Device for analyzing the current in an electrical consumer and electrical consumer having such a device

By using parallel circuits and artificial intelligence technology to analyze the current changes in the load branch in electric vehicles, the problem of difficulty in detecting load branch faults in electric vehicles in the prior art is solved, and accurate diagnosis of faults and reduction of EMV radiation is achieved.

CN113614550BActive Publication Date: 2024-11-19ELMOS SEMICON AG
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202080022646.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-03-20
Filing Date
2020-03-19
Publication Date
2024-11-19
Estimated Expiration
2040-03-19

AI Technical Summary

Technical Problem

The prior art is difficult to effectively analyze and diagnose load branch faults of multi-phase electrical consumers in electric vehicles, especially under large ohm loads, the fault status is difficult to distinguish from normal operation, and there is a problem of increased EMV radiation with higher energy .

Method used

Using a device, the device includes a parallel circuit, a control unit, a current measuring device, a detector and an analysis unit, detects the on and off signals of the switching element by measuring and analyzing the current changes in the load branch, and uses time correlation Methods such as nature and mathematical derivatives are used to detect faults, and combined with artificial intelligence tools for data processing and diagnosis.

Benefits of technology

It realizes fault detection and diagnosis of multi-phase electrically consumed load branches, reduces EMV radiation, improves the safety and reliability of the system, and can promptly identify safety-related failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113614550B_ABST
    Figure CN113614550B_ABST
Patent Text Reader

Abstract

A device for analyzing the current in an electrical consumer, the device being equipped with: a current measuring device that can be connected in series with a parallel circuit of a load branch of the electrical consumer, for measuring the current flowing through the parallel circuit; and a detector for detecting a change in the current when or due to the switching element of the load branch being switched on or off. The device also has an analysis unit that is connected to the control unit and the detector, and analyzes the time correlation of the control signal for switching on or off the switching element of the load branch with the detection of the change in the current due to switching on and / or switching off the relevant switching element; and / or analyzes the change in the current at multiple time points when the relevant switching element of a load branch or the switching elements of multiple and in particular all load branches are switched on and / or off.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Cross-references

[0002] This patent application claims the priority of German patent application 10 2019 107 135.6 of March 20, 2019, the content of which is hereby incorporated by reference into the subject matter of the present patent application. Technical Field

[0003] The invention relates to a device for switching a plurality of loads by means of switching elements. Background Art

[0004] With the development of electric vehicles, the safe control of electrical consumers in vehicles is becoming increasingly important. Especially in the case of high-ohmic loads, fault states cannot always be clearly distinguished from normal operation. In addition, due to the higher energy, EMC radiation increases. However, the invention can also be used in other areas. The invention proposed here also includes the use of AI technology for controlling such devices.

[0005] In the prior art, there are a series of Figure 1 system of structure.

[0006] Figure 1 The schematic diagram shows a circuit having a plurality of, that is to say n, load branches (where n is a positive integer greater than or equal to 1), loads RL1 to RLn of which are connected via switching elements T1 to T n , here exemplarily, a switching signal generating unit CTR of n transistors is periodically turned on and off to control the average power of these loads.

[0007] n switching elements T1 to T n Corresponding control signals G1 to Gn are obtained. The n control signals G1 to Gn are generated in corresponding switching signal generating units CTR. Usually, the control signals G1 to Gn are generated by the switching signal generating units CTR in a time-shifted manner relative to each other, so as to produce an average power consumption at the power supply V that is as constant as possible.

[0008] In accordance with Figure 1 In systems with parallel load branches, there is usually a common current measuring element Z between the star point SP of the parallel load branches and the reference potential GND. g The current measurement element Z g For example, it is used to measure the average power consumption of the electrical consumer in the form of the power consumption measurement value of the current measurement signal MS. gThe real-time control is usually used to carry out a targeted measurement of the power consumption of the individual load branches for control purposes during an actuation cycle at a predefinable phase position of the measuring point.

[0009] Applications of such systems are, for example, multiphase DC / DC converters, glow plug controllers for a plurality of glow plugs or also electric heaters with a plurality of heating elements.

[0010] Typically, in addition to the amplifier OP1 , the current measurement path also contains a low-pass filter in order to eliminate interference in the measurement signal that is generated by the switching edges.

[0011] A method for the time-controlled operation of at least two electrical consumers according to a time schedule is known from DE-A-100 41 880. A method for load distribution of electrical consumers is known from EP-A-0 198 222.

[0012] DE-A-10 2020 033 633 discloses a switch-on control method and a switch-on control device.

[0013] None of these publications describe technical teachings for fault identification, analysis and / or diagnosis. Summary of the invention

[0014] The object of the present invention is to specify a simplified device for evaluating the current in a load branch of a multi-phase load.

[0015] In order to achieve this object, the invention proposes a device for analyzing the current in an electrical consumer, the electrical consumer being equipped with:

[0016] - a parallel circuit consisting of multiple load branches,

[0017] wherein each load branch has an electrical load and a controllable switching element which can selectively switch the electrical load on or off, and

[0018] an actuation unit for generating actuation signals for the switching elements,

[0019] The device is equipped with:

[0020] a current measuring device connectable in series with the parallel circuit of the load branches of the electrical consumer for measuring the current flowing through the parallel circuit;

[0021] - a detector for detecting a change in the current when or as a result of switching on or off a switching element of the load branch; and

[0022] an analysis unit connected to the control unit and the detector, and

[0023] - evaluating a control signal for switching on or switching off a switching element of a load branch in relation to the time correlation of the detection of a change in the current resulting from switching on and / or switching off the relevant switching element,

[0024] and / or

[0025] - analyzing the course of this current at a plurality of points in time when the relevant switching element of a load branch or the switching elements of a plurality and in particular all load branches are switched on and / or off.

[0026] The device according to the invention has a common current measuring device for a plurality of load branches of a parallel circuit of a multi-phase consumer, with which the current flowing through the parallel circuit can be determined in each case by means of measurement technology. In this case, the load branches are periodically switched on and off, wherein changes in the total current are usually obtained, which changes can be detected by means of a detector. The analysis unit receives information from a control unit and from the detector, which generates switching-on and switching-off signals for the switching elements of the load branches. Based on the time correlation of the switching-on and switching-off of one or more of the switching elements with the detection of the change in the total current, it is now possible to check whether the consumer is operating normally or faultily. Alternatively or additionally, the check can also be performed by analyzing the changes in the current at a plurality of time points when one or more switching elements of the consumer are switched on and off.

[0027] The time-dependent change between switching on a load branch (or also switching off the load branch) and the change in the current detected by the detector can indicate a change in the operation or state of the consumer. For example, aging of components of the consumer or mechanical wear of the consumer or of an actuator driven by the consumer can be detected based on such a check. The change in the total current when switching on and / or switching off the load branch should follow a specific signal waveform pattern. If there is a deviation from this pattern, this is also a sign of a change in the consumer.

[0028] Thus, for example, it is advantageous if the evaluation unit evaluates the change in the current with respect to its temporal waveform and / or evaluates the time-dependent change of the control signal for switching on or off a switching element of a load branch with respect to the detection of the change in the current caused by switching on and / or switching off the relevant switching element. In this respect, the checks that can be performed on a plurality of parameters describing the time dependence and / or the change in the signal waveform of the current are varied and in particular application-dependent. The use of "artificial intelligence" to perform all these checks also allows new types of changes to be taken into account.

[0029] In another advantageous embodiment of the invention, the evaluation unit can also evaluate, for example, first-order and / or second-order and / or higher-order mathematical derivatives of the change in the current and / or integrals over the change in the current and / or the magnitude and direction of the change in the current.

[0030] It is particularly advantageous to carry out the analysis with the aid of currently known and future developed "artificial intelligence" tools. In one advantageous embodiment of the invention in this respect, the analysis unit has a data processing unit which, based on a database in which data are stored about which events related to the operation of the load are to be associated with different results of the analysis of the analysis unit, forms actuation signals for a switching element of a load branch of the load or for an actuation unit of the load according to a statistical model, in particular an HMM model or an artificial neural network model, and / or signals when the analysis performed by the analysis unit indicates that the load may be faulty or is actually faulty.

[0031] In a further advantageous embodiment of the invention, the invention is directed to a design of the current measuring device which is as simple and inexpensive as possible. If the current measuring device has a measuring inductance, or a measuring inductance is arranged in series with the current measuring device in addition to the current measuring device, the detector can detect changes in the current as interference pulses formed through or at or due to the measuring inductance, taking into account its polarity.

[0032] According to this variant of the invention, in order to achieve the above-mentioned object, a device for analyzing the current in an electrical consumer is used, which is equipped with:

[0033] - a parallel circuit consisting of multiple load branches,

[0034] wherein each load branch has an electrical load and a controllable switching element which can selectively switch the electrical load on or off, and

[0035] - an actuation unit for generating actuation signals for the switching elements,

[0036] The device is equipped with:

[0037] a measuring inductor connectable in series with the parallel circuit of the load branches of the electrical consumer;

[0038] - a detector for detecting the size and polarity of interference pulses formed when the load branch is switched on or off by measuring the inductance; and

[0039] an evaluation unit which is connected to the control unit and the detector and which evaluates the time dependence of the control signal for switching on or off the switching element of the load branch on the detection of interference pulses caused by or at or due to the measuring inductance and their polarity.

