A curtain wall double-track lifting system
By setting up hinges, cantilever beams and cable-stayed components on the main structure of the curtain wall, combined with the track mechanism, a curtain wall double-rail lifting system without secondary welding is designed, which solves the problems of complex and unenvironmental construction in the existing technology, and achieves efficient, safe and environmentally friendly curtain wall construction.
Patent Information
- Application Number
- CN202110553018.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-20
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2041-05-20
AI Technical Summary
The existing curtain wall construction technology requires secondary welding of the main structure, resulting in complex construction, uneco-friendly, inconvenient and unstable installation.
A curtain wall double-rail lifting system is designed, by setting up multiple hoops and cantilever beams at intervals on the main structure, and using the combination of cable-stayed members and track mechanisms to realize the installation and transportation of the lifting device, avoiding secondary welding of the main structure.
The curtain wall construction without secondary welding is realized, the construction efficiency and safety is improved, and the system is green and environmentally friendly, convenient to install, stable and reliable, and easy to disassemble and maintain.
Smart Images

Figure CN113120775B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building curtain walls, and in particular to a curtain wall double-track hoisting system. Background Art
[0002] In recent years, with the development of society and the continuous breakthroughs in science and technology, various high-rise and super-high-rise buildings have emerged one after another, which has brought great challenges to the construction design of the facade maintenance curtain wall. In addition, with the substantial increase in labor costs and quality and safety requirements, higher requirements have been put forward for the construction efficiency and quality of the exterior curtain walls of high-rise and super-high-rise buildings for various curtain wall construction and design companies. In recent years, double-track construction technology has been widely used in the construction of curtain walls. Its main advantage is that it has achieved breakthroughs in the vertical and horizontal transportation of materials. By setting up double tracks, people go up the outer hanging basket, and the inner hanging basket hoists the panels to achieve the purpose of synchronous installation, which greatly improves the efficiency of construction. However, in a large number of existing projects, curtain wall construction measures need to be attached to the main structure, and the general main structure does not allow secondary welding, which brings many challenges to the focus design of curtain wall construction measures. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a curtain wall double-track lifting system which does not require secondary welding of the main structure of the curtain wall, is green and environmentally friendly, easy to install, and stable and reliable.
[0004] In order to solve the above technical problems, the purpose of the present invention is achieved through the following technical solutions: providing a curtain wall double-track lifting system, which is installed on the main structure of the curtain wall, including multiple hoops, multiple cantilever beams and a track mechanism, multiple hoops are respectively arranged on the main structure at intervals, the hoops include a top component and two side components arranged on both sides of the top component, so as to respectively hold and clamp the top and both sides of the main structure, and the lower end of the side component is flush with the bottom plane of the main structure. Bolt holes are opened to allow the two ends of the screw to pass through so that the hoops can hold the main structure tightly; multiple cantilever beams The corresponding clamps are arranged at intervals on the main structure and are respectively installed on the clamps through supporting columns, the supporting columns are vertically arranged on the outer side of the upper surface of the top component, and the side components close to the inner side of the top component are provided with ear plates, and the ear plates are connected to the end of the cantilever beam close to the ear plates through oblique tension members; the track mechanism is horizontally arranged at the end of the cantilever beam away from the ear plates, so that the multiple cantilever beams are arranged at intervals along the length direction of the track mechanism, and the track mechanism includes two parallel and side-by-side tracks, and each of the tracks is provided with a lifting device that moves along the track.
[0005] A further technical solution is as follows: the cantilever beam and the track are both I-beams.
[0006] A further technical solution is as follows: a connecting plate for installing the track is provided on one end of the cantilever beam away from the ear plate, and the track is installed on the connecting plate by bolts.
[0007] A further technical solution is as follows: a lower steel plate is arranged between the track and the connecting plate.
[0008] A further technical solution is as follows: a stiffening member is fixedly connected between the main body of the cantilever beam and the connecting plate to support the cantilever beam and the connecting plate.
[0009] A further technical solution is as follows: the diagonal member comprises an angle steel, one end of the angle steel is connected to the ear plate, and the other end of the angle steel is connected to the cantilever beam.
