A construction method for controlling the stability of the tunnel face in high water pressure and water-rich strata
Through the construction method of detection and drainage, combined with the advanced high-level drainage structure and the drainage system behind the lining, the palm surface stability problem in the construction of high-pressure water-rich formation tunnels is solved, long-distance hydrophobic pressure reduction is achieved, and the formation is reduced The loss of filling mass ensures the safety and stability of tunnel construction.
Patent Information
- Application Number
- CN202110822408.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-07-21
AI Technical Summary
In the construction of high-pressure water-rich formation tunnels, the palm surface is prone to extrusion deformation and water influx, resulting in instability of surrounding rocks. The existing pit drainage methods lead to loss of formation fill mass, which seriously affects the stability of the tunnel.
Using a construction method that integrates detection and drainage, the safe distance is determined through advance geological forecast, and the advanced high-level drainage structure is arranged to achieve long-distance hydrophobic pressure reduction and high-level drainage. Combined with the advanced drainage long conduit and the drainage system behind the lining, it reduces the loss of formation fill mass .
It has achieved stable construction of the palm surface of the tunnel with high water pressure and water-rich formations, reduced the risks of water inrush and landslides, protected the grouting ring, safe construction, simple operation, and strong practicality.
Smart Images

Figure CN113374484B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering construction, and in particular relates to a construction method for controlling the stability of a tunnel face in a high-water-pressure, water-rich stratum tunnel. Background Art
[0002] With the deepening of the western development strategy and the rapid development of the national economy, more long and large tunnel projects will be built in the fields of railways, highways, hydropower, inter-basin water transfer and mineral resources. In the process of tunnel construction, high water pressure and water-rich strata are generally encountered, which brings great challenges to the safety of tunnel construction and subsequent operation.
[0003] During the construction of tunnels in high-pressure strata, due to the complex spatial environment, high water pressure, and strong excavation disturbance, the face is very likely to be extruded and deformed, and even form geological disasters such as water gushing and mud bursting, which in turn causes the tunnel surrounding rock to become unstable. It is necessary to use drainage and pressure reduction to release the high-pressure water stored in the stratum, reduce potential energy, and reduce the impact of water and soil pressure on tunnel stability. The current face drainage will cause a large amount of filling material between the rock mass cracks in the stratum to be lost, thereby seriously damaging the structure of the surrounding rock and seriously reducing its self-stabilizing ability, especially in the unconsolidated high-pressure fault fracture zone fault, because the loss of fine particles is an important cause of surrounding rock relaxation. This is also one of the main reasons for the failure and collapse of the tunnel face. Therefore, finding an accurate, fast, and efficient construction method for controlling the stability of the face of tunnels in high-pressure and water-rich strata has become an urgent problem to be solved when deep-buried long mountain tunnels pass through high-pressure and water-rich strata. Summary of the invention
[0004] The present invention aims to address the deficiencies in the prior art and provide a construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum tunnel that integrates detection and drainage, thereby achieving long-distance drainage and pressure reduction + high-level drainage, simple operation, safe construction, and strong practicality.
[0005] In order to achieve the above technical objectives, the technical solution adopted by the present invention is:
[0006] A construction method for controlling the stability of the tunnel face in a high-water-pressure water-rich stratum tunnel, the specific implementation steps comprising:
[0007] Step S1: Locate water-rich strata: Conduct advanced geological forecasting of the tunnel, find out the distribution of water-rich strata and groundwater storage characteristics in front of the tunnel face, and determine the surrounding rock parameters of the water-rich strata in combination with geological survey reports and field tests;
[0008] Step S2: Establish a mechanical calculation model between the water-rich stratum and the rock disk in the middle of the front tunnel face, calculate the safe distance L between the water-rich stratum and the rock disk in the middle of the front tunnel face, and determine the construction position of the advanced high-level drainage structure according to the safe distance L;
[0009] Step S3, when the tunnel face reaches the position determined in step S2, an advanced high-level drainage structure is arranged;
[0010] Step S4, monitoring the water inflow at the tunnel face, and when the water inflow is lower than a predetermined value, continuing tunnel excavation and applying a grouting ring and a grout stop wall;
[0011] Step S5, repeating step S4 until passing through the water-rich stratum;
[0012] Step S6: Arrange the drainage system behind the lining and apply the secondary lining.
