A continuous reforming atmospheric pressure regeneration system and control method thereof

By designing the continuous reforming normal pressure regeneration system and cycle control steps, the cold shutdown problem of the existing catalyst regeneration process system when control errors are solved has been solved, achieving a higher level of self-control and operational stability, and reducing operating intensity and troubleshooting. time.

CN113814004BActive Publication Date: 2024-10-29SINOPEC YANGZI PETROCHEMICAL CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010565453.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-19
Publication Date
2024-10-29
Estimated Expiration
2040-06-19

AI Technical Summary

Technical Problem

The existing catalyst continuous regeneration process system requires a cold shutdown and restart when the control sequence is wrong, resulting in a long system recovery period, cumbersome operations, high labor intensity for operators, and the lack of a flexible and controllable control system.

Method used

A continuous reforming atmospheric pressure regeneration system is designed, including No. 1 and No. 2 lock hoppers. Through cycle control steps and valve management, automatic control is realized, valve operating time setting and fault alarm functions are added, and the automation level and maintenance efficiency are improved. .

Benefits of technology

It improves the level of automatic control of the device, reduces the operating intensity of process personnel, enhances the stability of device operation, shortens troubleshooting time, and improves the ability of automatic control and rapid maintenance processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113814004B_ABST
    Figure CN113814004B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of catalyst reforming regeneration, and in particular to a continuous reforming atmospheric pressure regeneration system and a control method thereof, comprising a lock hopper No. 1 LH-1 and a lock hopper No. 2 LH-2, wherein in the lock hopper No. 1 LH-1, a reactor reduction zone LS-3502, a first buffer hopper FA-351, a first collecting hopper FA-352, and a first lifter FA-353 are sequentially connected; the first lifter FA-353 is always connected to a separation hopper FA-354 of the lock hopper No. 2 LH-2, and the first lifter FA-353 is always connected to a hydrogen source; in the lock hopper No. 2 LH-2, a regenerator DC-351, a second buffer hopper FA-356, a second collecting hopper FA-357, and a second lifter FA-358 are sequentially connected. The lock hopper No. 1 LH-1 and the lock hopper No. 2 LH-2 are controlled respectively through relevant steps. The present invention effectively improves the automatic control level of the device, reduces the operating intensity of personnel, improves the operating stability, improves the automatic control level, adds a valve fault alarm function, improves the rapid processing ability of personnel, and shortens the fault inspection and repair time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of catalyst reforming regeneration, and in particular to a continuous reforming atmospheric pressure regeneration system and a control method thereof. Background Art

[0002] At present, there are two common catalyst continuous regeneration process systems in the industry. One of them is the axial overlapping continuous reforming process system developed by Universal Oil Products of the United States. The existing control system of this process system has no redundant settings for the key components of the controller. When control step errors occur multiple times during the production process, the entire process system must be restarted after cold shutdown to resume normal operation. However, the system recovery cycle after cold shutdown is long, the process operation is cumbersome, and the labor intensity of operators is high. In actual work, a catalyst continuous regeneration unit control system with complete functions, flexible and controllable operation is urgently needed to improve the stability of the device operation. Summary of the invention

[0003] In order to solve the problems existing in the prior art, the present invention proposes a continuous reforming atmospheric pressure regeneration system and a control method thereof, which effectively improves the automatic control level of the device, reduces the operating intensity of the process personnel, and significantly improves the operating stability of the device.

[0004] The specific technical solutions of the present invention are as follows:

[0005] A continuous reforming atmospheric regeneration system, comprising a lock hopper No. 1 LH-1 and a lock hopper No. 2 LH-2, wherein in the lock hopper No. 1 LH-1, a reactor reduction zone LS-3502, a first buffer hopper FA-351, a first collecting hopper FA-352, and a first lifter FA-353 are sequentially connected; the first buffer hopper FA-351 is connected to a hydrogen source by two passages, one of which is provided with a valve BV-1, and the other is provided with a second flow detection device FS-3502, and the first buffer hopper FA-351 is sequentially connected to the hydrogen source by two passages, wherein a valve BV-1 is provided on one passage, and a second flow detection device FS-3502 is provided on the other passage, and the first buffer hopper FA-351 is sequentially connected to the hydrogen source by a valve BV-1. V-2, valve BV-3, valve BV-5 are connected to the first collecting hopper FA-352, a pipeline leading to the heating furnace is arranged between the valves BV-3 and BV-5, and a valve BV-4 is arranged on the pipeline; the first collecting hopper FA-352 is connected to the first lifter FA-353 through valves BV-13, valves BV-14 and valves BV-16 in sequence, and the valves BV-14 and valves BV-16 are connected to the combustion chamber BA-302 of the heating furnace through valve BV-15; a pipeline is arranged between the first collecting hopper FA-352 and the nitrogen source, and the nitrogen is sequentially connected through the first collecting hopper FA-352 and the first collecting hopper FA-352. A flow detection device FS-3503, valve BV-10, valve BV-12 lead to the first collecting hopper FA-352; a pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valve BV-12 and valve BV-10, and a valve BV-11 is arranged on the pipeline; the first collecting hopper FA-352 is also connected to the torch system BF and the heating furnace combustion chamber BA-302 through valve BV-9.1 and valve BV-9.2 respectively; the hydrogen source is provided with a pipeline connected to the heating furnace combustion chamber BA-302 through valve BV-6 and valve BV-7, or in sequence A pipeline connected to the flare system BF through valves BV-6 and BV-8; the first collecting hopper FA-352 is provided with a first collecting hopper pressure detection device PS-3502 and a first collecting hopper material level detection device LS-3501, and a first pressure difference indicating device PD-3501 is provided between the first buffer hopper FA-351 and the first collecting hopper FA-352; the first lifter FA-353 is always connected to the separation hopper FA-354 of the second locking hopper LH-2, and the first lifter FA-353 is always connected to the hydrogen source;

[0006] The regenerator DC-351, the second buffer hopper FA-356, the second collecting hopper FA-357 and the second lifter FA-358 in the second lock hopper LH-2 are connected in sequence; the second buffer hopper FA-356 is connected to the second collecting hopper FA-357 through valves BV-42, BV-43 and BV-45 in sequence, and the second collecting hopper FA-357 is connected to the second lifter FA-358 through valves BV-53 and BV-54 in sequence; the valve BV-43 is connected to the valve BV -45 is provided with a pipeline leading to the heating furnace combustion chamber BA-302, and a valve BV-44 is provided on the pipeline; a pipeline leading to the heating furnace combustion chamber BA-302 is provided between the valve BV-54 and the valve BV-56, and a valve BV-55 is provided on the pipeline; the second collecting hopper FA-357 is provided with a second collecting hopper pressure detection device PS-3504 and a second collecting hopper material level detection device LS-3504; the second collecting hopper FA-357 is connected to the nitrogen source, and the nitrogen passes through in sequence The third flow detection device FS-3510, valve BV-50, and valve BV-52 lead to the second collecting hopper FA-357; a pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valve BV-50 and valve BV-52, and a valve BV-51 is arranged on the pipeline; the second collecting hopper FA-357 is connected to the hydrogen source, and the hydrogen passes through valves BV-46 and valve BV-48 in turn to the second collecting hopper FA-357, and a pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valves BV-46 and valve BV-48. The pipeline of chamber BA-302 is provided with a valve BV-47; the second collecting hopper FA-357 is connected with the flare system BF through valve BV-49.1, and is connected with the heating furnace combustion chamber BA-302 through valve BV-49.2; a second pressure difference indicating device PD-3503 is provided between the second collecting hopper FA-357 and the second riser FA-358; the second riser FA-358 is connected with the hydrogen source and is provided with a fourth flow indicator FS-3511.

[0007] A control method for a continuous reforming atmospheric regeneration system according to claim 1, wherein the No. 1 lock hopper LH-1 control system is cyclically controlled by the following steps:

[0008] S0: Preparation stage, balance the pipeline pressure in the No. 1 lock hopper LH-1;

[0009] S1-S3: Purge stage, flush the first collection hopper FA-352 with nitrogen several times,

[0010] S4-S7: unloading stage, the catalyst to be regenerated in the first collecting hopper FA-352 is unloaded to the first lifter FA-353,

[0011] S8-S11: Pressurization stage, pressurize the first collection hopper FA-352 to make its pressure equal to that of the first buffer hopper FA-351,

[0012] S12-S14: loading stage, transferring the catalyst to be regenerated in the first buffer hopper FA-351 to the first collection hopper FA-352 to complete the loading;

[0013] Execute S0-S14 in a loop, and start calculating the long cycle time T0 from S1, and reset T0 when looping to S0. When the long cycle time T0 exceeds the preset value of the long cycle time, output a long cycle alarm;

[0014] The No. 2 lock hopper LH-2 control system is controlled through the following cycle steps:

[0015] S20: In the preparation stage, the pipeline pressure in the No. 2 lock hopper LH-2 is balanced;

[0016] S21-S23: Purge 1 stage, the first time, the second collection hopper FA-357 is flushed with nitrogen multiple times,

[0017] S24-S26: Pressurization stage, pressurizing the second collecting hopper FA-357 to make the pressure of the second collecting hopper FA-357 and the second lifter FA-358 equal,

[0018] S27-S30: unloading stage, unloading the regenerated catalyst in the second collecting hopper FA-357 to the second lifter FA-358,

[0019] S31-S33: 2 stages of purging, the second collection hopper FA-357 is flushed with nitrogen multiple times for the second time,

[0020] S34-S37: loading stage, the regenerated catalyst in the second buffer hopper FA-356 is transferred to the second collection hopper FA-357 to complete the loading;

[0021] S20-S37 is executed in a loop, and the second long cycle time T20 is calculated starting from S21, and T20 is reset when looping to S20. When the second long cycle time T20 exceeds the predetermined value of the long cycle time, a long cycle alarm is output.

