A gas sampling device for coalbed methane well drainage outlet

By designing the exhaust gas sampling device for the coalbed methane well drain outlet, including the air collection bag, intake valve assembly and outlet valve assembly, the effective sampling and detection of coalbed methane is achieved, the problems of resource waste and environmental pollution are solved, and the sampling efficiency is improved and accuracy.

CN112763283BActive Publication Date: 2024-11-01CHINA UNIV OF GEOSCIENCES (WUHAN)
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202110041753.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-13
Publication Date
2024-11-01
Estimated Expiration
2041-01-13

AI Technical Summary

Technical Problem

The prior art is difficult to effectively sample and detect gas evacuated at the coalbed methane well drainage outlet, resulting in waste of resources and environmental pollution.

Method used

A coalbed methane well drainage gas sampling device is designed, including an air collection bag, an intake valve assembly and an outlet valve assembly. The coalbed methane is introduced into the air collection bag through the intake valve assembly, and the collected coal layer is used to use the air outlet valve assembly to The gas discharge is tested. The device uses annular cylindrical drying tube and a spherical drying tube for coalbed methane drying, and the check valve prevents inverting, and automatically sampling and data recording is achieved through patch piezoelectric buzzer and programmable timer.

Benefits of technology

Effective sampling and component detection of coalbed methane are achieved, adapted to the gas dissipation environment of coalbed methane drainage outlets, improved sampling efficiency and accuracy, and timely counting the dissipation of coalbed methane, helping to take control measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112763283B_ABST
    Figure CN112763283B_ABST
Patent Text Reader

Abstract

The present invention provides a gas sampling device for escaped gas from a drainage outlet of a coalbed methane well, and relates to the technical field of coalbed methane collection; the gas sampling device for escaped gas from a drainage outlet of a coalbed methane well comprises an air collecting bag, an air inlet valve assembly and an air outlet valve assembly; the air inlet valve assembly comprises an air inlet outer cylinder and an air inlet inner cylinder; one end of the air inlet outer cylinder is arranged on the air collecting bag; a first partition is arranged on the inner side wall of the air inlet outer cylinder; the air inlet inner cylinder is movably sleeved in the air inlet outer cylinder and is located above the first partition; the first partition, the air inlet outer cylinder and the air inlet inner cylinder are combined to form a first enclosed space; a first air duct for connecting the air collecting bag and the first enclosed space is penetrated on the first partition; an air inlet pipe communicating with the first enclosed space is arranged on the side wall of the air inlet outer cylinder; the air inlet inner cylinder is used to cut off the connection between the first air duct and the air inlet pipe; the air outlet valve assembly is arranged on the air collecting bag; the coalbed methane can be effectively sampled, so as to detect the composition of the escaped gas from the coalbed methane well.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coalbed methane collection, and in particular to a sampling device for escaped gas from a drainage outlet of a coalbed methane well. Background Art

[0002] Coalbed methane is a coalbed methane resource that coexists with coal. It is a hydrocarbon coalbed methane stored in coal seams and is an unconventional natural gas. The main component of coalbed methane is methane. As a clean and efficient energy source, it is also a greenhouse gas. Its emission into the atmosphere is very likely to cause a greenhouse effect. Therefore, it is necessary to develop and design a coalbed methane sampling device to sample and detect coalbed methane, and take corresponding control measures according to the on-site conditions to avoid wasting resources and polluting the environment. Summary of the invention

[0003] The present invention aims to provide a gas sampling device for coalbed methane well drainage outlet to sample coalbed methane, so as to collect coalbed methane samples in time.

[0004] An embodiment of the present invention provides a gas sampling device for a drainage outlet of a coalbed methane well, comprising a gas collecting bag, an air inlet valve assembly and an air outlet valve assembly;

[0005] The air intake valve assembly comprises an air intake outer cylinder and an air intake inner cylinder; one end of the air intake outer cylinder is arranged on the air collecting bag; a first partition is arranged on the inner side wall of the air intake outer cylinder; the air intake inner cylinder is movably sleeved in the air intake outer cylinder and is located above the first partition; the first partition, the air intake outer cylinder and the air intake inner cylinder enclose a first enclosed space; a first air duct for connecting the air collecting bag and the first enclosed space is penetrated on the first partition; an air intake pipe connected to the first enclosed space is arranged on the side wall of the air intake outer cylinder; the air intake inner cylinder is used to cut off the connection between the first air duct and the air intake pipe;

[0006] The gas outlet valve assembly is arranged on the gas collecting bag and is used to discharge the coalbed methane in the gas collecting bag to the outside.

