Quickly-built steel structure prefabricated pig house and its construction method
Through the design of prefabricated pig houses in steel structures, prefabricated roof ceiling frames and steel frame columns, the problems of slow construction speed and insufficient space in the existing technology are solved, and a modern pig house with rapid construction, high quality and low cost are achieved.
Patent Information
- Application Number
- CN202110414879.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-17
- Publication Date
- 2025-06-27
- Estimated Expiration
- 2041-04-17
AI Technical Summary
It is difficult for the existing technology to quickly build a modern thermal insulation and energy-saving pig house that meets the requirements of modern intensive breeding spaces, and conventional construction processes lead to long construction cycles and unstable quality.
The steel structure prefabricated pig house design is adopted, and rapid assembly and expansion is achieved through the combination of prefabricated roof ceiling frames, steel frame columns, joists and truss connectors.
It significantly improves the construction speed, ensures construction quality, and reduces the cost, meeting the space needs of modern intensive breeding.
Smart Images

Figure CN113508755B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of breeding buildings, in particular to a steel structure prefabricated pig house for rapid construction and its construction method. Background Art
[0002] In recent years, prefabricated buildings and industrial modernization have developed rapidly in China. The State Council has issued the "Guiding Opinions on Vigorously Developing Prefabricated Buildings", further clarifying that in the future, prefabricated building technologies should be actively promoted, and it is hoped that within about 10 years, the proportion of prefabricated buildings in newly built buildings will reach 30%. The advantages of prefabricated buildings are fast construction speed, little restriction by climate conditions, labor saving and improved building quality.
[0003] With the rapid development of modern aquaculture, modern heat-insulating and energy-saving pig houses have replaced traditional semi-open pig houses. Modern intensive aquaculture technology requires the installation of an environmental control system, a ventilation and air exchange system, a feed supply system, and a lighting system, etc. in the heat-insulating and energy-saving pig house. At the same time, after ammonia and hydrogen sulfide formed by pig excrement are combined with water, they will form a chemical electrolytic reaction with the metal surface, and the metal components will be quickly corroded. Ordinary color steel pig houses will be scrapped in only about 3 - 5 years, and a ceiling system with heat insulation, flame retardancy, corrosion resistance, and high-pressure flushing resistance needs to be set up. Therefore, using conventional construction techniques to build modern heat-insulating and energy-saving pig houses has a long construction period and unstable quality.
[0004] Existing modular buildings based on container technology are limited by transportation dimensions, have small bays, and cannot meet the space requirements of modern intensive aquaculture. Summary of the Invention
[0005] The purpose of the present invention is to provide a steel structure prefabricated pig house for rapid construction and its construction method, which can significantly improve the construction speed, ensure the construction quality, and reduce the cost.
[0006] The purpose of the present invention is achieved through the following technical solutions:
[0007] A rapid construction steel structure prefabricated pigsty, which is assembled by several pigsty units. The pigsty unit includes a prefabricated roof ceiling frame, steel frame columns, supporting beams and truss connectors. The steel frame columns are distributed in a rectangular array. At the upper end of the steel frame column, there is a supporting plate for supporting the prefabricated roof ceiling frame. On the upper side wall of the steel frame column, there is a side connecting plate for locking the supporting beam. The supporting beam spans between adjacent steel frame columns on the left and right sides. The end of the supporting beam is locked and connected to the side connecting plate, and a beam supporting plate is arranged in the middle of the supporting beam. The prefabricated roof ceiling frame is arranged between two parallel supporting beams. Two prefabricated roof ceiling frames are arranged side by side on the same supporting beam. The prefabricated roof ceiling frame is a rectangular frame surrounded by several trusses. At the four corners of the rectangular frame, there are steel short columns. The steel short columns are locked and connected to the supporting plate at the upper end of the steel frame column or supported on the beam supporting plate in the middle of the supporting beam. The truss connector is arranged between two steel short columns on the butt joint side of the prefabricated roof ceiling frame, and it includes two channel-shaped parts with opposite openings and a cross bar connected between the two channel-shaped parts.
