Mobility measurement method, device and communication equipment

By receiving messages configured by network equipment, scaling factor is determined based on the overlap between CSI-RS resources and the measurement gap, which solves the problem of insufficient measurement capabilities of terminals in multiple mobility measurement objects, and improves the efficiency and flexibility of mobility measurement .

CN113518370BActive Publication Date: 2024-11-15HUAWEI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010279006.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-10
Publication Date
2024-11-15
Estimated Expiration
2040-04-10

AI Technical Summary

Technical Problem

When the terminal communicates, due to the limited measurement capability caused by position changes, it is impossible to complete the measurement of multiple mobility measurement objects at the same time. The prior art is difficult to effectively determine the scaling factor of CSI-RS resources, which affects the flexibility and efficiency of mobility measurement. .

Method used

By receiving the first configuration message configured by the network device, the scaling factor of the first MO is determined based on whether there is a CSI-RS resource that completely coincides with the measurement gap, and then determine whether a competition gap is needed for measurement, and calculate CSSFwithingap or CSSFoutsidegap as scaling factor. Ensure smooth progress of mobility measurements based on CSI-RS.

Benefits of technology

The accurate determination of scaling factor in mobility measurement based on CSI-RS is realized, which improves the measurement efficiency and flexibility of the terminal in different situations, and ensures the smooth progress of mobility measurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113518370B_ABST
    Figure CN113518370B_ABST
Patent Text Reader

Abstract

The embodiments of the present application disclose a mobility measurement method, apparatus and communication equipment, which relate to the field of communication technology, and determine the scaling factor in the mobility measurement based on CSI-RS, and then realize the mobility measurement based on CSI-RS. The specific scheme is: receiving a first configuration message, the first configuration message is used to configure a first MO, and the first MO includes one or more CSI-RS resources. According to whether the first MO has CSI-RS resources that completely overlap with the gap, the scaling factor of the first MO is determined, which is used to perform mobility measurement on the first MO.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of communication technology, and in particular to a mobility measurement method, apparatus and communication equipment. Background Art

[0002] When a terminal is communicating, its position often changes. As the terminal moves, the communication quality between it and the network device (such as a base station) will also change accordingly. As a result, there is a need for terminal mobility measurement. Exemplarily, the terminal can perform mobility measurement on one or more measurement objects (measurement objects, MO) configured by the network device, and send the obtained measurement results to the network device, so that the network device can determine the current communication status of the terminal and the neighboring area measurement results, and then perform mobility management on the UE.

[0003] Exemplarily, the above mobility measurement can be implemented based on a channel state information reference signal (CSI-RS). For example, the terminal can receive an MO from a network device, where the MO includes one or more CSI-RS resources. Under the instruction of the network device, the terminal can perform mobility measurement on the CSI-RS resources included in the MO to obtain a measurement result corresponding to the MO.

[0004] It should be noted that when configuring a terminal to perform mobility measurement, the network device will usually configure multiple MOs to the terminal for mobility measurement at the same time. However, due to the limited measurement capability of the terminal, it may not be possible to complete the measurement of these multiple MOs at the same time. Therefore, when performing measurement, the terminal first needs to determine the corresponding mobility measurement requirements. Summary of the invention

[0005] The present application provides a mobility measurement method, apparatus and communication equipment, and provides a mobility measurement solution based on CSI-RS.

[0006] In a first aspect, a mobility measurement method is provided, the method comprising: receiving a first configuration message, the first configuration message being used to configure a first measurement object (MO), the first MO comprising one or more channel state information reference signal (CSI-RS) resources. According to whether the first MO has a CSI-RS resource that completely overlaps with a measurement gap, a scaling factor of the first MO is determined, which is used to perform mobility measurement on the first MO.

[0007] Based on this scheme, the terminal can determine whether the first MO needs to compete for the gap for measurement according to whether the CSI-RS resources included in the first MO indicated by the network device completely overlap with the gap, and then determine the scaling factor of the first MO. For example, when the first MO includes CSI-RS resources that completely overlap with the gap, the first MO needs to compete for the gap for measurement. For another example, when the first MO does not include any CSI-RS resources that completely overlap with the gap, the first MO does not need to compete for the gap for measurement, that is, it can be measured outside the gap. Among them, the first configuration message can be configured by the network device for the terminal, used to instruct the network device to perform CSI-RS-based mobility measurement. Due to the high configuration flexibility of CSI-RS resources, those skilled in the art cannot determine the scaling factor of the first MO including CSI-RS resources by referring to the prior art (such as SSB-based mobility measurement) without creative efforts. This scheme provides such a scheme, so that the terminal can clearly determine the scaling factor in the CSI-RS-based mobility measurement, thereby ensuring the smooth progress of the CSI-RS-based mobility measurement.

[0008] In combination with the first aspect, in a possible implementation manner, the determining the scaling factor of the first MO according to whether the first MO has a CSI-RS resource that completely overlaps with a measurement gap, including: when the first MO has at least one CSI-RS resource that completely overlaps with the gap, determining the specific carrier scaling factor (CSSF) in the gap of the first MO according to the first MO and the MO that needs to compete for the gap. withingap ), the CSSF withingap When the first MO does not have a CSI-RS resource that completely overlaps with the gap, the gap-outside specific carrier scaling factor (CSSF) of the first MO is determined according to the first MO and the MO measured outside the gap. outsidegap ), according to the CSSF outsidegap Determine the scaling factor of the first MO.

[0009] Based on this solution, a method for determining the scaling factor of the first MO in different situations (such as when there are CSI-RS resources that completely overlap with the measurement gap in the first MO and when there are no CSI-RS resources that completely overlap with the measurement gap in the first MO) is given. Exemplarily, when there are CSI-RS resources that completely overlap with the measurement gap in the first MO, that is, when the first MO needs to compete for the gap for measurement, the terminal can determine the CSSF of the first MO based on all MOs that need to compete for the gap. withingap , and the CSSF withingap When there is no CSI-RS resource in the first MO that completely overlaps with the measurement gap, that is, when the first MO is measured outside the gap, the terminal can determine the CSSF of the first MO based on all MOs measured outside the gap. outsidegap , and according to the CSSF outsidegap Determine the scaling factor of the first MO. For example, the terminal can outsidegap As the scaling factor of the first MO, the terminal can also adjust the CSSF according to the terminal's search (seacher) capability. outsidegap After making adjustments, determine the scaling factor.

[0010] In combination with the first aspect, in a possible implementation, the MO that needs to compete for the gap includes a second MO and / or a third MO. There is at least one CSI-RS resource in the second MO that completely overlaps with the gap. There is at least one synchronization signal block (SSB) resource in the third MO that completely overlaps with the gap.

[0011] Based on this solution, it is clear that the MO participating in the competition gap may include multiple forms. For example, in some embodiments, if there is another MO (such as a second MO) including CSI-RS resources different from the first MO and also needs to compete for the gap to perform measurement, the terminal can use the second MO as the MO competing for the gap to calculate the CSSF of the first MO. withingap In some other embodiments, if there are other MOs (such as a third MO) including SSB resources that also need to compete for the gap in order to perform measurement, the terminal can use the third MO as the MO competing for the gap to calculate the CSSF of the first MO. withingap. That is to say, in this embodiment, the terminal can simultaneously consider the MO including SSB resources and the MO including CSI-RS resources to compete for the gap. It should be noted that in some scenarios, the terminal can provide different hardware and / or software configurations for the MO including SSB resources and the MO including CSI-RS resources for measurement, thereby achieving the effect of independent measurement of the MO including SSB resources and the MO including CSI-RS resources. Therefore, in other embodiments of the present scheme, if there are other MOs including SSB resources (such as the third MO) that also need to compete for the gap for measurement, the terminal can also calculate the CSSF of the first MO. withingap When the third MO is not considered, only other MOs including CSI-RS resources that need to compete for the gap (such as the second MO) are considered.

[0012] In combination with the first aspect, in a possible implementation, the first configuration message is also used to configure the third MO. Alternatively, the first MO carries an associated SSB (associatedSSB) identifier, and the associatedSSB identifier is used to indicate that mobility measurement is to be performed on the third MO. Based on this scheme, the measurement indication of the third MO including the SSB resource can be configured for the terminal together with the first configuration message, or can be transmitted to the terminal by carrying the associatedSSB identifier in the first MO.

