formed in a prefabricated manner on the steel box girder and the concrete bridge deck respectively, eliminating the on-site production process. When installing the concrete bridge deck, the concrete bridge deck can be installed by simply aligning the semicircular protrusions and the semicircular grooves with each other. The installation operation is very convenient, which can greatly simplify the construction process and shorten the construction period. The semicircular protrusions are inserted into the semicircular grooves to play the role of buckles, which significantly improves the shear bearing capacity of the connection structure and makes the integrity of the combined structure better.
[0010] Preferably, two grouting holes are provided in the concrete bridge deck; the upper end of the grouting hole is connected to the upper end surface of the concrete bridge deck, and the lower end of the grouting hole is connected to the groove, and the two grouting holes correspond to the two grooves respectively; after the concrete bridge deck and the steel box girder are connected, the bonding mortar is poured into the groove through the grouting holes. In order to further improve the shear bearing capacity, grouting holes are provided in the concrete bridge deck. In specific implementation, the space in the groove is completely filled with bonding mortar, and the second connecting ridge and the first connecting ridge are wrapped with bonding mortar. At this time, the force between the structures is bonding force + snap action, which can significantly improve the shear bearing capacity of the structure.
[0011] Preferably, a plurality of first semicircular notches are provided on the upper end surface of the first connecting ridge, and the first semicircular notches and the semicircular protrusions are arranged alternately; a plurality of second semicircular notches are provided on the lower end surface of the second connecting ridge, and the arrangement positions of the second semicircular notches correspond one to one with the first semicircular notches; when the semicircular protrusion is inserted into the semicircular slot, the first semicircular notches and the second semicircular notches form a circular hole. After adopting this improved scheme on the basis of the pouring bonding mortar scheme, the bonding mortar will form a PBL shear key at the circular hole. At this time, the force between the structures is bonding force + buckle action + PBL shear key, which further improves the shear bearing capacity of the structure.
[0012] Preferably, the first connecting ridge and the second connecting ridge are both made of patterned steel plates; the first connecting ridge is welded to the flange plate; and the upper part of the second connecting ridge is pre-embedded in the concrete bridge deck.
[0013] Preferably, the first connecting ridge and the second connecting ridge that match each other are cut from a whole piece of patterned steel plate. When this solution is adopted, the semicircular protrusions and semicircular grooves that match each other can be precisely matched, effectively reducing the difficulty of processing.
[0014] The beneficial technical effect of the present invention is: a shear connection structure for assembled steel-concrete composite beams is proposed, which can greatly improve the shear bearing capacity of the structure, and can also effectively simplify the assembly operation, improve construction efficiency and reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 , a schematic diagram of a half-section structure of the present invention;
[0016] Figure 2 , a half-section exploded view of the present invention;
[0017] Figure 3 , schematic diagram of the half-section structure when the PBL shear key solution is adopted;
[0018] Figure 4 , schematic diagram of concrete bridge deck structure;
[0019] Figure 5, schematic diagram of the matching relationship between the first connecting ridge and the second connecting ridge Figure 1 (without round hole);
[0020] Figure 6 , schematic diagram of the matching relationship between the first connecting ridge and the second connecting ridge Figure 2 (with round hole);
[0021] The names corresponding to the marks in the figure are: first connecting ridge 1, second connecting ridge 2, steel box girder 3, flange plate 31, concrete bridge deck 4, circular hole 5, groove 6, grouting hole 7. DETAILED DESCRIPTION
[0022] A shear connection structure for an assembled steel-concrete composite beam, comprising a steel box beam and a concrete bridge deck, wherein the steel box beam and the concrete bridge deck are both prefabricated parts, and the innovation thereof lies in: a first connecting ridge 1 is respectively arranged on two flange plates of the steel box beam, the axial direction of the first connecting ridge 1 is parallel to the axial direction of the flange plate, and the length of the first connecting ridge 1 is equal to the length of the flange plate; a plurality of semicircular protrusions are arranged on the upper end surface of the first connecting ridge 1, and the plurality of semicircular protrusions are distributed at equal intervals;
[0023] Two grooves are arranged on the lower side of the concrete bridge deck, and the grooves are connected to the front and rear end surfaces of the concrete bridge deck; the axial direction of the groove is parallel to the axial direction of the concrete bridge deck; a second connecting ridge 2 is arranged at the bottom of the groove, the axial direction of the second connecting ridge 2 is parallel to the axial direction of the groove, and the length of the second connecting ridge 2 matches the length of the first connecting ridge 1; the positions of the two second connecting ridges 2 are respectively opposite to the two first connecting ridges 1; a plurality of semicircular card grooves are arranged on the lower end surface of the second connecting ridge 2, and the plurality of semicircular card grooves correspond to the plurality of semicircular protrusions one by one;
[0024] During assembly, the concrete bridge deck is placed on the flange plate of the steel box girder, the lower end surface of the concrete bridge deck contacts the upper end surface of the flange plate, and the semicircular protrusion on the first connecting ridge 1 is inserted into the semicircular groove on the corresponding second connecting ridge 2.