[0040] In the present invention, a complex measuring impedance with ohmic, mostly parasitic and capacitive and / or inductive components is used, which is connected between the series circuit formed by the load branch of the consumer and either the supply voltage or a reference potential (e.g. ground). Usually, a current measuring device, in particular in the form of a shunt resistor, is located in this area.

[0041] The measuring impedance used according to the invention preferably has a measuring inductance which causes interference pulses to form at the measuring inductance when one of the load branches is switched on, without the other load branch being switched off at the same time. In other words, when a voltage drop is to be detected at the measuring inductance, a voltage drop pulse is detected. The reason for this is that since the measuring impedance usually includes a parasitic ohmic resistance component, a corresponding voltage drop is formed. Even when a capacitive component of the measuring impedance is used, interference pulses are formed when switching on and off.

[0042] It is now possible to analyze whether and how the interference pulses at the measuring inductance are time-dependent on the switch-on or switch-off signal of the switching element of the load branch for the electrical consumer. In this case, for example, in the evaluation unit of the device according to the invention, it is possible to do this: after initialization of the switch-on signal, for example for the switching element, the interference pulses are present at the measuring inductance, more precisely within a predefined time window. It is also possible to check whether the polarity of the interference pulses corresponds to expectations. In the case of an application of the measuring inductance, the interference pulses are positive when the switching element is switched on and negative when the switching element is switched off.

[0043] Then, with all these checks, it can be ascertained whether the electrical consumer is operating normally or with a fault. In the latter case, if necessary, a fault message may be output or the operation of the electrical consumer may be completely stopped just in case.

[0044] Alternatively, it is also possible to evaluate, based on the temporal correlation of the switch-on and switch-off signals for the switching elements with the interference pulses at the measuring inductance, to what extent the switch-on and switch-off signals must be shifted in time in order to comply with certain boundary conditions, such as, for example, EMC radiation. For the purpose of reducing such EMC radiation, it is known to generate a switch-on signal for a switching element of a load branch of a consumer at the same time as a switch-off signal for a switching element of another load branch. In other words, in this case, in an ideal case, no interference pulses would be detected at the measuring impedance. If, however, this should nevertheless occur, this is a sign that the timing of the periodically continuous switch-on and switch-off signals for the switching elements of the individual load branches is not optimal or that other effects are present.

[0045] In another advantageous embodiment of the invention, provision may also be made in particular for the evaluation unit to evaluate whether the interference pulse is greater than a predefined minimum level and / or lies within a range between a predefined minimum level and a predefined maximum level with respect to its value.

[0046] In a further advantageous embodiment of the invention, it can also be provided that the detector is designed as an edge detector for detecting a rising or falling edge of an interference pulse at the measuring inductance, each having a predefined minimum level.

[0047] As mentioned above, in order to measure the current in a single load branch of an electrical consumer, a common current measuring device is sometimes used for all load branches, which is then arranged in series with the parallel circuit of these load branches. For its part, the current measuring device is then connected in series with the measuring inductor.

[0048] As has also been briefly mentioned above, a shunt resistor is usually used as the current measuring device, which has an inductance as a parasitic component, wherein the parasitic inductance of the shunt resistor forms the measuring inductance. That is, in this variant, the inductive part of the shunt resistor, which is parasitic in this respect, is used as the measuring inductance. However, the parasitic capacitive component of the current measuring device can also be used well in order to detect interference pulses that are due to the switching on and off of the switching element of the load branch of the electrical consumer. That is, in this respect, a complex impedance is used in the most general form as the current measuring device, which, in addition to the ohmic component, has parasitic, capacitive and / or inductive components.

[0049] In another advantageous embodiment of the present invention, it can be provided that the analysis unit analyzes whether an interference pulse with a positive polarity exists within a predetermined time window after the switching element of one of the load branches is connected; and / or whether an interference pulse with a negative polarity exists within a predetermined time window after the switching element of one of the load branches is turned off.

[0050] In another advantageous embodiment of the invention, the analysis unit of the device according to the invention may have a diagnostic component, which generates a fault message as long as no interference pulses with positive polarity are present within a predetermined time window after the switching element of one of the load branches is connected and / or no interference pulses with negative polarity are present within a predetermined time window after the switching element of one of the load branches is disconnected.

[0051] In the case of an electrical consumer, wherein the control unit of the electrical consumer controls the switching elements of two load branches that are respectively connected and disconnected continuously and alternately so that the switching element of one of the load branches is turned off simultaneously with the switching element of the other load branch, the evaluation unit according to an advantageous variant of the present invention can analyze: whether there are no interference pulses with positive polarity within a predetermined time window after the switching element of one of the load branches is connected; and / or whether there are no interference pulses with negative polarity within a predetermined time window after the switching element of the other load branch is turned off.

[0052] In the event that an interference pulse with a positive polarity exists within a predetermined time window after the switching element of one of the load branches is connected and / or in the event that an interference pulse with a negative polarity exists within a predetermined time window after the switching element of one of the load branches is connected, in another embodiment of the present invention, the analysis unit controls the switching element control unit to time-shift the control signal for the purpose of simultaneously and alternately connecting and disconnecting and disconnecting the switching elements of the corresponding two load branches of the electrical consumer.

[0053] In another embodiment of the invention, the switch-on control signal of the control unit for switching on the switching element of the load branch may have a rising switching edge, and the switch-off control signal of the control unit for switching off the switching element of the load branch may have a falling switching edge.

[0054] The components of the device according to the invention are usually designed in the form of an integrated circuit and thus form an IC. Such an IC can then advantageously also include the switching elements of the load branches of the electrical load.

[0055] In another advantageous embodiment of the invention, it can be provided that the evaluation unit has a data processing unit which, based on a database in which data are stored about which events are to be respectively associated with different results of the evaluation of the evaluation unit, forms a control signal for a switch element of a load branch of the load or for a control unit of the load according to a statistical model, in particular an HMM model or an artificial neural network model, and / or signals when the evaluation performed by the evaluation unit indicates that the load may be faulty or is actually faulty. That is, in this embodiment of the invention, tools for data / signal analysis and / or data / signal processing are used, as is also implemented within the framework of “artificial intelligence”. With such a data processing unit, as is known in the case of “artificial intelligence”, the basis is a data analysis based on relatively very large amounts of data, which, for example, have been fed to the neural network in the training and learning phase and which was obtained, for example, from experimental tests in the preparatory phase for using the device to analyze the currently existing analysis results. Therefore, within the scope of the present invention, the term "data processing unit" refers to all known and future data / signal analysis and data / signal processing tools, which are understood as "artificial intelligence" in a narrow and broad sense and / or will also be understood as "artificial intelligence" in the future.

[0056] Finally, in order to solve the above-mentioned task, the present invention also proposes an electrical consumer, which has:

[0057] - a parallel circuit consisting of multiple load branches,

[0058] wherein each load branch has an electrical load and a controllable switching element which can selectively switch the electrical load on or off, and

[0059] an actuation unit for generating an actuation signal for the switching element; and the electrical consumer also additionally comprises a device for evaluating a current in a load branch of the electrical consumer according to one of the above-described embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Subsequently, different embodiments of the present invention will be described with reference to the accompanying drawings. Here, in detail:

[0061] Figure 1 The main elements of the control of an electrical consumer having a plurality of load branches are schematically shown, which are connected in parallel and have a common current measuring device assigned to them;

[0062] Figure 2 A first exemplary embodiment of a device according to the invention for analyzing a current in a load branch is shown;

[0063] Figure 3A second exemplary embodiment of the device according to the invention for analyzing a current in a load branch is shown;

[0064] Figure 4 A further embodiment of the device according to the invention for analyzing a current in a load branch is shown;

[0065] Figure 5 The structure of the non-contact current measuring device is schematically shown. The current measuring device can be used as Figures 2 to 4 An alternative to the shunt resistor of the current measuring device of the embodiment;

[0066] Figure 6 An alternative exemplary embodiment of a contactless current measuring device is shown; and

[0067] Figure 7 A circuit is shown for realizing an edge detector which can be used to determine interference pulses at a measuring inductance. DETAILED DESCRIPTION

[0068] Figure 2 A first embodiment of the device according to the invention for analyzing the respective power consumption of a multi-phase consumer VER is shown. The consumer VER has a parallel circuit PA consisting of a plurality of load branches LZW, wherein each load branch LZW has an electrical load RL1, RL2, RL3, RL4, ..., RLn and switching elements T1, T2, T3, T4, ... Tn. A current measuring device Zg is connected to the star point SP of all load branches LZW, which for its part is connected to a reference potential GND. The parallel circuit PA is connected to a power supply V.

[0069] Current measuring device Z g The current measurement signal of Z can be present, for example, via an amplifier OP1 as an amplified measurement signal MS, which is supplied to an evaluation unit ANA. In addition, a detector FD is present, which detects the current measurement signal of the current measuring device Z. g The detection signal FDS provided by the detector FD is also supplied to the analysis unit ANA.

[0070] Furthermore, the evaluation unit ANA receives a signal from the actuation unit ANS for the switching elements T1 , T2 , T3 , T4 , . . . Tn which indicates when (and if appropriate which) the switching element was switched on or off.

[0071] Now, various checks can be performed in the analysis unit ANA, which are used for the analysis or diagnosis of the electrical consumer VER. Here, for example, the time correlation of the activation of one of these switching elements T1, T2, T3, T4, ... Tn with the occurrence of the detection signal FDS is important. In addition, the form (time waveform) of the detection signal FDS can also be included in these checks. Not only this time correlation, but also the detection signal waveform should vary within the corresponding tolerance, so that, for example, the normal operation of the electrical consumer VER can be diagnosed and also fault situations can be diagnosed.

