Medium frequency furnace electric furnace support assembly and construction method

By designing the electric furnace support assembly of the intermediate frequency furnace and using arc-shaped plates, support rods and screw rods to connect, the problem of construction workers stepping on the air due to position restrictions and the crucible mold offset problem was solved, and construction safety and quality were improved.

CN112944913BActive Publication Date: 2024-10-15HENAN ZHONGFU TECH CENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110344434.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-31
Publication Date
2024-10-15
Estimated Expiration
2041-03-31

AI Technical Summary

Technical Problem

During the operation of the intermediate frequency furnace, construction workers are prone to stepping on the wrong foot due to position restrictions, and the crucible mold is not fixed, causing the crucible mold to shift during the furnace operation, affecting the construction quality.

Method used

Design an electric furnace support component for an intermediate frequency furnace, including a first arc plate, a support rod, a U-shaped slot, a positioning component and an extension plate. Through the design of screw connections and positioning holes, the crucible mold can be fixed and supported. Ensure that construction workers perform furnace opening operations in a safe location.

Benefits of technology

It effectively prevents the crucible mold from shifting, improves construction safety and quality, and ensures the safety and operational stability of construction personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112944913B_ABST
    Figure CN112944913B_ABST
Patent Text Reader

Abstract

The present invention discloses an electric furnace-beating support assembly and construction method for a medium-frequency furnace, wherein: the electric furnace-beating support assembly for a medium-frequency furnace comprises a first arc-shaped plate and a support rod, the upper parts of the two ends of the inner side of the first arc-shaped plate are respectively fixedly connected with support rods, U-shaped through grooves are arranged on the two support rods, a right-end positioning assembly is slidably connected in the U-shaped through groove, and a middle positioning assembly is slidably connected in the U-shaped through groove on the left side of the right-end positioning assembly; extension plates are respectively arranged on the outer sides of the two support rods, a first rectangular through hole is arranged on each extension plate, and at least two support plates are inserted on each extension plate. By arranging the middle positioning assembly, the corresponding crucible mold is fixed, and the crucible mold is prevented from being offset during the furnace-beating operation; by arranging the extension plate, the staff can stand on the extension plate to perform the furnace-beating operation, and the staff is prevented from stepping on empty space due to limited position when beating the furnace, thereby improving the safety of the construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0002] The invention relates to a supporting device and a construction method of the device, and in particular to an electric furnace supporting assembly for a medium frequency furnace and a construction method. Background technology:

[0004] When beating a medium frequency furnace, first you need to place the crucible mold in the furnace and adjust the crucible mold to the center position, then pour the lining material for beating into the gap between the outer wall of the crucible mold and the inner wall of the furnace, and finally the staff will stand outside the furnace to perform the beating operation. Due to position restrictions, the staff often step one foot on the outside of the furnace and the other foot on the top of the crucible mold to perform the beating operation. When performing the beating operation, there are the following problems: ① The staff needs to pay attention to the safety of their feet at all times to avoid stepping on empty space; ② Since the crucible mold is not fixed, the crucible mold will be offset during beating, which affects the quality of the beating. Summary of the invention:

[0006] The technical problem to be solved by the present invention is: to overcome the differences in the prior art and provide an electric furnace support assembly and construction method for a medium frequency furnace, which solves the inconvenience caused by position limitations for construction personnel and at the same time fixes the crucible mold to avoid the crucible mold from shifting during furnace striking.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] A medium frequency furnace electric furnace support assembly comprises a first arc-shaped plate and a support rod, wherein the upper parts of the two ends of the inner side of the first arc-shaped plate are respectively fixedly connected with the support rods, and the top surfaces of the two support rods are located at the same horizontal height; U-shaped through grooves are arranged on the two support rods, a right end positioning assembly is slidably connected in the U-shaped through groove, and a middle positioning assembly is slidably connected in the U-shaped through groove on the left side of the right end positioning assembly; extension plates are respectively arranged on the outer sides of the two support rods, a first rectangular through hole is arranged on each of the extension plates, and at least two support plates are inserted in each of the extension plates.

[0009] The support plate is distributed in an L shape, and one end of the support plate is inserted in the first rectangular through hole and can move left and right along the first rectangular through hole; a third positioning vertical plate is vertically arranged on the bottom surface of the support plate on the outer side of the extension plate, and a first guide tube with an internal thread is arranged on the outer side of the third positioning vertical plate, a first screw rod is threadedly connected in the first guide tube, and the end of the first screw rod passes through the inner side surface of the third vertical plate; at least ten first positioning holes distributed in horizontal rows are arranged at the position of the first screw rod on the outer side surface of the extension plate.

