Boiler maintenance control method and device based on three-dimensional engineering model

Through the boiler maintenance control method based on the three-dimensional engineering model, the problems of complexity and chaotic management of three-dimensional bending pipes in boiler maintenance are solved, efficient and refined maintenance control is achieved, and maintenance quality and efficiency are improved, and costs and time are saved.

CN112766521BActive Publication Date: 2024-12-20DATANG YANGCHENG POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110166779.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-04
Publication Date
2024-12-20
Estimated Expiration
2041-02-04

AI Technical Summary

Technical Problem

During boiler maintenance, the three-dimensional bent pipes on the heated surface are complex and the pipe arrangement sequence changes greatly, resulting in frequent maintenance errors and affecting efficiency. The purchased bent pipes often do not meet the standards, the quality of rework is low, there are hidden dangers in on-site pipe replacement, and management is chaotic.

Method used

Using the boiler maintenance control method based on the three-dimensional engineering model, the three-dimensional model of the boiler is drawn, combined with the maintenance database to simulate and calculate the parameter information of the maintenance components, send it to the terminal, confirm the processing results, design the maintenance process, and uniformly control the construction progress on the three-dimensional platform. and engineering volume.

Benefits of technology

It improves maintenance efficiency and quality, reduces waste, ensures coordination from design to construction, achieves refined maintenance control, reduces rework and hidden dangers, and saves costs and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112766521B_ABST
    Figure CN112766521B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of boiler maintenance. In order to solve at least one technical problem of low efficiency, low quality, and chaotic maintenance site in existing boiler maintenance, the present invention provides a boiler maintenance control method based on a three-dimensional engineering model; the method includes: drawing a three-dimensional engineering model corresponding to the three-dimensional diagram of the boiler screen, the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model; simulating and calculating the parameter information of each maintenance component that needs to be prepared, and when each maintenance operator confirms that the processed maintenance component meets the requirements of the parameter information, the control information that the processed maintenance component can perform maintenance according to the maintenance process is sent. Through the design, construction, operation management and even the entire maintenance life cycle of the boiler maintenance project, the maintenance process is analyzed, simulated, visualized, and the construction progress and engineering quantity are uniformly controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of boiler maintenance, and in particular to a boiler maintenance control method and device based on a three-dimensional engineering model. Background Art

[0002] Boiler is a kind of energy conversion equipment. The energy input to the boiler includes chemical energy and electrical energy in the fuel, and the boiler outputs steam, high-temperature water or organic heat carrier with a certain amount of thermal energy. As an important equipment in a thermal power plant, its performance directly affects the power generation efficiency, so the boiler needs to be regularly inspected and maintained to ensure the safe and efficient operation of the boiler.

[0003] In particular, as the unit continues to age and due to coal quality issues, maintenance personnel are required to increase the inspection scope of boiler defects and the number of damaged pipe sections to be replaced. For example, the inventors found the following problems in the process of implementing the present invention, which are not conducive to the smooth implementation of maintenance:

[0004] 1. The three-dimensional bending pipes on the heating surface are complex, and the order of the pipe rows varies greatly. Errors often occur during maintenance, affecting maintenance efficiency.

[0005] 2. As three-dimensional bending is relatively complicated and pipe serial numbers are often wrong, all purchased bent pipes often fail to meet the standards (low roundness and large deviation in bending angle). Due to time constraints, the quality after repair is not high, and new pipes replaced on site have great hidden dangers.

[0006] 3. The maintenance site management is rather chaotic. Summary of the invention

[0007] In order to solve at least one technical problem existing in the existing boiler maintenance, such as low efficiency, poor quality and chaotic maintenance site, the present invention provides a boiler maintenance control method and device based on a three-dimensional engineering model, which can analyze, simulate and visualize the maintenance process, and uniformly control the construction progress and engineering quantity during the design, construction, operation management and even the entire maintenance life cycle of the boiler maintenance project.

