A prefabricated high-rise residential cast-in-place sandwich insulation shear wall structure

The sandwich insulated shear wall structure connected by modular special formwork and special tie-pieces solves the problem of low wall pouring accuracy in high-rise residential buildings, achieving more efficient construction and better building quality.

CN113494145BActive Publication Date: 2025-01-24GUANGJUN NEW MATERIAL TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010260494.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-03
Publication Date
2025-01-24
Estimated Expiration
2040-04-03

AI Technical Summary

Technical Problem

In existing high-rise residential buildings, the concrete shear wall structure has low accuracy during the pouring process, resulting in the displacement of the insulation panel, insufficient thickness of the concrete protective layer, cumbersome formwork construction and serious waste.

Method used

Adopt a modular first template and the second template, connect the dedicated tensile parts of the insulation board to form a protective cavity and structural empty cavity, to accommodate the crack -resistant steel wire mesh and structural steel, forming a sandwich sandwiches, heating, heating, heating, heating, heating, heating, heating, heating fixture. Power wall template structure.

Benefits of technology

It improves the accuracy of wall pouring, ensures the wall is straight and accurate in thickness, reduces the need for plastering, improves construction efficiency and reduces material waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113494145B_ABST
    Figure CN113494145B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of building wall structures, and proposes an assembled high-rise residential cast-in-place sandwich insulation shear wall structure, comprising a first template, an insulation board, a second template, and an anchor, wherein the first template and the insulation board are arranged in sequence, and the first template, the insulation board and the second template are arranged in sequence, and the anchor is used to connect the first template, the insulation board and the second template. Through the above technical solution, the problem of low wall casting accuracy in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building wall structures and relates to a cast-in-situ sandwich insulation shear wall structure for an assembled high-rise residential building. Background Art

[0002] At present, most high-rise residential buildings adopt concrete shear wall structures. With the increasing requirements for thermal insulation, basically all high-rise buildings adopt thermal insulation measures. Among them, the thin plastering system of high-rise residential exterior walls has been used in China for many years, which has produced good economic and social benefits. However, the insulation layer adopts polystyrene foam board insulation material, which has poor fire resistance and serious fire hazards, and cannot achieve the same lifespan as the exterior wall. Therefore, the integrated insulation structure technology system has been vigorously promoted. At present, there are many integrated insulation structures on the market, most of which are sandwich insulation structures. The insulation board is located on the outer layer of the concrete structure layer, and there is a cast-in-place concrete slab at least 50 mm thick on the outside of the insulation board. The inner and outer layers of concrete are connected together by oblique or straight bars penetrating the insulation layer. The positioning and fixation of the insulation board of the current integrated insulation structure system is unreliable, resulting in the displacement of the insulation board during concrete pouring, and the cold bridge of the tie pieces penetrating the insulation board is serious, which greatly reduces the insulation effect. In addition, the thickness of the concrete protective layer outside the insulation layer is generally 50-60 mm, which is relatively thin. It is difficult to insert the vibrating rod into the concrete, making pouring difficult and easily causing pouring defects. In addition, the current integrated insulation structure wall structure concrete formwork construction is cumbersome, and the formwork construction progress is low, resulting in low wall surface accuracy and the need for plastering and leveling. In addition, the formwork of the concrete shear wall does not meet the requirements of assembly, and a lot of on-site cutting is required, resulting in serious waste. Based on the above problems, a new wall casting model structure is urgently needed. Summary of the invention

[0003] The present invention provides a cast-in-situ sandwich insulation shear wall structure for an assembled high-rise residential building, which solves the problem of low wall casting accuracy in the prior art.

[0004] The technical solution of the present invention is achieved in this way:

[0005] An assembled high-rise residential cast-in-place sandwich insulation shear wall structure, comprising:

[0006] First template;

[0007] Insulation board, the first template and the insulation board are arranged in sequence;

[0008] A second template, wherein the first template, the insulation board and the second template are arranged in sequence;

[0009] An anchor is used to connect the first template, the insulation board and the second template.

