A simulation method for emergency evacuation of personnel considering radioactive impact
By considering the radioactive impact and personnel behavior in the emergency evacuation simulation of nuclear power plants, static and dynamic path planning and multi-agent collision avoidance models are adopted, the problem of insufficient simulation in the existing technology is solved, and high-precision emergency evacuation simulation and The solution is optimized to improve the executability of emergency responses.
Patent Information
- Application Number
- CN202110412035.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-16
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-04-16
AI Technical Summary
The existing technology lacks specific calculation methods from the perspective of micro-person behavior in the emergency evacuation simulation of nuclear power plants. In the international field of transportation, the complexity of personnel behavior is not fully considered, resulting in the simulation being inaccurate enough and difficult to formulate. Optimized contingency plan.
A simulation method for emergency evacuation of personnel considering the influence of radioactivity is proposed. Through scene modeling, static and dynamic path planning, multi-agent collision avoidance model, comprehensively considering the concentration of radioactive substances, path distance and pass time, the personnel evacuation path is optimized and personnel are realized. Emergency evacuation simulation.
It realizes high-precision emergency evacuation simulation of nuclear power plants, provides technical support for emergency time estimation and plan optimization, improves the enforceability of emergency response, and is suitable for the formulation of emergency plans for nuclear power plants and other similar scenarios.
Smart Images

Figure CN113222219B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a personnel emergency evacuation simulation technology, and in particular to a personnel emergency evacuation simulation method taking radioactive influence into consideration. Background Art
[0002] A serious accident at a nuclear power plant could release large amounts of radioactive material into the environment, potentially exposing people to radiation exposure through plume exposure, inhalation exposure, and ground deposition exposure. Radioactive material cannot be destroyed or eliminated by conventional physical, chemical, or biological methods; only the decay of radionuclides can reduce radioactivity to a certain level. Therefore, in the event of a serious accident, the public within the nuclear power plant area and a nearby area must be evacuated as soon as possible to minimize the potential for harm to humans from released radioactive material.
[0003] Since nuclear power plant evacuation involves a large scope and numerous influencing factors, and may cause negative impacts such as public panic and unfavorable public opinion, there is an urgent need to develop an emergency evacuation simulation method to quantitatively evaluate the feasibility and effectiveness of emergency evacuation actions in the event of a nuclear accident, and provide technical support for the formulation of more optimized emergency plans and the improvement of the feasibility of emergency responses.
[0004] Research in my country on nuclear power plant emergency evacuation simulation is in its infancy. With only general requirements for emergency evacuation, there is a lack of specific calculation methodologies and guidelines. Internationally, there are clear regulations, guidelines, methods, and procedures for nuclear power plant emergency evacuation simulation, such as NUREG / CR 0654, NUREG / CR 7002, DYNEV-II, and OREMS. Existing research in China is largely based on mature foreign software tools, but these methods themselves are not fully adapted to China's specific circumstances.
[0005] Currently, international simulations for nuclear power plant emergency evacuations primarily focus on traffic simulations, primarily simulating the evacuation of vehicles. In reality, the behavior of personnel during a nuclear power plant evacuation is more complex, and the time required to assemble personnel can be significantly longer than the travel time of vehicles on the road network. Therefore, it is necessary to research methods for simulating personnel emergency evacuations from a microscopic perspective. Summary of the Invention
[0006] The purpose of the present invention is to provide a personnel emergency evacuation simulation method taking into account the impact of radioactivity, realizing the emergency evacuation simulation function of a nuclear power plant, and providing guidance for the emergency evacuation actions of non-emergency personnel of a nuclear power plant in the event of a radioactive accident. The method has the characteristics of high simulation accuracy and strong applicability, and provides technical support for the emergency evacuation time estimation of domestic nuclear power plant sites.
[0007] The technical solution of the present invention is as follows: a personnel emergency evacuation simulation method considering radioactive impacts, comprising the following steps:
[0008] (1) Conduct scenario modeling, including building modeling and road modeling, and provide information on radioactive material concentration, the number of people in the building, and vehicle source information;
[0009] (2) Based on the distribution of radioactive material concentrations and assuming that personnel evacuate at a uniform speed, estimate the radiation doses that personnel may receive along each path to the assembly point, and plan static evacuation paths for personnel;
[0010] (3) Dynamically update the path of personnel to the assembly point by comprehensively considering the factors affecting radioactive material concentration, travel time and path distance;
[0011] (4) Plan the vehicle movement path based on the emergency assembly points set in the scene, taking into account the number of vehicles available for evacuation and the number of people at the assembly points;
[0012] (5) By simulating the emergency evacuation process, the effectiveness of the evacuation is evaluated and the emergency evacuation plan is optimized.