[0008] In order to achieve the above object, the technical solution provided by the present invention includes:

[0009] In one aspect, the present invention provides a boiler maintenance control method based on a three-dimensional engineering model, which is characterized by comprising:

[0010] Draw a three-dimensional engineering model corresponding to the three-dimensional view of the boiler screen, the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model, and design a maintenance database for the boiler required to be maintained at different stages in combination with the three-dimensional engineering model;

[0011] Before the boiler is overhauled, the parameter information of each overhaul component that needs to be prepared is simulated and calculated by combining the overhaul database and the attribute information of each overhaul component in the three-dimensional engineering model;

[0012] Sending parameter information of each maintenance component to the terminal where each maintenance operator is located;

[0013] Each maintenance operator confirms whether the processed maintenance parts meet the corresponding required parameter information received in the terminal;

[0014] Designing a maintenance process for maintenance components according to the three-dimensional engineering model corresponding to the screen stereogram;

[0015] When each maintenance operator confirms that the processed maintenance component meets the requirements of the parameter information, control information is sent to indicate that the processed maintenance component can be maintained according to the maintenance process.

[0016] In a preferred implementation manner of the embodiment of the present invention, the parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

[0017] In a preferred implementation manner of the embodiment of the present invention, the attribute information of each maintenance component includes material, position and number.

[0018] In a preferred implementation manner of an embodiment of the present invention, the three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

[0019] The second aspect of the present invention further provides a boiler maintenance control device based on a three-dimensional engineering model, characterized in that it includes:

[0020] A three-dimensional engineering model building module is used to draw a three-dimensional engineering model corresponding to the three-dimensional view of the boiler screen, wherein the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model, and combines the three-dimensional engineering model to design a maintenance database for the boiler required to be maintained at different stages;

[0021] A maintenance component parameter information confirmation module is used to simulate and calculate the parameter information of each maintenance component that needs to be prepared by combining the maintenance database and the attribute information of each maintenance component in the three-dimensional engineering model before the boiler is repaired;

[0022] A maintenance component parameter information sending module, used to send the parameter information of each maintenance component to the terminal where each maintenance operator is located;

[0023] A maintenance component parameter information confirmation module is used for each maintenance operator to confirm whether the processed maintenance component meets the corresponding required parameter information received in the terminal;

[0024] A maintenance process generation module, used to design a maintenance process for maintenance components according to a three-dimensional engineering model corresponding to the screen-through stereogram;

[0025] The maintenance and installation startup module is used to send control information that the processed maintenance parts can be maintained according to the maintenance process when each maintenance operator confirms that the processed maintenance parts meet the requirements of the parameter information.

[0026] In a preferred implementation manner of the embodiment of the present invention, the parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

[0027] In a preferred implementation manner of the embodiment of the present invention, the attribute information of each maintenance component includes material, position and number.

[0028] In a preferred implementation manner of an embodiment of the present invention, the three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

[0029] The third aspect of the present invention further provides an electronic device, characterized in that it includes:

[0030] Memory;

[0031] Processor; and

[0032] As described in any one of the items provided in the second aspect, the boiler maintenance control device based on the three-dimensional engineering model includes one or more software function modules stored in the memory and executed by the processor.

[0033] A fourth aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed, implements the steps of any one of the methods provided in the first aspect.

[0034] By adopting the above technical solution provided by the present invention, the three-dimensional digital model of the component is meshed and can cover all links. The departments where the maintenance operators are located work together, and the work of all maintenance operators is recorded and shared, ensuring the coordination of work from design, construction to materials, making it possible to carry out refined maintenance control based on the three-dimensional platform and reducing waste. Moreover, in the design, construction, operation management and even the entire maintenance life cycle of the boiler maintenance project, all engineering information such as design, processing, maintenance, and project management can be integrated into a unified data model, and any change in any parameter will have a global impact; the maintenance process is analyzed, simulated, visualized, and the construction progress and engineering quantity are controlled in a unified maintenance control.