[0072] according to Figure 2 The device can also be expanded as follows: Figure 3 As shown in , the time points for switching on and / or off these individual switching elements are influenced by the analysis in the analysis unit ANA. This may be necessary due to manufacturing tolerances or due to the aging process of the electrical consumer. From the perspective of reducing EMC radiation, a time shift of the switch-on and switch-off signals for the individual switching elements may also be advantageous. With regard to reducing EMC radiation, the following approach is taken: the switch-off signal for the switch element of one of the load branches LZW occurs simultaneously with the switch-on signal for the switch element of the other load branch LZW. Then, the detector FD should not detect any anomalies, in particular, it should not detect changes in the current waveform. However, if the detector does, this is a sign that the time consistency of the above-mentioned switch-on and switch-off signals does not exist. That is, by means of the device ZFV for time shifting these signals, an optimization or "correction" can be set here. The device ZFV for time shifting receives the control signals from the control unit and shifts these control signals in time relative to each other, more precisely, shifts these control signals in time relative to each other according to the signals received from the analysis unit ANA.

[0073] Subsequently, other design solutions of the present invention are described with further reference to some other figures of the accompanying drawings.

[0074] In a special embodiment, the invention relates in particular to two task settings which are generally found in the prior art.

[0075] Firstly, it should be possible to check whether the switching elements T1 to Tn or the transistors actually switch all n load branches of the n loads RL1 to RLn as well. Such a diagnosis is often required for safety purposes. The diagnosis allows detection of whether a load, such as a heating element, has a high impedance or whether a switching element no longer switches. Without such a detection, subsequent damages could occur which, unfortunately, could lead to personal injury or death due to insufficient protection against this fault situation.

[0076] Secondly, the interference radiation caused by the electrical consumers during operation should be minimized by analyzing the switch-on and switch-off points in time of these individual load branches. The time-shifted switching of the individual loads firstly leads to a reduction in the interference radiation, especially the wired interference, in the low-frequency range, which is usually interpreted as the frequency range of frequencies <1 MHz. Impediments to the reduction of higher-frequency interference in the frequency range >1 MHz may be caused by manufacturing tolerances, for example in the threshold voltages of the switching elements T1 to Tn, but also in the control branches in the form of control signals G1 to Gn that differ slightly from the ideal form, which may lead to the individual load branches showing different characteristics from each other on the one hand and also showing different characteristics for the switch-on and switch-off edges on the other hand.

[0077] The n switching elements T1 to Tn, the switching signal generating unit CTR, the common current measuring device Zg for all n load branches, the current measuring electronics, for example with the amplifier OP1 , and generally further components are preferably integrated monolithically in an integrated circuit IC.

[0078] The aim is to solve these two tasks with as few discrete components as possible outside the integrated circuit IC in order to improve the system cost position.

[0079] By using the Figure 4 structure to solve the above two tasks.

[0080] In this case, use is made of the fact that common current measuring devices usually contain parasitic inductances which are therefore usually not in accordance with the desired inductances. Figure 1 and 4 In the example, the current measuring device Z is in the form of an inductor ML. g Preferably, the current measuring device Z g is an ohmic resistor, that is to say a so-called shunt resistor. g In the case of a typical shunt resistor Sh, the inductance ML is often a value between 5 nH and 10 nH.

[0081] Current measuring device Z g The parasitic inductance ML of the current measuring device Z causes an undesirable effect in the application circuit: at each switching edge of one of the n switching elements T1 to Tn, a brief but relatively strong pulse-like interference of the current measuring signal MS is generated, which preferably reproduces the current measuring signal of the current measuring device Z. g The polarity of this interference depends on: During the switching edge, the current through the current measuring device Z g The current is increasing (that is, the interference is a positive current pulse) or decreasing (that is, the interference is a negative current pulse).

[0082] Beyond the basis Figure 1 The present invention uses an edge detector FD. The edge detector FD detects the edge of the current measuring device Z. g In another embodiment, the edge detector FD can also detect the time point at which a disturbance occurs in the current measurement signal MS. g The edge detector FD is used to determine the polarity of the interference in the current measurement signal MS and thereby the interference in the current measurement signal MS. For example, the edge detector can evaluate the polarity of the interference as "no interference", "positive interference" or "negative interference". An edge detector FD is required in any embodiment of the invention. It is not important whether the invention is to be used for diagnostic purposes, for reducing interference radiation or for both.

[0083] The edge detector FD can be located directly at the current measuring device Z g and can be evaluated, for example, in the current measuring device Z g The edge detector FD can also be located at the output for the current measurement signal MS and evaluate the current measurement signal. However, the latter is only reasonable if the current measurement path with the amplifier OP1 and the possibly present low-pass filter for the current measurement signal MS has a very fast reaction time of typically <1 μs and if the low-pass filter is not present (which would hamper other control purposes).

[0084] The following description of the embodiments of the present invention is divided according to which of the two purposes mentioned above by way of example the respective application is intended to be used. However, an application in which both are combined is also possible.

[0085] diagnosis

[0086] For this purpose, the diagnostic block DIAG is connected to the switching signal generation unit CTR and the edge detector FD. In this case, the diagnostic block DIAG contains the following functionality:

[0087] The switching signal generating unit CTR generates switching events for n switching elements T1 to Tn by means of n control signals G1 to Gn. Now, the switching signal generating unit CTR signals each of these switching events to the diagnostic block DIAG by means of, for example, pulses or, for example, alternating signals. Subsequently, the diagnostic block DIAG starts an activation time interval for a specific first duration. If the edge detector FD detects a disturbance pulse within this first duration, the load branch is also actually switched. If only one switching element of the n switching elements T1 to Tn controlled in the time division multiplexing is switched by the switching signal generating unit CTR, then this switching element and the associated load branch exist and are switched. Thus, the diagnostic block DIAG can evaluate this load branch as "normal" at least from the functional perspective. If the edge detector FD has not detected an edge until the end of the first duration, the switching element of the corresponding load branch has not been switched or the load branch has not been interrupted. Thus, the diagnostic block DIAG usually evaluates the load branch as "faulty", at least from a functional point of view, wherein the diagnostic block usually does not distinguish whether the fault is actually located in the edge detector FD or in the load branch in question, since this is usually not important for a safety-related evaluation. For many applications, this first duration lies in the range of durations of less than 2 μs. However, there are exceptions in the case of special applications (e.g. glow plug control), in which the switching edges are significantly slow and the first duration can therefore also be significantly increased. In this case, the first duration can be, for example, 100 μs or more.

[0088] For the purpose of a plausibility test or to further increase the validity, the polarity of a switching interference pulse can also be taken into account in the evaluation if the edge detector FD detects the polarity of the switching interference pulse.

[0089] In response to a switch-on signal from the switching signal generating unit CTR for one of the n switching elements T1 to Tn, the edge detector FD must detect a positive interference pulse during a first time period and transmit it to the diagnostic block DIAG, for example by means of an edge detector signal FDS.

[0090] In this case, in response to a switch-off signal for one of the n switching elements T1 to Tn, the edge detector FD must detect a negative interference pulse during a first or generally defined predetermined time period and transmit it to the diagnostic block DIAG, for example by means of an edge detector signal FDS.

[0091] It is thus possible to reliably detect a fault state and, if necessary, to initiate an emergency shutdown of the system by means of a safety switch which can be arranged in series with the power supply V or the reference potential GNG.

[0092] Reduction of interference radiation (EME)

[0093] For this purpose, a switching edge shifting block FV for a temporal shifting of the switching edges, ie, of the switching-on and switching-off control signals for the switching elements, is connected upstream or downstream of the switching signal generating unit CTR.

[0094] The following description refers to the edge shift block FV being connected downstream of the switch signal generating unit CTR (see Figure 4 ). Then, the output of the analysis unit FV generates at least a part of the n control signals G1 to Gn for controlling the corresponding switching elements T1 to Tn. Here, two possibilities are proposed for this application:

[0095] 1) Measurement and compensation of delay time

[0096] In this case, the edge shift block FV preferably measures for each individual load branch and preferably for each rising or falling switching edge of a switching element of the respective load branch the difference between the switching control signal of the switching signal generation unit CTR for the relevant switching element and the corresponding interference pulse arriving at the current measuring device Z. g The edge detector FD detects the first delay time between the load branch and ...

[0097] Preferably, the edge shift block FV can determine the shift by means of a statistical signal model, for example a neural network model.

[0098] In this case, the edge translation block FV may include an evaluator which improves the parameters of such a neural network model during operation. In this case, the evaluator strengthens the parameters of such a decision for improving, i.e. reducing the corresponding situation, i.e., for example, interference. In this case, the evaluator weakens the parameters of such a decision of the neural network model which, i.e., for example, worsens the corresponding situation, i.e., increases interference. For this purpose, the evaluator checks the value of the edge detector signal FDS before and after the change with the aid of the neural network model.

[0099] In order to avoid safety-related erroneous training, it is reasonable to set up a safety evaluator, which recognizes and prevents obviously erroneous translations caused by the edge translation block FV or high-probability future erroneous translations of the edge translation block FV, and retrains the neural network model accordingly. For example, translations that exceed a certain time value in value can be prevented. If the edge translation block FV still attempts to perform such a translation, the neural network model is erroneous, and the safety evaluator prevents the edge translation block FV from causing the time translation to exceed the target time range and retrains the neural network model. In order to train the neural network model, reference should be made to the literature on neural network models in the prior art.