[0010] As a further technical solution, the anchor comprises:

[0011] A tie rod, the tie rod is used to connect the first template, the insulation board and the second template;

[0012] A connecting piece is arranged on the tie rod and is used to fix the positions of the first template, the insulation board and the second template.

[0013] As a further technical solution, it also includes:

[0014] A steel wire mesh, the steel wire mesh being arranged on the tie rod;

[0015] Structural steel bars, the structural steel bars are arranged on the tie rods;

[0016] A protective cavity is formed between the first template and the insulation board to accommodate the steel mesh and concrete;

[0017] A structural cavity is formed between the second template and the insulation board for accommodating the structural steel bars and concrete.

[0018] As a further technical solution, it also includes:

[0019] A bearing member, the bearing member is arranged on the tie rod and is located in the structural cavity, and the structural steel bar is arranged on the bearing member;

[0020] The tie rod comprises:

[0021] A bending portion, the bending portion is located in the protection cavity, and the steel wire mesh is arranged on the bending portion;

[0022] A straight rod portion, the connecting member and the bearing member are arranged on the straight rod portion.

[0023] As a further technical solution, the first template, the second template and the insulation board are all provided with:

[0024] A slot, wherein the connecting member is arranged in the slot;

[0025] The connecting piece comprises:

[0026] An insert board, the insert board is inserted into the slot;

[0027] Baffles, two baffles are vertically arranged at two ends of the plug board.

[0028] As a further technical solution, the bearing member includes:

[0029] A bearing plate, the bearing plate being arranged on the tie rod;

[0030] A load-bearing claw is arranged on the load-bearing plate, and the structural steel bar is clamped on the load-bearing claw.

[0031] As a further technical solution, the insulation board is provided with:

[0032] A plug-in boss, the plug-in boss being located at one end of the insulation board;

[0033] The plug-in slot is located at the other end of the insulation board, the plug-in boss corresponds to the position of the plug-in slot, and the plug-in boss is inserted into the plug-in slot of the adjacent insulation board.

[0034] As a further technical solution, the insulation board is also provided with:

[0035] A clearance groove, wherein the clearance groove is arranged at one end of the insulation board close to the protection cavity;

[0036] A compensation boss is arranged at an end of the insulation board opposite to the clearance groove.

[0037] The working principle and beneficial effects of the present invention are:

[0038] The present invention discloses a prefabricated high-rise residential cast-in-place sandwich insulation shear wall structure. The outermost sides of the cast-in-place concrete shear wall formwork structure are modularized special first formwork and second formwork. The two layers of special formwork are tied together by special tie pieces that penetrate the insulation board to form two cavities. The insulation board and the second formwork form a concrete protective layer cavity that accommodates anti-cracking steel wire mesh and concrete. The insulation board and the first formwork form a concrete structure cavity that accommodates structural steel bars and concrete. Thus, a sandwich insulation shear wall formwork structure is formed. Compared with the prior art, the modular special formwork has uniform force and precise and reliable clamping grooves. After pouring concrete, the wall is very straight and the wall thickness is also precise, so that the flatness without plastering can be achieved, the accuracy of pouring is improved, and the problem of low wall pouring accuracy is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0040] Figure 1 It is an axonometric view of the overall structure of the present invention;

[0041] Figure 2 It is a top view of the overall structure of the present invention;

[0042] Figure 3 It is a side view of the overall structure of the present invention;

[0043] Figure 4 This is an axonometric view of the anchor structure of the present invention;

[0044] In the figure: 1-first template, 2-insulation board, 21-plug-in boss, 22-plug-in groove, 23-yield groove, 24-compensation boss, 3-second template, 4-anchor, 41-tie rod, 411-bending portion, 412-straight rod portion, 42-connecting member, 421-plug plate, 422-baffle, 5-wire mesh, 6-structural reinforcement, 7-protective cavity, 8-structural cavity, 9-bearing member, 91-bearing plate, 92-bearing claw, 10-slot. DETAILED DESCRIPTION

[0045] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0046] like Figures 1 to 4 As shown, a prefabricated high-rise residential cast-in-place sandwich insulation shear wall structure includes:

[0047] First template 1;

[0048] The insulation board 2, the first template 1 and the insulation board 2 are arranged in sequence;

[0049] The second template 3, the first template 1, the insulation board 2 and the second template 3 are arranged in sequence;

[0050] The anchor 4 is used to connect the first template 1, the insulation board 2 and the second template 3.

