Production material preparation management method, management device, storage medium and production system
By combining production orders and generating material preparation slips, sending material preparation slips to the material preparation area, allowing parallel material preparation, solving the problem of inefficient material preparation in the existing technology, and improving the efficiency of the material preparation process and the production efficiency are achieved.
Patent Information
- Application Number
- CN202110523936.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-13
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-05-13
AI Technical Summary
In the prior art, the material preparation efficiency of product production is low, resulting in a long wait period and low efficiency.
By obtaining production orders, determining preset type information, combining orders of the same preset type to generate material preparation orders, obtaining material and manufacturer information, sending material preparation to the material preparation area, allowing parallel material preparation, reducing waiting periods, and improving efficiency.
The efficiency improvement of the material preparation process is achieved, the waiting cycle is reduced, and the production efficiency and material flow efficiency are improved.
Smart Images

Figure CN113159631B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of industrial production, and in particular to a production material preparation management method, a management device, a storage medium and a production system. Background Art
[0002] Before products are processed and produced, materials used in production need to be prepared first, i.e., material preparation. For example, materials involved in the production of electronic products need to be prepared before production. The existing material preparation model basically relies on manual follow-up. Taking the production of electronic products as an example, the warehouse material preparation model is: the order-making post prints the nesting list and material preparation label according to the plan - after printing, it is passed to the flyer post - the flyer post starts the material preparation of the flyer - serial material preparation is carried out from the first material preparation post to the last material preparation post - material preparation is completed - transportation and distribution to the team.
[0003] The current manual follow-up material preparation mode and the serial pull method mean that the material must wait for the previous process to be completed and confirmed before it can flow to the next process, resulting in a long waiting period for the next process and waiting waste in the material preparation process. Moreover, preparing materials according to a single plan is inefficient. Summary of the invention
[0004] The technical problem to be solved by the present invention is that the material preparation efficiency of product production in the prior art is low.
[0005] In order to solve the above technical problems, the present invention provides a production material preparation management method, a management device, a storage medium and a production system.
[0006] A production material preparation management method, comprising:
[0007] Get production orders for planned production;
[0008] Determine the preset type information of the production order, merge the production orders with the same preset type information and generate a material preparation list;
[0009] Based on the production order for generating the material preparation list, obtaining material information of the material preparation list and obtaining manufacturer information of the material preparation list, to obtain a material list of the material preparation list;
[0010] When a material preparation instruction is received, the material list of the material preparation order is sent to the receiving end of each material preparation area of the material preparation warehouse.
[0011] In one embodiment, the preset type information includes a production date and a material code; and the step of merging production orders with the same preset type information and generating a material preparation list includes:
[0012] When the production order meets the preset conditions for changing the production date, changing the production date of the corresponding production order;
[0013] Filter the production orders with the same production date and the same material code, and merge the filtered production orders to obtain the material preparation list.
[0014] In one embodiment, obtaining the material information of the material preparation list includes:
[0015] Read the material code contained in the production order that generates the material preparation list;
[0016] Identify the quantity of each material according to the material code;
[0017] Read the material name corresponding to the material code and the material position corresponding to the material code;
[0018] The material position is read as an area corresponding to the material code of the preset position.
[0019] In one embodiment, obtaining the manufacturer information of the material preparation list includes:
[0020] Find the authentication method and CDF corresponding to the production order that generates the material preparation list;
[0021] Merge and read production orders with the same authentication method and CDF;
[0022] For production orders with the same certification method but different CDFs, the certified manufacturers of the materials are compared, and the material information corresponding to the production orders with the same certified manufacturers is merged and read.
[0023] In one embodiment, upon receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, the method further includes:
[0024] Obtaining the material preparation completion degree of the material preparation list;
[0025] When the material preparation completion degree is less than a preset completion degree, no response is given to the input material preparation instruction.
[0026] In one embodiment, upon receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, the method further includes:
[0027] Obtain the remaining amount of material preparation progress in each material preparation area of the material preparation warehouse;
[0028] The material preparation areas are sorted in ascending order according to the remaining amount of material preparation progress, and task scheduling information is sent to the receiving end of the forward-positioned material preparation area. The task scheduling information is used to prompt the scheduling personnel to assist in the rear-positioned material preparation area.