[0100] As already described above, the edge shift block FV then uses the measured first delay times in order to shift the control signals G1 to Gn relative to one another so that the actual rising switching edge of the switching element for one load branch always falls on the falling switching edge of another load branch and vice versa. For this purpose, for example, the measured maximum first delay time is used and the switching edges are shifted by the measured maximum first delay time—the time delay of the corresponding edge of the corresponding load branch. Instead of the measured maximum first delay time, a constant time can also be used, which is guaranteed to correspond at least to the measured maximum first delay time.

[0101] 2) Minimize the duration of interruptions

[0102] As long as the switch-off edge of a load branch does not coincide in time with the switch-on edge of another load branch, the edge detector FD observes at least two edges (interference pulses). Since the switching edges themselves are not infinitely short in time, it is possible that a short-term interference signal may form at the edge detector FD, which contains more than just two edges.

[0103] The edge shift block FV measures the second duration of the disturbance and changes the shift of the switching edges of the control signals G1 to Gn in order to either minimize the second duration of the disturbance or numerically (in a mathematical sense) reduce it to a specific value below the first threshold.

[0104] Here, it should be relatively simple to determine the direction (leading or lagging) in which the switching edge must be shifted based on the polarity of the edge of the interference measured by the edge detector. If the first interference edge that occurs is a negative edge, the cut-off edge for the switching element, that is, for the switching element of one of the load branches, occurs in time before the switch-on edge for the other switching element. Therefore, the edge translation block FV must increase the time delay of the cut-off edge or reduce the time delay of the switch-on edge. If the first edge that occurs is a positive edge, the switch-on edge occurs before the cut-off edge. Then, in this opposite case, the edge translation block FV must therefore reduce the time delay of the cut-off edge or increase the time delay of the switch-on edge. If the control target is achieved and the switch-on edge and the cut-off edge are, for example, exactly symmetrical to each other with respect to the measurement results of the edge detector FD, a situation occurs in which the edge detector FD no longer detects the edge. Then, for the edge translation block FV, it is no longer necessary to change the time intervention within the framework of the control. As soon as the control target is no longer met, for example due to changed ambient conditions, the edge detector FD detects a fault edge again and the control by the edge shift block FV can continue.

[0105] Combination of diagnostics and interference radiation reduction

[0106] For this third purpose, the analysis unit may have not only edge translation but also diagnostic functionality ( Figure 4 ) and their functions can be combined with each other.

[0107] For diagnostic purposes, a corresponding refinement can be made. If the rising edge and the falling edge cancel each other and the edge detector FD therefore no longer detects an edge, the diagnostic block DIAG can assume that either both edges occurred or both relevant load branches are normal.

[0108] If, however, both load branches are defective, then in the case of more than two load branches an interfering edge will be detected at another point in time for which the edge shift block FV can no longer perform a correction. It is therefore reasonable for the diagnostic block DIAG to determine and evaluate a successful edge time shift of the edge shift block FV in a subsequent cycle. For this purpose, the edge shift block FV preferably reports corresponding information about this edge shift to the diagnostic block DIAG. Alternatively, of course, the edge shift block FV can also carry out the diagnosis itself.

[0109] In the case where these edges are not ideally cancelled, it is always possible to observe from the disturbance itself whether the two load branches involved are actually switched. To this end, the disturbance detected by the edge detector FD must contain at least one rising disturbance edge and at least one falling disturbance edge (positive and negative interference pulse).

[0110] Implementation of the current measuring device

[0111] The embodiments of the current measuring device listed here serve as examples, but are by no means required to be complete. These embodiments represent the prior art and describe their suitable use within the scope of the present invention. Possible extensions are also described.

[0112] 1) Shunt resistor

[0113] The use of shunt resistors is usually the most cost-effective variant for current measurement. Figure 1 The shunt resistor introduces a parasitic inductance. The use of this inductance as the measurement inductance ML has been described above.

[0114] 2) Non-contact current measurement

[0115] Figure 5 A contactless current sensor according to the prior art is shown. The line whose current is to be measured is guided through a magnetic core, for example a ferrite core. The core serves to bunch the magnetic flux density B. A magnetic core is not absolutely necessary, but is generally advantageous. The method also works without a magnetic core. However, in the case of a magnetic core there are advantages with regard to the measurement sensitivity.

[0116] In the magnetic core (for example, in the gap of the magnetic core) there is a measuring probe for measuring the magnetic field strength H or the magnetic flux density B. This is mostly a Hall element. The first winding 1 is arranged on the magnetic core in order to generate a reverse field to the magnetic field generated by the energized line to be measured. The regulator measures the output signal of the magnetic field probe at the input terminal E and generates a reverse current in the first winding 1, with the purpose of adjusting the magnetic field strength H or the magnetic flux density B in the magnetic core to a value of zero. Then, the value of the reverse current is a measure of the current flowing in the line. The value of the reverse current is provided at another output terminal A either as a current or converted into a voltage, preferably multiplied by a proportional factor. Therefore, the output terminal A provides a current measurement signal MS.

[0117] Due to the inertia of the control, such an assembly is usually not suitable for allowing detection of edges at the output A, as is required for use in the present invention. However, the assembly contributes by its design to a significant increase in the inductance of the line passed through the magnetic core.

[0118] This means that the signal, on the basis of which the edges are to be detected, can be tapped off without any problems at the connection of the line itself, but the edge detection then has to be connected again to the line current.

[0119] However, if the edge detection itself is to be separated from the current path current, then either the voltage at the first winding 1 can be directly measured as a measurement signal for the edge detector FD (this regulator only affects the current and is independent of the voltage), or a Figure 6 For this purpose, a further winding 2 is placed on the magnetic core, the connection ends of which are led directly to the edge detector FD.

[0120] Of course, the further winding 2 can also be placed on another magnetic core, which is independent of the current measuring device and through which the (measuring) line is laid. The further winding 2 can also be implemented as an air coil and be located in a suitable position relative to the measuring line. The further winding can be part of a conductor track of a printed circuit, for example.

[0121] Edge Detector

[0122] According to the prior art, the edge detector FD can be implemented relatively simply, for example using a high-pass filter and comparators CMP1 , CMP2 . Figure 7 Such a simple edge detector FD is shown. A high pass is formed by a capacitor C and a resistor divider R1, R2. The resistor dividers R1, R2 simultaneously determine the equilibrium position (Ruhelage) of the input signal DEF for the two comparators CMP1, CMP2. The reference signals Ref+, Ref- of these comparators are at respective suitable values ​​above and below the equilibrium position. Then, in the case of a rising edge at the input terminal EF of the edge detector FD, the output signal A+ for the rising edge becomes active briefly. In the case of a negative edge at the input terminal EF of the edge detector FD, the output signal A- for the falling edge becomes active briefly. Preferably, the diagnostic block DIAG is associated with the output signal A- for the falling edge and the output signal A+ for the rising edge. In this example, the output signal A- for the falling edge and the output signal A+ for the rising edge jointly form the edge detector signal FDS.

[0123] If the edge detector FD is used purely for diagnostic purposes and not for EME optimization (optimization of the emission characteristic), then perhaps one of the two comparators CMP1 , CMP2 is sufficient and then only one of the two switching edges is processed in the diagnostic block DIAG.

[0124] Features of the invention and / or its variants

[0125] Even though different versions are listed below, according to which the invention can be implemented, individual features of the different versions can be combined with one another if necessary.

[0126] Version 1

[0127] According to this first version of the invention, a device for switching a plurality of loads RL1 to RLn is provided, the device comprising: switching elements T1 to Tn; a switching signal generating unit CTR; a common current measuring device Zg; an edge detector FD; a star point SP; an edge detector signal FDS; and control signals G1 to Gn. The switching elements T1 to Tn are configured and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP, respectively. The current measuring element Zg is a common current measuring device Zg; an edge detector FD; a star point SP; an edge detector signal FDS; and control signals G1 to Gn. The switching elements T1 to Tn are configured and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP, respectively. g is connected between the star point SP and the reference potential GND. The switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn. The current measuring device Z g The current between the star point SP and the reference potential GND is detected and a current measurement value signal is generated. The edge detector FD evaluates the current measurement value signal and detects the presence or absence of an edge if necessary. The edge detector signals the presence of an edge of the current measurement value signal by means of an edge detector signal FDS. The edge detector signal FDS can influence the switching time points of the switching elements T1 to Tn. If necessary, the edge detector signal FDS can also be used in parallel with the fault state detection or as an alternative to the fault state detection.

[0128] In a first embodiment, the device has a first time measuring device that measures a first time period from a state change of at least one generated control signal at a first time point to the start of signaling by means of the edge detector signal FDS and preferably generates a measured value of the first time period.

[0129] In a second refinement, the edge detector signal FDS at least sometimes also includes information about the direction of the detected edge.

[0130] In a third embodiment, the device has a second time measuring device, which can be identical or identical to the first time measuring device. The second time measuring device measures a second duration of the presence of the interference signal measured at the edge detector FD. For the purposes of the present disclosure, the interference signal is a sequence of rising and falling edges within a predetermined first time interval.

[0131] In a fourth embodiment, the device has a time window generator. The time window generator generates a predetermined second time interval when a specific switching signal event occurs in the switching signal generating unit CTR or when there is a certain delay relative to the switching signal event. Usually, this is a signal that occupies a special state within the time interval.

