A large all-aluminum structure open aluminum plate curtain wall system and its installation process

By adopting an all-aluminum structure open aluminum plate curtain wall system and using components such as aluminum alloy columns and L-shaped angle aluminum, the problems of traditional curtain wall systems such as heavy weight, difficult installation, and poor weather resistance are solved, achieving a strong structure, light weight, environmental protection, and no need for maintenance. effect.

CN112854571BActive Publication Date: 2025-01-21中亿丰城市更新(江苏)有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110224944.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-01
Publication Date
2025-01-21
Estimated Expiration
2041-03-01

AI Technical Summary

Technical Problem

The traditional large-line curtain wall system has large weight, difficulty in installation and poor weather resistance, resulting in large loads, expensive maintenance and safety hazards.

Method used

Adopting an all-aluminum structure open aluminum plate curtain wall system, through components such as aluminum alloy columns, L-shaped angle aluminum, curtain wall public columns and female columns, and using aluminum alloy pick-up parts, clamping parts and aluminum welding nails to form an overall hoisting assembly. production methods.

Benefits of technology

It achieves strong structure, light weight, assembled production, easy installation, improved anti-corrosion and weather resistance, environmental protection and no need for post-maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112854571B_ABST
    Figure CN112854571B_ABST
Patent Text Reader

Abstract

The present invention relates to a large all-aluminum structure open aluminum plate curtain wall system, comprising a first aluminum alloy column, a first L-shaped aluminum angle, a second aluminum alloy column, a second L-shaped aluminum angle, a third L-shaped aluminum angle and a fourth L-shaped aluminum angle, and a fifth L-shaped aluminum angle, a first curtain wall public column, a first clamping piece, a second clamping piece, a first curtain wall female column, a second curtain wall public column, a perforated aluminum plate and a second curtain wall female column, which are fixedly connected in sequence. The large all-aluminum structure open aluminum plate curtain wall system has the advantages of strong structure, light weight, assembly production, easy installation, integral hoisting, improved corrosion resistance and weather resistance, environmental protection and no need for maintenance in the later stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of unitized aluminum plate curtain walls, in particular to a large all-aluminum structure open aluminum plate curtain wall system. Background Art

[0002] Nowadays, buildings are no longer just objects that can be lived in. Buildings have become the symbol and memory of a city. Complex buildings are also the boosters of scientific and technological development. How to solve some special requirements of buildings? Then new curtain wall systems will be born to meet the architects' ultimate requirements for buildings.

[0003] The development direction of modern architecture will become more and more complicated. Architects are increasingly turning to using lines to enrich the facade of buildings to achieve architectural effects. Traditional large lines are realized by steel keels and aluminum plates. The forces of panels and keels are calculated separately, which is the traditional split installation method. The defects are as follows: First, the weight of the lines is very large, which is a relatively large load factor for the attached curtain wall system. Second, the installation of the lines is very difficult. It is difficult to weld keels and install aluminum panels in the air, and it is impossible to form an assembly. Third, the weather resistance of steel keels is poor, it is easy to rust, the later maintenance cost is very expensive, and there are safety hazards. At present, galvanized steel keels are basically used for connection in the market. Aluminum plates and galvanized steel keels are separated. This requires a large number of steel keels, increases the weight of decorative lines, and has a certain adverse effect on the unit curtain wall keels. At the same time, galvanized steel has poor corrosion resistance, short weather resistance, and is easy to rust at welding and punching positions. Rusty water is easy to flow for a long time, and there may even be safety hazards.

[0004] To this end, we have developed a large all-aluminum structure open aluminum panel curtain wall system to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a large all-aluminum structure open aluminum plate curtain wall system, which has the advantages of strong structure, light weight, assembly production, easy installation, overall lifting, improved corrosion resistance and weather resistance, environmental protection and no need for maintenance in the later stage.