[0029] In one embodiment, upon receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, the method further includes:
[0030] Get the scan information of the picked materials;
[0031] If the information in the bill of materials matches the scanned information, a verification pass information is output.
[0032] In one embodiment, the production material preparation management method further includes:
[0033] Receive query information, query corresponding material-related information and / or order information according to the query information and output;
[0034] and / or
[0035] Acquire user identity information and input user operation, and prohibit the user operation when the user operation does not conform to a preset operation type corresponding to the user identity information;
[0036] and / or
[0037] The planned production date of the stored production order is obtained, and a transaction reminder message is sent to a preset user mailbox at a preset time before the planned production date.
[0038] A management device includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0039] Get production orders for planned production;
[0040] Determine the preset type information of the production order, merge the production orders with the same preset type information and generate a material preparation list;
[0041] Based on the production order for generating the material preparation list, obtaining material information of the material preparation list and obtaining manufacturer information of the material preparation list, to obtain a material list of the material preparation list;
[0042] When a material preparation instruction is received, the material list of the material preparation order is sent to the receiving end of each material preparation area of the material preparation warehouse.
[0043] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the following steps:
[0044] Get production orders for planned production;
[0045] Determine the preset type information of the production order, merge the production orders with the same preset type information and generate a material preparation list;
[0046] Based on the production order for generating the material preparation list, obtaining material information of the material preparation list and obtaining manufacturer information of the material preparation list, to obtain a material list of the material preparation list;
[0047] When a material preparation instruction is received, the material list of the material preparation order is sent to the receiving end of each material preparation area of the material preparation warehouse.
[0048] A production system, comprising: a transmission system and a management system, wherein the transmission system is arranged in a material preparation warehouse, and the material preparation warehouse is divided into a plurality of material preparation areas according to material attributes;
[0049] The management system includes a plurality of terminals and the above-mentioned management device. There are a plurality of terminals. At least one terminal is respectively arranged in each material preparation area of the material preparation warehouse, and each terminal is connected to the management device.
[0050] In one of the embodiments, the transmission system includes a middle channel transmission mechanism, and the middle channel transmission mechanism extends along the arrangement direction of the plurality of preparation areas.
[0051] In one embodiment, the middle-layer channel transmission mechanism includes a middle-layer material conveyor belt and an upper-layer material conveyor belt, and the upper-layer material conveyor belt and the middle-layer material conveyor belt are arranged in layers up and down, and both extend along the arrangement direction of the multiple preparation areas; the upper-layer material conveyor belt is located on the upper layer of the middle-layer material conveyor belt.
[0052] In one of the embodiments, the management system further includes a plurality of printers, at least one printer is disposed in each of the plurality of material preparation areas of the material preparation warehouse, and the printers in the same material preparation area are connected to the terminal.
[0053] Compared with the prior art, one or more embodiments of the above scheme may have the following advantages or beneficial effects: after obtaining the production order, the production orders are merged to generate a material preparation list, and the material information and manufacturer information of the material preparation list are sorted out based on the production order to obtain a material list; when the material preparation instruction is received, the material list of the material preparation list is sent to the receiving end of each preparation area of the material preparation warehouse, so that each preparation area can receive the material preparation list, so that the staff in each preparation area can prepare materials in parallel according to the received material preparation list, without waiting for the completion confirmation of the material of the previous process, thereby reducing the waiting cycle and improving efficiency; moreover, by merging the production orders and processing multiple production orders together, the efficiency of material preparation can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The scope of the present disclosure may be better understood by reading the following detailed description of exemplary embodiments in conjunction with the accompanying drawings. The drawings included are:
[0055] Figure 1A schematic diagram of a production material preparation management method in one embodiment;
[0056] Figure 2 A schematic diagram of a process for merging production orders with the same preset type information and generating a material preparation list in one embodiment;
[0057] Figure 3 A flowchart of obtaining material information of a material preparation list in one embodiment;
[0058] Figure 4 A flowchart of obtaining manufacturer information of a material preparation list in one embodiment;
[0059] Figure 5 is a structural block diagram of a management system in an embodiment;
[0060] Figure 6 A schematic diagram of the layout of a material preparation area in a material preparation warehouse in one embodiment;
[0061] Figure 7 for Figure 6 Schematic diagram of local A;
[0062] Figure 8 for Figure 6 A top view of
[0063] Fig. 9 Workflow diagram for preparing materials for production. DETAILED DESCRIPTION
[0064] In order to make the objectives, technical solutions and advantages of the present invention clearer, the implementation method of the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments, so that the implementation process of how the present invention applies technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly.