[0010] The right end positioning assembly consists of a second arc plate, a first connecting rod and a second connecting rod. The first connecting rod is distributed in a U-shape, and the two ends of the first connecting rod are respectively fixedly connected to the two ends of the upper end surface of the second arc plate. A second connecting rod is arranged between the right side of the middle part of the first connecting rod and the middle part of the upper end surface of the second arc plate, and the second connecting rod is distributed in an L-shape; the two ends of the first connecting rod are inserted into the U-shaped through grooves on the two support rods, and the first connecting rod can move left and right along the U-shaped through grooves on the two support rods.

[0011] At least ten second positioning holes are arranged on the inner side surface of the support rod, a first positioning vertical plate is vertically arranged on the bottom surface of the first connecting rod inside the support rod, a second guide tube with internal threads is arranged on the first positioning vertical plate, a second screw rod is threadedly connected in the second guide tube, and an end of the second screw rod passes through the inner side surface of the first positioning vertical plate and is inserted into the corresponding second positioning hole; the position of the second screw rod corresponds to the position of the second positioning hole.

[0012] The lower end of the first arc-shaped plate and the lower end of the second arc-shaped plate are located on the same horizontal line.

[0013] The middle positioning assembly consists of a third arc plate, a third connecting rod and a fourth connecting rod, and there are two third arc plates, which are symmetrically distributed; a third connecting rod is arranged above each third arc plate, and the third connecting rod is U-shaped, and the two ends of the lower part of the third connecting rod are respectively inserted into the U-shaped through grooves on the support rod, and are fixedly connected to the two ends of the upper end surface of the third arc plate; a second positioning vertical plate is vertically arranged on the bottom surface of the third connecting rod on the inner side of the support rod, and a third guide tube with internal threads is arranged on the second positioning vertical plate, and a third threaded rod is threadedly connected in the third guide tube, and the end of the third threaded rod passes through the inner side surface of the second positioning vertical plate; the end of the third screw rod corresponds to the position of the second positioning hole on the inner side surface of the support rod.

[0014] The length of the U-shaped through groove is four fifths of the length of the support rod.

[0015] The construction method of the intermediate frequency furnace electric furnace support assembly comprises the following steps:

[0016] A. Construction preparation:

[0017] ①. Clean the inner cavity of the furnace wall. After cleaning, expose the coil glue and fill the seam of the original coil glue;

[0018] ② Place a stainless steel mesh and lay asbestos cloth inside the stainless steel mesh;

[0019] B. Specific operation steps:

[0020] 1. Build the furnace bottom:

[0021] ①. Place the first curved plate close to the outer wall of one side of the intermediate frequency furnace, remove the middle positioning component on the support rod, insert the right end positioning component into the U-shaped through groove on the support rod, and make the inner wall of the second curved plate close to the outer wall of the other side of the intermediate frequency furnace;

[0022] ②. Rotate the second screw rod to fix the first positioning vertical plate and the support rod together;

[0023] ③. According to the change of the furnace position, adjust the position of the support plate on the extension plate, and fix the third positioning vertical plate and the support rod together through the first screw;

[0024] ④. The staff stands on the support plate to perform the furnace bottom beating operation. After the furnace bottom beating is completed, the device is removed, the crucible mold is placed in the medium frequency furnace, and the medium frequency furnace is adjusted to be located in the middle position of the bottom of the furnace. After the adjustment is completed, the furnace wall beating operation is prepared;

[0025] 2. Build the furnace wall:

[0026] ①, slide the middle positioning assembly into the first rectangular through hole on the support rod so that the two third arc plates are located on both sides of the crucible mold;

[0027] ②. Place the device above the crucible mold, make the inner wall of the first curved plate close to the outer wall of one side of the medium frequency furnace, insert the right end positioning component into the U-shaped through groove on the support rod, and make the inner wall of the second curved plate close to the outer wall of the other side of the medium frequency furnace;

[0028] ③. Rotate the second screw rod to fix the first positioning vertical plate and the support rod together; at the same time, move the two third arc-shaped plates so that the inner walls of the two third arc-shaped plates are respectively close to the outer walls of the two sides of the crucible mold, and fix the second positioning vertical plate and the support rod together by rotating the third screw rod. At this time, the middle positioning assembly and the support rod (2) are fixed together, that is, the crucible mold is fixed;

[0029] ④. According to the change of the furnace striking position, adjust the position of the support plate on the extension plate, and fix the third positioning vertical plate and the support rod together through the first screw; the staff stands on the support plate to perform the furnace striking operation on the furnace wall.