[0006] To achieve the above object, the technical solution adopted by the present invention is: a large all-aluminum structure open aluminum plate curtain wall system, including a first aluminum alloy column, a first L-shaped angle aluminum, a second aluminum alloy column, a second L-shaped angle aluminum, a third L-shaped angle aluminum and a fourth L-shaped angle aluminum, and a fifth L-shaped angle aluminum, a first curtain wall public column, a first curtain wall female column, a second curtain wall public column and a second curtain wall female column fixedly connected in sequence;

[0007] One end of the fifth L-shaped angle aluminum is fixedly connected to the fourth L-shaped angle aluminum through a connection seam, one end of the fifth L-shaped angle aluminum is provided with the first aluminum alloy column, and the other end of the fifth L-shaped angle aluminum is fixedly connected to the second L-shaped angle aluminum through an L-shaped plate;

[0008] The first aluminum alloy column and the first curtain wall public column are fixedly connected by a first aluminum alloy pick and a second aluminum alloy pick in sequence, and the first curtain wall public column and the first curtain wall female column are clamped by a first clamp and a second clamp respectively;

[0009] The second aluminum alloy column and the second curtain wall public column are fixedly connected by a third aluminum alloy pick and a fourth aluminum alloy pick in sequence, and the second curtain wall public column and the second curtain wall female column are clamped by a clamp;

[0010] A perforated aluminum plate is arranged on the outer walls of the first aluminum alloy column, the fourth L-shaped angle aluminum, the third L-shaped angle aluminum, the second L-shaped angle aluminum and the second aluminum alloy column, and a plurality of aluminum welding nails are arranged on the inner walls of the fourth L-shaped angle aluminum, the third L-shaped angle aluminum and the second L-shaped angle aluminum respectively.

[0011] Preferably, a first bar-shaped tooth and a second bar-shaped tooth are respectively provided on the two parallel side walls at one end of the first aluminum alloy pick, a third bar-shaped tooth is provided on the side wall at one end of the second aluminum alloy pick, the second bar-shaped tooth is meshed with the third bar-shaped tooth, and the first bar-shaped tooth and the second aluminum alloy pick are crimped together by a second bolt.

[0012] Preferably, a U-shaped groove is provided on a side of the first aluminum alloy column close to the fifth L-shaped angle aluminum, a step groove is provided on a side of the first aluminum alloy column away from the fifth L-shaped angle aluminum, and the second aluminum alloy cantilever is plugged into the U-shaped groove and connected to the first aluminum alloy column by a first bolt.

[0013] Preferably, the perforated aluminum plate is provided with through holes arranged at intervals on the side wall close to the fourth L-shaped angle aluminum, one end of the perforated aluminum plate is fixed to the step groove by a first screw, and the other end is fixed to the second aluminum alloy column by a second screw.

[0014] Preferably, a hook tooth is provided at one end of the first clamping member, and a T-shaped connector is provided at the other end.

[0015] Preferably, a plurality of third clamping parts, a first T-slot and a second T-slot are sequentially provided on the side wall of the first curtain wall public column close to the first curtain wall female column, and a hook is provided at one end of the third clamping part, and the hook is clamped with the hook tooth.

[0016] Preferably, a third T-slot, a plurality of fourth T-slots, a third T-slot and a fifth T-slot are sequentially provided on the side wall of the first curtain wall female column close to the first curtain wall male column, the fourth T-slot is clamped with the T-joint, the fifth T-slot is clamped with the second T-slot via the second clamping piece, a T-block is provided in the third T-slot, and the T-block abuts against the third clamping piece.

[0017] A plurality of protrusions are arranged on a side wall at one end of the first aluminum alloy pick, one end of the first aluminum alloy pick is plugged into the first T-shaped slot, and the protrusions are crimped into the first T-shaped slot.

