Long spiral drilling machine integrating drilling and compaction and drilling and compaction method
By designing a long auger that integrates drilling and compaction, the compaction of ash soil is achieved by using a gas hammer, which solves the problem of frequent mechanical cross-operation of a long auger in the construction of ash soil compact piles, improving construction efficiency and quality, and reducing costs.
Patent Information
- Application Number
- CN202110489798.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-06
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-05-06
AI Technical Summary
After the long auger is holed in the construction of ash soil compact piles, the compactor needs to be replaced for compaction, resulting in frequent cross-operation of machinery, reducing construction efficiency and utilization, and increasing costs.
A long auger drill rig that integrates drilling and compaction is designed. The air pipe and the air hammer are connected through a rotary sealing joint. The compaction function is achieved by using an electric push rod and the air hammer, which can compaction operations without replacing the compaction machine.
It greatly reduces equipment costs, improves construction efficiency, avoids mechanical cross-operation, improves construction quality and equipment utilization, and makes the application range of long auger rigs wider.
Smart Images

Figure CN113153138B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of construction engineering, specifically to the technical field of building pile foundation construction, and in particular to a long spiral drilling machine for building pile foundation construction. Background Art
[0002] The rapid economic development has brought certain pressure to construction engineering technology. Especially for the increasing height and number of high-rise buildings in cities, not only do construction personnel need to improve their relevant skills and levels, but also the requirements for construction equipment are getting higher and higher. In order to improve the bearing capacity of the foundation, the introduction of compaction pile construction technology in foundation treatment has received more and more attention and recognition from architects. According to the hole-making method, it can be divided into several categories such as vibration sinking pipe, hammer sinking pipe, impact or drilling. According to the different fillers, it can be divided into lime soil compaction piles and soil compaction piles. Among them, the use of long spiral drilling rigs for drilling and tamping machines and other construction machinery and tools is easy to operate, fast in construction speed, good in pile quality, and has the advantages of low cost and low noise, which makes long spiral drilling rigs widely used.
[0003] The long spiral drilling rig is a mechanical equipment for completing the construction of cast-in-place piles, including a chassis assembly, which has a walking mechanism and a rotary workbench. The rotary workbench is equipped with a drilling tower, a cab and a lifting device, etc. The drilling tower is hoisted with a power head through a lifting rope and a movable pulley device. The movable pulley device includes a wheel frame and a movable pulley installed on the wheel frame, and the lifting rope passes around the movable pulley. The power head is used to move up and down along the tower body; the power head is equipped with a long spiral drill rod. When drilling, the power head drives the long spiral drill rod to rotate and continuously descend under the weight of the drill tool itself to achieve the drilling operation.
[0004] Although long spiral drilling machines are increasingly used in construction projects, in the construction process of lime-soil compaction piles in construction projects, after the long spiral drilling machine is used to drill holes, lime soil is poured by a forklift, and then compacted by a strong tamping pile driver. The compactor has high requirements for the expansion effect and poor diameter, and multiple filling cycle steps result in multiple machines working in parallel, reducing construction efficiency. Only drilling holes during the construction process reduces machine utilization and increases construction costs. Therefore, the utilization rate of long spiral drilling machines in lime-soil compaction piles is relatively low.
[0005] At present, there is no effective method to improve construction efficiency and pile quality and reduce construction machinery and tools in construction; to reduce the high requirements for construction machinery and tools, the construction requirements can only be met through cross-operation of multiple machines, which reduces the utilization rate of construction machinery and tools and ultimately limits the scope of use of long spiral drills. At the same time, compaction piles are widely used in my country. If the difficulty of low utilization rate of long spiral drills in compaction piles can be solved, it will not only break through technical difficulties and optimize construction technology, but also enable long spiral drills to break through the limitations of construction technology in construction and obtain wider application and development.
[0006] Therefore, how to provide a long spiral drilling machine that can achieve simultaneous drilling and compaction has become a problem that needs to be solved urgently by technicians in this field. Summary of the invention
[0007] The purpose of the present invention is to provide a long spiral drilling machine, which can carry out compaction operation without replacing a compactor after drilling a hole and pouring lime soil, thereby greatly reducing equipment costs and improving construction efficiency.
