A deep peak regulation system based on thermal system coupling between units and its operation method
By establishing a thermal system coupling connection between the two generator sets of the thermal power plant, and using the liaison pipeline and control valve, the problems of insufficient operating flexibility and deep peak shaving capacity of the existing thermal power plant at the lowest electric load are solved, and more flexible electrical load regulation and higher production and operational benefits are achieved.
Patent Information
- Application Number
- CN202110298131.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-19
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2041-03-19
AI Technical Summary
The existing large-capacity thermal power plants have insufficient operating flexibility and deep peak regulating capabilities at the lowest power load, and the safe and continuous operation of the boiler is limited, making it difficult to effectively regulate the electrical load.
By establishing a thermal system coupling connection between two conventional unit generator sets, deep peak-shaving operation between units is achieved using main steam duct, medium-pressure cylinder exhaust duct, low-pressure water supply duct and other pipelines and control valves.
It enhances the deep peak shaking capability and operational flexibility of the unit, and can achieve more flexible electrical load regulation without technical transformation on the boiler side, improving the production and operational efficiency of the power plant.
Smart Images

Figure CN113153467B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of thermal power generation, and specifically relates to a deep peak regulation system based on thermal system coupling between units and an operation method thereof. Background Art
[0002] At present, domestic large-capacity thermal power plants widely adopt the unit operation method, that is, one boiler supplies steam to one steam turbine, and the steam turbine drives the generator to generate electricity, forming an independent power generation unit of boiler-turbine-generator. There is basically no horizontal connection between the various power generation units. Due to the minimum stable combustion output limit of coal-fired boilers without auxiliary fuel, the minimum electrical load of existing thermal power units is generally limited to about 30%-40%. Further reduction will have an adverse effect on the safe and continuous operation of the boiler. China's invention patent disclosure specification CN109653810A discloses a thermal system with one boiler and two machines switching operation. By adding superheated steam and reheated steam bypass and control valves, when one boiler fails, another boiler is used to drive two steam turbines to generate electricity. At this time, the unit has a certain peak-shaving capacity, but the system layout is relatively complex, the operation flexibility is low, and the operability in the actual operation of the power plant is poor.
[0003] In recent years, with the continuous advancement of the upgrading and transformation of thermal power units, there is an urgent need to propose a thermal system that can realize the coupling connection between large-capacity thermal power units and its operation method, so as to enhance the flexibility of the units to adapt to the dispatching power load instructions and improve the deep peak regulation capability of the units. Summary of the invention
[0004] In response to the problems existing in the prior art, the present invention provides a deep peak-shaving system based on thermal system coupling between units and an operation method thereof, which can improve the deep peak-shaving capability of the unit and increase the flexibility of unit operation without the need for technical transformation of the boiler side.
[0005] The present invention is achieved through the following technical solutions:
[0006] A deep peak-shaving system based on thermal system coupling between units, comprising a first conventional unit-based generator set and a second conventional unit-based generator set;
[0007] Specifically include the first high-pressure main steam valve, the second high-pressure main steam valve, the first high-pressure cylinder, the second high-pressure cylinder, the first intermediate-pressure cylinder, the second intermediate-pressure cylinder, the first low-pressure cylinder, the second low-pressure cylinder, the first condensate pump, the second condensate pump, the first intermediate-pressure cylinder exhaust control, isolation valve group, the second intermediate-pressure cylinder exhaust control, isolation valve group, main steam connecting pipe control, isolation valve group, intermediate-pressure cylinder exhaust connecting pipe control, isolation valve group, low-pressure feed water connecting pipe control, isolation valve group, the first high and intermediate pressure cylinder minimum cooling steam inlet pipeline control Control, isolation valve group, the second high and medium pressure cylinder minimum cooling steam inlet pipeline control, isolation valve group, the first low pressure cylinder minimum cooling steam pipeline control, isolation valve group, the second low pressure cylinder minimum cooling steam pipeline control, isolation valve group, main steam connecting pipe, medium pressure cylinder exhaust connecting pipe, low pressure feed water connecting pipe, the first high and medium pressure cylinder minimum cooling steam inlet pipeline, the second high and medium pressure cylinder minimum cooling steam inlet pipeline, and the first low pressure cylinder minimum cooling steam pipeline, the second low pressure cylinder minimum cooling steam pipeline;
[0008] The intermediate pressure cylinder exhaust connecting pipe is connected between the exhaust outlet of the first intermediate pressure cylinder and the exhaust outlet of the second intermediate pressure cylinder of the two steam turbines, and the intermediate pressure cylinder exhaust connecting pipe is equipped with an intermediate pressure cylinder exhaust connecting pipe control and isolation valve group;
[0009] The main steam connecting pipe is connected between the steam inlet of the first high-pressure main steam valve and the steam inlet of the second high-pressure main steam valve of the two steam turbines. The main steam connecting pipe is equipped with a main steam connecting pipe control and isolation valve group;