[0013] In combination with the first aspect, in a possible implementation, the method further includes: receiving a second configuration message, the second configuration message being used to configure the third MO. Based on this scheme, the measurement indication of the third MO including the SSB resource may also be sent to the terminal via other configuration messages (such as the second configuration message) different from the first configuration message.

[0014] In combination with the first aspect, in a possible implementation, the MO measured outside the gap includes a fourth MO and / or a fifth MO. There is no CSI-RS resource in the fourth MO that completely overlaps with the gap. There is no SSB resource in the fifth MO that completely overlaps with the gap.

[0015] Based on this solution, it is clear that the MO for measuring outside the gap may include multiple forms. Exemplarily, in some embodiments, if there is another MO (such as a fourth MO) that includes CSI-RS resources different from the first MO for measuring outside the gap, the terminal can use the fourth MO as the MO for competing for the measurement opportunity outside the gap to calculate the CSSF of the first MO. outsidegapIn some other embodiments, if there are other MOs (such as the fifth MO) including SSB resources that perform measurements outside the gap, the terminal may use the fifth MO as the MO competing for the measurement opportunity outside the gap to calculate the CSSF of the first MO. outsidegap . That is to say, in this embodiment, the terminal can simultaneously consider the MO including SSB resources and the MO including CSI-RS resources competing for measurement opportunities outside the gap. It should be noted that in some scenarios, the terminal can provide different hardware and / or software configurations for the MO including SSB resources and the MO including CSI-RS resources for measurement, thereby achieving the effect of independent measurement of the MO including SSB resources and the MO including CSI-RS resources. Therefore, in other embodiments of the present scheme, if there are other MOs including SSB resources (such as the fifth MO) that also need to compete for measurement opportunities outside the gap, the terminal can also calculate the CSSF of the first MO. outsidegap When the fifth MO is not considered, only other MOs including CSI-RS resources that need to compete for measurement opportunities outside the gap (such as the fourth MO) are considered.

[0016] In combination with the first aspect, in a possible implementation, the first configuration message is also used to configure the fifth MO. Alternatively, the first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is performed on the fifth MO. Based on this scheme, the measurement indication of the fifth MO including SSB resources can be configured for the terminal together with the first configuration message, or can be transmitted to the terminal by carrying the associatedSSB identifier in the first MO.

[0017] In combination with the first aspect, in a possible implementation, the method further includes: receiving a second configuration message, the second configuration message being used to configure the fifth MO. Based on this scheme, the measurement indication of the fifth MO including the SSB resource may also be sent to the terminal via other configuration messages (such as the second configuration message) different from the first configuration message.

[0018] In combination with the first aspect, in a possible implementation, the CSI-RS period of the first MO is equal to the longest period of CSI-RS resources included in the first MO, or the CSI-RS period of the first MO is equal to the longest period of CSI-RS resources included in the first MO that completely overlaps with the gap.

[0019] Based on this solution, since the terminal needs to determine the CSI-RS period of each MO including CSI-RS resources when determining the mobility measurement requirements, the solution clarifies the method for determining the period of the first MO. That is, when the first MO needs to compete for the gap for measurement, the CSI-RS period of the first MO is equal to the maximum period of all CSI-RS resources included therein that completely overlap with the gap. When the first MO is measured outside the gap, the CSI-RS period of the first MO is equal to the maximum period of all CSI-RS resources included therein.

[0020] In a second aspect, a mobility measurement method is provided, the method comprising: receiving a first configuration message, the first configuration message being used to configure a first measurement object (MO), the first MO comprising one or more channel state information reference signal (CSI-RS) resources. Determining a gap-outside-specific carrier scaling factor (CSSF) of the first MO according to the first MO and an MO measured outside a measurement gap (gap); outsidegap ), according to the CSSF outsidegap A scaling factor of the first MO is determined.

[0021] Based on this solution, when the network device does not configure gap related information for the terminal, the terminal may consider that the mobility measurements currently required are all measurements outside the gap. outsidegap , determine the scaling factor of the first MO, so that the terminal can perform CSI-RS-based mobility measurement accordingly.

[0022] In combination with the second aspect, in a possible implementation, the MO measured outside the gap includes a second MO and / or a third MO. There is no CSI-RS resource in the second MO that completely overlaps with the gap. There is no synchronization signal block (SSB) resource in the third MO that completely overlaps with the gap.

[0023] Based on this solution, it is clarified that the MO for measuring outside the gap may include multiple forms. Referring to the first aspect, in some embodiments, if there is another MO (such as a second MO) including CSI-RS resources different from the first MO for measuring outside the gap, the terminal may use the second MO as the MO for competing for the measurement opportunity outside the gap to calculate the CSSF of the first MO. outsidegap In some other embodiments, if there is another MO (such as a third MO) including SSB resources and performing measurements outside the gap, the terminal may use the third MO as the MO competing for the measurement opportunity outside the gap to calculate the CSSF of the first MO. outsidegap. That is to say, in this embodiment, the terminal can simultaneously consider the MO including SSB resources and the MO including CSI-RS resources competing for measurement opportunities outside the gap. It should be noted that in some scenarios, the terminal can provide different hardware and / or software configurations for the MO including SSB resources and the MO including CSI-RS resources for measurement, thereby achieving the effect of independent measurement of the MO including SSB resources and the MO including CSI-RS resources. Therefore, in other embodiments of the present scheme, if there are other MOs including SSB resources (such as the third MO) that also need to compete for measurement opportunities outside the gap, the terminal can also calculate the CSSF of the first MO. outsidegap When the third MO is not considered, only other MOs (such as the second MO) including CSI-RS resources that need to compete for measurement opportunities outside the gap are considered.

[0024] In combination with the second aspect, in a possible implementation, the first configuration message is also used to configure the third MO. Alternatively, the first MO carries a related SSB associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is performed on the third MO. Based on this scheme, the measurement indication of the third MO including SSB resources can be configured for the terminal together with the first configuration message, or it can be transmitted to the terminal by carrying the associatedSSB identifier in the first MO.

[0025] In combination with the second aspect, in a possible implementation, the method further includes: receiving a second configuration message, the second configuration message being used to configure the third MO. Based on this scheme, the measurement indication of the third MO including the SSB resource may also be sent to the terminal via other configuration messages (such as the second configuration message) different from the first configuration message.

[0026] In combination with the second aspect, in a possible implementation, the CSI-RS period of the first MO is equal to the longest period of the CSI-RS resources included in the first MO. Based on this scheme, since the terminal needs to determine the CSI-RS period of each MO including CSI-RS resources when determining the mobility measurement requirements, the scheme clarifies the method for determining the period of the first MO. That is, when the first MO is measured outside the gap, the CSI-RS period of the first MO is equal to the maximum period of all CSI-RS resources included therein.

[0027] In a third aspect, a mobility measurement device is provided, the device comprising a receiving unit and a determining unit. The receiving unit is used to receive a first configuration message, the first configuration message is used to configure a first measurement object (MO), the first MO includes one or more channel state information reference signal (CSI-RS) resources. The determining unit is used to determine a scaling factor of the first MO according to whether the first MO has a CSI-RS resource that completely overlaps with a measurement gap, and is used to perform mobility measurement on the first MO.

[0028] In combination with the third aspect, in a possible implementation manner, the determining unit is configured to determine, when the first MO has at least one CSI-RS resource that completely overlaps with the gap, a specific carrier scale factor (CSSF) within the gap of the first MO according to the first MO and the MO that needs to compete for the gap. withingap ), the CSSF withingap The determining unit is further configured to determine, when the first MO does not have a CSI-RS resource that completely overlaps with the gap, a specific carrier scaling factor (CSSF) outside the gap of the first MO according to the first MO and the MO measured outside the gap. outsidegap ), according to the CSSF outsidegap Determine the scaling factor of the first MO.

[0029] In conjunction with the third aspect, in a possible implementation, the MO that needs to compete for the gap includes a second MO and / or a third MO. There is at least one CSI-RS resource in the second MO that completely overlaps with the gap. There is at least one synchronization signal block (SSB) resource in the third MO that completely overlaps with the gap.

[0030] In conjunction with the third aspect, in a possible implementation, the first configuration message is further used to configure the third MO. Alternatively, the first MO carries an associated SSB (associated SSB) identifier, and the associated SSB identifier is used to indicate that mobility measurement is to be performed on the third MO.

[0031] In combination with the third aspect, in a possible implementation, the receiving unit is further used to receive a second configuration message, where the second configuration message is used to configure the third MO.

