A construction method for slope protection support structure used for slope water ecological management

Through methods such as wooden pile support and planting bag stacking, a natural, harmonious, and ecological water ecological management slope structure is formed, which solves the problems of traditional slope structures with poor naturalness, environmental protection, and aesthetics, and achieves biodiversity Space to breed and improvements in construction safety.

CN113605416BActive Publication Date: 2024-10-11YUNNAN CONSTR INVESTMENT HLDG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110900284.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-06
Publication Date
2024-10-11
Estimated Expiration
2041-08-06

AI Technical Summary

Technical Problem

The traditional water ecological management slope structure has poor naturalness, poor ecological environmental protection, and poor porosity, which affects the reproduction of biodiversity and has poor aesthetics. In addition, the construction cost of supporting piles made of industrial products is high, it is easy to cause water and soil pollution, it is heavy, and it has soft foundation. It is easy to sink and has poor toughness, which poses greater construction risks and safety hazards.

Method used

Methods such as wooden pile support, Reynolds pad stacking, and planting bag stacking are used to form a natural, harmonious, ecological, and environmentally friendly water ecological management slope structure. Through on-site investigation, design, and construction, the natural quality of the slope is improved. Safety, ecological environmental protection and aesthetics, reduce construction costs and enhance construction safety.

Benefits of technology

It has improved the naturalness, ecological environmental protection and aesthetics of water ecological management slopes, solved the spatial problem of biodiversity reproduction, reduced construction costs and safety risks, and improved construction efficiency and effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113605416B_ABST
    Figure CN113605416B_ABST
Patent Text Reader

Abstract

The present invention discloses a slope protection support structure for slope water ecological management, including slope protection structures arranged relative to each other and a support structure installed between the two slope protection structures, wherein the slope protection structure includes a slope foot, a slope and a slope top, wherein a plurality of support piles are arranged on the slope protection structure, and the support piles are arranged at the slope foot, the slope top and the slope respectively, one end of the slope is connected to the slope foot, and the slope foot is provided with an anchoring layer and a leveling layer in sequence from bottom to top; one end of the slope is connected to the slope top, and a maintenance passage or road is provided on the slope top, and a protective base layer and a protective reinforcement layer are provided in sequence from bottom to top on the slope, and a lower protective layer is provided at the lower part of the protective reinforcement layer, and an upper protective layer is provided at the upper part. The present invention forms an ecological and natural slope structure through reasonable design, and the protective effect and ecological management effect achieve good effects, and the construction is convenient and fast at the same time, and the construction safety is guaranteed to the maximum extent, and the construction effect is also improved, so as to save time and labor and realize efficient construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a slope protection support structure, in particular to a construction method of a slope protection support structure for slope water ecological management, which is mainly used for slope water ecological management and protection and belongs to the technical field of slope management. Background Art

[0002] Generally speaking, since the reform and opening up, people's awareness of protecting the ecological environment has been continuously enhanced. In the process of ecological environment governance, slope governance is a key component.

[0003] With the rapid development of my country's social economy, it is inevitable that the ecological environment will be damaged to a certain extent. In particular, the discharge of domestic sewage, industrial sewage, and agricultural production tail water has caused great damage to the fragile water ecological environment. The governance of the water ecological environment has been put on the national agenda. All parts of the country have increased the intensity of the governance of the water ecological environment. At present, the implementation steps of the original lake and river slope improvement are as follows: survey → design → construction preparation → top slope support piles (3) pressure → first layer foundation pit excavation → slope waist support piles (3) pressure → second layer foundation pit excavation → slope foot support piles (3) pressure → slope foot anchor layer (4) → support structure (2) construction → slope protection structure (1) shaping → slope surface laying a layer of protective base layer (7) → laying mixed protective reinforcement layer (8) → stacking lower protective layer (9) → stacking upper protective layer (10) → top slope curb construction → Maintenance channel (6), the corresponding water ecological governance slope treatment using the above traditional structural form encountered some difficulties, which can be summarized as follows: (1) The naturalness of the slope treatment is poor; (2) The ecological and environmental protection of the slope treatment is poor; (3) The poor porosity of the slope treatment affects the reproduction of biodiversity; (4) The aesthetics of the slope treatment is poor; (5) The traditional support piles made of industrial products have high construction costs, are easy to cause water and soil pollution, are heavy and easy to sink in soft foundations, are difficult to pile in soft foundations, and have poor toughness; (6) For high slopes, the above traditional treatment methods not only pose great construction risks to construction workers, but also have poor slope strength and stability, and can no longer meet the requirements of stable and closed slopes, especially for slopes with high fragmentation. The higher the slope, the worse the integrity. In addition, the support and fixation of the protruding hanging rocks are insufficient, which poses great safety hazards to the construction workers, materials and equipment below.

[0004] Therefore, the key to solving the above technical problems is to develop a construction method for a slope protection support structure with high practicality and high working reliability for slope water ecological management. Summary of the invention

[0005] In view of the many defects and shortcomings in the above-mentioned background technology, the present invention has made improvements and innovations thereto, with the aim of providing a novel and reasonable design, simple structure, good strength, stability and integrity of the slope, which can meet the requirements of stable and closed high slopes and has good protective effect; through on-site investigation, design and construction, a natural, harmonious, ecological and environmentally friendly water ecological management slope structure is formed by using wooden pile support, Reno mat stacking, vegetation bag stacking reinforcement, etc., to solve the technical problems of poor naturalness, poor ecological and environmental protection, poor porosity affecting the reproduction of biodiversity, poor aesthetics, and shortcomings of industrial support piles in traditional water ecological management slope structures.

