A rapid modeling and automatic optimization method for road pile composite foundation engineering
Through information model technology and standardized formulas, a three-dimensional model of pile-type composite foundation is quickly established and automatic optimization is carried out, which solves the problem of high modeling and optimization time consumption in pile-type composite foundation engineering, and realizes an economically feasible optimization solution.
Patent Information
- Application Number
- CN202110355727.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-04-01
AI Technical Summary
In pile-type composite foundation engineering, it is difficult for the existing technology to quickly establish three-dimensional models and automatic optimization solutions, resulting in a large amount of time spent by engineering designers.
Using the method based on information model technology, composite foundation technical specifications and highway soft soil foundation embankment design and construction technical rules, by obtaining three-dimensional geological models and road information, calculating the reinforcement range, processing each reinforcement section in sections, selecting pile shapes and Layout form, establish the objective function for optimal solution, and generate three-dimensional modeling of pile-type composite foundations.
Rapidly establish a three-dimensional model of pile-type composite foundation, save time and cost for engineering designers, and ensure the economic feasibility of automatic optimization solutions through existing specification formulas.
Smart Images

Figure CN113012287B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information model technology, and in particular to the application of information model technology in pile composite foundation engineering. The present invention provides a method for rapid modeling and automatic optimization of engineering structures during three-dimensional modeling of pile composite foundation engineering. Background Art
[0002] Soft soil foundation reinforcement is one of the common geotechnical engineering problems in road construction. Currently, the commonly used methods for soft foundation reinforcement include composite foundation method, rigid pile method, replacement method and drainage method. Among them, pile-type composite foundation has the advantages of convenient construction and good reinforcement effect, making it popular among engineers in soft foundation reinforcement.
[0003] The pile type composite foundation reinforcement project has the characteristics of the pile top elevation constantly changing with the ground elevation, the pile length constantly adjusting with the depth of soft soil, and the reinforcement range constantly changing with the mileage pile number. These characteristics make it impossible to quickly establish a three-dimensional model of the pile type composite foundation through simple copying or array during the modeling process, resulting in engineering designers consuming a lot of time in modeling and optimizing the scheme. This drawback also restricts the promotion and application of information modeling technology in pile type composite foundation reinforcement projects. Summary of the invention
[0004] In order to save the time cost of engineering personnel in performing three-dimensional modeling of pile-type composite foundation reinforcement projects, the present invention proposes a rapid modeling and automatic optimization method for pile-type composite foundation projects suitable for road projects based on information modeling technology, "Technical Specifications for Composite Foundations" (GB / T50783-2012) and "Technical Specifications for Design and Construction of Highway Soft Soil Foundation Embankments" (JTG / TD31-02—2013) verification formulas.
[0005] In order to achieve the above object, the present invention provides the following scheme:
[0006] A method for rapid modeling and automatic optimization of a road pile composite foundation engineering comprises the following steps:
[0007] S1, obtain information such as 3D geological model, road centerline, road construction scope, and corrected terrain surface;
[0008] S2, calculate the soft foundation reinforcement scope based on the road construction scope and 3D geological model information;
[0009] S3, the reinforcement range is re-segmented according to the changes in the rock / soil layer and the embankment structure. After segmentation, the most unfavorable cross section in each reinforcement segment is read as the representative cross section of the reinforcement segment;
[0010] S4, select a pile type and layout for each reinforcement segment and give the recommended range of pile diameter, pile length and pile spacing;
[0011] S5, taking settlement, bearing capacity and stability as constraints, an objective function with engineering quantity as dependent variable is established to solve the optimal solution for each reinforcement segment;
[0012] S6, reading the optimized pile spacing and pile number of each reinforcement segment, calculating the horizontal coordinates of the center of each pile using an offset algorithm, and projecting them onto the corrected terrain surface to obtain the pile top elevation;
[0013] S7, generating pile bodies in sequence in the three-dimensional model according to the horizontal coordinates of the pile center, the elevation of the pile top, the pile diameter, and the pile length, and completing the three-dimensional modeling of the pile-type composite foundation.
