A pressure loading system for high temperature expansion test of micro metal specimens

By designing a pressure loading system suitable for high-temperature bulging testing of micro-metal test pieces under high-temperature conditions, the problem that existing technology cannot test the mechanical properties of materials at high temperatures has been solved, and the pressure-loading test of micro-metal test pieces at high temperatures has been realized. , ensuring the accuracy and safety of test results.

CN113466056BActive Publication Date: 2024-10-01EAST CHINA UNIV OF SCI & TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110880350.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-02
Publication Date
2024-10-01
Estimated Expiration
2041-08-02

AI Technical Summary

Technical Problem

The existing technology lacks a pressure loading system suitable for bulging test of miniature metal test pieces under high temperature conditions, and cannot accurately test the mechanical properties of materials at high temperatures, which makes it difficult to solve the problem of equipment material degradation and failure in aerospace, nuclear power and other fields.

Method used

A pressure loading system for high-temperature bulging testing of miniature metal specimens is designed, including a hydraulic supply system, a pneumatic supply system, a pressure control system and a safety protection system. It provides pressure at high temperatures through liquid or gas media, combined with automatic adjustment and safety protection. Measures are taken to achieve reliable testing at high temperatures.

Benefits of technology

It realizes the pressure loading test of micro metal test pieces under high temperature conditions, ensuring the accuracy and safety of test results, avoiding accidents such as fires and explosions, and is suitable for high temperature and long-term creep tests above 500°C.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113466056B_ABST
    Figure CN113466056B_ABST
Patent Text Reader

Abstract

The present invention discloses a pressure loading system for high-temperature swelling test of a micro metal specimen. The pressure loading system for high-temperature swelling test of a micro metal specimen comprises: a hydraulic supply system, a pneumatic supply system, a pressure control system and a safety protection system. Among them, the hydraulic supply system is used to provide a liquid pressure medium, and the output end is connected to the pressure control system. The pneumatic supply system is used to provide a gas pressure medium, and the output end is connected to the pressure control system. The pressure control system is used to adjust the pressure of the liquid pressure medium or the gas pressure medium input thereto, and the output end is connected to the safety protection system. The safety protection system is used to cut off the discharge of the liquid pressure medium or the gas pressure medium when the metal specimen bulges and ruptures, and the output end is used to transport the liquid pressure medium or the gas pressure medium to the metal specimen to pressurize the metal specimen. The pressure loading system provided by the present invention can be used for high-temperature swelling test of metal specimens.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of material mechanical property testing, in particular to a pressure loading system for high-temperature swelling testing of a micro metal test piece. Background Art

[0002] In the fields of aerospace, nuclear power, petrochemicals, etc., pressure-bearing equipment or other metal components used under high temperature, high pressure, irradiation and other conditions will gradually deteriorate and be damaged as the service time increases. The mechanical properties of the materials gradually degrade, which may lead to failure of pressure-bearing equipment or other metal components, causing safety accidents and causing significant economic losses. In order to accurately understand the degree of degradation of the mechanical properties of materials, the traditional solution is to cut a certain amount of material from the in-service equipment according to the standard requirements, process it into standard specimens, and then conduct performance tests. Although the results are relatively accurate and reliable, this method has a large specimen size and requires more material to be cut, which is easy to damage the equipment and cannot be actually applied in many occasions.

[0003] The room temperature test method for micro metal specimens based on hydraulic expansion requires very little material to be cut, the constitutive theory of the structural model is relatively complete, there are fewer influencing factors, and the results are more accurate and reliable. It can test some mechanical properties of materials at room temperature, such as yield strength and tensile strength. However, this hydraulic expansion method is currently only applicable to room temperature and cannot be used to test material properties under high temperature conditions (≥300°C). At present, there is a lack of pressure loading systems that can be applied to expansion tests under high temperature conditions. Summary of the invention

[0004] The purpose of the invention is to provide a pressure loading system for high-temperature swelling test of a micro metal test piece.