[0008] To achieve the above-mentioned purpose, the long spiral drilling machine for drilling and compacting of the present invention comprises a chassis assembly, the chassis assembly has a walking mechanism and a rotary worktable, a drilling tower and a cab are arranged on the rotary worktable, a power head is hoisted on the drilling tower through a lifting rope and a movable pulley device, the power head is used to move up and down along the tower body, and a long spiral drill rod is installed downward on the power head;
[0009] The top of the long spiral drill rod is connected to an air guide pipe through a rotary sealing joint, and the air guide pipe is connected to an air pump; a fixing frame is installed downwardly on the power head, and the fixing frame is connected to the fixed part of the rotary sealing joint;
[0010] An installation cavity is provided at the lower part of the long spiral drill rod, in which an electric push rod is fixedly installed, and the extension rod of the electric push rod is downwardly connected to an air hammer; an air guide hole is provided inside the long spiral drill rod along the up and down directions, the upper end of the air guide hole is connected to the air guide pipe through a rotating sealing joint, and the lower end of the air guide hole is connected to the air hammer through a hose;
[0011] The long spiral drill rod at the bottom end of the installation cavity is evenly hinged with a number of drill bit racks along the circumference;
[0012] When the extension rod of the electric push rod is in the retracted state, the bottom end of the air hammer is higher than each drill bit rack and each drill bit rack is formed into a cone with the tip facing downward to form a drill bit;
[0013] When the extension rod of the electric push rod is in the extended state, the air hammer pushes each drill bit rack downward and is lower than each drill bit rack. At this time, the air hammer is used for compaction operation;
[0014] A brush device is arranged on the long auger rod at the rotary seal joint, and a connection line of the electric push rod is led out of the long auger rod through the brush device and connected to an electric control device in the cab.
[0015] The bottom end of the air hammer bulges downward to form a hemispherical tamping portion.
[0016] A cross bar is arranged on the drill frame, and a reset spring is connected between the cross bar and the hinge point of the drill frame. The reset spring is used to cause the drill frame to reset after the air hammer is retracted upward.
[0017] The present invention also discloses a drilling and compacting method using the above-mentioned long spiral drilling machine for drilling and compacting, which is carried out according to the following steps:
[0018] The first step is drilling;
[0019] In this step, the extension rod of the electric push rod is in a retracted state; the staff starts the drilling machine to drive the long spiral drill rod to rotate and drill to a predetermined depth;
[0020] The second step is to inject lime soil into the hole;
[0021] The staff operated the drilling rig to lift the drill (lift the long spiral drill rod out of the borehole), and then used a forklift to pour ash and soil into the borehole;
[0022] The third step is tamping;
[0023] The staff operates the drilling rig to drop the drill, allowing the long spiral drill rod to enter the borehole, and controls the extension rod of the electric push rod to extend downward through the electronic control device, so that the air hammer touches the poured ash and soil downward. The staff starts the air hammer through the air pump to compact the poured ash and soil in the borehole.
[0024] The present invention has the following advantages:
[0025] The invention has a simple structure, improves construction efficiency, ensures pile quality, reduces construction equipment cost and time cost, and is bound to make the long spiral drilling rig more widely used.
[0026] By using the present invention, there is no need for cross-operation of compactors, thus saving time for moving large equipment back and forth and greatly improving construction efficiency; since there is no need to use compactors, the equipment cost of construction is significantly reduced.
[0027] The compacting part is hemispherical, and when it initially contacts the striking surface, the contact area is small and the pressure is strong, which is more conducive to compaction; when the compacting part is on the striking surface and the striking surface sinks into the compaction process, the contact area between the hemispherical compacting part and the striking surface expands rapidly, avoiding the compaction of the striking surface from turning into penetration of the striking surface, making the striking force more of a downward compacting force, preventing the penetration of the compaction surface from squeezing the compacted objects to both sides, thereby failing to achieve the downward compaction effect.