[0014] Furthermore, the three-dimensional geological model information in S1 includes the rock / soil layer interface, the physical parameters of the rock / soil, and the property description information;
[0015] Furthermore, the road centerline in S1 includes the mileage pile number and plane coordinate information of the road center;
[0016] Furthermore, the road construction scope in S1 refers to the scope determined by the vertical projection of all engineering structures in the pile-type composite foundation reinforcement project; for highway projects, it is generally determined by adding a certain value to the width of the embankment bottom; the road construction scope is given in the form of a set, which includes the horizontal coordinates and horizontal offset values of each mileage pile number and its corresponding left and right construction scope boundary points;
[0017] Furthermore, the modified topographic surface refers to the topographic surface obtained by recalculating the original three-dimensional topographic surface after clearing and leveling it;
[0018] Furthermore, the horizontal offset value is equal to the horizontal and vertical distance from the point to the center line of the road, and is divided into left and right according to the direction of the route, with the left offset being negative and the right offset being positive;
[0019] Furthermore, S2 includes:
[0020] S2.1, set the lateral search interval value, longitudinal search interval value, longitudinal search interval initial value, longitudinal search interval minimum value, reinforcement range array and its sequence number, search base point and search base point initial value, take the minimum mileage pile number of the road centerline as the starting point, calculate its horizontal coordinates, and assign them to the search base point and search base point initial value;
[0021] S2.2, assigning the longitudinal search interval initial value to the longitudinal search interval value;
[0022] S2.3, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if it is obtained, execute S2.12; if not, execute the next step;
[0023] S2.4, giving two horizontal offset values of equal magnitude and opposite sign to the lateral search interval value, taking the search base point as the reference, using these two horizontal offset values to calculate the horizontal coordinates of two offset points located on both sides of the road centerline;
[0024] S2.5, determine whether all the lateral offset points are beyond the road construction range; if so, execute S2.8; if not, execute the next step;
[0025] S2.6, vertically project the offset points that do not exceed the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute S2.12; if not, execute the next step;
[0026] S2.7, based on the previous offset points on both sides, offset outwards by a horizontal search interval value along both sides, update the horizontal offset values and horizontal coordinates of the offset points on both sides, and return to S2.5;
[0027] S2.8, assigning the search base point to the search base point initial value;
[0028] S2.9, judging whether the longitudinal search interval value based on the search base point exceeds the mileage range; if so, executing the next step; if not, executing S2.11;
[0029] S2.10, reduce the vertical search interval value by a part and assign it to itself, and determine whether the vertical search interval value is greater than the minimum vertical search interval value; if so, return to S2.9; if not, execute S2.29;
[0030] S2.11, calculate the pile number and horizontal coordinates that are one longitudinal search interval value ahead of the search base point and use them to update the search base point, and return to S2.3;
[0031] S2.12, determine whether the vertical search interval value is less than or equal to the vertical search interval minimum value or whether the search base point is the starting point; if so, execute step S2.14; if not, execute the next step;
[0032] S2.13, after reducing the longitudinal search interval value by a part and re-assigning it to itself, assign the initial value of the search base point to the search base point, then advance a longitudinal search interval value based on the search base point, calculate the stake number and horizontal coordinates of the point and use them to update the search base point, and return to S2.3;
[0033] S2.14, record the pile number corresponding to the current search base point as the starting pile number of the reinforcement range, and assign the search base point to the search base point initial value;
[0034] S2.15, assigning the longitudinal search interval initial value to the longitudinal search interval value;
[0035] S2.16, determining whether the longitudinal search interval value based on the search base point exceeds the mileage range; if so, executing the next step; if not, executing step S2.18;
[0036] S2.17, reduce the vertical search interval value by a part and assign it to itself, and determine whether the vertical search interval value is greater than the minimum vertical search interval value; if so, return to S2.16; if not, execute step S2.28;
[0037] S2.18, calculate the pile number and horizontal coordinates that are one longitudinal search interval value ahead of the search base point and use them to update the search base point;
[0038] S2.19, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute S2.25;
[0039] S2.20, giving two horizontal offset values of equal magnitude and opposite sign to the lateral search interval value, using the search base point as a reference and using these two horizontal offset values to calculate the horizontal coordinates of two offset points located on both sides of the road centerline;
[0040] S2.21, determine whether all lateral offset points are beyond the road construction range; if so, execute S2.24; if not, execute the next step;