[0013] Furthermore, in the above-mentioned personnel emergency evacuation simulation method considering radioactive effects, in step (1), three model files are generated during the modeling process, including a road node coordinate information file, a building vertical projection shape file, and a building ground node position information file; the distribution of the number of people in the building is given by the factory information file, and the initial position of the people is determined by random sampling; the radioactive material concentration information includes the center position of the release source and the boundary range exceeding the dose limit; the vehicle source information includes the vehicle source position, departure time, passenger capacity, and number of vehicles.
[0014] Furthermore, in the above-mentioned personnel emergency evacuation simulation method considering the impact of radioactivity, in step (2), according to the dose limit requirements, the roads that exceed the dose limit and should be avoided during the evacuation process are identified, and the red zone is marked; when the doses received by personnel in most areas exceed the dose limit, the red zone strategy is no longer considered, and the evacuation road is selected with the goal of getting personnel away from the high-concentration radioactive area as soon as possible.
[0015] Furthermore, when selecting evacuation roads outside the red zone, the concentration of radioactive substances is used as the road segment comparison keyword; when the red zone strategy is not considered, the concentration of radioactive substances and path distance are used as road segment comparison keywords, and the path with the smallest keyword value is selected as the shortest path tree from personnel to the gathering point to complete static path planning.
[0016] Furthermore, in the above-mentioned personnel emergency evacuation simulation method considering the radioactive impact, in step (3), the planned static path is gridded using the midpoint line drawing algorithm, and the length of the path intercepted by the grid is calculated. The travel time of the personnel passing through each grid on the road section is accumulated in sequence to obtain the estimated travel time of the personnel through each path, which is used as one of the influencing factors of dynamic path planning.
[0017] Furthermore, in step (3), the radioactive substance concentration, travel time and path distance are used as the comparison keywords of the road sections from each road node to the collection point, and the road node with the smallest keyword value is selected as its target node as the velocity direction of the next time step.
[0018] Furthermore, in step (3), a multi-agent collision avoidance model is used to calculate the velocity of the next time step and update the personnel position.
[0019] Furthermore, in the above-mentioned simulation method for emergency evacuation of personnel taking into account the impact of radioactivity, in step (4), after the vehicle arrives at the assembly point according to the designated route, the waiting personnel board the vehicle. When the vehicle is full or no one is heading to the assembly point, the vehicle carries the evacuees to the resettlement point and updates the number of evacuees. After the vehicle arrives at the resettlement point, the target assembly point and vehicle route are re-designated based on the number of people at each assembly point. This step is repeated until all personnel have evacuated to the resettlement point, and the evacuation is completed.
[0020] Furthermore, in the above-mentioned personnel emergency evacuation simulation method considering the radioactive impact, in step (5), the personnel emergency evacuation process during a serious nuclear accident is simulated, the personnel emergency evacuation time and the dose received are estimated, the personnel evacuation time and vehicle operation status information are counted, the effectiveness of the evacuation is evaluated, and optimization measures and plans are proposed.
