A road and bridge marking equipment for construction
By designing construction road and bridge marking equipment with automatic marking and water spray cleaning functions, the problems of high labor intensity and dust pollution in traditional construction have been solved, and construction efficiency and environmental quality have been improved.
Patent Information
- Application Number
- CN202011544458.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-24
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-12-24
AI Technical Summary
During the bridge construction process, traditional dotting tools resulted in high labor intensity for construction workers, low work efficiency, and serious contamination with dust and impurities, affecting work clarity and environmental quality.
A construction road and bridge dotting equipment including a movable base, a dotting column, a control mechanism and a spraying mechanism is designed. It realizes automatic dotting through a motor-driven gear system and combines it with a water spray cleaning function to reduce dust and improve operating efficiency and environmental quality. .
It has reduced the labor intensity of construction personnel, improved work efficiency, ensured road cleanliness, reduced dust pollution, and improved the quality of the construction environment.
Smart Images

Figure CN113718605B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction equipment, in particular to a road and bridge marking device for construction. Background Art
[0002] Bridge engineering refers to the process of bridge survey, design, construction, maintenance and verification, as well as the science and engineering technology of studying this process. It is a branch of civil engineering. The development of bridge engineering mainly depends on the needs of transportation.
[0003] In the actual construction process, it is necessary to mark and stake out roads and bridges. The traditional method is that construction workers use a single marking tool to mark the bridge pavement, which is inefficient and labor-intensive. In addition, there are often dust and impurities on the bridge pavement during construction, which makes the pavement unclear, which not only affects the marking operation, but also the dust raised during the marking process will pollute the environment. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the shortcomings of the prior art, the present invention provides a road and bridge marking equipment for construction. During the whole process, construction workers are not required to hit the road surface, which reduces the labor intensity of construction workers and improves work efficiency. Water will be sprayed for cleaning before marking, which ensures the clarity of the road surface and is conducive to observing the marking situation. Moreover, the dust generated during the marking process is not easily blown up when mixed with clean water, thereby ensuring the quality of the surrounding environment.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a road bridge marking device for construction, comprising a moving seat, a marking column, a control mechanism and a spraying mechanism, wherein a mounting frame is provided on the upper side of the moving seat, the marking column is movably inserted on the moving seat, an auxiliary plate is fixedly sleeved on the marking column, the auxiliary plate is located below the moving seat, and a return spring is fixedly connected between the auxiliary plate and the moving seat;
[0008] The control mechanism includes a motor, a first gear and a second gear, the motor is fixedly connected to the inner wall of the mounting frame, the first gear is fixedly sleeved on the motor shaft of the motor, the second gear is connected to the mounting frame through a first rotating shaft, the second gear corresponds to the first gear, a connecting block is provided at an eccentric position on the side of the second gear, and a first control rod is hinged between the connecting block and the upper side of the dotting column;
[0009] The spraying mechanism includes a sealing cylinder, a water tank and a second control rod, the sealing cylinder and the water tank are both arranged on the upper side of the movable seat, a piston is provided inside the sealing cylinder, and a conduit is connected between the sealing cylinder and the water tank; a hose is connected to the bottom surface of the water tank, the hose is fixedly inserted on the auxiliary plate, and a nozzle is provided at the bottom end of the hose; the second control rod is movably inserted on the movable seat, the top end of the second control rod is fixedly connected to the piston, and the bottom end of the second control rod is fixedly connected to the auxiliary plate.
[0010] Furthermore, the bottom surface of the movable seat is provided with four wheels distributed in a rectangular shape; and the outer wall of the mounting frame is provided with a push rod.
[0011] Furthermore, the bottom end of the dot-marking column is set to be conical; the diameter of the auxiliary plate is larger than the diameter of the dot-marking column.
[0012] Furthermore, a connection point between one end of the conduit and the sealing cylinder is located above the piston, and a connection point between the other end of the conduit and the water tank is located on an upper side of the water tank.
[0013] Furthermore, an adjustment mechanism is provided on the marking column, and the adjustment mechanism includes a limit plate and a threaded rod. The limit plate is fixedly mounted on the upper end of the marking column, and a through hole is provided on the limit plate; the threaded rod is fixedly connected to the moving seat and is located on the right side of the marking column. The top end of the threaded rod passes through the through hole, and an adjusting nut is connected to the threaded rod, and the adjusting nut is located below the limit plate.
[0014] Furthermore, the diameter of the through hole is larger than the diameter of the threaded rod, and the diameter of the through hole is smaller than the diameter of the adjusting nut.