[0041] S2.22, vertically project the offset points that do not exceed the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute step S2.25;
[0042] S2.23, based on the previous offset points on both sides, offset outwards by a horizontal search interval value along both sides, and use the calculation results to update the horizontal offset values and horizontal coordinates of the offset points on both sides, and return to S2.21;
[0043] S2.24, assign the search base point to the search base point initial value, and return to S2.16;
[0044] S2.25, whether the longitudinal search interval value is greater than the longitudinal search interval minimum value; if so, execute the next step; if not, execute S2.27;
[0045] S2.26, assign the initial value of the search base point to the search base point, reduce the longitudinal search interval value by a part and assign it to itself, then advance one longitudinal search interval value based on the search base point, calculate the stake number and horizontal coordinates of the point and use them to update the search base point, and return to S2.19;
[0046] S2.27, record the pile number corresponding to the current search base point minus the longitudinal search interval value as the end pile number of the reinforcement range, save the pair of the starting pile number and the end pile number of the reinforcement range into the reinforcement range array corresponding to the current sequence number, then increase the array sequence number by one, and then assign the search base point to the search base point initial value, and return to S2.2;
[0047] S2.28, record the pile number corresponding to the current search base point as the end pile number of the reinforcement range, and save the pair of the starting pile number and the end pile number of the reinforcement range into the reinforcement range array corresponding to the current sequence number;
[0048] S2.29, calculating the distance between the end pile number and the start pile number of the reinforcement range of each group of data in the reinforcement range array, if the distance is less than or equal to the minimum value of the longitudinal search interval, then remove the group of data and reorganize the array;
[0049] Furthermore, the longitudinal search interval value in S2.1 refers to the length of the horizontal curve of the road centerline between two points;
[0050] Furthermore, in S2.5, whether the lateral offset point exceeds the road construction range is determined by comparing whether the horizontal offset value of the lateral offset point exceeds the horizontal offset value of the road construction range boundary at the corresponding pile number in the road construction range set; if the position of the lateral offset point does not have a corresponding pile number in the road construction range set, the horizontal offset values of the road construction range boundaries of the adjacent front and rear pile numbers are linearly interpolated to obtain the solution;
[0051] Furthermore, the principles for further segmenting one or more groups of reinforcement ranges in S3 are: ① the location where a structural lens or stratum pinch-out occurs; ② the thickness change of a rock / soil layer above the bedrock exceeds the set value; ③ the change amplitude of a physical parameter affecting settlement, bearing capacity and stability in a rock / soil layer above the bedrock is greater than the set value; segmentation is performed if any of the above conditions is met;
[0052] Furthermore, the method for reading the most unfavorable cross section in each reinforcement section is: in each reinforcement section, the physical parameters of the bedrock and the rock / soil layer above each pile number, the elevation of the rock / soil layer interface and the embankment size are read or calculated in turn, and then weights are set for them, and the most unfavorable cross section in each reinforcement section is calculated and selected, and it is set as the representative cross section of the reinforcement section;
[0053] Furthermore, the representative cross section means that it is assumed that all cross-section information in the reinforcement segment is the same as the representative cross section;
[0054] Furthermore, the recommended ranges of pile diameter, pile length and pile spacing in the reinforcement scheme of S4 are set according to the relevant specifications of pile-type composite foundation and the working parameters of existing pile foundation equipment in the market;
[0055] Furthermore, the pile length, pile diameter and pile spacing of the composite foundation piles in each reinforcement segment given in the preliminary scheme in S4 are the same;
[0056] Furthermore, S5 includes:
[0057] S5.1, take m, n, s values within the recommended range of pile length, pile diameter and pile spacing respectively, and combine them into m×n×s reinforcement schemes;
[0058] S5.2, select a reinforcement scheme and calculate the longitudinal spacing of the piles according to the arrangement and spacing of the composite foundation piles in the reinforcement section;
[0059] S5.3, divide the total mileage of the reinforcement section by the longitudinal spacing of the piles, round up and add 1 to get the number of pile rows;
[0060] S5.4, after determining the pile number of the first row of piles in the reinforcement section, calculate the pile numbers of each row of piles in turn;
[0061] S5.5, calculate the center coordinates and transverse number of each row of piles according to the pile spacing, pile arrangement and the reinforcement range corresponding to the pile number of each row of piles, then obtain the total number of piles in the reinforcement section, and then calculate the engineering quantity of the reinforcement scheme according to the pile diameter and pile length;