[0013] Preferably, in step S1, the advanced geological prediction of the tunnel is carried out by combining hydrogeological survey, geophysical prospecting and drilling.
[0014] Furthermore, in step S2, the calculation formula of the safety distance L is as follows (1):
[0015]
[0016] Where: L-rock bed length (m), i.e. safety distance; D-tunnel diameter (m); σ1-vertical pressure of water-rich stratum on rock bed under limit equilibrium state (Pa); c-cohesion of water-rich stratum (Pa); - friction angle of water-rich strata (°); σ′1- vertical earth pressure at the bedrock (Pa); c′- cohesion at the bedrock (Pa); -Friction angle at the bedrock (°); λ′-lateral pressure coefficient at the bedrock.
[0017] Furthermore, in step S3, the specific method for arranging the advanced high-level drainage structure is: within the range of 120° of the included angle of the arch excavation contour line, 7 drill holes are evenly arranged toward the surrounding rock in front, the drill holes are deep into the water-rich stratum, and then a long advanced drainage conduit is buried for high-level drainage, and the long advanced drainage conduit is welded and fixed to the steel arch frame.
[0018] Preferably, in the specific method of arranging the advanced high-level drainage structure, the drilling hole has an outward inclination angle of 10 to 15° and a hole diameter of φ60 to 70 mm.
[0019] Preferably, in step S4, the predetermined value of the water inflow is 20 L / min.
[0020] Furthermore, the drainage system behind the lining in step S6 includes a long advance drainage duct, a reducing tee and an annular drainage pipe, the side pipe and the straight pipe of the reducing tee are perpendicular to and connected to each other, the side pipe is an inlet pipe, the straight pipe is an outlet pipe, and annular grooves are provided at the outlet ends on both sides; the long advance drainage duct is connected to the side pipe of the reducing tee through a flange plate group, and the annular drainage pipe is connected to the straight pipe of the reducing tee through a clamp, and the clamp is embedded in the annular groove.
[0021] Furthermore, the body of the long advanced drainage conduit is a seamless steel pipe with a solid pointed cone at the front end; a plurality of groups of annular water inlet holes are drilled at intervals on the pipe wall and are staggeredly distributed between adjacent water inlet holes along the axial direction of the steel pipe.
[0022] Furthermore, a pipe hoop is welded to the rear of the pipe body of the long advance drainage conduit with steel bars, and the pipe hoop is a connecting component between the long advance drainage conduit and the steel arch frame; no hole is drilled on the pipe wall between the pipe hoop and the flange plate welded to the rear end of the long advance drainage conduit.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1) The present invention forms a construction method for controlling the stability of the tunnel face in high-pressure water-rich strata that integrates detection and drainage. Relevant rock and soil parameters are obtained through geological survey data and super-strong geological forecasts, and a safe distance is obtained through theoretical calculations. According to the calculation results, an advanced high-level drainage structure is constructed at the safe distance position to achieve long-distance water drainage and pressure reduction + high-level drainage. While meeting economic benefits, the stability of the tunnel face in high-pressure water-rich strata conditions can be guaranteed during the entire construction process. The method is simple to operate, safe to construct, and has strong practicality.
[0025] 2) The present invention can reduce the loss of stratum filling materials and protect the construction of the grouting ring by draining water at a high position in advance.