[0032] In combination with the third aspect, in a possible implementation, the MO measured outside the gap includes a fourth MO and / or a fifth MO. There is no CSI-RS resource in the fourth MO that completely overlaps with the gap. There is no SSB resource in the fifth MO that completely overlaps with the gap.

[0033] In combination with the third aspect, in a possible implementation manner, the first configuration message is further used to configure the fifth MO. Alternatively, the first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to instruct to perform mobility measurement on the fifth MO.

[0034] In combination with the third aspect, in a possible implementation, the receiving unit is further used to receive a second configuration message, where the second configuration message is used to configure the fifth MO.

[0035] In combination with the third aspect, in a possible implementation, the CSI-RS period of the first MO is equal to the longest period of CSI-RS resources included in the first MO, or the CSI-RS period of the first MO is equal to the longest period of CSI-RS resources included in the first MO that completely overlaps with the gap.

[0036] In a fourth aspect, a mobility measurement device is provided, the device comprising: a receiving unit and a determining unit. The receiving unit is configured to receive a first configuration message, the first configuration message is used to configure a first measurement object (MO), the first MO includes one or more channel state information reference signal (CSI-RS) resources. The determining unit is configured to determine a specific carrier scale factor (CSSF) outside the gap of the first MO based on the first MO and the MO measured outside the measurement gap (gap). outsidegap ), according to the CSSF outsidegap A scaling factor for the first MO is determined.

[0037] In conjunction with the fourth aspect, in a possible implementation, the MO measured outside the gap includes a second MO and / or a third MO. There is no CSI-RS resource in the second MO that completely overlaps with the gap. There is no synchronization signal block (SSB) resource in the third MO that completely overlaps with the gap.

[0038] In conjunction with the fourth aspect, in a possible implementation, the first configuration message is further used to configure the third MO. Alternatively, the first MO carries an associated SSB (associated SSB) identifier, and the associated SSB identifier is used to indicate that mobility measurement is to be performed on the third MO.

[0039] In combination with the fourth aspect, in a possible implementation, the receiving unit is further used to receive a second configuration message, where the second configuration message is used to configure the third MO.

[0040] In combination with the fourth aspect, in a possible implementation manner, the CSI-RS period of the first MO is equal to the longest period of the CSI-RS resources included in the first MO.

[0041] In a fifth aspect, a communication device is provided, the communication device comprising one or more processors and one or more memories. The one or more memories are coupled to the one or more processors, and the one or more memories store computer instructions. When the one or more processors execute the computer instructions, the communication device executes the mobility measurement method as described in any one of the first aspect and possible implementations thereof, or executes the mobility measurement method as described in any one of the second aspect and possible implementations thereof.

[0042] In a sixth aspect, a chip system is provided, comprising a processing circuit and an interface. The processing circuit is used to call and run a computer program stored in a storage medium from a storage medium to execute the mobility measurement method as described in any one of the first aspect and possible implementations thereof, or to execute the mobility measurement method as described in any one of the second aspect and possible implementations thereof.

[0043] In a seventh aspect, a computer-readable storage medium is provided, the computer-readable storage medium comprising computer instructions. When the computer instructions are executed, the mobility measurement method as described in any one of the first aspect and its possible implementations is executed, or the mobility measurement method as described in any one of the second aspect and its possible implementations is executed.

[0044] In an eighth aspect, a communication system is provided, which includes the communication device provided in the fifth aspect, and a network device. The network device can be used to send a mobility measurement configuration to the communication device, so that the communication device can perform mobility measurement according to the mobility measurement method described in any one of the first aspect and its possible implementations, or the mobility measurement method described in any one of the second aspect and its possible implementations. Exemplarily, the network device can send a first configuration message to the communication device, and the first configuration message is used to configure a first MO, and the first MO includes one or more channel state information reference signal CSI-RS resources. Among them, the first MO can carry an associated SSB identifier so that the terminal can determine the SSB-based mobility measurement indication according to the identifier. In some embodiments, the first configuration message can also be used to configure a third MO, and at least one synchronization signal block SSB resource in the third MO completely overlaps with the gap. In some other embodiments, the first configuration message can also be used to configure a fifth MO, and there is no SSB resource in the fifth MO that completely overlaps with the gap. In some other embodiments, the network device can also be used to send a second configuration message to the terminal, and the second configuration message can be used to configure the third MO, and / or the fifth MO. Of course, the network device may also send other configuration messages to the terminal to instruct the terminal to perform mobility measurement on other MOs including CSI-RS resources.

[0045] It should be noted that the above-mentioned third to eighth aspects and any possible design method therein can correspond to the above-mentioned first aspect and any possible design thereof or the second aspect and any possible design thereof, and therefore, can bring similar technical effects, which will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 A schematic diagram of the composition of a communication system provided in an embodiment of the present application;

[0047] Figure 2 A flow chart of a mobility measurement method provided in an embodiment of the present application;

[0048] Figure 3 A schematic diagram of a method for determining whether a CSI-RS resource completely overlaps with a gap provided in an embodiment of the present application;

[0049] Figure 4 A schematic diagram of the distribution of MO resources in the time domain provided in an embodiment of the present application;

[0050] Figure 5 A schematic diagram of the distribution of resources of another MO in the time domain provided in an embodiment of the present application;

[0051] Figure 6 A flow chart of another mobility measurement method provided in an embodiment of the present application;

[0052] Figure 7 A schematic diagram of the distribution of resources of another MO in the time domain provided in an embodiment of the present application;

[0053] Figure 8 A schematic block diagram of a mobility measurement device provided in an embodiment of the present application;

[0054] Fig. 9 A schematic block diagram of a communication device provided in an embodiment of the present application;

[0055] Fig.10 A schematic block diagram of another communication device provided in an embodiment of the present application;

[0056] Fig.11 A schematic block diagram of another communication device provided in an embodiment of the present application;

[0057] Fig.12 A schematic block diagram of another communication device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0058] When the network device instructs the terminal to perform mobility measurement (i.e., layer 3 (L3) measurement), it can send a configuration message to the terminal so that the terminal can receive the configuration information and perform corresponding mobility measurement according to the configuration information. Exemplarily, the mobility measurement can be based on synchronization signal block (Synchronization Signal and PBCHblock based, SSB based) mobility measurement.

[0059] For example, in performing SSB-based mobility measurement, the terminal may receive a configuration message including a synchronization signal block measurement timing configuration (SSB based measurement timing configuration, SMTC) sent by a network device, and an SMTC may be used to instruct the terminal to perform mobility measurement on one or more MOs. As an example, different access resources may be included in the SMTC (in an embodiment of the present application, the resources of the MO in the SSB-based mobility measurement may be referred to as SSB resources). The terminal may perform mobility measurement on the SSB resources based on the different SSB resources indicated by the SMTC, and obtain corresponding measurement results.

[0060] Since the terminal can only work on one frequency at the same time, the terminal can only measure the MO with this frequency as the center frequency at this time. If the frequency at which the terminal is currently working is different from the center frequency of the MO to be measured, the terminal needs to first switch its working frequency to the center frequency corresponding to the MO (i.e., perform RF tuning). In order to provide the terminal with the opportunity for RF tuning, the network device can also configure different measurement gaps (gaps) for the terminal while sending a configuration message to the terminal, so that the terminal can perform RF tuning within the gap and measure the corresponding MO. Generally speaking, the network device will configure multiple MOs for the terminal at the same time for mobility measurement, which may include more than one MO that needs to perform RF tuning before measurement, that is, there are multiple MOs that need to compete for gaps. In order to deal with this situation, the terminal needs to determine the scaling factor of each MO in order to determine the corresponding measurement requirements accordingly, such as determining the measurement order of different MOs in the time domain.

[0061] Correspondingly, when the current operating frequency of the terminal is the same as the central frequency of the MO to be measured, the terminal can perform the corresponding measurement without performing RF tuning. In an embodiment of the present application, the measurement performed without RF tuning can be referred to as measurement outside the gap. Similar to the above description of the situation where RF tuning is required for measurement, generally speaking, there will be multiple MOs that need to be measured outside the gap. Due to the limitations of the terminal's software and hardware implementation, these multiple MOs need to compete for measurement opportunities outside the gap. Therefore, for the MO that is measured outside the gap, the terminal also needs to determine its scaling factor in order to determine the corresponding measurement requirements.

