A spare parts warehouse intelligent management method and system
By classifying and numbering spare parts and making real-time statistics, combined with the outbound and alarm modules, the problem of spare parts shortage and spare parts recommendation in the spare parts library is solved, the intelligent management of the spare parts library is realized, and the effective management of the spare parts library and production efficiency are ensured. promote.
Patent Information
- Application Number
- CN202110604153.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-31
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-05-31
AI Technical Summary
The existing technology cannot effectively count the remaining spare parts in the spare parts library, resulting in a shortage of spare parts, and cannot recommend suitable spare parts according to production needs, affecting production efficiency and costs.
By sequentially classifying and numbering based on application fields, brands, whether they are recycled spare parts, and the usage conditions of recycled spare parts, the number of spare parts can be counted in real time, and the outbound logic can be initialized to alternately outsource spare parts of the same application field and different brands, and the growth of recycled spare parts can be analyzed. The quantity and purchase cycle determine the shortage alarm threshold, the time cost and purchase cost are combined to determine the best choice of spare parts, and the outbound logic is reset to select the best spare parts for targeted outbound delivery.
Intelligent management of the spare parts warehouse is realized, prompting alarms for spare parts shortages, reducing production costs, ensuring effective management of the spare parts warehouse and optimizing the use of spare parts.
Smart Images

Figure CN113298471B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of spare parts warehouse management, and in particular to an intelligent management method and system for spare parts warehouse. Background Art
[0002] At present, there are many wind turbine materials in the wind farm warehouse. The spare parts of each system of the wind turbine are of different sizes, and the various models and brands are easy to be confused. In addition, the power farm personnel have a lot of work to do, and the entry and exit of the warehouse to take and return materials is in a mixed state that is difficult to manage, resulting in the mixing of normal and abnormal materials, and the difficulty in grasping the quantity of materials.
[0003] In the prior art, there is a spare parts management method and system based on QR codes with application number "201710142838.8". A QR code is set on the spare parts. When the spare parts are stored in the spare parts library, the QR code is scanned to register the spare parts. When the spare parts are taken out of the spare parts library, the QR code is scanned to remove the registration information of the spare parts. The setting of the QR code makes the management of spare parts more accurate and complete, and reduces the probability of errors in the spare parts management system.
[0004] However, the existing technology still has major defects, such as: 1. The existing technology is unable to count the spare parts surplus in the spare parts warehouse, which is prone to shortage of spare parts of a certain model. The shortage of spare parts cannot be replenished in time, which will have an adverse impact on production; 2. The service life of accessories of the same model and different brands under the same working conditions is different, and the service life of accessories of the same model and the same brand under different working conditions is also different. The spare parts warehouse cannot recommend suitable spare parts according to production needs, thereby increasing the service life of accessories and reducing production costs. Summary of the invention
[0005] The purpose of the present invention is to provide a spare parts warehouse intelligent management method and system thereof to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A spare parts warehouse intelligent management method comprises the following steps:
[0008] Spare parts are gradually classified and numbered based on application field, brand, whether they are recycled spare parts, and the working conditions of recycled spare parts;
[0009] Real-time statistics of spare parts with different serial numbers, without deducting the number of returned spare parts;
[0010] Initialize the outbound logic. For any working condition, spare parts of the same application field and different brands are outbound alternately in turn.
[0011] Analyze the growth of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts based on the purchase cycle;
[0012] Determine the best spare parts for a certain working condition by combining time cost and purchase cost;
[0013] Reset the delivery logic and deliver the best selected spare parts for any working condition.
[0014] Preferably, the spare parts are gradually classified and numbered based on the application field, brand, whether they are recycled spare parts, and the use conditions of the recycled spare parts, specifically including:
[0015] Spare parts are classified according to application fields, and the first number is named after the application fields. Spare parts in the same application field are classified according to brands, and the second number is named after the brand. Spare parts in the same application field and the same brand are classified according to whether they are recycled spare parts, and the third number is named after whether they are recycled spare parts. Finally, recycled spare parts in the same application field and the same brand are classified according to the usage conditions before recycling, and the fourth number is named after the usage conditions.
[0016] Preferably, the real-time counting of the number of spare parts of each number specifically includes:
[0017] Record and count the number of spare parts with the same number, integrate the statistical results and update them in real time without deducting the number of recycled spare parts shipped out.