[0007] In some preferred embodiments, the air intake inner cylinder includes an integrally formed first upper cylinder and a first lower cylinder; a first internal thread is provided on the inner side wall of the upper end of the air intake outer cylinder; a first external thread used in conjunction with the first internal thread is provided on the outer side wall of the first upper cylinder; the first upper cylinder is threadedly connected to the air intake outer cylinder; a first rubber plug is provided in the first upper cylinder for closing or opening one end of the first air duct located in the first confined space; the outer diameter of the first lower cylinder is smaller than the inner diameter of the air intake outer cylinder, so that the air intake pipe is connected to the first confined space through the gap between the first lower cylinder and the air intake outer cylinder.

[0008] In some more preferred embodiments, an annular cylindrical drying pipe is sleeved on the outer side of the upper end of the first air duct, which is used to dry the coalbed methane entering the first air duct; the annular cylindrical drying pipe is filled with a first desiccant; the first air duct is coaxially arranged with the air inlet inner tube; the inner side wall of the first lower cylinder is fitly connected with the outer side wall of the annular cylindrical drying pipe.

[0009] In some more preferred embodiments, a first end cover is provided on the top of the first upper cylinder to facilitate the rotation of the air intake inner cylinder.

[0010] In some more preferred embodiments, a first sealing gasket is provided on the first air duct; the lower surface of the first sealing gasket is fitted and connected to the upper surface of the first partition; the first sealing gasket cooperates with the first lower cylinder to further cut off the connection between the first air duct and the air inlet duct.

[0011] In some more preferred embodiments, the first upper cylinder body is outer-coated with a second sealing gasket; the upper surface of the second sealing gasket is fitted and connected to the lower surface of the first end cover; and the lower surface of the second sealing gasket is used to abut against the top of the air intake outer cylinder.

[0012] In some more preferred embodiments, a first sealing ring is fixed on the outer side wall of the first lower cylinder; the first sealing ring is located above the air intake pipe and abuts against the inner side wall of the air intake outer cylinder.

[0013] In some more preferred embodiments, a second sealing ring is fixedly provided on the outer wall of the first lower cylinder; the second sealing ring is located below the first sealing ring; the second sealing ring, the first lower cylinder and the air intake outer cylinder cooperate to further isolate the first air duct from being connected to the air intake pipe.

[0014] In some preferred embodiments, one end of the air inlet pipe is connected to a spherical drying pipe for drying the coalbed methane entering the air inlet pipe; the spherical drying pipe is filled with a second desiccant.

[0015] In some preferred embodiments, one end of the air inlet pipe is connected to a one-way valve to prevent coalbed methane from being sucked back to the outside of the gas collecting bag.

[0016] In some preferred embodiments, a patch-type piezoelectric buzzer and a programmable timer are also provided on the air collecting bag; the patch-type piezoelectric buzzer and the programmable timer are electrically connected.

[0017] In some preferred embodiments, the air outlet valve assembly includes an air outlet outer cylinder and an air outlet inner cylinder; one end of the air outlet outer cylinder is arranged on the air collecting bag; a second partition is arranged on the inner wall of the air outlet outer cylinder; the air outlet inner cylinder is movably mounted in the air inlet and outlet outer cylinder, and is located above the second partition; the second partition, the air outlet outer cylinder and the air outlet inner cylinder together form a second enclosed space; a second air duct for connecting the air collecting bag and the second enclosed space is penetrated on the second partition; an air outlet pipe connected to the second enclosed space is arranged on the side wall of the air outlet outer cylinder; the air outlet inner cylinder is used to cut off the connection between the second air duct and the air outlet pipe.

[0018] In some more preferred embodiments, the air outlet inner cylinder includes an integrally formed second upper cylinder and a second lower cylinder; a second internal thread is provided on the inner side wall of the upper end of the air outlet outer cylinder; a second external thread used in conjunction with the second internal thread is provided on the outer side wall of the second upper cylinder; the second upper cylinder is threadedly connected to the air outlet outer cylinder; a second rubber plug is provided in the second upper cylinder for closing or opening one end of the second air duct located in the second confined space; the outer diameter of the second lower cylinder is smaller than the inner diameter of the air outlet outer cylinder, so that the air outlet pipe is connected to the second confined space through the gap between the second lower cylinder and the air outlet outer cylinder.

[0019] In some more preferred embodiments, a second end cover is provided on the top of the second upper cylinder to facilitate the rotation of the air outlet inner cylinder.

[0020] In some more preferred embodiments, a third sealing gasket is provided on the second air duct; the lower surface of the third sealing gasket is fitted and connected to the upper surface of the second partition; the third sealing gasket cooperates with the second lower cylinder to further cut off the connection between the second air duct and the air outlet pipe.

[0021] In some more preferred embodiments, the second upper cylinder body is outer-coated with a fourth sealing gasket; the upper surface of the fourth sealing gasket is fitted and connected with the lower surface of the second end cover; the lower surface of the fourth sealing gasket is used to abut against the top of the air outlet outer cylinder.