[0021] The beneficial effects of the present invention are as follows: The present invention proposes a personnel emergency evacuation simulation method that takes into account the impact of radioactivity from the perspective of microscopic personnel behavior simulation. The method innovatively proposes a dynamic and static combined path planning algorithm that comprehensively considers the influencing factors of radioactive material concentration distribution, path distance, and travel time, and combines it with a multi-agent collision avoidance model to realize personnel emergency evacuation simulation. The personnel emergency evacuation simulation method provided by the present invention is not only suitable for emergency evacuation simulation of nuclear facilities such as nuclear power plants, but also has certain applicability in other fields (such as chemical plants) by adjusting the influencing factors. The present invention can provide auxiliary tools for formulating and improving feasible and efficient emergency plans, improve the operability of emergency plans, and play a positive role in reducing the impact of serious accidents in nuclear power plants on people and the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A flow chart of a personnel emergency evacuation simulation method considering radioactive impacts provided in a specific embodiment of the present invention;
[0023] Figure 2 This is a schematic diagram of an emergency evacuation scenario of a nuclear power plant in a specific embodiment of the present invention;
[0024] Figure 3 Schematic diagram of the initial position distribution of personnel in a nuclear power plant in a specific embodiment of the present invention;
[0025] Figure 4 This is a schematic diagram of the evacuation process of nuclear power plant personnel in a specific embodiment of the present invention;
[0026] Figure 5 Schematic diagram of personnel distribution in the factory building near source 2 in a specific embodiment of the present invention;
[0027] Figure 6 This is a schematic diagram of the distribution of people gathered at the gathering point 7 in a specific embodiment of the present invention;
[0028] Figure 7 A statistical diagram of the number of people waiting at a gathering point in a specific embodiment of the present invention;
[0029] Figure 8 This is a statistical diagram of the emergency evacuation time of a nuclear power plant in a specific embodiment of the present invention;
[0030] Figure 9 This is a statistical diagram of the evacuation time of some personnel in a nuclear power plant in a specific embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0032] The present invention provides a personnel emergency evacuation simulation method that considers the impact of radioactivity, enabling nuclear power plant emergency evacuation simulation capabilities and providing guidance for the evacuation of non-emergency personnel in the event of a radioactive accident. In the event of a nuclear power plant accident, radioactive materials are released. Using appropriate accident assumptions and dispersion conditions, the concentration distribution of radioactive materials in the site and surrounding areas is estimated. The impact of the radioactive material distribution is considered to determine the available evacuation paths and perform static path planning. During the evacuation process, appropriate human behavior models are used to simulate interactions between individuals and between individuals and obstacles, obtaining data on human speed and density throughout the evacuation process. By comprehensively considering the influencing factors of radioactive material distribution, path distance, and travel time, the evacuation path is adjusted appropriately to achieve dynamic path planning. A multi-objective collision avoidance model is used to more precisely simulate the behavioral characteristics of personnel during evacuation, addressing issues such as collision avoidance, jitter, and failure of collision avoidance on different sides during movement. In this way, the entire process of non-emergency personnel evacuation from a nuclear power plant is simulated, information such as personnel evacuation time and vehicle travel is collected, bottleneck areas in the evacuation process are identified, and recommendations are provided for evacuation protection actions.
[0033] Figure 1 A flow chart of a personnel emergency evacuation simulation method considering radioactive impact is given, which mainly includes the following steps:
[0034] Step 1: Scenario modeling is performed using graph theory, including building and road modeling. An adjacency list is used to describe the graph, with key geographic locations in the scenario added as road nodes. The lines connecting the road nodes represent the traversable road segments in the actual scenario. Buildings in the scenario are represented as a collection of line segments with specified normal vectors. The normal vector of each line segment is a unit vector that is perpendicular to the line segment and points to the right when closed counterclockwise. Three input files are generated: a road node information file, a building vertical projection shape file, and a building ground node location file. It is assumed that all personnel are located within the buildings at the time of the accident. The distribution of personnel within each building is given by the building information file, and the initial positions of personnel are determined by random sampling. Furthermore, given the predicted radioactive material concentration distribution and vehicle source information, at the time of the accident, a preliminary allocation of vehicles to the assembly point and routes is made based on historical experience with assembly point locations and population estimates.
[0035] Step 2: Based on the distribution of radioactive material concentrations, assuming that personnel evacuate at a uniform speed, estimate the possible radiation doses received by personnel on each path. Combined with the relevant dose limit requirements, identify the evacuation roads that should be avoided during the evacuation process, and mark the red zone. In subsequent calculations, personnel will follow instructions and no longer pass through this area; for areas outside the red zone, it is considered that all roads are available during the evacuation process, and the influence of the concentration of radioactive materials on the road section is considered with appropriate weights. When the dose received by personnel in most areas exceeds the limit, the red zone strategy is no longer adopted, but the goal is to get personnel away from high-concentration radioactive areas as soon as possible. At this time, the influence of the concentration of radioactive materials on the personnel passing through the road section is taken into account, and the radioactive material concentration and path distance are used as keywords to update the road section comparison keywords. The keyword calculation method is as follows:
[0036] Cr=wd*distance+ws*dose
[0037] Where: distance is the distance factor term, dose is the quantitative factor term considering the impact of radioactive pollutants, Cr is the comparison keyword applied to the path planning model, and wd and ws are weight factors.
[0038] The key values are sorted and the path with the smallest key value is selected as the shortest path tree from the person to the gathering point. Static path planning is completed and used as the initial path for the person to the gathering point. This determines the initial speed direction of the person and randomly assigns the speed of the person. The midpoint line algorithm is used to calculate the length of the path intercepted by the grid, providing input for dynamic path planning.
