Risk detection method and device

By obtaining and calculating the sampling data during the vehicle verification process, the problem of insufficient risk detection in vehicle verification is solved, the quantification and accurate detection of project risks is achieved, and the accuracy and completeness of risk detection are improved.

CN113537662BActive Publication Date: 2024-10-18SAIC MOTOR
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010293732.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-15
Publication Date
2024-10-18
Estimated Expiration
2040-04-15

AI Technical Summary

Technical Problem

Existing technology cannot effectively quantitatively manage and detect project risks during the vehicle verification process, resulting in incomplete and inaccurate risk control.

Method used

By obtaining sampling data in the project to be evaluated, including verification data, phased data, problem severity data and time data, the risk value of the problem to be evaluated is calculated, and the overall risk value of the project to be evaluated is determined based on these risk values, using Weighted averages and relationship curves characterize changes in risk over time.

Benefits of technology

It achieves quantification and accurate detection of project risks, can identify incompletely verified problem risks, and improves the completeness and accuracy of overall risk detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113537662B_ABST
    Figure CN113537662B_ABST
Patent Text Reader

Abstract

The embodiments of the present application provide a risk detection method and device. The risk detection method obtains sampling data corresponding to the problem to be evaluated in the project to be evaluated, determines the risk value of the problem to be evaluated based on the sampling data, and then determines the risk value of the project to be evaluated based on the risk value of the problem to be evaluated. The method can quantify the risks of the problem to be evaluated and the risks of the project to be evaluated in a unified manner, and can not only easily identify the risk values ​​of the problem to be evaluated that are not actually fully verified, but also can more completely and accurately detect the overall risk of the project to be evaluated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of automobile technology, and in particular to a risk detection method and device. Background Art

[0002] As the pace of vehicle development accelerates, the verification cycle of vehicles is constantly shortening, which makes it impossible to ensure the adequacy of verification of many vehicle problems. The management of hundreds or thousands of problems in the same vehicle project relies on manual qualitative analysis, which makes it difficult to quantify project risks and problem risks. Taking the risk control of problems found during vehicle road tests as an example, it is usually mainly through manual identification and qualitative analysis of the severity of risks, such as sorting all problems into a list through EXCEL, marking the severity of individual problems with red, yellow and green, and obtaining key problems through screening and simple statistical problem closure. However, this method is not perfect and has low accuracy. Summary of the invention

[0003] In view of this, one of the technical problems solved by the embodiments of the present invention is to provide a risk detection method and device for quantifying problem risks and project risks, and detecting the overall risk of the project more completely and accurately.

[0004] The present application provides a risk detection method, which includes:

[0005] Acquire sampling data corresponding to the problem to be evaluated in the project to be evaluated, the sampling data including at least one of verification data, stage data, problem severity data and time data, the verification data indicating the analysis and verification of the problem to be evaluated, the stage data indicating the stage of the problem to be evaluated, the problem severity data indicating the severity of the problem to be evaluated, and the time data indicating the risk increase degree corresponding to the problem opening time of the problem to be evaluated, and the number of the problems to be evaluated is greater than or equal to 2;

[0006] Determine the risk value of the problem to be assessed based on the sampled data;

[0007] The risk value of the project to be evaluated is determined according to the risk value of the problem to be evaluated.

[0008] Optionally, in an embodiment of the present application, obtaining sample data corresponding to the problem to be evaluated in the project to be evaluated includes:

[0009] The verification data is obtained according to the cause quantification data, measure quantification data and verification quantification data of the problem to be evaluated, wherein the cause quantification data indicates the cause identification of the problem to be evaluated, the measure quantification data indicates the use of the measures of the problem to be evaluated, and the verification quantification data indicates the verification status of the problem to be evaluated.

[0010] Optionally, in an embodiment of the present application, obtaining sample data corresponding to the problem to be evaluated in the project to be evaluated includes:

[0011] The problem severity data is obtained according to the safety quantitative data, high-frequency quantitative data, functional quantitative data and perceptual quantitative data of the problem to be evaluated, wherein the safety quantitative data indicates whether the problem to be evaluated is a safety problem, the high-frequency quantitative data indicates whether the problem to be evaluated is a high-frequency problem, the functional data indicates whether the problem to be evaluated is a functional problem, and the perceptual quantitative data indicates whether the problem to be evaluated is a perceptual problem.

[0012] Optionally, in an embodiment of the present application, obtaining the problem severity data according to the safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated includes:

[0013] The safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated are weighted and summed to obtain the problem severity data.

[0014] Optionally, in an embodiment of the present application, obtaining sample data corresponding to the problem to be evaluated in the project to be evaluated includes:

[0015] The time data is acquired according to the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and a preset risk increment.

[0016] Optionally, in an embodiment of the present application, acquiring the time data according to the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and a preset risk increment includes:

[0017] When the verification data belongs to the first data set, the time data is determined as the product of the time interval between the opening time of the question to be evaluated and the preset time threshold and the preset risk increment;

[0018] When the confirmatory data belongs to the second data set, 0 is determined as the time data.