[0006] Another invention purpose of the present invention is to form an ecological and natural slope structure based on the current actual situation of water ecological management slope regulation through reasonable design, and the protection effect and ecological management effect achieve better results. At the same time, the construction is convenient and fast, which maximizes the construction safety while also improving the construction effect, saving time and effort and achieving efficient construction.

[0007] In order to solve the above problems and achieve the above invention objectives, the present invention provides a construction method for a slope protection support structure for slope water ecological management by adopting the following design structure and the following technical solution:

[0008] As an improvement of the construction method of a slope protection support structure for slope water ecological management of the present invention, it comprises slope protection structures (1) arranged relative to each other and a support structure (2) installed between the two slope protection structures (1), wherein the slope protection structure (1) comprises a slope foot, a slope and a slope top, wherein a plurality of support piles (3) are arranged on the slope protection structure (1), and the support piles (3) are arranged at the slope foot, the slope top and the slope respectively, one end of the slope is connected to the slope foot, and an anchoring layer (4) and a leveling layer (5) are arranged in sequence from bottom to top at the slope foot; one end of the slope is connected to the slope top, and an inspection channel (6) is arranged on the slope top, and a protective base layer (7) and a protective reinforcement layer (8) are arranged in sequence from bottom to top on the slope, and a lower protective layer (9) is arranged at the lower part of the protective reinforcement layer (8), and an upper protective layer (10) is arranged at the upper part, and the upper protective layer (10) and the lower protective layer (9) are overlapped to form an integrated structure;

[0009] There are two slope protection structures (1), and the two slope protection structures (1) are symmetrical structures; one end of the support structure (2) is overlapped with one of the slope protection structures (1); and the other end is overlapped with the other slope protection structure (1);

[0010] The support structure (2) comprises a foot guard beam and a support beam, wherein the foot guard beams are two beams arranged opposite to each other, and a plurality of support beams are connected between the two foot guard beams;

[0011] The construction method of the slope protection support structure for slope water ecological management includes the following construction steps:

[0012] S1, Construction Preparation: Make technical preparation, site preparation and resource allocation according to the design documents;

[0013] S2, Slope top support piles (3) Pressing: Manually assist mechanical equipment to press the support piles on both sides of the slope top;

[0014] S3, excavation of the first foundation pit: excavating the foundation pit to the waist of the slope by using an excavator;

[0015] S4, Slope waist support piles (3) pressing: manual and mechanical equipment press the waist support piles on both sides of the slope;

[0016] S5, excavation of the second foundation pit: excavation is continued with an excavator to 20 cm above the bottom of the foundation pit, and the last 20 cm thick soil layer is excavated manually;

[0017] S6, Slope foot support piles (3) are pressed: manual and mechanical equipment are used to press the slope foot support and foundation reinforcement piles on both sides;

[0018] S7, Anchoring layer at the foot of the slope (4): Manual and mechanical equipment are used to throw rough stones to fill the gaps between the exposed pile tops;

[0019] S8, Support structure (2) construction: level the foot beam and support beam positions and lay a layer of weathering material, tie steel bars, set up formwork, and pour concrete;

[0020] S9, Slope protection structure (1) Shaping: Manual cooperation with excavators to shape and level the slope;

[0021] S10, laying a protective base layer (7) on the slope surface: artificially laying a layer of non-woven fabric from the slope foot to the slope top;

[0022] S11, laying a mixed protective reinforcement layer (8): artificially laying a layer of sand and gravel cushion or a mixed sand and gravel cushion on the non-woven fabric on the slope;

[0023] S12, protective layer under the stack (9): artificially laid Reno mats below the designed normal water level on both sides of the slope;

[0024] S13, upper protective layer of the stack (10): artificially lay vegetation bags on both sides of the slope above the designed normal water level, and plant grass seeds in the planting soil in a reasonable ratio in the vegetation bags;

[0025] S14, Construction of curbstones on the top of the slope: Construction of concrete curbstones and hollow brick footing on both sides of the top of the slope;

[0026] S15, maintenance passage (6): manual labor and mechanical equipment are used to lay the maintenance passage and pedestrian passage;

[0027] Specifically in S1, 1) familiarize yourself with the design documents and do a good job of on-site investigation; 2) establish a survey control network; 3) re-survey the original landform; 4) remove obstacles and topsoil in the construction area; 5) lay temporary access roads in the construction area; 6) transport materials, machinery and equipment to the site along the temporary access roads;

[0028] Specifically in S2, 1) the positions of the wooden piles on both sides of the slope top are positioned and laid out, and the gray lines are sprinkled; 2) the construction personnel, wooden piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the supporting wooden piles on both sides of the slope top. The number and spacing of wooden piles are implemented according to the design requirements, and the pressing order is followed from the outside to the inside;

[0029] Specifically, in S3, 1) according to the depth of the foundation pit, two excavators with appropriate arm lengths are selected for cooperation in excavation; 2) when excavating the foundation pit, the excavation is divided into two layers, one excavator excavates the earth in the foundation pit, and the other excavates the earth on the top of the foundation pit. According to the design elevation and slope requirements, the excavation is carried out to the bottom elevation of the first layer, that is, the elevation of the supporting wooden piles at the waist of the slope;