[0039] Step 3: Taking the grid where the person is located as the center, calculate the average population density of the grid and the 8 grids around it. According to the conversion relationship between population density and speed, estimate the personnel speed value, and combine the length of the path intercepted by the grid in step 2 to calculate the time it takes for the person to pass through the grid. In this way, based on the assumption that each individual has a grasp of the global population density distribution, the travel time of each grid on the road section is accumulated in sequence to obtain the estimated travel time of the person through each path, which is used as an influencing factor in dynamic path planning. On the basis of comprehensively considering the two influencing factors of radioactive material concentration and path distance in step 2, the travel time influencing factor is added, and the comparison keyword of the path planning model is updated. The keyword calculation method is as follows:
[0040] Cr=wd*distance+wt*time+ws*dose
[0041] Where: distance is the distance factor term, time is the time factor term, dose is the quantitative factor term considering the impact of radioactive pollutants, Cr is the comparison keyword applied to the path planning model, and wd, wt, and ws are weight factors.
[0042] Assuming the operator has access to the comparison key values of all road nodes within their visual range, the operator selects the road node with the smallest comparison key value as the target node based on the comparison key values obtained from each road node to the rendezvous point. This serves as the velocity direction for the next time step. A multi-agent collision avoidance model is used to calculate the velocity magnitude for the next time step and update the operator's position. Upon reaching the rendezvous point, the operator waits for the vehicle to arrive and board. The multi-agent collision avoidance model can utilize the publicly available Hybrid Reciprocal Velocity Obstacle (HRVO) model.
[0043] Step 4: The public vehicle travels to the assembly point along the designated route. Upon arrival, the waiting passengers board. When the vehicle is full or no one is heading to the assembly point, the vehicle takes the evacuees to the relocation point and updates the number of evacuees. Upon arrival, the target assembly point and vehicle route are reassigned based on the number of people at each relocation point. This process repeats until all passengers have evacuated to the relocation point, completing the evacuation.
[0044] Step 6: By simulating the emergency evacuation process of personnel in the event of a serious nuclear accident, estimate the emergency evacuation time and the dose received by personnel, collect information such as personnel evacuation time and vehicle operation status, evaluate the effectiveness of the evacuation, and propose optimization measures and plans.
[0045] Example
[0046] Step 1: Taking a nuclear power plant as an example, according to the overall plan of the nuclear power plant, an abstract nuclear power plant simulation scene is established. The abstraction is a 2D scene with a peripheral area of 1000 meters long and 500 meters wide. Assuming that the radioactive release source occurs near the plant exit, an evacuation scene is established. Figure 2 As shown, Figure 2 There are two radioactive sources (source 1 and source 2) and a number of assembly points indicated by numbers.
[0047] During the modeling process, three model files are generated: building ground edge information (buildinginfo.txt), building edge node coordinate information (nodedata.txt), and road node coordinate information (roadmap.txt). Additionally, radioactive material concentration distribution information (sourceterm.grd), initial building occupancy information (roominfo.txt), and vehicle source information (carinfo.txt) are provided. The information in each file is as follows:
[0048] buildinginfo.txt: Figure 2There are 160 buildings in the scene, most of which are quadrilaterals, and the rest are hexagonal, octagonal, decagonal, or dodecagonal buildings.
[0049] nodedata.txt: horizontal and vertical coordinates of the nodes on each side of the building.
[0050] roadmap.txt: horizontal and vertical coordinates of road nodes. There are 335 road nodes in total.
[0051] roominfo.txt: Assuming that there are people distributed in 38 of the factories, give the number of people in each factory.
[0052] sourceterm.grd: Assume that there are two radioactive material release points, and give the center position of the release source and the designated red zone boundary range respectively.
[0053] carinfo.txt: Vehicle source location, including vehicle source location, departure time, passenger capacity, number of vehicles, and other information. A total of 10 vehicle sources are set in this scene.
[0054] Step 2: Based on the given initial number of personnel in the factory, initialize the initial position of each factory personnel at the time T = 0s. The personnel distribution is as follows: Figure 3 According to the rules in step 2, considering the radioactive release, the radioactive material concentration distribution and path distance are used as comparison keywords to update the road section comparison keyword information, plan the static evacuation path of the personnel, and determine the initial movement speed of the personnel.
[0055] Step 3: Update the personnel speed in a 1-second time step. The weighting factors for the radioactive material concentration, travel time, and path distance in the comparison keyword are 5:3:2. Dynamically update the personnel path by comprehensively considering the influencing factors of radioactive material concentration, travel time, and path distance.