[0019] Optionally, in an embodiment of the present application, determining the risk value of the problem to be assessed according to the sampled data includes:

[0020] Calculating the product of the verification data, the stage data and the problem severity data;

[0021] The sum of the product and the time data is determined as the risk value of the problem to be assessed.

[0022] Optionally, in an embodiment of the present application, determining the risk value of the project to be evaluated according to the risk value of the problem to be evaluated includes:

[0023] A weighted average of the risk values ​​of at least two of the issues to be assessed is determined as the risk value of the item to be assessed.

[0024] Optionally, in an embodiment of the present application, the risk value of the project to be evaluated includes risk values ​​at at least two time points, and the method further includes:

[0025] A relationship curve between the risk value of the project to be evaluated and the time point is determined according to each time point and the risk value of the project to be evaluated corresponding to each time point. The relationship curve is used to characterize the change of the risk value of the project to be evaluated over time.

[0026] The embodiment of the present application also provides a risk detection device, which includes:

[0027] A data acquisition module, used to acquire sampling data corresponding to the problem to be evaluated in the project to be evaluated, wherein the sampling data includes at least one of verification data, stage data, problem severity data and time data, wherein the verification data indicates the analysis and verification of the problem to be evaluated, the stage data indicates the stage of the problem to be evaluated, the problem severity data indicates the severity of the problem to be evaluated, and the time data indicates the risk increase degree corresponding to the problem opening time of the problem to be evaluated, and the number of the problems to be evaluated is greater than or equal to 2;

[0028] A problem risk determination module, used to determine the risk value of the problem to be assessed based on the sampled data;

[0029] The project risk determination module is used to determine the risk value of the project to be evaluated according to the risk value of the problem to be evaluated.

[0030] Optionally, in an embodiment of the present application, the data acquisition module is specifically used to:

[0031] The verification data is obtained according to the cause quantification data, measure quantification data and verification quantification data of the problem to be evaluated, wherein the cause quantification data indicates the cause identification of the problem to be evaluated, the measure quantification data indicates the use of the measures of the problem to be evaluated, and the verification quantification data indicates the verification status of the problem to be evaluated.

[0032] Optionally, in an embodiment of the present application, the data acquisition module is specifically used to:

[0033] The problem severity data is obtained according to the safety quantitative data, high-frequency quantitative data, functional quantitative data and perceptual quantitative data of the problem to be evaluated, wherein the safety quantitative data indicates whether the problem to be evaluated is a safety problem, the high-frequency quantitative data indicates whether the problem to be evaluated is a high-frequency problem, the functional data indicates whether the problem to be evaluated is a functional problem, and the perceptual quantitative data indicates whether the problem to be evaluated is a perceptual problem.

[0034] Optionally, in an embodiment of the present application, the data acquisition module is specifically used to:

[0035] The safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated are weighted and summed to obtain the problem severity data.

[0036] Optionally, in an embodiment of the present application, the data acquisition module is specifically used to:

[0037] The time data is acquired according to the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and a preset risk increment.

[0038] Optionally, in an embodiment of the present application, the data acquisition module is specifically used to:

[0039] When the verification data belongs to the first data set, the time data is determined as the product of the time interval between the opening time of the question to be evaluated and the preset time threshold and the preset risk increment;

[0040] When the confirmatory data belongs to the second data set, 0 is determined as the time data.

[0041] Optionally, in an embodiment of the present application, the problem risk determination module:

[0042] Calculating the product of the verification data, the stage data and the problem severity data;

[0043] The sum of the product and the time data is determined as the risk value of the problem to be assessed.

[0044] Optionally, in one embodiment of the present application, the project risk determination module:

[0045] A weighted average of the risk values ​​of at least two of the issues to be assessed is determined as the risk value of the item to be assessed.

[0046] Optionally, in one embodiment of the present application, the risk value of the project to be evaluated includes risk values ​​at at least two time points, and the device also includes a relationship curve determination module, which is used to determine the relationship curve between the risk value of the project to be evaluated and the time point according to each time point and the risk value of the project to be evaluated corresponding to each time point, and the relationship curve is used to characterize the change of the risk value of the project to be evaluated over time.

[0047] In this embodiment, by obtaining sampling data corresponding to the problems to be evaluated in the project to be evaluated, determining the risk value of the problems to be evaluated based on the sampling data, and then determining the risk value of the project to be evaluated based on the risk value of the problems to be evaluated, the risks of the problems to be evaluated and the risks of the project to be evaluated can be quantified in a unified manner, which can not only easily identify the risk values ​​of the problems to be evaluated that are not actually fully verified, but also can more completely and accurately detect the overall risk of the project to be evaluated. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Hereinafter, some specific embodiments of the present application will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:

[0049] Figure 1 A risk detection method provided in an embodiment of the present application;

[0050] Figure 2 A method for determining a preset risk increment provided in an embodiment of the present application;

[0051] Figure 3 A relationship curve between the risk value and time point of the project to be evaluated provided in the embodiment of the present application;

[0052] Figure 4 Another risk detection method provided in an embodiment of the present application;

[0053] Figure 5 A risk detection device is provided in an embodiment of the present application. DETAILED DESCRIPTION

[0054] The specific implementation of the embodiment of the present invention is further described below in conjunction with the accompanying drawings of the embodiment of the present invention.