[0051] In the present embodiment, an assembled high-rise residential cast-in-place sandwich insulation shear wall structure is disclosed. On the outermost side of the cast-in-place concrete shear wall formwork structure are modular special first formwork 1 and second formwork 3. The two layers of special formwork are tied together by special tie pieces 4 that penetrate the insulation board 2 to form two cavities. The insulation board 2 and the second formwork 3 form a concrete protective layer cavity that accommodates a crack-resistant steel wire mesh 5 and concrete. The insulation board 2 and the first formwork 1 form a concrete structure cavity 8 that accommodates structural steel bars 6 and concrete, thus forming a sandwich insulation shear wall formwork structure. Compared with the prior art, the modular special formwork has uniform force and precise and reliable clamping grooves. After pouring concrete, the wall is very straight and the wall thickness is also precise, which can achieve flatness without plastering, improves the accuracy of pouring, and solves the problem of low wall pouring accuracy.

[0052] Further, the anchor 4 comprises:

[0053] A tie rod 41, which is used to connect the first template 1, the insulation board 2 and the second template 3;

[0054] The connecting member 42 is arranged on the tie rod 41 and is used to fix the positions of the first template 1, the insulation board 2 and the second template 3.

[0055] In this embodiment, the first formwork 1, the insulation board 2 and the second formwork 3 are connected and fixed in position by an anchor 4. The anchor 4 is composed of a tie rod 41 and a connecting member 42. The connecting member 42 is installed on the tie rod 41 and the first formwork 1, the insulation board 2 and the second formwork 3. The connecting member 42 fixes the relative position of the first formwork 1, the insulation board 2 and the second formwork 3 along the tie rod 41, determines the size of the space between the first formwork 1, the insulation board 2 and the second formwork 3, and the connecting member 42 is installed on the tie rod 41. The anchor 4 plays a role in supporting the shear wall model structure.

[0056] Furthermore, it also includes:

[0057] Steel mesh 5, which is arranged on the tie rod 41;

[0058] Structural steel bars 6, which are arranged on the tie rods 41;

[0059] A protective cavity 7 is formed between the first template 1 and the insulation board 2 for accommodating the wire mesh 5 and concrete;

[0060] A structural cavity 8 is formed between the second formwork 3 and the insulation board 2 for accommodating structural steel bars 6 and concrete.

[0061] In this embodiment, two layers of special formwork are tied together by special tie pieces 4 that penetrate the insulation board 2 to form two cavities. A protective cavity 7 is formed between the first formwork 1 and the insulation board 2, which contains a wire mesh 5 hung on the tie rod 41. A structural cavity 8 is formed between the second formwork 3 and the insulation board 2, which contains structural steel bars 6 hung on the tie rod 41. When concrete is poured into the two spaces, the concrete, the wire mesh 5 and the structural steel bars 6 form a concrete reinforced structure. The wire mesh 5 and the structural steel bars 6 act as reinforcing bars, thereby improving the strength of the wall structure.

[0062] Furthermore, it also includes:

[0063] A bearing member 9, the bearing member 9 is arranged on the tie rod 41 and is located in the structural cavity 8, and the structural reinforcement 6 is arranged on the bearing member 9;

[0064] The tie rod 41 comprises:

[0065] A bending portion 411, the bending portion 411 is located in the protection cavity 7, and the wire mesh 5 is arranged on the bending portion 411;

[0066] The straight rod portion 412 , the connecting member 42 and the bearing member 9 are arranged on the straight rod portion 412 .