[0022] In some more preferred embodiments, a third sealing ring is fixed on the outer side wall of the second lower cylinder; the third sealing ring is located above the air outlet pipe and abuts against the inner side wall of the air outlet outer cylinder.

[0023] In some more preferred embodiments, a fourth sealing ring is fixedly provided on the outer wall of the second lower cylinder; the fourth sealing ring is located below the third sealing ring; the fourth sealing ring, the second lower cylinder and the air outlet outer cylinder cooperate to further isolate the connection between the second air duct and the air outlet pipe.

[0024] In some more preferred embodiments, a sampling hole is provided on the second end cover to facilitate syringe sampling.

[0025] The beneficial effects brought about by the technical solution provided by the embodiments of the present invention are as follows: the coalbed methane well drainage outlet gas sampling device in the present invention comprises an air collecting bag, an air inlet valve assembly and an air outlet valve assembly; the air inlet valve assembly comprises an air inlet outer cylinder and an air inlet inner cylinder; one end of the air inlet outer cylinder is arranged on the air collecting bag; a first partition is arranged on the inner side wall of the air inlet outer cylinder; the air inlet inner cylinder is movably mounted in the air inlet outer cylinder and is located above the first partition; the first partition, the air inlet outer cylinder and the air inlet inner cylinder are combined to form a first enclosed space; a first partition is provided on the first partition for connecting the air collecting bag and the first enclosed space An air duct; an air inlet pipe connected to the first enclosed space is arranged on the side wall of the air inlet outer cylinder; the air inlet inner cylinder is used to cut off the connection between the first air duct and the air inlet pipe; the air outlet valve assembly is arranged on the air collecting bag, and is used to discharge the coalbed methane in the air collecting bag to the outside; the air inlet valve assembly and the air outlet valve assembly are arranged on the air collecting bag; when sampling, the coalbed methane is introduced into the air collecting bag through the air inlet valve assembly to detect the components of the coalbed methane, which can adapt to the sampling environment of the escaped gas at the coalbed methane drainage outlet, and effectively sample the coalbed methane, so as to detect the composition of the escaped gas from the coalbed methane well. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of a gas sampling device for a drainage outlet of a coalbed methane well in a certain embodiment of the present invention.

[0027] Figure 2 yes Figure 1 A schematic diagram of the structure of the air inlet valve assembly 2 in the sampling device for escaping gas at the drainage outlet of a coalbed methane well.

[0028] Figure 3 yes Figure 2 A schematic structural diagram of the air intake inner cylinder 21 in the air intake valve assembly 2.

[0029] Figure 4 yes Figure 1 A schematic diagram of the structure of the gas outlet valve assembly 1 in the gas sampling device for the escaped gas at the drainage outlet of a coalbed methane well.

[0030] Figure 5 yes Figure 4A schematic structural diagram of the air outlet inner cylinder 11 in the air outlet valve assembly 1.

[0031] Figure 6 Figure 2 Schematic diagram of the structure of the annular cylindrical drying tube 24 in the intake valve assembly 2.

[0032] Figure 7 yes Figure 6 A side view of the hollow cylindrical drying tube 24 in the middle.

[0033] Figure 8 yes Figure 7 A cross-sectional view of the annular cylindrical drying tube 24 along the AA direction.

[0034] Among them, 1. outlet valve assembly; 11. outlet inner cylinder; 111. second end cover; 112. second upper cylinder; 113. second lower cylinder; 114. sampling hole; 115. second rubber plug; 12. third sealing gasket; 13. second air guide tube; 14. third sealing ring; 15. fourth sealing ring; 16. fourth sealing gasket; 17. second partition; 18. outlet outer cylinder; 19. outlet pipe; 2. inlet valve assembly; 21. inlet inner cylinder; 211. first end cover; 212. first upper cylinder; 213. first lower cylinder; 214. first rubber plug; 22. first sealing gasket ; 23. First air duct; 24. Annular cylindrical drying tube; 241. First annular plate; 242. First air vent; 243. First cylinder; 244. Second cylinder; 245. Second annular plate; 246. Second air vent; 247. Annular connecting portion; 248. First desiccant; 25. First sealing ring; 26. Air inlet pipe; 27. Second sealing ring; 28. Second sealing gasket; 29. ​​First partition; 210. Air inlet outer cylinder; 3. Air collecting bag; 4. Spherical drying tube; 41. Second desiccant; 5. One-way valve; 6. Programmable timer; 7. Piezoelectric buzzer. DETAILED DESCRIPTION

[0035] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described below with reference to the accompanying drawings.

[0036] Please refer to Figure 1-5 An embodiment of the present invention provides a gas sampling device for a coalbed methane well drainage outlet, comprising a gas collecting bag 3, an air inlet valve assembly 2, an air outlet valve assembly 1, a spherical drying tube 4 and a one-way valve 5.