[0062] In addition, there is a special case: the mobility measurement of the MO to be measured does not require a gap (such as the center frequency of the MO to be measured is in the active working bandwidth (active bandwidth part, active BWP) of the terminal), but the measurement opportunity of the MO to be measured completely overlaps with the gap in the time domain, then the MO to be measured also needs to compete for the gap to obtain the measurement opportunity. Therefore, for this kind of MO, the terminal also needs to determine its scaling factor in order to determine the corresponding measurement requirements accordingly.

[0063] In order to determine the scaling factors of different MOs in the process of SSB-based mobility measurement, the prior art proposes a carrier-specific scaling factor (CSSF) as a configuration reference for scaling factors. For example, depending on whether the MO needs to measure gap, the corresponding CSSF can be divided into: withingap and CSSF outsidegap For an MO that needs to compete for the gap, that is, the multiple SSB resources (or SSB carriers) included in the MO are completely covered by the gap, the terminal can calculate the CSSF of the MO based on the SMTC of each SSB carrier configured by the network device. withingap For MOs measured outside the gap, that is, the SSB carriers included in the MO have measurement opportunities outside the gap, the terminal can calculate the CSSF of the MO based on the SMTC of each SSB carrier configured by the network device. outsidegap Among them, CSSF withingap and CSSF outsidega For the specific calculation method of p, please refer to the corresponding description in the relevant chapter of the specification requirements for supporting wireless resource management published by the 3rd Generation Partnership Project (3GPP) (ie, R15.38.133), which will not be repeated here.

[0064] It should be noted that in SSB-based mobility measurement, although different resources included in the same MO can have different time domain offsets, the period of each resource is fixed. Therefore, it is difficult for network devices to cover all the resources they want to measure by configuring terminals to perform SSB-based mobility measurements, resulting in insufficient flexibility in the mobility configuration of network devices.

[0065] At present, in CSI-RS based mobility measurement, since different resources included in the measured MO can have different periods and biases, it can provide network equipment with greater flexibility in mobility measurement configuration. In an embodiment of the present application, the resources of the MO in the CSI-RS based mobility measurement can be called CSI-RS resources.

[0066] Similar to the mobility measurement based on SSB, in the mobility measurement based on CSI-RS, the terminal also needs to determine the scaling factor corresponding to each MO. However, the prior art does not clearly define the method for determining the scaling factor of the mobility measurement based on CSI-RS. At the same time, since the MO configured by the network equipment has a high degree of flexibility in the mobility measurement based on CSI-RS, the method for determining the scaling factor of the mobility measurement based on SSB cannot be directly used. Therefore, in order to implement the mobility measurement based on CSI-RS, a solution is needed that can provide a method for determining the scaling factor of the corresponding MO.

[0067] The mobility measurement method provided in the embodiment of the present application provides a method for determining the scaling factor of MO in the CSI-RS-based mobility measurement, which is used to implement the CSI-RS-based mobility measurement.

[0068] Please refer to Figure 1 , is a schematic diagram of the composition of a communication system 100 provided in an embodiment of the present application. Figure 1 As shown in FIG. 1 , the communication system 100 may include a terminal 110 and a network device 120. In the communication system 100, other terminals other than the terminal 110 shown in the figure may also be included, such as Figure 1 The terminal 130 shown. The embodiment of the present application does not limit the number of terminals included in the communication system 100. Exemplarily, the terminal (also referred to as user equipment (UE)) in the embodiment of the present application can be a mobile phone, a tablet computer, a desktop, a laptop, a handheld computer, a notebook computer, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a netbook, as well as a cellular phone, a personal digital assistant (personal digital assistant, PDA), an augmented reality (augmented reality, AR)\virtual reality (virtual reality, VR) device, a media player and other devices, and the embodiment of the present application does not impose any special restrictions on the specific form of the device.

[0069] The network device 120 may be a base station corresponding to the third generation mobile communication technology (3rd-Generation, 3G) or the fourth generation mobile communication technology (the 4th generation mobile communication technology, 4G) or the fifth generation mobile communication technology (5th generation mobile networks, 5G). Exemplarily, when the network device 120 is a 5G base station, it can provide a 5G new radio (new radio, NR) for 5G communication with other devices (such as the terminal 110 and / or the terminal 130). The network device 120 may include multiple antennas. For example Figure 1 The antenna 121, antenna 122, antenna 123, antenna 124, antenna 125 and antenna 126 are shown. In addition, the network device 120 may additionally include a transmitter chain and a receiver chain, and those skilled in the art will appreciate that they may include multiple components related to signal transmission and reception (such as processors, modulators, multiplexers, encoders, demultiplexers or antennas, etc.).

[0070] like Figure 1 As shown, terminal 110 communicates with antenna 121, where antenna 121 sends information to terminal 110 via forward link 121-1 (also referred to as a downlink) and receives information from terminal 110 via reverse link 121-2 (also referred to as an uplink). Similarly, terminal 130 communicates with antenna 124, where antenna 124 sends information to terminal 130 via forward link 124-1 and receives information from terminal 130 via reverse link 124-2.

[0071] It should be noted that the communication system 100 may be a public land mobile network (PLMN) or a device-to-device (D2D) network or a machine-to-machine (M2M) network or other networks. Figure 1 This is just a simplified diagram for example. The network may also include other network devices. Figure 1 Not drawn in.

[0072] As an example, in an embodiment of the present application, the network device 120 may be used to send one or more configuration messages to a terminal (such as terminal 110 and / or terminal 130) for configuring the MO. After receiving the configuration message, the terminal may perform mobility measurement on the MO configured by the network device 120 according to the configuration message. For example, when the MO configured by the configuration message includes CSI-RS resources, the terminal may perform CSI-RS-based mobility measurement according to the configuration message. When the MO configured by the configuration message includes SSB resources, the terminal may perform SSB-based mobility measurement according to the configuration message. It should be noted that, in one implementation, the MO configured by the network device received by the terminal may also include SSB resources and CSI-RS resources at the same time, and the terminal may measure the SSB resources and CSI-RS resources included in the MO respectively. The specific implementation method will be explained in detail in the following description and will not be repeated here.

[0073] The mobility measurement method provided in the embodiments of the present application can be applied to the above-mentioned Figure 1 In the communication system 100 shown in FIG. 1 , the mobility measurement method provided in the embodiment of the present application is described in detail below with reference to the accompanying drawings.

[0074] Please refer to Figure 2 , a flow chart of a first mobility measurement method is provided for an embodiment of the present application. The method is applied to Figure 1 The terminal 110 and / or the terminal 130 shown in the figure, as well as other terminals in the communication system 100, are used to implement mobility measurement based on CSI-RS. Among them, the MO including the CSI-RS resource is called CSI-RS MO, and the network device configures multiple CSI-RS MOs to be measured for the terminal, and the first MO is any one of the multiple CSI-RS MOs as an example. Figure 2 As shown, the method may include S201 - S202 .

[0075] S201. A terminal receives a first configuration message.

[0076] The first configuration message is used to configure a CSI-RS MO (such as a first MO), and the first MO includes one or more CSI-RS resources. That is, when the network device wants the terminal to perform mobility measurement, the first configuration message can be configured for the terminal to instruct the terminal to perform mobility measurement on the CSI-RS MO configured therein including one or more CSI-RS resources. Exemplarily, the first configuration message can be sent by the network device to the terminal through a downlink via a Radio Resource Control (RRC) message.

[0077] The first measurement configuration message may include relevant information of the first MO and configuration information for performing mobility measurement on the first MO.

[0078] As an example, the relevant information of the first MO may include the center frequency of the first MO, the period and bias of different CSI-RS resources in the first MO. Among them, the frequency of different CSI-RS resources included in an MO is the same as the center frequency of the MO. The terminal can determine the position of the first MO to be measured and the CSI-RS resources included therein in the time domain according to the center frequency of the MO, the period and bias of different CSI-RS resources in the first MO, and then determine the measurement configuration for the first MO and the different CSI-RS resources therein. For example, the terminal can determine whether RF tuning is needed for measurement based on the center frequency of the first MO and the position of different CSI-RS resources in the time domain.

[0079] The configuration information of the mobility measurement may include mobility measurement items performed on different CSI-RS resources in the first MO. For example, the mobility measurement items may include: Reference Signal Receiving Power (RSRP) and / or Reference Signal Receiving Quality (RSRQ) and / or Signal to Interference plus Noise Ratio (SINR). Of course, the mobility measurement items may also include other parameters that can characterize the communication quality of the corresponding CSI-RS resources, and the embodiments of the present application are not limited to this.