[0022] Wherein, the control method comprises:

[0023] S0: Preparation stage

[0024] The following steps are involved:

[0025] 1) Set valves BV-1, BV-11 and BV-15 to open state, and other valves to closed state.

[0026] 2) Set valve BV-7 to open state.

[0027] 3) Check all current valve positions. When the valve position is correct, step to S1; at the same time, set the long cycle time T0 to 0.

[0028] S0 valve position: valve BV-7, valve BV-11, valve BV-15 are open, and the rest of the valves are closed;

[0029] S1: First stage of purge

[0030] The following steps are involved:

[0031] 1) Set valve BV-4 to the open state and calculate the long cycle time T0 from the time valve BV-4 is opened.

[0032] 2) When the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, the valve BV-9.2 is set to the open state.

[0033] Otherwise, valve BV-9.1 is set to the open valve position, and when the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, valve BV-9.1 is closed and valve BV-9.2 is set to the open state.

[0034] 3) When the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 decreases and is lower than the second given value PSH2-3502, the valve BV-11 is closed.

[0035] 4) Check the current valve position. When all valve positions are correct, step to S2.

[0036] Among them, the first given value PSH1-3502 is higher than the second given value PSH2-3502.

[0037] S1 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-15 are open;

[0038] S2: Second stage of purge

[0039] The following steps are involved:

[0040] 1) Set valve BV-10 to open state.

[0041] 2) When the first flow detection device FS-3503 detects that the flow rate of the purge gas N2 is less than the low flow setting value FSL-3503, and the first collection hopper pressure detection device PS-3502 detects that the pressure of the first collection hopper FA-352 is lower than the second given value PSH2-3502, the valve BV-12 is set to the open state to perform the purge.

[0042] 3) When the valve BV-12 is open for a preset purge time value T2, the valve BV-12 is closed and the first collecting hopper FA-352 is depressurized through the valve BV-9.2.

[0043] 4) When the pressure of the first collecting hopper FA-352 decreases and is again lower than the second given value PSH2-3502, the valve BV-12 is set to the open state;

[0044] 5) When the opening time of valve BV-12 reaches the preset purge time value T2, close valve BV-12 again;

[0045] 6) Execute steps 4) to 5) in a loop. When the number of cycles reaches the preset number of purges and the valve position is correct, proceed to S3.

[0046] S2 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-10, valve BV-15 are open;

[0047] S3: The third stage of purge

[0048] The following steps are involved:

[0049] 1) Shut-off valve BV-9.2, valve BV-10, valve BV-15;

[0050] 2) Check all valve positions. When all valve positions are correct, step to S4;

[0051] S3 valve position: valve BV-4, valve BV-7 are open.

[0052] Wherein, the control method further includes:

[0053] S4: First stage of unloading

[0054] The following steps are involved:

[0055] 1) Set valve BV-11 to open state.

[0056] 2) Set valve BV-14 and valve BV-16 to open state.

[0057] 3) Check all valve positions. When all valve positions are correct, proceed to S5;

[0058] S4 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open;

[0059] S5: Second stage of unloading

[0060] The following steps are involved:

[0061] 1) Set valve BV-13 to the open state and calculate the opening time of valve BV-13.

[0062] 2) When the opening time of valve BV-13 reaches T5, step to S6A, where T5 is the preset opening time value of valve BV-13;

[0063] S5 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-13, valve BV-14, valve BV-16 are open;

[0064] S6A: Unloading stage 3

[0065] The following steps are involved:

[0066] 1) Close valve BV-13 and calculate the closing time of valve BV-13.

[0067] 2) When the closing time of valve BV-13 reaches T6A, step to S6B, where T6A is the preset closing time value of valve BV-13;

[0068] S6A valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open;

[0069] S6B: Unloading stage 4

[0070] The following steps are involved:

[0071] 1) Close valve BV-14 and calculate the closing time of valve BV-14.

[0072] 2) When the closing time of valve BV-14 reaches T6B, check the valve position. When all valve positions are correct, step to S7;

[0073] T6B is the preset value of the closing time of valve BV-14.

[0074] S6B valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-16 are open;

[0075] S7: Unloading stage 5

[0076] The following steps are involved:

[0077] 1) Shut-off valve BV-16;

[0078] 2) The conveying count of the LH-1 lifter is increased by 1;

[0079] 3) Check all valve positions. When all valve positions are correct, proceed to S8;

[0080] S7 valve position: valve BV-4, valve BV-7, valve BV-11 are open.

[0081] Wherein, the control method further includes:

[0082] S8: First stage of pressurization

[0083] The following steps are involved:

[0084] 1) Set valve BV-15 to open state and close valves BV-4 and BV-7;

[0085] 2) Check all valve positions. When all valve positions are correct, proceed to S9;

[0086] S8 valve position: valve BV-11, valve BV-15 are open;

[0087] S9: Second stage of pressurization

[0088] The following steps are involved:

[0089] 1) Set valve BV-8 to open state.

[0090] 2) Check all valve positions. When all valve positions are correct and the pressure difference indicating device PD-3501 indicates that the pressure difference is less than the low pressure difference setting value PDSH-3501, proceed to S10;

[0091] S9 valve position: valve BV-8, valve BV-11, valve BV-15 are open;

[0092] S10: Pressurization Stage 3

[0093] 1) Set valve BV-1, valve BV-5 and valve BV-6 to open state.

[0094] 2) Check all valve positions. When all valve positions are correct and the pressure difference indicator PD-3501 indicates that the pressure difference is close to 0, proceed to S11.

[0095] S10 valve position: valve BV-1, valve BV-5, valve BV-6, valve BV-8, valve BV-11, valve BV-15 are open;

[0096] S11: Pressurized Stage 4

[0097] The following steps are involved:

[0098] 1) Shut off valve BV-6 and valve BV-8.

[0099] 2) Compare the flow rate measured by the second flow detection device FS-3502 with the second low flow setting value FSL-3502;

[0100] 3) Calculate the time when the flow rate is less than the second lowest flow setting value FSL-3502.

[0101] When the flow rate is less than the second low flow setting value FSL-3502 for a time ≥ T11, and the material level of the first collecting hopper material level detection device LS-3501 is less than the material level setting value LSH-3501, and when the first buffer hopper pressure detection device PS-3501 detects that the pressure is greater than the first given value PSH1-3502, step to S12,

[0102] Otherwise, no operation is performed;

[0103] T11 is the preset time value when the flow rate measured by FS-3502 is less than the second low flow setting value FSL-3502.

[0104] S11 valve position: valve BV-1, valve BV-5, valve BV-11, valve BV-15 are open.

[0105] Wherein, the control method further includes:

[0106] S12: First stage of loading

[0107] The following steps are involved:

[0108] 1) Set valve BV-3 to open state.

[0109] 2) Check all valve positions. When all valve positions are correct, proceed to S13;

[0110] S12 valve position: valve BV-1, valve BV-3, valve BV-5, valve BV-11, valve BV-15 are open;

[0111] S13: Second stage of loading

[0112] 1) Set valve BV-2 to open state.

[0113] 2) Define the time from the opening of valve BV-2 to the time when LS-3501 detects that the material level is full as T13.

[0114] When T13 is less than the minimum time setting value and LS-3501 detects that the material level is full, it will output an abnormal loading alarm;

[0115] When the minimum time setting value ≤ T13 < maximum time setting value, and LS-3501 detects that the material level is full, it steps to S14A.

[0116] When T13 ≥ the maximum time setting value, and LS-3501 detects that its material level is not full, it steps to S14A;

[0117] Wherein, the minimum time setting value is less than the normal filling time value, and the maximum time setting value is greater than the normal filling time value;

[0118] S14A: Loading Stage 3

[0119] The following steps are involved:

[0120] 1) Shut-off valve BV-2,

[0121] 2) Check the valve position.

[0122] 3) Start counting the time from the closing of valve BV-2. When the closing time of valve BV-2 reaches T14A and the valve position is correct, proceed to S14B, where T14A is the closing time setting value of valve BV-2.

[0123] S14B: Loading Stage 4

[0124] The following steps are involved:

[0125] 1) Shut-off valve BV-3,

[0126] 2) Check valve position

[0127] 3) Start counting the time from the closing of valve BV-3. When the closing time of valve BV-3 reaches T14B and the valve position is correct, cycle to S0. T14B is the closing time setting value of valve BV-3.

[0128] Wherein, the control method further includes:

[0129] S20: Preparation

[0130] The following steps are involved:

[0131] 1) Set valve BV-44 and valve BV-51 to open state.

[0132] 2) Set valve BV-47 and valve BV-55 to open state.

[0133] 3) Check the valve position and the material level of LS-3502 in the reactor reduction zone. When the valve position is correct and LS-3502 detects that its material level has reached LSL-3502, step to S21; at the same time, set the second long cycle time T20 to 0.

[0134] The LSL-3502 is the low material level setting value.

[0135] Valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-55 are open;

[0136] S21: Purge 1 Stage 1

[0137] The following steps are involved:

[0138] 1) The second longest cycle time T20 starts timing,

[0139] When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the third given value PSH1-3504, the valve BV-49.2 is set to the open state;

[0140] Otherwise, valve BV-49.1 is set to an open state, and when the pressure drops to a third given value PSH1-3504, valve BV-49.1 is closed and valve BV-49.2 is set to an open state;

[0141] 2) When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the fourth given value PSH2-3504, the valve BV-51 is closed;

[0142] 3) Check all valve positions. When all valve positions are correct, proceed to S22;

[0143] Wherein, the third given value PSH1-3504>the fourth given value PSH2-3504;

[0144] S21 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-55 are open;

[0145] S22: Purge 1 second stage

[0146] 1) Set valve BV-50 to open state.