[0055] Embodiment 1

[0056] The first embodiment of the present application provides a risk detection method, such as Figure 1 As shown, Figure 1 A flow chart of a risk detection method provided in an embodiment of the present application. The risk detection method comprises the following steps:

[0057] S101: Obtain sampling data corresponding to the problem to be evaluated in the project to be evaluated.

[0058] The sampled data may include at least one of verification data, phase data, problem severity data, and time data. The verification data indicates the analysis and verification of the problem to be evaluated, the phase data indicates the stage of the problem to be evaluated, the problem severity data indicates the severity of the problem to be evaluated, and the time data indicates the risk increase corresponding to the problem opening time of the problem to be evaluated. The number of problems to be evaluated is greater than or equal to 2.

[0059] In this embodiment, the project to be evaluated may be a vehicle road test project, and the problem to be evaluated may be a problem that occurs during the road test of the vehicle. Of course, the project to be evaluated may also be other projects, and correspondingly, the problem to be evaluated may be a problem that occurs during the test or testing of the project to be evaluated.

[0060] In this embodiment, the verification data may be data that quantifies the analysis and verification of the problem to be evaluated, the phase data may be data that quantifies the stage of the problem to be evaluated, the problem severity data may be data that quantifies the severity of the problem to be evaluated, and the time data may be data that quantifies the degree of risk increase corresponding to the problem opening time of the problem to be evaluated. The sampling data may include verification data, phase data, problem severity data, time data, or a combination thereof. Optionally, in order to perform risk detection more completely and accurately, the sampling data includes verification data, phase data, problem severity data, and time data.

[0061] Optionally, in order to consider the analysis and verification of the problem to be evaluated and accurately quantify the risk of the problem to be evaluated, in one implementation of the present application, obtaining sampling data corresponding to the problem to be evaluated in the project to be evaluated may include:

[0062] Verification data is obtained based on the cause quantified data, measure quantified data and verification quantified data of the problem to be evaluated. The cause quantified data can indicate the cause identification of the problem to be evaluated, the measure quantified data can indicate the use of the measure of the problem to be evaluated, and the verification quantified data can indicate the verification status of the problem to be evaluated.

[0063] Specifically, the cause quantification data may be data that quantifies whether the cause of the problem to be evaluated is identified and whether the identified cause is reasonable. The value of the cause quantification data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the cause of the problem to be evaluated is identified and the identified cause is correct, that is, the cause is reasonable, 1 can be used to indicate that the cause of the problem to be evaluated is not identified, that is, there is no cause, and 2 can be used to indicate that the cause of the problem to be evaluated is identified but the identified cause is wrong, that is, the cause is wrong.

[0064] The measure quantification data may be data that quantifies whether a measure has been found to solve the problem to be evaluated and whether the measure found is reasonable. The value of the measure quantification data is not limited and can be set according to actual needs. For example, 0 may be used to indicate that a measure has been found to solve the problem to be evaluated and the measure found is correct, that is, the measure is reasonable, 1 may be used to indicate that no measure has been found to solve the problem to be evaluated, that is, no measure, and 2 may be used to indicate that a measure has been found to solve the problem to be evaluated but the measure found cannot correctly solve the problem to be evaluated, that is, the measure is wrong.

[0065] Verification quantitative data can be data that quantifies whether the problem to be solved has been verified and whether the verification has passed. The value of verification quantitative data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the problem to be solved has been verified and passed, that is, the verification has passed or no verification is required, 1 can be used to indicate that the problem to be solved is being verified, that is, being verified, 3 can be used to indicate that the problem to be evaluated has not been verified, that is, not verified, and 6 can be used to indicate that the problem to be evaluated has not reappeared and is no longer verified, that is, not verified or not reproduced.

[0066] Further optionally, in order to simplify the calculation process, obtaining verification data based on the cause quantitative data, measure quantitative data and verification quantitative data of the problem to be evaluated may include:

[0067] The verification data is obtained by summing up the quantitative data of the cause, the quantitative data of the measures and the quantitative data of the verification of the problem to be evaluated.

[0068] Specifically, the verification data can be obtained by substituting the sum of the cause quantitative data, measure quantitative data and verification quantitative data of the problem to be evaluated into formula (1) to obtain the verification data.

[0069] C=∫(R,M,P)=R+M+P (1)

[0070] Among them, R represents cause quantitative data, M represents measure quantitative data, P represents verification quantitative data, and C represents confirmatory data.

[0071] For example, if the quantitative data of the cause of the problem to be evaluated is 0, the quantitative data of the measure is 0, and the quantitative data of the verification is 1, then the obtained verification data is 1. For another example, if the quantitative data of the cause of the problem to be evaluated is 2, the quantitative data of the measure is 2, and the quantitative data of the verification is 4, then the verification data is 8.