[0005] To achieve the above object, the present invention provides the following solutions:

[0006] A pressure loading system for high-temperature swelling test of a micro metal specimen, comprising: a hydraulic supply system, an air pressure supply system, a pressure control system and a safety protection system;

[0007] The hydraulic supply system is used to provide liquid pressure medium, and the output end is connected to the pressure control system;

[0008] The gas pressure supply system is used to provide gas pressure medium, and the output end is connected to the pressure control system;

[0009] The pressure control system is used to adjust the pressure of the liquid pressure medium or the gas pressure medium input thereto, and the output end is connected to the safety protection system;

[0010] The safety protection system is used to cut off the discharge of the liquid pressure medium or the gas pressure medium when the metal test piece swells and ruptures, and the output end is used to transport the liquid pressure medium or the gas pressure medium to the metal test piece to pressurize the metal test piece.

[0011] Optionally, the hydraulic supply system includes: a liquid inlet tank, a plunger pump and a first pressure buffer tank;

[0012] The liquid inlet tank is used to store the liquid pressure medium;

[0013] The plunger pump, the input end of which is connected to the output end of the liquid inlet tank;

[0014] The first pressure buffer tank has an input end connected to the output end of the plunger pump, and an output end that is the output end of the hydraulic supply system.

[0015] Optionally, the air pressure supply system includes a high-pressure gas cylinder group, a pressure reducing valve and a second pressure buffer tank;

[0016] The high-pressure gas cylinder group is used to store the gas pressure medium, and the output end is connected to the input end of the pressure buffer tank through the pressure reducing valve;

[0017] The output end of the second pressure buffer tank is the output end of the air pressure supply system;

[0018] The gas pressure medium is an inert gas.

[0019] Optionally, the pressure control system includes: a three-way valve, a pressure fine-tuning valve, a pressure gauge, a first controller and an overpressure relief valve;

[0020] The three-way valve has a first port connected to the output end of the hydraulic supply system, a second port connected to the output end of the air pressure supply system, and a third port connected to the output end of the pressure control system through the pressure fine-tuning valve;

[0021] The pressure gauge is used to measure the medium pressure at the output end of the pressure control system;

[0022] The first controller is controllably connected to the three-way valve, the pressure fine-tuning valve and the overpressure relief valve respectively.

[0023] Optionally, the safety protection system includes: a safety protection pipeline, a second controller and an emergency shut-off valve;

[0024] The input end of the safety protection pipeline is connected to the output end of the pressure control system, and the output end of the safety protection pipeline is the output end of the safety protection system;

[0025] The emergency shut-off valve is installed on the safety protection pipeline;

[0026] The second controller is control-connected to the emergency shut-off valve.

[0027] Optionally, the safety protection system further includes: an expansion deformation rate measuring device, electrically connected to the second controller, and used to measure the expansion deformation rate of the metal test piece.

[0028] Optionally, the safety protection system further includes: a water bath, wherein the water bath is installed on the safety protection pipeline between the emergency shut-off valve and the output end of the safety protection pipeline.

[0029] Optionally, the safety protection system includes: a self-closing plug, which is installed at the output end of the safety protection system.

[0030] According to the specific embodiments provided by the present invention, the following technical effects are disclosed: the pressure loading system provided by the present application includes a hydraulic supply system, a pneumatic supply system, a pressure control system and a safety protection system. Among them, the hydraulic supply system is used to provide a liquid pressure medium, and the output end is connected to the pressure control system. The pneumatic supply system is used to provide a gas pressure medium, and the output end is connected to the pressure control system. The pressure control system is used to adjust the pressure of the liquid pressure medium or gas pressure medium input thereto, and the output end is connected to the safety protection system. The safety protection system is used to cut off the discharge of the liquid pressure medium or gas pressure medium when the metal test piece bulges and ruptures, and the output end is used to transport the liquid pressure medium or gas pressure medium to the metal test piece to pressurize the metal test piece. When the test temperature does not exceed 500°C, the liquid pressure medium provided by the hydraulic supply system can be used, and when the test temperature exceeds 500°C, the gas pressure medium provided by the pneumatic supply system can be used, so as to realize the loading of high-temperature pressure medium in the micro metal test piece bulging test. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0032] Figure 1 It is a schematic structural diagram of a pressure loading system for high-temperature swelling test of a micro metal specimen in an embodiment of the present invention;

[0033] Figure 2 (a) is a schematic diagram of the structure of a self-closing plug according to an embodiment of the present invention. Figure 2(b) is a schematic diagram of the structure of another self-closing plug in an embodiment of the present invention.