[0147] 2) When the third flow detection device FS-3510 detects that the flow rate of the purge gas N2 is lower than the third low flow setting value FSL-3510, and the second collection hopper pressure detection device PS-3504 detects that the pressure is lower than the low pressure alarm setting value PSL-3504, the valve BV-52 is set to the open state;

[0148] 3) When the opening time of valve BV-52 reaches the preset purge time value T22, valve BV-52 is closed and the second collecting hopper FA-357 is depressurized through valve BV-49.2;

[0149] 4) When the pressure of the second collecting hopper FA-357 drops to the low pressure alarm setting value PSL-3504, set the valve BV-52 to the open state;

[0150] 5) When the opening time of valve BV-52 reaches T22, valve BV-52 is closed, wherein T22 is the opening time setting value of valve BV-52;

[0151] 6) Execute steps 4) to 5) in a loop. When the number of cycles reaches the predetermined number of purges and all valve positions are correct, proceed to S23.

[0152] S22 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-50, valve BV-55 are open;

[0153] S23: Purge 1 Stage 3

[0154] The following steps are involved:

[0155] 1) Shut off valve BV-47, valve BV-49.2, valve BV-50 and valve BV-55,

[0156] 2) Check all valve positions. When all valve positions are correct, proceed to S24;

[0157] S23 valve position: valve BV-44 is open.

[0158] Wherein, the control method further includes:

[0159] S24: Pressurization Stage 1

[0160] The following steps are involved:

[0161] 1) Set valve BV-51 to open state.

[0162] 2) Set valve BV-48 and valve BV-54 to open state.

[0163] 3) Calculate the duration when the second pressure difference indicator PD-3503 indicates that the pressure difference is greater than the high pressure difference setting value PDSH-3503 and FS-3511 detects flow.

[0164] 4) When the duration is greater than the set value T24 of the time in 3), check all valve positions, and when the valve positions are correct, step to S25;

[0165] S24 valve position: valve BV-44, valve BV-48, valve BV-51, valve BV-54 are open;

[0166] S25: Second stage of pressurization

[0167] The following steps are involved:

[0168] 1) Set valve BV-46 to open state.

[0169] 2) When PD-3503 indicates that the pressure difference is 0, step to S26;

[0170] S26: Pressurization Stage 3

[0171] The following steps are involved:

[0172] 1) Shut off valve BV-46, valve BV-48,

[0173] 2) Check the valve position. When the pressure of FA-357 is greater than the third given value PSH1-3504, step to S27;

[0174] S26 valve position: valve BV-44, valve BV-51, valve BV-54 are open.

[0175] Wherein, the control method further includes:

[0176] S27: Unloading stage 1

[0177] The following steps are involved:

[0178] 1) Set valve BV-47 and valve BV-56 to open state.

[0179] 2) Check the valve position. When the valve position is correct, proceed to S28;

[0180] S27 valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open;

[0181] S28: Unloading stage 2

[0182] The following steps are involved:

[0183] 1) Set valve BV-53 to the open state and calculate the opening time of valve BV-53.

[0184] 2) When the opening time of valve BV-53 reaches T28, step to S29A,

[0185] Said T28 is the preset value of the opening time of valve BV-53;

[0186] S29A: Unloading stage 3

[0187] The following steps are involved:

[0188] 1) Close valve BV-53 and calculate the closing time of valve BV-53.

[0189] 2) When the closing time of valve BV-53 reaches T29A, check the valve position. When all valve positions are correct, step to S29A. T29A is the preset closing time value of valve BV-53.

[0190] S29A valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open;

[0191] S29B: Unloading Stage 4

[0192] The following steps are involved:

[0193] 1) Close valve BV-54 and calculate the closing time of valve BV-54.

[0194] 2) When the closing time of valve BV-54 reaches T29B, check the valve position. When all valve positions are correct, proceed to S30. T29B is the preset closing time value of valve BV-54.

[0195] S29B valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-56 are open;

[0196] S30: Unloading stage 5

[0197] The following steps are involved:

[0198] 1) Shut-off valve BV-56,

[0199] 2) When no abnormal loading alarm is received, the LH-2 delivery counter increases by 1; otherwise, the delivery counter does not count;

[0200] 3) Check the valve position. When all valve positions are correct, proceed to S31;

[0201] S30 valve position: valve BV-44, valve BV-47, valve BV-51 are open.

[0202] Wherein, the control method further includes:

[0203] S34: First stage of loading

[0204] The following steps are involved:

[0205] 1) Set valve BV-51 to open state.

[0206] 2) Set valve BV-43 and valve BV-45 to open state.

[0207] 3) Check the valve position. When all valve positions are correct, proceed to S35;

[0208] S35: Second stage of loading

[0209] The following steps are involved:

[0210] 1) Set valve BV-42 to open state.

[0211] 2) Define the time from the opening of valve BV-42 to the time when LS-3504 indicates that the material level is full as T35, calculate T35,

[0212] When T35 is less than the minimum time setting value and LS-3504 detects that the material level is full, it will output an abnormal loading alarm;

[0213] When the minimum time setting value ≤ T35 < maximum time setting value, and LS-3504 detects that its material level is full, it steps to S36A;

[0214] When T35 ≥ the maximum time setting value, and LS-3504 detects that the material level is not full, it steps to S36A.

[0215] Wherein, the minimum time setting value is less than the normal filling time value, and the maximum time setting value is greater than the normal filling time value;

[0216] S36A: Loading Stage 3

[0217] The following steps are involved:

[0218] 1) Close valve BV-42 and calculate the time from the closing of valve BV-42.

[0219] 2) Check all valve positions. When all valve positions are correct and the closing time of valve BV-42 reaches the set value T36A, step to S36B;

[0220] S36A valve position: valve BV-43, valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open;

[0221] S36B: Loading Stage 4

[0222] The following steps are involved:

[0223] 1) Close valve BV-43 and calculate the time from the closing of valve BV-43.

[0224] 2) Check the valve position.

[0225] 3) When the closing time of valve BV-43 reaches the set value T36B and all valve positions are correct, step to S37;

[0226] S36B valve position: valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open;

[0227] S37: Loading Stage 5

[0228] The following steps are involved:

[0229] 1) Shut-off valve BV-45,

[0230] 2) Check the valve position. When all valve positions are correct, cycle to S20;

[0231] S37 valve position: valve BV-47, valve BV-51, valve BV-55 are open.

[0232] Beneficial Effects

[0233] The continuous reforming atmospheric pressure regeneration system and control system of the present invention effectively improve the automatic control level of the device, reduce the operating intensity of process personnel, and significantly improve the operating stability of the device; increase the setting of valve operation time, and improve the level of automatic control; add a valve operation failure alarm function, when the step logic is paused, the maintenance personnel can easily determine the reason for the current step sequence pause through the step diagram, thereby improving the maintenance personnel's rapid processing ability and shortening the fault inspection and repair time. BRIEF DESCRIPTION OF THE DRAWINGS

[0234] Figure 1 It is a schematic diagram of the continuous reforming atmospheric pressure regeneration system of the present invention. DETAILED DESCRIPTION

[0235] The continuous reforming atmospheric pressure regeneration system used in the present invention is as follows: Figure 1 As shown, it includes a lock hopper No. 1 LH-1 and a lock hopper No. 2 LH-2.

[0236] In the No. 1 lock hopper LH-1, the reactor reduction zone LS-3502, the first buffer hopper FA-351, the first collection hopper FA-352, and the first lifter FA-353 are connected in sequence. Specifically, the reactor reduction zone LS-3502 is connected to the second lifter FA-358 of the No. 2 lock hopper LH-2 to continuously receive the regenerated catalyst. There are two passages connecting the first buffer hopper FA-351 and the hydrogen source, one of which is provided with a valve BV-1 to control the on and off of hydrogen, and the other is provided with a second flow detection device FS-3502. The first buffer hopper FA-351 is connected to the first collection hopper FA-352 through valves BV-2, BV-3, and BV-5 in sequence. A pipeline leading to the heating furnace is provided between the valves BV-3 and BV-5, and a valve BV-4 is provided on the pipeline. The first collecting hopper FA-352 is connected to the first lifter FA-353 through valve BV-13, valve BV-14, and valve BV-16 in sequence, and the valve BV-14 and valve BV-16 are connected to the heating furnace combustion chamber BA-302 through valve BV-15. A pipeline is set between the first collecting hopper FA-352 and the nitrogen source, and the nitrogen passes through the first flow detection device FS-3503, valve BV-10, and valve BV-12 in sequence to the first collecting hopper FA-352. A pipeline leading to the heating furnace combustion chamber BA-302 is set between the valve BV-12 and valve BV-10, and a valve BV-11 is set on the pipeline to control the discharge of nitrogen in the pipeline. The first collecting hopper FA-352 is also connected to the torch system BF and the heating furnace combustion chamber BA-302 through valve BV-9.1 and valve BV-9.2 respectively. The hydrogen source is provided with a pipeline connected to the heating furnace combustion chamber BA-302 through valves BV-6 and BV-7, or a pipeline connected to the flare system BF through valves BV-6 and BV-8 in sequence, so as to discharge the hydrogen in the pipeline. The first collecting hopper FA-352 is provided with a first collecting hopper pressure detection device PS-3502 and a first collecting hopper material level detection device LS-3501. A first pressure difference indicating device PD-3501 is provided between the first buffer hopper FA-351 and the first collecting hopper FA-352. The first lifter FA-353 is always connected to the separation hopper FA-354 of the second locking hopper LH-2, and the first lifter FA-353 is always connected to the hydrogen source so that the catalyst to be regenerated can be continuously transported to the separation hopper FA-354.

[0237] The control method of the No. 1 lock hopper LH-1 and the control method of the No. 2 lock hopper LH-2 will be introduced below.