[0026] 3) The construction method of the advanced high-level drainage structure in the present invention is simple. It only requires connecting the advanced drainage long conduit with the annular drainage pipe during the normal construction process of the advanced conduit and the drainage system behind the lining. The construction process is clear and it is highly feasible during the construction of tunnels in high water pressure and water-rich strata. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1This is a schematic diagram of a safety distance calculation model in the present invention;
[0029] Figure 2 A schematic diagram of the construction of a tunnel far away from a water-rich stratum in the present invention;
[0030] Figure 3 This is a schematic diagram of the advanced high-level drainage structure constructed near the water-rich stratum during tunnel construction;
[0031] Figure 4 Schematic diagram of grouting ring and grout stop wall in water-rich strata during tunnel construction;
[0032] Figure 5 Schematic diagram of secondary lining during tunnel construction through water-rich strata;
[0033] Figure 6 This is a schematic diagram of the construction layout of the long advance drainage conduit;
[0034] Figure 7 It is a schematic diagram of the structure of the advanced high-level drainage system used in tunnel construction;
[0035] Figure 8 It is a structural schematic diagram of a reducing tee pipe (7);
[0036] The markings in the figure are: 1-long advance drainage conduit, 2-water-rich stratum, 3-water level line, L-safety distance, 5-grouting ring, 6-slurry stop wall, 7-reducing tee pipe, 8-annular drainage pipe, 9-secondary lining, σ1'-vertical earth pressure, τ-rock resistance, σ3-lateral earth pressure, 10-solid pointed cone head; 11-water inlet hole; 12-metal filter; 13-pipe clamp; 14-annular groove. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0038] The following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of protection of the present application, but merely represents the preferred embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0039] In order to make the purpose, technical scheme and advantages of the present invention more clearly understood, the high-level drainage of water-rich strata in Xinping Tunnel of the newly built railway from Yuxi to Mohan is taken as an example, and combined with the accompanying drawings, a construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum tunnel of the present invention is further described in detail. The specific implementation steps are as follows:
[0040] Step S1: Finding water-rich strata: Using an advanced geological prediction method combining geophysical prospecting and drilling methods, accurately detect the spatial location of water-rich strata within 100 to 200 meters in front of the tunnel face, groundwater distribution, and hydraulic recharge path, and obtain surrounding rock parameters of water-rich strata in combination with geological survey reports and field tests;
[0041] Step S2: Establish a mechanical calculation model of the water-rich stratum and the rock disk in the middle of the front tunnel face, calculate and ensure that the safe distance L between the water-rich stratum and the rock disk in the middle of the front tunnel face is 28m, and determine to construct an advanced high-level drainage structure 30 to 32m in front of the water-rich stratum area according to the safe distance L;
[0042] The safety distance refers to the distance at which, during tunnel excavation, when the distance between the tunnel face and the critical tunnel face is less than a certain distance, the tunnel face will collapse, burst water and mud due to the combined effect of high water pressure and high ground stress due to the inability to withstand the water and soil pressure behind;
[0043] The safety distance L is obtained by the mechanical equilibrium condition, and the calculation formula is as follows:
[0044]
[0045] Where: L-rock bed length (m), i.e. safety distance; D-tunnel diameter (m); σ1-vertical pressure of water-rich stratum on rock bed under limit equilibrium state (Pa); c-cohesion of water-rich stratum (Pa); - friction angle of water-rich strata (°); σ′1- vertical earth pressure at the bedrock (Pa); c′- cohesion at the bedrock (Pa); -Friction angle at the rock bed (°): λ′-lateral pressure coefficient at the rock bed;
[0046] Step S3, arranging the advanced high-level drainage structure: when the tunnel is excavated to 30-32m in front of the water-rich stratum area, within the range of 120° of the arch excavation contour line, 7 boreholes are evenly arranged toward the surrounding rock in front. Figure 4-6 The figure shows the construction layout of the advanced drainage long conduit 1: the borehole is drilled deep into the water-rich stratum, and the advanced drainage long conduit 1 is installed for high-level drainage; the borehole has an outward inclination angle of 10-15° and a hole diameter of φ60-70mm; the tail of the advanced drainage long conduit is welded on the erected steel arch frame;
[0047] Step S4, monitoring the water inflow at the tunnel face, when the water inflow is less than 20L / min, continuing tunnel excavation and constructing the grouting ring 5 and the grout stop wall 6;
[0048] Step S5, repeating step S4 until passing through the water-rich stratum;
[0049] Step S6: Arrange the drainage system behind the lining, such as Figure 7 As shown, the long advance drainage conduit 1 is connected to the side pipe of the reducing tee pipe 7 through a flange plate group, the annular drainage pipe 8 is connected to the straight pipe of the reducing tee pipe 7 through a clamp, and a secondary lining 9 is applied.