[0030] Specifically in S4, 1) the pile positions at the waist of the slope are positioned and laid out, and the gray line is spread out; 2) construction personnel, wood piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the wood piles supporting the waist of the slope, and the wood piles are pressed according to the design requirements;

[0031] Specifically, in S5, according to the design elevation, two excavators are used to cooperate in excavating the second layer of foundation pit. When the excavation reaches a position 20cm above the design elevation from the waist of the foundation pit to the bottom of the pit, the excavator stops excavating and manual excavation is used to reach the design elevation;

[0032] Specifically in S6, 1) after the foundation pit is excavated to the designed bottom elevation, the wood piles on both sides of the slope are positioned and laid out and the lime lines are sprinkled; 2) construction personnel, wood piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the wood piles on both sides of the slope foot support and foundation reinforcement. The wood piles are pressed according to the design requirements of elevation and spacing, and follow the pressing order from outside to inside;

[0033] Specifically, in S7, 1) rough stones with particle sizes that meet the requirements are selected; 2) rough stones are thrown and filled by humans in coordination with mechanical equipment to fill the gaps between the exposed pile tops. During the filling process, it is necessary to ensure that the wooden piles are not squeezed out of the way by the rough stones, and that the gaps between the piles are densely filled and compacted;

[0034] Specifically in S8, 1) the guardrail beam and support beam are laid out and positioned; 2) the beam foundation is leveled and a layer of weathered material is laid; 3) the steel bars are tied; 4) the formwork is supported; 5) the concrete is poured; 6) the concrete is cured; 7) the formwork is removed; 8) the space between the guardrail beam and the support beam is backfilled with original soil or rough stones by manual labor and mechanical equipment, and backfilled to the top elevation of the guardrail beam and the support beam;

[0035] Specifically in S9, 1) the slope of the excavated slope is measured and verified; 2) manual and mechanical equipment are used to shape the slope, requiring the slope surface to be flat and compacted;

[0036] Specifically, in S10, 1) a layer of non-woven fabric is manually laid from the foot of the slope to the top of the slope; 2) a portion of the non-woven fabric on the top of the slope is stretched and pressed under the maintenance passages or sidewalks on both sides of the top of the slope;

[0037] Specifically, in S11, 1) prepare a mixed sand and gravel that meets the requirements; 2) manually lay a mixed sand and gravel cushion layer on the slope non-woven fabric according to the design requirements;

[0038] Specifically in S12, 1) select rough stones with particle size and strength that meet the requirements and transport them to the construction site using small vehicles; 2) manually lay Reno cushions layer by layer from the foot of the slope to the waist of the slope until the designed normal water level elevation;

[0039] Specifically, in S13, 1) the planting soil, fertilizer, and grass seeds are mixed evenly according to the required proportions, manually filled into the vegetation bags, and the openings of the vegetation bags are sealed with a sealing machine; 2) the top of the slope is laid out and a horizontal line is drawn; 3) the filled vegetation bags are manually lifted one by one from the designed normal water level to the slope surface, and the bags are stacked flat in layers with the seams pressed, so as to form a layer of environment suitable for plant growth on the slope surface, and at the same time play the role of slope protection;

[0040] Specifically in S14, 1) the surveyor lays out the positions and elevations of the concrete curbstones and hollow brick footings on both sides of the slope top; 2) manual labor cooperates with mechanical equipment to lay a layer of weathered material on the foundation of the concrete curbstones and hollow brick footings and compacts it; 3) manual masonry of the curbstones and hollow brick footings;

[0041] Specifically in S15, 1) surveyors lay out the elevations of the roadbed, base layer, and surface layer of the maintenance passage and pedestrian walkway on both sides of the slope top; 2) manual labor and mechanical equipment are used to lay the roadbed, base layer, and surface layer in layers, and level and compact them layer by layer.

[0042] As an improvement of the above-mentioned present invention, the support pile (3) is a long rod-shaped body or a long rectangular body component as a whole, and the support pile (3) is a metal product or a wooden product.

[0043] As a further improvement of the above-mentioned present invention, the fixed end of the support pile (3) is needle-shaped or cone-shaped to facilitate insertion into the soil.

[0044] As a further improvement of the present invention, the anchoring layer (4) is a dumped rough stone; the leveling layer (5) is a weathered material layer; and the inspection passage (6) is formed by pouring a filling material, a concrete curbstone, and a concrete hollow brick foot guard together.

[0045] As a further improvement of the above-mentioned present invention, the protective base layer (7) is a non-woven fabric; the protective reinforcement layer (8) is a mixed sand and gravel cushion layer; the lower protective layer (9) is a Reno pad; and the upper protective layer (10) is a vegetation bag.

[0046] The working principle is: during installation and construction, the present invention uses natural wooden piles as supporting piles, which are arranged at the foot, waist and top of the slope respectively, among which the wooden piles at the waist of the slope can be increased or decreased according to the engineering geological conditions; the upper layer of the slope is stacked with Reynolds mats and vegetation bags, among which the Reynolds mats are located below the normal water level, and the vegetation bags are mainly located above the normal water level, and partially below the water level, a mixed sand and gravel cushion layer is arranged in the middle layer, and a layer of non-woven fabric is arranged on the bottom layer; reinforced concrete foot guard beams and support beams are arranged at the foot of the slope, mainly to prevent the Reynolds mats and vegetation bags from slipping; a maintenance passage or road is arranged at the top of the slope; so as to achieve a natural, harmonious, ecological and environmentally friendly effect.