[0062] S5.6, read the physical parameters of the bedrock and the rock / soil layer above the cross section of the reinforcement segment, the elevation of the rock / soil interface and the embankment size information, and then verify whether the bearing capacity and settlement of the composite foundation meet the requirements based on the pile diameter, pile length and pile spacing; if the requirements are met, execute the next step; if not, determine whether all the solutions have been executed, if not, return to S5.2, if so, execute S5.9;
[0063] S5.7, using the arc sliding method to verify whether the stability of the reinforcement scheme meets the requirements; if it meets the requirements, execute the next step; if it does not meet the requirements, determine whether all schemes have been executed, if not, return to S5.2, if it has been executed, execute S5.9;
[0064] S5.8, record the reinforcement plan and determine whether all reinforcement plans have been executed; if so, proceed to the next step; if not, return to S5.2;
[0065] S5.9, reading the engineering quantities of all recorded reinforcement schemes, and selecting the scheme with the smallest engineering quantity as the optimal reinforcement scheme;
[0066] Furthermore, in S5.1, m, n, and s values are taken within the recommended ranges of pile length, pile diameter, and pile spacing, respectively, and these values all satisfy an arithmetic progression, and the maximum and minimum values are equal to the maximum and minimum values of their respective recommended ranges;
[0067] Furthermore, the pile number of the first row of piles in the reinforcement section determined in S5.4 should ensure that the number of piles in the reinforcement section is equal to the result calculated in S5.3 and the pile number of the last row of piles is not greater than the end pile number of the reinforcement range of the reinforcement section; the pile number of each row of piles should be calculated to ensure that the length of the horizontal curve of the road centerline between adjacent pile numbers is equal to the longitudinal spacing of the rows of piles;
[0068] Furthermore, the calculation formulas for the bearing capacity and settlement of composite foundations in S5.6 shall be implemented in accordance with the Technical Specifications for Composite Foundations (GB / T 50783-2012);
[0069] Furthermore, each time an arc is searched in S5.7, the stability safety factor is calculated by referring to the method in the Technical Specifications for Design and Construction of Highway Embankments on Soft Soil Foundation (JTG / TD31-02—2013);
[0070] Furthermore, if there is a chain break in the pile number in the road centerline, the pile number and distance calculation should be corrected according to the pile number chain break table;
[0071] The beneficial effects of the present invention compared to the prior art are:
[0072] (1) Rapidly establish a three-dimensional model of a pile-type composite foundation, saving a lot of time and cost for engineering designers;
[0073] (2) Use existing standard formulas to solve the optimal solution and ensure that the automatic optimization solution is economically feasible; BRIEF DESCRIPTION OF THE DRAWINGS
[0074] This manual contains the following four figures:
[0075] Figure 1 It is a flow chart of a rapid modeling and automatic optimization method for a road pile composite foundation project;
[0076] Figure 2 Flow chart for calculating the scope of soft foundation reinforcement;
[0077] Figure 3 Optimize the flow chart for the reinforcement scheme of pile-type composite foundation;
[0078] Figure 4 It is the plane distribution diagram of the composite foundation piles in the reinforcement section;
[0079] Among them: 1 – pile diameter; 2 – longitudinal spacing of pile rows; 3 – spacing between piles; 4 – center line of road; 5 – boundary of road construction range. DETAILED DESCRIPTION
[0080] The following will be combined with the accompanying drawings in the present invention to explain the technical solutions in the embodiments of the present invention in a comprehensive and detailed manner. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. This embodiment does not consider the broken chain of the pile number; in this embodiment, i = 1, 2...t; "=" is the assignment symbol; "==" is the equal sign;
[0081] S1, obtain the three-dimensional geological model (including the rock / soil interface, the physical parameters of the rock / soil and the property description information), the road centerline 4 (pile number is The corresponding points are denoted as P1, P2...P t ), road construction scope (the 5 points on the left side of the road construction scope are The horizontal offset value is The 5 points on the right side of the road construction boundary are The horizontal offset value is ), correct terrain information, etc.;
[0082] S2, determine the soft foundation reinforcement range based on the intersection of the projection of the road construction range and the soft soil distribution range in the 3D geological model in the horizontal plane. The detailed steps are as follows:
[0083] S2.1, set the horizontal search interval value Cr S , vertical search interval value Le S , the initial value of the longitudinal search interval Le in , Minimum vertical search interval Le mi , reinforcement range array and its serial number (CON start [j], CON end [j]), search for base point P SE Pile No. and horizontal coordinates and the initial value P of the search base point INSE Pile No. and horizontal coordinates, and then the minimum mileage station number of the road centerline 4 As the starting point, its pile number and horizontal coordinates are assigned to the search base point and the search base point initial value;
[0084] S2.2, assigning the longitudinal search interval initial value to the longitudinal search interval value;
[0085] S2.3, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if it is obtained, execute S2.12; if not, execute the next step;
