A pulverized coal boiler structure and method for burning chemical dry gas or flare gas
By using low-nitrogen gas burners and rationally arranging gas burners in pulverized coal boilers, the problem of insufficient proportion of mixed gas is solved, stable operation of pulverized coal boilers and low NOx emissions are achieved, and coal consumption and pollute.
Patent Information
- Application Number
- CN202110497217.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-05-07
AI Technical Summary
Existing pulverized coal boilers cannot achieve stable operation when the proportion of mixed gas reaches 30%, resulting in inability to operate for a long time, high coal consumption and serious pollution.
Design a pulverized coal boiler structure mixed with chemical dry gas or flare gas, using a low-nitrogen gas burner. By reasonably arranging the gas burner and pulverized coal burner, it ensures uniform mixing and graded jet combustion of gas and pulverized coal, which avoids NOx emissions to achieve safe and stable operation of the boiler.
The proportion of gas mixed with pulverized coal boilers is increased to 80%, which reduces NOx emissions, saves coal consumption, achieves safe and stable operation of the boilers, and reduces energy losses and pollution emissions in chemical plants.
Smart Images

Figure CN113028388B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pulverized coal boiler transformation, and in particular relates to a pulverized coal boiler structure and method for burning chemical dry gas or flare gas. Background Art
[0002] my country has a developed chemical industry and many chemical plants. Many chemical plants produce a large amount of chemical dry gas and flare gas during the production process. These gases were previously discharged into the atmosphere through flare combustion, which seriously polluted the environment, increased the difficulty of environmental governance, and caused energy waste. Coal-fired boilers pollute the environment seriously due to the emission of NOx, sulfur dioxide, dust and other emissions, and the amount of coal consumed each year is very high. If the large amount of chemical dry gas or flare gas produced by chemical plants is used as fuel to feed coal-fired boilers for combustion, it can save coal and reduce emissions.
[0003] The existing pulverized coal boilers can mix gas with a maximum of 30% of natural gas, but have not been able to fully form a stable operation mode of mixing pulverized coal and natural gas, and cannot maintain long-term operation. Summary of the invention
[0004] The purpose of the present invention is to provide a pulverized coal boiler structure and method for burning chemical dry gas or flare gas, so as to solve the problem that the existing pulverized coal boiler can only burn 30% of fuel gas at most, cannot fully form a stable operation mode of pulverized coal and fuel gas, and cannot maintain long-term operation.
[0005] The present invention delivers chemical dry gas or flare gas and pulverized coal into the furnace through a gas burner according to a blending ratio for combustion, selects a suitable blending ratio of gas to pulverized coal, selects a suitable gas burner (a low-nitrogen gas burner), and designs a reasonable structural position to ensure that the technical solution achieves safe and stable operation of the boiler without quality problems such as coking, deflagration, and incomplete combustion.
[0006] To achieve the above purpose, the technical solution adopted by the present invention is:
[0007] The present invention discloses a pulverized coal boiler structure for burning chemical dry gas or flare gas, comprising a furnace, a tail shaft flue, a two-stage economizer, a two-stage air preheater, an upper pulverized coal burner and a lower pulverized coal burner; the upper flue gas outlet of the furnace is connected to the inlet of the tail shaft flue, the two-stage economizer and the two-stage air preheater are alternately arranged in the tail shaft flue, the upper pulverized coal burner and the lower pulverized coal burner are both four in number, the upper pulverized coal burner and the lower pulverized coal burner are both arranged at the four corners of the furnace water-cooled wall, and are both connected to the furnace, and the furnace water-cooled wall is provided with an upper ember burning air port, a lower ember burning air port, an upper secondary air port from top to bottom. , tertiary air inlet, middle secondary air inlet, upper primary air inlet, lower primary air inlet and lower secondary air inlet; the pulverized coal boiler structure blended with chemical dry gas or flare gas also includes an upper gas burner and a lower gas burner, the number of the upper gas burners and the number of the lower gas burners are four, the upper gas burners and the lower gas burners are both arranged on the water-cooled wall of the furnace and communicated with the furnace, and the upper gas burner is arranged between the upper secondary air inlet and the lower ember air inlet, the lower gas burner is arranged below the lower secondary air inlet, the upper pulverized coal burner and the upper gas burner are on the same layer, and the lower pulverized coal burner and the lower gas burner are on the same layer.