[0080] It should be noted that, in some other examples, the first configuration message may also include information about the gap configured by the network device for the terminal, such as the starting position or offset of the gap, the period of the gap, etc. So that the terminal can measure the MO that needs RF tuning within the gap. Of course, the gap information may not be included in the first configuration message, but may be sent to the UE through other means. The embodiments of the present application are not limited to this.

[0081] S202: The terminal determines a scaling factor of the first MO according to the first configuration message, so as to perform mobility measurement on the first MO.

[0082] In an embodiment of the present application, the scaling factor determination method for the CSI-RS MO measured within the gap (i.e., the CSI-RS MO that needs to compete for the gap for measurement) and the CSI-RS MO measured outside the gap are different. Therefore, the terminal must first determine, based on the first configuration message, whether the first MO needs to compete for the gap for measurement, or whether it can be measured outside the gap.

[0083] Exemplarily, the terminal may determine whether the first MO needs to compete for the gap for measurement, or whether the measurement can be performed outside the gap, according to whether there is a CSI-RS resource in the first MO that completely overlaps with the gap.

[0084] As an implementation method, if a CSI-RS resource appears within the gap every time and does not appear outside the gap, then the CSI-RS resource is considered to completely overlap with the gap. For example, please refer to Figure 3 .like Figure 3 As shown in (a) in FIG, each time a CSI-RS resource appears, it overlaps with a gap in the time domain. Therefore, the CSI-RS resource completely overlaps with the gap. It should be noted that when a CSI-RS resource appears at regular intervals, the gaps that overlap with it may be adjacent or non-adjacent. For example, Figure 3 As shown in (b), when the CSI-RS resource appears for the second time, it overlaps with the gap of the third period in the time domain. As long as the CSI-RS overlaps with a gap each time it appears, it is considered that the CSI-RS resource also completely overlaps with the gap.

[0085] On the contrary, if a certain CSI-RS resource appears outside the gap in a certain period, it is considered that the CSI-RS resource does not completely overlap with the gap.

[0086] The following is an example of whether MO needs to compete for gaps in combination with the position of resources in MO. Take the CSI-RS MO to be measured as MO1 and MO2. MO1 includes resource 1 and resource 2. MO2 includes resource 3. And resource 1, resource 2 and resource 3 are all CSI-RS resources. Among them, the gap period is T1, the period of resource 1 is T2, the period of resource 2 is T3, and the period of resource 3 is T4. For its distribution in the time domain, please refer to Figure 4 It can be seen that in the CSI-RS-based mobility measurement, the offsets and periods of different resources included in the same MO (such as MO1) may be different.

[0087] like Figure 4As shown in the figure, resource 1 appears outside the gap after a period T2, so resource 1 is not a resource that completely overlaps with the gap. Similarly, resource 2 appears outside the gap after a period T3, so resource 2 is not a resource that completely overlaps with the gap. Resource 3 overlaps with the gap in the time domain every time it appears, so resource 3 completely overlaps with the gap.

[0088] That is to say, neither resource 1 nor resource 2 included in MO1 completely overlaps with the gap, that is, there is no resource in MO1 that completely overlaps with the gap, so when the first MO is MO1, the first MO is an MO measured outside the gap. Resource 3 included in MO2 completely overlaps with the gap, so when the first MO is MO2, the first MO is an MO that needs to compete for the gap for measurement.

[0089] It should be noted that in Figure 4 In the example shown, all resources included in MO2 (i.e., resource 3) completely overlap with the gap, so MO2 needs to compete for the gap for measurement. In other embodiments, when only a portion of the resources included in the CSI-RS MO completely overlap with the gap, the terminal may also consider that the CSI-RS MO needs to compete for the gap for measurement.

[0090] For example, please refer to Figure 5 For example, the CSI-RS MO to be measured includes MO3, and MO3 includes resources 4, 5, and 6, and resources 4, 5, and 6 are all CSI-RS resources. Figure 4 As shown, in the time domain, resource 4 and resource 5 are not resources that completely overlap with the gap, but since resource 6 completely overlaps with the gap, MO3 includes resources that completely overlap with the gap, that is, MO3 needs to compete for the gap for measurement.

[0091] According to the above method, the terminal can determine whether each CSI-RS MO to be measured is an MO that needs to compete for the gap for measurement or an MO that can be measured outside the gap, and on this basis, determine the scaling factor of each CSI-RS MO to perform mobility measurement on it.

[0092] For example, the terminal may store the CSSF of the MO that needs to compete for the gap for measurement. withingap , as the scaling factor of the MO. The terminal can use the CSSF of the MO measured outside the gap outsidegap , as the scaling factor of the MO.

[0093] The following combination Figure 4and Figure 5 Take an example. The CSI-RS MO to be measured includes MO1, MO2, MO3, MO4 and MO5, where MO4 is the MO measured outside the gap, and MO5 is the MO that needs to compete for the gap for measurement. As in the above example, MO1 is the MO measured outside the gap, and MO2 and MO3 are the MOs that need to compete for the gap for measurement. Therefore, the terminal can determine the CSSF of MO2, MO3 and MO5 that need to compete for the gap for measurement. withingap As the scaling factor of the corresponding MO. The terminal can determine the CSSF of MO1 and MO4 measured outside the gap respectively. outsidegap , and according to the CSSF outsidegap Determine the scaling factor corresponding to the MO.

[0094] That is, when the first MO is MO2, then MO3 and MO5 can constitute the second MO. The terminal can calculate and obtain the CSSF of the first MO according to the configuration information of the first MO and the second MO. withingap , and the CSSF withingap As the scaling factor of the first MO.

[0095] When the first MO is MO1, MO4 can be called the fourth MO. The terminal can calculate and obtain the CSSF of the first MO according to the configuration information of the first MO and the fourth MO. outsidegap , and according to the CSSF outsidegap Determine the scaling factor of the first MO.

[0096] It should be noted that, unlike only one CSI-RS MO can be measured within a gap, when measuring outside the gap, the UE can perform mobility measurements on multiple MOs at the same time. However, due to the limitation of the terminal's own search (seacher) capability, the terminal cannot simultaneously measure all CSI-RS MOs measured outside the gap. Therefore, in some embodiments, the determination of the scaling factor also needs to refer to the terminal's own seacher capability to ensure that when measuring outside the gap according to the scaling factor, CSI-RS MOs exceeding the maximum number of terminal seachers will not be measured at the same time.

[0097] In addition, in the process of determining the mobility measurement requirements based on CSI-RS, the terminal also needs to determine the CSI-RS period of the corresponding MO (such as the first MO). Exemplarily, when the first MO is an MO that needs to compete for the gap for measurement, the CSI-RS period of the first MO can be equal to the maximum period of all CSI-RS resources that completely overlap with the gap. When the first MO is an MO that measures outside the gap, the CSI-RS period of the first MO can be equal to the maximum period of all CSI-RS resources included therein.

[0098] Exemplarily, when the first MO is as follows Figure 4 When MO1 is used, since MO1 is an MO measured outside the gap and the maximum period of the CSI-RS resources included therein is period T3 corresponding to resource 2, the CSI-RS period of MO1 is T3.

[0099] When the first MO is Figure 5 When MO3 in the figure is used, since MO3 is an MO that needs to compete for the gap for measurement, and the period of the CSI-RS resource (i.e., resource 6) included therein that completely overlaps with the gap is T5 (not shown in the figure), the CSI-RS period of MO3 is T5. Of course, if there are other CSI-RS resources in MO3 that completely overlap with the gap, and the period of the CSI-RS resource is greater than T5, the CSI-RS period of MO3 can also be adjusted accordingly. For example, the period of the resource with the longest period included in MO3 is used as the CSI-RS period of MO3.

[0100] In order to more clearly describe the mobility measurement method provided in the embodiment of the present application, please refer to Figure 6 , for Figure 1 FIG. 1 is a flow chart showing a specific example of the execution of the mobility measurement in the communication system shown in FIG. Figure 6 As shown, the method may include S601-S607.

[0101] S601: A network device configures a first configuration message for a terminal, wherein the first configuration message is used to configure a first MO including one or more CSI-RS resources.

[0102] S602: The terminal receives a first configuration message.

[0103] S603: The terminal determines whether the first MO includes CSI-RS resources that completely overlap with the gap.

[0104] When the terminal determines that the first MO includes CSI-RS resources that completely overlap with the gap, that is, the first MO needs to compete for the gap for measurement, execute the following S604; when the terminal determines that the first MO does not include CSI-RS resources that completely overlap with the gap, that is, the first MO performs measurement outside the gap, execute the following S605.