[0086] S2.4, give two horizontal offset values Ld out , Rd out , where Ld out =-Cr S , Rdout =Cr S , based on the search base point, using these two horizontal offset values Ld out , Rd out Calculate the corresponding offset points LP respectively out , RP out horizontal coordinate;
[0087] S2.5, read the corresponding pile number of the current search base point The road construction range of the current search base point is calculated using the adjacent pile numbers before and after the pile number and their road construction range judge and Are they satisfied at the same time? If yes, execute S2.8; if not, execute the next step;
[0088] S2.6, vertically project the offset point within the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute S2.12; if not, execute the next step;
[0089] S2.7, before the two offset points LP out , RP out Based on this, the horizontal search interval value is offset outward along both sides to obtain the horizontal offset value and horizontal coordinate of the two new offset points, and they are used to update LP out , RP out The horizontal offset value Ld out , Rd out and horizontal coordinates, return to S2.5;
[0090] S2.8, assigning the pile number and horizontal coordinates of the search base point to the search base point initial value;
[0091] S2.9, Judgment Is it satisfied? If yes, go to the next step; if not, go to S2.11;
[0092] S2.10, take (h is a positive number greater than 1), and judge Le S >Le mi Is it satisfied? If yes, return to S2.9; if not, execute S2.29;
[0093] S2.11, take Then calculate The corresponding horizontal coordinates are And the corresponding horizontal coordinates update the search base point P SE , return to S2.3;
[0094] S2.12, determine Le S ≤Le mior Is it satisfied? If yes, go to step S2.14; if not, go to the next step;
[0095] S2.13, take Assign the initial value of the search base point to the search base point, and then take Calculate the horizontal coordinates corresponding to the stake number and use them to update the search base point, and return to S2.3;
[0096] S2.14, take And assign the search base point to the search base point initial value;
[0097] S2.15, take
[0098] S2.16, Judgment Is it satisfied? If yes, proceed to the next step; if not, proceed to step S2.18;
[0099] S2.17, take (h is a positive number greater than 1), and judge Le S >Le mi Is it satisfied? If so, return to S2.16; if not, execute step S2.28;
[0100] S2.18, take Then calculate The corresponding horizontal coordinates, and use them to update the search base point;
[0101] S2.19, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute S2.25;
[0102] S2.20, gives two horizontal offset values Ld in , Rd in , whose size is Ld in =-Cr S , Rd in =Cr S , based on the search base point, using these two horizontal offset values Ld in , Rd in Calculate the corresponding offset points LP respectively in , RP in horizontal coordinate;
[0103] S2.21, read the corresponding pile number of the current search base point The road construction range of the current search base point is calculated using the adjacent pile numbers before and after the pile number and their road construction range judge and Are they satisfied at the same time? If yes, execute S2.24; if not, execute the next step;
[0104] S2.22, vertically project the offset point within the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute step S2.25;
[0105] S2.23, at the previous offset point LP on both sides in , RP in Based on this, we then offset the horizontal search interval value outward along both sides and use them to update LP in , RP in The horizontal offset value Ld in , Rd in and horizontal coordinates, return to S2.21;
[0106] S2.24, assign the search base point to the search base point initial value, and return to S2.16;
[0107] S2.25, determine Le S >Le mi Is it satisfied? If yes, go to the next step; if not, go to S2.27;
[0108] S2.26, assign the initial value of the search base point to the search base point, and take Then take Calculate the horizontal coordinates corresponding to the stake number and use them to update the search base point, returning to S2.19:
[0109] S2.27, take j=j+1, then assign the search base point to the search base point initial value, and return to S2.2;
[0110] S2.28, take
[0111] S2.29, remove CON in the array end [j]-CON start [j]≤Le mi data and reorganize the array;
[0112] S3, read the starting and ending pile numbers of each group of reinforcement ranges in the reinforcement range array, and divide them into sections according to the following steps:
[0113] S3.1, search for whether there is a stratum pinch-out or structural lens within the starting and ending pile numbers of each group of reinforcement range. If there is, divide the section at the starting and ending points of the stratum pinch-out and structural lens;
[0114] S3.2, within the reinforcement range of each segment after segmentation, calculate whether the thickness change of each rock / soil layer exceeds the set value of the rock / soil layer, and re-segment the segments that exceed the set value until the requirements are met;
[0115] S3.3, within the scope of each reinforced section after the second segmentation, search for the change range of a physical parameter affecting settlement, bearing capacity and stability in each rock / soil layer that exceeds the set value of the corresponding parameter of the rock / soil layer. If it exceeds, segment it until the requirements are met;
[0116] S3.4, read the starting and ending pile number information of each reinforcement segment and store it in (SEG stast [k], SEG end [k]) and number the section as k, and read or calculate the physical parameters of the bedrock and the rock / soil layer above each pile number, the elevation of the rock / soil layer interface, and the embankment size in each reinforcement section in turn; then set weights for them, calculate and select the pile number at the most unfavorable position in each reinforcement section, and set the cross section where the pile number is located as the representative cross section of the reinforcement section;