[0037] The air intake valve assembly 2 includes an air intake outer tube 210 and an air intake inner tube 21; one end of the air intake outer tube 210 is arranged on the air collecting bag 3; a first fixing seat (not shown in the figure) is arranged at the bottom of the air intake outer tube 210; the air intake outer tube 210 and the first fixing seat are integrally formed; the first fixing seat is glued to the air collecting bag 3; a first baffle 29 is arranged on the inner side wall of the air intake outer tube 210; the air intake inner tube 21 is movably sleeved in the air intake outer tube 210 and is located above the first baffle 29; the air intake inner tube 21 can move up and down in the air intake outer tube 210 along the axial direction of the air intake outer tube 210; the first baffle 29, the air intake outer tube 210 and the air intake inner tube 210 are movable. The air inner cylinder 21 encloses a first enclosed space; a first air duct 23 for connecting the air collecting bag 3 and the first enclosed space is provided through the first partition 29; one end of the first air duct 23 is vertically arranged on the first partition 29, and is connected with the air collecting bag 3 through the lower end of the air intake outer cylinder 210; the first air duct 23 is coaxially arranged with the air intake inner cylinder 21; an air intake pipe 26 connected with the first enclosed space is provided on the side wall of the air intake outer cylinder 210; the air intake inner cylinder 21 is used to cut off the connection between the first air duct 23 and the air intake pipe 26; the air intake outer cylinder 210, the first partition 29, the first air duct 23 and the air intake pipe 26 are integrally formed.

[0038] The gas outlet valve assembly 1 is arranged on the gas collecting bag 3, and is used for discharging the coalbed methane in the gas collecting bag 3 to the outside; the gas outlet valve assembly 1 comprises a gas outlet outer tube 18 and a gas outlet inner tube 11; one end of the gas outlet outer tube 18 is arranged on the gas collecting bag 3; a second fixing seat is arranged at the bottom of the gas outlet outer tube 18; the gas outlet outer tube 18 and the second fixing seat are integrally formed; the second fixing seat is glued to the gas collecting bag 3; a second baffle 17 is arranged on the inner side wall of the gas outlet outer tube 18; the gas outlet inner tube 11 is movably sleeved in the gas inlet and outlet outer tube 18, and is located above the second baffle 17; the gas outlet inner tube 11 can move up and down in the gas outlet outer tube 18 along the axial direction of the gas outlet outer tube 18; the second baffle 1 7. The air outlet outer tube 18 and the air outlet inner tube 11 are combined to form a second enclosed space; a second air duct 13 for connecting the air collecting bag 3 and the second enclosed space is provided through the second partition 17; one end of the second air duct 13 is vertically arranged on the second partition 17, and is connected with the air collecting bag 3 through the lower end of the air outlet outer tube 18; the second air duct 13 and the air outlet inner tube 11 are coaxially arranged; an air outlet pipe 19 connected with the second enclosed space is provided on the side wall of the air outlet outer tube 18; the air outlet inner tube 11 is used to cut off the connection between the second air duct 13 and the air outlet pipe 19; the second partition 17, the second air duct 13, the air outlet outer tube 18 and the air outlet pipe 19 are integrally formed.

[0039] One end of the air inlet pipe 26 is connected to a spherical drying pipe 4 for drying the coalbed methane entering the air inlet pipe 26 ; the spherical drying pipe 4 is filled with a second desiccant 41 ; one end of the spherical drying pipe 4 is threadedly connected to one end of the air inlet pipe 26 , and the other end is connected to a one-way valve 5 .

[0040] The one-way valve 5 is threadedly connected to the other end of the spherical drying pipe 4 to prevent the coalbed methane from being sucked back to the outside of the gas collecting bag 3.

[0041] Specifically, the air intake inner cylinder 21 includes an integrally formed first upper cylinder 212 and a first lower cylinder 213; a first internal thread is provided on the inner side wall of the upper end of the air intake outer cylinder 210; a first external thread used in conjunction with the first internal thread is provided on the outer side wall of the first upper cylinder 212; the first upper cylinder 212 is threadedly connected to the air intake outer cylinder 210; a first rubber plug 214 is provided in the first upper cylinder 212, which is used to close or open one end of the first air guide pipe 23 located in the first confined space; the outer diameter of the first lower cylinder 213 is smaller than the inner diameter of the air intake outer cylinder 210, so that the air intake pipe 26 is connected to the first confined space through the gap between the first lower cylinder 213 and the air intake outer cylinder 210 ; In order to facilitate the rotation of the air intake inner cylinder 21, a first end cover 211 is provided on the top of the first upper cylinder 212, and the first end cover 211 is integrally formed with the air intake inner cylinder 21; after the coalbed methane passes through the one-way valve 5, the spherical drying tube 4 and the air intake pipe 26, it enters the first confined space through the gap between the first lower cylinder 213 and the air intake outer cylinder 210; by rotating the first end cover 211, the air intake inner cylinder 21 moves upward along the axial direction of the air intake outer cylinder 210, so that the first rubber stopper 214 moves upward accordingly, thereby realizing the conduction between the first air guide pipe 23 and the first confined space, so that the coalbed methane entering the first confined space enters the air collecting bag 3 through the first air guide pipe 23.

