Method for handling molten samples in a steelworks laboratory and steelworks laboratory
Through continuous clamping and transfer of sample carriers, the problem of long disposal and analysis time of molten samples in steel plant laboratories is solved, fully automated processing is achieved, processing efficiency and accuracy is improved, and sample disposal and analysis time is shortened.
Patent Information
- Application Number
- CN202080012355.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-02-07
- Filing Date
- 2020-01-30
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In steel plant laboratories, the disposal and chemical analysis time of molten samples under traditional methods is long, and the transfer of samples between different processing devices requires frequent clamping and measurement, resulting in complex processes and inefficient efficiency.
The sample carrier is used for clamping and transfer of molten samples, ensuring continuous conveying and positioning of samples between processing devices, reducing intermediate disposal steps, and improving the positioning accuracy and clamping force of samples through image analysis and clamping equipment to achieve full Automated processing.
The sample preparation and analysis process is simplified, the time for sample disposal and chemical analysis is shortened, and the sample is completed in 2-3 minutes is realized, and the processing efficiency and accuracy are improved.
Smart Images

Figure CN113412428B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method for handling molten samples in a steel mill laboratory and a steel mill laboratory, wherein the molten sample is processed and / or analyzed in at least one first processing device and subsequently, the molten sample is transported via at least one first transport path to at least one second processing device, in which the molten sample is further processed and / or analyzed. Background Art
[0002] At all stages of steel production, from pig iron production to the finished product, the most modern manufacturing and measuring methods are used. Here, precise knowledge of the steel composition is an important aspect, since the material properties depend on the steel composition and the processing method. At the beginning of the production process, the steel composition is produced from the raw materials iron ore, coke, reduction processing and alloying of accompanying elements in secondary metallurgy. The composition is traditionally determined by means of random samples from pig iron melt or steel melt with the help of X-ray fluorescence analysis (XRF), combustion analysis and additionally spark emission spectrometry. The sample preparation must meet the demanding requirements of these methods.
[0003] In conventional process control in steel mills, samples taken from the steel melt by means of an immersion probe are transported to the steel mill laboratory by means of a pipe transport system. Depending on the requirements, the samples must be cooled before further processing and then enter a milling machine in order to remove the scale layer over the entire surface. Subsequently, the samples from which the scale has been removed are subjected to an X-ray fluorescence analysis or optionally immediately analyzed by means of spark emission spectrometry. In addition to spark emission spectrometry, combustion analysis is also performed on parts of the samples in order to determine the carbon and sulfur contents. Partial chips obtained during milling or by means of other cutting machine processing methods are usually used for this purpose. In addition, further processing devices may be present.
[0004] The samples are transported between the individual processing devices by means of a conveyor system (conveyor belt or rail system). In addition, it is known to transport the samples to the next processing device by means of a robot. Each processing device is usually provided with a transport unit, which enables the sample to be transported from the transport system to the processing device, where the sample is positioned and where the sample is optionally measured and processed.
[0005] From EP 0 633 207 A1, a conveying system for conveying samples to different processing devices is known, in which a circumferential conveyor belt with a sample carrier is used, on which the sample carrier is conveyed. In this case, the sample is present in a cup-shaped object arranged on the sample carrier. The sample carrier is located on two conveyor belts of the conveyor belt during transportation. Before the processing device, the sample carrier is stopped by means of a stop device and is lifted from the conveyor belt and transferred to the processing device together with the cup-shaped object containing the sample by means of a disposal instrument. After the processing of the sample, the sample carrier returns to the conveyor belt together with the cup-shaped object containing the sample, it is also conceivable that the sample remains in the processing device and only the empty cup-shaped object and the sample carrier are returned to the conveyor belt together. Summary of the invention
[0006] The object of the present invention is to simplify the handling of molten samples in steel production and to shorten the time for sample preparation, sample handling and chemical analysis.
[0007] In the method according to the invention for processing a molten sample in a steel plant laboratory, the molten sample is processed and / or analyzed in at least one first processing device and subsequently, the molten sample is transported via at least one first transport path to at least one second processing device, in which the molten sample is further processed and / or analyzed. Here, the molten sample is clamped on a sample carrier, so that the sample carrier with the clamped molten sample is transported between the processing devices and positioned in the processing device for processing and / or analysis.
[0008] The sample thus remains on the sample carrier until the last processing device, so that re-gripping and measurement are not necessary, thus requiring less handling in between. Compared to clamped samples, easier handling is also provided, since the sample carrier always has the same shape for transfer between transport devices and processing devices.