[0065] like Figure 1 As shown, in one embodiment, a production material preparation management method is provided, which can be applied to a management device, and is used to manage the material preparation process of a material preparation warehouse including multiple material preparation areas, and the material preparation areas of the material preparation warehouse are divided according to the categories of materials; the management device is connected to the receiving end of each material preparation area in the material preparation warehouse; the management device can be a computer device, such as a server, etc. Taking the application to the management device as an example, the method includes:
[0066] S110: Obtain the production order for planned production.
[0067] The production order is the order information of the products that need to be produced. Specifically, the production order can be uploaded by the user, for example, by using standard EXCEL; or, the management device can be associated with the system that records the order to automatically check the data to obtain the production order.
[0068] S130: Determine the preset type information of the production order, merge the production orders with the same preset type information and generate a material preparation list.
[0069] A production order includes multiple types of information. For example, a production order includes information related to materials that need to be prepared. The information type corresponding to the production order may include a code for indicating the type of material, and may also include information such as the time required for production. Among them, the preset type information can be set according to the needs of merging. For example, if the production orders of the same production shift need to be merged, the preset type information includes information for indicating the production shift.
[0070] S150: Based on the production order for generating the material preparation list, material information of the material preparation list and manufacturer information of the material preparation list are obtained to obtain a material list of the material preparation list.
[0071] Among them, material information is information related to materials, such as material name, material quantity, material location, etc.; manufacturer information is information related to the production order and the manufacturer of the materials included in the production order. Specifically, the management device sorts out the material information and manufacturer information of the material preparation list based on the information in each production order of the material preparation list.
[0072] S170: When a material preparation instruction is received, the material list of the material preparation order is sent to a receiving end of each material preparation area of the material preparation warehouse.
[0073] The material preparation instruction is used to instruct the start of material preparation. The material preparation warehouse is divided into multiple areas according to the type of materials, and each material preparation area is provided with at least one receiving terminal for connecting to the management device; the management device sends the material list of the material preparation list to the receiving terminal of each material preparation area, so that each material preparation area can receive the material list of the material preparation list, and the staff of each material preparation area prepares materials in parallel according to the material preparation list.
[0074] The above-mentioned production material preparation management method, after obtaining the production order, merges the production orders to generate a material preparation list, and organizes the material information and manufacturer information of the material preparation list based on the production order to obtain a material list; when the material preparation instruction is received, the material list of the material preparation list is sent to the receiving end of each material preparation area in the material preparation warehouse, so that each material preparation area can receive the material preparation list, so that the staff in each material preparation area can prepare materials in parallel according to the received material preparation list, without waiting for the completion confirmation of the material of the previous process, thereby reducing the waiting cycle and improving efficiency; moreover, by merging the production orders and processing multiple production orders together, the efficiency of material preparation can be improved.
[0075] The above production material preparation management method realizes the information management of material preparation and conducts unified and standardized control of production materials. The application of the above production material preparation management method has a positive effect on enterprises to improve production management quality, improve material flow efficiency, reduce material preparation time, shorten production preparation cycle, ensure product delivery on time, improve production efficiency and reduce production costs.
[0076] In one embodiment, the preset type information includes a production date and a material code. The production date is the time when the production order needs to be produced, and the material code is a code indicating the type of material. Specifically, in step S130, merging production orders with the same preset type information and generating a material preparation list includes:
[0077] When a production order meets the preset conditions for changing the production date, change the production date of the corresponding production order; filter the production orders with the same production date and the same material code, and merge the filtered production orders to obtain the material preparation list.