[0105] S604: The terminal calculates the CSSF of the first MO withingap According to the CSSF withingap Determine the scaling factor of the first MO.

[0106] S605: The terminal calculates the CSSF of the first MO outsidegap According to the CSSF outsidegap Determine the scaling factor of the first MO.

[0107] S606: The terminal performs mobility measurement on the first MO according to the scaling factor.

[0108] S607: The terminal obtains the mobility measurement result of the first MO.

[0109] After obtaining the mobility measurement result, the terminal may process the mobility measurement result accordingly, for example, by sending the measurement result to the network device.

[0110] It should be noted that, in the above examples, the MO to be measured only includes CSI-RS resources. It is understandable that in some implementation scenarios, the MO to be measured may also include SSB resources.

[0111] Exemplarily, in some embodiments, the SSB resource may be sent to the terminal in the same configuration message when the network device configures the first MO. Take the first configuration message in the network device corresponding to the mobility measurement of MO-1 as an example. When the network device sends the configuration of MO-1 for mobility measurement to the terminal, the MO-1 may include both SSB resources and CSI-RS resources. After receiving the configuration of MO-1, the terminal may divide it into MO-2 and MO-3 for separate processing. Among them, MO-2 may include all SSB resources in MO-1, and MO-3 may include all CSI-RS resources in MO-1 (in this example, MO-3 may be the first MO in the above example). In this way, data processing confusion caused by the terminal confusing resources with different characteristics can be avoided.

[0112] In other embodiments, the SSB resource may also be indicated by the associatedSSB identifier carried in the first MO when the network device configures the first MO. At this time, although the MO sent by the network device does not include a specific SSB measurement configuration, the terminal can determine the MO including the SSB resource for mobility measurement based on the central frequency indicated by the identifier.

[0113] In other embodiments, the SSB resource may also be sent to the terminal by the network device through other configuration messages (such as a second configuration message) that are different from the first configuration message including the first MO. Take the first configuration message corresponding to the CSI-RS-based mobility measurement of MO-4 (in this example, the MO-4 may correspond to the first MO in the above example), and the second configuration message corresponding to the mobility measurement of MO-5 as an example. The network device may send MO-4 for mobility measurement to the terminal, and the MO-4 may include the measurement configuration related to the first MO. The network device may also send MO-5 for mobility measurement to the terminal, and the MO-5 may include the measurement configuration for measuring the SSB resources.

[0114] Of course, in addition to the above examples, the SSB resource can also be obtained by the terminal through other channels, such as the terminal can obtain it by receiving a broadcast message sent by a network device within a preset time. The embodiment of the present application is not limited to this.

[0115] It is understandable that when the MO to be measured includes only SSB resources, the method in the prior art can be successfully executed. However, when the MO to be measured includes both SSB resources and CSI-RS resources, the terminal needs to determine the scaling factor of each MO according to the specific situation.

[0116] Exemplarily, in some embodiments, the terminal may consider both the MO including SSB resources (such as referred to as SSB MO) and the MO including CSI-RS resources (such as referred to as CSI-RS MO) when calculating the scaling factor of each MO. For example, if the first MO including CSI-RS resources needs to compete for the gap for measurement, when determining the scaling factor of the first MO, the terminal may take the SSB MO including resources that completely overlap with the gap (such as referred to as the third MO) as one of the competing objects of the first MO, and calculate the CSSF corresponding to the first MO accordingly. withingapAs its scaling factor. For another example, if the first MO including the CSI-RS resource can be measured outside the gap, when determining the scaling factor of the first MO, the terminal can use the SSB MO (such as the fifth MO) measured outside the gap as one of the competing objects of the first MO, and calculate the CSSF corresponding to the first MO accordingly. outsidegap as its scaling factor.

[0117] Correspondingly, when calculating the scaling factor of the SSB MO that needs to compete for the gap, the terminal may also use the CSI-RS MO that needs to compete for the gap as one of its competition objects. When calculating the scaling factor of the SSB MO measured outside the gap, the terminal may also use the CSI-RS MO measured outside the gap as one of its competition objects.

[0118] In other embodiments, the terminal may consider the CSI-RS MO and the SSB MO separately when calculating the scaling factor of each MO. That is, the terminal may measure the CSI-RS MO and the SSB MO separately, and the two measurement methods do not interfere with each other. For example, if the first MO including the CSI-RS resource needs to compete for the gap for measurement, when determining the scaling factor of the first MO, the terminal may only consider other CSI-RS MOs that need to compete for the gap for measurement, and calculate the CSSF corresponding to the first MO accordingly. withingap As another example, if the first MO including the CSI-RS resource can be measured outside the gap, when determining the scaling factor of the first MO, the terminal can only consider other CSI-RS MOs measured outside the gap, and calculate the CSSF corresponding to the first MO accordingly. outsidegap as its scalingfactor.

[0119] Correspondingly, when calculating the scaling factor of the SSB MO that needs to compete for the gap, the terminal may only consider the SSB MO that will need to compete for the gap. When calculating the scaling factor of the SSB MO measured outside the gap, the terminal may only consider the SSB MO measured outside the gap.

[0120] It should be noted that, in the above description, two possible implementation methods for the terminal to determine the scaling factor of the CSI-RS MO are provided, namely:

[0121] 1. When the terminal determines the scaling factor of the CSI-RS MO that needs to compete for the gap, the SSB MO (i.e., the third MO) that needs to compete for the gap in the MO to be measured needs to be considered; when determining the scaling factor of the CSI-RS MO measured outside the gap, the SSB MO (i.e., the fifth MO) that is measured outside the gap in the MO to be measured needs to be considered.

[0122] 2. When the terminal determines the scaling factor of the CSI-RS MO that needs to compete for the gap, the third MO is not considered, and only the CSI-RS MO that needs to compete for the gap in the MO to be measured (i.e., the second MO) is considered; when determining the scaling factor of the CSI-RS MO measured outside the gap, the fifth MO is not considered, and only the CSI-RS MO measured outside the gap in the MO to be measured (i.e., the fourth MO) is considered.

[0123] In other implementations, when the terminal determines the scaling factor of the CSI-RS MO that needs to compete for the gap, the consideration of the SSB MO may be different from that when the terminal determines the scaling factor of the CSI-RS MO that is measured outside the gap. Exemplarily, when the terminal determines the scaling factor of the CSI-RS MO that needs to compete for the gap, it is necessary to consider the SSB MO that needs to compete for the gap in the MO to be tested; when determining the scaling factor of the CSI-RS MO that is measured outside the gap, it is not necessary to consider the SSB MO that is measured outside the gap in the MO to be tested, and only the CSI-RSMO that is measured outside the gap in the MO to be tested needs to be considered. Alternatively, when the terminal determines the scaling factor of the CSI-RS MO that needs to compete for the gap, it does not consider the SSB MO that needs to compete for the gap in the MO to be tested, and only considers the CSI-RS MO that needs to compete for the gap in the MO to be tested; when determining the scaling factor of the CSI-RS MO that is measured outside the gap, it is necessary to consider the SSB MO that is measured outside the gap in the MO to be tested.

[0124] The terminal can flexibly select the specific implementation method according to its own needs, and the embodiments of the present application do not limit this.

[0125] It should be noted that, in the above description of the embodiments of the present application, the example is taken that the network device configures the gap for RF tuning for the terminal. In other embodiments, the network device may not configure the gap for RF tuning for the terminal. Then the terminal will not receive information related to the gap. At this time, the terminal may assume that all MOs configured for it by the network device are MOs measured outside the gap. In other words, the determination of the scaling factor in the mobility measurement process of these MOs is based on the premise of measuring outside the gap. The specific measurement method is similar to the method in the above embodiment and will not be repeated here.

[0126] In addition, in actual implementation, the resource distribution in MO may be different from Figure 4 or Figure 5 For example, Figure 7 As shown, MO4 includes resources 7, 8 and 9. According to the offset of resources 7, 8 and 9 in the time domain, it can be determined that it takes at least T6 to measure all resources in MO4. Obviously, T6 is greater than the length of the gap, that is, only part of the resources in MO4 are covered by the measurement gap length (measurement gap length, MGL). In this case, it is difficult for the terminal to determine whether MO4 needs to compete for the gap for measurement. Therefore, in an embodiment of the present application, the network device may not configure the terminal to perform mobility measurement on the MO whose CSI-RS resources are only partially covered by MGL. If the network device configures the terminal to perform mobility measurement on the MO whose CSI-RS resources are only partially covered by MGL, the terminal can flexibly decide the measurement method of the MO according to its own situation, and the embodiment of the present application does not limit this.