[0047] The present invention is constructed according to the construction steps:

[0048] S1—Construction preparation→S2—Slope top support piles (3) are pressed→S3—First layer foundation pit excavation→S4—Slope waist support piles (3) are pressed→S5—Second layer foundation pit excavation→S6—Slope foot support piles (3) are pressed

[0049] →S7—anchoring layer at the foot of the slope (4) →S8—construction of the support structure (2) →S9—shaping of the slope protection structure (1) →S10—laying of a protective base layer on the slope (7) →S11—laying of a mixed protective reinforcement layer (8) →S12—protective layer below the stack (9) →S13—protective layer above the stack (10) →S14—construction of curbstones at the top of the slope →S15—maintenance passage (6).

[0050] Compared with the prior art, the present invention has the following beneficial effects:

[0051] 1. The present invention improves the naturalness of slope regulation in water ecological management;

[0052] 2. The present invention improves the ecological and environmental protection of water ecological management and slope regulation;

[0053] 3. The present invention solves the problem that the traditional water ecological management slope regulation has poor porosity, cannot provide effective living space for the development of biodiversity, and affects the reproduction of biodiversity;

[0054] 4. The present invention improves the aesthetics of slope regulation in water ecological management;

[0055] 5. The present invention adopts natural wood piles to replace the supporting piles made of traditional industrial products, such as steel bars, cement, fly ash, etc., making full use of the advantages of wood piles such as natural organic, light weight, strong toughness, etc., solving the problems of high construction cost of traditional supporting piles, easy to cause water and soil pollution, heavy weight and easy to sink in soft foundation, difficulty in pile formation in soft foundation, poor toughness, etc.

[0056] 6. The present invention can improve the naturalness, ecological protection, biodiversity, porosity, and aesthetics of water ecological management slopes such as newly built ditches, rebuilt and expanded ditches, lake slope regulation and protection, and river slope regulation and protection. The porous structure is biodiversity, especially the reproduction of microorganisms to build a complete ecosystem;

[0057] 7. The invention solves the problems of poor naturalness, poor ecological and environmental protection, poor porosity, poor aesthetics, and high construction cost of supporting piles made of industrial products, such as traditional reinforced concrete retaining walls or slopes, concrete buried stone retaining walls or slopes, mortar-laid stone retaining walls or slopes, and industrial products such as steel bars, cement, fly ash, etc., which are easy to sink in soft foundations, difficult to pile in soft foundations, and poor toughness. In particular, the poor porosity cannot provide an effective living space for the development of biodiversity, making it difficult to build a complete biodiversity, especially a microbial reproduction ecosystem;

[0058] 8. The present invention is based on the actual situation of slope regulation in water ecological management. Through reasonable design, an ecological and natural slope structure is formed, and the protection effect and ecological management effect are better. At the same time, the construction is convenient and fast, which maximizes the construction safety and improves the construction effect, saving time and effort and realizing efficient construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings, wherein:

[0060] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0061] Figure 2 It is one of the schematic diagrams of the use state of the present invention;

[0062] Figure 3 This is the second usage state diagram of the present invention;

[0063] Figure 4 This is the third schematic diagram of the use state of the present invention;

[0064] Figure 5 This is the fourth schematic diagram of the use state of the present invention;

[0065] Figure 6This is the fifth schematic diagram of the use state of the present invention;

[0066] Figure 7 This is the sixth schematic diagram of the use state of the present invention;

[0067] Figure 8 This is the seventh schematic diagram of the use state of the present invention;

[0068] Fig. 9 This is the eighth schematic diagram of the use state of the present invention;

[0069] Fig.10 This is the ninth schematic diagram of the use state of the present invention;

[0070] Fig.11 This is the tenth schematic diagram of the use state of the present invention;

[0071] Fig.12 This is the eleventh schematic diagram of the use state of the present invention;

[0072] Fig.13 This is the twelfth schematic diagram of the use state of the present invention;

[0073] Fig.14 This is the thirteenth schematic diagram of the use state of the present invention;

[0074] Fig.15 This is the fourteenth schematic diagram of the use state of the present invention;

[0075] Fig.16 This is the fifteenth schematic diagram of the use state of the present invention;

[0076] Fig.17 This is the sixteenth schematic diagram of the use state of the present invention;

[0077] Fig.18 This is the seventeenth schematic diagram of the use state of the present invention;

[0078] Fig.19 This is the eighteenth schematic diagram of the use state of the present invention;

[0079] Fig. 20 yes Fig.19 A schematic diagram of the local enlarged structure of position A shown;

[0080] Fig.21 This is the nineteenth schematic diagram of the use state of the present invention;

[0081] Fig. 22 yes Fig.21 A schematic diagram of the local enlarged structure of position B shown;

[0082] Fig.23 This is the twentieth schematic diagram of the use state of the present invention;

[0083] Fig.24 It is a construction process flow chart of the present invention;