[0078] Among them, the preset conditions can be set according to the needs of changing the production date. Specifically, the preset conditions can include that the production date is a statutory holiday, and can also include receiving a production date change instruction input by the user. The traditional material preparation method prepares materials according to a single plan, and there is repeated sorting of the same material, which will also cause inefficiency; this embodiment selects production orders with the same production date and the same material code after adjusting the production date, and merges them, thereby merging orders with the same production date and required materials into one material preparation list, which can avoid repeated sorting and improve material preparation efficiency.
[0079] Specifically, before changing the production date of the corresponding production order, you can also verify the unlock password. If the verification is passed, the production date is changed to avoid accidental changes and ensure the accuracy of the changes. Furthermore, in addition to meeting the same production date and the same material code, the screening conditions can also meet the same production shift. For example Figure 2 As shown, when the production date is a statutory holiday or the user needs to change the production date and enters a production date change instruction, the unlock password entered by the user is verified. If the verification is passed, the system is unlocked, the production date of the corresponding production order is changed, and then screening and merging are performed to merge the production orders of the same shift within this production date to generate a material preparation order number.
[0080] In one embodiment, the material information includes the material code, the quantity of the material, the material name, the material location and the area. The step S150 of obtaining the material information of the material preparation list includes: reading the material code contained in the production order for generating the material preparation list; identifying the quantity of each material according to the material code; reading the material name corresponding to the material code and the material location corresponding to the material code; reading the area corresponding to the material code whose material location is the preset location.
[0081] The material code is a code indicating the type of material. The material location refers to the location of the preparation warehouse where the material is stored; the area corresponding to the material code refers to the preparation area in the warehouse where the material corresponding to the material code is stored; wherein the preset location is the location of the warehouse where the material preparation is required. Specifically, the management device can store the read material code in an array, traverse the array to determine the number of the same material code, and obtain the number of materials corresponding to this material code. Specifically, the management device can read the material name from a database that records the correspondence between the material code and the material name, read the material location from a database that records the correspondence between the material code and the material location, and for the material code whose material location is the preset location, read the area of the material code from the database that records the storage area corresponding to the material code. By reading the material code, obtaining the material quantity, material name, material location and the area of the material code at the preset location according to the material code, the material-related information in the preparation list is obtained.
[0082] In one embodiment, the manufacturer information may include information such as authentication method, CDF (construction data form), and certified manufacturer. In step S150, the manufacturer information of the material preparation list is obtained, including: finding the authentication method and CDF corresponding to the production order that generates the material preparation list; for production orders with the same authentication method and CDF, merging and reading the production orders with the same authentication method and CDF; for production orders with the same authentication method but different CDFs, comparing the certified manufacturers of the materials, and merging and reading the material information corresponding to the production orders with the same certified manufacturers.
[0083] Specifically, the management device reads the order number and order quantity of the production orders with the same authentication method and CDF and stores them in the first data table; the management device reads the material information corresponding to the production orders with the same authentication method but different CDF and the same certified manufacturer in the production orders and stores them in the second data table. By reading the authentication method and CDF of the production order and the certified manufacturer of the materials in the production order, they are classified and stored according to whether the authentication method, CDF and certified manufacturer are the same, which is convenient for statistical analysis.
[0084] For example Figure 3 and Figure 4 As shown, it is a flowchart for obtaining material information and manufacturer information of a material preparation list; specifically, before reading the material information, the material information stored in the database may also be updated; wherein, the third phase refers to a warehouse for storing materials that need to be prepared.
[0085] In one of the embodiments, after step S170, the following steps are further included: obtaining the material preparation completion degree of the material preparation list; when the material preparation completion degree is less than a preset completion degree, not responding to the input material preparation instruction.