[0018] Preferably, an installation process of a large all-aluminum structure open aluminum plate curtain wall system is characterized by comprising the following steps in sequence:

[0019] 9.1 The first aluminum alloy column, the first L-shaped angle aluminum, the second aluminum alloy column, the second L-shaped angle aluminum, the third L-shaped angle aluminum and the fourth L-shaped angle aluminum are fixedly connected in sequence, and both ends of the fifth L-shaped angle aluminum are fixedly connected to the fourth L-shaped angle aluminum and the second L-shaped angle aluminum respectively to form an integral skeleton;

[0020] 9.2 Connect the perforated aluminum plate to the periphery of the overall frame to form an overall linear component;

[0021] 9.3 Fix the first aluminum alloy column and the second aluminum alloy cantilever member by using the four first bolts;

[0022] 9.4 In step 9.3, the first curtain wall public column is clamped and fixed to the first curtain wall female column at the same time, the clamping hook is clamped to the hook tooth, the fourth T-slot is clamped to the T-joint, the fifth T-slot is clamped to the second T-slot via the second clamping piece, the protrusion is crimped to the first T-slot via the third screw, and the second curtain wall public column is clamped and fixed to the second curtain wall female column in the same way;

[0023] 9.5 The second strip-shaped teeth are meshed with the third strip-shaped teeth, and are fixedly connected by four second bolts to realize the overall lifting of the line.

[0024] Preferably, a transparent layer is provided between the first curtain wall public column and the second curtain wall public column.

[0025] Due to the application of the above technical solution, the present invention has the following advantages compared with the prior art:

[0026] 1. The structure of the aluminum curtain wall is strong and can withstand heavy loads;

[0027] 2. The aluminum curtain wall is light in weight, reducing the adverse effects on the glass behind;

[0028] 3. Factory processing of aluminum curtain wall, full assembly production and installation;

[0029] 4. The processing and installation of aluminum curtain wall are simple, and the whole hoisting is required;

[0030] 5. Improve the corrosion resistance and weather resistance of aluminum curtain walls;

[0031] 6. Aluminum curtain wall is environmentally friendly and requires no maintenance in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Attached Figure 1 This is a schematic diagram of the structure of the large all-aluminum structure open aluminum plate curtain wall system of the present invention;

[0033] Attached Figure 2 This is a schematic structural diagram of the first curtain wall public column of the present invention;

[0034] Attached Figure 3 This is a schematic structural diagram of the first curtain wall mother column of the present invention;

[0035] Attached Figure 4 is a schematic structural diagram of the first clamping member of the present invention;

[0036] Attached Figure 5 The present invention is attached Figure 1 The enlarged view of point A in the middle;

[0037] Attached Figure 6 The present invention is attached Figure 1 Enlarged view of point B in the middle. DETAILED DESCRIPTION

[0038] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0039] Attached Figure 1 To Attachment Figure 6 In the invention, a large all-aluminum structure open aluminum plate curtain wall system includes a first aluminum alloy column 30, a first L-shaped aluminum angle 51, a second aluminum alloy column 39, a second L-shaped aluminum angle 61, a third L-shaped aluminum angle 62 and a fourth L-shaped aluminum angle 60, and a fifth L-shaped aluminum angle 50, a first curtain wall public column 10, a first curtain wall female column 20, a second curtain wall female column 28 and a second curtain wall public column 17. A plurality of aluminum welding nails 65 are respectively arranged on the inner walls of the fourth L-shaped aluminum angle 60, the third L-shaped aluminum angle 62 and the second L-shaped aluminum angle 61.

[0040] The first aluminum alloy column 30 is fixedly connected to the first curtain wall public column 10 by the first aluminum alloy lifting piece 19 and the second aluminum alloy lifting piece 35 in turn. The first curtain wall public column 10 is clamped to the first curtain wall female column 20 by the first clamping piece 16 and the second clamping piece 13 respectively. A hook tooth 161 is provided at one end of the first clamping piece 16, and a T-shaped joint 162 is provided at the other end. According to the same method, the second aluminum alloy column 39 is fixedly connected to the second curtain wall public column 17 by the third aluminum alloy lifting piece 18 and the fourth aluminum alloy lifting piece 36 in turn, and the second curtain wall public column 17 is clamped to the second curtain wall female column 28 by the clamping piece.