[0010] The first intermediate pressure cylinder exhaust control and isolation valve group is connected between the exhaust port of the first intermediate pressure cylinder and the steam inlet of the first low pressure cylinder, and the second intermediate pressure cylinder exhaust control and isolation valve group is connected between the exhaust port of the second intermediate pressure cylinder and the steam inlet of the second low pressure cylinder;
[0011] The first low-pressure cylinder minimum cooling steam pipeline is also connected between the inlet and outlet of the first intermediate-pressure cylinder exhaust steam control and isolation valve group, and the second low-pressure cylinder minimum cooling steam pipeline is also connected between the inlet and outlet of the second intermediate-pressure cylinder exhaust steam control and isolation valve group. The first low-pressure cylinder minimum cooling steam pipeline is installed with the first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group, and the second low-pressure cylinder minimum cooling steam pipeline is installed with the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group;
[0012] The minimum cooling steam inlet pipeline of the first high- and medium-pressure cylinder is connected between the inlet and outlet of the first high-pressure main steam valve, and the minimum cooling steam inlet pipeline of the second high- and medium-pressure cylinder is connected between the inlet and outlet of the second high-pressure main steam valve. The minimum cooling steam inlet pipeline of the first high- and medium-pressure cylinder is equipped with a first high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group, and the minimum cooling steam inlet pipeline of the second high- and medium-pressure cylinder is equipped with a second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group;
[0013] The low-pressure feedwater connecting pipe is connected between the outlet of the first condensate pump and the outlet of the second condensate pump of the two steam turbines, and a low-pressure feedwater connecting pipe control and isolation valve group is installed on the low-pressure feedwater connecting pipe;
[0014] The main steam of the first conventional unit generator set can enter the second high-pressure cylinder and the second medium-pressure cylinder of the second conventional unit generator set through the main steam connecting pipe to perform work, and the main steam of the second conventional unit generator set can enter the first high-pressure cylinder and the first medium-pressure cylinder of the first conventional unit generator set through the main steam connecting pipe to perform work.
[0015] A further improvement of the present invention is that the first conventional unit-type generator set and the second conventional unit-type generator set have the same power generation capability and equivalent capacity, and the equipment type and thermal system design are consistent.
[0016] A further improvement of the present invention is that the operating status of the first conventional unit-type generator set and the second conventional unit-type generator set is that both boilers and both steam turbines are in an operating state.
[0017] A further improvement of the present invention is that when the second high-pressure main steam valve of the second conventional unit-type generator set is closed, the main steam of the second conventional unit-type generator set can enter the second high-pressure cylinder and the second medium-pressure cylinder through the second high-pressure and medium-pressure cylinder minimum cooling steam inlet pipeline, thereby ensuring the safe operation of the second high-pressure cylinder and the second medium-pressure cylinder;
[0018] When the first high-pressure main steam valve of the first conventional unit generator set is closed, the main steam of the first conventional unit generator set can enter the first high-pressure cylinder and the first intermediate-pressure cylinder through the first high- and intermediate-pressure cylinder minimum cooling steam inlet pipeline, ensuring the safe operation of the first high-pressure cylinder and the first intermediate-pressure cylinder.
[0019] A further improvement of the present invention is that the exhaust steam of the first intermediate pressure cylinder of the first conventional unit-type generator set can enter the second low pressure cylinder of the second conventional unit-type generator set through the intermediate pressure cylinder exhaust communication pipe to perform work;
[0020] The exhaust steam of the second intermediate pressure cylinder of the second conventional unit-type generator set can enter the first low pressure cylinder of the first conventional unit-type generator set through the intermediate pressure cylinder exhaust steam connecting pipe to perform work.
[0021] A further improvement of the present invention is that the condensate at the outlet of the first condensate pump of the first conventional unit-type generator set enters the low-pressure water supply system of the second conventional unit-type generator set through the low-pressure water supply connecting pipe to maintain the deaerator water level of the second conventional unit-type generator set stable;
[0022] The condensate at the outlet of the second condensate pump of the second conventional unit-type generator set enters the low-pressure water supply system of the first conventional unit-type generator set through the low-pressure water supply connecting pipe to maintain the stability of the deaerator water level of the first conventional unit-type generator set.
[0023] A further improvement of the present invention is that when the exhaust steam control and isolation valve group of the second intermediate pressure cylinder of the second conventional unit-type generator set is closed, part of the exhaust steam of the intermediate pressure cylinder of the second conventional unit-type generator set enters the second low pressure cylinder through the minimum cooling steam pipeline of the second low pressure cylinder to cool the low pressure cylinder, thereby ensuring the safe operation of the second low pressure cylinder;
[0024] When the first intermediate pressure cylinder exhaust steam control and isolation valve group of the first conventional unit generator set is closed, part of the intermediate pressure cylinder exhaust steam of the first conventional unit generator set enters the first low pressure cylinder through the first low pressure cylinder minimum cooling steam pipeline to cool the low pressure cylinder, thereby ensuring the safe operation of the first low pressure cylinder.