[0025] Furthermore, two grouting holes are arranged in the concrete bridge deck; the upper end of the grouting hole is connected with the upper end surface of the concrete bridge deck, and the lower end of the grouting hole is connected with the groove, and the two grouting holes correspond to the two grooves respectively; after the concrete bridge deck and the steel box girder are connected, bonding mortar is poured into the groove through the grouting holes.
[0026] Furthermore, a plurality of first semicircular notches are arranged on the upper end surface of the first connecting ridge 1, and the first semicircular notches and the semicircular protrusions are arranged alternately; a plurality of second semicircular notches are arranged on the lower end surface of the second connecting ridge 2, and the setting positions of the second semicircular notches correspond one-to-one to the first semicircular notches; when the semicircular protrusion is inserted into the semicircular slot, the first semicircular notches and the second semicircular notches form a circular hole.
[0027] Furthermore, the first connecting ridge 1 and the second connecting ridge 2 are both made of patterned steel plates; the first connecting ridge 1 is welded to the flange plate; and the upper part of the second connecting ridge 2 is pre-embedded in the concrete bridge deck.
[0028] Furthermore, the first connecting ridge 1 and the second connecting ridge 2 that match each other are cut from a whole piece of patterned steel plate.
Claims
1. A shear connection structure for assembled steel-concrete composite beams, comprising a steel box beam and a concrete bridge deck, wherein the steel box beam and the concrete bridge deck are both prefabricated parts. Features: A first connecting ridge (1) is provided on each of the two flange plates of the steel box girder, the axial direction of the first connecting ridge (1) is parallel to the axial direction of the flange plate, and the length of the first connecting ridge (1) is equal to the length of the flange plate; a plurality of semicircular protrusions are provided on the upper end surface of the first connecting ridge (1), and the plurality of semicircular protrusions are distributed at equal intervals; Two grooves are provided on the lower side of the concrete bridge deck, the grooves communicating with the front and rear end surfaces of the concrete bridge deck; the axial direction of the groove is parallel to the axial direction of the concrete bridge deck; a second connecting ridge (2) is provided at the bottom of the groove, the axial direction of the second connecting ridge (2) is parallel to the axial direction of the groove, and the length of the second connecting ridge (2) matches the length of the first connecting ridge (1); the positions of the two second connecting ridges (2) are respectively opposite to the two first connecting ridges (1); a plurality of semicircular grooves are provided on the lower end surface of the second connecting ridge (2), and the plurality of semicircular grooves correspond to the plurality of semicircular protrusions one by one; During assembly, the concrete bridge deck is placed on the flange plate of the steel box girder, the lower end surface of the concrete bridge deck contacts the upper end surface of the flange plate, and the semicircular protrusion on the first connecting ridge (1) is inserted into the semicircular groove on the corresponding second connecting ridge (2).
2. The shear connection structure for assembled steel-concrete composite beams according to claim 1, Features: Two grouting holes are arranged in the concrete bridge deck; the upper end of the grouting hole is connected with the upper end surface of the concrete bridge deck, and the lower end of the grouting hole is connected with the groove, and the two grouting holes correspond to the two grooves respectively; after the concrete bridge deck and the steel box girder are connected, bonding mortar is poured into the groove through the grouting holes.
3. The shear connection structure for assembled steel-concrete composite beams according to claim 2, Features: A plurality of first semicircular notches are arranged on the upper end surface of the first connecting ridge (1), and the first semicircular notches and the semicircular protrusions are arranged alternately; a plurality of second semicircular notches are arranged on the lower end surface of the second connecting ridge (2), and the arrangement positions of the second semicircular notches correspond one to one with the first semicircular notches; when the semicircular protrusion is inserted into the semicircular slot, the first semicircular notches and the second semicircular notches form a circular hole.
4. The shear connection structure for assembled steel-concrete composite beams according to claim 1, 2 or 3, Features: The first connecting ridge (1) and the second connecting ridge (2) are both made of patterned steel plates; the first connecting ridge (1) is welded to the flange plate; and the upper part of the second connecting ridge (2) is pre-embedded in the concrete bridge deck.
5. The shear connection structure for assembled steel-concrete composite beams according to claim 4, Features: The first connecting ridge (1) and the second connecting ridge (2) that match each other are cut from a whole piece of patterned steel plate.
Citation Information
Patent Citations
Take perforated plate connecting piece, girder steel and orthotropic steel sheet of boot -shaped slotted hole
CN206204761U
Novel construction method for efficient fabricated steel-concrete composite beam
CN105113425A
Novel concrete bridge deck with channels at bottom
CN105133492A
Combined beam containing perforated plate connectors and construction method of combined beam
CN105887655A
Bearing-shearing connector
CN110067313A