[0042] Furthermore, in order to dry the coalbed methane entering the first air duct 23 from the air inlet pipe 26, an annular cylindrical drying pipe 24 is sleeved on the outer side of the upper end of the first air duct 23; the upper end of the first air duct 23 protrudes from the top of the annular cylindrical drying pipe 24, so as to facilitate the abutment with the first rubber stopper 214; the first air duct 23 is glued to the annular cylindrical drying pipe 24; the annular cylindrical drying pipe 24 is filled with a first desiccant 248; the first air duct 23 is coaxially arranged with the air inlet inner tube 21; the inner wall of the first lower cylinder 213 is fitted and connected with the outer wall of the annular cylindrical drying pipe 24; the coalbed methane flows through the air inlet pipe 26, passes through the gap between the first lower cylinder 213 and the air inlet outer tube 210, and enters the first air duct 23 after passing through the annular cylindrical drying pipe 24, and the coalbed methane flowing through the annular cylindrical drying pipe 24 is dried again.

[0043] Specifically, refer to Figure 6-8The annular cylindrical drying pipe 24 includes a first cylinder 243 and a second cylinder 244 sleeved in the first cylinder 243; the first cylinder 243 and the second cylinder 244 are coaxially arranged; the two end surfaces of the first cylinder 243 and the second cylinder 244 are flush; a first annular plate 241 is arranged between the tops of the first cylinder 243 and the second cylinder 244; a first air hole 242 is opened on the first annular plate 241, so as to facilitate the coalbed methane dried by the first desiccant 248 to enter the first air guide pipe 23 through the first air hole 242; a second annular plate 245 is detachably arranged between the bottoms of the first cylinder 243 and the second cylinder 244; a second annular plate 245 is provided on the upper surface of the second annular plate 245 An annular connecting portion 247 is provided; the outer side of the annular connecting portion 247 is threadedly connected to the inner side of the bottom of the first cylinder 243; the second cylinder 244 is connected to the stopper of the second annular plate 245; the first cylinder 243, the second cylinder 244, the first annular plate 241 and the second annular plate 245 enclose a cavity for accommodating the first desiccant 248; the second annular plate 245 is provided with a second air hole 246, and the second air hole 246 is connected to the cavity to facilitate the coalbed methane to enter the cavity and contact with the first desiccant 248; the first cylinder 243, the second cylinder 244 and the first annular plate 241 are integrally formed; the second annular plate 245 and the annular connecting portion 247 are integrally formed.

[0044] In this embodiment, the first desiccant 248 and the second desiccant 41 are both silica gel particle desiccant.

[0045] Further, refer to Figure 2 and Figure 3 In order to improve the air tightness of the intake valve assembly 2, a first sealing gasket 22 is sleeved on the first air guide pipe 23; the lower surface of the first sealing gasket 22 is fitted and connected with the upper surface of the first partition plate 29; the first sealing gasket 22 cooperates with the first lower cylinder 213 to further cut off the communication between the first air guide pipe 23 and the intake pipe 26; a second sealing gasket 28 is sleeved on the first upper cylinder 212; the upper surface of the second sealing gasket 28 is fitted and connected with the lower surface of the first end cover 211; the lower surface of the second sealing gasket 28 is used to abut against the top of the intake outer cylinder 210; by rotating the first An end cover 211 makes the upper end of the first air duct 23 sealed when the bottom of the first rubber stopper 214 abuts against the upper end surface of the first air duct 23; at this time, the upper end surface of the air intake outer tube 210 abuts against the second sealing gasket 28, thereby improving the air tightness between the first end cover 211 and the upper end of the air intake outer tube 210; at the same time, the bottom of the first lower cylinder 213 abuts against the first sealing gasket 22, thereby preventing the coalbed methane entering the gap between the first lower cylinder 213 and the air intake outer tube 210 from entering the annular cylindrical drying pipe 24, thereby improving the air tightness of the air intake valve assembly 2.