[0015] Furthermore, the wheels are divided into driving wheels and driven wheels, two driving wheels and two driven wheels are provided respectively, and a second rotating shaft is connected between the two driving wheels.
[0016] Furthermore, a third rotating shaft is also provided inside the installation frame; the motor shaft of the motor and the third rotating shaft, as well as the third rotating shaft and the second rotating shaft are connected via a transmission assembly; the transmission assembly includes a belt and a pulley.
[0017] (III) Beneficial effects
[0018] The present invention provides a road and bridge spotting device for construction, which has the following beneficial effects:
[0019] (1) In the present invention, when the first gear is meshed with the second gear, the first control rod pulls the dotting column to move vertically upward, and the return spring is compressed; when the first gear is not meshed with the second gear, the dotting column instantly moves downward under the elastic force of the return spring to achieve the dotting operation on the road surface. The entire process does not require construction workers to hit the road surface, which reduces the labor intensity of construction workers and improves work efficiency. At the same time, when the first gear is meshed with the second gear, the second control rod moves vertically upward, the piston moves upward, and the clean water in the water tank is sprayed out from the nozzle on the hose under the action of compressed air, which can spray water to clean the dotting road surface, ensuring the clarity of the road surface, which is conducive to observing the dotting situation, and the dust generated during the dotting process is not easy to be raised under the mixing of clean water, ensuring the quality of the surrounding environment.
[0020] (2) In the present invention, when the adjusting nut is rotated upward, the closer the adjusting nut is to the limit plate, the smaller the space for the striking column to descend, and the degree of impact on the road surface is reduced accordingly. Therefore, construction personnel can adjust the strength of the striking column according to the actual conditions of the road surface, thereby improving the practicality of the equipment; the striking column can also be stored and protected to prevent the tip of the striking column from being damaged by friction with the road surface.
[0021] (3) When the motor of the present invention starts working, the motor shaft rotates. Under the action of the third rotating shaft and the transmission assembly, the second rotating shaft will rotate synchronously, thereby driving the moving seat to move forward. Construction personnel do not need to push it forward, but only need to grasp the direction. Moreover, the rotation of the second rotating shaft and the dotting of the dotting column are carried out synchronously and regularly, so that evenly spaced dotting can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present invention;
[0023] Figure 2 This is a schematic diagram of the structure of Embodiment 2 of the present invention;
[0024] Figure 3 This is a schematic diagram of the structure of Embodiment 3 of the present invention;
[0025] Figure 4 This is a schematic diagram of the connection between the dotted column and the auxiliary plate of the present invention;
[0026] Figure 5 It is a structural schematic diagram of the control mechanism of the present invention;
[0027] Figure 6 It is a schematic diagram of the connection between the control mechanism of the present invention and the third rotating shaft;
[0028] In the figure: moving seat 1, dotting column 2, mounting frame 3, auxiliary plate 4, return spring 5, motor 6, first gear 7, second gear 8, first rotating shaft 9, first control rod 10, sealing cylinder 11, water tank 12, second control rod 13, piston 14, conduit 15, hose 16, wheel 17, driving wheel 1701, driven wheel 1702, hand push rod 18, limit plate 19, threaded rod 20, adjusting nut 21, third rotating shaft 22, belt 23, pulley 24. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] The following is combined with Figures 1 to 6 Specific embodiments of the present invention are described.
[0031] Example 1
[0032] like Figure 1 , Figure 4 and Figure 5 As shown, a road bridge marking device for construction includes a mobile seat 1, a marking column 2, a control mechanism and a spraying mechanism. A mounting frame 3 is provided on the upper side of the mobile seat 1, a push rod 18 is provided on the outer wall of the mounting frame 3, and four wheels 17 distributed in a rectangular shape are provided on the bottom surface of the mobile seat 1. Construction workers can conveniently move the device through the push rod 18. The marking column 2, the control mechanism and the spraying mechanism are all arranged inside the mounting frame 3. The marking column 2 is movably inserted on the mobile seat 1. The bottom end of the marking column 2 is set to be conical. When the marking column 2 hits the road surface, the set tip can realize the marking operation on the road surface. An auxiliary plate 4 is fixedly sleeved on the marking column 2. The diameter of the auxiliary plate 4 is larger than the diameter of the marking column 2. The auxiliary plate 4 is located below the mobile seat 1, and a reset spring 5 is fixedly connected between the auxiliary plate 4 and the mobile seat 1. The reset spring 5 is distributed around the marking column 2 in a circumferential shape.