[0018] Preferably, the initialization outbound logic, for any working condition, alternately outbound spare parts of the same application field and different brands in sequence, specifically includes:
[0019] Determine the application fields of spare parts that need to be shipped out based on the operating conditions, and ship out spare parts of the same application field and of various brands that are not recycled spare parts in turn. That is, for the same operating conditions, use spare parts of the same application field and of various brands evenly.
[0020] Preferably, the analyzing the growth number of recycled spare parts in the same application field and brand and determining the shortage alarm threshold of spare parts in combination with the purchase cycle specifically includes:
[0021] Taking the procurement cycle as the time period, the growth number of recycled spare parts in the same application field and brand in multiple adjacent time periods before the ongoing time period is counted, and the growth number of recycled spare parts in multiple adjacent time periods is divided by the number of elapsed time periods to determine the average growth number of spare parts in a procurement cycle. The shortage alarm threshold is set to twice the average growth number. When the number of spare parts that are not recycled spare parts in the same application field and brand is lower than the shortage alarm threshold, an alarm is triggered to warn that accessories need to be purchased in the next procurement cycle.
[0022] Preferably, the method of determining the best selected spare parts suitable for a certain working condition by combining time cost and purchase cost specifically includes:
[0023] Determine the traceability cycle. If a spare part of a certain brand directly causes damage to other workpieces or causes a serious production accident when used in a certain working condition during the traceability cycle, change the delivery logic and stop the delivery of spare parts of this brand in this working condition. Count the growth of recycled spare parts of the same application field and different brands under the same working condition during the traceability cycle.
[0024] The time cost is the repair time caused by the damage of a spare part of a certain application field and brand in a certain working condition during the traceability period multiplied by the total output value of the traceability period, divided by the actual production time minus the repair time. The purchase cost includes the increase in the number of recycled spare parts of this brand during the same traceability period multiplied by the purchase price of the recycled spare parts of this brand. When a spare part of a certain application field and brand is used in a certain working condition, the smaller the sum of the time cost and the purchase cost is, the more suitable the spare part is for this working condition, and the spare part is the best choice.
[0025] Preferably, the reset outbound logic specifically outbound optimally selected spare parts for any working condition includes:
[0026] The brand of the best spare parts suitable for a certain working condition is entered into the outbound delivery logic. In the subsequent outbound delivery logic, the best spare parts that need to be shipped out for use are determined based on the working conditions.
[0027] An intelligent management system for spare parts warehouse, comprising:
[0028] Numbering module: used to classify and number spare parts step by step according to application field, brand, whether it is a recycled spare part, and the working condition of the recycled spare parts;
[0029] Statistics module: used to count the number of spare parts of each number in real time, without deducting the number of returned spare parts;
[0030] Outbound module: used to initialize outbound logic. For any working condition, spare parts of the same application field and different brands are outbound alternately in turn.
[0031] Alarm module: used to analyze the growth of the number of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts in combination with the purchase cycle;
[0032] Analysis module: used to determine the best spare parts suitable for a certain working condition by combining maintenance cost and purchase cost;
[0033] Optimization module: used to reset the delivery logic and select the best spare parts for any working condition.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] The intelligent spare parts warehouse management method and system of the present invention obtains the shortage alarm threshold through analysis and calculation, and promptly issues an alarm to prompt purchase when a spare part is about to be in short supply, thereby effectively preventing the adverse effects caused by spare parts shortages. It also determines the best spare parts suitable for a certain working condition by combining time cost and purchase cost, thereby reducing production costs and achieving targeted delivery from warehouse. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a flow chart of the intelligent management method of spare parts warehouse of the present invention;
[0037] Figure 2 It is a schematic diagram of an embodiment of the intelligent management system of spare parts warehouse of the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] See also Figure 1-2 , the present invention provides a technical solution:
[0040] A method for intelligent management of spare parts warehouse, comprising the following steps
[0041] S1O1. Classify and number spare parts step by step based on application field, brand, whether they are recycled spare parts, and the working conditions of recycled spare parts;
[0042] S1O2. Real-time statistics of the number of spare parts of each number, without deducting the number of returned spare parts;
[0043] S1O3, initialize the outbound logic, and for any working condition, alternately outbound spare parts of the same application field and different brands;
[0044] S1O4. Analyze the growth of the number of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts in combination with the purchase cycle;
[0045] S1O5. Determine the best spare parts suitable for a certain working condition by combining time cost and purchase cost;
[0046] S1O6. Reset the delivery logic and deliver the best selected spare parts to any working condition.