[0041] One end of the fifth L-shaped angle aluminum 50 is fixedly connected to the fourth L-shaped angle aluminum 60 via a connection seam 55. A first aluminum alloy column 30 is provided at one end of the fifth L-shaped angle aluminum 50. The other end of the fifth L-shaped angle aluminum 50 is fixedly connected to the second L-shaped angle aluminum 61 via an L-shaped plate 66.

[0042] A perforated aluminum plate 70 is disposed around the outer walls of the first aluminum alloy column 30, the fourth L-shaped aluminum angle 60, the third L-shaped aluminum angle 62, the second L-shaped aluminum angle 61 and the second aluminum alloy column 39. The perforated aluminum plate 70 is provided with through holes 75 arranged at intervals on the side wall close to the fourth L-shaped aluminum angle 60. One end of the perforated aluminum plate 70 is fixed to the step groove 32 by a first screw 71, and the other end is fixed to the second aluminum alloy column 39 by a second screw.

[0043] A first strip-shaped tooth 191 and a second strip-shaped tooth 192 are respectively disposed on two parallel side walls at one end of the first aluminum alloy lifting member 19. A plurality of protrusions 195 are disposed on the side wall at one end of the first aluminum alloy lifting member 19. One end of the first aluminum alloy lifting member 19 is plugged into the first T-shaped slot 11, and the protrusions 195 are crimped with the first T-shaped slot 11. A third strip-shaped tooth 351 is disposed on the side wall at one end of the second aluminum alloy lifting member 35. The second strip-shaped tooth 192 is meshed with the third strip-shaped tooth 351 to improve the connection strength and facilitate installation. The first strip-shaped tooth 191 is crimped with the second aluminum alloy lifting member 35 by a second bolt 40.

[0044] A U-shaped groove 31 is provided on one side of the first aluminum alloy column 30 close to the fifth L-shaped angle aluminum 50. A stepped groove 32 is provided on one side of the first aluminum alloy column 30 away from the fifth L-shaped angle aluminum 50. The second aluminum alloy pick 35 is plugged into the U-shaped groove 31 and connected to the first aluminum alloy column 30 via a first bolt 45.

[0045] A plurality of third clamping members 15, a first T-shaped slot 11 and a second T-shaped slot 12 are sequentially arranged on the side wall of the first curtain wall male column 10 close to the first curtain wall female column 20. A clamping hook 151 is arranged at one end of the third clamping member 15, and the clamping hook 151 is clamped with the hook tooth 161.

[0046] A third T-slot 25, a plurality of fourth T-slots 21, a third T-slot 25 and a fifth T-slot 22 are sequentially arranged on the side wall of the first curtain wall female column 20 close to the first curtain wall male column 10. The fourth T-slot 21 is clamped with the T-joint 162, the fifth T-slot 22 is clamped with the second T-slot 12 through the second clamping member 13, a T-block 251 is arranged in the third T-slot 25, and the T-block 251 abuts against the third clamping member 15. The T-block 251 improves the connection strength between the third clamping member 15 and the first clamping member 16.

[0047] An installation process of a large all-aluminum structure open aluminum plate curtain wall system comprises the following steps in sequence:

[0048] 9.1 The first aluminum alloy column 30, the first L-shaped angle aluminum 51, the second aluminum alloy column 39, the second L-shaped angle aluminum 61, the third L-shaped angle aluminum 62 and the fourth L-shaped angle aluminum 60 are welded in sequence, the two ends of the fifth L-shaped angle aluminum 50 are respectively welded to the fourth L-shaped angle aluminum 60 through the connecting seam 55, and the fifth L-shaped angle aluminum 50 and the second L-shaped angle aluminum 61 are fixedly connected by the L-shaped plate 66 to form an integral skeleton.