[0035] Other features and advantages of the invention will be described in the following description, and partly become apparent from the description, or understood by implementing the technical solution of the invention. The purpose and other advantages of the invention can be achieved and obtained by the structures and / or processes specifically pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A flowchart of a boiler maintenance control method based on a three-dimensional engineering model is provided for the first embodiment of the present invention.

[0037] Figure 2a-2d They are respectively partial schematic diagrams of the three-dimensional engineering model provided in the first embodiment of the present invention.

[0038] Figure 3 A structural block diagram of a boiler maintenance control device based on a three-dimensional engineering model is provided for the second embodiment of the present invention.

[0039] Figure 4 A structural schematic diagram of an electronic device is provided for a third embodiment of the present invention. DETAILED DESCRIPTION

[0040] The following will describe the implementation methods of the present invention in detail with reference to the accompanying drawings and embodiments, so that the implementation process of how the present invention applies technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly. It should be noted that these specific descriptions are only to make it easier and clearer for ordinary technicians in the field to understand the present invention, rather than a restrictive interpretation of the present invention; and as long as there is no conflict, the various embodiments of the present invention and the various features in the embodiments can be combined with each other, and the technical solutions formed are all within the protection scope of the present invention.

[0041] The technical solution of the present invention is described in detail below through the accompanying drawings and specific embodiments:

[0042] Embodiment 1

[0043] In order to solve the problem that the existing boilers need maintenance personnel to expand the inspection scope of boiler defects and the number of damaged pipe sections to be replaced due to the continuous aging of the units and the coal quality reasons; this embodiment provides a boiler maintenance control method based on a three-dimensional engineering model, wherein the three-dimensional engineering model is a digital expression of the entity and functional characteristics of a facility; various relevant information data are used as the basis of the model to establish a building model, and the real information of the building is simulated through digital information simulation; it has at least one of the characteristics of visualization, coordination, simulation, optimization and plotting.

[0044] like Figure 1 As shown, this embodiment provides a boiler maintenance control method based on a three-dimensional engineering model, and the control method includes:

[0045] S110, drawing a three-dimensional engineering model corresponding to the three-dimensional view of the boiler screen, the three-dimensional engineering model including the attribute information of each maintenance component in the boiler maintenance model, and designing a maintenance database for the boiler required to be maintained at different stages in combination with the three-dimensional engineering model;

[0046] In this embodiment, known three-dimensional drawing software can be used to draw the three-dimensional engineering model corresponding to the three-dimensional drawing of the boiler screen, such as UG, Pro / E, etc., and special three-dimensional drawing software can also be developed according to actual needs; wherein, the three-dimensional engineering model is a three-dimensional drawing composed of various maintenance components used in actual maintenance drawn in combination with the parts and dimensional characteristics of the boiler itself, and according to actual needs, if different maintenance components are required at different maintenance stages, there are corresponding different three-dimensional engineering models. In addition, the three-dimensional engineering model can be combined with the design of a maintenance database for the boiler for maintenance. For example, in the three-dimensional engineering model, the dimensions and / or component usage information that need to be paid attention to during the design and maintenance process of each component are combined, that is, in the process of designing the three-dimensional engineering model, the requirements for the various maintenance components in the boiler maintenance model involved in the boiler maintenance are combined into a maintenance database; the specific form of the maintenance database is not limited in this embodiment, for example, it can be a document, or directly marked in the three-dimensional drawing corresponding to each maintenance component in the three-dimensional engineering model.

[0047] S120, before overhauling the boiler, combining the overhaul database and the attribute information of each overhaul component in the three-dimensional engineering model, simulate and calculate the parameter information of each overhaul component that needs to be prepared;

[0048] For example, based on the current usage status of the boiler, the maintenance database is used to find out which specific maintenance needs to be performed on the boiler, as well as which maintenance parts are needed for these maintenance. The attribute information of each maintenance part in the three-dimensional engineering model is used to simulate and calculate the parameter information of each maintenance part that needs to be prepared.