[0050] Among them, the drainage system behind the lining includes a long advance drainage duct 1, a reducing tee pipe 7 and an annular drainage pipe 8. The long advance drainage duct 1 is fixedly connected to the side pipe of the reducing tee pipe 7 through a flange plate group, and the annular drainage pipe 8 is connected to the straight pipe of the reducing tee pipe 7 through a clamp; the annular drainage pipe 8 is fixedly connected to the outlets on both sides of the straight pipe of the reducing tee pipe 7.
[0051] The pipe body of the long advance drainage conduit 1 in this embodiment is a steel pipe with a diameter of φ55-65mm, a length of 6-8m, and a wall thickness of 4-6mm; the front end of the long advance drainage conduit is a solid pointed cone head 10 with a length of 0.2m; 4 water inlet holes 11 with a diameter of φ10mm are distributed in a circle every 0.2m on the pipe wall surface along the axial direction of the steel pipe, and adjacent water inlet holes are staggered along the length of the steel pipe; a metal filter screen 12 with a standard mesh number of 30 is arranged close to the inner wall of the pipe; a pipe hoop 13 is welded with a steel bar with a diameter of φ6mm at the tail end of the pipe body, and the pipe hoop is a connecting component between the long advance drainage conduit and the steel arch frame; no holes are drilled on the pipe wall between the pipe hoop and the flange plate welded to the rear end of the long advance drainage conduit 1.
[0052] The front end of the long advance drainage conduit is made into a solid pointed cone head, which ensures the stability and laying efficiency of the conduit, making the process of laying the long advance drainage conduit in the hole more time-saving and labor-saving; the water inlet holes are staggered in a ring to ensure the strength of the advance drainage conduit while draining water as all-round as possible. The metal filter installed on the inner wall of the pipe can prevent large-diameter gravel from entering and clogging the drainage system behind the masonry.
[0053] The reducing tee pipe 7 of this embodiment is composed of a side pipe and a straight pipe, which are perpendicular to each other and connected. The side pipe is an inlet pipe, with a length of 80mm, a pipe diameter of φ55-65mm, and a pipe wall thickness of 5mm. The end of the side pipe is welded with a flange plate; the straight pipe is an outlet pipe, with a length of 180mm, a pipe diameter of φ50mm, and a pipe wall thickness of 5mm. There is an annular groove 14 with a width of 7.5mm at 25mm from the ends of the water outlets on both sides.
[0054] The annular drainage pipe 8 of this embodiment adopts a soft permeable pipe with a diameter of φ60mm, which is sleeved on both ends of the straight pipe of the reducing tee pipe, and the reducing tee pipe and the annular drainage pipe are fixedly connected as a whole by a clamp, and the clamp is embedded in the annular groove.
[0055] The long advance drainage conduit and the reducing tee pipe are connected to each other through a flange plate. There are bolt holes with a diameter of φ22mm near the four corners of the flange plate, which are connected by bolts and nuts.
[0056] The present invention forms a construction method for controlling the stability of the tunnel face in high-pressure water-rich strata with integrated detection and drainage. Relevant rock and soil parameters are obtained through geological survey data and super-strong geological forecast, and a safe distance is obtained through theoretical calculation. According to the calculation result, an advanced high-level drainage structure is constructed at the safe distance position to achieve long-distance water drainage and pressure reduction + high-level drainage. While meeting economic benefits, it can ensure the stability of the tunnel face under high-pressure water-rich strata conditions during the entire construction process, avoid disasters such as landslides, water and mud gushing during the construction process, and cause a large amount of economic losses and personal injuries.
[0057] The present invention can reduce the loss of stratum filling materials and protect the construction of the grouting ring by advanced high-position drainage while draining water; the construction method of the advanced high-position drainage structure in the present invention is simple, and only requires connecting the advanced drainage long conduit with the annular drainage pipe through a reducing tee in the normal construction process of the advanced conduit and the drainage system behind the lining. The construction process is clear and the feasibility is strong in the construction process of tunnels in high water pressure and water-rich strata.