[0238] The lock hopper No. 1 LH-1 has the following control stages,

[0239] S0: Preparation stage, balance the pipeline pressure in the No. 1 lock hopper LH-1;

[0240] S1-S3: Purge stage, flush the first collection hopper FA-352 with nitrogen several times,

[0241] S4-S7: unloading stage, the catalyst to be regenerated in the first collecting hopper FA-352 is unloaded to the first lifter FA-353,

[0242] S8-S11: Pressurization stage, pressurize the first collection hopper FA-352 to make its pressure equal to that of the first buffer hopper FA-351,

[0243] S12-S14: loading stage, transferring the catalyst to be regenerated in the first buffer hopper FA-351 to the first collection hopper FA-352 to complete the loading;

[0244] S0-S14 is executed cyclically, and the long cycle time T0 is calculated starting from S1, and T0 is reset when the cycle reaches S0. When the long cycle time T0 exceeds the preset value of the long cycle time, a long cycle alarm is output.

[0245] Specifically, the first lock hopper LH-1 of the present invention is controlled by the following steps:

[0246] S0: Preparation stage

[0247] The following steps are involved:

[0248] 1) Set valves BV-1, BV-11 and BV-15 to open state, and other valves to closed state.

[0249] 2) Set valve BV-7 to open state.

[0250] 3) Check all current valve positions. When the valve position is correct, step to S1; at the same time, set the long cycle time T0 to 0.

[0251] S0 valve position: valve BV-7, valve BV-11, valve BV-15 are open, and the remaining valves are closed.

[0252] When the program is in S0, all valves are in safe position, that is, valve BV-1 is open to ensure the isolation of the reactor and the catalyst collection hopper, valves BV-11 and BV-15 are open to ensure the isolation of the hydrogen-containing part and the nitrogen-containing part of the system. The remaining valves remain closed.

[0253] After confirming the above status, set valve BV-7 to open to ensure that any residual hydrogen in the hydrogen pipeline is completely emptied to provide a safe environment for the next step. During this period, wait for the regeneration system to generate catalyst for reaction. When the catalyst reaches the preset value, close valve BV-1 and perform the next step.

[0254] S1: First stage of purge

[0255] The following steps are involved:

[0256] 1) Set valve BV-4 to the open state and calculate the long cycle time T0 from the time valve BV-4 is opened.

[0257] 2) When the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, the valve BV-9.2 is set to the open state.

[0258] Otherwise, valve BV-9.1 is set to the open valve position, and when the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, valve BV-9.1 is closed and valve BV-9.2 is set to the open state.

[0259] 3) When the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 decreases and is lower than the second given value PSH2-3502, the valve BV-11 is closed.

[0260] 4) Check the current valve position. When all valve positions are correct, step to S2.

[0261] Among them, the first given value PSH1-3502 is higher than the second given value PSH2-3502.

[0262] S1 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-15 are open.

[0263] The reason for this setting is that when the pressure is not high, it can be directly released to the heating furnace combustion chamber BA-302 through valve BV-9.2, avoiding the step of releasing the pressure to the flare system through valve BV9.1 when the pressure is high. The purpose of closing valve BV-11 is to make safety preparations for the next step.

[0264] In this embodiment, the first given value PSH1-3502 is 48 kPa, and the second given value PSH2-3502 is 21 kPa.

[0265] S2: Second stage of purge

[0266] The following steps are involved:

[0267] 1) Set valve BV-10 to open state.

[0268] 2) When the first flow detection device FS-3503 detects that the flow rate of the purge gas N2 is less than the low flow setting value FSL-3503, and the first collection hopper pressure detection device PS-3502 detects that the pressure of the first collection hopper FA-352 is lower than the second given value PSH2-3502, the valve BV-12 is set to the open state to perform the purge.

[0269] 3) When the valve BV-12 is open for a preset purge time value T2, the valve BV-12 is closed and the first collecting hopper FA-352 is depressurized through the valve BV-9.2.

[0270] 4) When the pressure of the first collecting hopper FA-352 decreases and is again lower than the second given value PSH2-3502, the valve BV-12 is set to the open state;

[0271] 5) When the opening time of valve BV-12 reaches the preset purge time value T2, close valve BV-12 again;

[0272] 6) Execute steps 4) to 5) in a loop. When the number of cycles reaches the predetermined number of purges and the valve position is correct, proceed to S3.

[0273] S2 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-10, valve BV-15 are open.

[0274] The first collecting hopper FA-352 is purged with N2 after opening valve BV-10 and valve BV-12. The pressure will increase during the purging process. When the preset purging time value T2 is reached, the purging gas is discharged to the heating furnace combustion chamber BA-302 through valve BV-9.2. At the same time, the pressure of the first collecting hopper FA-352 decreases. When the pressure drops, valve BV-12 is opened again for purging.

[0275] In step S2, when valve BV-12 is closed, the flow indication of the first flow detection device FS-3503 must be zero within a given time. If the first flow detection device FS-3503 detects that there is flow, the stepping should be stopped, and a check is performed here to avoid errors.

[0276] In this embodiment, the low flow setting value FSL-3503 is 65m 3 / h, the preset purge time value T2 is 30s, and the preset purge times is 2 times.

[0277] S3: The third stage of purge

[0278] The following steps are involved:

[0279] 1) Shut off valve BV-9.2, valve BV-10, valve BV-15.

[0280] 2) Check all valve positions. When all valve positions are correct, step to S4.

[0281] S3 valve position: valve BV-4, valve BV-7 are open.

[0282] Close valve BV-9.2, valve BV-10, valve BV-15, then the purge phase of the first collecting hopper FA-352 ends and prepares for S4.

[0283] S4: First stage of unloading

[0284] The following steps are involved:

[0285] 1) Set valve BV-11 to open state.

[0286] 2) Set valve BV-14 and valve BV-16 to open state.

[0287] 3) Check all valve positions. When all valve positions are correct, step to S5.

[0288] S4 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open.

[0289] In step S4: valve BV-11 is set to open state, and the N2 in the pipeline can be directly discharged to the heating furnace combustion chamber BA-302, so that the nitrogen main pipe and the lock hopper can be isolated. At the same time, valve BV-14 and valve BV-16 are opened to prepare for unloading.

[0290] S5: Second stage of unloading

[0291] The following steps are involved:

[0292] 1) Set valve BV-13 to the open state and calculate the opening time of valve BV-13.

[0293] 2) When the opening time of valve BV-13 reaches T5, step to S6A, where T5 is the preset opening time value of valve BV-13;

[0294] S5 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-13, valve BV-14, valve BV-16 are open.

[0295] In step S5, valve BV-13 is set to the open state to start unloading, and timing is started at the same time. When the timing reaches the preset time, stepping continues.

[0296] In this embodiment, T5 is 48s.

[0297] S6A: Unloading stage 3

[0298] The following steps are involved:

[0299] 1) Close valve BV-13 and calculate the closing time of valve BV-13.

[0300] 2) When the closing time of valve BV-13 reaches T6A, step to S6B, where T6A is the preset closing time value of valve BV-13;

[0301] S6A valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open.

[0302] In step S6A: close valve BV-13 to stop unloading and start timing at the same time to ensure that the fine dust of the catalyst on the unloading pipeline can be completely eliminated to reduce the wear of the valve seat.

[0303] In this embodiment, the T6A is 10s.

[0304] S6B: Unloading stage 4

[0305] The following steps are involved:

[0306] 1) Close valve BV-14 and calculate the closing time of valve BV-14.

[0307] 2) When the closing time of valve BV-14 reaches T6B, check the valve position. When all valve positions are correct, step to S7;

[0308] T6B is the preset value of the closing time of valve BV-14.

[0309] S6B valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-16 are open.

[0310] In S5 to S6B, by controlling the opening or closing time of each valve, it can be ensured that the spent catalyst is fully, quantitatively and stably discharged, ensuring stable operation of each step.

[0311] In this embodiment, T6B is 10s.

[0312] S7: Unloading stage 5

[0313] The following steps are involved:

[0314] 1) Shut-off valve BV-16.

[0315] 2) The conveying count of the LH-1 lifter is increased by 1;

[0316] 3) Check all valve positions. When all valve positions are correct, step to S8.

[0317] S7 valve position: valve BV-4, valve BV-7, valve BV-11 are open.

[0318] When valve BV-16 is closed in S7, it means that the catalyst of LH-1 has been lifted to the regenerator, so the delivery counter of the lifter is increased by "1". The counter is used to record the number of times the catalyst is lifted to ensure that the amount of catalyst discharged from the reactor and the amount of catalyst loaded back are balanced.

[0319] S8: First stage of pressurization

[0320] The following steps are involved:

[0321] 1) Set valve BV-15 to open state and close valves BV-4 and BV-7.

[0322] 2) Check all valve positions. When all valve positions are correct, step to S9.

[0323] S8 valve position: valve BV-11, valve BV-15 are open.

[0324] Valve BV-15 opens to isolate the lifter's lift gas system from the first collection hopper FA-352 in preparation for pressurizing the lock hopper.

[0325] S9: Second stage of pressurization

[0326] The following steps are involved:

[0327] 1) Set valve BV-8 to open state.

[0328] 2) Check all valve positions. When all valve positions are correct and the pressure difference indicating device PD-3501 indicates that the pressure difference is less than the low pressure difference setting value PDSH-3501, proceed to S10.

[0329] S9 valve position: valve BV-8, valve BV-11, valve BV-15 are open.

[0330] The valve BV8 is set to the open state to prepare for the next step S10.

[0331] In this embodiment, the low pressure difference setting value PDSH-3501 is 2 kPa.

[0332] S10: Pressurization Stage 3

[0333] 1) Set valve BV-1, valve BV-5 and valve BV-6 to open state

[0334] 2) Check all valve positions. When all valve positions are correct and the pressure difference indicating device PD-3501 indicates that the pressure difference is close to 0, proceed to S11.

[0335] S10 valve position: valve BV-1, valve BV-5, valve BV-6, valve BV-8, valve BV-11, valve BV-15 are open.