[0047] Specifically, spare parts are gradually classified and numbered based on application field, brand, whether they are recycled spare parts, and the use conditions of recycled spare parts, including:
[0048] Spare parts are classified according to application fields, and the first number is named after the application field. For example, if the spare parts warehouse has spare parts for four application fields, A, B, C and D, then the spare parts in different application fields are first numbered as A, B, C and D. Spare parts in the same application field are classified according to brand, and the second number is named after the brand. For example, if the spare parts in the same application field have four brands of spare parts, 1, 2, 3 and 4, then the spare parts of the same application field and different brands are secondly numbered as 1, 2, 3 and 4. Spare parts of the same application field and the same brand are classified according to whether they are recycled spare parts, and the third number is named according to whether they are recycled spare parts. There are two types of spare parts in the spare parts warehouse, one is unused spare parts, and the other is spare parts recycled due to damage after being used in production. The third number of unused spare parts is Y, and the third number of spare parts recycled due to damage after being used in production is N. Finally, Recycled spare parts of the same application field and the same brand are classified according to the usage conditions before recycling, and are named with the fourth number according to the usage conditions. Spare parts in the same application field can be applied in multiple conditions, such as spare parts in the same application field can be used in high load, medium load and low load conditions. However, spare parts of the same application field and different brands have different application effects in different working conditions. When the recycled spare parts are put into storage, the application conditions of the recycled spare parts are recorded, and the recycled spare parts of the same application field and different brands are classified as high, medium and low. There are three numbers for unused spare parts, such as unused spare parts of application field A and brand 1 are numbered A1Y. There are four numbers for spare parts recycled due to damage after application in production, such as application field A, brand 1, recycled spare parts, and spare parts with high usage conditions of recycled spare parts are numbered A1N-high. By numbering and classifying the spare parts in the spare parts library, subsequent statistics and analysis optimization are convenient.
[0049] Specifically, the number of spare parts with different numbers is counted in real time, without deducting the number of returned spare parts, including:
[0050] Record and count the number of spare parts with the same number, integrate the statistical results and update them in real time; when a batch of unused spare parts comes in, number and count the newly entered spare parts according to their application fields and brands, and add the number to the number of unused spare parts of the same application field and brand; when a batch of unused spare parts goes out, deduct the number of spare parts that have gone out from the number of unused spare parts of the same application field and brand; when a batch of recycled spare parts comes in, number and count the newly entered recycled spare parts according to their application fields, brands and usage conditions, and add the number to the number of recycled spare parts of the same application field, brand and usage conditions; when a batch of recycled spare parts is gone out due to insufficient storage space in the spare parts warehouse, the number of recycled spare parts that have gone out will not be deducted from the number of recycled spare parts of the same application field, brand and usage conditions.
[0051] Specifically, the outbound logic is initialized. For any working condition, spare parts of the same application field and different brands are outbound alternately in turn, including:
[0052] Determine the application fields of spare parts that need to be shipped out based on the operating conditions, and alternately ship out spare parts of the same application field and of various brands that are not recycled spare parts. That is, for the same operating conditions, use spare parts of the same application field and of various brands evenly, providing a testing basis for the subsequent analysis of the best applicable working conditions for each brand during the traceability cycle.
[0053] Specifically, analyze the growth of the number of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts in combination with the purchase cycle, including:
[0054] Taking the procurement cycle as the time period, the growth number of recycled spare parts in the same application field and brand in multiple adjacent time periods before the ongoing time period is counted, and the growth number of recycled spare parts in multiple adjacent time periods is divided by the number of elapsed time periods to determine the average growth number of spare parts in a procurement cycle. The shortage alarm threshold is set to twice the average growth number. When the number of spare parts that are not recycled spare parts in the same application field and brand is lower than the shortage alarm threshold, an alarm is triggered to warn that accessories need to be purchased in the next procurement cycle.