[0034] 1. Hydraulic supply system, 11. Liquid inlet tank, 12. Plunger pump, 13. First pressure buffer tank, 2. Air pressure supply system, 21. High-pressure gas cylinder group, 22. Pressure reducing valve, 23. Second pressure buffer tank, 3. Pressure control system, 31. Three-way valve, 32. Pressure fine-tuning valve, 33. First controller, 34. Pressure gauge, 35. Overpressure relief valve, 4. Safety protection system, 41. Second controller, 42. Emergency shut-off valve, 43. Water bath, 44. Self-closing plug, 45. Metal test piece. DETAILED DESCRIPTION

[0035] In order to clearly describe the technical solutions of the embodiments of the present application, in the embodiments of the present application, words such as "first" and "second" are used to distinguish the same or similar items with basically the same functions and effects. For example, the first wireless communication module and the second wireless communication module are only used to distinguish different wireless communication modules, and their order is not limited. Those skilled in the art can understand that words such as "first" and "second" do not limit the quantity and execution order.

[0036] It should be noted that, in this application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in this application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] The purpose of the invention is to provide a pressure loading system for high-temperature swelling test of a micro metal test piece.

[0039] See also Figure 1 The pressure loading system for high temperature swelling test of the micro metal test piece 45 provided in this embodiment includes: a hydraulic supply system 1, an air pressure supply system 2, a pressure control system 3 and a safety protection system 4.

[0040] A hydraulic supply system 1, used for providing a liquid pressure medium, the output end of which is connected to a pressure control system 3;

[0041] The gas pressure supply system 2 is used to provide gas pressure medium, and the output end is connected to the pressure control system 3;

[0042] A pressure control system 3, used for adjusting the pressure of the liquid pressure medium or gas pressure medium input thereto, the output end of which is connected to the safety protection system 4;

[0043] The safety protection system 4 is used to cut off the discharge of the liquid pressure medium or the gas pressure medium when the metal test piece 45 swells and ruptures, and the output end is used to deliver the liquid pressure medium or the gas pressure medium to the metal test piece 45 to pressurize the metal test piece 45.

[0044] The hydraulic supply system 1 is generally used for high-temperature bulging tests with a test temperature not higher than 500°C. Since the compression ratio of liquid is low, the pressure increase speed during loading is much faster than that of gas, and the test pressure requirement can be reached quickly. The higher the test pressure, the faster the hydraulic loading. However, liquids tend to boil and vaporize at high temperatures. Even organic liquid media such as high-temperature heat transfer oil generally have a boiling point of no more than 500°C. Otherwise, once leakage occurs after high-temperature vaporization, it is easy to cause serious fires, explosions and other accidents. Therefore, the hydraulic supply system 1 can be used to provide pressure medium when the test temperature is not higher than 500°C.

[0045] The air pressure supply system 2 is mainly used for high-temperature bulging tests with a test temperature exceeding 500°C. The gas has a high compression ratio, and the pressure increase speed during the test is relatively slow, and it is easy to cause an explosion caused by physical expansion after the test piece is ruptured. In order to prevent fire accidents and personal injuries that may be caused by large amounts of gas leakage, the pressurized gas generally uses non-flammable, non-combustible, non-toxic, non-radioactive, and economical and convenient gases (such as argon, nitrogen and other inert gases) to meet the needs of high-temperature and long-term creep tests of metal sheets.

[0046] In one example, the hydraulic supply system 1 includes: a liquid inlet tank 11 , a plunger pump 12 and a first pressure buffer tank 13 .

[0047] The liquid inlet tank 11 is used to store liquid pressure medium.

[0048] The input end of the plunger pump 12 is communicated with the output end of the liquid inlet tank 11 .

[0049] The first pressure buffer tank 13 has an input end connected to an output end of the plunger pump 12 , and an output end thereof is an output end of the hydraulic supply system 1 .

[0050] In one example, the air pressure supply system 2 includes a high-pressure gas cylinder group 21 , a pressure reducing valve 22 , and a second pressure buffer tank 23 .