[0072] Optionally, in order to consider the severity of the problem to be evaluated and accurately quantify the risk of the problem to be evaluated, in one implementation of the present application, obtaining sampling data corresponding to the problem to be evaluated in the project to be evaluated may include:

[0073] The problem severity data is obtained based on the safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated, wherein the safety quantitative data indicates whether the problem to be evaluated is a safety problem, the high-frequency quantitative data indicates whether the problem to be evaluated is a high-frequency problem, the functional data indicates whether the problem to be evaluated is a functional problem, and the perception quantitative data indicates whether the problem to be evaluated is a perception problem.

[0074] Specifically, safety issues may be issues that may cause casualties, high-frequency issues may be issues with a high probability of occurrence, functional issues may be issues related to the function of the item to be evaluated, and perception issues may be issues that make users feel psychologically or physically uncomfortable. For example, taking the problems that occur in vehicle road tests as an example, safety issues may be failures that may cause casualties or cause the failure of the main assembly of the vehicle or the failure of the vehicle to operate normally, such as steering failure, brake failure, etc. High-frequency issues may be potential design problems or supplier batch quality problems or factory assembly problems. Functional issues may be problems with the mechanical functions of the vehicle, such as seat belt jams, eye box jams, etc., or problems with the electrical functions of the vehicle, such as failure of the window lift function, etc., or problems with the intelligent networking functions of the vehicle, such as failure of the Advanced Driver Assistance System (ADAS). Perception problems may be those that cause visual discomfort to users, such as instrument reflection, rust, etc., or problems that cause auditory discomfort to users, such as wind noise, tire noise, or abnormal chassis noise, or problems that cause tactile discomfort to users, such as burrs, scratches, etc., or problems that cause olfactory discomfort to users, such as a strong smell of gasoline or interior decoration.

[0075] Safety quantitative data is data that quantifies whether the problem to be evaluated belongs to a safety problem. The value of safety quantitative data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the problem to be evaluated belongs to a safety problem, and 1 can be used to indicate that the problem to be evaluated does not belong to a safety problem. Similarly, high-frequency quantitative data is data that quantifies whether the problem to be evaluated belongs to a high-frequency problem. The value of high-frequency quantitative data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the problem to be evaluated belongs to a high-frequency problem, and 1 can be used to indicate that the problem to be evaluated does not belong to a high-frequency problem. Functional data is data that quantifies whether the problem to be evaluated belongs to a functional problem. The value of functional data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the problem to be evaluated belongs to a functional problem, and 1 can be used to indicate that the problem to be evaluated does not belong to a functional problem. Perception quantitative data indicates whether the problem to be evaluated belongs to a perception problem. The value of perception quantitative data is not limited and can be set according to actual needs. For example, 0 can be used to indicate that the problem to be evaluated belongs to a perception problem, and 1 can be used to indicate that the problem to be evaluated does not belong to a perception problem.

[0076] Further optionally, in order to increase the influence of certain types of problems, such as security problems, on the severity of the problem, which is conducive to the final risk detection result, in one embodiment of the present application, obtaining the problem severity data according to the security quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated may include:

[0077] The safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated are weighted and summed to obtain the problem severity data.

[0078] Specifically, corresponding weight values ​​can be set in advance for safety issues, high-frequency issues, functional issues, and perception issues. For example, weight values ​​can be set according to actual applications. For example, when safety issues occur, they may cause casualties and have serious consequences, so a larger weight value can be set for safety issues. When perception issues occur, the impact is relatively small, so a smaller weight value can be set for perception issues. Then, the safety quantitative data, high-frequency quantitative data, functional quantitative data, and perception quantitative data of the problem to be evaluated are substituted into formula (2) to obtain the problem severity data. In this way,

[0079] S=∫(S1+F1+F2+S2)=K1×S1+K2×F1+K3×F2+K4×S2 (2)

[0080] Among them, K1 represents the security weight value, K2 represents the high-frequency weight value, K3 represents the functional weight value, K4 represents the perception weight value, S1 represents the security quantified data, F1 represents the high-frequency quantified data, F2 represents the functional weight quantified data, and S2 represents the perception weight quantified data.

[0081] Optionally, in order to consider the influence of the problem opening time on the risk value of the problem to be evaluated and accurately quantify the risk of the problem to be evaluated, in one embodiment of the present application, obtaining sampling data corresponding to the problem to be evaluated in the project to be evaluated may include:

[0082] Obtain time data based on the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and the preset risk increment.

[0083] Here is a list of how to obtain time data. Of course, this is only an exemplary description and does not mean that the present application is limited to this.

[0084] Optionally, in an implementation of the present application, acquiring time data according to the verification data corresponding to the problem to be evaluated, the problem start time of the problem to be evaluated, and the preset risk increment may include:

[0085] When the verification data belongs to the first data set, the product of the time interval between the opening time of the problem to be evaluated and the preset time threshold and the preset risk increment is determined as the time data;

[0086] When the confirmatory data belongs to the second data set, 0 is determined as the time data.