[0055] If the purchase cycle is set to one month, the growth number of recycled spare parts in the same application field and brand in the three months before the ongoing month is counted, and the growth number of recycled spare parts in the first three months is divided by 3 to obtain the average growth number of recycled spare parts in each purchase cycle. One month is taken as the purchase cycle, and the first three months are the time interval for statistical growth, so that the obtained average growth number is more consistent with the growth number of recycled spare parts in the ongoing month. The shortage alarm threshold is set to twice the average growth number. When the number of spare parts that are not recycled spare parts in the same application field and brand is higher than the shortage alarm threshold, it means that the spare parts that are not recycled spare parts in the same application field and brand are sufficient to meet the use of the ongoing purchase cycle and the next purchase cycle time period, and no purchase is required in the next purchase cycle. When the number of spare parts that are not recycled spare parts in the same application field and brand is lower than the shortage alarm threshold, it means that the spare parts that are not recycled spare parts in the same application field and brand are in short supply and cannot meet the use of the next purchase cycle time period. Purchase and replenishment are required in the next purchase cycle. By setting the shortage alarm threshold, the adverse effects caused by spare parts shortage are effectively prevented.
[0056] Specifically, the best spare parts suitable for a certain working condition are determined by combining time cost and purchase cost, including:
[0057] Determine the tracing cycle. The tracing cycle is preferably set to the previous year, that is, analyze the usage of spare parts in the previous year to determine the best spare parts suitable for a certain working condition. During the tracing cycle, if a certain brand of spare parts directly causes damage to other workpieces or causes serious production accidents when used in a certain working condition, it means that the spare parts of this brand are seriously unsuitable for this working condition. Then change the outbound logic and stop the outbound delivery of spare parts of this brand in this working condition. Count the growth of recycled spare parts of the same application field and different brands under the same working condition during the tracing cycle. For example, when counting recycled spare parts in application field A and high-load working condition, count the number of recycled spare parts of four brands, namely A1N high, A2N high, A3N high and A4N high.
[0058] The time cost is the repair time caused by the damage of spare parts in a certain application field and brand in a certain working condition during the traceability period, multiplied by the total output value of the traceability period, and then divided by the actual production time minus the repair time from the total production time, which is the loss caused to production by the damage of the spare parts. The purchase cost includes the increase in the number of recycled spare parts of this brand in the same traceability period, multiplied by the purchase price of recycled spare parts of this brand, which is the increased purchase cost of replacing spare parts. When spare parts of a certain application field and brand are used in a certain working condition, the smaller the sum of the time cost and the purchase cost, the more suitable the spare part is for this working condition, and the better the spare part is.
[0059] Specifically, the delivery logic is reset, and the best selected spare parts are delivered to the warehouse for any working condition, including:
[0060] The brand of the best spare part suitable for a certain working condition is entered into the outbound delivery logic. In the subsequent outbound delivery logic, the best spare part to be delivered for use is determined according to the working condition. For example, within the statistical traceability period, among the four spare parts of A1N high, A2N high, A3N high and A4N high, the sum of the time cost and maintenance cost of A1N high spare parts is the lowest. In this case, the outbound delivery logic is changed. In the subsequent outbound delivery process, when it is necessary to deliver spare parts for application field A and high-load working conditions, A1Y spare parts are delivered instead of A2Y, A3Y and A4Y spare parts, thereby reducing production costs.
[0061] An intelligent management system for spare parts warehouse, comprising:
[0062] Numbering module 201: used to classify and number spare parts step by step based on application field, brand, whether it is a recycled spare part, and the use condition of the recycled spare parts;
[0063] Statistics module 202: used to count the number of spare parts of each number in real time, without deducting the number of returned spare parts;
[0064] Outgoing module 203: used to initialize the outgoing logic, and for any working condition, to alternately outgoing spare parts of the same application field and different brands in turn;
[0065] Alarm module 204: used to analyze the growth number of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts in combination with the purchase cycle;
[0066] Analysis module 205: used to determine the best selected spare parts suitable for a certain working condition by combining time cost and purchase cost;
[0067] Optimization module 206: used to reset the dispatch logic and dispatch the best selected spare parts for any working condition.
[0068] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for intelligent management of spare parts warehouse, characterized in that: The following steps are included Spare parts are gradually classified and numbered based on application field, brand, whether they are recycled spare parts, and the working conditions of recycled spare parts; Real-time statistics of spare parts with different serial numbers, without deducting the number of returned spare parts; Initialize the outbound logic. For any working condition, spare parts of the same application field and different brands are outbound alternately in turn. Analyze the growth of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts based on the purchase cycle; Determine the best spare parts for a certain working condition by combining time cost and purchase cost; Reset the delivery logic to deliver the best selected spare parts for any working condition; The initialization outbound logic, for any working condition, alternately outbound spare parts of the same application field and different brands, specifically includes: Determine the application fields of spare parts that need to be shipped out based on the operating conditions, and ship out spare parts of the same application field and of various brands that are not recycled spare parts in turn. That is, for the same operating conditions, use spare parts of the same application field and of various brands evenly.