[0067] In this embodiment, a bearing member 9 is also installed on the tie rod 41. The bearing member 9 is stronger than the tie rod 41. The structural steel bar 6 is arranged on the bearing member 9. The bearing member 9 improves the stability of the position of the structural steel bar 6 in the structural cavity 8. Even if it is impacted by concrete, it will not fall or tilt, thereby improving the stability and safety of the wall structure; the tie rod 41 is divided into a bending portion 411 and a straight rod portion 412. The straight rod portion 412 is connected in series to the entire formwork. The wire mesh 5 is hung on the bending portion 411 to ensure the positioning accuracy of the wire mesh and make the protective layer more stable and reliable.

[0068] Furthermore, the first template 1, the second template 3 and the insulation board 2 are all provided with:

[0069] The slot 10, the connecting member 42 is disposed in the slot 10;

[0070] The connecting member 42 comprises:

[0071] Insertion board 421, which is inserted into slot 10;

[0072] Baffles 422 , two baffles 422 are vertically arranged at both ends of the plug board 421 .

[0073] In this embodiment, three connecting members 42 are arranged on the anchor 4, which have three clamping positions. The outermost side is clamped with the first template 1, and the wire mesh 5 hook is close to the inner side, which is used to hang the anti-cracking wire mesh 5 of the concrete protective layer. The clamping position on the inner side is used to clamp the insulation board 2, which is clamped into the clamping groove of the insulation board 2 to fix the insulation board 2. When pouring concrete, the insulation board 2 is not allowed to move. The clamping position on the inner side is used to clamp the innermost second template 3. Slots 10 are provided on the first template 1, the insulation board 2 and the second template 3. The connecting member 42 is composed of a plug plate 421 and two baffles 422. The plug plate 421 is inserted into the slot 10 to fix it. The baffle 422 is perpendicular to the plug plate 421. The distance between the baffles 422 is the thickness of the first template 1, the insulation board 2 and the second template 3 respectively. In this way, the baffle 422 limits the specific positions of the first template 1, the insulation board 2 and the second template 3, and no position deviation will occur due to the impact of concrete.

[0074] Further, the bearing member 9 comprises:

[0075] A bearing plate 91, wherein the bearing plate 91 is disposed on the tie rod 41;

[0076] The load-bearing claw 92 is arranged on the load-bearing plate 91 , and the structural steel bar 6 is clamped on the load-bearing claw 92 .

[0077] In this embodiment, the bearing member 9 installed on the tie rod 41 is composed of a bearing plate 91 and a bearing claw 92. The bearing plate 91 is installed on the tie rod 41. When the concrete is poured, the bearing claw 92 ensures that the structural steel bar 6 will not change its position due to the impact of the concrete, so that the position of the structural steel bar 6 is accurate, and the structural strength of the wall is improved.

[0078] Further, the insulation board 2 is provided with:

[0079] The plug-in boss 21 is located at one end of the insulation board 2;

[0080] The plugging groove 22 is located at the other end of the insulation board 2 , the plugging boss 21 corresponds to the plugging groove 22 , and the plugging boss 21 is inserted into the plugging groove 22 of the adjacent insulation board 2 .

[0081] In this embodiment, the insulation board 2 is designed with an insertion boss 21 and an insertion groove 22. When the insulation board is installed, the insulation board is connected more tightly and reliably, the insertion is firm, and the insulation board is raised layer by layer. The operation is simple and firm, which improves the engineering efficiency.

[0082] Furthermore, the insulation board 2 is also provided with:

[0083] A clearance groove 23, which is arranged at one end of the insulation board 2 close to the protection cavity 7;

[0084] The compensation boss 24 is arranged on the end of the insulation board 2 opposite to the yielding groove 23 .

[0085] In this embodiment, the insulation board 2 used is a molded polystyrene board, and a clearance groove 23 is arranged on the insulation board 2. The clearance groove 23 is close to one end of the protective cavity 7. The clearance groove 23 is vertically arranged. The protective cavity 7 between the clearance groove 23 and the first template 1 is used to accommodate the insertion of the vibration rod. The vibration rod promotes the full pouring of concrete and will not cause air holes in the wall. There is a corresponding compensation boss 24 protruding on the inner side of the clearance groove 23 of the insulation board 2, which is used to compensate for the thinning of the insulation board 2 caused by the sinking of the insulation layer. While ensuring the insulation thickness, the strength of the insulation board 2 is also improved.