[0084] Among them, the numbers in the figure are: 1-slope protection structure, 2-support structure, 3-support piles, 4-anchoring layer, 5-leveling layer, 6-maintenance passage, 7-protection base layer, 8-protection reinforcement layer, 9-lower protection layer, 10-upper protection layer;

[0085] S1—Construction preparation;

[0086] S2—slope top support pile pressure;

[0087] S3—excavation of the first foundation pit;

[0088] S4—pressure pressing of the support piles at the waist of the slope;

[0089] S5—Excavation of the second foundation pit;

[0090] S6—slope foot support pile pressure;

[0091] S7—slope foot anchoring layer;

[0092] S8—support structure construction;

[0093] S9—slope protection structure shaping;

[0094] S10—a layer of protective base is laid on the slope;

[0095] S11—Laying of mixed protective reinforcement layer;

[0096] S12—protective layer under stacking;

[0097] S13—protective layer on stacking;

[0098] S14—Construction of curbstones on top of slope;

[0099] S15—Maintenance passage or road. DETAILED DESCRIPTION

[0100] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

[0101] A construction method of a slope protection support structure for slope water ecological management as shown in the accompanying drawings of the specification comprises slope protection structures 1 arranged relative to each other and a support structure 2 installed between the two slope protection structures 1, wherein the slope protection structure 1 comprises a slope foot, a slope and a slope top, wherein a plurality of support piles 3 are arranged on the slope protection structure 1, and the support piles 3 are respectively arranged at the slope foot, the slope top and the slope, one end of the slope is connected to the slope foot, and the slope foot is provided with an anchoring layer 4 and a leveling layer 5 in sequence from bottom to top; one end of the slope is connected to the slope top, and a maintenance passage 6 is provided on the slope top, and a protective base layer 7 and a protective reinforcement layer 8 are provided in sequence from bottom to top on the slope, a lower protective layer 9 is provided at the lower part of the protective reinforcement layer 8, and an upper protective layer 10 is provided at the upper part, and the upper protective layer 10 and the lower protective layer 9 are overlapped to form an integrated structure.

[0102] Furthermore, there are two slope protection structures 1 , and the two slope protection structures 1 are symmetrical structures; one end of the supporting structure 2 is overlapped with one of the slope protection structures 1 ; and the other end is overlapped with the other slope protection structure 1 .

[0103] Specifically, the support structure 2 includes a foot guard beam and a support beam, wherein the foot guard beams are two and arranged opposite to each other, and a plurality of support beams are connected between the two foot guard beams.

[0104] In the present invention, the foot guard beam and the support beam are long square components made of solid square steel or solid wood or reinforced concrete, and the foot guard beam and the support beam are connected to form a ladder-like structure.

[0105] Specifically in the present invention, the foot guard beam and the support beam are reinforced concrete foot guard beams and reinforced concrete support beams.

[0106] Furthermore, the supporting pile 3 as a whole is a long rod-shaped body or a long rectangular body component, and the supporting pile 3 is a metal product or a wooden product.

[0107] In the present invention, the support piles 3 are wooden piles, which are arranged at equal or unequal intervals at the bottom of the slope protection structure 1 and pre-buried in the underground soil according to the actual construction situation.

[0108] Specifically, the fixed end of the support pile 3 is needle-shaped or cone-shaped to facilitate insertion into the soil.

[0109] Furthermore, the anchoring layer 4 is a dumped rough stone; the leveling layer 5 is a weathered material layer; and the inspection channel 6 is formed by pouring and assembling a filling material, a concrete curbstone, and a concrete hollow brick foot guard.

[0110] Furthermore, the protective base layer 7 is a non-woven fabric; the protective reinforcement layer 8 is a mixed sand and gravel cushion layer; the lower protective layer 9 is a Reynolds pad; and the upper protective layer 10 is a vegetation bag.

[0111] A construction method for a slope protection support structure for slope water ecological management includes the following construction steps:

[0112] S1, Construction preparation: Make technical preparations, site preparations, and resource allocation according to the design documents.

[0113] Slope top support pile 3 pressing: manual auxiliary mechanical equipment presses the support piles on both sides of the slope top;

[0114] S3, excavation of the first foundation pit: excavating the foundation pit to the waist of the slope by using an excavator;

[0115] S4, pressing the waist support piles 3 of the slope: manual and mechanical equipment press the waist support piles on both sides of the slope;

[0116] S5, excavation of the second foundation pit: excavation is continued with an excavator to 20 cm above the bottom of the foundation pit, and the last 20 cm thick soil layer is excavated manually;

[0117] S6, pressing down the slope foot support piles 3: manual and mechanical equipment are used to press down the slope foot support and foundation reinforcement piles on both sides;

[0118] S7, Anchoring layer 4 at the foot of the slope: Manual and mechanical equipment are used to throw rough stones to fill the gaps between the exposed piles at the top of the piles;

[0119] S8, construction of support structure 2: leveling the foot beam and support beam positions and laying a layer of weathering material, tying steel bars, supporting the formwork, and pouring concrete;

[0120] S9, Slope protection structure 1 shaping: Manual cooperation with excavators to shape and level the slope;

[0121] S10, laying a layer of protective base 7 on the slope surface: artificially laying a layer of non-woven fabric from the foot of the slope to the top of the slope;

[0122] S11, laying a mixed protective reinforcement layer 8: artificially laying a layer of sand and gravel cushion or a mixed sand and gravel cushion on the non-woven fabric of the slope;

[0123] S12, protective layer 9 under the stack: artificially laid Reno mats below the design normal water level on both sides of the slope;

[0124] S13, stacking upper protective layer 10: artificially lay vegetation bags on both sides of the slope above the designed normal water level, and plant grass seeds in the planting soil in the vegetation bags according to a reasonable ratio;

[0125] S14, Construction of curbstones on the top of the slope: Construction of concrete curbstones and hollow brick footing on both sides of the top of the slope;

[0126] S15, Maintenance channel 6: Manual and mechanical equipment are used to lay the maintenance channel and pedestrian channel.