[0086] The preset completion degree can be preset according to actual needs. The preparation completion degree of the material preparation list is information that reflects the overall preparation progress of multiple preparation areas in the material preparation warehouse. For example, the preparation completion degree of each preparation area can be obtained separately, and the lowest preparation completion degree among multiple preparation areas is taken as the preparation completion degree of the material preparation list. By analyzing the preparation completion degree, if it is less than the preset completion degree, it means that the preparation work of the production order will take a long time; when the preparation completion degree is less than the preset completion degree, the input preparation instruction will not be responded to, that is, the user is prohibited from continuing to call for preparation, so as to implement the material call restriction, avoid causing a large number of idle order calls, and improve the material preparation efficiency at the same time. Only when the order is completed to a certain extent can the call for preparation continue to be responded.
[0087] In one of the embodiments, step S170 also includes: obtaining the remaining amount of material preparation progress in each material preparation area of the material preparation warehouse; sorting the material preparation areas according to the remaining amount of material preparation progress from small to large, and sending task scheduling information to the receiving end of the front preset material preparation area, and the task scheduling information is used to prompt the scheduling personnel to go to the rear preset material preparation area for assistance.
[0088] The remaining amount of material preparation progress is information that reflects the material preparation progress, specifically, information that reflects the size of the remaining material preparation tasks that need to be completed. The material preparation areas are sorted from small to large according to the remaining amount of material preparation progress. The closer to the front, the smaller the remaining material preparation tasks; the front preset preparation area refers to the preparation area corresponding to the remaining amount of material preparation progress at the front preset position, which is counted from the front to the back in the sorting, and the rear preset preparation area refers to the preparation area corresponding to the remaining amount of material preparation progress at the rear preset position, which is counted from the back to the front in the sorting. For example, the preset position is 2. For a material preparation warehouse with 6 material preparation areas, the front preset preparation area is the preparation area corresponding to the first and second material preparation progress remaining amounts in the sorting, and the rear preset preparation area is the preparation area corresponding to the penultimate and second to last material preparation progress remaining amounts in the sorting. Among them, the preset position can be set according to actual needs. By sending task scheduling information based on the remaining amount of material preparation progress in each material preparation area, intelligent scheduling is achieved and balanced job management is carried out. Staff in material preparation areas that have completed tasks first are prompted to assist staff in material preparation areas that have completed tasks later in preparing materials, helping to quickly resolve the material preparation rhythm problem.
[0089] Specifically, after obtaining the remaining amount of the material preparation progress of each material preparation area in the material preparation warehouse, the method may further include: displaying the remaining amount of the material preparation progress of each material preparation area. In this way, the material preparation completion status of each material preparation area may be displayed in real time, which is convenient for users to view.
[0090] In one embodiment, after step S170, the following steps are further performed: obtaining scan information of the picked material; if the information in the bill of materials matches the scan information, outputting a verification pass message. Further, if the information in the bill of materials does not match the scan information, outputting a verification fail message.
[0091] Among them, the picked materials are the materials picked by the staff when preparing materials according to the material list of the preparation list; the scanned information of the picked materials is the information obtained by scanning with a scanner, for example, each material may correspond to a product code, and the scanner scans the product code to obtain the scanned information. Specifically, the scanned information may include one or more types of information in the material information; the match may be the consistency of the information. If there is information in the bill of materials that matches the scanned information, it means that the scanned information belongs to the bill of materials, and the picked materials corresponding to the scanned information are the materials that need to be prepared as indicated by the bill of materials; correspondingly, the verification pass information is used to prompt that the picked materials are picked correctly. By verifying the scanned information, errors in material preparation can be prevented, and the accuracy of material preparation can be improved.
[0092] In one of the embodiments, the above-mentioned production material preparation management method further includes: receiving query information, querying corresponding material-related information and / or order information according to the query information and outputting it.
[0093] The query information may include at least one of an order number and a material preparation number. After receiving the query information, the management device may query the order information of the production order corresponding to the query information, or query the material-related information corresponding to the query information, or query the corresponding order information and material-related information, and then output the query information to an information output device, such as a display screen or a voice announcer, so that the user can view it in time. In this way, an information query function is provided, and rest and search are convenient.
[0094] In one of the embodiments, the above-mentioned production material preparation management method further includes: obtaining user identity information and input user operation, and prohibiting the user operation when the user operation does not conform to the preset operation type corresponding to the user identity information.