[0049] For example, Figure 2a Installation of the positioner, or Figure 2b , Figure 2c , Figure 2d Different components in the project, specifically, taking the scaffolding encountered in the plane drawing as an example, can be clearly seen in the three-dimensional model; precise calculations can be made before maintenance to calculate the amount of materials used, the amount of work, and the expected replacement of spare parts; and the maintenance equipment can be analyzed, simulated, and visualized; intervention begins from the design stage of the early stage of the project, timely discovering and avoiding some design errors, and guiding the maintenance work through the three-dimensional visualization model, greatly reducing the problems that arise during the implementation process. Within the scheduled time, when to start construction and when to end; how to construct, how many people, materials, equipment, funds, and time will be used. All can be reasonably arranged and simulated in the computer; ensuring that the maintenance work can be completed on time with quality and quantity guaranteed.

[0050] S130. Send the parameter information of each maintenance component to the terminal where each maintenance operator is located; each terminal where the maintenance operator is located is installed with a specific application that can receive the parameter information of each maintenance component designed and developed in S120, such as the size and material requirements of each maintenance component after conversion into a CAD drawing.

[0051] S140, each maintenance operator confirms whether the processed maintenance parts meet the corresponding required parameter information received in the terminal;

[0052] Each maintenance operator confirms whether the processed maintenance parts meet the requirements, for example, using the recycled water code to correspond one-to-one with the manufacturer's accessories; this improves the quality of accessories, increases maintenance efficiency, and eliminates maintenance quality risks.

[0053] S150. Design a maintenance process for maintenance components according to the three-dimensional engineering model corresponding to the screen stereogram; the component maintenance process may be, for example, the installation sequence or installation precautions that each maintenance operator needs to perform.

[0054] S160. When each maintenance operator confirms that the processed maintenance component meets the requirements of the parameter information, control information is sent to indicate that the processed maintenance component can be maintained according to the maintenance process.

[0055] By adopting the above technical solution provided in this embodiment, the three-dimensional digital model of the component is meshed and can cover all links. The departments where the maintenance operators are located work together, and the work of all maintenance operators is recorded and shared, ensuring the coordination of work from design, construction to materials, making it possible to carry out refined maintenance control based on the three-dimensional platform and reducing waste. Moreover, in the design, construction, operation management and even the entire maintenance life cycle of the boiler maintenance project, all engineering information such as design, processing, maintenance, and project management can be integrated into a unified data model, and any change in any parameter will have a global impact; the maintenance process is analyzed, simulated, visualized, and the construction progress and engineering quantity are controlled in a unified maintenance control.

[0056] In a preferred implementation manner of this embodiment, the parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

[0057] In a preferred implementation manner of this embodiment, the attribute information of each maintenance component includes material, position and number.

[0058] In a preferred implementation manner of this embodiment, the three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

[0059] The traditional idea of ​​boiler maintenance is serial, while the control method based on 3D engineering model is meshed, which can cover all links, and all departments work together. The work of all personnel is recorded and shared, and all engineering information such as design, processing, maintenance, and project management can be integrated into a unified data model. Any change in any parameter will have an overall impact. That is, it provides a platform to ensure the coordination of work from design, construction to materials, making refined management based on 3D platform possible and reducing waste; the relationship between people, between people and technology, and between people and processes has undergone fundamental changes, and the linear way of thinking has been replaced by a divergent way of thinking.

[0060] For example, the control method based on the three-dimensional engineering model can accurately check the position of the heating surface to avoid rework; taking the full furnace scaffolding of the #3 furnace of a thermal power plant as an example, it took only 5 days to set up, freeing up personnel and time for the maintenance of the heating surface. And by carefully calculating the number of racks and racks, the efficiency is improved. Specifically, for example, the cost savings of scaffolding are: saving time: 5 days (saving time) * 15 people * 0.03 million yuan (average salary) = 22,500 yuan; 2. 0.08 million yuan per bend * 24 (overreported bends and bends that were repaired due to errors during each maintenance) = 19,200 yuan; 3. The maintenance is completed early: 2.24 daily power generation profits * 4 days (the number of days saved) = 89,600 yuan. The total maintenance cost savings is 131,300 yuan.