[0025] An operation method of a deep peak-shaving system based on thermal system coupling between units, the method is based on the deep peak-shaving system based on thermal system coupling between units, and comprises the following steps:
[0026] Step 1, the first conventional unit-type generator set and the second conventional unit-type generator set operate normally, and the first high-pressure main steam valve and the second high-pressure main steam valve remain in normal operation; the main steam connecting pipe control and the isolation valve group of the main steam connecting pipe are in a closed state; the medium-pressure cylinder exhaust connecting pipe of the medium-pressure cylinder exhaust connecting pipe is controlled and the isolation valve group is in a closed state; the low-pressure water supply connecting pipe of the low-pressure water supply connecting pipe is controlled and the isolation valve group is in a closed state; the first medium-pressure cylinder exhaust control and the isolation valve group of the first conventional unit-type generator set are in an open state; the first high and medium-pressure cylinder minimum cooling steam inlet pipeline control and the isolation valve group of the first conventional unit-type generator set are in a closed state; the first low-pressure cylinder minimum cooling steam pipeline control and the isolation valve group of the first conventional unit-type generator set are in a closed state; the second medium-pressure cylinder exhaust control and the isolation valve group of the second conventional unit-type generator set are in an open state; the second high and medium-pressure cylinder minimum cooling steam inlet pipeline control and the isolation valve group of the second conventional unit-type generator set are in a closed state; the second low-pressure cylinder minimum cooling steam pipeline control and the isolation valve group of the second conventional unit-type generator set are in a closed state;
[0027] Step 2, the main steam connecting pipe of the main steam connecting pipe is controlled, and the isolation valve group is opened; the intermediate pressure cylinder exhaust connecting pipe of the intermediate pressure cylinder exhaust connecting pipe is controlled, and the isolation valve group is opened; the first high and intermediate pressure cylinder minimum cooling steam inlet pipeline of the first conventional unit-type generator set is controlled, and the isolation valve group is opened; the first low pressure cylinder minimum cooling steam pipeline of the first conventional unit-type generator set is controlled, and the isolation valve group is opened; the first high pressure main steam valve of the first conventional unit-type generator set is slowly closed; the first intermediate pressure cylinder exhaust control of the first conventional unit-type generator set, and the isolation valve group are slowly closed; the low pressure water supply connecting pipe of the low pressure water supply connecting pipe is controlled, and the isolation valve group is slowly opened; the water level of the deaerator of the first conventional unit-type generator set is maintained stable; and the deep peak load operation of the first conventional unit-type generator set is realized;
[0028] Step 3: The main steam connecting pipe of the main steam connecting pipe is controlled and the isolation valve group is kept open; the intermediate pressure cylinder exhaust connecting pipe of the intermediate pressure cylinder exhaust connecting pipe is controlled and the isolation valve group is kept open; the first high pressure main steam valve of the first conventional unit generator set is slowly opened; the first intermediate pressure cylinder exhaust control and the isolation valve group of the first conventional unit generator set are slowly opened; the first high and intermediate pressure cylinder minimum cooling steam inlet pipeline of the first conventional unit generator set is controlled and the isolation valve group is slowly closed; the first low pressure cylinder minimum cooling steam pipeline of the first conventional unit generator set is controlled and the isolation valve group is slowly closed. Close; open the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group of the second conventional unit-type generator set; open the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group of the second conventional unit-type generator set; slowly close the second high-pressure main steam valve of the second conventional unit-type generator set; slowly close the second medium-pressure cylinder exhaust control and isolation valve group of the second conventional unit-type generator set; maintain the low-pressure feed water control and isolation valve group open; maintain the water level of the deaerator of the second conventional unit-type generator set stable; realize the deep peak-shaving operation of the second conventional unit-type generator set.
[0029] A further improvement of the present invention is that the first conventional unit-based generator set and the second conventional unit-based generator set are both in a grid-connected power generation state, and any one of the generator sets can participate in deep peak regulation at any time.
[0030] A further improvement of the present invention is that the operating states of the first conventional unit-based generator set and the second conventional unit-based generator set can be switched with each other.
[0031] Compared with the prior art, the present invention has the following beneficial technical effects:
[0032] The present invention provides a deep peak-shaving system based on thermal system coupling between units and its operation method. By adding a main steam connecting pipe, a medium-pressure cylinder exhaust connecting pipe, a low-pressure water supply connecting pipe, a high- and medium-pressure cylinder minimum cooling steam inlet pipelines, and a low-pressure cylinder minimum cooling steam pipeline, the switching of the deep peak-shaving operation mode of any unit is realized. When a unit is in deep peak-shaving operation, its main steam inlet volume and low-pressure cylinder inlet flow rate can be reduced to the minimum. At this time, the unit maintains the minimum working capacity, and the deep peak-shaving capacity of the unit is increased. Utilizing the present invention, under deep peak-shaving operation conditions, most of the main steam and low-pressure cylinder inlet volume of one unit can be transported to another unit, achieving a smaller technical output for one unit. The flexibility of the unit to adapt to the dispatching electric load instructions is enhanced, the deep peak-shaving electricity price income of the power plant is increased, and the production and operation efficiency of the power plant is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a thermal system schematic diagram of a deep peak regulation system based on thermal system coupling between units described in an example of the present invention.