[0087] Specifically, first, the verification data can be divided into a first data set and a second data set according to the analysis and verification of the problem to be evaluated specifically indicated by the verification data. For example, the second data set may include verification data indicating that the cause and measures of the problem to be evaluated have been determined and verified, verification data indicating that the cause and measures of the problem to be evaluated have been determined and are being verified, and / or verification data indicating that the cause of the problem to be evaluated has been determined but there are no measures and verification is not required, etc. The first data set may include all verification data except the verification data in the second data set. Then, the time threshold is determined by formula (3) according to which data set the verification data belongs to.

[0088]

[0089] Among them, ΔR represents the preset risk increment, t1 represents the problem initiation time, t represents the preset time threshold, C represents the verification data, and T represents the time data.

[0090] Reference here Figure 2An example is given to illustrate how to determine the preset risk increment. Of course, this is only an exemplary description and does not mean that the present application is limited to this.

[0091] Optionally, if the risk value corresponding to the time threshold t is R1, and the risk value corresponding to the problem opening time of the problem to be evaluated is R2, then the preset risk increment ΔR of the problem to be evaluated can be set to R2-R1. Similarly, if the risk value corresponding to the time threshold t is R1, and the risk value corresponding to the problem opening time of the problem to be evaluated is R3, then the preset risk increment ΔR of the problem to be evaluated can be set to R3-R1.

[0092] S102. Determine the risk value of the problem to be assessed based on the sampling data.

[0093] Specifically, the risk value of the corresponding problem to be evaluated is determined based on the sampling data of each problem to be evaluated in the project to be evaluated, that is, at least one of the verification data, stage data, problem severity data and time data.

[0094] Optionally, in order to simplify the process of determining the risk value of the problem to be evaluated, determining the risk value of the problem to be evaluated based on the verification data, stage data, problem severity data and time data can include: calculating the product of the verification data, stage data and problem severity data; and determining the sum of the product and the time data as the risk value of the problem to be evaluated.

[0095] For example, the verification data, phase data, problem severity data and time data of each problem to be evaluated in the project to be evaluated can be substituted into formula (4) to obtain the risk value of the evaluation problem.

[0096] R=C×J×S+T (4)

[0097] Among them, R represents the risk value of the problem to be evaluated, C represents the verification data of the problem to be evaluated, J represents the phase data of the problem to be evaluated, S represents the problem severity data of the problem to be evaluated, and T represents the time data of the problem to be evaluated.

[0098] S103. Determine the risk value of the project to be evaluated based on the risk value of the problem to be evaluated.

[0099] Specifically, the project to be evaluated may include multiple issues to be evaluated. After the risk value of each issue to be evaluated is obtained, the risk value of the entire project to be evaluated may be determined according to the risk value of each issue to be evaluated.

[0100] Here, two possible implementation methods are listed to illustrate how to determine the preset risk increment. Of course, this is only an exemplary description and does not mean that the present application is limited thereto.

[0101] Optionally, in a possible implementation, in order to simplify the calculation process, optionally, determining the risk value of the project to be evaluated based on the risk value of the problem to be evaluated may include: determining the average of the risk values ​​of at least two problems to be evaluated as the risk value of the project to be evaluated.

[0102] Specifically, if the project to be evaluated contains n issues to be evaluated, the risk value of each issue to be evaluated is R i , i = 1, 2, ..., n, then the risk value of the project to be evaluated is

[0103] Optionally, in another possible implementation, in order to reflect the degree of influence of the risk values ​​of different issues to be evaluated on the risk value of the entire project to be evaluated, and thus more accurately determine the risk value of the project to be evaluated. Optionally, determining the risk value of the project to be evaluated based on the risk value of the issue to be evaluated may include: determining the weighted average of the risk values ​​of at least two issues to be evaluated as the risk value of the project to be evaluated.

[0104] Specifically, if the project to be evaluated contains n issues to be evaluated, the risk value of each issue to be evaluated is R i , i = 1, 2, ..., n, then the risk value of the project to be evaluated is

[0105] Optionally, in order to more intuitively reflect the change of the risk value of the entire project to be evaluated over time, in one implementation of the present application, the risk value of the project to be evaluated includes risk values ​​at at least two time points, and after determining the risk value of the project to be evaluated according to the risk value of the problem to be evaluated, it also includes:

[0106] A relationship curve between the risk value of the project to be evaluated and the time point is determined based on each time point and the risk value of the project to be evaluated corresponding to each time point. The relationship curve is used to characterize the change of the risk value of the project to be evaluated over time.

[0107] Among them, at each time point, the number of to-be-assessed issues of the to-be-assessed project may be different, and the risk value of each to-be-assessed issue may change. By determining the risk value of the to-be-assessed issue of the to-be-assessed project at every preset time interval, and determining the risk value of the to-be-assessed project based on the risk value of the to-be-assessed issue, the risk value of the to-be-assessed project at at least two time points can be obtained, and the relationship curve between the risk value of the to-be-assessed project and the time point can be determined based on each time point and the risk value of the to-be-assessed project. For example, the relationship curve between the risk value of the to-be-assessed project and the time point can be obtained by substituting each time point and the risk value of the to-be-assessed project corresponding to the time point into formula (5). The change of the project to be assessed can be judged by the change of the slope of the relationship curve.