[0030] The positive beneficial effects of the present invention are:

[0031] 1. The present invention has a right positioning assembly slidably connected to the right ends of the two support rods, and is fixed to the support rod by the second screw on the first positioning vertical plate, so that the device is fixed to the medium frequency furnace; by setting the middle positioning assembly, the corresponding crucible mold is fixed to avoid the crucible mold from shifting during the furnace operation.

[0032] 2. The present invention arranges an extension plate on the outer side of the support plate, and arranges a first rectangular through hole on the extension plate. When in use, the staff can insert one end of the support plate into the first rectangular through hole according to the position of the furnace, and put the other end on the edge of the medium frequency furnace, and fix the support plate and the extension plate together through the first screw; in this way, the staff can stand on the extension plate to perform the furnace operation, avoiding the situation where the staff step on empty space due to limited position when operating the furnace, thereby improving the safety of construction. Description of the drawings:

[0034] Figure 1 It is a structural schematic diagram of the present invention;

[0035] Figure 2 It is a partial structural schematic diagram of the middle positioning assembly of the present invention;

[0036] Figure 3 This is a structural diagram of the connection between the first curved plate and the support rod of the present invention;

[0037] Figure 4 It is a usage state diagram of the present invention;

[0038] Figure 4 In the figure, A represents the medium frequency furnace, and B represents the crucible mold. Specific implementation method:

[0040] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings:

[0041] See also Figure 1-Figure 4 A medium frequency furnace electric furnace support assembly comprises a first arc-shaped plate 1 and a support rod 2. The support rods 2 are fixedly connected to the upper parts of the two ends of the inner side of the first arc-shaped plate 1, and the top surfaces of the two support rods 2 are at the same horizontal height; U-shaped through grooves 9 are respectively arranged on the two support rods 2 (the U-shaped through grooves 9 are distributed in the shape of an opening at the right end), a right end positioning assembly is slidably connected in the U-shaped through grooves 9, and a middle positioning assembly is slidably connected in the U-shaped through grooves 9 on the left side of the right end positioning assembly; extension plates 3 are respectively arranged on the outer sides of the two support rods 2, a first rectangular through hole 4 is arranged on each extension plate 3, and at least two support plates 5 are inserted on each extension plate 3.

[0042] The support plate 5 is distributed in an L shape, and one end of the support plate 5 is inserted in the first rectangular through hole 4, and can move left and right along the first rectangular through hole 4; a third positioning vertical plate 5-1 is vertically arranged on the bottom surface of the support plate 5 on the outer side of the extension plate 3, and a first guide tube 6 with an internal thread is arranged on the outer side of the third positioning vertical plate 5-1, and a first screw rod 6-1 is connected by a thread in the first guide tube 6, and the end of the first screw rod 6-1 passes through the inner side surface of the third vertical plate 5-1; at least ten first positioning holes 7 distributed in horizontal rows are arranged at the position of the first screw rod 6-1 on the outer side surface of the extension plate 3.

[0043] The right end positioning assembly consists of a second arc plate 10, a first connecting rod 11 and a second connecting rod 12. The first connecting rod 11 is distributed in a U-shape, and the two ends of the first connecting rod 11 are respectively fixedly connected to the two ends of the upper end surface of the second arc plate 10. A second connecting rod 12 is arranged between the right side of the middle part of the first connecting rod 11 and the middle part of the upper end surface of the second arc plate 10. The second connecting rod 12 is distributed in an L-shape; the two ends of the first connecting rod 11 are inserted into the U-shaped through grooves 9 on the two support rods 2, and the first connecting rod 11 can move left and right along the U-shaped through grooves 9 on the two support rods 2.