[0008] The present invention provides a method for implementing the blending of chemical dry gas or flare gas by using a pulverized coal boiler structure blending chemical dry gas or flare gas, wherein the pulverized coal boiler in the pulverized coal boiler structure blending chemical dry gas or flare gas is a modified pulverized coal boiler, and the method is completed by the following steps:
[0009] Step 1: Select the models of the upper gas burner and the lower gas burner according to the rated load of the pulverized coal boiler and the calorific value of the input gas. The upper and lower gas burners have the same model, and select eight gas burners, four of which are used as the upper gas burners and the remaining four as the lower gas burners;
[0010] Step 2: Determine the layout positions of the upper gas burners and the lower gas burners in the furnace height direction, determine the fixed positions of the four upper gas burners on the same layer according to the size of the designed cutting circle, and determine the fixed positions of the four lower gas burners on the same layer; when arranging, avoid overlapping flames causing local high temperature, avoid excessive upward movement of the gas high temperature zone causing overheating of the tail heating surface, make the fuel burning flame evenly distributed in the furnace, and the furnace evenly absorbs heat;
[0011] Step 3: according to the determined angle position between the upper gas burner and the furnace water-cooled wall, and the angle position between the lower gas burner and the furnace water-cooled wall, holes are opened on the furnace water-cooled wall, and an upper gas burner is installed at each upper opening, and a lower gas burner is installed at each lower opening;
[0012] Step 4: After installing the upper gas burner and the lower gas burner, fix them to the outer wall of the furnace respectively, and install the insulation and sealing accessories;
[0013] Step 5: Connect the gas pipeline to the upper gas burner and the lower gas burner respectively, and connect the secondary air supply pipeline to the upper secondary air inlet, the middle secondary air inlet and the lower secondary air inlet respectively. The gas supply volume and the secondary air supply volume can be adjusted;
[0014] Step 6: Purge the furnace before ignition according to the gas boiler operating procedures and gas burner operation manual to meet the requirements for ignition;
[0015] Step seven: The gas pipeline sends the gas to the upper gas burner and the lower gas burner, and the gas is sprayed into the furnace from the nozzles of the upper gas burner and the lower gas burner, and is fully mixed and burned with the secondary air sent into the furnace through the secondary air supply pipeline. The proportion of gas input increases as the pulverized coal gradually decreases, and the boiler operation is monitored at the same time until the designed blending ratio of the boiler is reached; the blending ratio of pulverized coal and gas is 50%:50%~20%:80%, and the operation of the boiler is observed when the gas load is gradually increased. According to the combustion conditions, the secondary air supply is adjusted to 70% of the total secondary air supply of the boiler to ensure that the gas and secondary air are fully mixed and burned in good condition, so as to achieve operation according to the designed load.
[0016] The beneficial effects of the present invention relative to the prior art are:
[0017] 1. The gas burner adopts a multi-point injection method, the fuel is dispersed into the furnace, the secondary air enters the furnace through the gas burner air duct, and forms direct current wind and swirl wind in the gas burner area to fully mix with the fuel. The dense and thin combustion method is adopted (the dense combustion area is in the lower part of the furnace, and the thin combustion area is in the upper part of the furnace), so that a reducing atmosphere is generated in the dense combustion area to reduce NOx emissions; supplementing the ember wind in the thin combustion area can relatively cool the flame and reduce NOx emissions. The unique graded jet combustion technology means that each gas burner's spray gun is equipped with multiple nozzles to prevent the combustion heat from being too concentrated, which will increase the nitrogen oxide emissions and reduce NOx emissions.
[0018] 2. Due to the flame interference and temperature superposition of the eight gas burners, NOx generation may also be promoted. Therefore, the injection angles of the eight gas burners in the furnace are uniformly designed, and the four gas burners in each layer are arranged in the furnace according to the four corners of the tangent circle position, with a tangent circle diameter of 800mm to avoid flame interference, thereby achieving the effect of reducing NOx. The furnace section size length × width is 7600 × 7600mm.