[0051] The high-pressure gas cylinder group 21 is used to store gas pressure medium, and the output end is connected to the input end of the second pressure buffer tank 23 through the pressure reducing valve 22.

[0052] The output end of the second pressure buffer tank 23 is the output end of the air pressure supply system 2;

[0053] The gas pressure medium is an inert gas.

[0054] In one example, the pressure control system 3 includes: a three-way valve 31 , a pressure fine-tuning valve 32 , a pressure gauge 34 , a first controller 33 , and an overpressure relief valve 35 .

[0055] The three-way valve 31 has a first port connected to the output end of the hydraulic supply system 1 , a second port connected to the output end of the air pressure supply system 2 , and a third port connected to the output end of the pressure control system 3 via a pressure fine-tuning valve 32 .

[0056] The pressure gauge 34 is used to measure the medium pressure at the output end of the pressure control system 3 .

[0057] The first controller 33 is control-connected to the three-way valve 31 , the pressure fine-tuning valve 32 , and the overpressure relief valve 35 , respectively.

[0058] In one example, the safety protection system 4 includes: a safety protection pipeline, a second controller 41 and an emergency shut-off valve 42 .

[0059] The input end of the safety protection pipeline is connected to the output end of the pressure control system 3 , and the output end of the safety protection pipeline is the output end of the safety protection system 4 .

[0060] The emergency shut-off valve 42 is installed on the safety protection pipeline.

[0061] The second controller 41 is control-connected to the emergency shut-off valve 42 .

[0062] In addition, the safety protection system 4 further includes: an expansion deformation rate measuring device, which is electrically connected to the second controller 41 and is used to measure the expansion deformation rate of the metal test piece 45 .

[0063] Furthermore, the safety protection system 4 also includes: a water bath 43, which is installed on the safety protection pipeline between the emergency cut-off valve 42 and the output end of the safety protection pipeline.

[0064] In one example, the safety protection system 4 further includes: a self-closing plug 44 , which is installed at the output end of the safety protection system 4 .

[0065] The following is a detailed introduction to the pressure loading system for the high temperature expansion test of the micro metal specimen 45.

[0066] The hydraulic supply system 1 is composed of a liquid inlet tank 11, a plunger pump 12, a first pressure buffer tank 13 and connecting pipelines. The hydraulic supply system 1 is fixed on the ground. The liquid inlet tank 11 stores pressurized liquid pressure medium. Generally, the volume of the liquid inlet tank 11 does not exceed 10L. The liquid medium is drawn out from the bottom of the liquid inlet tank 11 and enters the plunger pump 12. After being pressurized by the plunger pump 12 (the maximum outlet pressure of the plunger pump 12 should be able to reach 50MPa), it enters the first pressure buffer tank 13 to stabilize the medium pressure, and then is sent to the three-way valve 31 of the pressure control system 3 through the pipeline.

[0067] The air pressure supply system 2 is generally composed of a high-pressure gas cylinder group 21, a pressure reducing valve 22, a second pressure buffer tank 23 and connecting pipelines. The air pressure supply system 2 is fixed on the ground. The high-pressure gas cylinder group 21 can be easily switched. When the gas pressure in some gas cylinders does not meet the test requirements, they can be switched out of the system and replaced with new ones. The maximum pressure of the gas in the new cylinder should not be less than 50MPa, and the total volume of the cylinder group should not be less than 2m 3 The pressurized gas is drawn out from the gas cylinder group and sent to the second pressure buffer tank 23 for pressure stabilization after passing through the pressure reducing valve 22 , and then sent to the three-way valve 31 of the pressure control system 3 through a pipeline.