[0044] At least ten second positioning holes 8 are arranged on the inner side surface of the support rod 2, and a first positioning vertical plate 13 is vertically arranged on the bottom surface of the first connecting rod 11 inside the support rod 2, and a second guide tube 14 with an internal thread is arranged on the first positioning vertical plate 13, and a second screw rod 15 is threadedly connected in the second guide tube 14, and the end of the second screw rod 15 passes through the inner side surface of the first positioning vertical plate 13 and is inserted into the corresponding second positioning hole 8; the position of the second screw rod 15 corresponds to the position of the second positioning hole 8.

[0045] The lower end of the first curved plate 1 and the lower end of the second curved plate 10 are located on the same horizontal line.

[0046] The middle positioning assembly consists of a third arc plate 16, a third connecting rod 17 and a fourth connecting rod 18. There are two third arc plates 16, which are symmetrically distributed; a third connecting rod 17 is arranged above each third arc plate 16, and the third connecting rod 17 is U-shaped, and the two ends of the lower part of the third connecting rod 17 are respectively inserted into the U-shaped through groove 9 on the support rod 2, and are fixedly connected to the two ends of the upper end surface of the third arc plate 16; a second positioning vertical plate 19 is vertically arranged on the bottom surface of the third connecting rod 17 on the inner side of the support rod 2, and a third guide tube 20 with an internal thread is arranged on the second positioning vertical plate 19, and a third threaded rod 21 is threadedly connected in the third guide tube 20, and the end of the third threaded rod 21 passes through the inner side surface of the second positioning vertical plate 19; the end of the third screw rod 21 corresponds to the position of the second positioning hole 8 on the inner side surface of the support rod 2.

[0047] The length of the U-shaped through slot 9 is four fifths of the length of the support rod 2 .

[0048] The above-mentioned construction method of the medium frequency furnace electric furnace support assembly comprises the following steps:

[0049] A. Construction preparation:

[0050] ①. Clean the inner cavity of the furnace wall. After cleaning, expose the coil glue and fill the seam of the original coil glue;

[0051] ② Place a stainless steel mesh and lay asbestos cloth inside the stainless steel mesh;

[0052] B. Specific operation steps:

[0053] 1. Build the furnace bottom:

[0054] ①. Place the first curved plate 1 close to the outer wall of one side of the intermediate frequency furnace, remove the middle positioning component on the support rod, insert the right end positioning component into the U-shaped through groove 9 on the support rod 2, and make the inner wall of the second curved plate 10 close to the outer wall of the other side of the intermediate frequency furnace A;

[0055] ②, rotate the second screw rod 15 to fix the first positioning vertical plate 13 and the support rod 2 together;

[0056] ③. According to the change of the furnace position, adjust the position of the support plate 5 on the extension plate 3, and fix the third positioning vertical plate 5-1 and the support rod 2 together through the first screw 6-1;

[0057] ④. The staff stands on the support plate 5 to perform the furnace bottom beating operation. After the furnace bottom beating is completed, the device is removed, the crucible mold B is placed in the intermediate frequency furnace A, and the intermediate frequency furnace A is adjusted to be located in the middle position of the bottom of the furnace. After the adjustment is completed, the furnace wall beating operation is prepared;

[0058] 2. Build the furnace wall:

[0059] ①, slide the middle positioning assembly into the first rectangular through hole 4 on the support rod 2, so that the two third arc plates 16 are located on both sides of the crucible mold B;

[0060] ②. Place the device above the crucible mold B, so that the inner wall of the first curved plate 1 is in close contact with the outer wall of one side of the intermediate frequency furnace, insert the right end positioning component into the U-shaped through groove 9 on the support rod 2, and make the inner wall of the second curved plate 10 in close contact with the outer wall of the other side of the intermediate frequency furnace A;

[0061] ③. Rotate the second screw 15 to fix the first positioning vertical plate 13 and the support rod 2 together; at the same time, move the two third arc-shaped plates 16 so that the inner walls of the two third arc-shaped plates 16 are respectively close to the outer walls on both sides of the crucible mold B, and fix the second positioning vertical plate 19 and the support rod 2 together by rotating the third screw 11. At this time, the middle positioning assembly is fixed together with the support rod 2, that is, the crucible mold is fixed;

[0062] ④. According to the change of the furnace striking position, adjust the position of the support plate 5 on the extension plate 3, and fix the third positioning vertical plate 5-1 and the support rod 2 together through the first screw 6-1; the staff stands on the support plate 5 to perform the furnace striking operation on the furnace wall.