[0019] When a large amount of low calorific value dry gas is mixed and burned, due to the low calorific value of the dry gas, very little heat is released at the bottom of the furnace. When encountering the high-temperature pulverized coal flame, a large amount of dry gas begins to burn fully, and the heat released by the combustion is concentrated in the middle and upper part of the furnace, causing the flue gas at the tail of the furnace to overheat. This poses a threat to the safe operation of the boiler. In response to this situation, the improvement plan is to consider strengthening the combustion of the gas burner at the bottom of the furnace to move the high-temperature zone of the boiler downward. The measure is to move the gas burner position downward as much as possible, so that the gas burner and the pulverized coal burner are relatively independent, the flames do not interfere with each other, and the wind does not grab each other, forming an independent combustion area, which solves the shortcomings of low calorific value gas combustion in chemical plants.
[0020] 3. The present invention delivers the mixed chemical dry gas or flare gas into the furnace through a gas burner (a low-nitrogen fuel burner), and mixes and burns it with the secondary air introduced into the boiler. The present invention analyzes the characteristics of combustion of gases of different calorific values in the boiler, and arranges the fuel burner in a suitable position according to the needs of the combustion conditions, so that the furnace flame is well filled, avoiding mutual interference with the adjacent pulverized coal burner flame, achieving safe and stable operation of the boiler, and reducing NOx generation. The present invention is mainly used for burning chemical dry gas and flare gas, and doing energy conservation and emission reduction work for chemical plants, reducing costs, reducing emissions, saving fuel, and avoiding energy waste.
[0021] 4. The method of the present invention has the effect of utilizing the waste gas of chemical plants to prevent air pollution, save coal consumption, reduce energy loss of chemical plants, and reduce NOx emissions.
[0022] 5. The pulverized coal boiler structure and method for mixing chemical dry gas or flare gas of the present invention have been put into practical use on pulverized coal boilers and are stable in operation. The boiler structure and method of the present invention can make the proportion of gas mixed with pulverized coal boilers reach 80%, which solves the limitation of the previous mixing ratio of pulverized coal boilers within 30%, and greatly improves the proportion of gas mixed with pulverized coal boilers. The present invention is a modified design of the traditional pulverized coal boiler structure, which meets the conditions for stable combustion of gas and has actual stable operation cases. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a side view of the structure of a pulverized coal boiler for burning chemical dry gas or flare gas according to the present invention;
[0024] Figure 2 It is a top view of the arrangement of the upper gas burner in a pulverized coal boiler structure mixed with chemical dry gas or flare gas according to the present invention;
[0025] Figure 3 It is a top view of the arrangement of the lower gas burner in a pulverized coal boiler structure mixed with chemical dry gas or flare gas according to the present invention;
[0026] Figure 4A schematic diagram of the structure of a pulverized coal boiler for burning chemical dry gas or flare gas according to the present invention.
[0027] The names and numbers of the components involved in the above figure are as follows:
[0028] Furnace 1, tail shaft flue 2, economizer 3, air preheater 4, upper pulverized coal burner 5, lower pulverized coal burner 6, furnace water-cooled wall 7, upper ember burning air inlet 8, lower ember burning air inlet 9, upper secondary air inlet 10, tertiary air inlet 11, middle secondary air inlet 12, upper primary air inlet 13, lower primary air inlet 14, lower secondary air inlet 15, upper gas burner 16, lower gas burner 17, upper gas gun nozzle 18, lower gas gun nozzle 19, boiler drum 20. DETAILED DESCRIPTION
[0029] Specific implementation method 1: Figure 1-Figure 4 As shown, the present embodiment discloses a pulverized coal boiler structure for burning chemical dry gas or flare gas, comprising a furnace 1, a tail shaft flue 2, a two-stage economizer 3, a two-stage air preheater 4, an upper pulverized coal burner 5 and a lower pulverized coal burner 6; the upper flue gas outlet of the furnace 1 is connected to the inlet of the tail shaft flue 2, the two-stage economizer 3 and the two-stage air preheater 4 are alternately arranged in the tail shaft flue 2 in sequence, the upper pulverized coal burner 5 and the lower pulverized coal burner 6 are both four in number, the upper pulverized coal burner 5 and the lower pulverized coal burner 6 are both arranged at the four corners of the furnace water-cooled wall 7, and are all connected to the furnace 1, the furnace water-cooled wall 7 is provided with an upper ember burning air port 8, a lower ember burning air port 9, an upper secondary air port 10, and a tertiary air port 11 from top to bottom. 11, middle secondary air inlet 12, upper primary air inlet 13, lower primary air inlet 14 and lower secondary air inlet 15; the pulverized coal boiler structure mixed with chemical dry gas or flare gas also includes an upper gas burner 16 and a lower gas burner 17, the number of the upper gas burners 16 and the lower gas burners 17 are four, the upper gas burners 16 and the lower gas burners 17 are both arranged on the furnace water-cooled wall 7 and communicate with the furnace 1, and the upper gas burner 16 is arranged between the upper secondary air inlet 10 and the lower ember air inlet 9, the lower gas burner 17 is arranged below the lower secondary air inlet 15, the upper pulverized coal burner 5 and the upper gas burner 16 are located on the same layer, and the lower pulverized coal burner 6 and the lower gas burner 17 are located on the same layer.