[0009] The steel plant laboratory for processing molten samples according to the present invention provides at least one first processing device and a second processing device for processing and / or analyzing the molten sample and also a conveying device for conveying the molten sample between the processing devices. In addition, a sample carrier with a first clamping device for clamping the molten sample is provided, wherein the sample carrier is configured together with the clamped sample for conveying on the conveying device. In the area of the processing station, a conveying unit for conveying the sample carrier with the clamped molten sample into the processing device is also arranged.
[0010] In one embodiment of the present invention, the sample carrier is placed on a conveyor together with the sandwiched molten sample, which is formed, for example, by a conveyor belt or a track system, for conveying between at least two processing stations. However, for the purpose of the present invention, it is also conceivable that the conveying occurs between the processing devices by means of a robot. In another embodiment, the sample carrier can be transferred between the conveyor and at least one processing device together with the sandwiched molten sample, and, for example, positioned in a rotation position (180 °) from the top, it can also be arranged in the processing station. This may be necessary when analyzing from below and the molten sample must be kept from the top.
[0011] In the specific processing of the sample, its position and height in the processing device are also crucial. Thus, for example, in spark emission spectroscopy (OES), the position of the sample is crucial for the analysis of molten samples. For this purpose, the surface of the molten sample is analyzed for defects by image analysis, so that the analysis can be performed in a "clean" area of the sample surface due to the clear position of the molten sample on the sample carrier. The height of the sample is particularly important for milling production in milling machines.
[0012] Therefore, in a preferred embodiment of the invention, the position and height of the molten sample clamped on the sample carrier relative to the sample carrier are measured before the molten sample is positioned in the measuring station, so that these data can be used as needed in the respective processing device. Thus, in processing devices where precise alignment is important, re-measurement is no longer necessary. In another embodiment, the measurement data are transmitted to at least one processing station before the molten sample is processed and / or analyzed.
[0013] In the processing device, the molten sample can optionally be cooled and / or surface treated and / or analyzed by X-ray fluorescence and / or analyzed by means of spark emission spectrometry. If a surface treatment is performed on the molten sample, the processing device can be provided with a clamping device which acts on a sample carrier positioned in the processing device in order to increase the clamping force acting on the molten sample. In the case of a milling machine, such an additional clamping force is particularly advantageous.
[0014] The molten sample and / or the associated sample carrier may be marked to identify the molten sample; here, the associated sample carrier also records processing information (eg, measurement data) for the molten sample and transmits the processing information to a processing device.
[0015] In an embodiment of the present invention, the first clamping device of the sample carrier has a clamping jaw, which is provided with a microparticle coating to increase the friction coefficient and ensure that the sample is firmly held. It is also conceivable that the sample carrier is equipped with a second clamping device for clamping another molten sample so that two molten samples can be transported together. Here, it is particularly advantageous to arrange one molten sample on the upper side of the sample carrier and another molten sample on the lower side of the sample carrier, thereby obtaining a relatively compact shape. In addition, in this way, the time for sample preparation, sample processing and chemical analysis can be further reduced. Overall, these three fully automatic processing steps (including transporting the sample to the laboratory) only require 2-3 minutes of time. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Further advantages and embodiments of the invention are described in more detail with the aid of the following description and the drawings.
[0017] The accompanying drawings show
[0018] Figure 1 According to the block flow diagram of the steel plant laboratory of the present invention,
[0019] Figure 2 3D image of the sample carrier with the sandwiched molten sample,
[0020] Figure 3 Schematic diagram of the clamping and measuring equipment used to clamp and measure the molten sample,
[0021] Figure 4 Schematic diagram of a sample carrier with a clamped molten sample on a transport device,
[0022] Figure 5a and Figure 5b Plan and three-dimensional views of the holding device in the handling unit,
[0023] Figures 6a to 6c Various views during the transfer of the sample carrier from the transport device to the processing device and
[0024] Figure 7 3D image of the sample carrier used for two fused samples. DETAILED DESCRIPTION
[0025] Figure 1 A steel mill laboratory for sample preparation, sample handling and chemical analysis of molten samples from steel production is shown. The sampling operation is performed by immersing a special sampling probe into the melt, which is not shown in greater detail here. Depending on the probe, lollipop samples, cone or chill samples, oval samples and rack samples can be distinguished, with lollipop samples and oval samples being preferred, since they can be handled automatically after the stem is separated.