[0095] User identity information can be the user's biometric information or user account, etc.; each user identity information corresponds to a preset operation type that is allowed to be operated. By analyzing the user identity information and user operations, permission management is achieved and the professionalism of user operations is improved. Specifically, the management device can identify the user category according to the user identity information, and use the preset operation type corresponding to the user category as the preset operation type corresponding to the user identity information, so as to set permissions for users of different categories. For example, taking the material preparation of electronic products as an example, for the order planning administrator, operations such as order import, editing, merging, and adjusting the material preparation sequence can be performed, and new employees can be registered; for the order picking administrator, operations such as order picking import and editing can be performed, and new employees can be registered; for the material preparation administrator, order information and material preparation list information can be viewed, and printing operations can be performed; for the equipment progress maintainer, the order equipment progress can be maintained, including the SMT surface mounting progress and the AI automatic plug-in progress; for the motherboard progress maintainer, the order motherboard line set progress (including chip burning, first inspection preparation, test tooling status, etc.) can be maintained; for ordinary employees, order and material preparation list information can be viewed.
[0096] In one of the embodiments, the above-mentioned production material preparation management method further includes: obtaining the planned production date of the stored production order, and sending a transaction reminder message to a preset user mailbox at a preset time before the planned production date.
[0097] The preset time can be set according to actual needs, for example, it can be one day. Specifically, the management device sends a transaction reminder message to the preset user mailbox one day before the planned production date to remind the user to process the plan for the next day. In this way, the transaction reminder function is realized to help users plan their work.
[0098] In one of the embodiments, the above-mentioned production material preparation management method further includes: obtaining an input material code, and obtaining the available surplus of the material corresponding to the material code from a material quantity recording system.
[0099] Among them, the material quantity recording system is a system that records the remaining available quantity of materials. By obtaining the available balance of the corresponding material from the material quantity recording system according to the material code, the matching query of the material quantity is realized, which is convenient for users to query.
[0100] It should be understood that although Figure 1-Figure 4 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1-Figure 4At least part of the steps may include multiple steps or multiple stages. These steps or stages are not necessarily performed at the same time, but can be performed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed in turn or alternately with other steps or at least part of the steps or stages in other steps.
[0101] In one embodiment, a management device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method in each of the above embodiments when executing the computer program.
[0102] The above management device can implement the steps of the methods in the above embodiments, and similarly, can improve the material preparation efficiency.
[0103] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method in the above embodiments are implemented.
[0104] The computer-readable storage medium can implement the steps of the methods in the above embodiments, and similarly, can improve the material preparation efficiency.
[0105] In one embodiment, a production system is provided, including a transmission system and a management system. The transmission system is arranged in a material preparation warehouse, and the material preparation warehouse is divided into a plurality of material preparation areas according to material attributes. Figure 5 As shown, the management system includes a terminal 410 and a management device 430 . There are multiple terminals. At least one terminal 410 is set in each of the multiple preparation areas divided by material attributes in the material preparation warehouse. Each terminal 410 is connected to the management device 430 .
[0106] The above production system, because it adopts the above management system that can improve the material preparation efficiency, also has the advantage of high material preparation efficiency.
[0107] In one embodiment, the management device 430 is wirelessly connected to the terminal 410. The communication connection is carried out through wireless communication, and the layout is simple.
[0108] Specifically, the management device may be a server. The server may store data through a backend database and a LAN server data backup method to ensure data security and flexibility, realize remote automatic backup of programs and dual storage of backend databases, and prevent the loss of programs and production data due to server system failure.
[0109] In one embodiment, the transmission system further includes a middle channel transmission mechanism, which extends along the arrangement direction of the plurality of material preparation areas. The middle channel transmission mechanism is used to transmit materials and / or other items, and by extending the middle channel transmission mechanism in the arrangement direction of each material preparation area, it is convenient to transmit materials in each material preparation area.
[0110] In one embodiment, the middle channel transmission mechanism includes a middle material conveyor belt and an upper material conveyor belt, and the middle material conveyor belt and the upper material conveyor belt are arranged in a material preparation warehouse. The upper material conveyor belt and the middle material conveyor belt are arranged in layers, and both extend along the arrangement direction of the multiple material preparation areas; the upper material conveyor belt is located on the upper layer of the middle material conveyor belt. By setting two layers of material conveyor belts, they are used for material transmission and empty box return respectively, which is convenient to use.