[0127] Specifically in S1, 1) familiarize yourself with the design documents and do a good job of on-site investigation; 2) establish a survey control network; 3) re-survey the original landform; 4) remove obstacles and topsoil in the construction area; 5) lay temporary access roads in the construction area; 6) transport materials, machinery and equipment to the site along the temporary access roads;

[0128] Specifically in S2, 1) the positions of the wooden piles on both sides of the slope top are positioned and laid out, and the gray lines are sprinkled; 2) the construction personnel, wooden piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the supporting wooden piles on both sides of the slope top. The number and spacing of wooden piles are implemented according to the design requirements, and the pressing order is followed from the outside to the inside;

[0129] Specifically in S3, 1) according to the depth of the foundation pit, select two excavators with appropriate arm lengths to cooperate in excavation; 2) when excavating the foundation pit, it is divided into two layers, one excavator excavates the earth in the foundation pit, and the other excavates the earth on the top of the foundation pit. According to the design elevation and slope requirements, excavation is carried out to the bottom elevation of the first layer, that is, the elevation of the supporting wooden piles at the waist of the slope;

[0130] Specifically in S4, 1) the pile positions at the waist of the slope are located and laid out, and the gray line is spread out; 2) construction personnel, wooden piles and mechanical equipment are in place; 3. Manual labor cooperates with mechanical equipment to press down the waist of the slope, that is, the first layer of foundation pit slope foot support wooden piles, and the wooden piles are pressed down according to the design requirements.

[0131] Specifically, in S5, according to the design elevation, two excavators are used to cooperate in excavating the second layer of foundation pit. When the excavation reaches a position 20cm above the design elevation from the waist of the foundation pit to the bottom of the pit, the excavator stops excavating and manual excavation is used to reach the design elevation;

[0132] Specifically in S6, 1) after the foundation pit is excavated to the designed bottom elevation, the wooden piles on both sides of the slope are positioned and laid out and the ash lines are sprinkled; 2) construction personnel, wooden piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press down the wooden piles on both sides of the slope support and foundation reinforcement. The wooden piles are pressed down according to the design elevation and spacing requirements, following the pressing order from outside to inside.

[0133] Furthermore, specifically in S7, 1) rough stones with particle sizes meeting the requirements are selected; 2) rough stones are thrown and filled manually with mechanical equipment to fill the gaps between the exposed piles at the top of the piles. During the filling process, it is necessary to ensure that the wooden piles are not squeezed by the rough stones, and the gaps between the piles are densely filled and compacted.

[0134] Specifically in S8, 1) the guardrail beam and support beam are laid out and positioned; 2) the beam foundation is leveled and a layer of weathered material is laid; 3) the steel bars are tied; 4) the formwork is supported; 5) the concrete is poured; 6) the concrete is cured; 7) the formwork is removed; 8) the space between the guardrail beam and the support beam is backfilled with original soil or rough stones by manual labor and mechanical equipment, and backfilled to the top elevation of the guardrail beam and the support beam;

[0135] Specifically in S9, 1) the slope of the excavated slope is measured and verified; 2) manual and mechanical equipment are used to shape the slope, requiring the slope surface to be flat and compacted;

[0136] Specifically, in S10, 1) a layer of non-woven fabric is manually laid from the foot of the slope to the top of the slope; 2) a portion of the non-woven fabric on the top of the slope is stretched and pressed under the maintenance passages or sidewalks on both sides of the top of the slope;

[0137] Specifically, in S11, 1) prepare a mixed sand and gravel that meets the requirements; 2) manually lay a mixed sand and gravel cushion layer on the slope non-woven fabric according to the design requirements;

[0138] Specifically in S12, 1) select rough stones with particle size and strength that meet the requirements and transport them to the construction site using small vehicles; 2) manually lay Reno cushions layer by layer from the foot of the slope to the waist of the slope until the designed normal water level elevation;

[0139] Specifically, in S13, 1) the planting soil, fertilizer and grass seeds are mixed evenly according to the required proportions, manually filled into the vegetation bags, and the openings of the vegetation bags are sealed with a sealing machine; 2) the top of the slope is laid out and a horizontal line is drawn; 3) the filled vegetation bags are manually lifted one by one from the waist of the slope at the designed normal water level to the slope surface, and the bags are stacked flat in layers with the seams pressed, so as to form a layer of environment suitable for plant growth on the slope surface, and at the same time play the role of slope protection;

[0140] Specifically in S14, 1) the surveyor lays out the positions and elevations of the concrete curbstones and hollow brick footings on the top of the slope on both sides; 2) manual labor cooperates with mechanical equipment to lay a layer of weathered material on the base of the concrete curbstones and hollow brick footings to level and compact it; 3) manual masonry of the curbstones and hollow brick footings.