[0132] In a fifth embodiment, the device has a third time measuring device, which can be identical to the first time measuring device and / or the second time measuring device. In this refinement, the current measuring element has an additional output, which reflects the current through the current measuring element. The edge detector FD evaluates the signal of the additional output. The third time measuring device measures a third time period from the start of a state change of at least one generated control signal to the start of an edge detected at the edge detector FD and generates an associated measured value.

[0133] In the sixth embodiment, the detected direction of the edge is also taken into account for measuring the third duration, that is, not all edges are always used in this refinement.

[0134] In a seventh design, the device has a fourth time measuring device, which can be the same as or identical to the first time measuring device and / or the second time measuring device and / or the third time measuring device. In this refinement, the current measuring element has an additional output terminal, which reflects the current passing through the current measuring device. The edge detector FD evaluates the signal of the additional output terminal. The fourth time measuring device measures the second duration of the presence of the interference signal measured at the edge detector FD and generates a corresponding measurement value. In this case, a sequence of rising edges and falling edges within a predetermined first or other time interval is regarded as an interference signal.

[0135] In an eighth embodiment, the device has a fifth time measuring device, which can be the same as the first time measuring device and / or the second time measuring device and / or the third time measuring device and / or the fourth time measuring device. The current measuring device preferably includes a sub-device and / or a plurality of sub-devices, in particular an inductor or a mutual inductor. Current measuring device Z g The sub-device of is preferably suitable and / or arranged to convert a current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD. The fifth time measuring device measures a fifth time period from the beginning of a state change of at least one generated control signal to the beginning of an edge detected at the edge detector FD and generates a corresponding measured value.

[0136] In the ninth design, in order to measure the fifth duration by the fifth time measuring device, the direction of the edge is also taken into account. That is, not all edges are always used in this refinement.

[0137] In a tenth design, the device has a sixth time measuring device, which can be the same as the first time measuring device and / or the second time measuring device and / or the third time measuring device and / or the fourth time measuring device and / or the fifth time measuring device. The current measuring device in turn includes a sub-device and / or a plurality of sub-devices, in particular an inductor or a mutual inductor. Current measuring device Z g The sub-device of is preferably suitable and / or arranged to convert the current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD. The sixth time measuring device measures the sixth duration of the presence of the interference signal measured at the edge detector FD and generates a corresponding measured value. The interference signal in this context is again a sequence of rising and falling edges within a predetermined first or other time interval.

[0138] In an eleventh embodiment, the device has a time window generator. The current measuring device in turn comprises a sub-device and / or a plurality of sub-devices, in particular an inductance or a mutual inductance. g The sub-device of is preferably suitable and / or arranged to convert a current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD. The time window generator generates a predetermined third time interval when a specific switching signal event occurs in the switching signal generating unit CTR or when there is a certain delay relative to the switching signal event.

[0139] In a twelfth embodiment, the device has an analysis unit FV. The analysis unit FV is suitable and / or is configured to delay or time-shift the control signals G1 to Gn or the generation of these control signals according to at least one of the above-mentioned measured durations so that the edge detector FD no longer detects an edge.

[0140] In a thirteenth design option, the device has an analysis unit FV, wherein the analysis unit FV is suitable for and / or is configured to: based on at least one of the measured durations mentioned above, the control signals G1 to Gn or the generation of these control signals is delayed or time-shifted so that the relevant duration is minimized or does not exceed a predetermined time value in terms of value.

[0141] In a fourteenth design option, the device has an analysis unit FV, wherein the analysis unit FV is now suitable and / or configured to: depending on whether the first edge detected by the edge detector FD within a time interval is a positive edge or a negative edge, the switch-on edge or switch-off edge of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn are delayed or advanced in time.

[0142] In a fifteenth refinement, the device has a diagnostic block DIAG, wherein the diagnostic block DIAG generates or provides a fault signal if the edge detector FD does not detect an edge within a time-dependent, predefined time window after a state change of the control signals G1 to Gn.

[0143] In a sixteenth refinement, the device has a diagnostic block DIAG, wherein the diagnostic block DIAG does not generate or provide a fault signal if the edge detector FD does not detect a pair of two temporally consecutive edges within a time-dependent, predefined time window after a state change of the control signals G1 to Gn.

[0144] In a further seventeenth embodiment, the time windows of the signal pairs are exchanged cyclically in order to detect multiple errors.

[0145] In the eighteenth design, the device has an analysis unit FV, wherein the analysis unit FV is suitable and / or configured to delay or advance the switch-on edge or switch-off edge of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time. Now, the analysis unit FV includes a neural network model or other structure, which is an artificial intelligence model and can in particular execute a deep learning method and / or a machine learning method. According to the principles of the present disclosure, the device in this variant includes the mentioned neural network model, which is preferably stored as a software model in a digital memory of the analysis unit FV, for example, and is implemented by a computer, and more preferably, the computer is part of the device. The neural network model with deep learning includes the following software, which can be written by a software designer and can also be publicly available from a series of sources. An application that can be used to create a neural network model named "NVidia Digits" can be obtained under https: / / developer.nvidia.com / digits. NVidia Digits is a high-level user interface that includes a deep learning framework named "Caffe" developed by the Berkeley Vision and Learning Center (http: / / caffe.berkeleyvision.org / ). A list of common deep learning frameworks suitable for use in implementations of the present invention is at https: / / developer.nvidia.com / deep-learning- frameworks Found below.

[0146] In a nineteenth embodiment, the device has a diagnostic block DIAG, wherein the diagnostic block DIAG includes a neural network model. The above-mentioned situations about neural networks, computers, memories, deep learning, machine learning and training methods also apply here.

[0147] In a twentieth design, the input signal of the edge detector FD is separated from the star point SP current.

[0148] Version 2

[0149] According to this second version, the present invention relates to a device for switching a plurality of loads RL1 to RLn, the device comprising: switching elements T1 to Tn, a switching signal generating unit CTR, control signals G1 to Gn, a measuring device and an analyzing unit FV. The switching elements T1 to Tn are established and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP or a reference potential GND, respectively. The switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn. The measuring device detects important operating state data of the device. The analyzing unit FV is suitable for and / or is arranged to delay or advance the switch-on edge or switch-off edge of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time. The analyzing unit FV comprises a neural network model. The analyzing unit FV uses the detected operating state data as input for the neural network model.

[0150] In a first variant of this second version, the device comprises an evaluation block which checks and / or changes parameters of such a neural network model during operation.

[0151] In a second variant of the second version, the device comprises a safety evaluation block which detects and prevents clearly erroneous and possibly safety-relevant changes in the commutation before the commutation is carried out.

[0152] In a third variant of the second version, the safety assessment block changes parameters of the neural network model during operation in the event of an attempted, clearly erroneous and possibly safety-related change of the commutation by means of the neural network model.

[0153] Version 3

[0154] According to the third version, the present invention relates to a device for switching a plurality of loads RL1 to RLn, the device comprising: switching elements T1 to Tn, a switching signal generating unit CTR, control signals G1 to Gn, a measuring device and an analyzing unit FV. The switching elements T1 to Tn are established and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP or a reference potential GND, respectively. The switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn. The measuring device detects operating state data of the device. The analyzing unit FV is suitable for and / or arranged to delay or advance the switch-on edge or switch-off edge of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time. The analyzing unit FV includes a statistical model for calculating a time series pattern and / or for predicting an event sequence. The statistical model can be, for example, a Viterbi or HMM model. Analysis unit FV uses the detected operating state data as input for the statistical model.

[0155] In a first embodiment of the third version, the statistical model is an HMM model or a neural network model.

[0156] In a second refinement of the third version, the device comprises an evaluation block which checks and / or changes parameters of such a statistical model during operation.

[0157] In a third embodiment of the third version, the device comprises a safety evaluation block which detects and prevents clearly erroneous and possibly safety-relevant changes in the commutation before the commutation is carried out.

[0158] In a fourth embodiment of the third version, the safety assessment block changes parameters of the statistical model during operation by means of the statistical model in the event of a tried, clearly erroneous and possibly safety-relevant change of the commutation.

[0159] A preferred detail of the device proposed here relates to a measuring device for measuring the sum current. The measuring device has a conductor, a first winding 1, a second winding 2, a regulator and a magnetic field probe. The conductor and the first winding 1 and the second winding 2 are magnetically connected to each other. In particular, in the event of a change in the magnetic flux density, an induction can be generated in the other component by one of these components. The conductor is arranged and / or is determined as a common measuring device Z gis connected between the star point SP and the reference potential GND so that the sum current can flow from the star point through the conductor to the reference potential GND. The magnetic field probe detects the magnetic field of the current flowing through the conductor and the magnetic fields of these windings as magnetic field measurement values. The regulator generates a regulated reverse current with the help of the magnetic field measurement values, which flows through the first winding 1 and compensates for the magnetic field of the conductor with the help of the first winding 1 with a first time constant. Another second winding 2 is determined and set as a current measuring element Z used as an edge detector FD with a second time constant. g Preferably, the second time constant is smaller than the first time constant.

[0160] Version 4

[0161] According to this fourth version, the invention relates to a device for switching a plurality of loads RL1 to RLn, the device having a sub-device for controlling the loads, wherein the sub-device comprises a statistical model.