[0336] Valve BV-5 on the catalyst line is opened to allow pressure to equalize between valves BV-3 and BV-5. At the end of the step, the only unequal pressures in the system are in the body and ball chamber of valve BV-3. This minimizes pressure variations in the line.

[0337] S11: Pressurized Stage 4

[0338] The following steps are involved:

[0339] 1) Shut off valve BV-6 and valve BV-8.

[0340] 2) Compare the flow rate measured by the second flow detection device FS-3502 with the second low flow setting value FSL-3502;

[0341] 3) Calculate the time when the flow rate is less than the second lowest flow setting value FSL-3502.

[0342] Calculate the relationship between the material level of the first collecting hopper material level detection device LS-3501 and the material level setting value LSH-3501,

[0343] Calculate the relationship between the pressure of the first buffer hopper pressure detection device PS-3501 and the first given value PSH1-3502,

[0344] When the flow rate is less than the second low flow setting value FSL-3502 for a time ≥ T11, and the material level of the first collecting hopper material level detection device LS-3501 is less than the material level setting value LSH-3501, and when the first buffer hopper pressure detection device PS-3501 detects that the pressure is greater than the first given value PSH1-3502, step to S12,

[0345] Otherwise, no operation is performed;

[0346] The T11 is the preset time value when the flow rate measured by FS-3502 is less than the second low flow setting value FSL-3502.

[0347] S11 valve position: valve BV-1, valve BV-5, valve BV-11, valve BV-15 are open.

[0348] In this step, the material level indication of LS-3501 should normally be low, because the locking hopper has been unloaded at S5. If the indication is high, there are two possibilities. One is that the LS-3501 circuit is wrong, resulting in wrong material level indication, and the other is that the unloading pipeline is blocked and the hopper is not actually unloading. Therefore, when the conditions in 3) cannot be met at the same time, that is, the conditions for loading cannot be met, the loading step should not be continued.

[0349] In this embodiment, the second low flow setting value FSL-3502 is 20m 3 / h, the material level setting value LSH-3501 is 75%, and T11 is 30s.

[0350] S12: First stage of loading

[0351] The following steps are involved:

[0352] 1) Set valve BV-3 to open state.

[0353] 2) Check all valve positions. When all valve positions are correct, proceed to S13.

[0354] S12 valve position: valve BV-1, valve BV-3, valve BV-5, valve BV-11, valve BV-15 are open.

[0355] S13: Second stage of loading

[0356] 1) Set valve BV-2 to open state.

[0357] 2) Define the time from the opening of valve BV-2 to the time when LS-3501 detects that the material level is full as T13.

[0358] When T13 is less than the minimum time setting value and LS-3501 detects that the material level is full, it will output an abnormal loading alarm;

[0359] When the minimum time setting value ≤ T13 < maximum time setting value, and LS-3501 detects that the material level is full, it steps to S14A.

[0360] When T13 ≥ the maximum time setting value and LS-3501 detects that its material level is not full, it steps to S14A.

[0361] The minimum time setting value is smaller than the normal filling time value, and the maximum time setting value is larger than the normal filling time value.

[0362] Obviously, if T13 < minimum time setting value, but LS-3501 detects that its material level is full, it may be due to abnormal catalyst circulation or LS-3501 error. The abnormal catalyst circulation may be caused by abnormal differential pressure or catalyst pipeline blockage. Any of the above situations should generate an abnormal loading alarm.

[0363] In this embodiment, the minimum time setting value is 80s, and the maximum time setting value is 340s.

[0364] S14A: Loading Stage 3

[0365] The following steps are involved:

[0366] 1) Shut-off valve BV-2,

[0367] 2) Check the valve position.

[0368] 3) Start counting the time from the closing of valve BV-2. When the closing time of valve BV-2 reaches T14A and the valve position is correct, proceed to S14B, where T14A is the closing time setting value of valve BV-2.

[0369] By setting the set value T14A, a buffer time can be provided for the dust settling of the charge.

[0370] In this embodiment, the T14A is 10s.

[0371] S14B: Loading Stage 4

[0372] The following steps are involved:

[0373] 1) Shut-off valve BV-3,

[0374] 2) Check valve position

[0375] 3) Start counting the time from the closing of valve BV-3. When the closing time of valve BV-3 reaches T14B and the valve position is correct, cycle to S0. T14B is the closing time setting value of valve BV-3.

[0376] S0-S14B is executed cyclically. When the long cycle time T0 reaches the preset long cycle time value, a long cycle alarm is output.

[0377] In this embodiment, T14B is 10s, and the predetermined value of the long cycle time is 1800s.

[0378] The following will introduce the No. 2 lock hopper LH-2, in which the regenerator DC-351, the second buffer hopper FA-356, the second collection hopper FA-357, and the second lifter FA-358 are connected in sequence. Specifically, the second buffer hopper FA-356 is connected to the second collection hopper FA-357 through valves BV-42, BV-43, and BV-45 in sequence, and the second collection hopper FA-357 is connected to the second lifter FA-358 through valves BV-53 and BV-54 in sequence. A pipeline is provided between the valves BV-43 and BV-45 to the heating furnace combustion chamber BA-302, and a valve BV-44 is provided on the pipeline. A pipeline is provided between the valves BV-54 and BV-56 to the heating furnace combustion chamber BA-302, and a valve BV-55 is provided on the pipeline.

[0379] The second collecting hopper FA-357 is provided with a second collecting hopper pressure detection device PS-3504 to detect the pressure in the second collecting hopper FA-357, and a second collecting hopper material level detection device LS-3504 to detect the material level of the second collecting hopper FA-357. The second collecting hopper FA-357 is connected to a nitrogen source, and the nitrogen passes through the third flow detection device FS-3510, valve BV-50, and valve BV-52 to the second collecting hopper FA-357 in sequence. A pipeline leading to the heating furnace combustion chamber BA-302 is provided between the valves BV-50 and BV-52, and a valve BV-51 is provided on the pipeline to control the discharge of nitrogen in the pipeline. The second collecting hopper FA-357 is connected to the hydrogen source, and the hydrogen is led to the second collecting hopper FA-357 through valves BV-46 and BV-48 in sequence. A pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valves BV-46 and BV-48, and a valve BV-47 is arranged on the pipeline. The second collecting hopper FA-357 is connected to the torch system BF through valve BV-49.1, and is connected to the heating furnace combustion chamber BA-302 through valve BV-49.2.

[0380] A second pressure difference indicating device PD-3503 is provided between the second collecting hopper FA-357 and the second lifter FA-358. The second lifter FA-358 is connected to a hydrogen source and is provided with a fourth flow indicator FS-3511.

[0381] The second locking hopper control system of the present invention is controlled by the following cycle steps:

[0382] S20: Preparation

[0383] The following steps are involved:

[0384] 1) Set valve BV-44 and valve BV-51 to open state.

[0385] 2) Set valve BV-47 and valve BV-55 to open state.

[0386] 3) Check the valve position and the material level of LS-3502 in the reactor reduction zone. When the valve position is correct and LS-3502 detects that its material level has reached LSL-3502, step to S21; at the same time, set the second long cycle time T20 to 0.

[0387] The LSL-3502 is the low material level setting value.

[0388] Valve position: Valve BV-44, valve BV-47, valve BV-51, valve BV-55 are open.

[0389] In this step, valve BV-44 and valve BV-51 are opened to ensure that the nitrogen-containing part and the hydrogen-containing part of the system are isolated.

[0390] S21: Purge 1 Stage 1

[0391] The following steps are involved:

[0392] 1) The second longest cycle time T20 starts timing,

[0393] When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the third given value PSH1-3504, the valve BV-49.2 is set to the open state;

[0394] Otherwise, valve BV-49.1 is set to an open state, and when the pressure drops to a third given value PSH1-3504, valve BV-49.1 is closed and valve BV-49.2 is set to an open state;

[0395] 2) When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the fourth given value PSH2-3504, the valve BV-51 is closed.

[0396] 3) Check all valve positions. When all valve positions are correct, proceed to S22.

[0397] Among them, the third given value PSH1-3504>the fourth given value PSH2-3504.

[0398] S21 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-55 are open.

[0399] The reason for this setting is that when the pressure is not high, it can be directly released to the heating furnace combustion chamber BA-302 through valve BV-49.2, saving steps. The purpose of closing valve BV-51 is to make safety preparations for the next step.

[0400] Among them, the third given value PSH1-3504 is 18kPa, and the fourth given value PSH2-3504 is 16kPa.

[0401] S22: Purge 1 second stage

[0402] 1) Set valve BV-50 to open state.

[0403] 2) When the third flow detection device FS-3510 detects that the flow rate of the purge gas N2 is lower than the third low flow setting value FSL-3510, and the second collection hopper pressure detection device PS-3504 detects that the pressure is lower than the low pressure alarm setting value PSL-3504, the valve BV-52 is set to the open state;

[0404] 3) When the opening time of valve BV-52 reaches the preset purge time value T22, valve BV-52 is closed and the second collecting hopper FA-357 is depressurized through valve BV-49.2;

[0405] 4) When the pressure of the second collecting hopper FA-357 drops to the low pressure alarm setting value PSL-3504, set the valve BV-52 to the open state;

[0406] 5) When the opening time of valve BV-52 reaches T22, valve BV-52 is closed, wherein T22 is the opening time setting value of valve BV-52;

[0407] 6) Execute step 4)-step 5) cyclically. When the number of cycles reaches the predetermined number of purge times and all valve positions are correct, proceed to S23.

[0408] S22 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-50, valve BV-55 are open.

[0409] The second collecting hopper FA-357 is purged with N2 after opening valve BV-50 and valve BV-52. After its pressure increases, valve BV-52 is closed and the pressure is released to the heating furnace combustion chamber BA-302 through valve BV-49.2. When the pressure drops, valve BV-52 is opened again for purging.