[0034] Description of reference numerals:
[0035] 1. First intermediate pressure cylinder exhaust control, isolation valve group, 2. Second intermediate pressure cylinder exhaust control, isolation valve group; 3. Intermediate pressure cylinder exhaust communication pipe control, isolation valve group; 4. Intermediate pressure cylinder exhaust communication pipe; 5. Low pressure water supply communication pipe; 6. Low pressure water supply communication pipe control, isolation valve group; 7. First intermediate pressure cylinder; 8. First low pressure cylinder; 9. Second intermediate pressure cylinder; 10. Second low pressure cylinder; 11. First condensate pump; 12. Second condensate pump; 13. First conventional unit generator set; 14. Second conventional unit generator set; 15. First low pressure cylinder minimum cooling steam pipeline control, isolation valve group, 17. Second low pressure cylinder minimum cooling steam pipeline control, isolation valve group Steam pipeline control and isolation valve group; 16. Minimum cooling steam pipeline of the first low-pressure cylinder, 18. Minimum cooling steam pipeline of the second low-pressure cylinder; 19. Main steam connecting pipe; 20. Main steam connecting pipe control and isolation valve group; 21. First high-pressure main steam valve; 22. Minimum cooling steam inlet pipeline of the first high and medium-pressure cylinder; 23. Minimum cooling steam inlet pipeline control and isolation valve group of the first high and medium-pressure cylinder; 24. Second high-pressure main steam valve; 25. Minimum cooling steam inlet pipeline of the second high and medium-pressure cylinder; 26. Minimum cooling steam inlet pipeline control and isolation valve group of the second high and medium-pressure cylinder; 27. First high-pressure cylinder; 28. Second high-pressure cylinder. DETAILED DESCRIPTION
[0036] The present invention is further described in detail below in conjunction with specific implementation modes, which are intended to explain the present invention rather than to limit it.
[0037] like Figure 1As shown, the present invention provides a deep peak-shaving system based on thermal system coupling between units, including a first conventional unit-type generator set 13 and a second conventional unit-type generator set 14 with basically the same capacity, equipment type and thermal system.
[0038] Specifically, it includes the first high-pressure main steam valve 21, the second high-pressure main steam valve 24, the first high-pressure cylinder 27, the second high-pressure cylinder 28, the first intermediate-pressure cylinder 7, the second intermediate-pressure cylinder 9, the first low-pressure cylinder 8, the second low-pressure cylinder 10, the first condensate pump 11, the second condensate pump 12, the first intermediate-pressure cylinder exhaust control, isolation valve group 1, the second intermediate-pressure cylinder exhaust control, isolation valve group 2, the main steam connecting pipe control, isolation valve group 20, the intermediate-pressure cylinder exhaust connecting pipe control, isolation valve group 3, the low-pressure feed water connecting pipe control, isolation valve group 6, the first high-pressure and intermediate-pressure cylinder minimum cooling steam inlet pipeline Control and isolation valve group 23, second high and medium pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 26, first low pressure cylinder minimum cooling steam pipeline control and isolation valve group 15, second low pressure cylinder minimum cooling steam pipeline control and isolation valve group 17, main steam connecting pipe 19, medium pressure cylinder exhaust connecting pipe 4, low pressure feed water connecting pipe 5, first high and medium pressure cylinder minimum cooling steam inlet pipeline 22, second high and medium pressure cylinder minimum cooling steam inlet pipeline 25, and first low pressure cylinder minimum cooling steam pipeline 16, second low pressure cylinder minimum cooling steam pipeline 18.
[0039] The intermediate pressure cylinder exhaust connection pipe 4 is connected between the exhaust outlet of the first intermediate pressure cylinder 7 and the exhaust outlet of the second intermediate pressure cylinder 9 of the two steam turbines, and the intermediate pressure cylinder exhaust connection pipe 4 is installed with an intermediate pressure cylinder exhaust connection pipe control and isolation valve group 3; the main steam connection pipe 19 is connected between the first high-pressure main steam valve 21 and the second high-pressure main steam valve 24 of the two steam turbines, and the main steam connection pipe 19 is installed with a main steam connection pipe control and isolation valve group 20; the first intermediate pressure cylinder exhaust control and isolation valve group 1 is connected between the two steam turbines. The exhaust port of the first intermediate pressure cylinder 7 and the steam inlet of the first low pressure cylinder 8 of the turbine are connected, and the exhaust control and isolation valve group 2 of the second intermediate pressure cylinder is connected between the exhaust port of the second intermediate pressure cylinder 9 and the steam inlet of the second low pressure cylinder 10 of the two steam turbines; the minimum cooling steam pipeline 16 of the first low pressure cylinder is also connected between the inlet and outlet of the first intermediate pressure cylinder exhaust control and isolation valve group 1, and the minimum cooling steam pipeline 18 of the second low pressure cylinder is also connected between the inlet and outlet of the second intermediate pressure cylinder exhaust control and isolation valve group 2, and the minimum cooling steam pipeline 18 of the first low pressure cylinder is also connected between the inlet and outlet of the first intermediate pressure cylinder exhaust control and isolation valve group 2. The minimum cooling steam pipeline 16 is equipped with the first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 15, and the second low-pressure cylinder minimum cooling steam pipeline 18 is equipped with the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 17; the first high- and medium-pressure cylinder minimum cooling steam inlet pipeline 22 is connected between the inlet and outlet of the first high-pressure main steam valve 21, and the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline 25 is connected between the inlet and outlet of the second high-pressure main steam valve 24. The small cooling steam inlet pipeline 22 is equipped with the first high and medium pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 23, and the second high and medium pressure cylinder minimum cooling steam inlet pipeline 25 is equipped with the second high and medium pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 26; the low-pressure feed water connecting pipe 5 is connected between the outlet of the first condensate pump 11 and the outlet of the second condensate pump 12 of the two steam turbines, and the low-pressure feed water connecting pipe 5 is equipped with a low-pressure feed water connecting pipe control and isolation valve group 6.