[0162] In a first variant of the fourth version, the statistical model is an HMM model or a neural network model or an HMM model or a Petri network.

[0163] Version 5

[0164] A fifth version relates to a corresponding method for operating a device for switching a plurality of loads RL1 to RLn. The device to be operated by the method comprises switching elements T1 to Tn, a star point SP and a reference potential GND. The switching elements T1 to Tn are set up and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP, respectively. The method comprises the steps described below. The first step involves: preferably by means of the current measuring device Z mentioned above g The current from the star point SP to the reference potential GND is detected. Then, based on the detection result determined in this way, the edges in the current from the star point SP to the reference potential GND are detected and the associated information is generated. Then, this information generated in this way is used to operate the device.

[0165] The method thus roughly outlined can then be further refined. Particularly preferably, the mentioned information is used to control the switching elements.

[0166] In another embodiment of the method, the time of the state change of one of the switching elements T1 to Tn depends on the information. For example, the commutation or control of a voltage regulator of a switched mode power supply or a power supply or a motor can be changed in this way.

[0167] In another embodiment of the method, the detection time of at least one edge is changed so that the edge can no longer be detected due to interaction with another edge. This change can be achieved, for example, by shifting the change time of the state of the control signals G1 to Gn of the switching elements T1 to Tn.

[0168] As already mentioned above, in a further refinement this information can also be used in parallel with and / or as an alternative to this for detecting a fault state.

[0169] On the one hand, the invention enables timely detection of safety-related failures. This is particularly important in the case of electric vehicles, where huge energies can lead to huge risks in the event of damage. On the other hand, EMC radiation can also be significantly improved. However, the advantages are not limited to this.

[0170] Alternatively, the invention can also be elaborated by the feature groups mentioned below, wherein these feature groups can be combined with one another as desired and individual features of a feature group can also be combined with one or more features of one or more other feature groups and / or one or more of the previously described embodiments.

[0171] 1. A device for switching a plurality of loads RL1 to RLn, the device comprising:

[0172] - switching elements T1 to Tn, and

[0173] - a switching signal generating unit CTR, and

[0174] - Common current measuring device Z g ,and

[0175] - edge detector FD, and

[0176] - star point SP, and

[0177] - the edge detector signal FDS, and

[0178] - control signals G1 to Gn,

[0179] wherein the switching elements T1 to Tn are set up and arranged to connect and disconnect one or more loads RL1 to RLn to the power source V and / or the star point SP, respectively, and

[0180] - Wherein the current measuring device Z g is connected between the star point SP and the reference potential GND, and

[0181] - wherein the switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn, and

[0182] - Wherein the current measuring device Z g detecting a current between the star point SP and the reference potential GND and generating a current measurement value signal, and

[0183] wherein an edge detector FD evaluates the current measurement value signal, detects the presence or absence of an edge if necessary, and signals the presence of an edge to the current measurement value signal by means of an edge detector signal FDS, and

[0184] wherein the edge detector signal FDS can influence the switching times of the switching elements T1 to Tn and / or be used for fault state detection.

[0185] 2. The device according to claim 1, comprising a first time measuring device, wherein the first time measuring device measures a first time period from a state change of at least one generated control signal at a first point in time to the start of signaling by means of the edge detector signal FDS.

[0186] 3. The device according to point 1 or 2, wherein the edge detector signal FDS at least sometimes also includes information about the direction of the detected edge.

[0187] 4. The device according to one or more of the above points 1 to 3, which has:

[0188] - a second time measuring device,

[0189] wherein the second time measuring device measures a second duration of the presence of the interference signal measured at the edge detector FD,

[0190] wherein the interference signal is a sequence of rising and falling edges within a predetermined first time interval.

[0191] 5. The device according to one or more of the above points 1 to 4, which has:

[0192] -Time window generator,

[0193] wherein the time window generator generates a predefined second time interval when a specific switching signal event occurs in the switching signal generating unit CTR or when there is a certain delay relative to the switching signal event.

[0194] 6. The device according to one or more of the above points 1 to 5, which has:

[0195] - a third time measuring device,

[0196] - wherein the current measuring element has an additional output which reflects the current passing through the current measuring device, and

[0197] wherein an edge detector FD evaluates the signal at the additional output, and

[0198] wherein the third time measuring device measures a third time period from the start of the change in state of at least one generated control signal to the start of the edge detected at the edge detector FD.

[0199] 7. The equipment as referred to in point 6,

[0200] wherein the detected direction of the edge is taken into account for measuring the third duration.

[0201] 8. The device according to one or more of the above points 1 to 7, which has:

[0202] - a fourth time measuring device,

[0203] - wherein the current measuring element has an additional output terminal, which additional output terminal reflects the current passing through the current measuring element, and

[0204] wherein an edge detector FD evaluates the signal at the additional output, and

[0205] wherein the fourth time measuring device measures a fourth duration of the presence of the interference signal measured at the edge detector FD,

[0206] wherein the interference signal is a sequence of rising and falling edges within a predetermined first or other time interval.

[0207] 9. The device according to one or more of the above points 1 to 8, which has:

[0208] - a fifth time measuring device,

[0209] - wherein the current measuring device comprises a sub-device and / or a plurality of sub-devices, in particular an inductance or a mutual inductance, and

[0210] - wherein the current measuring device Z g The sub-device or one of the sub-devices is suitable and / or arranged to convert a current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD, and

[0211] wherein the fifth time measuring device measures a fifth time period from the start of the change in state of at least one generated control signal to the start of the edge detected at the edge detector FD.

[0212] 10. The device as described in point 9,

[0213] - wherein for measuring the fifth duration, the fifth time measuring means takes into account the direction of the edge.

[0214] 11. The device according to one or more of the above points 1 to 10, which has:

[0215] - a sixth time measuring device,

[0216] - wherein the current measuring device comprises a sub-device and / or a plurality of sub-devices, in particular an inductance or a mutual inductance, and

[0217] - wherein the current measuring device Z g The sub-device of is suitable and / or arranged to convert a current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD, and - wherein the sixth time measuring device measures a sixth duration of the presence of the interference signal measured at the edge detector FD, and

[0218] wherein the interference signal is a sequence of rising and falling edges within a predetermined first or other time interval.

[0219] 12. The device according to one or more of the above points 1 to 11, which has:

[0220] -Time window generator,

[0221] - wherein the current measuring device comprises a sub-device and / or a plurality of sub-devices, in particular an inductance or a mutual inductance, and

[0222] - wherein the current measuring device Z g The sub-device or one of the sub-devices is suitable and / or arranged to convert a current change in the line between the star point SP and the reference potential GND into a signal suitable for edge detection by the edge detector FD, and

[0223] wherein the time window generator generates a predefined third time interval when a specific switching signal event occurs in the switching signal generating unit CTR or when there is a certain delay relative to the switching signal event.

[0224] 13. The device according to one or more of the above points 1 to 12, which has:

[0225] - Analytical unit FV,

[0226] wherein the evaluation unit FV is suitable and / or configured to delay or time-shift the control signals G1 to Gn or their generation, depending on at least one of the above-mentioned measured durations, such that the edge detector FD no longer detects an edge.

[0227] 14. The device according to one or more of the above points 1 to 13, which has:

[0228] - Analytical unit FV,

[0229] -Wherein the analysis unit FV is suitable and / or arranged to delay or time-shift the control signals G1 to Gn or the generation of these control signals, depending on at least one of the measured durations mentioned above, so that the relevant duration is minimized or does not exceed a predetermined time value in terms of value.

[0230] 15. The device according to one or more of the above points 1 to 14, comprising:

[0231] - Analytical unit FV,

[0232] - wherein the analysis unit FV is suitable and / or arranged to delay or advance in time the switch-on edges or switch-off edges of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn, depending on whether the first edge detected by the edge detector FD within the time interval is a positive edge or a negative edge.

[0233] 16. The device according to one or more of the above points 1 to 15, comprising:

[0234] - Diagnostic block DIAG,

[0235] The diagnostic block DIAG generates or provides a fault signal if the edge detector FD does not detect an edge within a time-dependent, predefined time window after a state change of the control signals G1 to Gn.

[0236] 17. The device according to one or more of the above points 1 to 16, comprising:

[0237] - Diagnostic block DIAG,

[0238] The diagnostic block DIAG does not generate or provide a fault signal if the edge detector FD does not detect a pair of two temporally consecutive edges within a time-dependent, predefined time window after a state change of the control signals G1 to Gn.

[0239] 18. The device according to claim 17, wherein the time windows of the signal pairs are exchanged cyclically in order to detect multiple errors.

[0240] 19. The device according to one or more of the above points 1 to 18, which has:

[0241] - Analytical unit FV,

[0242] wherein the evaluation unit FV is suitable and / or is designed to delay or advance switching edges or switching edges of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time, and

[0243] - wherein the analysis unit FV comprises a neural network model.

[0244] 20. The device according to one or more of the above points 1 to 19, comprising: a diagnostic block DIAG, wherein the diagnostic block DIAG comprises a neural network model.

[0245] 21. The device according to one or more of the above points 1 to 20, wherein the input signal of the edge detector FD is separated from the star point SP current.