[0410] In step S22, when valve BV-52 is closed, the actual flow rate detected by the third flow detection device FS-3510 must be zero. If the detected flow rate is not zero, it means that there is flow and the stepping should be stopped. The stepping stop causes the second long cycle time T-20 to reach a predetermined value, generating a long cycle alarm, which is checked here to avoid errors.

[0411] In this embodiment, the third low flow setting value FSL-3510 is 72m 3 / h, the low pressure alarm setting value PSL-3504 is 18kPa, the T22 is 30s, and the predetermined purge times is 2 times.

[0412] S23: Purge 1 Stage 3

[0413] The following steps are involved:

[0414] 1) Shut off valve BV-47, valve BV-49.2, valve BV-50 and valve BV-55,

[0415] 2) Check all valve positions. When all valve positions are correct, proceed to S24.

[0416] S23 valve position: valve BV-44 is open.

[0417] Complete the purge step while establishing pressurized conditions.

[0418] S24: Pressurization Stage 1

[0419] The following steps are involved:

[0420] 1) Set valve BV-51 to open state.

[0421] 2) Set valve BV-48 and valve BV-54 to open state.

[0422] 3) Calculate the duration when the second pressure difference indicator PD-3503 indicates that the pressure difference is greater than the high pressure difference setting value PDSH-3503 and FS-3511 detects flow.

[0423] 4) When the duration is greater than the set value T24 of the time in 3), check all valve positions, and when the valve positions are correct, step to S25.

[0424] S24 valve position: valve BV-44, valve BV-48, valve BV-51, valve BV-54 are open.

[0425] In this embodiment, the high pressure difference setting value PDSH-3503 is 12 kPa, and T24 is 10 s.

[0426] S25: Second stage of pressurization

[0427] The following steps are involved:

[0428] 1) Set valve BV-46 to open state.

[0429] 2) When PD-3503 indicates that the pressure difference is 0, step to S26.

[0430] S26: Pressurization Stage 3

[0431] The following steps are involved:

[0432] 1) Shut off valve BV-46, valve BV-48,

[0433] 2) Check the valve position. When the pressure of FA-357 is greater than the third given value PSH1-3504, step to S27.

[0434] S26 valve position: valve BV-44, valve BV-51, valve BV-54 are open.

[0435] S27: Unloading stage 1

[0436] The following steps are involved:

[0437] 1) Set valve BV-47 and valve BV-56 to open state.

[0438] 2) Check the valve position. When the valve position is correct, step to S28.

[0439] S27 valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open.

[0440] Valve BV-47 and valve BV-56 are opened to isolate the nitrogen and hydrogen mains.

[0441] S28: Unloading stage 2

[0442] The following steps are involved:

[0443] 1) Set valve BV-53 to the open state and calculate the opening time of valve BV-53.

[0444] 2) When the opening time of valve BV-53 reaches T28, step to S29A,

[0445] The T28 is the preset value of the opening time of the valve BV-53.

[0446] In this embodiment, the T28 is 320s.

[0447] S29A: Unloading stage 3

[0448] The following steps are involved:

[0449] 1) Close valve BV-53 and calculate the closing time of valve BV-53.

[0450] 2) When the closing time of valve BV-53 reaches T29A, check the valve position. When all valve positions are correct, step to S29A. T29A is the preset closing time value of valve BV-53.

[0451] S29A valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open.

[0452] When valve BV-53 is closed, the dust settling timer starts timing to ensure that the fine dust of the catalyst on the discharge pipeline can be completely eliminated to reduce the wear of the ball valve seat of the discharge valve.

[0453] In this embodiment, the T29A is 10s.

[0454] S29B: Unloading Stage 4

[0455] The following steps are involved:

[0456] 1) Close valve BV-54 and calculate the closing time of valve BV-54.

[0457] 2) When the closing time of valve BV-54 reaches T29B, check the valve position. When all valve positions are correct, proceed to S30. T29B is the preset closing time value of valve BV-54.

[0458] S29B valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-56 are open.

[0459] In this embodiment, the T29B is 10s.

[0460] S30: Unloading stage 5

[0461] The following steps are involved:

[0462] 1) Shut-off valve BV-56,

[0463] 2) When no abnormal loading alarm is received, the LH-2 delivery counter increases by 1; otherwise, the delivery counter does not count.

[0464] 3) Check the valve position. When all valve positions are correct, proceed to S31.

[0465] S30 valve position: valve BV-44, valve BV-47, valve BV-51 are open.

[0466] The counter is used to record the number of times the catalyst is lifted to ensure that the amount of catalyst unloaded from the reactor and the amount of catalyst loaded back are balanced.

[0467] S31: Purge 2 Stage 1

[0468] The following steps are involved:

[0469] 1) Set valve BV-55 to open state.

[0470] 2) Set valve BV-49.1 to open state.

[0471] 3) When the pressure of the second collecting hopper FA-357 drops to the third given value PSH1-3504, close valve BV-49.1 and set valve BV-49.2 to the open state;

[0472] 4) When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the fourth given value PSH2-3504, the valve BV-51 is closed.

[0473] 5) Check all valve positions. When all valve positions are correct, proceed to S32.

[0474] S31 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-55 are open.

[0475] S32: Purge 2 Stage 2

[0476] The following steps are involved:

[0477] 1) Set valve BV-50 to open state.

[0478] 2) When the third flow detection device FS-3510 detects that the flow rate of the purge gas N2 is lower than the third low flow setting value FSL-3510, and the second collection hopper pressure detection device PS-3504 detects that the pressure is lower than the low pressure alarm setting value PSL-3504, the valve BV-52 is set to the open state;

[0479] 3) When the opening time of valve BV-52 reaches the preset purge time value T22, valve BV-52 is closed and the second collecting hopper FA-357 is depressurized through valve BV-49.2;

[0480] 4) When the pressure of the second collecting hopper FA-357 drops to the low pressure alarm setting value PSL-3504, set the valve BV-52 to the open state;

[0481] 5) When the opening time of valve BV-52 reaches T22, valve BV-52 is closed, wherein T22 is the opening time setting value of valve BV-52;

[0482] 6) Execute steps 4) to 5) in a loop. When the number of cycles reaches the predetermined number of purges and all valve positions are correct, proceed to S33.

[0483] S32 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-50, valve BV-55 are open.

[0484] S33: Purge 2 Stage 3

[0485] The following steps are involved:

[0486] 1) Shut-off valve BV-44, valve BV-49.2, valve BV-50,

[0487] 2) Check the valve position. When the second collecting hopper material level detection device LS-3504 is lower than the second material level setting value LSL-3504 and all valve positions are correct, step to S34.

[0488] S33 valve position: valve BV-47, valve BV-55 are open.

[0489] In this embodiment, the second material level setting value LSL-3504 is 75%.

[0490] S34: First stage of loading

[0491] The following steps are involved:

[0492] 1) Set valve BV-51 to open state.

[0493] 2) Set valve BV-43 and valve BV-45 to open state.

[0494] 3) Check the valve position. When all valve positions are correct, proceed to S35.

[0495] S35: Second stage of loading

[0496] The following steps are involved:

[0497] 1) Set valve BV-42 to open state.

[0498] 2) Define the time from the opening of valve BV-42 to the time when LS-3504 indicates that the material level is full as T35, calculate T35,

[0499] When T35 is less than the minimum time setting value and LS-3504 detects that the material level is full, it will output an abnormal loading alarm;

[0500] When the minimum time setting value ≤ T35 < maximum time setting value, and LS-3504 detects that its material level is full, it steps to S36A;

[0501] When T35 ≥ the maximum time setting value, and LS-3504 detects that the material level is not full, it steps to S36A.

[0502] The minimum time setting value is smaller than the normal filling time value, and the maximum time setting value is larger than the normal filling time value.

[0503] Obviously, if T35 < minimum time setting value, but LS-3504 detects that its material level is full, it may be due to abnormal catalyst flow or LS-3504 error. The abnormal catalyst flow may be caused by abnormal differential pressure or catalyst pipeline blockage. Any of the above situations should generate an abnormal loading alarm.

[0504] S36A: Loading Stage 3

[0505] The following steps are involved:

[0506] 1) Close valve BV-42 and calculate the time from the closing of valve BV-42.

[0507] 2) Check all valve positions. When all valve positions are correct and the closing time of valve BV-42 reaches the set value T36A, step to S36B.

[0508] S36A valve position: valve BV-43, valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open.

[0509] Valve BV-42 is closed. When the valve is closed, the loading dust removal timer starts to count. This ensures that the fine dust of the catalyst on the discharge pipeline can be completely eliminated to reduce the wear of the discharge valve ball valve seat.

[0510] In this embodiment, the T36A is 10s.

[0511] S36B: Loading Stage 4

[0512] The following steps are involved:

[0513] 1) Close valve BV-43 and calculate the time from the closing of valve BV-43.

[0514] 2) Check valve position

[0515] 3) When the closing time of valve BV-43 reaches the set value T36B and all valve positions are correct, step to S37.

[0516] S36B valve position: valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open.

[0517] In this embodiment, T36B is 10s.

[0518] S37: Loading Stage 5

[0519] The following steps are involved:

[0520] 1) Shut-off valve BV-45,

[0521] 2) Check the valve position. When all valve positions are correct, cycle to S20.

[0522] S37 valve position: valve BV-47, valve BV-51, valve BV-55 are open.

[0523] Steps S20-S37 are executed cyclically, and when the second long cycle time T20 reaches the second long cycle time preset value, a long cycle alarm is output.

[0524] In this embodiment, the predetermined value of the second long cycle time is 1800s.