[0068] The pressure control system 3 is composed of an inlet three-way valve 31, a pressure fine-tuning valve 32, a pressure gauge 34, a first controller 33, an overpressure relief valve 35, and connecting pipelines, etc. The pressure control system 3 is fixed on the ground. Under the control of the first controller 33, the pressure medium entering the three-way valve 31 is switched by the valve (the pneumatic and hydraulic loading methods are selected according to the test needs), and after being reduced in pressure by the pressure fine-tuning valve 32, it passes through the safety protection system 4 (emergency shut-off valve 42, water bath 43, self-closing embolism, and flows upward from the periphery of the embolism) to the metal test piece 45 for testing. A pressure gauge 34 is provided on the pipeline between the pressure fine-tuning valve and the emergency shut-off valve 42 to measure the pipeline medium pressure near the metal test piece 45. When the pressure value of the pressure gauge 34 is lower than the test requirement, the first controller 33 automatically adjusts the opening and opening and closing actions of each valve according to the measured pressure of the pressure gauge 34, keeps the overpressure relief valve 35 in a closed state, and the three-way valve 31, the pressure fine-tuning valve 32 and the emergency shut-off valve 42 are all kept in an open state, and the test pressure medium continues to be delivered to the metal test piece 45. In particular, when the pressure value of the pressure gauge 34 is close to the test requirement, the opening of the pressure fine-tuning valve 32 is automatically reduced to maintain a stable pressure change. When the pressure value of the pressure gauge 34 is consistent with the test requirement or within the allowable error range (generally 0.5% of the test requirement pressure value and not more than 1MPa), the first controller 33 closes the pressure fine-tuning valve 32 and the overpressure relief valve 35. Once the pressure value of the pressure gauge 34 reaches the upper limit of the allowable error range of the pressure value required for the test, the first controller 33 keeps the pressure fine-tuning valve 32 closed, and immediately opens the overpressure relief valve 35 to release part of the pressure medium to reduce the pipeline pressure, and when the pressure value of the pressure gauge 34 falls back to the lower limit of the allowable error range close to the pressure value required for the test, the overpressure relief valve 35 is immediately closed. In this way, the medium pressure is automatically adjusted to keep the pressure value of the pressure gauge 34 stable and within the allowable error range of the test.

[0069] The above-mentioned safety protection system 4 adopts a dual protection structure: one is a linkage control system based on the emergency shut-off valve 42, including a water bath 43, an emergency shut-off valve 42, a second controller 41 and connecting pipelines. The emergency shut-off valve 42 is connected to the end of the pipeline of the pressure control system 3. The pipeline behind the emergency shut-off valve 42 passes through the water bath 43 to prevent the emergency shut-off valve 42 from overheating and failing during the high-temperature long-term creep test. The pipeline after the water bath 43 sends the pressure medium to the self-sealing embolism. The second controller 41 determines whether to open the emergency shut-off valve 42 based on the swelling deformation rate of the metal test piece 45 (measured by the swelling deformation rate measuring device). Generally, when the swelling deformation rate of the metal test piece 45 exceeds 0.5m / s, the emergency shut-off valve 42 is automatically started. The feedback time does not exceed 0.01 seconds, and the time for emergency shut-off of the pipeline medium does not exceed 0.2 seconds. The second is an emergency shut-off embolism based on a self-sealing structure-a self-sealing embolism. The typical structure of the self-sealing embolism is shown in Figure 2 . This structure needs to be fixed vertically in the pipeline near the test piece. A special self-closing metal embolism is set in the pipeline. The embolism can be conical, spherical, cylindrical or a combination of effective shapes. The outer diameter of the embolism is slightly smaller than the inner diameter of the pipeline at the embolism part (generally the gap does not exceed 1mm), but larger than the inner diameter of the pipeline at both ends of the embolism (generally designed as a step or cone shape). When the pressure medium is transported to the metal test piece 45, due to the slow transportation speed, the embolism sinks below under the action of gravity, and the pressure medium can slowly flow around the embolism and enter the metal test piece 45; when the metal test piece 45 bulges and deforms, and finally ruptures, due to the loss of pressure at the ruptured part, the medium in the pipeline flows upward rapidly, driving the embolism to move together and close the upper step or cone mouth. At this time, the flow of the pressure medium drops sharply, and the pressure before the embolism remains in a pressure-bearing state, while the pressure after the embolism is very low (close to atmospheric pressure). Under the action of the pressure difference, the embolism remains in a tight state, achieving a good anti-leakage function. This double protection structure can improve the reliability of the safety protection system 4. The shut-off action of the emergency shut-off valve 42 or the self-sealing plug can greatly reduce the amount of medium leaking from the rupture of the metal test piece 45, so that the remaining medium in the pipeline will not continue to flow or spray out from the rupture of the test piece, thereby reducing the possibility of combustion and explosion caused by medium leakage.

