Inspection device and inspection method

Through the heat exchange technology of the multi-layer inspection chamber structure and the refrigerant gas piping, the wafer heat removal process is simplified, the problems of complex structure and high cost in the existing technology are solved, and efficient and accurate temperature control is achieved.

CN113820577BActive Publication Date: 2024-10-01TOKYO ELECTRON LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110556938.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-06-02
Filing Date
2021-05-21
Publication Date
2024-10-01
Estimated Expiration
2041-05-21

AI Technical Summary

Technical Problem

In the existing technology, the problem of removing heat from wafers in the inspection room is complex, occupying a large space, and being costly. Especially in high-temperature environments, it is difficult to simply and effectively cool the wafers.

Method used

Using a multi-layer inspection room structure, the cooled refrigerant gas is heat exchanged in the heat exchanger through the refrigerant gas piping. The heat exchanger is used to cool the refrigerant gas to normal temperature, and is supplied to the top of the suction cup, combined with heating. The controller and temperature sensor realize the temperature control of the wafer.

Benefits of technology

It can easily remove the heat from the wafer in the inspection room, reducing the occupied space and cost. It can also control the temperature of the wafer with high precision and is suitable for different temperature environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113820577B_ABST
    Figure CN113820577B_ABST
Patent Text Reader

Abstract

The present invention provides an inspection device and an inspection method, which can remove heat from a wafer in an inspection chamber with a simple structure. The inspection device includes: a multi-layer inspection chamber row in which a plurality of inspection chambers are arranged, the inspection chambers can accommodate a tester for inspecting an object to be inspected on a suction cup top; a refrigerant supply unit for supplying refrigerant gas; and a control unit, the refrigerant supply unit having: a refrigerant gas piping, which is provided for each of the inspection chamber rows, connecting the plurality of suction cup tops, and allowing the refrigerant gas to pass through; and a first heat exchanger, which is arranged for each of the refrigerant gas piping between the plurality of suction cup tops, and performs heat exchange with the refrigerant gas discharged from the suction cup tops, the plurality of suction cup tops respectively having a heater for heating the object to be inspected and a temperature sensor, and the control unit controls the heater based on the temperature detected by the temperature sensor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an inspection device and an inspection method. Background Art

[0002] For example, Patent Document 1 has a cryogenic nitrogen heat exchanger that cools compressed air using cryogenic nitrogen gas, which is a gas with a temperature lower than room temperature, and supplies the compressed air cooled by the cryogenic nitrogen heat exchanger to a workbench. The workbench has a heater that heats the workbench and a temperature sensor that detects the temperature of the top of the suction cup of the workbench. A valve is provided in a supply passage for supplying cryogenic nitrogen gas to the cryogenic nitrogen heat exchanger. A control unit controls the opening and closing of the valve, and controls the flow rate of the cryogenic nitrogen gas supplied to the cryogenic nitrogen heat exchanger and the output of the heater, so that the detected temperature of the temperature sensor becomes a predetermined temperature.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Application Publication No. 2013-167474 Summary of the invention

[0006] Technical problem to be solved by the invention

[0007] The present invention provides an inspection device and an inspection method capable of removing heat from a wafer in an inspection chamber with a simple structure.

[0008] Technical solutions for solving technical problems

[0009] One embodiment of the present invention provides an inspection device, which includes: a multi-layer inspection chamber row in which a plurality of inspection chambers are arranged, the inspection chambers being capable of accommodating testers for inspecting an object to be inspected above a suction cup top; a refrigerant supply unit for supplying refrigerant gas; and a control unit, the refrigerant supply unit having: a refrigerant gas piping, which is arranged for each of the inspection chamber rows and connects the plurality of suction cup tops to allow the refrigerant gas to pass through; and a first heat exchanger, which is arranged for each of the refrigerant gas piping between the plurality of suction cup tops and performs heat exchange with the refrigerant gas discharged from the suction cup tops, the plurality of suction cup tops respectively having a heater for heating the object to be inspected and a temperature sensor, and the control unit controls the heater based on the temperature detected by the temperature sensor.

[0010] Effects of the Invention

[0011] According to the present invention, heat of a wafer in an inspection chamber can be removed with a simple structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a horizontal cross-sectional view showing an example of an inspection system according to an embodiment.

[0013] Figure 2 yes Figure 1 A cross-sectional view of line II of the inspection system.

[0014] Figure 3 yes Figure 1 Cross-sectional view of the inspection system along the Y direction.

[0015] Figure 4 Yes means Figure 1 A diagram of a schematic structure of an inspection unit of an inspection system.

[0016] Figure 5 Yes means Figure 2 Diagram of the refrigerant supply section for a row of inspection rooms on the first floor.