[0127] In this way, based on the mobility measurement method provided in the embodiment of the present application, the UE can clearly determine the scaling factor of the MO including the CSI-RS resources according to whether the first MO has CSI-RS resources that completely overlap with the measurement gap, so that the terminal can accurately perform CSI-RS-based mobility measurement according to the configuration message sent by the network device.

[0128] The above mainly introduces the solution provided by the embodiment of the present application from the perspective of the terminal. In order to realize the above functions, it includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the units and algorithm steps of each example described in the embodiments disclosed herein, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the present application.

[0129] The embodiment of the present application may divide the functional modules of the above-mentioned terminal according to the above-mentioned method example. For example, the terminal may include a mobility measurement device, which may divide each functional module corresponding to each function, or integrate two or more functions into one processing module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical functional division. There may be other division methods in actual implementation.

[0130] Please refer to Figure 8 , is a schematic block diagram of a mobility measurement device 800 provided in an embodiment of the present application. The mobility measurement device 800 can be set in a terminal, and is used to execute any mobility measurement method provided in an embodiment of the present application.

[0131] like Figure 8 As shown, the mobility measurement device 800 may include a receiving unit 801 and a determining unit 802 .

[0132] The receiving unit 801 is used to receive a first configuration message, where the first configuration message is used to configure a first measurement object MO, where the first MO includes one or more channel state information reference signal CSI-RS resources. Exemplarily, the receiving unit 801 may be used to perform the following steps: Figure 2 S201 as shown, and / or Figure 6 S602 shown.

[0133] The determining unit 802 is configured to determine a scaling factor of the first MO according to whether the first MO has a CSI-RS resource that completely overlaps with the measurement gap, so as to perform mobility measurement on the first MO. Exemplarily, the determining unit 802 may be configured to perform the following steps: Figure 2 S202 as shown, and / or Figure 6 S603-S605 shown.

[0134] In some possible designs, the determining unit 802 is configured to determine, when the first MO has at least one CSI-RS resource that completely overlaps with the gap, a specific carrier scale factor CSSF within the gap of the first MO according to the first MO and the MO that needs to compete for the gap. withingap , the CSSF withingap The determining unit 802 is further configured to determine, when the first MO does not have a CSI-RS resource that completely overlaps with the gap, a specific carrier scaling factor CSSF outside the gap of the first MO according to the first MO and the MO measured outside the gap. outsidegap According to the CSSF outsidegap Determine the scaling factor of the first MO.

[0135] In some possible designs, the MO that needs to compete for the gap includes a second MO and / or a third MO. In the second MO, at least one CSI-RS resource completely overlaps with the gap. In the third MO, at least one synchronization signal block SSB resource completely overlaps with the gap.

[0136] In some possible designs, the first configuration message is also used to configure the third MO. Alternatively, the first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is to be performed on the third MO.

[0137] In some possible designs, the receiving unit is also used to receive a second configuration message, and the second configuration message is used to configure the third MO.

[0138] In some possible designs, the MO measured outside the gap includes a fourth MO and / or a fifth MO. There is no CSI-RS resource in the fourth MO that completely overlaps with the gap. There is no SSB resource in the fifth MO that completely overlaps with the gap.

[0139] In some possible designs, the first configuration message is also used to configure the fifth MO. Alternatively, the first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is to be performed on the fifth MO.

[0140] In some possible designs, the receiving unit 801 is also used to receive a second configuration message, and the second configuration message is used to configure the fifth MO.

[0141] It should be noted that, in some implementations, when the network device does not configure gap-related information to the terminal, or when all MOs perform measurements outside the gap, such as Figure 8 The mobility measurement device 800 shown can also be used to implement other mobility measurement methods. Exemplarily, the receiving unit 801 is used to receive a first configuration message, the first configuration message is used to configure a first MO, the first MO includes one or more CSI-RS resources. The determining unit 802 is used to determine the CSSF of the first MO according to the first MO and the MO measured outside the gap. outsidegap According to the CSSF outsidegap Determine the scaling factor of the first MO.

[0142] It should be noted that all relevant contents of each step involved in the above method embodiment can be referred to the functional description of the corresponding functional module, and will not be repeated here. The mobility measurement device 800 provided in the embodiment of the present application can be set in the terminal to execute the corresponding mobility measurement method, so that the same effect as the above mobility measurement method can be achieved. As an option but not a necessity, when necessary, the mobility measurement device 800 provided in the embodiment of the present application may also include a processing module or a control module for supporting the above receiving unit 801 and / or the determining unit 802 to complete the corresponding functions.

[0143] The embodiment of the present application further provides a communication device, which may be a terminal or a circuit. The communication device may be used to execute the action executed by the terminal in the above method embodiment.

[0144] When the communication device is a terminal, Fig. 9 A simplified schematic diagram of the terminal structure is shown. For ease of understanding and illustration, Fig. 9 In the example, a mobile phone is used as a terminal. Fig. 9 As shown, the terminal includes a processor, a memory, a radio frequency circuit, an antenna, and an input-output device. The processor is mainly used to process communication protocols and communication data, as well as to control the terminal, execute software programs, process software program data, etc. The memory is mainly used to store software programs and data. The radio frequency circuit is mainly used for conversion between baseband signals and radio frequency signals and processing of radio frequency signals. The antenna is mainly used to send and receive radio frequency signals in the form of electromagnetic waves. Input-output devices, such as touch screens, display screens, keyboards, etc., are mainly used to receive data input by users and output data to users. It should be noted that some types of terminals may not have input-output devices.

[0145] When data needs to be sent, the processor performs baseband processing on the data to be sent and outputs the baseband signal to the RF circuit. The RF circuit performs RF processing on the baseband signal and then sends the RF signal outward in the form of electromagnetic waves through the antenna. When data is sent to the terminal, the RF circuit receives the RF signal through the antenna, converts the RF signal into a baseband signal, and outputs the baseband signal to the processor. The processor converts the baseband signal into data and processes the data. For ease of explanation, Fig. 9 Only one memory and processor are shown. In an actual terminal product, there may be one or more processors and one or more memories. The memory may also be referred to as a storage medium or a storage device. The memory may be set independently of the processor or may be integrated with the processor, and the embodiments of the present application do not limit this.

[0146] In the embodiments of the present application, the antenna and the radio frequency circuit having transceiver functions may be regarded as the transceiver unit of the terminal, and the processor having the processing function may be regarded as the processing unit of the terminal. Fig. 9 As shown, the terminal includes a transceiver unit 910 and a processing unit 920. The transceiver unit may also be referred to as a transceiver, a transceiver, a transceiver device, etc. The processing unit may also be referred to as a processor, a processing board, a processing module, a processing device, etc. Optionally, the device used to implement the receiving function in the transceiver unit 910 may be regarded as a receiving unit, and the device used to implement the sending function in the transceiver unit 910 may be regarded as a sending unit, that is, the transceiver unit 910 includes a receiving unit and a sending unit. The transceiver unit may also be sometimes referred to as a transceiver, a transceiver, or a transceiver circuit, etc. The receiving unit may also be sometimes referred to as a receiver, a receiver, or a receiving circuit, etc. The sending unit may also be sometimes referred to as a transmitter, a transmitter, or a transmitting circuit, etc.

[0147] It should be understood that the transceiver unit 910 is used to perform sending operations and receiving operations on the terminal side in the above method embodiment, and the processing unit 920 is used to perform other operations on the terminal except the sending and receiving operations in the above method embodiment.

[0148] For example, in one implementation, the transceiver unit 910 is used to execute Figure 2 The receiving operation in S201 in the embodiment of the present application, and / or the transceiver unit 910 is also used to perform other transceiver steps on the terminal side. The processing unit 920 is used to perform Figure 2 Step 202 in the embodiment of the present application, and / or the processing unit 920 is also used to execute other processing steps on the terminal side.

[0149] For another example, in another implementation, the transceiver unit 910 is used to execute Figure 6 In S602, and / or the transceiver unit 920 is also used to execute other transceiver steps on the terminal side in the embodiment of the present application. The processing unit 920 is used to execute Figure 6 S603-S607, and / or processing unit 920 are also used to execute other processing steps on the terminal side in the embodiment of the present application.