[0141] Specifically in S15, 1) surveyors lay out the elevations of the roadbed, base layer, and surface layer of the maintenance passage and pedestrian walkway on both sides of the slope top; 2) manual labor and mechanical equipment are used to lay the roadbed, base layer, and surface layer in layers, and level and compact them layer by layer.

[0142] In the present invention, the connection or overlap referred to is a fixed connection or a movable connection or a detachable connection, wherein the fixed connection is a binding connection, a welding connection or is directly processed into an integrally formed structure; the movable connection or detachable connection is a hinged connection, an internal and external threaded connection, a bayonet connection, a plug-in socket connection or a bolt assembly connection or a screw connection.

[0143] Meanwhile, in the present invention, all concrete or fillers mentioned are mainly earthwork, concrete and the like.

[0144] The present invention forms a natural, harmonious, ecological and environmentally friendly water ecological management slope through on-site investigation, design and construction, using wooden pile support, Reno mat stacking, vegetation bag stacking and other settings, so as to solve the technical problems of poor naturalness of the traditional water ecological management slope structure, poor ecological and environmental protection, poor porosity affecting the reproduction of biodiversity, poor aesthetics, and shortcomings of industrial support piles.

[0145] Finally, it should be noted that the above is only a preferred embodiment of the present invention, and does not limit the present invention in other forms. Any technician familiar with the profession may use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.