[0008] A construction method for a rapid construction steel structure prefabricated pigsty, which includes the following steps: S1. Fix the steel frame columns in a rectangular array. S2. Span the supporting beam between adjacent steel frame columns on the left and right sides, and lock and connect the end of the supporting beam to the side connecting plate on the steel frame column. S3. Place two prefabricated roof ceiling frames side by side between parallel supporting beams. The steel short columns intersecting with the steel frame columns are locked and connected to the supporting plate through the short column bottom plate, and the steel short columns intersecting with the supporting beam are temporarily supported on the beam supporting plate through the short column bottom plate. S4. Install the truss connector between two steel short columns on the butt joint side of the prefabricated roof ceiling frame, and permanently fix the channel-shaped part to the steel short column. S5. Remove the supporting beam to complete the assembly of the pigsty unit. S6. Continue to install pigsty units on the left and right sides of the assembled pigsty unit. Adjacent pigsty units on the left and right are fixed through truss connectors, and the channel-shaped parts of the truss connectors are locked on the steel short columns of adjacent pigsty units. S7. Continue to install pigsty units on the front and back sides of the assembled pigsty unit. Adjacent pigsty units on the front and back are fixed through connecting rods, and the connecting rods are respectively fixed on the extended section suspensions of adjacent pigsty units.
[0009] Compared with the prior art, the advantages of the present invention are as follows:
[0010] 1. Decomposing the prefabricated pigsty unit into a prefabricated roof ceiling frame and steel frame columns can meet the space requirements during the operation and maintenance of the pigsty while meeting the transportation size limitations.
[0011] 2. The prefabricated roof ceiling frame can be produced and processed in the factory. Due to its fixed shape, it can be transported and hoisted as a whole. Since the highly completed prefabricated roof ceiling frame can be prefabricated off-site, it can significantly accelerate the on-site construction speed.
[0012] 3. The steel short columns of the prefabricated roof ceiling frame are arranged to ensure good stability during transportation; at the same time, it can ensure that the completed roof and ceiling in the factory are not easily damaged during transportation.
[0013] 4. The combined application of steel frame columns, supporting beams and truss connectors can achieve a column-free space within twice the transportation width limit in the length direction of the pigsty, which is convenient for the later operation and maintenance management of the pigsty;
[0014] 5. The construction of large pigsties can be achieved by the horizontal combination of prefabricated pigsty units, and the construction cost can be significantly reduced through the mass production of standard module units. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 is a schematic structural diagram of an embodiment of a rapid construction steel structure prefabricated pigsty of the present invention.
[0016] Figure 2 is a schematic structural diagram of the prefabricated roof ceiling frame.
[0017] Figure 3 is a schematic structural diagram of the steel frame column.
[0018] Figure 4 is a schematic structural diagram of the supporting beam.
[0019] Figure 5 is a schematic structural diagram of the truss connector.
[0020] Figure 6 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0021] Figure 7 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0022] Figure 8 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0023] Figure 9 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0024] Figure 10 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0025] Figure 11 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0026] Figure 12 is a schematic diagram of the construction steps of a rapid construction steel structure prefabricated pigsty.
[0027] Figure 13It is a schematic diagram of the construction steps for quickly building a steel structure prefabricated pigsty.
[0028] Label description: 1 Prefabricated roof ceiling frame, 1-1 Steel short column, 1-2 Truss, 1-3 Extension section suspension, 1-4 Short column base plate, 1-5 Roof support purlin, 1-6 Ceiling support purlin, 2 Steel frame column, 2-1 Supporting plate, 2-2 Column base plate, 2-3 Anchor bolt, 2-4 Side connecting plate, 3 Supporting beam, 3-1 End connecting structure, 3-2 Beam support plate, 4 Truss connecting piece, 4-1 Groove-shaped piece, 4-2 Cross bar. Specific implementation mode
[0029] The following will describe the content of the present invention in detail in conjunction with the specification drawings and embodiments:
[0030] As Figures 1-13 Shown is a schematic diagram of an embodiment of a method for quickly building a steel structure prefabricated pigsty and its construction method provided by the present invention.
[0031] A steel structure prefabricated pigsty for quick construction is assembled by several pigsty units. The pigsty units include a prefabricated roof ceiling frame 1, a steel frame column 2, a supporting beam 3, and a truss connecting piece 4;
[0032] The force-bearing structural parts of the prefabricated roof ceiling frame 1, the steel frame column 2, the supporting beam 3, and the truss connecting piece 4 are all made of section steel.
[0033] The steel frame columns 2 are distributed in a rectangular array. At the upper end of the steel frame column 2, there is a supporting plate 2-1 for supporting the prefabricated roof ceiling frame 1, and on the upper side wall of the steel frame column 2, there is a side connecting plate 2-4 for locking the supporting beam 3;
[0034] The supporting beam 3 spans between adjacent steel frame columns 2 on the left and right sides. The end of the supporting beam 3 is locked and connected to the side connecting plate 2-4, and a beam support plate 3-2 is provided in the middle of the supporting beam 3;
[0035] The beam surface elevation of the supporting beam 3 is slightly lower than the plate surface elevation of the supporting plate 2-1 of the steel frame column 2.