[0063] In the above description, the curvature of the first curved plate 1 and the second curved plate 10 matches the curvature of the outer wall of the intermediate frequency furnace A, and the curvature of the two third curved plates 16 matches the outer wall of the crucible mold B.

[0064] Working principle:

[0065] 1. When in use, move the middle positioning assembly along the U-shaped through groove 9 to the middle position of the intermediate frequency furnace A, so that the two third arc plates 16 are located on both sides of the crucible mold B, and then place the device above the middle position of the intermediate frequency furnace A, and at the same time make the inner wall of the first arc plate 1 close to the outer wall of the intermediate frequency furnace;

[0066] 2. Move the second curved plate 10 along the U-shaped through groove 9 on the support rod 2 until the inner wall of the second curved plate 10 is in close contact with the outer wall of the intermediate frequency furnace A, and fix the first positioning vertical plate 13 and the support rod 2 together through the second screw 15;

[0067] 3. According to the position of the crucible mold, move the two third curved plates 16 so that the outer walls of the two third curved plates 16 are in close contact with the outer wall of the crucible mold B, and fix the second positioning vertical plate 19 and the support rod 2 together through the third screw 21, thereby completing the fixation of the crucible mold B;

[0068] 4. According to the position of the furnace, move the positions of the two extension plates 3, and fix the third positioning vertical plate 5-1 and the support rod 2 together through the first screw rod 6-1, and then the staff can stand on the two extension plates 2 to perform the furnace operation.

[0069] The invention solves the problem that during traditional furnace construction, workers may step on empty space or stand unsteadily due to position restrictions, which affects the furnace construction operation. At the same time, the crucible mold can be fixed, thereby improving construction efficiency and quality and ensuring construction safety.

Claims

1. A medium frequency furnace electric furnace support assembly, comprising a first arc-shaped plate (1) and a support rod (2), Features: Support rods (2) are fixedly connected to the upper parts of the two ends of the inner side of the first arc-shaped plate (1), and the top surfaces of the two support rods (2) are located at the same horizontal height; U-shaped through grooves (9) are provided on the two support rods (2), a right end positioning component is slidably connected in the U-shaped through groove (9), and a middle positioning component is slidably connected in the U-shaped through groove (9) on the left side of the right end positioning component; extension plates (3) are provided on the outer sides of the two support rods (2), and each extension plate (3) is provided with a The first rectangular through hole (4) is provided with at least two support plates (5) inserted on each of the extension plates (3); the support plates (5) are distributed in an L shape, and one end of the support plate (5) is inserted in the first rectangular through hole (4) and can move left and right along the first rectangular through hole (4); a third positioning vertical plate (5-1) is vertically arranged on the bottom surface of the support plate (5) on the outer side surface of the extension plate (3), and a first guide tube (6) with an internal thread is arranged on the outer side surface of the third positioning vertical plate (5-1). A first screw rod (6-1) is connected to a guide tube (6) by a thread, and the end of the first screw rod (6-1) passes through the inner side surface of the third vertical plate (5-1); at least ten first positioning holes (7) distributed in a horizontal row are arranged at a position on the outer side surface of the extension plate (3) corresponding to the first screw rod (6-1); the right end positioning assembly is composed of a second arc plate (10), a first connecting rod (11) and a second connecting rod (12); the first connecting rod (11) is distributed in a U-shape, and the first connecting rod (12) is provided with a plurality of first positioning holes (7) arranged in a horizontal row. The two ends of the first connecting rod (11) are respectively fixedly connected to the two ends of the upper end surface of the second arc plate (10); a second connecting rod (12) is arranged between the right side of the middle part of the first connecting rod (11) and the middle part of the upper end surface of the second arc plate (10); the second connecting rod (12) is arranged in an L shape; the two ends of the first connecting rod (11) are inserted into the U-shaped through grooves (9) on the two support rods (2), and the first connecting rod (11) can move left and right along the U-shaped through grooves (9) on the two support rods (2).

2. The electric furnace support assembly for a medium frequency furnace according to claim 1, Features: At least ten second positioning holes (8) are arranged on the inner side surface of the support rod (2); a first positioning vertical plate (13) is vertically arranged on the bottom surface of the first connecting rod (11) inside the support rod (2); a second guide tube (14) with an internal thread is arranged on the first positioning vertical plate (13); a second screw rod (15) is connected to the inside of the second guide tube (14) through a thread, and the end of the second screw rod (15) passes through the inner side surface of the first positioning vertical plate (13) and is inserted into the corresponding second positioning hole (8); the position of the second screw rod (15) corresponds to the position of the second positioning hole (8).