[0046] In order to further improve the air tightness of the intake valve assembly 2, a first sealing ring 25 is fixed on the outer wall of the first lower cylinder 213; the first sealing ring 25 is located above the intake pipe 26 and abuts against the inner wall of the intake outer cylinder 210; a second sealing ring 27 is fixedly arranged on the outer wall of the first lower cylinder 213; the second sealing ring 27 is located below the first sealing ring 25; the second sealing ring 27, the first lower cylinder 213 and the intake outer cylinder 210 cooperate to further isolate the first air guide pipe 23 from being connected to the intake pipe 26; when the bottom of the first rubber stopper 214 abuts against the top of the first air guide pipe 23, the first sealing ring 25 is located above the intake pipe 26, and the second sealing ring 27 is located above the intake pipe 2 6, so that the connection between the air inlet pipe 26 and the air inlet outer cylinder 210 is located between the first sealing ring 25 and the second sealing ring 27, further preventing the coalbed methane from entering the annular cylindrical drying pipe 24; when it is necessary to sample the coalbed methane, the first end cover 211 is rotated so that the air inlet inner cylinder 21 moves up to where the first sealing ring 25 and the second sealing ring 27 are both located above the air inlet pipe 26, and the coalbed methane passes through the gap between the first lower cylinder 213 and the air inlet outer cylinder 210, and enters the cavity through the second air vent 246 to contact the first desiccant 248, and then enters the air collecting bag 3 through the first air vent 242 and the first air guide pipe 23, thereby realizing the sampling of the coalbed methane.

[0047] Specifically, refer to Figure 4 and Figure 5 The air outlet inner cylinder 11 includes an integrally formed second upper cylinder 112 and a second lower cylinder 113; a second internal thread is provided on the inner side wall of the upper end of the air outlet outer cylinder 18; a second external thread used in conjunction with the second internal thread is provided on the outer side wall of the second upper cylinder 112; the second upper cylinder 112 is threadedly connected to the air outlet outer cylinder 18; a second rubber plug 115 is provided in the second upper cylinder 112 for closing or opening one end of the second air guide pipe 13 located in the second enclosed space; the outer diameter of the second lower cylinder 113 is smaller than the inner diameter of the air outlet outer cylinder 18, so that the air outlet pipe 19 is connected to the air outlet outer cylinder 18 through the second lower cylinder 113. The gap between the cylinders 18 is connected to the second enclosed space; in order to facilitate the rotation of the air outlet inner cylinder 11, a second end cover 111 is provided on the top of the second upper cylinder 112; when the coalbed methane in the air collecting bag 3 needs to be discharged, the second end cover 111 is rotated to make the air outlet inner cylinder 11 move upward along the axial direction of the air outlet outer cylinder 18, driving the second rubber stopper 115 to move upward, so that the upper end of the second air duct 13 is connected to the second enclosed space; the coalbed methane in the air collecting bag 3 flows through the second air duct 13, the second enclosed space and the gap between the second lower cylinder 113 and the air outlet outer cylinder 18 and is discharged through the air outlet pipe 19.

[0048] The second air guide pipe 13 is sleeved with a third sealing gasket 12; the lower surface of the third sealing gasket 12 is fitted and connected with the upper surface of the second partition plate 17; the third sealing gasket 12 cooperates with the second lower cylinder 113 to further cut off the connection between the second air guide pipe 13 and the outlet pipe 19; the second upper cylinder 112 is sleeved with a fourth sealing gasket 16; the upper surface of the fourth sealing gasket 16 is fitted and connected with the lower surface of the second end cover 111; the lower surface of the fourth sealing gasket 16 is used to be connected with the outlet pipe 19. The top of the cylinder 18 abuts; when the second rubber stopper 115 abuts against the upper end of the second air duct 13, the upper end of the air outlet outer cylinder 18 abuts against the fourth sealing gasket 16, thereby improving the air tightness between the second end cover 111 and the air outlet outer cylinder 18; at the same time, the bottom of the second lower cylinder 113 abuts against the third sealing gasket 12, so that the coalbed methane in the second enclosed space cannot enter the gap between the second lower cylinder 113 and the air outlet outer cylinder 18, thereby improving the air tightness of the air outlet valve assembly 1.

[0049] A third sealing ring 14 is fixed on the outer wall of the second lower cylinder 113; the third sealing ring 14 is located above the air outlet pipe 19 and abuts against the inner wall of the air outlet outer cylinder 18; a fourth sealing ring 15 is fixed on the outer wall of the second lower cylinder 113; the fourth sealing ring 15 is located below the third sealing ring 14; the fourth sealing ring 15, the second lower cylinder 113 and the air outlet outer cylinder 18 cooperate to further cut off the communication between the second air guide pipe 13 and the air outlet pipe 19; when the second rubber stopper 115 abuts against the upper end of the second air guide pipe 13, the third sealing ring 14 and the fourth sealing ring 15 are connected. The sealing ring 15 is respectively located above and below the connection between the air outlet pipe 19 and the air outlet outer cylinder 18, further improving the air tightness of the air outlet valve assembly 1; when the coalbed methane in the air collecting bag 3 needs to be discharged to the outside, the second end cover 111 is rotated so that the air outlet inner cylinder 11 moves up to the point where the third sealing ring 14 and the fourth sealing ring 15 are both located above the connection between the air outlet pipe 19 and the air outlet outer cylinder 18, the coalbed methane in the air collecting bag 3 flows through the second air guide pipe 13, the second enclosed space, the gap between the second lower cylinder 113 and the air outlet outer cylinder 18, and is discharged through the air outlet pipe 19.