Claims

1. A control method for a continuous reforming atmospheric pressure regeneration system, characterized in that: The continuous reforming atmospheric pressure regeneration system comprises a first lock hopper LH-1 and a second lock hopper LH-2. In the No. 1 lock hopper LH-1, the reactor reduction zone LS-3502, the first buffer hopper FA-351, the first collecting hopper FA-352, and the first lifter FA-353 are connected in sequence; the first buffer hopper FA-351 is connected to the hydrogen source by two passages, one of which is provided with a valve BV-1, and the other is provided with a second flow detection device FS-3502; the first buffer hopper FA-351 is connected to the first collecting hopper FA-352 through valves BV-2, BV-3, and BV-5 in sequence; a pipeline leading to the heating furnace is provided between the valves BV-3 and BV-5, and a valve BV-4 is provided on the pipeline; the first collecting hopper FA-352 is connected to the first lifter FA-353 through valves BV-13, BV-14, and BV-16 in sequence, The valves BV-14 and BV-16 are connected to the heating furnace combustion chamber BA-302 through valve BV-15; a pipeline is set between the first collecting hopper FA-352 and the nitrogen source, and the nitrogen passes through the first flow detection device FS-3503, valve BV-10, and valve BV-12 to the first collecting hopper FA-352 in sequence; a pipeline leading to the heating furnace combustion chamber BA-302 is set between the valves BV-12 and BV-10, and a valve BV-11 is set on the pipeline; the first collecting hopper FA-352 is also connected to the torch system BF and the heating furnace combustion chamber BA-302 through valves BV-9.1 and BV-9.2 respectively; the hydrogen source is set There is a pipeline connected to the heating furnace combustion chamber BA-302 through valves BV-6 and BV-7, or a pipeline connected to the flare system BF through valves BV-6 and BV-8 in sequence; the first collecting hopper FA-352 is provided with a first collecting hopper pressure detection device PS-3502 and a first collecting hopper material level detection device LS-3501, and a first pressure difference indicating device PD-3501 is provided between the first buffer hopper FA-351 and the first collecting hopper FA-352; the first lifter FA-353 is always connected to the separation hopper FA-354 of the second locking hopper LH-2, and the first lifter FA-353 is always connected to the hydrogen source; The regenerator DC-351, the second buffer hopper FA-356, the second collecting hopper FA-357 and the second lifter FA-358 in the second lock hopper LH-2 are connected in sequence; the second buffer hopper FA-356 is connected to the second collecting hopper FA-357 through valves BV-42, BV-43 and BV-45 in sequence, and the second collecting hopper FA-357 is connected to the second lifter FA-358 through valves BV-53 and BV-54 in sequence; the valve BV-43 is connected to the valve BV -45 is provided with a pipeline leading to the heating furnace combustion chamber BA-302, and a valve BV-44 is provided on the pipeline; a pipeline leading to the heating furnace combustion chamber BA-302 is provided between the valve BV-54 and the valve BV-56, and a valve BV-55 is provided on the pipeline; the second collecting hopper FA-357 is provided with a second collecting hopper pressure detection device PS-3504 and a second collecting hopper material level detection device LS-3504; the second collecting hopper FA-357 is connected to the nitrogen source, and the nitrogen passes through in sequence The third flow detection device FS-3510, valve BV-50, and valve BV-52 lead to the second collecting hopper FA-357; a pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valve BV-50 and valve BV-52, and a valve BV-51 is arranged on the pipeline; the second collecting hopper FA-357 is connected to the hydrogen source, and the hydrogen passes through valves BV-46 and valve BV-48 in turn to the second collecting hopper FA-357, and a pipeline leading to the heating furnace combustion chamber BA-302 is arranged between the valves BV-46 and valve BV-48. The pipeline of the chamber BA-302 is provided with a valve BV-47; the second collecting hopper FA-357 is connected with the flare system BF through the valve BV-49.1, and is connected with the heating furnace combustion chamber BA-302 through the valve BV-49.2; a second pressure difference indicating device PD-3503 is provided between the second collecting hopper FA-357 and the second riser FA-358; the second riser FA-358 is connected with the hydrogen source and is provided with a fourth flow indicator FS-3511; The lock hopper No. 1 LH-1 is controlled by the following steps: S0: Preparation stage, balancing the pipeline pressure in the No. 1 lock hopper LH-1; including the following steps: S01), set valve BV-1, valve BV-11, valve BV-15 to open state, and other valves to closed state, S02) Set valve BV-7 to open state. S03) Check all current valve positions. When the valve position is correct, step to S1; at the same time, set the long cycle time T0 to 0; S0 valve position: valve BV-7, valve BV-11, valve BV-15 are open, and the rest of the valves are closed; S1-S3: Purge stage, flushing the first collection hopper FA-352 with nitrogen multiple times, including: S1: First stage of purge The following steps are involved: S11), set valve BV-4 to open state, and calculate the long cycle time T0 from the time valve BV-4 is opened, S12), when the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, the valve BV-9.2 is set to the open state, Otherwise, valve BV-9.1 is set to the open valve position, and when the pressure of the first collecting hopper FA-352 is lower than the first given value PSH1-3502, valve BV-9.1 is closed and valve BV-9.2 is set to the open state. S13) When the first collecting hopper pressure detection device PS-3502 detects that the pressure of the first collecting hopper FA-352 decreases and is lower than the second given value PSH2-3502, the valve BV-11 is closed. S14), check the current valve position, when all valve positions are correct, step to S2; Wherein, the first given value PSH1-3502 is higher than the second given value PSH2-3502; S1 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-15 are open; S2: Second stage of purge S21) Set valve BV-10 to open state. S22), when the first flow detection device FS-3503 detects that the flow rate of the purge gas N2 is less than the low flow setting value FSL-3503, and the first collection hopper pressure detection device PS-3502 detects that the pressure of the first collection hopper FA-352 is lower than the second given value PSH2-3502, the valve BV-12 is set to the open state to perform the purge, S23) When the opening time of valve BV-12 reaches the preset purge time value T2, valve BV-12 is closed, and the first collecting hopper FA-352 is depressurized through valve BV-9.