[0040] Preferably, the main steam connecting pipe 19 is equipped with a main steam connecting pipe control and isolation valve group 20 to achieve the switching of the deep peak-shaving operation mode of a single unit.
[0041] Preferably, the intermediate pressure cylinder exhaust connecting pipe 4 is equipped with an intermediate pressure cylinder exhaust connecting pipe control and isolation valve group 3 to realize the switching of the deep peak regulation operation mode of a single unit.
[0042] Preferably, a first intermediate-pressure cylinder exhaust control and isolation valve group 1 is installed on the intermediate-pressure cylinder exhaust pipe of the first conventional unit-type generator set 13. The valve group can control the steam intake amount of the first low-pressure cylinder 8, and cooperate with the first high-pressure main steam valve 21 to jointly adjust the output of the first conventional unit-type generator set 13.
[0043] Preferably, a second intermediate-pressure cylinder exhaust control and isolation valve group 2 is installed on the intermediate-pressure cylinder exhaust pipe of the second conventional unit-type generator set 14. The valve group can control the steam intake amount of the second low-pressure cylinder 10 and cooperate with the second high-pressure main steam valve 24 to jointly adjust the output of the second conventional unit-type generator set 14.
[0044] Preferably, a first high- and intermediate-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 23 is installed on the first high- and intermediate-pressure cylinder minimum cooling steam inlet pipeline 22 of the first conventional unit-type generator set 13. The valve group can maintain the minimum steam intake volume of the first high-pressure cylinder 27 to ensure the safe operation of the first high-pressure cylinder 27 and the first intermediate-pressure cylinder 7.
[0045] Preferably, a second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 26 is installed on the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline 25 of the second conventional unit generator set 14. The valve group can maintain the minimum steam intake volume of the second high-pressure cylinder 28 to ensure the safe operation of the second high-pressure cylinder 28 and the second medium-pressure cylinder 9.
[0046] Preferably, a first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 15 is installed on the first low-pressure cylinder minimum cooling steam pipeline 16 of the first conventional unit generator set 13. The valve group can maintain the minimum steam intake volume of the first low-pressure cylinder 8 to ensure the safe operation of the first low-pressure cylinder 8.
[0047] Preferably, the second low-pressure cylinder minimum cooling steam pipeline 18 of the second conventional unit generator set 14 is equipped with a first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 17, which can maintain the minimum steam intake volume of the second low-pressure cylinder 10 to ensure the safe operation of the second low-pressure cylinder 10.
[0048] Preferably, a low-pressure water supply connecting pipe control and isolation valve group 6 is installed on the low-pressure water supply connecting pipe 5, which is used to adjust the low-pressure water supply flow of the two units during the deep peak regulation process to maintain the deaerator water level stable.