[0010] A further technical solution is: the diagonal member also includes a steel cable, one end of the steel cable is connected to the ear plate, and the other end of the steel cable is connected to the cantilever beam, and the angle between the steel cable and the side member is greater than the angle between the angle steel and the side member.
[0011] A further technical solution is as follows: a connecting support plate connected to the other end of the angle steel and the other end of the steel cable is provided at one end of the cantilever beam close to the ear plate.
[0012] A further technical solution is as follows: a diagonal brace is fixedly connected between the support column and the cantilever beam to provide support between the support column and the cantilever beam.
[0013] A further technical solution is as follows: cross beams are connected to both sides of the upper end of the supporting column, and scissor braces are fixedly connected between adjacent supporting columns.
[0014] The beneficial technical effect of the present invention is that: a curtain wall double-track lifting system of the present invention is provided with a plurality of hoops at intervals on the main structure of the curtain wall, and the hoops include a top component and two side components respectively provided on both sides of the top component to respectively hold the top and two side edges of the main structure, and a screw is passed through the lower end of the side component to enable the hoops to hold the main structure tightly, so as to clamp the main structure, and a cantilever beam is installed on the outer side of the upper surface of the top component of the hoops through a supporting column, and an ear plate is provided on the side component close to the inner side of the top component, and the ear plate is connected to the cantilever beam through an inclined member to support the connection between the main structure and the cantilever beam, so that the main structure The structure is stably connected to the cantilever beam, and the supporting column is located on the outside of the upper surface of the top component to achieve the maximum rotational eccentricity, while the diagonal member is located on the inside of the hoop, which can maximize the distance between the supporting column and the diagonal member, making the connection between the cantilever beam and the main structure more stable, and can prevent the hoop from causing the main structure to flip, and avoid the top component from being compressed and deformed. The track mechanism is horizontally arranged at the end of the cantilever beam away from the ear plate for the setting of the lifting device. During the installation of the entire system, there is no need for secondary welding of the main structure of the curtain wall. It is green and environmentally friendly, easy to install, stable and reliable, and detachable for easy maintenance and replacement. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0016] Figure 1 A schematic diagram of a main section of a curtain wall double-track lifting system provided by an embodiment of the present invention;
[0017] Figure 2 for Figure 1 A magnified schematic diagram of part A;
[0018] Figure 3 for Figure 1 A magnified schematic diagram of part B;
[0019] Figure 4 A schematic diagram of the connection structure between a cantilever beam and a track mechanism of a curtain wall double-track lifting system provided by an embodiment of the present invention;
[0020] Figure 5 A schematic diagram of the connection structure at another angle between the cantilever beam, supporting columns, hoop and main structure of a curtain wall double-track lifting system provided in an embodiment of the present invention.
[0021] Explanation of the symbols in the figure: 11. Clamp; 111. Top part; 112. Side part; 113. Screw; 12. Cantilever beam; 121. Connecting plate; 122. Stiffener; 123. Connecting support plate; 13. Track mechanism; 131. Track; 132. Lower steel plate; 14. Support column; 15. Ear plate; 16. Diagonal member; 161. Angle steel; 162. Steel cable; 17. Diagonal brace; 18. Crossbeam; 19. Scissors brace; 101. Bolt; 102. Fixing bolt; 103. Hook; 20. Main structure; 30. Lifting device. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0024] It should also be understood that the terms used in this specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the specification of the present invention and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0025] It should be further understood that the term "and / or" used in the present description and the appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0026] See also Figures 1 to 5 As shown, Figure 1The main cross-sectional diagram of a curtain wall double-track lifting system provided in an embodiment of the present invention is provided. The curtain wall double-track lifting system is installed on the main structure 20 of the curtain wall, and includes a plurality of hoops 11, a plurality of cantilever beams 12 and a track mechanism 13. The plurality of hoops 11 are respectively arranged on the main structure 20 at intervals. The hoops 11 include a top component 111 and two side components 112 respectively arranged on both sides of the top component 111, so as to respectively hold and clamp the top of the main structure 20 and the two sides of the main structure 20. A bolt hole is provided at a position where the lower end of the side component 112 is flush with the bottom plane of the main structure 20, so that the two ends of the screw rod 113 can be passed through so that the hoops 11 can hold the main structure 20 tightly. The plurality of cantilever beams 12 correspond to the hoops 11. The hoops 11 are arranged at intervals on the main structure 20 and are installed on the hoops 11 respectively through supporting columns 14. The supporting columns 14 are vertically arranged on the outer side of the upper surface of the top component 111. The side component 112 close to the inner side of the top component 111 is provided with an ear plate 15. The ear plate 15 is connected to the end of the cantilever beam 12 close to the ear plate 15 through a diagonal member 16; the track mechanism 13 is horizontally arranged at the end of the cantilever beam 12 away from the ear plate 15, so that the multiple cantilever beams 12 are arranged at intervals along the length direction of the track mechanism 13, and the track mechanism 13 includes two parallel and side-by-side tracks 131, and each of the tracks 131 is provided with a lifting device 30 that moves along the track 131.