[0030] A boiler drum 20 is arranged above the furnace 1 .
[0031] Specific implementation method 2: Figure 2 , Figure 3As shown, this embodiment is a further description of the specific embodiment 1, the four upper gas burners 16 and the four lower gas burners 17 are arranged on the four furnace water-cooled walls 7, and are arranged in the furnace 1 according to the four corner tangential circle positions, and the tangential circle diameter is D, D = 800mm. The purpose of setting the tangential circle diameter is to ensure that the flame is evenly distributed in the furnace, and will not cause the high temperature area to deviate and cause the furnace water-cooled wall 7 to be partially over-sintered and coked.
[0032] Specific implementation method three: Figure 2 , Figure 3 As shown, this embodiment is a further description of the specific embodiment 1, the vertical distance between the center line of the upper gas burner 16 and the center line of the lower gas burner 17 is H, H = 4300mm, the angle between the center line of each upper gas burner 16 (the extension line of which is the tangent line tangent to the four-corner tangent circle) and the center line of the furnace 1 is α1, and α1 = 19.2°, the angle between the center line of each lower gas burner 17 (the extension line of which is the tangent line tangent to the four-corner tangent circle) and the center line of the furnace 1 is α2, and α2 = 19.2°; the horizontal distance between the inner side wall of the furnace water-cooled wall 7 of each upper gas burner 16, which is close to the intersection point between the vertical plane of its center line and the nozzle mouth end, is L 1 , L 1 = 2900mm, the horizontal distance between the inner wall of the furnace water-cooled wall 7 of each lower gas burner 17 and the intersection point of the vertical plane through its center line and its nozzle mouth end is close to L 2 , L 2 =2900mm. This embodiment mainly determines the specific position of the gas burner to ensure that the flame is blown into the furnace 1 according to the designed direction after the gas is burned, and the flue gas can be moved in the furnace 1 according to the tangential position, so that the heat is evenly distributed in the furnace 1 and the combustion is stable.
[0033] Specific implementation method four: Figure 4 As shown, this embodiment is a further explanation of the specific embodiment one, the two-stage economizer 3 is respectively a primary economizer and a secondary economizer, the two-stage air preheater 4 is respectively a primary air preheater and a secondary air preheater, and the primary economizer, the primary air preheater, the secondary economizer and the secondary air preheater are arranged in sequence from top to bottom in the tail shaft flue 2.
[0034] Specific implementation method five: Figure 1As shown, this embodiment is a further description of the specific embodiment 1, and the furnace water-cooled wall 7 is further provided with an upper gas gun nozzle 18 and a lower gas gun nozzle 19, the upper gas gun nozzle 18 is arranged between the upper gas burner 16 and the upper secondary air port 10, and the lower gas gun nozzle 19 is arranged between the upper primary air port 13 and the lower primary air port 14. This embodiment has the function of adjusting the amount of fuel injected into the boiler, and when the amount of fuel input is not large, the gas gun can be not put into use.