[0033] The control mechanism is arranged above the dotting column 2, and the control mechanism includes a motor 6, a first gear 7 and a second gear 8. The motor 6 is fixedly connected to the inner wall of the mounting frame 3, the first gear 7 is fixedly sleeved on the motor shaft of the motor 6, the second gear 8 is connected to the mounting frame 3 through the first rotating shaft 9, and the second gear 8 corresponds to the first gear 7. A connecting block is arranged at an eccentric position on the side of the second gear 8, and a first control rod 10 is hinged between the connecting block and the upper side of the dotting column 2. Due to the characteristics of the first gear 7, after the motor 6 is started, the first gear 7 will intermittently mesh with the second gear 8. When the first gear 7 meshes with the second gear 8, the second gear 8 will rotate counterclockwise by a certain angle, at which time the first control rod 10 pulls the dotting column 2 to move vertically upward, and the reset spring 5 is compressed; as the first gear 7 continues to rotate, the first gear 7 will not mesh with the second gear 8, that is, the second gear 8 loses power, and under the elastic force of the reset spring 5, the dotting column 2 instantly moves downward to achieve the dotting operation on the road surface. Then repeat the above work in this way to achieve cyclic marking. During the whole process, the construction workers do not need to hit the road surface, which reduces the labor intensity of the construction workers and improves work efficiency.
[0034] The spraying mechanism includes a sealing cylinder 11, a water tank 12 and a second control rod 13. The sealing cylinder 11 is connected to the mobile seat 1 through a support frame, and the water tank 12 is fixedly connected to the mobile seat 1, wherein the height of the upper side of the sealing cylinder 11 is higher than the height of the upper side of the water tank 12, which is convenient for the flow of air. A piston 14 is provided inside the sealing cylinder 11, and a conduit 15 is connected between the sealing cylinder 11 and the water tank 12. The connection between the conduit 15 and the sealing cylinder 11 is located above the piston 14, and the connection between the conduit 15 and the water tank 12 is located on the upper side of the water tank 12; a hose 16 is connected to the bottom surface of the water tank 12, the hose 16 is fixedly inserted on the auxiliary plate 4, and a nozzle is provided at the bottom end of the hose 16; the second control rod 13 is movably inserted on the mobile seat 1, the top end of the second control rod 13 is fixedly connected to the piston 14, and the bottom end of the second control rod 13 is fixedly connected to the auxiliary plate 4. According to the above description, when the first gear 7 is meshed with the second gear 8, the second gear 8 will rotate counterclockwise by a certain angle, at which time the first control rod 10 will pull the dotting column 2 to move vertically upward. Due to the setting of the auxiliary plate 4, the second control rod 13 moves vertically upward at the same time, and the piston 14 moves upward to compress the air on the upper part of the sealing cylinder 11. Then, the clean water in the water tank 12 is sprayed out by the nozzle on the hose 16 under the action of the compressed air, and the dotting road surface can be sprayed and cleaned; then, when the first gear 7 is not meshed with the second gear 8, the dotting column 2 moves downward instantly under the elastic force of the return spring 5, and the cleaned road surface can be dotted. The road surface is clear during construction, which is conducive to observing the dotting situation, and the dust generated during the dotting process is not easy to be raised under the mixing of clean water, which ensures the quality of the surrounding environment.
[0035] Example 2
[0036] On the basis of embodiment 1, the dot column 2 is further provided with an adjustment mechanism, such as Figure 2 , Figure 4 and Figure 5 As shown, the adjustment mechanism includes a limit plate 19 and a threaded rod 20. The limit plate 19 is fixedly mounted on the upper end of the dotting column 2. The limit plate 19 is located above the moving seat 1, and a through hole is provided on the limit plate 19. The threaded rod 20 is fixedly connected to the moving seat 1 and is located on the right side of the dotting column 2. The top end of the threaded rod 20 passes through the through hole. An adjusting nut 21 is connected to the threaded rod 20, and the adjusting nut 21 is located below the limit plate 19. The degree of impact of the dotting column 2 on the road surface can be controlled by the adjustment mechanism. When the adjusting nut 21 is turned upward, the closer the adjusting nut 21 is to the limit plate 19, the smaller the space for the dotting column 2 to descend, and the degree of impact on the road surface is reduced accordingly. Therefore, the construction personnel can adjust the strength of the dotting column 2 according to the actual situation of the road surface, thereby improving the practicality of the equipment. Moreover, when the device is not in use, the adjusting nut 21 can be rotated to the top of the threaded rod 20. At this time, the reset spring 5 is compressed, and there is a distance between the bottom end of the marking column 2 and the road surface, which avoids friction between the tip of the marking column 2 and the road surface, thereby playing a role of storage and protection.