[0049] The present invention provides an operation method of a deep peak load regulation system based on thermal system coupling between units, comprising the following steps:
[0050] Step 1, the first conventional unit-type generator set 13 and the second conventional unit-type generator set 14 operate normally, and the first high-pressure main steam valve 21 and the second high-pressure main steam valve 24 remain in normal operating state; the main steam connecting pipe control and the isolation valve group 20 of the main steam connecting pipe 19 are in a closed state; the medium-pressure cylinder exhaust connecting pipe control and the isolation valve group 3 of the medium-pressure cylinder exhaust connecting pipe 4 are in a closed state; the low-pressure water supply connecting pipe control and the isolation valve group 6 of the low-pressure water supply connecting pipe 5 are in a closed state; the first medium-pressure cylinder exhaust control and the isolation valve group 1 of the first conventional unit-type generator set 13 are in an open state; the first conventional unit-type generator The first high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 23 of group 13 are in a closed state; the first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 15 of the first conventional unit-based generator set 13 are in a closed state; the second medium-pressure cylinder exhaust steam control and isolation valve group 2 of the second conventional unit-based generator set 14 are in an open state; the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 26 of the second conventional unit-based generator set 14 are in a closed state; the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 17 of the second conventional unit-based generator set 14 are in a closed state;
[0051] Step 2, the main steam connecting pipe of the main steam connecting pipe 19 is controlled, and the isolation valve group 20 is opened; the medium-pressure cylinder exhaust connecting pipe of the medium-pressure cylinder exhaust connecting pipe 4 is controlled, and the isolation valve group 3 is opened; the first high- and medium-pressure cylinder minimum cooling steam inlet pipeline of the first conventional unit-based generator set 13 is controlled, and the isolation valve group 23 is opened; the first low-pressure cylinder minimum cooling steam pipeline of the first conventional unit-based generator set 13 is controlled, and the isolation valve group 15 is opened; the first high-pressure main steam valve 21 of the first conventional unit-based generator set 13 is slowly closed; the first medium-pressure cylinder exhaust control of the first conventional unit-based generator set 13, and the isolation valve group 1 are slowly closed; the low-pressure water supply connecting pipe of the low-pressure water supply connecting pipe 5 is controlled, and the isolation valve group 6 is slowly opened; the water level of the deaerator of the first conventional unit-based generator set 13 is maintained stable; and the deep peak-shaving operation of the first conventional unit-based generator set 13 is realized;
[0052] Step 3, the main steam connecting pipe 19 is controlled, and the isolation valve group 20 is kept open; the intermediate pressure cylinder exhaust connecting pipe 4 of the intermediate pressure cylinder exhaust connecting pipe is controlled, and the isolation valve group 3 is kept open; the first high pressure main steam valve 21 of the first conventional unit generator set 13 is slowly opened; the first intermediate pressure cylinder exhaust control and isolation valve group 1 of the first conventional unit generator set 13 are slowly opened; the first high and intermediate pressure cylinder minimum cooling steam inlet pipeline of the first conventional unit generator set 13 is controlled, and the isolation valve group 23 is slowly closed; the first low pressure cylinder minimum cooling steam pipeline of the first conventional unit generator set 13 is controlled, and the isolation valve group 15 is slowly closed. Close; open the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group 26 of the second conventional unit-type generator set 14; open the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group 17 of the second conventional unit-type generator set 14; slowly close the second high-pressure main steam valve 24 of the second conventional unit-type generator set 14; slowly close the second medium-pressure cylinder exhaust control and isolation valve group 2 of the second conventional unit-type generator set 14; maintain the low-pressure feed water control and isolation valve group 6 open; maintain the water level of the deaerator of the second conventional unit-type generator set 14 stable; realize the deep peak-shaving operation of the second conventional unit-type generator set 14.
[0053] The above description is only a preferred specific implementation method of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation or application to multiple units made by using the contents of the present invention specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A deep peak load regulation system based on thermal system coupling between units, characterized in that: It comprises a first conventional unit-type generator set (13) and a second conventional unit-type generator set (14); Specifically, it includes a first high-pressure main steam valve (21), a second high-pressure main steam valve (24), a first high-pressure cylinder (27), a second high-pressure cylinder (28), a first intermediate-pressure cylinder (7), a second intermediate-pressure cylinder (9), a first low-pressure cylinder (8), a second low-pressure cylinder (10), a first condensate pump (11), a second condensate pump (12), a first intermediate-pressure cylinder exhaust control and an isolation valve group (1), a second intermediate-pressure cylinder exhaust control and an isolation valve group (2), a main steam connecting pipe control and an isolation valve group (20), an intermediate-pressure cylinder exhaust connecting pipe control and an isolation valve group (3), a low-pressure feedwater connecting pipe control and an isolation valve group (6), and the minimum cooling steam of the first high-pressure and intermediate-pressure cylinders. Steam inlet pipeline control, isolation valve group (23), second high and medium pressure cylinder minimum cooling steam inlet pipeline control, isolation valve group (26), first low pressure cylinder minimum cooling steam pipeline control, isolation valve group (15), second low pressure cylinder minimum cooling steam pipeline control, isolation valve group (17), main steam connecting pipe (19), medium pressure cylinder exhaust connecting pipe (4), low pressure feed water connecting pipe (5), first high and medium pressure cylinder minimum cooling steam inlet pipeline (22), second high and medium pressure cylinder minimum cooling steam inlet pipeline (25), first low pressure cylinder minimum cooling steam pipeline (16), second low pressure cylinder minimum cooling steam pipeline (18); The intermediate pressure cylinder exhaust connecting pipe (4) is connected between the exhaust outlet of the first intermediate pressure cylinder (7) and the exhaust outlet of the second intermediate pressure cylinder (9) of the two steam turbines, and the intermediate pressure cylinder exhaust connecting pipe (4) is equipped with an intermediate pressure cylinder exhaust connecting pipe control and isolation valve group (3); A main steam connecting pipe (19) is connected between the steam inlets of the first high-pressure main steam valves (21) and