2. The intelligent management method for spare parts warehouse according to claim 1 is characterized in that: The spare parts are gradually classified and numbered based on the application field, brand, whether they are recycled spare parts, and the use conditions of recycled spare parts, including: Spare parts are classified according to application fields, and the first number is named after the application field. Spare parts in the same application field are classified according to brand, and the second number is named after the brand. Spare parts in the same application field and the same brand are classified according to whether they are recycled spare parts, and the third number is named after whether they are recycled spare parts. Finally, recycled spare parts in the same application field and the same brand are classified according to the usage conditions before recycling, and the fourth number is named after the usage conditions.
3. The intelligent management method for spare parts warehouse according to claim 1 is characterized in that: The real-time statistics of the number of spare parts of each number specifically include: Record and count the number of spare parts with the same number, integrate the statistical results and update them in real time without deducting the number of recycled spare parts shipped out.
4. The intelligent management method for spare parts warehouse according to claim 1 is characterized in that: The analysis of the growth number of recycled spare parts in the same application field and brand, and the determination of the shortage alarm threshold of spare parts in combination with the purchase cycle, specifically includes: Taking the procurement cycle as the time period, the growth number of recycled spare parts in the same application field and brand in multiple adjacent time periods before the ongoing time period is counted, and the growth number of recycled spare parts in multiple adjacent time periods is divided by the number of elapsed time periods to determine the average growth number of spare parts in a procurement cycle. The shortage alarm threshold is set to twice the average growth number. When the number of spare parts that are not recycled spare parts in the same application field and brand is lower than the shortage alarm threshold, an alarm is triggered to warn that accessories need to be purchased in the next procurement cycle.
5. The intelligent management method for spare parts warehouse according to claim 1 is characterized in that: The combination of time cost and purchase cost to determine the best spare parts suitable for a certain working condition specifically includes: Determine the traceability cycle. If a spare part of a certain brand directly causes damage to other workpieces or causes a serious production accident when used in a certain working condition during the traceability cycle, change the delivery logic and stop the delivery of spare parts of this brand in this working condition. Count the growth of recycled spare parts of the same application field and different brands under the same working condition during the traceability cycle. The time cost is the repair time caused by the damage of a spare part of a certain application field and brand in a certain working condition during the traceability period multiplied by the total output value of the traceability period, divided by the actual production time minus the repair time. The purchase cost includes the increase in the number of recycled spare parts of this brand during the same traceability period multiplied by the purchase price of the recycled spare parts of this brand. When a spare part of a certain application field and brand is used in a certain working condition, the smaller the sum of the time cost and the purchase cost is, the more suitable the spare part is for this working condition, and the spare part is the best choice.
6. The intelligent management method for spare parts warehouse according to claim 1 is characterized in that: The reset delivery logic specifically delivers the best selected spare parts for any working condition, including: The brand of the best spare parts suitable for a certain working condition is entered into the outbound delivery logic. In the subsequent outbound delivery logic, the best spare parts that need to be shipped out for use are determined based on the working conditions.
7. An intelligent management system for spare parts warehouse, characterized by: include Numbering module: used to classify and number spare parts step by step according to application field, brand, whether it is a recycled spare part, and the working condition of the recycled spare parts; Statistics module: used to count the number of spare parts of each number in real time, without deducting the number of returned spare parts; Outbound module: used to initialize outbound logic. For any working condition, spare parts of the same application field and different brands are outbound alternately in turn. Alarm module: used to analyze the growth of the number of recycled spare parts in the same application field and brand, and determine the shortage alarm threshold of spare parts in combination with the purchase cycle; Analysis module: used to determine the best spare parts suitable for a certain working condition by combining maintenance cost and purchase cost; Optimization module: used to reset the delivery logic and deliver the best selected spare parts for any working condition; The initialization outbound logic, for any working condition, alternately outbound spare parts of the same application field and different brands, specifically includes: Determine the application fields of spare parts that need to be shipped out based on the operating conditions, and ship out spare parts of the same application field and of various brands that are not recycled spare parts in turn. That is, for the same operating conditions, use spare parts of the same application field and of various brands evenly.