[0037] Example 3
[0038] The above embodiment requires the construction personnel to push the mobile seat 1 to perform multiple marking operations, such as Figure 3 , Figure 4 and Figure 6 As shown, in this embodiment, the wheel 17 is divided into a driving wheel 1701 and a driven wheel 1702, wherein the driving wheel 1701 and the driven wheel 1702 are each provided with two, and the two driving wheels 1701 are arranged on the same side, and the second rotating shaft is connected between the two driving wheels 1701, and when the second rotating shaft is rotated by force, the two driving wheels 1701 can rotate synchronously; the interior of the mounting frame 3 is also provided with a third rotating shaft 22, and the motor shaft of the motor 6 and the third rotating shaft 22, as well as the third rotating shaft 22 and the second rotating shaft are connected through a transmission assembly, wherein the transmission assembly includes a belt 23 and a pulley 24. When the motor 6 starts working, the motor shaft rotates, and under the action of the third rotating shaft 22 and the transmission assembly, the second rotating shaft will rotate synchronously, thereby driving the moving seat 1 to move forward, and the construction personnel do not need to push forward, but only need to grasp the direction. Moreover, the rotation of the second rotating shaft and the dotting of the dotting column 2 are synchronized and regularly carried out, and the dotting of equal intervals can be achieved.
[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprising a reference structure" do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0040] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0041] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A road and bridge marking equipment for construction, comprising a mobile seat, a marking column, a control mechanism and a spraying mechanism, characterized in that: A mounting frame is provided on the upper side of the movable seat, the dotting column is movably inserted on the movable seat, an auxiliary plate is fixedly sleeved on the dotting column, the auxiliary plate is located below the movable seat, and a return spring is fixedly connected between the auxiliary plate and the movable seat; The control mechanism includes a motor, a first gear and a second gear, the motor is fixedly connected to the inner wall of the mounting frame, the first gear is fixedly sleeved on the motor shaft of the motor, the second gear is connected to the mounting frame through a first rotating shaft, the second gear corresponds to the first gear, a connecting block is provided at an eccentric position on the side of the second gear, and a first control rod is hinged between the connecting block and the upper side of the dotting column; The spraying mechanism includes a sealing cylinder, a water tank and a second control rod, the sealing cylinder and the water tank are both arranged on the upper side of the movable seat, a piston is arranged inside the sealing cylinder, and a conduit is connected between the sealing cylinder and the water tank; a hose is connected to the bottom surface of the water tank, the hose is fixedly inserted on the auxiliary plate, and a nozzle is arranged at the bottom end of the hose; the second control rod is movably inserted on the movable seat, the top end of the second control rod is fixedly connected to the piston, and the bottom end of the second control rod is fixedly connected to the auxiliary plate; The bottom end of the dotting column is set to be conical; the diameter of the auxiliary plate is larger than the diameter of the dotting column; The connection between one end of the conduit and the sealing cylinder is located above the piston, and the connection between the other end of the conduit and the water tank is located on the upper side of the water tank; The dotting column is also provided with an adjustment mechanism, which includes a limit plate and a threaded rod. The limit plate is fixedly sleeved on the upper end of the dotting column, and a through hole is provided on the limit plate; the threaded rod is fixedly connected to the moving seat and is located on the right side of the dotting column, and the top end of the threaded rod passes through the through hole. An adjustment nut is connected to the threaded rod, and the adjustment nut is located below the limit plate; The diameter of the through hole is larger than the diameter of the threaded rod, and the diameter of the through hole is smaller than the diameter of the adjusting nut.
2. The road and bridge marking equipment for construction according to claim 1, characterized in that: The bottom surface of the movable seat is provided with four wheels distributed in a rectangular shape; the outer wall of the installation frame is provided with a push rod.
3. The road and bridge marking equipment for construction according to claim 2, characterized in that: The wheels are divided into driving wheels and driven wheels, two driving wheels and two driven wheels are provided respectively, and a second rotating shaft is connected between the two driving wheels.
4. The road and bridge construction marking equipment according to claim 3, characterized in that: A third rotating shaft is also provided inside the installation frame; the motor shaft of the motor and the third rotating shaft, as well as the third rotating shaft and the second rotating shaft are connected via a transmission assembly; the transmission assembly includes a belt and a pulley.
Citation Information
Patent Citations
Land tamping device with dust fall function
CN107630446A
Cyclic continuous cleaning and compacting device for road surface
CN108060630A
Ground leveling vehicle for municipal construction
CN108086105A
Road surface and bridge floor tamping device
CN110258264A
Concrete drilling and coring machine
CN111119774A