[0049] 9.2 The perforated aluminum plate 70 is connected to the periphery of the overall frame to form an overall linear component, and the perforated aluminum plate 70 is fixedly connected to the stepped groove 32 by a first screw 71.

[0050] 9.3 The first aluminum alloy column 30 and the second aluminum alloy lifting piece 35 are fixed by four first bolts 45 , and the bottom end of the second aluminum alloy lifting piece 35 is inserted into the U-shaped groove 31 .

[0051] 9.4 In step 9.3, the first curtain wall public column 10 is clamped and fixed with the first curtain wall female column 20 at the same time. At this time, the hook 151 is clamped with the hook tooth 161, the fourth T-slot 21 is clamped with the T-joint 162, and the fifth T-slot 22 is clamped with the second T-slot 12 through the second clamping member 13. The protrusion 195 is crimped with the first T-slot 11 through the third screw. The second curtain wall public column 17 is clamped and fixed with the second curtain wall female column 28 in the same way. A transparent layer is provided between the first curtain wall public column 10 and the second curtain wall public column 17, and the transparent layer is curtain wall glass.

[0052] 9.5 The second strip-shaped teeth 192 are meshed with the third strip-shaped teeth 351, and are fixedly connected by four second bolts 40, that is, the first aluminum alloy lifting member 19 and the second aluminum alloy lifting member 35 are fixedly connected by four second bolts 40, so as to realize the overall lifting of the line.

[0053] The above are only specific application examples of the present invention and do not constitute any limitation on the protection scope of the present invention. Any technical solution formed by equivalent transformation or equivalent replacement shall fall within the protection scope of the present invention.

Claims

1. A large all-aluminum structure open aluminum plate curtain wall system, characterized by: It includes a first aluminum alloy column, a first L-shaped aluminum angle, a second aluminum alloy column, a second L-shaped aluminum angle, a third L-shaped aluminum angle, a fourth L-shaped aluminum angle, a fifth L-shaped aluminum angle, a first curtain wall male column, a first curtain wall female column, a second curtain wall male column, and a second curtain wall female column, which are fixedly connected in sequence; One end of the fifth L-shaped angle aluminum is fixedly connected to the fourth L-shaped angle aluminum through a connection seam, one end of the fifth L-shaped angle aluminum is provided with the first aluminum alloy column, and the other end of the fifth L-shaped angle aluminum is fixedly connected to the second L-shaped angle aluminum through an L-shaped plate; The first aluminum alloy column and the first curtain wall public column are fixedly connected by a first aluminum alloy pick and a second aluminum alloy pick in sequence, and the first curtain wall public column and the first curtain wall female column are clamped by a first clamp and a second clamp respectively; The second aluminum alloy column and the second curtain wall public column are fixedly connected by a third aluminum alloy pick and a fourth aluminum alloy pick in sequence, and the second curtain wall public column and the second curtain wall female column are clamped by a clamp; The first aluminum alloy column, the first L-shaped angle aluminum, the second aluminum alloy column, the second L-shaped angle aluminum, the third L-shaped angle aluminum and the fourth L-shaped angle aluminum are fixedly connected in sequence, and both ends of the fifth L-shaped angle aluminum are fixedly connected to the fourth L-shaped angle aluminum and the second L-shaped angle aluminum respectively to form an integral skeleton; A perforated aluminum plate is arranged on the outer walls of the first aluminum alloy column, the fourth L-shaped aluminum angle, the third L-shaped aluminum angle, the second L-shaped aluminum angle and the second aluminum alloy column, and a plurality of aluminum welding nails are arranged on the inner walls of the fourth L-shaped aluminum angle, the third L-shaped aluminum angle and the second L-shaped aluminum angle respectively; A first strip-shaped tooth and a second strip-shaped tooth are respectively disposed on two parallel side walls at one end of the first aluminum alloy pick, a third strip-shaped tooth is disposed on a side wall at one end of the second aluminum alloy pick, the second strip-shaped tooth is meshed with the third strip-shaped tooth, and the first strip-shaped tooth and the second aluminum alloy pick are crimped by a second bolt; A U-shaped groove is provided on the side of the first aluminum alloy column close to the fifth L-shaped angle aluminum, and a step groove is provided on the side of the first aluminum alloy column away from the fifth L-shaped angle aluminum. The second aluminum alloy cantilever is inserted into the U-shaped groove and connected to the first aluminum alloy column by a first bolt.