[0027] The main structure 20 is a box-type structure to prevent the main structure 20 from rotating when being clamped by the clamp 11 to ensure the rigidity requirement. The main structure 20 can be a main steel beam of a building or a concrete beam of a building. The top component 111 can be a π-shaped steel, and the side component 112 can be a steel pipe. The two ends of the screw 113 pass through the corresponding bolt holes and are fixed with nuts. Preferably, two bolt holes can be arranged side by side on each side component 112, and accordingly, each clamp 11 is fastened by two screws 113, and the screws 113 and the clamp 11 are in close contact with the main structure 20. The lifting device 30 located on the outside may include a construction hanging basket for carrying workers, and the lifting device 30 located on the inside may include a hook for lifting curtain wall panels. The working principle of the lifting device 30 can adopt the working principle of the lifting sling in the prior art, such as the working principle of the lifting trolley in a telescopically adjustable curtain wall unit panel double-track lifting device disclosed in Chinese patent CN212076186U, which will not be repeated here. The curtain wall double-track lifting system is provided with a plurality of hoops 11 at intervals on the main structure 20 of the curtain wall, and the hoops 11 include a top member 111 and two side members 112 respectively provided on both sides of the top member 111 to respectively hold the top and both sides of the main structure 20, and the lower end of the side member 112 is penetrated by a screw 113 to make the hoops 11 hold the main structure 20 tightly, so as to clamp the main structure 20, and the outer side of the upper surface of the top member 111 of the hoops 11 is installed with a cantilever beam 12 through a supporting column 14, and an ear plate 15 is provided on the side member 112 close to the inner side of the top member 111, and the ear plate 15 is connected to the cantilever beam 12 through a diagonal member 16 to support the connection between the main structure 20 and the cantilever beam 12, so that the main The structure 20 is stably connected to the cantilever beam 12, and the supporting column 14 is located on the outside of the upper surface of the top component 111 to achieve the purpose of maximum rotational eccentricity, and the diagonal member 16 is located on the inside of the hoop 11, which can maximize the distance between the supporting column 14 and the diagonal member 16, so that the connection between the cantilever beam 12 and the main structure 20 is more stable, and the hoop 11 can be prevented from causing the main structure 20 to flip, and the top component 111 can be prevented from being compressed and deformed. The track mechanism 13 is horizontally arranged at one end of the cantilever beam 12 away from the ear plate 15 for the installation of the lifting device 30. During the installation of the entire system, there is no need to perform secondary welding on the main structure 20 of the curtain wall. It is green and environmentally friendly, easy to install, stable and reliable, and removable for easy maintenance and replacement.
[0028] Specifically, in this embodiment, a diagonal brace 17 is fixedly connected between the support column 14 and the cantilever beam 12 to support the support column 14 and the cantilever beam 12, so that the support column 14 and the cantilever beam 12 are firmly connected, thereby making the clamp 11 and the cantilever beam 12 firmly connected, improving the rigidity of the curtain wall double-track lifting system, reducing the vertical deformation, and increasing the anti-overturning rigidity of the curtain wall double-track lifting system. Preferably, the angle between the diagonal brace 17 and the support column 14 and the angle between the diagonal brace 17 and the cantilever beam 12 are both 45°.