[0036] The beam support plate 3-2 has the same elevation as the plate surface of the supporting plate 2-1.
[0037] The prefabricated roof ceiling frame 1 is arranged between two parallel supporting beams 3. Two prefabricated roof ceiling frames 1 are arranged side by side on the left and right on the same supporting beam 3. The prefabricated roof ceiling frame 1 is a rectangular frame body enclosed by several trusses 1-2. At the four corners of the rectangular frame body, there are steel short columns 1-1, and the steel short columns 1-1 are locked and connected to the supporting plate 2-1 at the upper end of the steel frame column 2 or supported on the beam support plate 3-2 in the middle of the supporting beam 3;
[0038] The truss connector 4 is arranged between two steel short columns 1-1 on the docking side of the prefabricated roof ceiling truss 1, and it includes two channel-shaped members 4-1 with opposite openings and a cross bar 4-2 connected between the two channel-shaped members 4-1.
[0039] On the front side or the rear side of the prefabricated roof ceiling truss 1, there is an extended section suspension 1-3 coplanar with the prefabricated roof ceiling truss 1. The extended section suspension 1-3 is a rectangular frame body formed by enclosing a number of trusses 1-2.
[0040] The upper chord bars of the trusses 1-2 of the prefabricated roof ceiling truss 1 and the extended section suspension 1-3 are coplanar. A roof supporting purlin 1-5 is arranged between the upper chord bars of each truss 1-2, and a metal roof panel is arranged on the outdoor side of the roof supporting purlin 1-5.
[0041] The lower chord bars of the trusses 1-2 of the prefabricated roof ceiling truss 1 and the extended section suspension 1-3 are coplanar. A ceiling supporting purlin 1-6 is arranged between the lower chord bars of each truss 1-2, and a ceiling board is arranged on the indoor side of the ceiling supporting purlin 1-6.
[0042] At the lower end of the steel short column 1-1, there is a short column bottom plate 1-4, and the short column bottom plate 1-4 is fixedly connected to the supporting plate 2-1 by bolts or welding.
[0043] The elevation of the short column bottom plate 1-4 is lower than the plane of the lower chord bar of the truss 1-2.
[0044] At the bottom of the steel frame column 2, there are a column base plate 2-2 and anchor bolts 2-3.
[0045] The channel-shaped member 4-1 of the truss connector 4 matches the side wall contour of the steel short column 1-1, and the channel-shaped member 4-1 is fixedly connected to the steel short column 1-1 by bolts or welding.
[0046] A construction method for quickly building a steel structure prefabricated pigsty, which includes the following steps:
[0047] S1. Fix the steel frame columns 2 in a rectangular array.
[0048] S2. Span a supporting beam 3 between adjacent steel frame columns 2 on the left and right sides, and the end of the supporting beam 3 is locked and connected to the side connecting plate 2-4 on the steel frame column 2.
[0049] S3. Horizontally arrange two prefabricated roof ceiling trusses 1 side by side between parallel supporting beams 3. The steel short column 1-1 intersecting with the steel frame column 2 is locked and connected to the supporting plate 2-1 through the short column bottom plate 1-4, and the steel short column 1-1 intersecting with the supporting beam 3 is temporarily supported on the beam supporting plate 3-2 through the short column bottom plate 1-4.
[0050] S4. Install a truss connecting member 4 between the two steel short columns 1-1 on the docking side of the prefabricated roof ceiling frame 1, and permanently fix the channel-shaped member 4-1 to the steel short column 1-1;
[0051] S5. Remove the supporting beam 3 to complete the assembly of the pigsty unit;
[0052] S6. Continue to install pigsty units on the left and right sides of the assembled pigsty unit. The adjacent pigsty units on the left and right are fixed through the truss connecting member 4, and the channel-shaped member 4-1 of the truss connecting member 4 is locked on the steel short column 1-1 of the adjacent pigsty unit;
[0053] S7. Continue to install pigsty units on the front and back sides of the assembled pigsty unit. The adjacent pigsty units on the front and back are fixed through connecting rods, and the connecting rods are respectively fixed on the extended section suspension 1-3 of the adjacent pigsty unit.
[0054] The pigsty units on the front and back sides are arranged in mirror symmetry.
[0055] The connecting rods can be fixed to the corner columns of the extended section suspension 1-3 by welding.