[0026] Near the sampling location, the collected molten sample 1 is transferred to a pipeline delivery station and transported to the steel plant laboratory together with a pipeline delivery tank. In the steel plant laboratory, there is at least one pipeline delivery receiver 2, which automatically opens the pipeline delivery tank and takes out the molten sample 1. The molten sample 1 is transferred to a clamping and measuring station 3 ( Figure 3 ).like Figure 2 As shown, there, the molten sample is clamped on the sample carrier 5. For this purpose, the sample carrier 5 has a first clamping device 6, which is here depicted by a fixed jaw 6a and a spring-preloaded jaw 6b. The two jaws 6a, 6b can be provided with a microparticle coating to increase the holding force. The molten sample 1 clamped on the sample carrier 5 is then measured with the aid of at least one measuring device 7; in particular, the position and height of the molten sample 1 relative to the sample carrier 5 are determined. The measurement data are stored on the sample carrier 5, for example, via an RFID system, or are directly transmitted to a processing device. In each, the molten sample and / or the associated sample carrier are marked in a suitable manner for identifying the molten sample 1, so that each molten sample 1 can be clearly identified at the corresponding processing device.
[0027] The sample carrier 5 with the clamped molten sample 1 is moved from the clamping and measuring station 3 by means of a robot 4 and placed on a transport device 9 in order to transport the sample carrier 5 to a first processing station 10 ( Figure 4 ), which in this example is a milling machine. The transfer of the conveying device 9 to the first processing station 10 is achieved by means of a suitable transfer device, which is formed, for example, by a second robot 11. Here, the sample carrier 5 is transferred to the milling machine together with the clamped molten sample 1.
[0028] The uppermost layer of the molten sample is characterized by oxidation and has an oxide scale layer of about 0.5 mm thick, which is not representative of the molten sample. Below this, there is a layer with a thickness of several millimeters, which is suitable for a representative analysis. Therefore, the oxide scale layer on the molten sample 1 must be removed over the entire area. For this purpose, the use of a milling machine has been established. Due to the increased forces acting on the molten sample 1 during the milling operation, the first processing station 10 (milling machine) has an additional clamping device, which is in operative contact with the first clamping device 6 of the sample carrier 5 in the sample carrier 5 positioned in the first processing device 10, so as to increase the clamping force ( Figure 5a , Figure 5b). The clamping device 12 of the first processing device 10 consists of a fixed jaw 12a and a movable jaw 12b, and the sample carrier 5 is placed in the clamping device 12 in such a way that the fixed jaw 6a of the sample carrier 5 is in operative contact with the fixed jaw 12a and the spring-preloaded jaw 6b is in operative contact with the movable jaw 12b. The total clamping force acting on the molten sample can be increased by the additional force of the movable jaw 12b (arrow 19), and in this way the molten sample can be firmly held in place even during milling.
[0029] After the milling work, the second robot 11 again places the sample carrier 5 together with the clamped molten sample 1 on the conveyor device 9 in order to go to the second processing device 13. This is, for example, an instrument for spark emission spectroscopy (OES), which allows a rapid chemical analysis of the molten sample 1 and displays the emission spectrum of the chemical substances. OES analysis, like XRF analysis, aims at qualitative and quantitative determination of the elemental composition of the sample, the difference being accuracy and analysis time. The transfer from the conveyor device 9 to the second processing device 13 is carried out in Figures 6a to 6c , and here is implemented by a third robot 14 with a suitable gripper 14a.
[0030] An instrument for X-ray fluorescence analysis (XRF) is provided as a third processing device 15; this represents a method for qualitative and quantitative determination of the elemental composition of the sample and has the advantage that the sample is not destroyed by the measurement and no digestion step is required. Here, the transfer of the sample carrier 5 with the clamped molten sample 1 is performed by a fourth robot 16.
[0031] After all analyses have been carried out on the molten sample 1, the molten sample enters the sample magazine with the help of the fifth robot, where it is removed from the sample carrier 5 so that the sample carrier can be used for a new molten sample. The transport system is therefore also advantageously configured as a continuous loop so that the empty sample carrier is subsequently returned to the gripping and measuring station 3.
[0032] Figure 1 The steelworks laboratory depicted in the figure should only be regarded as a conceivable working example. However, other embodiments are also conceivable in the context of the present invention. Thus, the individual processing stations can also appear several times, in particular as a function of the number of molten samples to be analyzed. It is also conceivable to arrange several processing stations in the operating area of a single conveyor device (robot).