[0108] Rallt =∫(R all , t) (5)

[0109] Among them, R allt It indicates the change of risk value of vehicle road test items with time point t, R all Represents the risk value of the vehicle road test item at time point t.

[0110] Below Figure 3 The relationship curve between the risk value and time point of the project to be evaluated is taken as an example to explain in detail, where R allt It represents the risk value of the project to be evaluated at a certain point in time, R start represents the risk value of the first vehicle road test problem at time t1, R end It indicates the risk value of the project to be evaluated at time point t4, t1 indicates the time point when the first problem to be evaluated begins, t2 indicates the time point when the risk value of the project to be evaluated reaches its peak, t3 indicates the time point at which any risk value of the project to be evaluated is located, and t4 indicates the time point when the risk value of the project to be evaluated begins to converge. The change in the risk of the project to be evaluated can be judged by the change in this relationship curve. An increase in slope indicates an increase in risk, a decrease in slope indicates that the response measures taken have the purpose of reducing risk, and if the slope tends to be stable and the risk value of the project to be evaluated is at a low value level, it means that the project risk is controllable.

[0111] Optionally, in order to determine the key issues to be evaluated of the project to be evaluated, after determining the corresponding risk values ​​of all the issues to be evaluated based on all the sampling data, it also includes: sorting the risk values ​​of the issues to be evaluated, and determining the issues to be evaluated corresponding to the first several risk values ​​with higher risk values ​​as important issues to be evaluated.

[0112] In this embodiment, by obtaining sampling data corresponding to the problems to be evaluated in the project to be evaluated, determining the risk value of the problems to be evaluated based on the sampling data, and then determining the risk value of the project to be evaluated based on the risk value of the problems to be evaluated, the risks of the problems to be evaluated and the risks of the project to be evaluated can be quantified in a unified manner, which can not only easily identify the risk values ​​of the problems to be evaluated that are not actually fully verified, but also can more completely and accurately detect the overall risk of the project to be evaluated.

[0113] Embodiment 2

[0114] Based on a risk detection method provided in Example 1 of the present application, Example 2 of the present application takes a test of a vehicle on a road as an example to Figure 1 The risk detection method provided in the embodiment shown is described in detail. Figure 3 As shown, the risk detection method provided in this embodiment may include:

[0115] S301. Obtain sampling data of whole vehicle road test problems in whole vehicle road test items.

[0116] Among them, vehicle road test problems refer to problems that occur during the vehicle road test. Sampling data can include verification data, stage data, problem severity and time data. The number of vehicle road test problems is greater than or equal to 2.

[0117] In this embodiment, the verification data C is first obtained by substituting the cause quantification data R, the measure quantification data M and the verification quantification data P into the formula (1) described above. In this embodiment, the specific values ​​of the cause quantification data R, the measure quantification data M and the verification quantification data P and the specific contents indicated are shown in the second column, the third column and the fourth column of Table 1, respectively, and the obtained verification data C is shown in the first column of Table 1. In addition, a remarks column is added in Table 1 to help understand the analysis and verification situation specifically indicated by the verification data C.

[0118] Table 1

[0119]

[0120] Next, the phased data of the vehicle road test problem is obtained. In this embodiment, the values ​​of the phased data and the indicated stages are shown in Table 2.

[0121] Table 2

[0122]

[0123] Next, the safety quantification data, high frequency quantification data, functional quantification data and perception quantification data are substituted into the formula (2) described above to obtain the problem severity data of the vehicle road test problem. In this embodiment, if the safety weight value K1, the high frequency weight value K2, the functional weight value K3 and the perception weight value K4 are 8, 4, 2 and 1 respectively, and for the case of the vehicle road test problem shown in the sixth column of Table 3, the safety quantification data S1, the high frequency quantification data F1, the functional weight quantification data F2 and the perception weight quantification data S2 are shown in the second column, the third column, the fourth column and the fifth column of Table 3 respectively, then the problem severity data S of the vehicle road test problem is shown in the first column of Table 3.

[0124] Table 3

[0125]

[0126]

[0127] Finally, 8, 6, 5, 4, and 3 of the values ​​of the verification data C are divided into the first data set, and 1, 2, and 7 are divided into the second data set, and the time data T is obtained according to the formula (3) described above.

[0128] S302: Determine the risk value of the vehicle road test problem based on the sampling data.

[0129] In this embodiment, the risk value R of the corresponding vehicle road test problem is obtained by substituting the verification data C, stage data J, problem severity data S and time data T of each vehicle road test problem into the formula (4) described above.

[0130] S303. Determine the risk value of the whole vehicle road test item according to the risk value of the whole vehicle road test problem.