[0028] The present invention improves the long spiral drilling machine so that it can not only form holes but also perform compaction during construction, thereby improving the construction efficiency during compaction pile construction. At the same time, the good compaction effect of the air hammer is fully utilized to reduce the requirements for the strong compaction pile driving compaction machine and improve the construction quality. It not only avoids the cross operation of multiple machines, but also improves the utilization rate of construction machinery and tools, making the construction scope of the long spiral drilling machine wider. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the structure of the present invention;
[0030] Figure 2 is an enlarged schematic diagram of the air hammer and the drill bit holder of the present invention when the extension rod of the electric push rod is retracted;
[0031] Figure 3 It is an enlarged schematic diagram of the air hammer and the drill bit holder of the present invention when the extension rod of the electric push rod is retracted. DETAILED DESCRIPTION
[0032] like Figures 1 to 3 As shown, the long spiral drilling machine integrated with drilling and compaction of the present invention is a mechanical device for completing cast-in-place pile construction, including a chassis assembly, the chassis assembly has a walking mechanism and a rotary workbench, the rotary workbench is provided with a drilling tower and a cab, the drilling tower is hoisted with a power head 1 through a lifting rope and a movable pulley device, the power head 1 is used to move up and down along the tower body, and a long spiral drill rod 2 is installed downwardly of the power head 1;
[0033] The top of the long spiral drill rod 2 is connected to an air guide pipe 4 through a rotary sealing joint 3, and the air guide pipe 4 is connected to an air pump 5; a fixing frame 6 is installed downwardly on the power head 1, and the fixing frame 6 is installed and connected to the fixed part of the rotary sealing joint 3;
[0034] An installation cavity 7 is provided at the lower part of the long spiral drill rod 2, and an electric push rod 8 is fixedly installed in the installation cavity 7, and an extension rod 11 of the electric push rod 8 is downwardly connected to an air hammer 9; an air guide hole 12 is provided inside the long spiral drill rod 2 along the up and down direction, and the upper end of the air guide hole 12 is connected to the air guide pipe 4 through a rotary sealing joint 3, and the lower end of the air guide hole 12 is connected to the air hammer 9 through a hose 16;
[0035] The long spiral drill rod 2 at the bottom end of the installation cavity 7 is evenly hinged with a number of drill bit racks 10 along the circumferential direction;
[0036] When the extending rod 11 of the electric push rod 8 is in the retracted state, the bottom end of the air hammer 9 is higher than each drill bit rack 10 and each drill bit rack 10 is formed into a cone with the tip facing downward to form a drill bit; the cone formed by each drill bit rack 10 can be a frame structure, and the lower part of each drill bit rack 10 is provided with inclined ribs for drilling arranged along the generatrix of the formed cone; it can also be a conical surface, in which case the lower part of each drill bit rack 10 is in a conical tile shape, and the conical tile part of each drill bit rack 10 forms a conical surface, and spiral ribs are provided on the formed conical surface.
[0037] When the extension rod 11 of the electric push rod 8 is in the extended state, the air hammer 9 pushes the drill bit racks 10 downward and is lower than the drill bit racks 10. At this time, the air hammer 9 is used for compaction operation; when the extension rod 11 of the electric push rod 8 is extended, the drill bit rack 10 is opened and the drilling position where it is located is partially enlarged or inserted into the soil.
[0038] A brush device is provided on the long auger rod 2 at the rotary seal joint 3, and the connection line of the electric push rod 8 is led out of the long auger rod 2 through the brush device and connected to the electric control device in the cab.
[0039] The brush device is a conventional device for conducting electricity between a rotating part and a stationary part. Informed by the fact that the present invention can be used for a long spiral drill rod 2, those skilled in the art are able to use existing brushes in the electrical field to achieve the function of rotating conductive connection.
[0040] Not shown in the figure. In the present invention, the air hammer 9 rotates integrally with the long spiral drill rod 2. Since the chassis assembly, the traveling mechanism, the rotary table derrick, the cab and the electronic control device are all conventional technologies, the present invention has not made any improvements, so the drawings of the present invention do not show the above structures that are irrelevant to the innovation of the present invention. The spiral on the long spiral drill rod 2 is also conventional technology, not shown in the figure.
[0041] The bottom end of the air hammer 9 protrudes downward to form a hemispherical tamping portion 13.
[0042] The tamping portion 13 is hemispherical, and when it initially contacts the striking surface, the contact area is small and the pressure is strong, which is more conducive to tamping. When the tamping portion 13 falls on the striking surface and the striking surface sinks and tampers, the contact area between the hemispherical tamping portion 13 and the striking surface expands rapidly, avoiding the tamping of the striking surface from turning into piercing the striking surface, making the striking force more of a downward tamping force, preventing the piercing of the tamping surface from squeezing the compacted object to both sides, thereby failing to achieve the downward tamping effect.