[0017] Description of Reference Numerals

[0018] 12 Inspection Department

[0019] 12a Upper inspection space

[0020] 12b Mid-level inspection space

[0021] 12c Lower inspection space

[0022] 13 Loading unit

[0023] 14 Feeding and discharging section

[0024] 18 FOUP

[0025] 22 Conveying mechanism

[0026] 23. Transport Room

[0027] 24 Examination Room

[0028] 27 Refrigerant piping layout space

[0029] 28 Alignment

[0030] 30 Inspection Unit

[0031] 31 Tester

[0032] 32 Probe Card

[0033] 36 Suction cup top

[0034] 60 Refrigerant gas piping

[0035] 62 Heater

[0036] 65 Refrigerant gas output

[0037] 66 Heat Treatment Department

[0038] 67 Temperature Sensor

[0039] 70 Heat exchanger

[0040] 90 Control Department

[0041] 100 Check system

[0042] 200 Refrigerant supply unit

[0043] 300 Clean room. DETAILED DESCRIPTION

[0044] Hereinafter, the mode for carrying out the present invention will be described with reference to the accompanying drawings. In each of the drawings, the same components are sometimes given the same reference numerals, and repeated descriptions are omitted.

[0045] [Check system]

[0046] First, refer to Figure 1 to Figure 3 , an inspection system 100 according to an embodiment is described. Figure 1 It is a horizontal cross-sectional view showing an example of the inspection system 100 according to one embodiment. Figure 2 yes Figure 1 A cross-sectional view of the inspection system 100 along line II. Figure 3 yes Figure 1 A cross-sectional view of the inspection system 100 along the Y direction.

[0047] like Figure 1 As shown, the inspection system 100 includes: an inspection section 12 having a plurality of inspection units 30 for electrically inspecting a wafer (a device formed on a wafer); and a loading section 13 for transporting the wafer to the inspection section 12. The inspection section 12 and the loading section 13 are connected together. The back side of the inspection section 12 opposite to the loading section 13 is a maintenance side.

[0048] The refrigerant supply unit 200 supplies refrigerant gas to each inspection room row of the inspection unit 12. The refrigerant supply unit 200 includes a refrigerant gas output unit 65, a heat exchanger 70, a refrigerant gas pipe 60 extending into the inspection system 100, and a heat exhaust processing unit 66.

[0049] like Figure 2 As shown, in the inspection unit 12, along the X direction, four inspection rooms 24 are arranged in a plurality (four) in the X direction, and such an inspection room row is arranged in three layers in the Z direction (up and down direction). That is, the inspection system 100 has 12 inspection units 30 in the 12 inspection rooms 24, and the four inspection rooms are arranged in a row in three layers. The 12 inspection rooms 24 are arranged in the clean room 300.

[0050] The inspection room rows of each layer are connected to form a roughly closed space, namely, an inspection space, and form an upper inspection space 12a, a middle inspection space 12b, and a lower inspection space 12c. A refrigerant pipe arrangement space 27 is provided between the upper inspection space 12a and the middle inspection space 12b, between the middle inspection space 12b and the lower inspection space 12c, and below the lower inspection space 12c, where a refrigerant gas pipe 60 extending from the refrigerant supply unit 200 is arranged. The refrigerant gas pipe 60 of the refrigerant pipe arrangement space 27 is arranged one by one corresponding to the upper inspection space 12a, the middle inspection space 12b, and the lower inspection space 12c, respectively, and the four inspection units (probe devices) 30 in the inspection room row are connected in series.

[0051] Each inspection room 24 is provided with an inspection unit 30. In the inspection unit 30, Figure 3 As shown, a tester 31 for wafer inspection, a probe card 32, and a chuck top (wafer stage) 36 for holding a wafer W are installed.

[0052] like Figure 2 As shown, in each of the upper inspection space 12a, the middle inspection space 12b, and the lower inspection space 12c, an aligner (stage) 28 that can move in the X direction is provided below the inspection unit 30. The aligner 28 performs loading and unloading and positioning of the wafer W for the four inspection units 30 arranged in the X direction. In addition, in each of the upper inspection space 12a, the middle inspection space 12b, and the lower inspection space 12c, an alignment camera 29 is provided in a manner that can move in the X direction.

[0053] On the back side of each inspection room 24, a Figure 1 and Figure 3 The chamber control unit 25 of the control device of each inspection unit 30 shown in the figure. The chamber control unit 25 has a solenoid, a vacuum sensor, an electropneumatic regulator, an E-IOM substrate, a temperature regulator, etc. The E-IOM substrate, the temperature regulator, etc., which are electronic devices, are arranged in a separate state from the solenoid, the vacuum sensor, and the electropneumatic regulator, which are air / vacuum devices. In addition, a conveying port 24a is provided on the front surface of each inspection chamber 24, and the conveying port 24a can be opened and closed by an opening and closing member 26. The inspection chamber 24 is connected to the chamber control unit 25.