[0029] Specifically, in this embodiment, the cantilever beam 12 and the track 131 are both I-beams to ensure the connection strength of the cantilever beam 12. The cross-sectional size of the cantilever beam 12 is larger than the cross-sectional size of the track 131 to provide sufficient rigidity. The cantilever beam 12 is welded and fixed to the support column 14, and the support column 14 is a steel pipe. The cantilever beam 12 and the support column 14 are welded by fillet welds.
[0030] Specifically, a connecting plate 121 for installing the track 131 is provided on the end of the cantilever beam 12 away from the ear plate 15, and the track 131 is installed on the connecting plate 121 by bolts 101. The connection between the track 131 and the cantilever beam 12 is achieved by the bolts 101, and the cantilever beam 12 does not need to provide additional internal stress. The connecting plate 121 is welded to the bottom of the cantilever beam 12, and bolt holes are opened on the connecting plate 121 for the bolts 101 to pass through and fix. Preferably, a lower steel plate 132 is provided between the track 131 and the connecting plate 121, and the lower steel plate 132 is welded to the track 131, and holes corresponding to the bolt holes are opened on the lower steel plate 132 for the bolts 101 to pass through and fix.
[0031] Specifically, a stiffener 122 is fixedly connected between the main body of the cantilever beam 12 and the connecting plate 121 to support the cantilever beam 12 and the connecting plate 121, so that the cantilever beam 12 and the connecting plate 121 are stably connected. The cantilever beam 12 is located in the center of the connecting plate 121, and the stiffeners 122 are respectively welded and fixed between the two sides of the main body of the cantilever beam 12 and the two sides of the connecting plate 121.
[0032] Specifically, the diagonal member 16 includes an angle steel 161, one end of which is connected to the ear plate 15, and the other end of which is connected to the cantilever beam 12. Both ends of the angle steel 161 are respectively connected to the ear plate 15 and the cantilever beam 12 by fixing bolts 102, so that the angle steel 161 can be easily disassembled and replaced.
[0033] Specifically, the diagonal member 16 also includes a steel cable 162, one end of which is connected to the ear plate 15, and the other end of which is connected to the cantilever beam 12, and the angle between the steel cable 162 and the side member 112 is greater than the angle between the angle steel 161 and the side member 112. The angle steel 161 has a greater rigidity than the steel cable 162 and is easier to tighten, and the angle steel 161 is closer to the hoop 11. As the main force-bearing diagonal member, the arrangement of the steel cable 162 can tighten the hoop 11 in time after the angle steel 161 fails to avoid flipping between the cantilever beam 12 and the main structure 20, thereby improving the stability of the curtain wall double-track lifting system. The diagonal angles of the angle steel 161 and the steel cable 162 are inconsistent to avoid unbalanced force on both sides of the hoop 11. The two ends of the steel cable 162 are connected to the ear plate 15 and the cantilever beam 12 respectively through the hook 103, which can facilitate the removal and replacement of the steel cable 162. The ear plate 15 is provided with two through holes for the installation of the fixing bolt 102 and the hook 103 respectively. Preferably, the cantilever beam 12 is provided with a connecting support plate 123 connected to the other end of the angle steel 161 and the other end of the steel cable 162 respectively at one end close to the ear plate 15. The connecting support plate 123 is provided with a through hole for the installation of the fixing bolt 102 or the hook 103.
[0034] Specifically, the upper ends of the support columns 14 are connected to the two sides with beams 18, and the adjacent support columns 14 are fixedly connected with scissor braces 19 to improve the lateral rigidity of the curtain wall double-track lifting system and ensure the stability of the curtain wall double-track lifting system. The adjacent support columns 14 are respectively connected to the two ends of the beam 18. The side of the support column 14 is provided with a first ear plate, and the end of the scissor brace 19 is provided on the first ear plate by a connecting bolt to achieve a stable connection between the adjacent support columns 14.