[0050] In order to facilitate sampling of the coalbed methane in the gas collecting bag 3 using a syringe, a sampling hole 114 is provided on the second end cover 111; when sampling is required, the second rubber stopper 115 is pierced through the sampling hole 114 so that the syringe is inserted into the second gas guide tube 13 for sampling, which is simple and convenient.

[0051] Furthermore, the gas collecting bag 3 is also provided with a patch-type piezoelectric buzzer 7 and a programmable timer 6; the patch-type piezoelectric buzzer 7 is attached to the surface of the gas collecting bag 3, and by sensing the pressure change caused by the deformation of the gas collecting bag 3 during the gas collection process, the pressure signal is converted into an electrical signal through piezoelectric conversion. When the deformation of the gas collecting bag 3 reaches a certain degree, that is, a certain pressure threshold is reached, the converted electrical signal reaches the current threshold, and a buzzer alarm is triggered to determine that the gas collecting bag 3 is full of coalbed methane; the patch-type piezoelectric buzzer 7 and the programmable timer 6 are electrically connected ; When the programmable timer 6 senses the current transmitted from the chip-type piezoelectric buzzer 7, it starts timing; when the current reaches the threshold value, the chip-type piezoelectric buzzer 7 sounds an alarm, and the programmable timer 6 automatically controls the termination of timing and records the time taken for the gas collecting bag 3 to be full of coalbed methane. The amount of coalbed methane escaped from the drainage outlet of the coalbed methane well per unit time can be calculated based on the volume of the gas collecting bag 3 and the time required to be full of the coalbed methane, which is convenient for the staff to count the amount of coalbed methane escaped and take corresponding control measures according to the specific amount of escape.

[0052] Specifically, in this embodiment, the programmable timer 6 is a timer of model TLC555IDR TI 8-SOIC produced by Shenzhen Huaqiu Electronics Co., Ltd.; the model of the surface-mount piezoelectric buzzer 7 is KLJ-1706.

[0053] The working process of the gas sampling device for the drainage outlet of the coalbed methane well in this embodiment is as follows:

[0054] When it is necessary to sample the coalbed methane, the first end cover 211 is rotated so that the air inlet inner cylinder 21 moves up to the air inlet pipe 26 and connects with the first air guide pipe 23; the second end cover 111 is rotated so that the air outlet inner cylinder 11 moves down to the second rubber stopper 115 and abuts against the top of the second air guide pipe 13, thereby sealing the top of the second air guide pipe 13; the coalbed methane flows through the one-way valve 5, the spherical drying pipe 4, the air inlet pipe 26, the gap between the air inlet outer cylinder 210 and the first lower cylinder 213 in sequence and enters the first enclosed space, and then passes through the annular cylindrical drying pipe 24 and the first air guide pipe 23 and enters the air collecting bag 3; when the patch-type piezoelectric buzzer 7 detects that the air collecting bag 3 begins to expand, a timing signal is sent to the programmable timer 6, and the programmable timer 6 starts Timing; when the chip-type piezoelectric buzzer 7 detects that the gas collecting bag 3 has expanded to a certain extent, that is, when the pressure threshold is reached, the chip-type piezoelectric buzzer 7 sounds an alarm and sends a termination timing signal to the programmable timer 6, and the programmable timer 6 terminates the timing and records the sampling time; at the same time, the staff stops sampling the coalbed methane by rotating the first end cover 211 so that the air inlet inner tube 21 moves downward until the first rubber stopper 214 abuts against the upper end of the first air guide tube 23, and the upper end of the first air guide tube 23 is closed, so that the sampling of the coalbed methane can be achieved, and the amount of coalbed methane dissipated from the drainage outlet of the coalbed methane well per unit time can be calculated according to the volume of the gas collecting bag 3 and the time required to collect the coalbed methane, so as to facilitate the staff to count the amount of coalbed methane dissipated;

[0055] When it is necessary to test the sampled in the air collecting bag 3, it is only necessary to connect the air outlet pipe 19 and the detection instrument, and then rotate the second end cover 111 so that the air outlet inner tube 11 moves upward to the second rubber stopper 115 and separates from the second air duct 13, thereby realizing the connection between the air outlet pipe 19, the second enclosed space, the second air duct 13 and the air collecting bag 3.