[0033] at last, Figure 7 A second working example of a sample carrier 5 'is shown, which is configured so that two molten samples 1 ', 1 '' can be accommodated. In the working example depicted, the sample carrier 5 'is essentially composed of Figure 2The two sample carriers 5 ' are connected to each other on their side opposite to the inserted molten sample, so that a first molten sample 1 ' can be clamped at the top and a second molten sample 1 ' can be clamped at the bottom using a separate clamping device 6 ', 6 '' in each case. In this way, two molten samples can be transported simultaneously and processing in the processing device can also take place faster since the sample carrier 5 'only has to be turned over by the conveying device (robot).
Claims
1. A method for handling a molten sample (1) in a steel plant laboratory, wherein: The molten sample (1) is processed and / or analyzed in at least one first processing device (10) and subsequently conveyed via at least one first conveying path to at least one second processing device (13, 15), in which the molten sample (1) is further processed and / or analyzed, The invention is characterized in that the molten sample (1) is clamped on a sample carrier (5), and the sample carrier (5) together with the clamped molten sample (1) is transported between the processing devices (10, 13, 15) and positioned in the processing device (10, 13, 15) for processing and / or analysis; surface treatment of the molten sample is performed in at least one of the two first processing devices (10), wherein a clamping device (12) is provided in the first processing device (10), and the clamping device acts on the sample carrier (5) positioned in the first processing device (10) to increase the clamping force acting on the molten sample (1).
2. The method according to claim 1, characterized in that The sample carrier together with the sandwiched molten sample (1) is placed on a transport device (9) for transporting between at least two of the processing devices (10, 13, 15).
3. The method according to claim 2, characterized in that At each of the processing devices (10, 13, 15), the sample carrier (5) together with the sandwiched molten sample (1) is transferred from the transport device (9) to the processing device (10, 13, 15).
4. The method according to claim 3, characterized in that During the transfer between at least one of the processing devices (10, 13, 15) and the transport device (9), the sample carrier (5) together with the sandwiched molten sample (1) is positioned in a rotational position in the processing device (10, 13, 15).
5. The method according to claim 1, characterized in that Before positioning the molten sample (1) in the processing device (10, 13, 15), the position and height of the molten sample (1) clamped on the sample carrier (5) relative to the sample carrier (5) are measured, and before processing and / or analyzing the molten sample (1), the measurement data are transmitted to at least one of the processing devices (10, 13, 15).
6. The method according to claim 1, characterized in that In at least two of the treatment devices (10, 13, 15), the molten sample (1) is cooled and / or surface treated and / or analyzed by X-ray fluorescence and / or by spark emission spectrometry.
7. The method according to claim 1, characterized in that The molten sample (1) and / or the associated sample carrier (5) is marked to identify the molten sample.
8. The method according to claim 7, characterized in that The associated sample carrier (5) also records processing information about the molten sample (1) and transmits the processing information to the processing device (10, 13, 15).
9. A steel mill laboratory for handling a molten sample (1), the steel mill laboratory comprising at least one first processing device (10) and a second processing device (13, 15) for processing and / or analyzing the molten sample (1) and a transport device (9) for transporting the molten sample (1) between the processing devices (10, 13, 15), It is characterized in that A sample carrier (5) having a first clamping device (6) for clamping the molten sample (1) is provided, and the sample carrier (5) together with the clamped molten sample (1) is configured to be transported on the transport device (9), and in the area of the processing device (10, 13, 15), a transport unit (11, 14) is provided for transporting the sample carrier (5) together with the clamped molten sample (1) to the processing device (10, 13, 15); at least one of the two first processing devices (10) is formed by a surface treatment device, and the surface treatment device has a clamping device (12), and when the sample carrier (5) is positioned in the first processing device (10), the clamping device is in operative contact with the first clamping device (6) of the sample carrier (5) to increase the clamping force acting on the molten sample (1).
10. The steel plant laboratory according to claim 9, characterized in that: At least two of the processing devices (10, 13, 15) are formed by a cooling device and / or a surface processing device and / or an X-ray fluorescence analysis device and / or a spark emission spectrometer.
11. The steel plant laboratory according to claim 9, characterized in that: The first clamping device (6) of the sample carrier (5) has clamping jaws (6a, 6b) which are provided with a microparticle coating to increase the friction coefficient.
12. The steel plant laboratory according to claim 9, characterized in that: The sample carrier is equipped with a second clamping device (6") for clamping a further molten sample (1").