[0035] Specific implementation method six: Figure 1-Figure 4 As shown, this embodiment discloses a method for implementing the blending of chemical dry gas or flare gas by using the pulverized coal boiler structure blending chemical dry gas or flare gas described in any one of the specific embodiments 2 to 5, wherein the pulverized coal boiler in the pulverized coal boiler structure blending chemical dry gas or flare gas is a modified pulverized coal boiler, and the method is completed by the following steps:
[0036] Step 1: Select the models of the upper gas burner 16 and the lower gas burner 17 according to the rated load of the pulverized coal boiler and the calorific value of the input gas. The upper and lower gas burners have the same model, and eight gas burners are selected, four of which are used as the upper gas burners 16, and the remaining four are used as the lower gas burners 17;
[0037] Step 2: Determine the arrangement positions of the upper gas burners 16 and the lower gas burners 17 in the height direction of the furnace 1, determine the fixed positions of the four upper gas burners 16 on the same layer according to the size of the designed cutting circle, and determine the fixed positions of the four lower gas burners 17 on the same layer; when arranging, avoid overlapping flames to cause local high temperature, avoid excessive upward movement of the high temperature zone of the gas to cause overheating of the rear heating surface, so that the flame of the fuel combustion is evenly distributed in the furnace 1, and the furnace 1 absorbs heat evenly;
[0038] Step 3: according to the determined angle position between the upper gas burner 16 and the furnace water-cooled wall 7, and the angle position between the lower gas burner 17 and the furnace water-cooled wall 7, a hole is opened on the furnace water-cooled wall 7, a water-cooled wall pipe is installed at the opening of the water-cooled wall 7, and an upper gas burner 16 is installed at each upper opening, and a lower gas burner 17 is installed at each lower opening; the angle between the upper gas burner 16 and the lower gas burner 17 and the furnace water-cooled wall 7 is β, β = 70.8°;
[0039] Step 4: After installing the upper gas burner 16 and the lower gas burner 17, fix them to the outer wall of the furnace 1 respectively, and install the insulation and sealing accessories;
[0040] Step 5: Connect the gas pipeline to the upper gas burner 16 and the lower gas burner 17 respectively, and connect the secondary air supply pipeline to the upper secondary air port 10, the middle secondary air port 12 and the lower secondary air port 15 respectively. The gas supply volume and the secondary air supply volume can be adjusted; the gas is chemical dry gas or flare gas;
[0041] Step 6: Purge furnace 1 before ignition in accordance with the gas boiler operating procedures and gas burner operating manual to meet the requirements for ignition;
[0042] Step 7: The gas pipeline delivers the gas to the upper gas burner 16 and the lower gas burner 17, and the gas is sprayed into the furnace 1 through the nozzles of the upper gas burner 16 and the lower gas burner 17, and is fully mixed and burned with the secondary air delivered to the furnace 1 through the secondary air supply pipeline. The proportion of gas input increases as the pulverized coal gradually decreases, and the boiler operation is monitored at the same time until the designed mixing ratio of the boiler is reached; wherein the mixing ratio of pulverized coal to gas is 50%:50%~20%:80% (this ratio range can ensure safe combustion in the furnace, and there will be no flameout phenomenon resulting in excessive gas in the furnace and deflagration, so that the gas can be fully burned to achieve safe and stable operation), observe the operation of the boiler when the gas load is gradually increased, and adjust the secondary air supply to 70% of the total secondary air supply of the boiler according to the combustion condition (the secondary air supply is related to the calorific value of the fuel, and the fuel refers to gas and pulverized coal, where gas accounts for the majority and pulverized coal accounts for only a small part), to ensure that the gas and secondary air are fully mixed and burned in good condition, and to achieve operation according to the designed load.
[0043] A large amount of dry gas and flare gas from chemical plants are used as fuel to supply the modified pulverized coal boiler for combustion, which not only saves coal but also reduces emissions. It is a very good choice. Under such conditions, we classified the fuel according to its characteristics, and made detailed calculations and analysis summaries on the different gases used to replace coal in the boiler to form a gas blending transformation plan.
[0044] In order to blend the dry gas or flare gas from the chemical plant into the modified pulverized coal boiler to achieve stable combustion and ensure stable operation of the boiler, a detailed analysis was conducted based on the properties of the fuel gas with different calorific values, and the fuel air volume of the boiler was calculated based on the gas composition.