[0131] In this embodiment, the average of the risk values ​​of at least two vehicle road test problems is determined as the risk value of the vehicle road test project. Specifically, if the vehicle road test project includes n vehicle road test problems, the risk value of each vehicle road test problem is R i , i = 1, 2, ..., n, then the risk value of the vehicle road test project is

[0132] S304. The risk value of the whole vehicle road test item includes risk values ​​at at least two time points. A relationship curve between the risk value of the whole vehicle road test item and the time point is determined according to each time point and the risk value of the whole vehicle road test item corresponding to each time point. The relationship curve is used to characterize the change of the risk value of the whole vehicle road test item over time.

[0133] Specifically, at every preset time interval, the risk value of the whole vehicle road test problem in the whole vehicle road test project is determined, and the risk value of the whole vehicle road test project is determined according to the risk value of the whole vehicle road test problem, thereby obtaining the risk value of the whole vehicle road test project at at least two time points, and then substituting each time point and the risk value of the whole vehicle road test project corresponding to the time point into formula (5) to obtain the relationship curve between the risk value of the whole vehicle road test project and the time point,

[0134] Optionally, in order to determine the important issues of the whole vehicle road test project, after determining the corresponding risk values ​​of all the whole vehicle road test issues based on all the sampling data, it also includes: sorting the risk values ​​of the whole vehicle road test issues, and determining the whole vehicle road test issues corresponding to the first several risk values ​​with higher risk values ​​as important issues.

[0135] In this embodiment, by obtaining sampling data corresponding to the whole vehicle road test problems in the whole vehicle road test project, determining the risk value of the whole vehicle road test problems according to the sampling data, and then determining the risk value of the whole vehicle road test project according to the risk value of the whole vehicle road test problems, the risks of the whole vehicle road test problems and the risks of the whole vehicle road test project can be quantified in a unified manner, which can not only easily identify the risk values ​​of the whole vehicle road test problems that are not fully verified in reality, but also facilitate the transmission of the whole vehicle road test problems that are not fully verified to the relevant departments for processing, decentralize the risks of the whole vehicle road test project, attract the attention of various business lines, but also can more completely and accurately detect the overall risk of the whole vehicle road test problems.

[0136] Embodiment 3

[0137] Figure 5 A schematic diagram of the structure of the risk detection device provided in the embodiment of the present application is shown in FIG. Figure 5 As shown, the risk detection device provided in this embodiment may include:

[0138] The data acquisition module 501 is used to acquire sampling data corresponding to the to-be-evaluated problems in the to-be-evaluated project, the sampling data including at least one of verification data, stage data, problem severity data and time data, the verification data indicating the analysis and verification of the to-be-evaluated problems, the stage data indicating the stage of the to-be-evaluated problems, the problem severity data indicating the severity of the to-be-evaluated problems, and the time data indicating the risk increase degree corresponding to the problem opening time of the to-be-evaluated problems, and the number of the to-be-evaluated problems is greater than or equal to 2;

[0139] A problem risk determination module 502 is used to determine the risk value of the problem to be evaluated based on the sampled data;

[0140] The project risk determination module 503 is used to determine the risk value of the project to be evaluated according to the risk value of the problem to be evaluated.

[0141] Optionally, the data acquisition module 501 is specifically used for:

[0142] Verification data is obtained based on the cause quantification data, measure quantification data and verification quantification data of the problem to be evaluated, wherein the cause quantification data indicates the cause identification of the problem to be evaluated, the measure quantification data indicates the use of the measures for the problem to be evaluated, and the verification quantification data indicates the verification status of the problem to be evaluated.

[0143] Optionally, the data acquisition module 501 is specifically used for:

[0144] The problem severity data is obtained based on the safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated, wherein the safety quantitative data indicates whether the problem to be evaluated is a safety problem, the high-frequency quantitative data indicates whether the problem to be evaluated is a high-frequency problem, the functional data indicates whether the problem to be evaluated is a functional problem, and the perception quantitative data indicates whether the problem to be evaluated is a perception problem.

[0145] Optionally, the data acquisition module 501 is specifically used for:

[0146] The safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated are weighted and summed to obtain the problem severity data.

[0147] Optionally, the data acquisition module 501 is specifically used for:

[0148] Obtain time data based on the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and the preset risk increment.

[0149] Optionally, the data acquisition module 501 is specifically used for:

[0150] When the verification data belongs to the first data set, the product of the time interval between the opening time of the problem to be evaluated and the preset time threshold and the preset risk increment is determined as the time data;

[0151] When the confirmatory data belongs to the second data set, 0 is determined as the time data.

[0152] Optionally, the problem risk determination module 502 is specifically configured to:

[0153] Calculate the product of validation data, interim data, and problem severity data;

[0154] The sum of the product and the time data is determined as the risk value of the problem to be assessed.

[0155] Optionally, the project risk determination module 503 is specifically used to:

[0156] The weighted average of the risk values ​​of at least two issues to be evaluated is determined as the risk value of the project to be evaluated.

[0157] Optionally, the risk value of the project to be evaluated includes risk values ​​at at least two time points, and the risk detection device also includes a relationship curve determination module, which is used to determine the relationship curve between the risk value of the project to be evaluated and the time point according to each time point and the risk value of the project to be evaluated corresponding to each time point, and the relationship curve is used to characterize the change of the risk value of the project to be evaluated over time.