[0058] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for controlling the stability of the tunnel face in a high water pressure and water-rich stratum, characterized by: The specific implementation steps include: Step S1: Locate the water-rich stratum (2), conduct advanced geological forecasting of the tunnel, find out the distribution of the water-rich stratum and the characteristics of groundwater storage at the front face, and determine the surrounding rock parameters of the water-rich stratum in combination with the geological survey report and field tests; Step S2: Establish a mechanical calculation model between the water-rich stratum (2) and the rock disk in the middle of the front tunnel face, and calculate the safe distance between the water-rich stratum and the rock disk in the middle of the front tunnel face. L , according to the safety distance L Determine the location of the advanced high-level drainage structure; The safety distance L The calculation formula is as follows: Where: L -The length of the rock bed, i.e. the safety distance; D -Tunnel diameter; -Vertical pressure of water-rich strata on the bedrock in the state of limit equilibrium; - Cohesion of water-rich formations; - Friction angle of water-rich formations; -Vertical earth pressure at the rock bed; - Cohesion at the bedrock; -Friction angle at the bedrock; - Lateral pressure coefficient at the rock bed; Step S3, when the front face moves to the position determined in step S2, an advanced high-level drainage structure is arranged; Step S4, monitoring the water inflow at the front face, and when the water inflow is lower than a predetermined value, continuing tunnel excavation and applying a grouting ring (5) and a grout stop wall (6); Step S5, repeat step S4 until the water-rich stratum (2) is crossed; Step S6, arranging the drainage system behind the lining and applying the secondary lining (9); the drainage system behind the lining comprises a long advanced drainage conduit (1), a reducing tee pipe (7) and an annular drainage pipe (8); the side pipe and the straight pipe of the reducing tee pipe (7) are perpendicular to each other and connected; the side pipe is an inlet pipe, the straight pipe is an outlet pipe, and annular grooves (14) are provided on both sides of the outlet end of the straight pipe; the long advanced drainage conduit (1) is connected to the side pipe of the reducing tee pipe (7) through a flange plate group, and the annular drainage pipe (8) is connected to the straight pipe of the reducing tee pipe (7) through a clamp, and the clamp is embedded in the annular groove (14).
2. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 1 is characterized by: The advanced geological prediction of the tunnel described in step S1 is carried out by combining hydrogeological survey, geophysical prospecting and drilling methods.
3. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 1 is characterized by: The specific method for arranging the advanced high-level drainage structure in step S3 is as follows: within the range of 120° of the included angle of the arch excavation contour line, 7 boreholes are evenly arranged toward the surrounding rock in front, the boreholes are drilled deep into the water-rich stratum (2), and then an advanced drainage long conduit (1) is buried for high-level drainage, and the advanced drainage long conduit (1) is welded and fixed to the steel arch frame.
4. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 3 is characterized by: The borehole has an outward inclination angle of 10-15° and a hole diameter of φ60-70 mm.
5. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 1 is characterized by: The predetermined value of the water inflow in step S4 is 20 L / min.
6. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 1 is characterized by: The body of the long advanced drainage conduit (1) is a seamless steel pipe, and the front end is a solid pointed cone head (10); a plurality of groups of annular water inlet holes (11) are drilled at intervals in the pipe wall, and are staggeredly distributed between adjacent water inlet holes along the axial direction of the steel pipe.
7. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 1 is characterized by: The long advanced drainage conduit (1) is provided with a metal filter (12) in close contact with the inner wall of the conduit, and the standard mesh number of the metal filter (12) is 30 meshes.
8. The construction method for controlling the stability of the tunnel face in a high-pressure water-rich stratum according to claim 7 is characterized by: The rear part of the pipe body of the long advance drainage conduit (1) is welded with a pipe hoop (13) by steel bars, and the pipe hoop is a connecting member between the long advance drainage conduit and the steel arch frame; no hole is drilled on the pipe wall between the pipe hoop and the flange plate welded to the rear end of the long advance drainage conduit.