[0056] In this document, the directional words such as front, back, top, and bottom are defined by the positions of the components in the drawings and the positions of the components relative to each other, and are only for the sake of clarity and convenience in expressing the technical solution. It should be understood that the use of the directional words should not limit the scope of protection claimed in this application.

[0057] In the absence of conflict, the above embodiments and features in the embodiments may be combined with each other.

[0058] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A gas sampling device for coalbed methane well drainage outlet, characterized in that: It includes an air collecting bag, an air inlet valve assembly and an air outlet valve assembly; The air intake valve assembly comprises an air intake outer cylinder and an air intake inner cylinder; one end of the air intake outer cylinder is arranged on the air collecting bag; a first partition is arranged on the inner side wall of the air intake outer cylinder; the air intake inner cylinder is movably sleeved in the air intake outer cylinder and is located above the first partition; the first partition, the air intake outer cylinder and the air intake inner cylinder enclose a first enclosed space; a first air duct for connecting the air collecting bag and the first enclosed space is penetrated on the first partition; an air intake pipe connected to the first enclosed space is arranged on the side wall of the air intake outer cylinder; the air intake inner cylinder is used to cut off the connection between the first air duct and the air intake pipe; The gas outlet valve assembly is arranged on the gas collecting bag, and is used to discharge the coal bed gas in the gas collecting bag to the outside; The air intake inner cylinder comprises an integrally formed first upper cylinder and a first lower cylinder; a first internal thread is arranged on the inner side wall of the upper end of the air intake outer cylinder; a first external thread used in conjunction with the first internal thread is arranged on the outer side wall of the first upper cylinder; the first upper cylinder is threadedly connected to the air intake outer cylinder; a first rubber plug is arranged in the first upper cylinder for closing or opening one end of the first air guide pipe located in the first enclosed space; the outer diameter of the first lower cylinder is smaller than the inner diameter of the air intake outer cylinder, so that the air intake pipe is connected to the first enclosed space through the gap between the first lower cylinder and the air intake outer cylinder; One end of the air inlet pipe is connected to a spherical drying pipe for drying the coalbed methane entering the air inlet pipe; the spherical drying pipe is filled with a second desiccant.

2. The coalbed methane well drainage outlet escaping gas sampling device according to claim 1, characterized in that: An annular cylindrical drying pipe is sleeved on the outer side of the upper end of the first air guide pipe, which is used to dry the coalbed methane entering the first air guide pipe; the annular cylindrical drying pipe is filled with a first desiccant; the first air guide pipe is coaxially arranged with the air inlet inner tube; the inner side wall of the first lower cylinder is fitted and connected with the outer side wall of the annular cylindrical drying pipe.

3. The coalbed methane well drainage outlet escaping gas sampling device according to claim 1, characterized in that: A first end cover is provided on the top of the first upper cylinder to facilitate the rotation of the air intake inner cylinder.

4. The coalbed methane well drainage outlet escaping gas sampling device according to claim 1, characterized in that: A first sealing gasket is sleeved on the first air duct; the lower surface of the first sealing gasket is fitted and connected to the upper surface of the first partition; the first sealing gasket cooperates with the first lower cylinder to further isolate the connection between the first air duct and the intake pipe.

5. The coalbed methane well drainage outlet escaping gas sampling device according to claim 3, characterized in that: The first upper cylinder body is provided with a second sealing gasket on its outer sleeve; the upper surface of the second sealing gasket is fitted and connected with the lower surface of the first end cover; the lower surface of the second sealing gasket is used to abut against the top of the air intake outer cylinder.

6. The coalbed methane well drainage outlet escaping gas sampling device according to claim 1, characterized in that: A first sealing ring is fixed on the outer side wall of the first lower cylinder; the first sealing ring is located above the air intake pipe and abuts against the inner side wall of the air intake outer cylinder.

7. The coalbed methane well drainage outlet escaping gas sampling device according to claim 6, characterized in that: A second sealing ring is fixedly provided on the outer wall of the first lower cylinder; the second sealing ring is located below the first sealing ring; the second sealing ring, the first lower cylinder and the air intake outer cylinder cooperate to further isolate the first air duct from being connected to the air intake pipe.

8. The coalbed methane well drainage outlet escaping gas sampling device according to claim 1, characterized in that: One end of the air inlet pipe is connected with a one-way valve to prevent coalbed methane from being sucked back to the outside of the air collecting bag.

Citation Information

Patent Citations

  • Stack-gas measuring apparatus and stack-gas measuring method

    CN101660982A

  • Pulverized coal filtering and collecting device for coalbed methane exploitation

    CN111821776A

  • Sampling device for escaping gas at water outlet of coal-bed gas well

    CN214538785U