[0056] When T=10s, the distribution of people in the scene is as follows Figure 4 As shown in the figure, the distribution of personnel in the plant near source 1 and source 2 shows that in the event of radioactive release, the personnel in the plant no longer take the nearest exit as the preferred path, but prefer to move away from the source, which reflects the influence of the distribution of radioactive materials on the path selection of personnel. At this time, the distribution of personnel in the plant near source 2 is as follows: Figure 5As shown, the following characteristics are exhibited: ① Individual movement demonstrates independence, preventing collisions between people and between people and obstacles. ② Group movement demonstrates the phenomenon of people following each other, which conforms to the laws of pedestrian movement and reflects the familiarity of nuclear power plant personnel with emergency evacuation routes. ③ Comparing the movement directions of personnel in different buildings, it can be seen that for the building closest to Source 2, personnel evacuate from the left exit to avoid passing by the radiation source. For other buildings, the shortest path that does not pass by Source 2 is chosen for evacuation, which conforms to the dynamic path selection rule. ④ In this scenario, since the personnel are relatively dispersed and there is no obvious congestion, the impact of travel time on personnel path selection is not significant.
[0057] At T=40s, observe the movement behavior of people heading to the gathering point 7, such as Figure 6 As shown in the figure, the two circles mark the head and tail of the two queues, respectively. These two people were originally in the same queue. Due to the significant increase in crowd density along the path of the original queue, the subsequent people are expected to spend more time along this path. Therefore, the subsequent people re-select the right path to evacuate and head to the right path entrance. After the people in the congested section pass through, the subsequent people in the next queue will re-select this section to evacuate. This demonstrates the role of dynamic path planning in the program, which can effectively relieve congested sections and conform to the actual movement patterns of people. It also shows the impact of travel time on people's path selection, demonstrating the role of time as a comparison keyword in dynamic path planning.
[0058] Step 4: Plan vehicle routes based on the emergency assembly points set in the scenario, the number of available vehicles, and the number of people at the assembly point. Upon arrival at the assembly point, if there are vehicles waiting, they board in an orderly manner, prioritizing the nearest vehicle. If there are no vehicles, they wait for a vehicle. Once fully loaded, the vehicles carry the evacuees to the relocation site. Upon arrival, the vehicles update the number of evacuees and, based on the number of people remaining at each assembly point, re-allocate the vehicles and plan routes. The vehicles return to the assembly point to pick up the evacuees, continuing until all evacuees have reached the relocation site.
[0059] Step 5: Simulate the movement of people during the evacuation process, so you can visually observe the emergency evacuation process, such as Figure 5 and Figure 6 As shown in the simulation, emergency plan developers can promptly identify potentially congested sections of road and implement appropriate measures to alleviate traffic congestion, such as developing personnel deployment plans, setting up static signs, or implementing broadcast communications to avoid congestion. They can also promptly adjust the locations of emergency evacuation points and the allocation of vehicles to each point, continuously optimizing emergency plans.
[0060] Figures 7 to 9 A schematic diagram of the statistical results of the personnel evacuation process is given. Figure 7 The figure shows the distribution of the number of people waiting at each assembly point at different times. It can be seen that assembly point 8 has the largest number of people waiting. It is recommended to add a new assembly point and dispatch more vehicles to increase the evacuation rate. Figure 8 The statistics of the number of people who completed evacuation at different times are given. Overall, the evacuation efficiency is higher in the initial stage, and as the number of evacuees increases, the evacuation rate slows down, which is consistent with reality. Figure 9 The time required for some individuals to complete evacuation is given, reflecting the differences in evacuation time due to factors such as initial location, route planning, assembly point selection, waiting time, and the distance from the assembly point to the resettlement site. Planners can further focus on the evacuation time distribution of the last 10% of personnel to identify evacuation bottlenecks and optimize evacuation plans.
[0061] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered in all respects as illustrative and non-restrictive, and the scope of the invention is defined by the appended claims, not the foregoing description, and it is intended that all variations within the meaning and range of equivalents of the claims be embraced therein. Any reference sign in a claim should not be construed as limiting the claim to which it relates.