[0246] 22. A device for switching a plurality of loads RL1 to RLn, the device comprising:

[0247] - switching elements T1 and Tn, and

[0248] - a switching signal generating unit CTR, and

[0249] - control signals G1 to Gn, and

[0250] - measuring devices, and

[0251] - Analytical unit FV,

[0252] wherein the switching elements T1 to Tn are set up and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP or a reference potential GND, respectively, and

[0253] - wherein the switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn, and

[0254] - wherein the measuring device detects operating status data of the device, and

[0255] wherein the evaluation unit FV is suitable and / or is designed to delay or advance switching edges or switching edges of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time, and

[0256] - wherein the analysis unit FV comprises a neural network model, and

[0257] - wherein the analysis unit FV uses the detected operating state data as input for the neural network model.

[0258] 23. The device according to point 22, wherein the device comprises an evaluation block which checks and / or changes parameters of such a neural network model during operation.

[0259] 24. The device according to point 22 or 23, wherein the device comprises a safety evaluation block which detects and prevents clearly erroneous and possibly safety-relevant changes in the commutation before the commutation is carried out.

[0260] 25. The device according to point 24, wherein the safety evaluation block changes parameters of the neural network model during operation in the event of an attempted, clearly erroneous and possibly safety-related change of the commutation via the neural network model.

[0261] 26. A device for switching a plurality of loads RL1 to RLn, the device comprising:

[0262] - switching elements T1 and Tn, and

[0263] - a switching signal generating unit CTR, and

[0264] - control signals G1 to Gn, and

[0265] - measuring devices, and

[0266] - Analytical unit FV,

[0267] wherein the switching elements T1 to Tn are set up and arranged to connect and disconnect one or more loads RL1 to RLn to a power supply V and / or a star point SP or a reference potential GND, respectively, and

[0268] - wherein the switching signal generating unit CTR controls the switching elements T1 to Tn using the control signals G1 to Gn, and

[0269] - wherein the measuring device detects operating status data of the device, and

[0270] wherein the evaluation unit FV is suitable and / or is designed to delay or advance switching edges or switching edges of the control signals G1 to Gn and / or other state changes of the control signals G1 to Gn in time, and

[0271] - wherein the analysis unit FV comprises a statistical model for calculating time series patterns and / or for predicting time series, and

[0272] The analysis unit FV uses the detected operating state data as input for the statistical model.

[0273] 27. The device according to point 26, wherein the statistical model is an HMM model or a neural network model.

[0274] 28. The device according to point 26 or 27, wherein the device comprises an evaluation block which checks and / or changes parameters of such a statistical model during operation.

[0275] 29. The device according to one or more of points 26 to 28, wherein the device comprises a safety evaluation block which detects and prevents clearly erroneous and possibly safety-relevant changes in the commutation before the commutation is carried out.

[0276] 30. The device according to point 29, wherein the safety evaluation block changes parameters of the statistical model during operation in the event of a tried, clearly erroneous and possibly safety-related change of the commutation using a statistical model.

[0277] 31. A measuring device for an apparatus according to one or more of the above points 1 to 30, comprising:

[0278] - conductors, and

[0279] - the first winding 1, and

[0280] - a second winding 2, and

[0281] - regulator, and

[0282] - Magnetic field probe,

[0283] - wherein the conductor is in magnetic relationship with the first winding 1 and the second winding 2, and

[0284] - wherein the conductor is arranged and / or defined as a common measuring device Z g is connected between the star point SP and the reference potential GND, and

[0285] - wherein the magnetic field probe detects the magnetic field of the current flowing through the conductor and the magnetic fields of the windings as magnetic field measurement values,

[0286] wherein the regulator generates, by means of the magnetic field measurement, a countercurrent flowing through the first winding 1, which countercurrent compensates for the magnetic field of the conductor by means of the first winding having a first time constant, and

[0287] wherein the second winding 2 is determined and arranged to be used as a current measuring device Z for the edge detector FD with a second time constant g ,as well as

[0288] - wherein the second time constant is smaller than the first time constant.

[0289] 32. A device for performing switch control on a plurality of loads RL1 to RLn, the device comprising:

[0290] - sub-devices for controlling these loads,

[0291] - wherein the sub-device comprises a statistical model, and

[0292] -Wherein the statistical model is an HMM model or a neural network model.

[0293] 33. A method for operating a device for switching a plurality of loads RL1 to RLn, the device comprising:

[0294] - switching elements T1 and Tn, and

[0295] - star point SP, and

[0296] - reference potential GND,

[0297] wherein the switching elements T1 to Tn are configured and arranged to connect and disconnect one or more loads RL1 to RLn to the power source V and / or the star point SP, respectively, and

[0298] The method has the following steps:

[0299] - Detecting the current from the star point SP to the reference potential GND;

[0300] - detecting an edge in the current from the star point SP to the reference potential GND and generating associated information; and

[0301] - use this information for the operation of the device.

[0302] 34. The method according to point 33, wherein the information is used to control the switching elements.

[0303] 35. The method according to claim 34, wherein the time at which the state of one of the switching elements T1 to Tn changes depends on the information.

[0304] 36. The method according to point 35, comprising the step of changing the detection time of at least one edge so that the edge can no longer be detected due to interaction with another edge.

[0305] 37. The method according to one or more of points 33 to 36, comprising the step of using the information to identify a fault state.

[0306] 38. A device for performing switching control on multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; a common current measuring device; and an edge detector at the current measuring element; and a device that measures the time from the start of the switching signal generated at the control position to the start of the edge detected at the edge detector.

[0307] 39. The device according to point 38, wherein the direction of the edge is additionally taken into account or ascertained.

[0308] 40. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at the current measuring element; and the following device, which measures the duration of an interference signal measured at the edge detector, wherein the interference signal is a short sequence of rising edges and falling edges.

[0309] 41. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; an edge detector at the current measuring element; and the following device, which generates a time window when a specific switching signal event occurs at the switching signal generating device or when there is a certain delay relative to the switching signal event, and the time window ends again after a certain time.

[0310] 42. A device for performing switching control on multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at an additional output end of the current measuring element; and the following device, which measures the time from the start of the switching signal generated at the control position to the start of the edge detected at the edge detector.

[0311] 43. The device according to point 42, wherein the direction of the edge is additionally taken into account or ascertained.

[0312] 44. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at an additional output end of the current measuring element; and the following device, which measures the duration of an interference signal measured at the edge detector, wherein the interference signal is a short sequence of rising edges and falling edges.

[0313] 45. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring device; and an edge detector at an additional output end of the current measuring device; and the following device, which generates a time window when a specific switching signal event occurs at the switching signal generating device or when there is a certain delay relative to the switching signal event, and the time window ends again after a certain time.

[0314] 46. ​​A device for performing switching control on multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at an additional element, which is suitable for converting current changes in the line into a signal suitable for edge detection (especially inductance or mutual inductance); and the following device, which measures the time from the start of the switching signal generated at the control position to the start of the edge detected at the edge detector.

[0315] 47. The device according to point 46, wherein the direction of the edge is additionally taken into account or determined.

[0316] 48. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at an additional element, which is suitable for converting current changes in the line into a signal suitable for edge detection (especially inductance or mutual inductance); and the following device, which measures the duration of an interference signal measured at the edge detector, wherein the interference signal is a short sequence of rising edges and falling edges.

[0317] 49. A device for switching multiple loads Load1...Loadn, the device comprising: a switching element; a corresponding switching signal generating device, which controls each switching element with a time shift; and a common current measuring element; and an edge detector at an additional element, which is suitable for converting current changes in the line into a signal suitable for edge detection (especially inductance or mutual inductance); and the following device, which generates a time window when a specific switching signal event occurs at the switching signal generating device or when there is a certain delay relative to the switching signal event, and the time window ends again after a certain time.

[0318] 50. A device according to at least any one of the above points 38, 39, 42, 43, 46 or 47, which has a device for edge shifting according to the measured duration, which delays the switching signal so that differences in delay time caused by, for example, component changes in these switching elements are compensated and the switch-on edge and the switch-off edge fall exactly on each other.

[0319] 51. A device according to at least any one of points 40, 44 or 48, which has a device for edge shifting based on a measured interference signal, wherein the device for edge shifting shifts the switch-on edge and / or switch-off edge so that the measured duration is minimized or does not exceed a predetermined value.

[0320] 52. The device according to point 50, wherein the switch-on edge or switch-off edge time is delayed according to whether the first edge of the interference signal is a positive edge or a negative edge.

[0321] 53. A device according to at least any one of points 38 to 49, which has a diagnostic device that generates a fault signal if an edge detected according to any one of points 38 to 49 does not appear within a predetermined maximum duration or does not appear within a predetermined time window.

[0322] 54. A device according to at least any one of points 38 to 50, which has a diagnostic device that generates a fault signal if an edge determined according to any one of points 38 to 49 does not appear within a predetermined maximum duration or does not appear within a predetermined time window.

[0323] 55. The device according to point 53, wherein the absence of an edge pair detected by the diagnostic device is evaluated as a normal situation.

[0324] 56. The device according to point 53, wherein the time windows of the signal pairs are exchanged cyclically in order to better detect multiple errors.