[0043] A cross bar 14 is provided on the drill frame 10, and a return spring 15 is connected between the cross bar 14 and the hinge point of the drill frame 10. The return spring 15 is used to cause the drill frame 10 to return to its original position after the air hammer 9 is retracted upward.
[0044] The present invention also discloses a drilling and compacting method using the above-mentioned long spiral drilling machine capable of drilling and compacting in one, which is carried out according to the following steps:
[0045] The first step is drilling;
[0046] In this step, the extension rod 11 of the electric push rod 8 is in a retracted state; the staff starts the drilling machine to drive the long spiral drill rod 2 to rotate and drill to a predetermined depth;
[0047] The second step is to inject lime soil into the hole;
[0048] The staff operates the drilling rig to lift the drill (lift the long spiral drill rod 2 out of the borehole), and then uses a forklift to pour ash and soil into the borehole;
[0049] The third step is tamping;
[0050] The staff operates the drill to lower the drill, so that the long spiral drill rod 2 enters the borehole, and controls the extension rod 11 of the electric push rod 8 to extend downward through the electric control device, so that the air hammer 9 contacts the poured ash soil downward, and the staff activates the air hammer 9 through the air pump 5 to compact the poured ash soil in the borehole. During the implementation process, there is no need to use the compactor for cross-operation, and the construction efficiency is high.
[0051] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A long spiral drilling rig for drilling and compacting, comprising a chassis assembly, the chassis assembly having a traveling mechanism and a rotary worktable, a drilling tower and a cab being arranged on the rotary worktable, a power head being hoisted on the drilling tower through a lifting rope and a movable pulley device, the power head being used to move up and down along the tower body, and a long spiral drill rod being installed downward on the power head; the characteristics are: The top of the long spiral drill rod is connected to an air guide pipe through a rotary sealing joint, and the air guide pipe is connected to an air pump; a fixing frame is installed downwardly on the power head, and the fixing frame is connected to the fixed part of the rotary sealing joint; An installation cavity is provided at the lower part of the long spiral drill rod, in which an electric push rod is fixedly installed, and the extension rod of the electric push rod is downwardly connected to an air hammer; an air guide hole is provided inside the long spiral drill rod along the up and down directions, the upper end of the air guide hole is connected to the air guide pipe through a rotating sealing joint, and the lower end of the air guide hole is connected to the air hammer through a hose; The long spiral drill rod at the bottom end of the installation cavity is evenly hinged with a number of drill bit racks along the circumference; When the extension rod of the electric push rod is in the retracted state, the bottom end of the air hammer is higher than each drill bit rack and each drill bit rack is formed into a cone with the tip facing downward to form a drill bit; When the extension rod of the electric push rod is in the extended state, the air hammer pushes each drill bit rack downward and is lower than each drill bit rack. At this time, the air hammer is used for compaction operation; A brush device is provided on the long auger rod at the rotary seal joint, and the connection line of the electric push rod is led out of the long auger rod through the brush device and connected to the electric control device in the cab; The air hammer rotates integrally with the long auger rod.
2. The long spiral drilling rig for drilling and compacting according to claim 1, characterized in that: The bottom end of the air hammer bulges downward to form a hemispherical tamping portion.
3. The long spiral drilling machine for drilling and compacting according to claim 1 or 2, characterized in that: A cross bar is arranged on the drill frame, and a reset spring is connected between the cross bar and the hinge point of the drill frame. The reset spring is used to cause the drill frame to reset after the air hammer is retracted upward.
4. A drilling and compaction method using the long spiral drilling rig for drilling and compaction as claimed in claim 3, characterized in that Follow these steps: The first step is drilling; In this step, the extension rod of the electric push rod is in a retracted state; the staff starts the drilling machine to drive the long spiral drill rod to rotate and drill to a predetermined depth; The second step is to inject lime soil into the hole; The staff operated the drilling rig to lift the drill, and then used a forklift to pour ash and soil into the borehole; The third step is tamping; The staff operates the drilling rig to drop the drill, allowing the long spiral drill rod to enter the borehole, and controls the extension rod of the electric push rod to extend downward through the electronic control device, so that the air hammer touches the poured ash and soil downward. The staff starts the air hammer through the air pump to compact the poured ash and soil in the borehole.