[0070] The pressure loading system for high temperature expansion test of micro metal specimens provided in this application has the following effects:

[0071] 1) You can choose any loading method according to the test needs: if you need a loading test with a faster pressure increase, you can choose a hydraulic supply system, but the test temperature cannot exceed 500℃; if you need to test at a high temperature above 500℃, especially for high temperature and long-term creep tests, you can choose a pneumatic supply system.

[0072] 2) The two loading modes are easy to switch and simple to operate. After the pressure medium is buffered and stabilized, the load is uniform and stable without friction. The mechanical analysis results are significantly better than other similar test devices. After the pressure system is automatically adjusted, the loading accuracy is high and the pressure value can always be effectively controlled within the allowable error range.

[0073] 3) The safety protection system does not affect the flow of the medium during normal testing, and can automatically cut off the pressure medium when the test piece finally swells and ruptures, reducing the release of the pressure medium to a minimum, thereby preventing safety accidents such as fire and gas explosion, and improving the safety of the system.

[0074] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0075] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A pressure loading system for high-temperature expansion testing of a micro metal specimen, characterized in that: include: Hydraulic supply system, pneumatic supply system, pressure control system and safety protection system; The hydraulic supply system is used to provide liquid pressure medium, and the output end is connected to the pressure control system; The air pressure supply system is used to provide gas pressure medium, and the output end is connected to the pressure control system; The pressure control system is used to adjust the pressure of the liquid pressure medium or the gas pressure medium input thereto, and the output end is connected to the safety protection system; The safety protection system is used to cut off the discharge of the liquid pressure medium or the gas pressure medium when the metal test piece bulges and ruptures, and the output end is used to deliver the liquid pressure medium or the gas pressure medium to the metal test piece to pressurize the metal test piece; The safety protection system includes: a safety protection pipeline, a second controller, an emergency shut-off valve, a water bath and a self-closing plug; The input end of the safety protection pipeline is connected to the output end of the pressure control system, and the output end of the safety protection pipeline is the output end of the safety protection system; The emergency shut-off valve is installed on the safety protection pipeline; The second controller is control-connected to the emergency shut-off valve; The water bath is installed on the safety protection pipeline between the emergency shut-off valve and the output end of the safety protection pipeline; The self-closing plug is installed at the output end of the safety protection system.

2. The pressure loading system for high-temperature expansion testing of a micro metal specimen according to claim 1, characterized in that: The hydraulic supply system includes: a liquid inlet tank, a plunger pump and a first pressure buffer tank; The liquid inlet tank is used to store the liquid pressure medium; The plunger pump, the input end of which is connected to the output end of the liquid inlet tank; The input end of the first pressure buffer tank is connected to the output end of the plunger pump, and the output end is the output end of the hydraulic supply system.

3. The pressure loading system for high-temperature expansion testing of a micro metal specimen according to claim 1, characterized in that: The air pressure supply system includes a high-pressure gas cylinder group, a pressure reducing valve and a second pressure buffer tank; The high-pressure gas cylinder group is used to store the gas pressure medium, and the output end is connected to the input end of the pressure buffer tank through the pressure reducing valve; The output end of the second pressure buffer tank is the output end of the air pressure supply system; The gas pressure medium is an inert gas.

4. The pressure loading system for high-temperature expansion testing of a micro metal specimen according to any one of claims 1 to 3, characterized in that: The pressure control system includes: a three-way valve, a pressure fine-tuning valve, a pressure gauge, a first controller and an overpressure relief valve; The three-way valve has a first port connected to the output end of the hydraulic supply system, a second port connected to the output end of the air pressure supply system, and a third port connected to the output end of the pressure control system through the pressure fine-tuning valve; The pressure gauge is used to measure the medium pressure at the output end of the pressure control system; The first controller is controllably connected to the three-way valve, the pressure fine-tuning valve, and the overpressure relief valve, respectively.

5. The pressure loading system for high-temperature expansion testing of a micro metal specimen according to claim 1, characterized in that: The safety protection system further includes: an expansion deformation rate measuring device electrically connected to the second controller and configured to measure the expansion deformation rate of the metal test piece.