[0117] S4, select the pile foundation layout, and give the recommended ranges of the length of each reinforcement segment pile, pile diameter 1 and pile spacing 3, where the recommended range of the length of the reinforcement segment numbered k is l k1 ~l ku , the recommended range of pile diameter 1 is D k1 ~D kv , the recommended range of pile spacing 3 is d k1 ~d kw ;
[0118] S5, with the settlement value, bearing capacity and stability safety factor of the composite foundation as constraints, establish an objective function with the engineering quantity as the dependent variable, and solve the optimal combination solution within the recommended range of pile length, pile diameter 1 and pile spacing 3 of each reinforcement segment. Taking the reinforcement segment numbered k as an example, the detailed steps are as follows:
[0119] S5.1, take m recommended values for pile length, n recommended values for pile diameter and s recommended values for pile spacing. The formula for taking the recommended values is as follows: Each combination of pile length, pile diameter 1 and pile spacing 3 forms m×n×s solutions, which are traversed using nested loops starting from a=1, b=1, c=1;
[0120] S5.2, based on the pile spacing of 3d kc Calculate the longitudinal spacing of each row of piles 2d according to the arrangement of the piles lw ;
[0121] S5.3, yes Round it up and add 1, the integer obtained is the number of piles, recorded as g;
[0122] S5.4, yes Perform a remainder operation, divide the remainder by a number greater than one and add SEG start [k] Get the pile number of the first row of piles Then use the pile number of the first row to continuously accumulate d lw Until it is larger than SEG end [k], the value obtained by each accumulation is the pile number of other rows of piles
[0123] S5.5, according to the pile spacing 3, the pile layout and the road construction range, calculate the number of piles in each row in turn, and the number of piles in the hth (h = 1, 2...g) row is recorded as NUM h , then the total number of piles in the reinforcement segment is The project volume is
[0124] S5.6, according to the formulas in Sections 5.2 and 5.3 of the Technical Specifications for Composite Foundations (GB / T 50783-2012), respectively verify whether the settlement and bearing capacity of the composite foundation of this scheme meet the requirements. If they do, proceed to the next step; if not, judge
[0125]
[0126] S5.7, using the arc search algorithm, each time the arc is searched, the formula in Chapter 4 of "Technical Specifications for Design and Construction of Highway Embankments on Soft Soil Foundation" (JTG / TD31-02-2013) is used to verify whether the stability safety factor meets the requirements. If it meets the requirements, proceed to the next step; if it does not meet the requirements, judge
[0127] S5.8, record the reinforcement plan and judge
[0128] S5.9, read all recorded reinforcement schemes, compare the engineering quantity of each scheme, and select the scheme with the smallest engineering quantity as the optimal scheme;
[0129] S6, read the optimized pile spacing of each segment 3d k (k=1, 2...) and the pile number of each row The horizontal coordinates of the pile center are calculated using the offset algorithm, and the pile top elevation is obtained by projecting it onto the modified terrain surface. Taking the k reinforcement segment as an example, the detailed steps are as follows:
[0130] S6.1, get odd-numbered pile numbers Solve the horizontal coordinates of the corresponding pile number Taking the road centerline 4 as the reference, take two offset values CLd = -α·d kc, CRd=(1-α)d kc (where 0≤α≤1), calculate the coordinates of the offset point based on these two offset values, and record the points that do not exceed the road construction range; obtain the even-numbered pile number Solve the horizontal coordinates of the corresponding pile number Taking the road centerline 4 as the reference, take two offset values ELd = (0.5-α)·d kc , ERd=(1.5-α)d kc , calculate the coordinates of the offset point based on the two offset values, and record the points that do not exceed the road construction range;
[0131] S6.2, based on the two offset points obtained for each row of piles, offset one pile spacing to both sides Two new offset points are obtained, and the points that do not exceed the road construction range are recorded. This step is repeated until the offset points on both sides of the row of piles have exceeded the road construction range; all the recorded points are the horizontal coordinates of the pile centers of all composite foundation piles;
[0132] S7, generating a pile body in the three-dimensional model in sequence according to the horizontal coordinates of the pile center, the elevation of the pile top, the pile diameter 1, and the pile length;
[0133] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for rapid modeling and automatic optimization of road pile composite foundation engineering, characterized in that: The following steps are involved: S1, obtaining the three-dimensional geological model, road centerline, road construction scope, and corrected terrain surface information; S2, calculate the soft foundation reinforcement scope based on the road construction scope and 3D geological model information; S2 includes: S2.1, set the lateral search interval value, longitudinal search interval value, longitudinal search interval initial value, longitudinal search interval minimum value, reinforcement range array and its sequence number, search base point and search base point initial value, take the minimum mileage pile number of the road centerline as the starting point, calculate its horizontal coordinates, and assign them to the search base point and search base point initial value; S2.2, assigning the longitudinal search interval initial value to the longitudinal search interval value; S2.3, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if