[0062] In addition, it should be understood that although this specification is described in terms of implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. A personnel emergency evacuation simulation method considering radioactive impacts, comprising the following steps: (1) Conduct scenario modeling, including building modeling and road modeling, and provide information on radioactive material concentration, the number of people in the building, and vehicle source information; (2) Based on the distribution of radioactive material concentrations and assuming that personnel evacuate at a uniform speed, estimate the radiation dose that personnel may receive along each path to the assembly point, and plan a static evacuation path for personnel; (3) Comprehensively consider the influencing factors of radioactive material concentration, travel time and path distance, and dynamically update the path of personnel to the gathering point; use the midpoint line drawing algorithm to grid the planned static path, and calculate the length of the path intercepted by the grid. The travel time of personnel passing through each grid on the road section is accumulated in sequence to obtain the estimated travel time of personnel passing through each path as one of the influencing factors of dynamic path planning; use radioactive material concentration, travel time and path distance as the comparison keywords of the road section from each road node to the gathering point, select the road node with the smallest keyword value as its target node, and use it as the speed direction of the next time step; use the multi-agent collision avoidance model to calculate the speed of the next time step and update the position of the personnel; the calculation method using radioactive material concentration, travel time and path distance as the comparison keywords of the road section from each road node to the gathering point is as follows: Cr=wd*distance+wt*time+ws*dose in: distance is the distance factor term, time is the time factor term, dose is the quantitative factor term considering the impact of radioactive pollutants, Cr is the comparison keyword applied to the path planning model, and wd, wt, and ws are weight factors; (4) Plan the vehicle movement path based on the emergency assembly points set in the scene, the number of vehicles available for evacuation and the number of people at the assembly points; (5) By simulating the emergency evacuation process, the effectiveness of the evacuation is evaluated and the emergency evacuation plan is optimized.
2. The personnel emergency evacuation simulation method considering radioactive impact according to claim 1, characterized in that: In step (1), three model files are generated during the modeling process, including a road node coordinate information file, a building vertical projection shape file, and a building ground node position information file; the distribution of the number of people in the building is given by the plant information file, and the initial position of the people is determined by random sampling; the radioactive material concentration information includes the center position of the release source and the boundary range exceeding the dose limit; the vehicle source information includes the vehicle source location, departure time, passenger capacity, and number of vehicles.
3. The personnel emergency evacuation simulation method considering radioactive impact according to claim 1, characterized in that: In step (2), according to the dose limit requirements, roads that exceed the dose limit and should be avoided during the evacuation process are identified and marked as red zones; when the doses received by personnel in most areas exceed the dose limit, the red zone strategy is no longer considered, and the evacuation roads are selected with the goal of getting personnel away from the high-concentration radioactive area as quickly as possible.
4. The personnel emergency evacuation simulation method considering radioactive impact as claimed in claim 3, characterized in that: When selecting an evacuation road outside the red zone, the radioactive material concentration is used as the road segment comparison keyword; when the red zone strategy is not considered, the radioactive material concentration and path distance are used as the road segment comparison keywords, and the path with the smallest keyword value is selected as the shortest path tree from the personnel to the assembly point to complete the static path planning; the calculation method using the radioactive material concentration and path distance as the road segment comparison keywords is as follows: Cr=wd*distance+ws*dose Where: distance is the distance factor term, dose is the quantitative factor term considering the impact of radioactive pollutants, Cr is the comparison keyword applied to the path planning model, and wd and ws are weight factors.
5. The personnel emergency evacuation simulation method considering radioactive impact according to claim 1, characterized in that: In step (4), after the vehicle arrives at the assembly point according to the designated path, the waiting passengers get on the vehicle. When the vehicle is full or no one is going to the assembly point, the vehicle carries the evacuees to the resettlement point and updates the number of evacuees. After the vehicle arrives at the resettlement point, the target assembly point and vehicle path are re-designated according to the number of people at each assembly point. This step is repeated until all personnel have evacuated to the resettlement point and the evacuation is completed.
6. The personnel emergency evacuation simulation method considering radioactive impact according to claim 1, characterized in that: In step (5), the emergency evacuation process of personnel in the event of a serious nuclear accident is simulated, the emergency evacuation time and the dose received by the personnel are estimated, the evacuation time of the personnel and the vehicle operation status information are counted, the effectiveness of the evacuation is evaluated, and optimization measures and plans are proposed.
Citation Information
Patent Citations
Method, apparatus and system for traffic route planning
CN103745611A
System and method for realizing nuclear plant three-dimensional digital map
CN105354393A
Nuclear power plant region emergency evacuation system based on mobile positioning and radiation monitoring data
CN108038567A
Nuclear power plant emergency rescue evacuation system and method based on Internet of Vehicles
CN110135758A
Disaster evacuation system and method for providing evacuation simulation
KR1020140092526A