[0035] In summary, a curtain wall double-track lifting system of the present invention is provided with a plurality of hoops at intervals on the main structure of the curtain wall, and the hoops include a top component and two side components respectively provided at both ends of the top component to respectively hold the top and two side edges of the main structure, and a screw is passed through the lower end of the side component to enable the hoops to hold the main structure tightly, so as to clamp the main structure, and a cantilever beam is installed on the outer side of the upper surface of the top component of the hoops through a supporting column, and an ear plate is provided on the side component close to the inner side of the top component, and the ear plate is connected to the cantilever beam through a diagonal member to support the connection between the main structure and the cantilever beam, so that the main structure and the cantilever beam are connected. The cantilever beams are stably connected, and the supporting columns are located on the outside of the upper surface of the top component to achieve the maximum rotational eccentricity, while the diagonal member is located on the inside of the hoop, which can maximize the distance between the supporting columns and the diagonal member, making the connection between the cantilever beam and the main structure more stable, and can prevent the hoop from causing the main structure to flip, and avoid the top component from being compressed and deformed. The track mechanism is horizontally arranged at the end of the cantilever beam away from the ear plate for the setting of the lifting device. During the installation of the entire system, there is no need for secondary welding of the main structure of the curtain wall. It is green and environmentally friendly, easy to install, stable and reliable, and detachable for easy maintenance and replacement.
[0036] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A curtain wall double-track lifting system, installed on the main structure of the curtain wall, characterized in that: include: A plurality of hoops are respectively and spaced apart on the main structure, the hoops include a top member and two side members respectively arranged on both sides of the top member, so as to respectively hold and clamp the top and both sides of the main structure, and a bolt hole is provided at a position where the lower end of the side member is flush with the bottom plane of the main structure, so as to allow the two ends of the screw rod to pass through so that the hoops can hold the main structure tightly; A plurality of cantilever beams are arranged on the main structure at intervals corresponding to the hoop, and are respectively installed on the hoop through supporting columns, wherein the supporting columns are vertically arranged on the outer side of the upper surface of the top component, and the side component close to the inner side of the top component is provided with an ear plate, and the ear plate is connected to one end of the cantilever beam close to the ear plate through an inclined member; A track mechanism is transversely arranged at one end of the cantilever beam away from the ear plate, so that a plurality of the cantilever beams are arranged at intervals along the length direction of the track mechanism, the track mechanism comprises two parallel tracks arranged side by side, and each track is provided with a lifting device moving along the track; The cantilever beam and the track are both I-beams; the diagonal member includes an angle steel, one end of the angle steel is connected to the ear plate, and the other end of the angle steel is connected to the cantilever beam.
2. The curtain wall double-track lifting system according to claim 1, characterized in that: A connecting plate for mounting the track is arranged on one end of the cantilever beam away from the ear plate, and the track is mounted on the connecting plate by bolts.
3. The curtain wall double-track lifting system according to claim 2, characterized in that: A lower steel plate is arranged between the rail and the connecting plate.
4. The curtain wall double-track lifting system according to claim 2, characterized in that: A stiffening piece is fixedly connected between the main body of the cantilever beam and the connecting plate to support the cantilever beam and the connecting plate.
5. The curtain wall double-track lifting system according to claim 1, characterized in that: The diagonal member further comprises a steel cable, one end of which is connected to the ear plate, and the other end of which is connected to the cantilever beam, and an angle between the steel cable and the side member is greater than an angle between the angle steel and the side member.
6. The curtain wall double-track lifting system according to claim 5, characterized in that: One end of the cantilever beam close to the ear plate is provided with a connecting support plate which is respectively connected with the other end of the angle steel and the other end of the steel cable.
7. The curtain wall double-track lifting system according to claim 1, characterized in that: An oblique brace is fixedly connected between the support column and the cantilever beam to support the support column and the cantilever beam.
8. The curtain wall double-track lifting system according to claim 1, characterized in that: Crossbeams are connected to both sides of the upper end of the support column, and scissor braces are fixedly connected between adjacent support columns.
Citation Information
Patent Citations
Curtain wall unit plate double-track lifting device capable of being adjusted telescopically
CN212076186U
Curtain wall double-track hoisting system
CN215402720U