[0325] Reference numerals list

[0326] A+ Output of the edge detector for rising edge

[0327] A - Output of edge detector for falling edge

[0328] ANA Analysis Unit

[0329] ANS control unit

[0330] C Capacitor of high-pass filter (DC filter)

[0331] CB Control Bus

[0332] CMP1 First comparator

[0333] CMP2 Second comparator

[0334] CTR Switching signal generation unit for n switching signals of n switches or transistors

[0335] DEF Differential input signal for edge detector

[0336] DIAG diagnostic block

[0337] EF Edge detector input

[0338] FD Edge Detector

[0339] FDS (e.g. edge) detector signal

[0340] FV Edge Translation Block

[0341] G1 Actuation signal for the first switching element

[0342] G2 Actuation signal for the second switching element

[0343] G3 Actuation signal for the third switching element

[0344] G4 Control signal for the fourth switching element

[0345] Gn Control signal for the nth switching element

[0346] GND Reference potential

[0347] IC Integrated Circuit

[0348] LZW load branch

[0349] ML Measuring Inductance

[0350] MS current measurement signal

[0351] OP1 Amplifier

[0352] PA parallel circuit

[0353] Ref+ Reference value for rising edge

[0354] Ref - Reference value for falling edge

[0355] R1, R2 resistor divider

[0356] RL1 is a load in the first load branch switched by the first switching element.

[0357] RL2 is a load in the second load branch switched by the second switching element.

[0358] RL3 A load in a third load branch switched by a third switching element

[0359] RL4 is the load in the nth load branch switched by the fourth switching element.

[0360] RLn The load in the first load branch switched by the nth switching element

[0361] SP Star point of n load branches

[0362] Sh Shunt Resistor

[0363] T1 Switching element (transistor) for the first load branch

[0364] T2 Switching element (transistor) for the second load branch

[0365] T3 Switching element (transistor) for the third load branch

[0366] T4 Switching element (transistor) for the fourth load branch

[0367] Tn Switching element (transistor) for the nth load branch

[0368] V Power supply (or supply voltage line with operating voltage relative to reference potential)

[0369] VER Power Consumption

[0370] ZFV Device for time shifting

[0371] Z g Common current measurement for all n load branches

[0372] Citation list

[0373] DE-A100 41 880

[0374] EP-A0 198 222

[0375] DE-A10 2020 033 633.

Claims

1. A device for analyzing the current in an electrical consumer (VER), the electrical consumer being equipped with: - a parallel circuit (PA) consisting of several load branches (LZW), - each load branch has an electrical load (RL1, RL2, ..., RLn) and a controllable switching element (T1, T2, ..., Tn) which can selectively switch the electrical load on or off, and an actuation unit (ANS) for generating actuation signals for the switching elements (T1, T2, . . . , Tn), The device is equipped with: a current measuring device (Z) connectable in series with the parallel circuit (PA) of the load branch (LZW) of the electrical consumer (VER) g ), for measuring the current flowing through the parallel circuit (PA); a detector (FD) for detecting a change in the current when or as a result of switching elements (T1, T2, . . . , Tn) of the load branch (LZW); and an analysis unit (ANA) connected to the control unit (ANS) and to the detector (FD), and - analyzing the time dependence of a control signal for switching on or switching off a switching element (T1, T2, . . . , Tn) of a load branch (LZW) on the detection of a change in the current caused by switching on and / or switching off the relevant switching element (T1, T2, . . . , Tn), and / or - analyzing the change in this current at a plurality of points in time when the relevant switching element (T1, T2, ..., Tn) of a load branch (LZW) or the switching elements (T1, T2, ..., Tn) of a plurality of load branches (LZW) are switched on and / or off, in, The analysis unit (ANA) has a diagnostic component which generates a fault message as long as no interference pulses with positive polarity are present within a predetermined time window after switching on a switching element (T1, T2, . . . , Tn) of one of the load branches (LZW) and / or no interference pulses with negative polarity are present within a predetermined time window after switching off a switching element (T1, T2, . . . , Tn) of one of the load branches (LZW).

2. The device according to claim 1, It is characterized in that The analysis unit (ANA) analyzes the change in the current at a plurality of times when the relevant switching elements (T1, T2, . . . , Tn) of a load branch (LZW) or the switching elements (T1, T2, . . . , Tn) of all load branches (LZW) are switched on and / or off.

3. The device according to claim 1, It is characterized in that The analysis unit (ANA) analyzes the manner of the change in the current with respect to its temporal waveform and / or analyzes the time-dependent change of a control signal for switching on or off a switching element (T1, T2, . . . , Tn) of a load branch (LZW) and the detection of a change in the current caused by switching on and / or switching off the relevant switching element (T1, T2, . . . , Tn).

4. The device according to claim 3, It is characterized in that The evaluation unit (ANA) evaluates first-order and / or second-order and / or higher-order mathematical derivatives of the change in the current and / or integrals over the change in the current and / or the magnitude and direction of the change in the current.

5. The device according to any one of claims 1 to 4, It is characterized in that The analysis unit (ANA) has a data processing unit which, based on a database in which data are stored about which events relevant to the operation of the electrical consumer (VER) are to be respectively associated with different results of the analysis of the analysis unit (ANA), forms actuation signals for switching elements (T1, T2, . . . , Tn) of a load branch (LZW) of the electrical consumer or for an actuation unit (ANS) of the electrical consumer according to the type of statistical model and / or signals when the analysis performed by the analysis unit (ANA) indicates that the electrical consumer (VER) may be faulty or is actually faulty.

6. The device according to claim 5, It is characterized in that The statistical model is an HMM model or an artificial neural network model.

7. The device according to any one of claims 1 to 4, It is characterized in that The current measuring device (Z g ) has a measuring inductance (ML); and the detector (FD) detects changes in the current as interference pulses formed through the measuring inductance (ML) or on the measuring inductance or due to the measuring inductance while taking into account its polarity.

8. The device according to any one of claims 1 to 4, It is characterized in that The evaluation unit (ANA) evaluates whether the magnitude of the interference pulse is greater than a predefined minimum level and / or lies in a range between a predefined minimum level and a predefined maximum level.

9. The device according to claim 7, It is characterized in that The detector (FD) is designed as an edge detector for detecting a rising or falling edge of an interference pulse at the measuring inductance (ML), each having a predefined minimum level.

10. The device according to any one of claims 1 to 4, It is characterized in that The current measuring device (Z g ) is constructed as a shunt resistor (Sh), which has an inductance as a parasitic component.

11. The device according to any one of claims 1 to 4, It is characterized in that The analysis unit (ANA) analyzes whether, after switching on a switching element (T1, T2, ..., Tn) of one of the load branches (LZW), an interference pulse with a positive polarity is present within a predetermined time window; and / or whether, after switching off a switching element (T1, T2, ..., Tn) of one of the load branches (LZW), an interference pulse with a negative polarity is present within a predetermined time window.

12. The device according to any one of claims 1 to 4, It is characterized in that If the control unit (ANS) of the switching elements (T1, T2, ..., Tn) of the load branch (LZW) for the electrical consumer (VER) controls the switching elements (T1, T2, ..., Tn) of the two corresponding load branches (LZW) so that the switching elements (T1, T2, ..., Tn) of one of the load branches (LZW) are turned off and the switching elements (T1, T2, ..., Tn) of the other load branch (LZW) are turned on simultaneously, then the evaluation unit (DIAG) analyzes: whether there are no interference pulses within a predetermined time window after the switching elements (T1, T2, ..., Tn) of one of the load branches (LZW) are turned on; and / or whether there are no interference pulses within a predetermined time window after the switching elements (T1, T2, ..., Tn) of the other load branch (LZW) are turned off.

13. The device according to any one of claims 1 to 4, It is characterized in that If, after switching on a switching element (T1, T2, ..., Tn) of one of the load branches (LZW), an interference pulse with a positive polarity is present within a predetermined time window and / or after switching off a switching element (T1, T2, ..., Tn) of one of the load branches (LZW), an interference pulse with a negative polarity is present within a predetermined time window, the analysis unit (ANA) controls the switching element control unit (ANS) in order to time-shift the control signals for the purpose of simultaneously and alternately switching on and off and switching off and on the switching elements (T1, T2, ..., Tn) of the corresponding two load branches (LZW) of the electrical consumer (VER).

14. The device according to any one of claims 1 to 4, It is characterized in that The switching-on control signal of the actuation unit (ANS) for switching on the switching elements (T1, T2, . . . , Tn) of the load branch (LZW) has a rising switching edge; and the switching-off control signal of the actuation unit (ANS) for switching off the switching elements of the load branch (LZW) has a falling switching edge.

15. The device according to claim 14, It is characterized in that The switching element actuation unit (ANS) has a device (ZFV) for time-shifting a rising edge of the switch-on actuation signal and / or for time-shifting a falling edge of the switch-off actuation signal.

16. The device according to any one of claims 1 to 4, It is characterized in that The switching elements (T1, T2, . . . , Tn) of the load branch (LZW) of the electrical consumer (VER) are part of the device.

17. An electrical consumer (VER) having: - a parallel circuit (PA) consisting of several load branches (LZW), - each load branch has an electrical load (RL1, RL2, ..., RLn) and a controllable switching element (T1, T2, ..., Tn) which can selectively switch the electrical load on or off; - an actuation unit (ANS) for generating actuation signals for the switching elements (T1, T2, . . . , Tn); and - Device for analyzing the current in an electrical consumer (VER) according to any one of claims 1 to 16.

Citation Information

Patent Citations

  • Operating at least two electrical loads such as motor vehicle indicator lights, involves supplying current to multiple loads in clocked manner by switching loads on / off via time offset dedicated electrically operated switches

    DE10041880A1

  • refrigerator and / or freezer

    DE102017001179A1

  • Circuit for monitoring a fault of a load which is switched by a controlled switch

    EP0125404A1

  • Device for detecting failure of loads connected in parallel

    EP2390678A1

  • Current derivative sensor

    US20030034770A1