[0045] Q ka =D ne *1000*(i nn -i nb )+D np *1000*(ik nn -i nb )
[0046] =220*1000*(829.8-220.7)+4.4*1000*(318-220.7)
[0047] =80660712kcal / h;
[0048] Where: Q ka :Total effective heat of boiler unit kcal / h;
[0049] D ne : Superheated steam flow rate 220t / h;
[0050] i nn :Superheated steam enthalpy 829.8kcal / Nm 3 ;
[0051] i nb :Boiler feed water enthalpy 220.7kcal / Nm 3 ;
[0052] D np : Sewage flow rate 4.4t / h;
[0053] ik nn : Wastewater enthalpy 318kcal / kg
[0054] B=Q ka / (Q pp *η ka / 100)=80660712 / (6226*95.2 / 100)=13611Nm 3 / h;
[0055] Where: Q pp : Low calorific value of fuel 6226kcal / Nm 3 ;
[0056] η ka : Boiler unit efficiency; 95.2%;
[0057] B p =B*(1-q 4 / 100)=13611Nm 3 / h;
[0058] Where: q 4 : Mechanical incomplete combustion heat loss: 0%;
[0059] B p : Fuel consumption Nm 3 / h;
[0060] V 0 =0.0476*(0.5*H 2 +3.5*C2 H 6 +3*C 2 H 4 +2*CH 4 -O 2 )
[0061] =0.0476*(0.5*35.4+3.5*9.8+3*10.7+2*26.8-3.5)
[0062] =6.38Nm 3 / Nm 3 ;
[0063] Where: V 0 : Theoretical air volume, Nm 3 / Nm 3 ;
[0064] H 2 : Volume percentage of hydrogen %;
[0065] C 2 H 6 : Volume percentage of ethane %;
[0066] C 2 H 4 : Volume percentage of ethylene %;
[0067] CH 4 : Volume percentage of methane %;
[0068] O 2 : The percentage of oxygen in the gas.
[0069] V k =B p *V 0 *α*(t+273) / 273=13611*6.38*1.2*(30+273) / 273=115657Nm 3 / h;
[0070] Where: t: cold air supply temperature;
[0071] α: Excess air coefficient;
[0072] V k : air volume per hour;
[0073] Air volume per gas burner: 115657 / 8 = 14457 Nm 3 / h;
[0074] Accurate calculation of air distribution has a great impact on the combustion condition of the gas burner. To distribute air evenly and reasonably, adjust the air volume through the damper according to the combustion condition, fully mix the fuel and air to ensure that the gas burns evenly in the furnace 1, and the furnace 1 absorbs heat evenly, so that the gas combustion condition in the furnace is in the best state, stable operation is achieved, and low-nitrogen combustion is met.
Claims
1. A method for blending chemical dry gas or flare gas, characterized in that: The method is achieved by using a pulverized coal boiler structure that is mixed with chemical dry gas or flare gas. The pulverized coal boiler structure comprises a furnace (1), a tail shaft flue (2), a two-stage economizer (3), a two-stage air preheater (4), an upper pulverized coal burner (5) and a lower pulverized coal burner (6); the upper flue gas outlet of the furnace (1) is connected to the inlet of the tail shaft flue (2); the two-stage economizer (3) and the two-stage air preheater (4) are arranged alternately in the tail shaft flue (2); the number of the upper pulverized coal burner (5) and the number of the lower pulverized coal burner (6) are both four; the upper pulverized coal burner (5) and the lower pulverized coal burner (6) are both arranged at the four corners of the furnace water-cooled wall (7) and are all connected to the furnace (1); the furnace water-cooled wall (7) is provided with an upper ember burnout vent (8), a lower ember burnout vent (9), an upper secondary vent (10), a tertiary vent (11), a secondary vent (12), a secondary vent (13), a tertiary vent (14), a secondary vent (15), a tertiary vent (16) and a secondary vent (17) from top to bottom. The pulverized coal boiler structure for burning chemical dry gas or flare gas further comprises an upper gas burner (16) and a lower gas burner (17), the upper gas burner (16) and the lower gas burner (17) being four in number, the upper gas burner (16) and the lower gas burner (17) being both arranged on the furnace water-cooled wall (7) and communicating with the furnace (1), the upper gas burner (16) being arranged between the upper secondary air port (10) and the lower ember air port (9), the lower gas burner (17) being arranged below the lower secondary air port (15), the upper pulverized coal burner (5) and the upper gas burner (16) being located on the same layer, and the lower pulverized coal burner (6) and the lower gas burner (17) being located on the same layer; The four upper gas burners (16) and the four lower gas burners (17) are all arranged on four furnace water-cooled walls (7), and are arranged in four corner tangential circles in the furnace (1), and the diameter of the tangential circles is D, D=800 mm; The vertical distance between the center line of the upper gas burner (16) and the center line of the lower gas burner (17) is H, H=4300mm, the angle between the center line of each upper gas burner (16) and the center line of the furnace (1) is α1, and α1=19.2°, the angle between the center line of each lower gas burner (17) and the center line of the furnace (1) is α2, and α2=19.2°; the horizontal distance between the inner side wall of the furnace water-cooled wall (7) whose distance between the vertical plane passing through the center line of each upper gas burner (16) and the intersection point of its nozzle opening is close to L1, L1=2900mm, the horizontal distance between the inner side wall of the furnace water-cooled wall (7) whose distance between the vertical plane passing through the center line of each lower gas burner (17) and the intersection point of its nozzle opening is close to L2, L2=2900mm; The boiler is a high-pressure natural circulation π-type solid slag pulverized coal boiler with a square furnace; The two-stage economizer (3) is a primary economizer and a secondary economizer, the two-stage air preheater (4) is a primary air preheater and a secondary air preheater, and the primary economizer, the primary air preheater, the secondary economizer and the secondary air preheater are arranged in sequence from top to bottom in the tail shaft flue (2); The furnace water-cooled wall (7) is also provided with an upper gas gun nozzle (18) and a lower gas gun nozzle (19), wherein the upper gas gun nozzle (18) is arranged between the upper gas burner (16) and the upper secondary air port (10), and the lower gas gun nozzle (19) is arranged between the upper primary air port (13) and the lower primary air port (14); The method is completed by the following steps: Step 1: selecting the models of the upper gas burner (16) and the lower gas burner (17) according to the rated load of the pulverized coal boiler and the calorific value of the input gas, the upper and lower gas burners have the same model, and selecting eight gas burners, four of which are used as the upper gas burners (16) and the remaining four as the lower gas burners (17); Step 2: Determine the arrangement positions of the upper gas burners (16) and the lower gas burners (17) in the height direction of the furnace (1), determine the fixed positions of the four upper gas burners (16) on the same layer according to the size of the designed cutting circle, and determine the fixed positions of the four lower gas burners (17) on the same layer; when arranging, avoid overlapping flames to cause local high temperature, avoid excessive upward movement of the high temperature zone of the gas to cause overheating of the rear heating surface, so that the flame of the fuel combustion is evenly distributed in the furnace (1), and the furnace (1) absorbs heat evenly; Step 3: according to the determined angle position between the upper gas burner (16) and the furnace water-cooled wall (7), and the angle position between the lower gas burner (17) and the furnace water-cooled wall (7), holes are opened on the furnace water-cooled wall (7), and an upper gas burner (16) is installed at each upper opening, and a lower gas burner (17) is installed at each lower opening; Step 4: After installing the upper gas burner (16) and the lower gas burner (17), fix them to the outer wall of the furnace (1) respectively, and install the insulation and sealing accessories; Step 5: Connect the gas pipeline to the upper gas burner (16) and the lower gas burner (17) respectively, and connect the secondary air supply pipeline to the upper secondary air inlet (10), the middle secondary air inlet (12) and the lower secondary air inlet (15) respectively. The gas supply volume and the secondary air supply volume can be adjusted. Step 6: Purge the furnace (1) before ignition in accordance with the gas boiler operating procedures and gas burner operating manual to meet the requirements for ignition; Step 7: The gas pipeline delivers the gas to the upper gas burner (16) and the lower gas burner (17), and the gas is sprayed into the furnace (1) through the nozzles of the upper gas burner (16) and the lower gas burner (17), and is fully mixed with the secondary air delivered to the furnace (1) through the secondary air supply pipeline for combustion. The proportion of gas input increases as the pulverized coal gradually decreases, and the boiler operation is monitored at the same time until the designed mixing ratio of the boiler is reached; wherein the mixing ratio of pulverized coal to gas is 50%:50% to 20%:80%, and the operation of the boiler is observed when the gas load is gradually increased. According to the combustion condition, the secondary air supply is adjusted to 70% of the total secondary air supply of the boiler, to ensure that the gas and the secondary air are fully mixed and the combustion condition is good, so as to achieve operation according to the designed load.
2. The method according to claim 1, characterized in that: In step three, the angles between the upper gas burner (16) and the lower gas burner (17) and the furnace water-cooled wall (7) are both β, β=70.8°.
3. The method according to claim 1, characterized in that: In step five, the fuel gas is chemical dry gas or flare gas.
Citation Information
Patent Citations
Pulverized coal boiler structure for blending combustion of chemical dry gas or flare gas
CN214664368U