Claims

1. A construction method for a slope protection support structure for slope water ecological management, characterized in that: It comprises slope protection structures (1) arranged opposite to each other and a support structure (2) installed between the two slope protection structures (1), wherein the slope protection structure (1) comprises a slope foot, a side slope and a slope top, wherein a plurality of support piles (3) are arranged on the slope protection structure (1), and the support piles (3) are arranged at the slope foot, the slope top and the side slope respectively, one end of the side slope is connected to the slope foot, and an anchoring layer (4) and a leveling layer (5) are arranged in sequence from bottom to top at the slope foot; one end of the side slope is connected to the slope top, and an inspection channel (6) is arranged on the slope top, and a protective base layer (7) and a protective reinforcement layer (8) are arranged in sequence from bottom to top on the side slope, a lower protective layer (9) is arranged at the lower part of the protective reinforcement layer (8), and an upper protective layer (10) is arranged at the upper part, and the upper protective layer (10) and the lower protective layer (9) are overlapped to form an integrated structure; There are two slope protection structures (1), and the two slope protection structures (1) are symmetrical structures; one end of the support structure (2) is overlapped with one of the slope protection structures (1); and the other end is overlapped with the other slope protection structure (1); The support structure (2) comprises a foot guard beam and a support beam, wherein the foot guard beams are two beams arranged opposite to each other, and a plurality of support beams are connected between the two foot guard beams; The construction method of the slope protection support structure for slope water ecological management includes the following construction steps: S1, Construction Preparation: Make technical preparation, site preparation and resource allocation according to the design documents; S2, Slope top support piles (3) Pressing down: Manually assisted mechanical equipment presses down the support piles on both sides of the slope top; S3, excavation of the first foundation pit: excavating the foundation pit to the waist of the slope by using an excavator; S4, Slope waist support piles (3) pressing: manual and mechanical equipment press the waist support piles on both sides of the slope; S5, excavation of the second foundation pit: excavation is continued with an excavator to 20 cm above the bottom of the foundation pit, and the last 20 cm thick soil layer is excavated manually; S6, Slope foot support piles (3) are pressed: manual and mechanical equipment are used to press the slope foot support and foundation reinforcement piles on both sides; S7, Anchoring layer at the foot of the slope (4): Manual and mechanical equipment are used to dump rough stones to fill the gaps between the exposed pile tops; S8, Support structure (2) construction: level the foot beam and support beam positions and lay a layer of weathering material, tie the steel bars, support the formwork, and pour concrete; S9, Slope protection structure (1) Shaping: Manual cooperation with excavators to shape and level the slope; S10, laying a protective base layer (7) on the slope surface: artificially laying a layer of non-woven fabric from the slope foot to the slope top; S11, laying a mixed protective reinforcement layer (8): artificially laying a layer of sand and gravel cushion or a mixed sand and gravel cushion on the non-woven fabric on the slope; S12, protective layer under the stack (9): artificially laid Reno mats below the design normal water level on both sides of the slope; S13, upper protective layer of the stack (10): artificially lay vegetation bags above the designed normal water level on both sides of the slope, and plant grass seeds in the planting soil in a reasonable ratio in the vegetation bags; S14, Construction of curbstones on the top of the slope: Construction of concrete curbstones and hollow brick footing on both sides of the top of the slope; S15, maintenance passage (6): manual labor and mechanical equipment are used to lay the maintenance passage and pedestrian passage; Specifically in S1, 1) familiarize yourself with the design documents and do a good job of on-site investigation; 2) establish a survey control network; 3) re-survey the original landform; 4) remove obstacles and topsoil in the construction area; 5) lay temporary access roads in the construction area; 6) transport materials, machinery and equipment to the site along the temporary access roads; Specifically in S2, 1) the positions of the wooden piles on both sides of the slope top are positioned and laid out, and the gray lines are sprinkled; 2) the construction personnel, wooden piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the supporting wooden piles on both sides of the slope top. The number and spacing of wooden piles are implemented according to the design requirements, and the pressing order is followed from the outside to the inside; Specifically, in S3, 1) according to the depth of the foundation pit, two excavators with appropriate arm lengths are selected for cooperation in excavation; 2) when excavating the foundation pit, the excavation is divided into two layers, one excavator excavates the earth in the foundation pit, and the other excavates the earth on the top of the foundation pit. According to the design elevation and slope requirements, the excavation is carried out to the bottom elevation of the first layer, that is, the elevation of the supporting wooden piles at the waist of the slope; Specifically in S4, 1) the pile positions at the waist of the slope are positioned and laid out, and the gray line is spread out; 2) construction personnel, wood piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the wood piles supporting the waist of the slope, and the wood piles are pressed according to the design requirements; Specifically, in S5, according to the design elevation, two excavators are used to cooperate in excavating the second layer of foundation pit. When the excavation reaches a position 20cm above the design elevation from the waist of the foundation pit to the bottom of the pit, the excavator stops excavating and manual excavation is used to reach the design elevation; Specifically in S6, 1) after the foundation pit is excavated to the designed bottom elevation, the wood piles on both sides of the slope are positioned and laid out and the lime lines are sprinkled; 2) construction personnel, wood piles and mechanical equipment are in place; 3) manual labor cooperates with mechanical equipment to press the wood piles on both sides of the slope foot support and foundation reinforcement. The wood piles are pressed according to the design requirements of elevation and spacing, and follow the pressing order from outside to inside; Specifically, in S7, 1) rough stones with particle sizes that meet the requirements are selected; 2) rough stones are thrown and filled by humans in coordination with mechanical equipment to fill the gaps between the exposed pile tops. During the filling process, it is necessary to ensure that the wooden piles are not squeezed out of the way by the rough stones, and that the gaps between the piles are densely filled and compacted; Specifically in S8, 1) the guardrail beam and support beam are laid out and positioned; 2) the beam foundation is leveled and a layer of weathered material is laid; 3) the steel bars are tied; 4) the formwork is supported; 5) the concrete is poured; 6) the concrete is cured; 7) the formwork is removed; 8) the space between the guardrail beam and the support beam is backfilled with original soil or rough stones by manual labor and mechanical equipment, and backfilled to the top elevation of the guardrail beam and the support beam; Specifically in S9, 1) the slope of the excavated slope is measured and verified; 2) manual and mechanical equipment are used to shape the slope, requiring the slope surface to be flat and compacted; Specifically, in S10, 1) a layer of non-woven fabric is manually laid from the foot of the slope to the top of the slope; 2) a portion of the non-woven fabric on the top of the slope is stretched and pressed under the maintenance passages or sidewalks on both sides of the top of the slope; Specifically, in S11, 1) prepare a mixed sand and gravel that meets the requirements; 2) manually lay a mixed sand and gravel cushion layer on the slope non-woven fabric according to the design requirements; Specifically in S12, 1) select rough stones with particle size and strength that meet the requirements and transport them to the construction site using small vehicles; 2) manually lay Reno cushions layer by layer from the foot of the slope to the waist of the slope until the designed normal water level elevation; Specifically, in S13, 1) the planting soil, fertilizer, and grass seeds are mixed evenly according to the required proportions, manually filled into the vegetation bags, and the openings of the vegetation bags are sealed with a sealing machine; 2) the top of the slope is laid out and a horizontal line is drawn; 3) the filled vegetation bags are manually lifted one by one from the designed normal water level to the slope surface, and the bags are stacked flat in layers with the seams pressed, so as to form a layer of environment suitable for plant growth on the slope surface, and at the same time play the role of slope protection; Specifically in S14, 1) the surveyor lays out the positions and elevations of the concrete curbstones and hollow brick footings on both sides of the slope top; 2) manual labor cooperates with mechanical equipment to lay a layer of weathered material on the foundation of the concrete curbstones and hollow brick footings and compacts it; 3) manual masonry of the curbstones and hollow brick footings; Specifically in S15, 1) surveyors lay out the elevations of the roadbed, base layer, and surface layer of the maintenance passage and pedestrian walkway on both sides of the slope top; 2) manual labor and mechanical equipment are used to lay the roadbed, base layer, and surface layer in layers, and level and compact them layer by layer.

2. The construction method of a slope protection support structure for slope water ecological management according to claim 1 is characterized by: The support pile (3) is a long rod-shaped body or a long square body component as a whole, and the support pile (3) is a metal product or a wooden product.

3. The construction method of a slope protection support structure for slope water ecological management according to claim 2 is characterized in that: The fixed end of the support pile (3) is needle-shaped or cone-shaped to facilitate insertion into the soil.

4. The construction method of a slope protection support structure for slope water ecological management according to claim 1 is characterized in that: The anchoring layer (4) is a dumped rough stone; the leveling layer (5) is a weathered material layer; and the inspection passage (6) is formed by pouring a filling material, a concrete curbstone, and a concrete hollow brick foot guard together.

5. The construction method of a slope protection support structure for slope water ecological management according to claim 1 is characterized in that: The protective base layer (7) is a non-woven fabric; the protective reinforcement layer (8) is a mixed sand and gravel cushion layer; the lower protective layer (9) is a Reno pad; and the upper protective layer (10) is a vegetation bag.