it is obtained, execute S2.12; if not, execute the next step; S2.4, giving two horizontal offset values of equal magnitude and opposite sign to the lateral search interval value, taking the search base point as the reference, using these two horizontal offset values to calculate the horizontal coordinates of two offset points located on both sides of the road centerline; S2.5, determine whether all the lateral offset points are beyond the road construction range; if so, execute S2.8; if not, execute the next step; S2.6, vertically project the offset points that do not exceed the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute S2.12; if not, execute the next step; S2.7, based on the previous offset points on both sides, offset outwards by a horizontal search interval value along both sides, update the horizontal offset values and horizontal coordinates of the offset points on both sides, and return to S2.5; S2.8, assigning the search base point to the search base point initial value; S2.9, judging whether the longitudinal search interval value based on the search base point exceeds the mileage range; if so, executing the next step; if not, executing S2.11; S2.10, reduce the vertical search interval value by a part and assign it to itself, and determine whether the vertical search interval value is greater than the minimum vertical search interval value; if so, return to S2.9; if not, execute S2.29; S2.11, calculate the pile number and horizontal coordinates that are one longitudinal search interval value ahead of the search base point and use them to update the search base point, and return to S2.3; S2.12, determine whether the vertical search interval value is less than or equal to the vertical search interval minimum value or whether the search base point is the starting point; if so, execute step S2.14; if not, execute the next step; S2.13, after reducing the longitudinal search interval value by a part and re-assigning it to itself, assign the initial value of the search base point to the search base point, then advance a longitudinal search interval value based on the search base point, calculate the stake number and horizontal coordinates of the point and use them to update the search base point, and return to S2.3; S2.14, record the pile number corresponding to the current search base point as the starting pile number of the reinforcement range, and assign the search base point to the search base point initial value; S2.15, assigning the longitudinal search interval initial value to the longitudinal search interval value; S2.16, determining whether the longitudinal search interval value based on the search base point exceeds the mileage range; if so, executing the next step; if not, executing step S2.18; S2.17, reduce the vertical search interval value by a part and assign it to itself, and determine whether the vertical search interval value is greater than the minimum vertical search interval value; if so, return to S2.16; if not, execute step S2.28; S2.18, calculate the pile number and horizontal coordinates that are one longitudinal search interval value ahead of the search base point and use them to update the search base point; S2.19, read the horizontal coordinates of the search base point and project it vertically to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute S2.25; S2.20, giving two horizontal offset values of equal magnitude and opposite sign to the lateral search interval value, using the search base point as a reference and using these two horizontal offset values to calculate the horizontal coordinates of two offset points located on both sides of the road centerline; S2.21, determine whether all lateral offset points are beyond the road construction range; if so, execute S2.24; if not, execute the next step; S2.22, vertically project the offset points that do not exceed the road construction range to the soft soil layer interface to determine whether the projection elevation is obtained; if so, execute the next step; if not, execute step S2.25; S2.23, based on the previous offset points on both sides, offset outwards by a horizontal search interval value along both sides, and use the calculation results to update the horizontal offset values and horizontal coordinates of the offset points on both sides, and return to S2.21; S2.24, assign the search base point to the search base point initial value, and return to S2.16; S2.25, whether the longitudinal search interval value is greater than the longitudinal search interval minimum value; if so, execute the next step; if not, execute S2.27; S2.26, assign the initial value of the search base point to the search base point, reduce the longitudinal search interval value by a part and assign it to itself, then advance one longitudinal search interval value based on the search base point, calculate the stake number and horizontal coordinates of the point and use them to update the search base point, and return to S2.19; S2.27, record the pile number corresponding to the current search base point minus the longitudinal search interval value as the end pile number of the reinforcement range, save the pair of the starting pile number and the end pile number of the reinforcement range into the reinforcement range array corresponding to the current sequence number, then increase the array sequence number by one, and then assign the search base point to the search base point initial value, and return to S2.2; S2.28, record the pile number corresponding to the current search base point as the end pile number of the reinforcement range, and save the pair of the starting pile number and the end pile number of the reinforcement range into the reinforcement range array corresponding to the current sequence number; S2.29, calculating the distance between the end pile number and the start pile number of the reinforcement range of each group of data in the reinforcement range array, if the distance is