[0150] When the communication device is a chip-type device or circuit, the device may include a transceiver unit and a processing unit, wherein the transceiver unit may be an input / output circuit and / or a communication interface; and the processing unit may be an integrated processor or microprocessor or integrated circuit.

[0151] When the communication device in this embodiment is a terminal, it can refer to Fig.10 The device shown. Fig.10 In the embodiment, the device includes a processor 1010, a sending data processor 1020, and a receiving data processor 1030. The receiving unit 801 in the above embodiment can be Fig.10 The receiving data processor 1030 in the embodiment can perform the corresponding functions. Fig.10 When the terminal wants to feed back the mobility measurement result to the network device, the processor 1010 in the transmission data processor 1020 can implement this function. Fig.10 A channel encoder and a channel decoder are shown in the figure, but it can be understood that these modules do not constitute a restrictive description of this embodiment and are only illustrative.

[0152] Fig.11 Another form of this embodiment is shown. The processing device 1100 includes modules such as a modulation subsystem, a central processing subsystem, and a peripheral subsystem. The communication device in this embodiment can be used as a modulation subsystem therein. Specifically, the modulation subsystem may include a processor 1103 and an interface 1104. The processor 1103 performs the function of the above-mentioned determination unit 802, and the interface 1104 performs the function of the above-mentioned receiving unit 801. As another variation, the modulation subsystem includes a memory 1106, a processor 1103, and a program stored on the memory 1106 and executable on the processor, and the processor 1103 implements the method on the terminal side in the above-mentioned method embodiment when executing the program. It should be noted that the memory 1106 may be non-volatile or volatile, and its location may be located inside the modulation subsystem or in the processing device 1100, as long as the memory 1106 can be connected to the processor 1103.

[0153] Fig.12A schematic diagram of the composition of a chip system 1200 is shown. The chip system 1200 may include: a processor 1201 and a communication interface 1202, for supporting the terminal to implement the functions involved in the above embodiments. Exemplarily, the processor 1201 can communicate with other devices outside the terminal (such as network devices) through the communication interface 1202. In one possible design, the chip system also includes a memory for storing program instructions and data necessary for the terminal. The chip system may be composed of chips, and may also include chips and other discrete devices. It should be noted that all relevant contents of each step involved in the above method embodiment can be referred to the functional description of the corresponding functional module, which will not be repeated here.

[0154] As another form of this embodiment, a computer-readable storage medium is provided, on which instructions are stored. When the instructions are executed, the method on the terminal side in the above method embodiment is executed.

[0155] As another form of this embodiment, a computer program product including instructions is provided, and when the instructions are executed, the method on the terminal side in the above method embodiment is executed.

[0156] It should be understood that the processor mentioned in the embodiments of the present invention may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.

[0157] It should also be understood that the memory mentioned in the embodiments of the present invention may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct memory bus random access memory (Direct Rambus RAM, DR RAM).

[0158] It should be noted that when the processor is a general-purpose processor, DSP, ASIC, FPGA or other programmable logic device, discrete gate or transistor logic device, discrete hardware component, the memory (storage module) is integrated in the processor.

[0159] It should be noted that the memory described herein is intended to include, but is not limited to, these and any other suitable types of memory.

[0160] It should also be understood that the first, second, third, fourth and various numerical numbers involved in this document are only distinctions made for the convenience of description and are not intended to limit the scope of the present application.

[0161] It should be understood that the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0162] It should be understood that in various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0163] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0164] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0165] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0166] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0167] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0168] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0169] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A mobility measurement method, It is characterized in that The method comprises: Receive a first configuration message, where the first configuration message is used to configure a first measurement object MO, where the first MO includes one or more channel state information reference signal CSI-RS resources; A scaling factor of the first MO is determined according to whether there is a CSI-RS resource of the first MO that completely overlaps with the measurement gap, and is used to perform mobility measurement on the first MO.

2. The method according to claim 1, It is characterized in that The determining, according to whether the first MO has a CSI-RS resource that completely overlaps with a measurement gap, a scaling factor of the first MO includes: When the first MO has at least one CSI-RS resource that completely overlaps with the gap, the specific carrier scale factor CSSF in the gap of the first MO is determined according to the first MO and the MO that needs to compete for the gap. withingap , the CSSF withingap Determining a scaling factor for the first MO; When the first MO does not have a CSI-RS resource that completely overlaps with the gap, the gap-outside specific carrier scale factor CSSF of the first MO is determined according to the first MO and the MO measured outside the gap. outsidegap , according to the CSSF outsidegap Determine the scaling factor of the first MO.

3. The method according to claim 2, It is characterized in that The MO that needs to compete for the gap includes the second MO and / or the third MO; There is at least one CSI-RS resource in the second MO that completely overlaps with the gap; There is at least one synchronization signal block SSB resource in the third MO that completely overlaps with the gap.

4. The method according to claim 3, It is characterized in that The first configuration message is also used to configure the third MO; or, The first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is to be performed on the third MO.

5. The method according to claim 3, It is characterized in that The method further comprises: A second configuration message is received, where the second configuration message is used to configure the third MO.

6. The method according to claim 2, It is characterized in that The MO measured outside the gap includes a fourth MO, and / or a fifth MO; There is no CSI-RS resource in the fourth MO that completely overlaps with the gap; There are no SSB resources in the fifth MO that completely overlap with the gap.

7. The method according to claim 6, It is characterized in that The first configuration message is also used to configure the fifth MO; or, The first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is performed on the fifth MO.

8. The method according to claim 6, It is characterized in that The method further comprises: A second configuration message is received, where the second configuration message is used to configure the fifth MO.

9. The method according to any one of claims 1 to 8, It is characterized in that The CSI-RS period of the first MO is the longest period of the CSI-RS resources in the first MO, or, The CSI-RS period of the first MO is the longest period of CSI-RS resources in the first MO that completely overlaps with the gap.

10. A mobility measurement device, It is characterized in that The device comprises a receiving unit and a determining unit; The receiving unit is used to receive a first configuration message, where the first configuration message is used to configure a first measurement object MO, where the first MO includes one or more channel state information reference signal CSI-RS resources; The determining unit is used to determine a scaling factor of the first MO according to whether there is a CSI-RS resource in the first MO that completely overlaps with a measurement gap, so as to perform mobility measurement on the first MO.

11. The device according to claim 10, It is characterized in that The determining unit is used to determine the gap-specific carrier scale factor CSSF of the first MO according to the first MO and the MO that needs to compete for the gap when the first MO has at least one CSI-RS resource that completely overlaps with the gap. withingap , the CSSF withingap Determining a scaling factor for the first MO; The determining unit is further configured to determine, when the first MO does not have a CSI-RS resource that completely overlaps with the gap, a gap-outside specific carrier scale factor CSSF of the first MO according to the first MO and the MO measured outside the gap. outsidegap , according to the CSSF outsidegap Determine the scaling factor of the first MO.

12. The device according to claim 11, It is characterized in that The MO that needs to compete for the gap includes the second MO and / or the third MO; There is at least one CSI-RS resource in the second MO that completely overlaps with the gap; There is at least one synchronization signal block SSB resource in the third MO that completely overlaps with the gap.

13. The device according to claim 12, It is characterized in that The first configuration message is also used to configure the third MO; or, The first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is to be performed on the third MO.

14. The device according to claim 12, It is characterized in that The receiving unit is further used to receive a second configuration message, where the second configuration message is used to configure the third MO.

15. The device according to claim 11, It is characterized in that The MO measured outside the gap includes a fourth MO, and / or a fifth MO; There is no CSI-RS resource in the fourth MO that completely overlaps with the gap; There are no SSB resources in the fifth MO that completely overlap with the gap.

16. The device according to claim 15, It is characterized in that The first configuration message is also used to configure the fifth MO; or, The first MO carries an associatedSSB identifier, and the associatedSSB identifier is used to indicate that mobility measurement is performed on the fifth MO.

17. The device according to claim 15, It is characterized in that The receiving unit is further used to receive a second configuration message, where the second configuration message is used to configure the fifth MO.

18. A communication device, It is characterized in that The communication device includes one or more processors and one or more memories; the one or more memories are coupled to the one or more processors, and the one or more memories store computer instructions; When the one or more processors execute the computer instructions, the communication device is caused to perform the mobility measurement method according to any one of claims 1 to 9.

19. A system, It is characterized in that It comprises a processing circuit and an interface; the processing circuit is used to call and run a computer program stored in a storage medium from the storage medium to execute the mobility measurement method according to any one of claims 1 to 9.