the second high-pressure main steam valves (24) of the two steam turbines, and a main steam connecting pipe control and isolation valve group (20) is installed on the main steam connecting pipe (19); The first intermediate pressure cylinder exhaust control and isolation valve group (1) is connected between the exhaust port of the first intermediate pressure cylinder (7) and the steam inlet of the first low pressure cylinder (8), and the second intermediate pressure cylinder exhaust control and isolation valve group (2) is connected between the exhaust port of the second intermediate pressure cylinder (9) and the steam inlet of the second low pressure cylinder (10); A first low-pressure cylinder minimum cooling steam pipeline (16) is also connected between the inlet and outlet of the first intermediate-pressure cylinder exhaust steam control and isolation valve group (1), a second low-pressure cylinder minimum cooling steam pipeline (18) is also connected between the inlet and outlet of the second intermediate-pressure cylinder exhaust steam control and isolation valve group (2), a first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group (15) is installed on the first low-pressure cylinder minimum cooling steam pipeline (16), and a second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group (17) is installed on the second low-pressure cylinder minimum cooling steam pipeline (18); The first high- and medium-pressure cylinder minimum cooling steam inlet pipeline (22) is connected between the inlet and outlet of the first high-pressure main steam valve (21), the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline (25) is connected between the inlet and outlet of the second high-pressure main steam valve (24), the first high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group (23) is installed on the first high- and medium-pressure cylinder minimum cooling steam inlet pipeline (22), and the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group (26) is installed on the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline (25); The low-pressure water supply connection pipe (5) is connected between the outlets of the first condensate pumps (11) and the outlets of the second condensate pumps (12) of the two steam turbines, and a low-pressure water supply connection pipe control and isolation valve group (6) is installed on the low-pressure water supply connection pipe (5); The main steam of the first conventional unit-type generator set (13) can enter the second high-pressure cylinder (28) and the second medium-pressure cylinder (9) of the second conventional unit-type generator set (14) through the main steam connecting pipe (19) to perform work, and the main steam of the second conventional unit-type generator set (14) can enter the first high-pressure cylinder (27) and the first medium-pressure cylinder (7) of the first conventional unit-type generator set (13) through the main steam connecting pipe (19) to perform work.
2. According to claim 1, a deep peak load regulation system based on thermal system coupling between units is characterized in that: The first conventional unit-type generator set (13) and the second conventional unit-type generator set (14) have the same power generation capability and equivalent capacity, and the same equipment type and thermal system design.
3. According to claim 1, a deep peak load regulation system based on thermal system coupling between units is characterized in that: The operating status of the first conventional unit-type generator set (13) and the second conventional unit-type generator set (14) is that both boilers and both steam turbines are in an operating state.
4. According to claim 1, a deep peak load regulation system based on thermal system coupling between units is characterized in that: When the second high-pressure main steam valve (24) of the second conventional unit-type generator set (14) is closed, the main steam of the second conventional unit-type generator set (14) can enter the second high-pressure cylinder (28) and the second medium-pressure cylinder (9) through the second high- and medium-pressure cylinder minimum cooling steam inlet pipeline (25), thereby ensuring the safe operation of the second high-pressure cylinder (28) and the second medium-pressure cylinder (9); When the first high-pressure main steam valve (21) of the first conventional unit-type generator set (13) is closed, the main steam of the first conventional unit-type generator set (13) can enter the first high-pressure cylinder (27) and the first intermediate-pressure cylinder (7) via the first high- and intermediate-pressure cylinder minimum cooling steam inlet pipeline (22), thereby ensuring the safe operation of the first high-pressure cylinder (27) and the first intermediate-pressure cylinder (7).
5. The deep peak load regulation system based on thermal system coupling between units according to claim 1, characterized in that: The exhaust steam of the first intermediate pressure cylinder (7) of the first conventional unit-type generator set (13) can enter the second low pressure cylinder (10) of the second conventional unit-type generator set (14) through the intermediate pressure cylinder exhaust communication pipe (4) to perform work; The exhaust steam of the second intermediate pressure cylinder (9) of the second conventional unit-type generator set (14) can enter the first low pressure cylinder (8) of the first conventional unit-type generator set (13) through the intermediate pressure cylinder exhaust communication pipe (4) to perform work.
6. The deep peak load regulation system based on thermal system coupling between units according to claim 1 is characterized in that: Condensate at the outlet of the first condensate pump (11) of the first conventional unit-type generator set (13) enters the low-pressure water supply system of the second conventional unit-type generator set (14) through the low-pressure water supply connecting pipe (5) to maintain the water level of the deaerator of the second conventional unit-type generator set (14) stable; Condensate at the outlet of the second condensate pump (12) of the second conventional unit-type generator set (14) enters the low-pressure water supply system of the first conventional unit-type generator set (13) through the low-pressure water supply connecting pipe (5) to maintain the stability of the deaerator water level of the first conventional unit-type generator set (13).
7. The deep peak load regulation system based on thermal system coupling between units according to claim 1, characterized in that: When the second intermediate pressure cylinder exhaust steam control and isolation valve group (2) of the second conventional unit-type generator set (14) are closed, part of the intermediate pressure cylinder exhaust steam of the second conventional unit-type generator set (14) enters the second low pressure cylinder (10) through the second low pressure cylinder minimum cooling steam pipeline (18) to cool the low pressure cylinder, thereby ensuring the safe operation of the second low pressure cylinder (10); When the first intermediate pressure cylinder exhaust steam control and isolation valve group (1) of the first conventional unit-type generator set (13) is closed, part of the intermediate pressure cylinder exhaust steam of the first conventional unit-type generator set (13) enters the first low pressure cylinder (8) through the first low pressure cylinder minimum cooling steam pipeline (16) to cool the low pressure cylinder, thereby ensuring the safe operation of the first low pressure cylinder (8).