less than or equal to the minimum value of the longitudinal search interval, then remove the group of data and reorganize the array; S3, the reinforcement range is re-segmented according to the changes in the rock / soil layer and the embankment structure. After segmentation, the most unfavorable cross section in each reinforcement segment is read as the representative cross section of the reinforcement segment; S4, select a pile type and layout for each reinforcement segment and give the recommended range of pile diameter, pile length and pile spacing; S5, taking settlement, bearing capacity and stability as constraints, an objective function with engineering quantity as dependent variable is established to solve the optimal solution for each reinforcement segment; S5 includes: S5.1, take m, n, s values within the recommended range of pile length, pile diameter and pile spacing respectively, and combine them into m×n×s reinforcement schemes; S5.2, select a reinforcement scheme and calculate the longitudinal spacing of the piles according to the arrangement and spacing of the composite foundation piles in the reinforcement section; S5.3, divide the total mileage of the reinforcement section by the longitudinal spacing, round up and add 1 to obtain the number of pile rows; S5.4, after determining the pile number of the first row of piles in the reinforcement section, calculate the pile numbers of each row of piles in turn; S5.5, calculate the center coordinates and transverse number of each row of piles according to the pile spacing, pile arrangement and the reinforcement range corresponding to the pile number of each row of piles, then obtain the total number of piles in the reinforcement section, and then calculate the engineering quantity of the reinforcement scheme according to the pile diameter and pile length; S5.6, read the physical parameters of the bedrock and the rock / soil layer above the cross section of the reinforcement segment, the elevation of the rock / soil interface and the embankment size information, and then calculate whether the bearing capacity and settlement of the composite foundation meet the requirements based on the pile diameter, pile length and pile spacing; if they meet the requirements, execute the next step; if not, determine whether all the solutions have been executed, if not, return to S5.2, if they have been executed, execute S5.9; S5.7, using the arc sliding method to verify whether the stability of the reinforcement scheme meets the requirements; if it meets the requirements, execute the next step; if it does not meet the requirements, determine whether all schemes have been executed, if not, return to S5.2, if it has been executed, execute S5.9; S5.8, record the reinforcement plan and determine whether all reinforcement plans have been executed; if so, proceed to the next step; if not, return to S5.2; S5.9, reading the engineering quantities of all recorded reinforcement schemes, and selecting the scheme with the smallest engineering quantity as the optimal reinforcement scheme; S6, reading the optimized pile spacing and pile number of each reinforcement segment, calculating the horizontal coordinates of the center of each pile using an offset algorithm, and projecting them onto the corrected terrain surface to obtain the pile top elevation; S7, generating pile bodies in sequence in the three-dimensional model according to the horizontal coordinates of the pile center, the elevation of the pile top, the pile diameter, and the pile length, and completing the three-dimensional modeling of the pile-type composite foundation.
2. According to claim 1, a method for rapid modeling and automatic optimization of road pile composite foundation engineering is characterized in that: The three-dimensional geological model information includes the interface between rock / soil layers, physical parameters of rock / soil, and property description information; the road centerline includes the mileage pile number and plane coordinate information of the road center; the road construction scope is given in the form of a set, including the horizontal coordinates and horizontal offset values of the boundary points on the left and right sides of each mileage pile number; the modified terrain surface refers to the terrain surface recalculated after clearing and leveling the original three-dimensional terrain surface.
3. According to claim 1, a method for rapid modeling and automatic optimization of road pile composite foundation engineering is characterized in that: The principles for further segmenting one or more groups of reinforcement ranges in S3 are: ① the location where a structural lens or stratum pinch-out occurs; ② the thickness change of a rock / soil layer above the bedrock exceeds the set value; ③ the amplitude of the change of a physical parameter affecting settlement, bearing capacity and stability in a rock / soil layer above the bedrock is greater than the set value; segmentation is carried out when any of the above conditions is met.
4. According to claim 1, a method for rapid modeling and automatic optimization of road pile composite foundation engineering is characterized in that: The method for reading the most unfavorable cross section in each reinforcement section is: in each reinforcement section, the physical parameters of the bedrock and the rock / soil layer above each pile number, the elevation of the rock / soil layer interface and the embankment size are read or calculated in turn, and then weights are set for them, and the most unfavorable cross section in each reinforcement section is calculated and screened out, and it is set as the representative cross section of the reinforcement section.
Citation Information
Patent Citations
Modeling method of shear strength parameter time effect model of nano cement soil
CN106096202A
Numerical simulation analysis method for influence of shield tunnel excavation on adjacent group pile foundations