[0061] Embodiment 2

[0062] like Figure 3 As shown, this embodiment provides a boiler maintenance control device based on a three-dimensional engineering model, and the control device includes:

[0063] The three-dimensional engineering model building module 110 is used to draw a three-dimensional engineering model corresponding to the three-dimensional view of the boiler screen, the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model, and designs a maintenance database for the boiler that needs to be maintained at different stages in combination with the three-dimensional engineering model;

[0064] The maintenance component parameter information confirmation module 120 is used to simulate and calculate the parameter information of each maintenance component that needs to be prepared before the boiler is repaired by combining the maintenance database and the attribute information of each maintenance component in the three-dimensional engineering model;

[0065] The maintenance component parameter information sending module 130 is used to send the parameter information of each maintenance component to the terminal where each maintenance operator is located;

[0066] The maintenance component parameter information confirmation module 140 is used for each maintenance operator to confirm whether the processed maintenance component meets the corresponding parameter information received in the terminal;

[0067] A maintenance process generation module 150 is used to design a maintenance process for maintenance components according to a three-dimensional engineering model corresponding to the screen-through stereogram;

[0068] The maintenance installation start module 160 is used to send control information that the processed maintenance parts can be maintained according to the maintenance process when each maintenance operator confirms that the processed maintenance parts meet the requirements of the parameter information.

[0069] Among them, the boiler maintenance control device based on the three-dimensional engineering model provided in this embodiment can be used to implement the boiler maintenance control method based on the three-dimensional engineering model provided in Example 1. The specific control process can refer to Example 1 and will not be repeated here.

[0070] In a preferred implementation manner of this embodiment, the parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

[0071] In a preferred implementation manner of this embodiment, the attribute information of each maintenance component includes material, position and number.

[0072] In a preferred implementation manner of this embodiment, the three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

[0073] Embodiment 3

[0074] like Figure 4 As shown, this embodiment provides an electronic device, which includes:

[0075] Memory 210;

[0076] Processor 220; and

[0077] As provided in the second embodiment, the boiler maintenance control device based on the three-dimensional engineering model includes one or more software function modules stored in the memory and executed by the processor.

[0078] This embodiment also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed, the steps of any one of the methods provided in the first embodiment are implemented.

[0079] It can be understood by those skilled in the art that the above-mentioned method according to the embodiment of the present invention can be implemented in hardware, firmware, or implemented as software or computer code that can be stored in a recording medium (such as a CD ROM, RAM, floppy disk, hard disk or magneto-optical disk), or implemented as computer code originally stored in a remote recording medium or a non-temporary machine-readable medium downloaded through a network and to be stored in a local recording medium, so that the method described herein can be stored in such software processing on a recording medium using a general-purpose computer, a dedicated processor or programmable or dedicated hardware (such as an ASIC, FPGA or SoC). It can be understood that a computer, a processor, a microprocessor controller or programmable hardware includes a storage component (e.g., RAM, ROM, flash memory, etc.) that can store or receive software or computer code, and when the software or computer code is accessed and executed by a computer, a processor or hardware, the processing method described herein is implemented. In addition, when a general-purpose computer accesses the code for implementing the processing shown herein, the execution of the code converts the general-purpose computer into a dedicated computer for executing the processing shown herein.

[0080] Those of ordinary skill in the art will appreciate that the units and method steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the embodiments of the present invention.

[0081] Finally, it should be noted that the above description is only the best embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the art can make many possible changes and simple replacements to the technical solution of the present invention by using the above disclosed practices and technical contents without departing from the scope of the technical solution of the present invention, which all belong to the scope of protection of the technical solution of the present invention.