8. An operation method of a deep peak load regulation system based on thermal system coupling between units, characterized in that: The method is based on a deep peak load regulation system based on thermal system coupling between units according to any one of claims 1 to 7, and comprises the following steps: Step 1, the first conventional unit-type generator set (13) and the second conventional unit-type generator set (14) operate normally, and the first high-pressure main steam valve (21) and the second high-pressure main steam valve (24) maintain a normal operating state; the main steam connecting pipe (19) main steam connecting pipe control and the isolation valve group (20) are in a closed state; the intermediate-pressure cylinder exhaust connecting pipe (4) intermediate-pressure cylinder exhaust connecting pipe control and the isolation valve group (3) are in a closed state; the low-pressure water supply connecting pipe (5) low-pressure water supply connecting pipe control and the isolation valve group (6) are in a closed state; the first intermediate-pressure cylinder exhaust control and the isolation valve group (1) of the first conventional unit-type generator set (13) are in an open state; the first high- and intermediate-pressure cylinder minimum cooling steam inlet pipeline control and the isolation valve group (23) of the first conventional unit-type generator set (13) are in a closed state; the first low-pressure cylinder minimum cooling steam pipeline control and the isolation valve group (15) of the first conventional unit-type generator set (13) are in a closed state; The second intermediate pressure cylinder exhaust steam control and isolation valve group (2) of the second conventional unit-type generator set (14) is in an open state; The second high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group (26) of the second conventional unit-based generator set (14) are in a closed state; the second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group (17) of the second conventional unit-based generator set (14) are in a closed state; Step 2, the main steam connecting pipe (19) is controlled, and the isolation valve group (20) is opened; the intermediate pressure cylinder exhaust steam connecting pipe (4) is controlled, and the isolation valve group (3) is opened; the first high and intermediate pressure cylinder minimum cooling steam inlet pipeline of the first conventional unit generator set (13) is controlled, and the isolation valve group (23) is opened; The first low-pressure cylinder minimum cooling steam pipeline of the first conventional unit-type generator set (13) is controlled and the isolation valve group (15) is opened; the first high-pressure main steam valve (21) of the first conventional unit-type generator set (13) is slowly closed; the first medium-pressure cylinder exhaust steam of the first conventional unit-type generator set (13) is controlled and the isolation valve group (1) is slowly closed; the low-pressure water supply connecting pipe (5) of the low-pressure water supply connecting pipe is controlled and the isolation valve group (6) is slowly opened; the water level of the deaerator of the first conventional unit-type generator set (13) is maintained stable; and the deep peak-shaving operation of the first conventional unit-type generator set (13) is achieved; Step 3: The main steam connecting pipe (19) is controlled and the isolation valve group (20) is kept open; the intermediate pressure cylinder exhaust steam connecting pipe (4) is controlled and the isolation valve group (3) is kept open; the first high pressure main steam valve (21) of the first conventional unit generator set (13) is slowly opened; The first medium-pressure cylinder exhaust steam control and isolation valve group (1) of the first conventional unit-type generator set (13) are slowly opened; the first high- and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group (23) of the first conventional unit-type generator set (13) are slowly closed; the first low-pressure cylinder minimum cooling steam pipeline control and isolation valve group (15) of the first conventional unit-type generator set (13) are slowly closed; The second high-pressure and medium-pressure cylinder minimum cooling steam inlet pipeline control and isolation valve group (26) of the second conventional unit-type generator set (14) are opened; The second low-pressure cylinder minimum cooling steam pipeline control and isolation valve group (17) of the second conventional unit-type generator set (14) are opened; The second high-pressure main steam valve (24) of the second conventional unit-type generator set (14) is slowly closed; The second medium-pressure cylinder exhaust steam control and isolation valve group (2) of the second conventional unit-type generator set (14) are slowly closed; the low-pressure feed water control and isolation valve group (6) are kept open; the water level of the deaerator of the second conventional unit-type generator set (14) is maintained stable; and the deep peak-shaving operation of the second conventional unit-type generator set (14) is achieved.
9. The method for operating a deep peak load regulation system based on thermal system coupling between units according to claim 8, characterized in that: The first conventional unit-type generator set (13) and the second conventional unit-type generator set (14) are both in a grid-connected power generation state, and any one of the generator sets can participate in deep peak regulation at any time.
10. The method for operating a deep peak load regulation system based on thermal system coupling between units according to claim 8, characterized in that: The operating states of the first conventional unit-based generator set (13) and the second conventional unit-based generator set (14) can be switched with each other.
Citation Information
Patent Citations
Thermodynamic system capable of being switched between operation mode of driving two steam turbines through one boiler and operation mode of driving one steam turbine through one boiler
CN109653810A
Deep peak regulation system between units based on thermodynamic system coupling
CN214464455U