[0158] The risk detection device provided in this embodiment is used to execute the risk detection method provided in the first embodiment and the second embodiment. The technical principles and technical effects thereof are similar and will not be described in detail here.

[0159] Thus far, specific embodiments of the subject matter have been described. Other embodiments are within the scope of the appended claims. In some cases, the actions recited in the claims may be performed in a different order and still achieve the desired results. Additionally, the processes depicted in the accompanying drawings do not necessarily require the specific order or sequential order shown to achieve the desired results. In some embodiments, multitasking and parallel processing may be advantageous.

[0160] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A risk detection method, It is characterized in that Applied to vehicle road testing, the method comprises: Acquire sampling data corresponding to the problem to be evaluated in the project to be evaluated, the sampling data including verification data, stage data, problem severity data and time data, the verification data indicating the analysis and verification of the problem to be evaluated, the stage data indicating the stage of the problem to be evaluated, the problem severity data indicating the severity of the problem to be evaluated, and the time data indicating the risk increase degree corresponding to the problem opening time of the problem to be evaluated, and the number of the problems to be evaluated is greater than or equal to 2; Determine the risk value of the problem to be evaluated based on the sampling data, calculate the product of the verification data, the phased data and the problem severity data; and determine the sum of the product and the time data as the risk value of the problem to be evaluated; The risk value of the project to be evaluated is determined according to the risk value of the problem to be evaluated, and the average value or weighted average value of the risk values ​​of at least two problems to be evaluated is determined as the risk value of the project to be evaluated.

2. The risk detection method according to claim 1, It is characterized in that Obtain the sampling data corresponding to the issues to be evaluated in the project to be evaluated, including: The verification data is obtained according to the cause quantification data, measure quantification data and verification quantification data of the problem to be evaluated, wherein the cause quantification data indicates the cause identification of the problem to be evaluated, the measure quantification data indicates the use of the measures of the problem to be evaluated, and the verification quantification data indicates the verification status of the problem to be evaluated.

3. The risk detection method according to claim 1, It is characterized in that Obtain the sampling data corresponding to the issues to be evaluated in the project to be evaluated, including: The problem severity data is obtained according to the safety quantitative data, high-frequency quantitative data, functional quantitative data and perceptual quantitative data of the problem to be evaluated, wherein the safety quantitative data indicates whether the problem to be evaluated is a safety problem, the high-frequency quantitative data indicates whether the problem to be evaluated is a high-frequency problem, the functional quantitative data indicates whether the problem to be evaluated is a functional problem, and the perceptual quantitative data indicates whether the problem to be evaluated is a perceptual problem.

4. The risk detection method according to claim 3, It is characterized in that Obtaining the problem severity data according to the safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated, including: The safety quantitative data, high-frequency quantitative data, functional quantitative data and perception quantitative data of the problem to be evaluated are weighted and summed to obtain the problem severity data.

5. The risk detection method according to claim 1, It is characterized in that Obtain the sampling data corresponding to the issues to be evaluated in the project to be evaluated, including: The time data is acquired according to the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and a preset risk increment.

6. The risk detection method according to claim 5, It is characterized in that The time data is obtained according to the verification data corresponding to the problem to be evaluated, the problem opening time of the problem to be evaluated, and the preset risk increment, including: When the verification data belongs to the first data set, the time data is determined as the product of the time interval between the opening time of the question to be evaluated and the preset time threshold and the preset risk increment; When the confirmatory data belongs to the second data set, 0 is determined as the time data.

7. The risk detection method according to claim 1, It is characterized in that The risk value of the project to be evaluated includes risk values ​​at at least two time points, and the method further includes: A relationship curve between the risk value of the project to be evaluated and the time point is determined according to each time point and the risk value of the project to be evaluated corresponding to each time point. The relationship curve is used to characterize the change of the risk value of the project to be evaluated over time.

8. A risk detection device, It is characterized in that Suitable for vehicle road test, the device comprises: A data acquisition module is used to acquire sampling data corresponding to the problem to be evaluated in the project to be evaluated, wherein the sampling data includes verification data, stage data, problem severity data and time data, wherein the verification data indicates the analysis and verification of the problem to be evaluated, the stage data indicates the stage of the problem to be evaluated, the problem severity data indicates the severity of the problem to be evaluated, and the time data indicates the risk increase degree corresponding to the problem opening time of the problem to be evaluated, and the number of the problems to be evaluated is greater than or equal to 2; A problem risk determination module is used to determine the risk value of the problem to be evaluated based on the sampled data, calculate the product of the verification data, the phased data and the problem severity data; and determine the sum of the product and the time data as the risk value of the problem to be evaluated; The project risk determination module is used to determine the risk value of the project to be evaluated according to the risk value of the problem to be evaluated, and determine the average or weighted average of the risk values ​​of at least two problems to be evaluated as the risk value of the project to be evaluated.

Citation Information

Patent Citations

  • Risk assessment method and risk assessment device

    CN106251085A