[0111] In one embodiment, the distance between the middle material conveyor belt and the upper material conveyor belt is maintained at 25 cm. By setting the distance of 25 cm, the interval between the two conveyor belts is moderate, and the distance will not be too large to occupy space, nor will the distance be too small to make it difficult to place materials / empty boxes. Specifically, the upper material conveyor belt can be about 92 cm from the ground, the middle material conveyor belt can be about 57 cm from the ground, and the conveyor belt height can be 10 cm.
[0112] In one of the embodiments, the transmission system also includes a material cross-floor conveyor belt, and the middle-layer material conveyor belt and the upper-layer material conveyor belt can both be connected to the material cross-floor conveyor belt. Among them, the material cross-floor conveyor belt is used for cross-floor material transmission. The middle-layer material conveyor belt and the upper-layer material conveyor belt transfer the items placed by the staff in the material preparation area to the material cross-floor conveyor belt, and transmit them to other floors through the material cross-floor conveyor belt. The middle-layer material conveyor belt and the upper-layer material conveyor belt can also transfer the items transferred by the material cross-floor conveyor belt to the location of the material preparation area. By connecting the middle-layer material conveyor belt and the upper-layer material conveyor belt to the material cross-floor conveyor belt, cross-floor transmission can be achieved, which is highly convenient.
[0113] In one embodiment, the transmission system further includes a bidirectional corner device, and the middle-layer material conveyor belt and the upper-layer material conveyor belt are connected to the material cross-floor conveyor belt through the bidirectional corner device. There can be multiple bidirectional corner devices, and the middle-layer material conveyor belt and the upper-layer material conveyor belt are respectively connected to the material cross-floor conveyor belt through corresponding bidirectional corner devices. The bidirectional corner device is used to realize the turning and docking of tracks in different directions. By using the bidirectional corner device to dock the middle-layer material conveyor belt and the upper-layer material conveyor belt with the material cross-floor conveyor belt, the connection between different conveyor belts is more natural and the transmission of items is more stable.
[0114] In one embodiment, the transmission system further comprises a hoist, which is connected to the material cross-floor conveyor belt. Specifically, the material is connected to the material cross-floor conveyor belt through the hoist, so that the material is transmitted across heights, which is convenient to use.
[0115] For example Figure 6-Figure 8 As shown, the middle material conveyor belt and the upper material conveyor belt go uphill at the end of the last material preparation area of the material preparation warehouse, and use two-way turning equipment to connect with the uphill section of the original sixth-floor electronic material cross-floor transmission line; a pedestrian passage is set under the horizontal transmission section after the first turn.
[0116] In one embodiment, the management system further includes multiple printers, and at least one printer is respectively provided in multiple material preparation areas of the material preparation warehouse, and the printers in the same material preparation area are connected to the terminal 410. The terminal 410 can send the information to be printed to the printer for printing, for example, sending the received material preparation list to the printer for printing, so that the staff can view the paper documents, thereby improving the convenience of material preparation.
[0117] For example, if terminal 410 is an integrated machine and the material preparation warehouse is divided into 6 material preparation areas, the material preparation warehouse is divided into six areas from left to right, and each material preparation area is equipped with an integrated machine and a printer, so that the material preparation list can be automatically printed and printed synchronously by area. The integrated machine in each material preparation area displays the material information of the current material preparation list in that area, ensuring the timeliness of information transmission and solving the problem that the staff must use the nested material list as the only reference mark for material preparation.
[0118] like Fig. 9 As shown, the user imports the production order for planned production, and after confirmation, the production order is merged to generate a material preparation list, and the material preparation list is data processed; when the production line calls for materials and the administrator confirms the call, the material preparation list is sent to the all-in-one machine in the material preparation area for material preparation reminder; the staff in the material preparation area starts material preparation according to the material preparation list, and the material preparation process is scanned for error prevention, completeness inspection, and code affixing.
[0119] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0120] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0121] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the protection scope of the present invention shall still be subject to the scope defined in the attached claims.