[0086] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A prefabricated high-rise residential cast-in-place sandwich insulation shear wall structure, characterized in that: include: First template (1); A heat preservation plate (2), wherein the first template (1) and the heat preservation plate (2) are arranged in sequence; A second template (3), wherein the first template (1), the insulation board (2) and the second template (3) are arranged in sequence; An anchor (4), the anchor (4) being used to connect the first template (1), the insulation board (2) and the second template (3); The anchor (4) comprises: A tie rod (41), the tie rod (41) being used to connect the first template (1), the insulation board (2) and the second template (3); A connecting member (42), the connecting member (42) being arranged on the tie rod (41) and being used for fixing the positions of the first template (1), the insulation board (2) and the second template (3); The first template (1), the second template (3) and the insulation board (2) are all provided with: A slot (10), wherein the connecting member (42) is arranged in the slot (10); the connecting member (42) comprises: An inserting plate (421), the inserting plate (421) being inserted into the slot (10); Baffles (422), two baffles (422) are vertically arranged at two ends of the plug board (421); The insulation board (2) is provided with: An inserting boss (21), wherein the inserting boss (21) is located at one end of the thermal insulation board (2); The plug-in slot (22) is located at the other end of the thermal insulation board (2), the plug-in boss (21) corresponds to the position of the plug-in slot (22), and the plug-in boss (21) is inserted into the plug-in slot (22) of the adjacent thermal insulation board (2).

2. The cast-in-place sandwich insulation shear wall structure of a prefabricated high-rise residential building according to claim 1 is characterized in that Also includes: A steel wire mesh (5), wherein the steel wire mesh (5) is arranged on the tie rod (41); Structural steel bars (6), the structural steel bars (6) being arranged on the tie rods (41); A protective cavity (7) is formed between the first template (1) and the insulation board (2) for accommodating the steel mesh (5) and concrete; A structural cavity (8) is formed between the second formwork (3) and the insulation board (2) for accommodating the structural steel bars (6) and concrete.

3. The cast-in-place insulation sandwich shear wall structure of a prefabricated high-rise residential building according to claim 2 is characterized in that: Also includes: A bearing member (9), the bearing member (9) being arranged on the tie rod (41) and located in the structural cavity (8), and the structural steel bar (6) being arranged on the bearing member (9); The tie rod (41) comprises: a bending portion (411), the bending portion (411) being located in the protective cavity (7), and the steel wire mesh (5) being arranged on the bending portion (411); A straight rod portion (412), the connecting member (42) and the bearing member (9) being arranged on the straight rod portion (412).

4. The cast-in-place insulation sandwich shear wall structure of a prefabricated high-rise residential building according to claim 3 is characterized in that: The carrier (9) comprises: A bearing plate (91), wherein the bearing plate (91) is arranged on the tie rod (41); A load-bearing claw (92), wherein the load-bearing claw (92) is arranged on the load-bearing plate (91), and the structural steel bar (6) is clamped on the load-bearing claw (92).

5. The cast-in-place insulation sandwich shear wall structure of a prefabricated high-rise residential building according to claim 2 is characterized in that: The insulation board (2) is also provided with: a clearance groove (23), wherein the clearance groove (23) is arranged at one end of the thermal insulation board (2) close to the protective cavity (7); A compensation boss (24) is arranged at an end of the insulation board (2) on the opposite side of the clearance groove (23).

Citation Information

Patent Citations

  • Template fixing device and construction method of sandwich heat preservation dry wall

    CN110836009A

  • Demolding-free sandwich foam concrete wall

    CN204475591U

  • Cast-in-place sandwich heat insulation shear wall structure of fabricated high-rise residential building

    CN212104661U