3. The electric furnace support assembly for a medium frequency furnace according to claim 1, Features: The lower end of the first curved plate (1) and the lower end of the second curved plate (10) are located on the same horizontal line.

4. The electric furnace support assembly for a medium frequency furnace according to claim 1, Features: The middle positioning assembly is composed of a third arc-shaped plate (16), a third connecting rod (17) and a fourth connecting rod (18). The third arc-shaped plates (16) are two and are symmetrically distributed. A third connecting rod (17) is arranged above each third arc-shaped plate (16). The third connecting rod (17) is arranged in a U-shaped shape, and the two ends of the lower part of the third connecting rod (17) are respectively inserted into the U-shaped through groove (9) on the support rod (2) and are fixedly connected to the two ends of the upper end surface of the third arc-shaped plate (16). A second positioning vertical plate (19) is vertically arranged on the bottom surface of the third connecting rod (17) inside the support rod (2); a third guide tube (20) with an internal thread is arranged on the second positioning vertical plate (19); a third threaded rod (21) is threadedly connected inside the third guide tube (20), and the end of the third threaded rod (21) passes through the inner side surface of the second positioning vertical plate (19); the end of the third threaded rod (21) corresponds to the position of the second positioning hole (8) on the inner side surface of the support rod (2).

5. The electric furnace support assembly for a medium frequency furnace according to claim 1, Features: The length of the U-shaped through groove (9) is four fifths of the length of the support rod (2).

6. The construction method of the medium frequency furnace electric furnace support assembly according to any one of claims 1 to 5, It is characterized in that The steps include: A. Construction preparation: ①. Clean the inner cavity of the furnace wall. After cleaning, expose the coil glue and fill the seam of the original coil glue; ② Place a stainless steel mesh and lay asbestos cloth inside the stainless steel mesh; B. Specific operation steps:

1. Build the furnace bottom: ①. Place the first curved plate (1) in close contact with the outer wall of one side of the intermediate frequency furnace, remove the middle positioning component on the support rod, insert the right end positioning component into the U-shaped through groove (9) on the support rod (2), and make the inner wall of the second curved plate (10) in close contact with the outer wall of the other side of the intermediate frequency furnace (A); ②, rotating the second screw rod (15) to fix the first positioning vertical plate (13) and the support rod (2) together; ③. According to the change of the furnace position, the position of the support plate (5) on the extension plate (3) is adjusted, and the third positioning vertical plate (5-1) and the support rod (2) are fixed together by the first screw rod (6-1); ④. The staff stands on the support plate (5) to perform the furnace bottom beating operation. After the furnace bottom beating is completed, the device is removed, the crucible mold (B) is placed in the medium frequency furnace (A), and the medium frequency furnace (A) is adjusted so that it is located in the middle of the bottom of the furnace. After the adjustment is completed, the furnace wall beating operation is prepared; 2. Build the furnace wall: ①, slidingly inserting the middle positioning assembly into the first rectangular through hole (4) on the support rod (2), so that the two third arc-shaped plates (16) are located on both sides of the crucible mold (B); ②. Place the device above the crucible mold (B), so that the inner wall of the first curved plate (1) is in close contact with the outer wall of one side of the medium frequency furnace, insert the right end positioning component into the U-shaped through groove (9) on the support rod (2), and make the inner wall of the second curved plate (10) in close contact with the outer wall of the other side of the medium frequency furnace (A); ③. Rotate the second screw rod (15) to fix the first positioning vertical plate (13) and the support rod (2) together; at the same time, move the two third arc-shaped plates (16) so that the inner walls of the two third arc-shaped plates (16) are respectively in close contact with the outer walls of the two sides of the crucible mold (B), and fix the second positioning vertical plate (19) and the support rod (2) together by rotating the third screw rod (11). At this time, the middle positioning assembly and the support rod (2) are fixed together, that is, the crucible mold is fixed; ④. According to the change of the furnace striking position, the position of the support plate (5) on the extension plate (3) is adjusted, and the third positioning vertical plate (5-1) and the support rod (2) are fixed together by the first screw rod (6-1); the staff stands on the support plate (5) to perform the furnace striking operation on the furnace wall.