Claims
1. A production material preparation management method, characterized in that: include: Get production orders for planned production; Determine the preset type information of the production order, merge the production orders with the same preset type information and generate a material preparation list, wherein the preset type information includes a production date and a material code; Based on the production order for generating the material preparation list, obtaining material information of the material preparation list and obtaining manufacturer information of the material preparation list, to obtain a material list of the material preparation list; When receiving the material preparation instruction, the material list of the material preparation order is sent to the receiving end of each material preparation area of the material preparation warehouse; wherein the material preparation warehouse is divided into multiple material preparation areas according to material attributes; The obtaining of material information of the material preparation list includes: Read the material code contained in the production order that generates the material preparation list; Identify the quantity of each material according to the material code; Read the material name corresponding to the material code and the material position corresponding to the material code; Read the area corresponding to the material code of the material position which is the preset position; The obtaining of the manufacturer information of the material preparation list includes: Find the authentication method and CDF corresponding to the production order that generates the material preparation list; Merge and read production orders with the same authentication method and CDF; For production orders with the same certification method but different CDFs, the certified manufacturers of the materials are compared, and the material information corresponding to the production orders with the same certified manufacturers is merged and read.
2. The method according to claim 1, characterized in that The step of merging production orders with the same preset type information and generating a material preparation list includes: When the production order meets the preset conditions for changing the production date, changing the production date of the corresponding production order; Filter the production orders with the same production date and the same material code, and merge the filtered production orders to obtain the material preparation list.
3. The method according to claim 1, characterized in that When receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, it also includes: Obtaining the material preparation completion degree of the material preparation list; When the material preparation completion degree is less than a preset completion degree, no response is given to the input material preparation instruction.
4. The method according to claim 1, characterized in that: When receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, it also includes: Obtain the remaining amount of material preparation progress in each material preparation area of the material preparation warehouse; The material preparation areas are sorted in ascending order according to the remaining amount of material preparation progress, and task scheduling information is sent to the receiving end of the pre-positioned material preparation area. The task scheduling information is used to prompt the scheduling personnel to assist in the post-positioned material preparation area.
5. The method according to claim 1, characterized in that: When receiving the material preparation instruction, after sending the material list of the material preparation order to the receiving end of each material preparation area of the material preparation warehouse, it also includes: Get the scan information of the picked materials; If the information in the bill of materials matches the scanned information, a verification pass information is output.
6. The method according to claim 1, characterized in that Also includes: Receive query information, query corresponding material-related information and / or order information according to the query information, and output; and / or Acquire user identity information and input user operation, and prohibit the user operation when the user operation does not conform to a preset operation type corresponding to the user identity information; and / or The planned production date of the stored production order is obtained, and a transaction reminder message is sent to a preset user mailbox at a preset time before the planned production date.
7. A management device, comprising a memory and a processor, wherein the memory stores a computer program, characterized in that:When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A production system, characterized in that: It includes a transmission system and a management system, wherein the transmission system is arranged in a material preparation warehouse, and the material preparation warehouse is divided into a plurality of material preparation areas according to material attributes; The management system includes multiple terminals and the management device as described in claim 7. There are multiple terminals, and at least one terminal is respectively set in each preparation area of the material preparation warehouse, and each terminal is connected to the management device.
10. The production system according to claim 9, characterized in that: The transmission system comprises a middle channel transmission mechanism, and the middle channel transmission mechanism extends along the arrangement direction of the plurality of material preparation areas.
11. The production system according to claim 10, characterized in that: The middle-layer channel transmission mechanism includes a middle-layer material conveyor belt and an upper-layer material conveyor belt. The upper-layer material conveyor belt and the middle-layer material conveyor belt are arranged in layers up and down, and both extend along the arrangement direction of the multiple preparation areas; the upper-layer material conveyor belt is located on the upper layer of the middle-layer material conveyor belt.
12. The production system according to claim 9, characterized in that: The management system further comprises a plurality of printers, and at least one printer is respectively arranged in a plurality of material preparation areas of the material preparation warehouse, and the printers in the same material preparation area are connected to the terminal.