2. S24), when the pressure of the first collecting hopper FA-352 decreases and is lower than the second given value PSH2-3502 again, the valve BV-12 is set to the open state; S25), when the valve BV-12 is opened for a preset purge time value T2, the valve BV-12 is closed again; S26), cyclically execute step 4) - step 5), when the number of cycles reaches the predetermined number of purge times and the valve position is correct, step to S3, S2 valve position: valve BV-4, valve BV-7, valve BV-9.2, valve BV-10, valve BV-15 are open; S3: The third stage of purge The following steps are involved: S31), closing valve BV-9.2, valve BV-10, valve BV-15; S32), check all valve positions, when all valve positions are correct, step to S4; S3 valve position: valve BV-4, valve BV-7 are open; S4-S7: unloading stage, unloading the catalyst to be regenerated in the first collecting hopper FA-352 to the first lifter FA-353, including: S4: First stage of unloading The following steps are involved: S41) Set valve BV-11 to open state. S42) Set valve BV-14 and valve BV-16 to open state. S43), check all valve positions, when all valve positions are correct, step to S5; S4 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open; S5: Second stage of unloading The following steps are involved: S51), set valve BV-13 to the open state, calculate the opening time of valve BV-13, S52), when the opening time of the valve BV-13 reaches T5, step to S6A, wherein T5 is the preset value of the opening time of the valve BV-13; S5 valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-13, valve BV-14, valve BV-16 are open; S6A: Unloading stage 3 The following steps are involved: S6A1), close valve BV-13, calculate the closing time of valve BV-13, S6A2), when the closing time of the valve BV-13 reaches T6A, step to S6B, wherein T6A is the preset closing time value of the valve BV-13; S6A valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-14, valve BV-16 are open; S6B: Unloading stage 4 The following steps are involved: S6B1), close valve BV-14, calculate the closing time of valve BV-14, S6B2) When the closing time of valve BV-14 reaches T6B, check the valve position. When all valve positions are correct, proceed to S7; T6B is the preset value of the closing time of valve BV-14. S6B valve position: valve BV-4, valve BV-7, valve BV-11, valve BV-16 are open; S7: Unloading stage 5 The following steps are involved: S71), shut-off valve BV-16; S72) The number of times the LH-1 lifter delivers is counted is increased by 1; S73), check all valve positions, when all valve positions are correct, step to S8; S7 valve position: valve BV-4, valve BV-7, valve BV-11 are open; S8-S11: Pressurization stage, pressurizing the first collecting hopper FA-352 to make its pressure equal to that of the first buffer hopper FA-351, including: S8: First stage of pressurization The following steps are involved: S81), set valve BV-15 to open state, close valve BV-4 and valve BV-7; S82), check all valve positions, when all valve positions are correct, step to S9; S8 valve position: valve BV-11, valve BV-15 are open; S9: Second stage of pressurization The following steps are involved: S91) Set valve BV-8 to open state. S92), check all valve positions. When all valve positions are correct and the pressure difference indicating device PD-3501 indicates that the pressure difference is less than the low pressure difference setting value PDSH-3501, proceed to S10; S9 valve position: valve BV-8, valve BV-11, valve BV-15 are open; S10: Pressurization Stage 3 S101), set valve BV-1, valve BV-5, valve BV-6 to open state, S102) Check all valve positions. When all valve positions are correct and the pressure difference indicating device PD-3501 indicates that the pressure difference is close to 0, proceed to S11. S10 valve position: valve BV-1, valve BV-5, valve BV-6, valve BV-8, valve BV-11, valve BV-15 are open; S11: Pressurized Stage 4 The following steps are involved: S11), shut-off valve BV-6, valve BV-8, S12), comparing the flow rate measured by the second flow detection device FS-3502 with the second low flow setting value FSL-3502; S13) calculates the time when the flow rate is less than the second low flow rate setting value FSL-3502, When the flow rate is less than the second low flow setting value FSL-3502 for a time ≥ T11, and the material level of the first collecting hopper material level detection device LS-3501 is less than the material level setting value LSH-3501, and when the first buffer hopper pressure detection device PS-3501 detects that the pressure is greater than the first given value PSH1-3502, step to S12, Otherwise, no operation is performed; T11 is the preset time value when the flow rate measured by FS-3502 is less than the second low flow setting value FSL-3502. S11 valve position: valve BV-1, valve BV-5, valve BV-11, valve BV-15 are open; S12-S14: loading stage, transferring the catalyst to be regenerated in the first buffer hopper FA-351 to the first collection hopper FA-352 to complete the loading; including: S12: First stage of loading The following steps are involved: S121) Set valve BV-3 to open state. S122), check all valve positions, when all valve positions are correct, step to S13; S12 valve position: valve BV-1, valve BV-3, valve BV-5, valve BV-11, valve BV-15 are open; S13: Second stage of loading S131), set valve BV-2 to open state, S132) Define the time from the opening of valve BV-2 to the time when LS-3501 detects that the material level is full as T13. When T13 is less than the minimum time setting value and LS-3501 detects that the material level is full, it will output an abnormal loading alarm; When the minimum time setting value ≤ T13 < maximum time setting value, and LS-3501 detects that the material level is full, it steps to S14A. When T13 ≥ the maximum time setting value, and LS-3501 detects that its material level is not full, it steps to S14A; Wherein, the minimum time setting value is less than the normal filling time value, and the maximum time setting value is greater than the normal filling time value; S14A: Loading Stage 3 The following steps are involved: S14A1), shut-off valve BV-2, S14A2), check valve position, S14A3), start counting the time from the closing of valve BV-2, when the closing time of valve BV-2 reaches T14A and the valve position is correct, step to S14B, where T14A is the closing time setting value of valve BV-2; S14B: Loading Stage 4 The following steps are involved: S14B1), shut-off valve BV-3, S14B2) Check valve position S14B3), start counting the time from the closing of valve BV-3, when the closing time of valve BV-3 reaches T14B and the valve position is correct, cycle to S0, where T14B is the closing time setting value of valve BV-3; Execute S0-S14 in a loop, and start calculating the long cycle time T0 from S1, and reset T0 when looping to S0. When the long cycle time T0 exceeds the preset value of the long cycle time, output a long cycle alarm; The second lock hopper LH-2 is controlled by the following steps: S20: Preparation stage, balancing the pipeline pressure in the second lock hopper LH-2; including the following steps: S201), set valve BV-44 and valve BV-51 to open state, S202), set valve BV-47 and valve BV-55 to open state, S203), check the valve position, check the material level of LS-3502 in the reactor reduction zone, when the valve position is correct and LS-3502 detects that its material level has reached LSL-3502, step to S21; at the same time, set the second long cycle time T20 to 0, The LSL-3502 is the low material level setting value; Valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-55 are open; S21-S23: Purge 1 stage, the first time, the second collection hopper FA-357 is flushed with nitrogen multiple times, including: S21: Purge 1 Stage 1 The following steps are involved: 1) The second longest cycle time T20 starts timing, When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the third given value PSH1-3504, the valve BV-49.2 is set to the open state; Otherwise, valve BV-49.1 is set to an open state, and when the pressure drops to a third given value PSH1-3504, valve BV-49.1 is closed and valve BV-49.2 is set to an open state; 2) When the second collecting hopper pressure detection device PS-3504 detects that the pressure of the second collecting hopper FA-357 is less than the fourth given value PSH2-3504, the valve BV-51 is closed; 3) Check all valve positions. When all valve positions are correct, proceed to S22; Wherein, the third given value PSH1-3504>the fourth given value PSH2-3504; S21 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-55 are open; S22: Purge 1 second stage S221) Set valve BV-50 to open state. S222), when the third flow detection device FS-3510 detects that the flow rate of the purge gas N2 is lower than the third low flow setting value FSL-3510, and the second collection hopper pressure detection device PS-3504 detects that the pressure is lower than the low pressure alarm setting value PSL-3504, the valve BV-52 is set to the open state; S223), when the opening time of valve BV-52 reaches the preset purge time value T22, valve BV-52 is closed, and the second collecting hopper FA-357 is depressurized through valve BV-49.2; S224), when the pressure of the second collecting hopper FA-357 drops to the low pressure alarm setting value PSL-3504, the valve BV-52 is set to the open state; S225), when the opening time of valve BV-52 reaches T22, valve BV-52 is closed, wherein T22 is the opening time setting value of valve BV-52; S226), loop through step 4) - step 5), when the number of cycles reaches the predetermined number of purges and all valve positions are correct, proceed to S23, S22 valve position: valve BV-44, valve BV-47, valve BV-49.2, valve BV-50, valve BV-55 are open; S23: Purge 1 Stage 3 The following steps are involved: S231), shut-off valve BV-47, valve BV-49.2, valve BV-50 and valve BV-55, S232), check all valve positions, when all valve positions are correct, step to S24; S23 valve position: valve BV-44 is open; S24-S26: Pressurization stage, pressurizing the second collecting hopper FA-357 to make the pressure of the second collecting hopper FA-357 and the second lifter FA-358 equal, including: S24: Pressurization Stage 1 The following steps are involved: S241) Set valve BV-51 to open state. S242), set valve BV-48 and valve BV-54 to open state, S243), calculate the duration when the second pressure difference indicator PD-3503 indicates that the pressure difference is greater than the high pressure difference setting value PDSH-3503, and FS-3511 detects that there is flow, S244), when the duration is greater than the set value T24 of the time in 3), check all valve positions, and when the valve positions are correct, step to S25; S24 valve position: valve BV-44, valve BV-48, valve BV-51, valve BV-54 are open; S25: Second stage of pressurization The following steps are involved: S251) Set valve BV-46 to open state. S252) When the pressure difference indicated by PD-3503 is 0, proceed to S26; S26: Pressurization Stage 3 The following steps are involved: S261), shut-off valve BV-46, valve BV-48, S262), check the valve position, when the pressure of FA-357 is greater than the third given value PSH1-3504, step to S27; S26 valve position: valve BV-44, valve BV-51, valve BV-54 are open; S27-S30: unloading stage, unloading the regenerated catalyst in the second collecting hopper FA-357 to the second lifter FA-358, including: S27: Unloading stage 1 The following steps are involved: S271), set valve BV-47 and valve BV-56 to open state, S272), check the valve position, when the valve position is correct, step to S28; S27 valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open; S28: Unloading stage 2 The following steps are involved: S281), set valve BV-53 to the open state, calculate the opening time of valve BV-53, S282), when the opening time of valve BV-53 reaches T28, step to S29A, Said T28 is the preset value of the opening time of valve BV-53; S29A: Unloading stage 3 The following steps are involved: S29A1), close valve BV-53, calculate the closing time of valve BV-53, S29A2) When the closing time of valve BV-53 reaches T29A, check the valve position. When all valve positions are correct, step to S29A. T29A is the preset closing time value of valve BV-53. S29A valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-54, valve BV-56 are open; S29B: Unloading Stage 4 The following steps are involved: S29B1), close valve BV-54, calculate the closing time of valve BV-54, S29B2) When the closing time of valve BV-54 reaches T29B, check the valve position. When all valve positions are correct, step to S30. T29B is the preset closing time value of valve BV-54. S29B valve position: valve BV-44, valve BV-47, valve BV-51, valve BV-56 are open; S30: Unloading stage 5 The following steps are involved: S301), shut-off valve BV-56, S302) When no abnormal loading alarm is received, the LH-2 delivery counter is incremented by 1; otherwise, the delivery counter does not count; S303), check the valve position, when all valve positions are correct, step to S31; S30 valve position: valve BV-44, valve BV-47, valve BV-51 are open; S31-S33: 2 stages of purging, the second collection hopper FA-357 is flushed with nitrogen multiple times for the second time, S34-S37: Loading stage, the regenerated catalyst in the second buffer hopper FA-356 is transferred to the second collection hopper FA-357 to complete the loading; including: S34: First stage of loading The following steps are involved: S341) Set valve BV-51 to open state. S342), set valve BV-43 and valve BV-45 to open state, S343), check the valve position, when all valve positions are correct, step to S35; S35: Second stage of loading The following steps are involved: S351) Set valve BV-42 to open state. S352) Define the time from the opening of valve BV-42 to the time when LS-3504 indicates that the material level is full as T35, calculate T35, When T35 is less than the minimum time setting value and LS-3504 detects that the material level is full, it will output an abnormal loading alarm; When the minimum time setting value ≤ T35 < maximum time setting value, and LS-3504 detects that its material level is full, it steps to S36A; When T35 ≥ the maximum time setting value, and LS-3504 detects that the material level is not full, it steps to S36A. Wherein, the minimum time setting value is less than the normal filling time value, and the maximum time setting value is greater than the normal filling time value; S36A: Loading Stage 3 The following steps are involved: S36A1), close valve BV-42, and calculate the time from the closing of valve BV-42, S36A2), check all valve positions. When all valve positions are correct and the closing time of valve BV-42 reaches the set value T36A, step to S36B; S36A valve position: valve BV-43, valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open; S36B: Loading Stage 4 The following steps are involved: S36B1), close valve BV-43, and calculate the time from the closing of valve BV-43, S36B2), check valve position, S36B3), when the closing time of valve BV-43 reaches the set value T36B and all valve positions are correct, step to S37; S36B valve position: valve BV-45, valve BV-47, valve BV-51, valve BV-55 are open; S37: Loading Stage 5 The following steps are involved: S371), shut-off valve BV-45, S372), check valve positions, when all valve positions are correct, cycle to S20; S37 valve position: valve BV-47, valve BV-51, valve BV-55 are open S20-S37 are executed in a loop, and the second long cycle time T20 is calculated starting from S21, and T20 is reset when looping to S20. When the second long cycle time T20 exceeds the predetermined value of the long cycle time, a long cycle alarm is output.