Claims

1. A boiler maintenance control method based on a three-dimensional engineering model, characterized in that: include: Draw a three-dimensional engineering model corresponding to the three-dimensional diagram of the boiler screen, the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model, and designs a maintenance database for the boiler required to be maintained at different stages in combination with the three-dimensional engineering model; wherein the control method corresponding to the three-dimensional engineering model is a network, which can cover all links, and each department works collaboratively, and the work of all personnel is recorded and shared, and all engineering information of design, processing, maintenance, and project management is integrated into a unified data model; Before the boiler is overhauled, the parameter information of each overhaul component that needs to be prepared is simulated and calculated by combining the overhaul database and the attribute information of each overhaul component in the three-dimensional engineering model; and in combination with the current use status of the boiler, which overhauls need to be performed on the boiler are searched in the overhaul database, and which overhaul components are required for these overhauls, and the attribute information of each overhaul component in the three-dimensional engineering model is used to simulate and calculate the parameter information of each overhaul component that needs to be prepared; Sending parameter information of each maintenance component to the terminal where each maintenance operator is located; Each maintenance operator confirms whether the processed maintenance parts meet the corresponding required parameter information received in the terminal; Designing a maintenance process for maintenance components according to the three-dimensional engineering model corresponding to the screen stereogram; When each maintenance operator confirms that the processed maintenance component meets the requirements of the parameter information, control information is sent to indicate that the processed maintenance component can be maintained according to the maintenance process.

2. The method according to claim 1, characterized in that The parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

3. The method according to claim 1, characterized in that The attribute information of each maintenance component includes material, location and number.

4. The method according to any one of claims 1 to 3, characterized in that The three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

5. A boiler maintenance control device based on a three-dimensional engineering model, characterized in that: include: A three-dimensional engineering model building module is used to draw a three-dimensional engineering model corresponding to the three-dimensional diagram of the boiler screen, wherein the three-dimensional engineering model includes the attribute information of each maintenance component in the boiler maintenance model, and combines the three-dimensional engineering model to design a maintenance database for the boiler that needs to be maintained at different stages; wherein the control method corresponding to the three-dimensional engineering model is a network, which can cover all links, and each department works together, and the work of all personnel is recorded and shared, and all engineering information of design, processing, maintenance, and project management is integrated into a unified data model; The parameter information confirmation module of the maintenance components is used to simulate and calculate the parameter information of each maintenance component that needs to be prepared before the boiler is repaired, combining the maintenance database and the attribute information of each maintenance component in the three-dimensional engineering model; and in combination with the current use status of the boiler, find out which maintenances need to be performed on the boiler in the maintenance database, and which maintenance components are needed for these maintenances, and simulate and calculate the parameter information of each maintenance component that needs to be prepared based on the attribute information of each maintenance component in the three-dimensional engineering model; A maintenance component parameter information sending module, used to send the parameter information of each maintenance component to the terminal where each maintenance operator is located; A maintenance component parameter information confirmation module is used for each maintenance operator to confirm whether the processed maintenance component meets the corresponding required parameter information received in the terminal; A maintenance process generation module, used to design a maintenance process for maintenance components according to a three-dimensional engineering model corresponding to the screen-through stereogram; The maintenance and installation startup module is used to send control information that the processed maintenance parts can be maintained according to the maintenance process when each maintenance operator confirms that the processed maintenance parts meet the requirements of the parameter information.

6. The device according to claim 5, characterized in that The parameter information of each maintenance component includes the required material usage, engineering quantity and estimated replacement quantity of spare parts.

7. The device according to claim 5, characterized in that The attribute information of each maintenance component includes material, location and number.

8. The device according to any one of claims 5 to 7, characterized in that: The three-dimensional engineering model corresponding to the boiler screen stereogram includes: the design, construction, operation management and maintenance information corresponding to the entire maintenance life cycle of the boiler maintenance project, and the maintenance information can be displayed in the form of a three-dimensional engineering model.

9. An electronic device, characterized in that: include: Memory; processor; as well as According to any one of claims 5 to 8, the boiler maintenance control device based on a three-dimensional engineering model comprises one or more software function modules stored in the memory and executed by the processor.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed, the steps of the method according to any one of claims 1 to 4 are implemented.