2. The large all-aluminum structure open aluminum plate curtain wall system according to claim 1 is characterized in that: The side wall of the perforated aluminum plate close to the fourth L-shaped angle aluminum is provided with through holes arranged at intervals. One end of the perforated aluminum plate is fixed to the step groove by a first screw, and the other end is fixed to the second aluminum alloy column by a second screw.

3. The large all-aluminum structure open aluminum plate curtain wall system according to claim 2 is characterized in that: A hook tooth is arranged at one end of the first clamping member, and a T-shaped connector is arranged at the other end.

4. The large all-aluminum structure open aluminum plate curtain wall system according to claim 3 is characterized in that: A plurality of third clamping parts, a first T-shaped slot and a second T-shaped slot are sequentially arranged on the side wall of the first curtain wall public column close to the first curtain wall female column. A clamping hook is arranged at one end of the third clamping part, and the clamping hook is clamped with the hook tooth.

5. The large all-aluminum structure open aluminum plate curtain wall system according to claim 4 is characterized in that: A third T-slot, a plurality of fourth T-slots, a third T-slot and a fifth T-slot are sequentially provided on the side wall of the first curtain wall female column close to the first curtain wall male column, the fourth T-slot is clamped with the T-joint, the fifth T-slot is clamped with the second T-slot through the second clamping piece, a T-block is provided in the third T-slot, and the T-block is abutted with the third clamping piece.

6. The large all-aluminum structure open aluminum plate curtain wall system according to claim 5 is characterized in that: A plurality of protrusions are arranged on a side wall at one end of the first aluminum alloy pick, one end of the first aluminum alloy pick is plugged into the first T-shaped slot, and the protrusions are crimped into the first T-shaped slot.

7. An installation process of the large all-aluminum structure open aluminum plate curtain wall system according to claim 6, characterized in that: The steps are as follows: 9.1 The first aluminum alloy column, the first L-shaped angle aluminum, the second aluminum alloy column, the second L-shaped angle aluminum, the third L-shaped angle aluminum and the fourth L-shaped angle aluminum are fixedly connected in sequence, and both ends of the fifth L-shaped angle aluminum are fixedly connected to the fourth L-shaped angle aluminum and the second L-shaped angle aluminum respectively to form an integral skeleton; 9.2 Connect the perforated aluminum plate to the periphery of the overall frame to form an overall linear component; 9.3 Fix the first aluminum alloy column and the second aluminum alloy cantilever member by using the four first bolts; 9.4 In step 9.3, the first curtain wall public column is clamped and fixed to the first curtain wall female column at the same time, the clamping hook is clamped to the hook tooth, the fourth T-slot is clamped to the T-joint, the fifth T-slot is clamped to the second T-slot via the second clamping piece, the protrusion is crimped to the first T-slot via the third screw, and the second curtain wall public column is clamped and fixed to the second curtain wall female column in the same way; 9.5 The second strip-shaped teeth are meshed with the third strip-shaped teeth, and are fixedly connected by four second bolts to realize the overall lifting of the line.

8. The installation process of the large all-aluminum structure open aluminum plate curtain wall system according to claim 7 is characterized in that: A transparent layer is provided between the first curtain wall public column and the second curtain wall public column.