Claims
1. A construction method for quickly building a prefabricated steel structure pig house, characterized in that: It is assembled by a number of pigsty units, and the pigsty unit includes a prefabricated roof ceiling frame (1), steel frame columns (2), supporting beams (3), and truss connectors (4); The steel frame columns (2) are distributed in a rectangular array. At the upper end of the steel frame columns (2), there is a supporting plate (2-1) for supporting the prefabricated roof ceiling frame (1). On the upper side wall of the steel frame columns (2), there is a side connecting plate (2-4) for locking the supporting beam (3); The supporting beam (3) spans between adjacent steel frame columns (2) on the left and right sides. The end of the supporting beam (3) is locked and connected to the side connecting plate (2-4), and a beam supporting plate (3-2) is provided in the middle of the supporting beam (3); The prefabricated roof ceiling frame (1) is arranged between two parallel supporting beams (3). On the same supporting beam (3), two prefabricated roof ceiling frames (1) are arranged side by side from left to right. The prefabricated roof ceiling frame (1) is a rectangular frame body enclosed by a number of trusses (1-2). At the four corners of the rectangular frame body, there are steel short columns (1-1). The steel short columns (1-1) are locked and connected to the supporting plate (2-1) at the upper end of the steel frame columns (2) or supported on the beam supporting plate (3-2) in the middle of the supporting beam (3); The truss connector (4) is arranged between two steel short columns (1-1) on the butt joint side of the prefabricated roof ceiling frame (1). It includes two channel-shaped parts (4-1) with opposite openings and a cross bar (4-2) connected between the two channel-shaped parts (4-1); On the front side or the rear side of the prefabricated roof ceiling frame (1), there is an extended section suspension (1-3) coplanar with the prefabricated roof ceiling frame (1). The extended section suspension (1-3) is a rectangular frame body enclosed by a number of trusses (1-2); The upper chords of the trusses (1-2) of the prefabricated roof ceiling frame (1) and the extended section suspension (1-3) are coplanar. Between the upper chords of each truss (1-2), there is a roof supporting purlin (1-5). On the outdoor side of the roof supporting purlin (1-5), there is a metal roof panel; The lower chords of the trusses (1-2) of the prefabricated roof ceiling frame (1) and the extended section suspension (1-3) are coplanar. Between the lower chords of each truss (1-2), there is a ceiling supporting purlin (1-6). On the indoor side of the ceiling supporting purlin (1-6), there is a ceiling board; At the lower end of the steel short column (1-1), there is a short column bottom plate (1-4). The short column bottom plate (1-4) is fixedly connected to the supporting plate (2-1) by bolts or by welding; At the bottom of the steel frame column (2), there is a column base plate (2-2) and anchor bolts (2-3); The channel-shaped part (4-1) of the truss connector (4) matches the side wall contour of the steel short column (1-1), and the channel-shaped part (4-1) is fixedly connected to the steel short column (1-1) by bolts or by welding; The force-bearing structural parts of the prefabricated roof ceiling frame (1), steel frame columns (2), supporting beams (3), and truss connectors (4) are all made of section steel; It includes the following steps: S1. Fix the steel frame columns (2) in a rectangular array; S2. Span and support a bearing beam (3) between adjacent steel frame columns (2) on the left and right sides. The end of the bearing beam (3) is locked and connected to the side connection plate (2-4) on the steel frame column (2). S3. Horizontally arrange two prefabricated roof ceiling frames (1) side by side between parallel bearing beams (3). The steel short columns (1-1) intersecting with the steel frame columns (2) are locked and connected to the bearing plate (2-1) through the short column bottom plate (1-4). The steel short columns (1-1) intersecting with the bearing beam (3) are temporarily supported on the beam support plate (3-2) through the short column bottom plate (1-4). S4. Install a truss connector (4) between the two steel short columns (1-1) on the docking side of the prefabricated roof ceiling frame (1), and permanently fix the channel-shaped part (4-1) to the steel short column (1-1). S5. Remove the bearing beam (3) to complete the assembly of the pigsty unit. S6. Continue to install pigsty units on the left and right sides of the assembled pigsty unit. Adjacent pigsty units on the left and right are fixed through the truss connector (4), and the channel-shaped part (4-1) of the truss connector (4) is locked to the steel short column (1-1) of the adjacent pigsty unit. S7. Continue to install pigsty units on the front and back sides of the assembled pigsty unit. Adjacent pigsty units on the front and back are fixed through connecting members, and the connecting members are respectively fixed on the extended section suspension (1-3) of the adjacent pigsty unit.
Citation Information
Patent Citations
Modularized assembling type building structure
CN106193311A
Fully-assembled pig house
CN107396836A
Quickly-built steel structure assembly type hog house
CN216292527U