[0054] like Figure 1As shown, the loading section 13 includes a loading table 19, a loading and unloading section 14, and a conveying chamber 23 provided between the loading and unloading section 14 and the inspection section 12. The loading table 19 carries a FOUP 18 as a container for storing a plurality of wafers W in a manner opposite to the inspection section 12. In the loading and unloading section 14, a probe card loading section 20 and an alignment section 21 for aligning the wafers W are arranged in the X direction. A control section 90 is provided inside the loading and unloading section 14. In the conveying chamber 23, a conveying mechanism 22 for conveying the wafers W can move.

[0055] The conveying mechanism 22 is as follows Figure 3 As shown, the conveying mechanism 22 includes a conveying arm 51, a rotation driving unit 52, a base unit 53, a cover member 54, and a frame member 55. In addition, the conveying mechanism 22 includes a shielding wall (not shown) provided integrally with the frame member 55 and provided to cover a portion of the outer periphery of the cover member 54.

[0056] The rotation drive unit 52 supports the transfer arm 51 supporting the wafer W, and rotates the transfer arm 51. The base unit 53 supports the rotation drive unit 52. The cover member 54 is cylindrical and is a container supported by the rotation drive unit 52 and covers the transfer arm 51. The frame member 55 is fixed to the inspection unit 12 side of the base unit 53 and has a transfer port 55a for the wafer W. The cover member 54 can rotate together with the transfer arm 51 under the drive of the rotation drive unit 52, and has a transfer port 54a for the wafer W.

[0057] The conveying mechanism 22 is configured to be movable in the Z direction and the X direction, and receives the wafer W before inspection from the FOUP 18 and delivers the wafer W to the inspection chamber 24 of each layer by moving the conveying arm 51 forward and backward and rotating in the θ direction. In addition, the conveying mechanism 22 receives the wafer W after inspection and returns it to the FOUP 18. In addition, the conveying mechanism 22 conveys the probe card that needs maintenance from each inspection unit 30 to the probe card loading unit 20, and conveys a new probe card and a maintained probe card to each inspection unit 30.

[0058] [Structure of inspection unit]

[0059] Below, refer to Figure 4 , the structure of the inspection unit 30 is described in detail. Figure 43 is a diagram showing a schematic structure of the inspection unit 30. The inspection unit 30 includes a tester 31, a probe card 32, a support plate 33, a contact block 34, a bellows 35, and a suction cup top 36. The tester 31 sends an inspection signal to a device formed on a wafer W. The probe card 32 includes a plurality of probes 32a that contact electrodes of a plurality of devices formed on the wafer W. The support plate 33 is disposed under the tester 31 and supports the probe card 32. The contact block 34 connects the tester 31 and the probe card 32. The bellows 35 hangs down from the support plate 33 and is disposed so as to surround the probe card 32. The suction cup top 36 absorbs and supports the wafer W by vacuum adsorption, and adjusts the temperature of the wafer W.

[0060] A large number of spring pins 34a for electrically connecting the probe card 32 and the tester 31 are provided on the upper and lower surfaces of the contact block 34. In a state where the plurality of probes 32a of the probe card 32 are in contact with the wafer W on the chuck top 36, the bellows 35 forms a substantially closed space including the probe card 32 and the wafer W. The chuck top 36 is adsorbed on the support plate 33 by evacuating the substantially closed space with a vacuum line. In addition, the probe card 32 is also adsorbed on the support plate 33 by evacuating the vacuum.

[0061] The aligner 28 has an X block 42 that moves in the X direction on a guide rail 41 provided on a base plate of the layer. The aligner 28 also has a Y block 44 that moves in the Y direction on a guide rail 43 provided along the Y direction on the X block 42. The aligner 28 also has a Z block 45 that moves in the Z direction relative to the Y block 44, and the suction cup top 36 is clamped on the Z block 45 in a state of maintaining a predetermined positional relationship. In addition, a lower camera 46 for photographing the lower surface of the probe card 32 is provided on the peripheral wall of the Y block 44.

[0062] The aligner 28 can access each inspection unit 30 by moving the X block 42 in the X direction. The aligner 28 moves the X block 42, the Y block 44, and the Z block 45 by the moving mechanism, and moves the chuck top 36 on which the wafer is mounted in the X, Y, and Z directions. Thus, the wafer W as the inspection object can be aligned with each inspection unit 30. In addition, the wafer W on the chuck top 36 can be mounted on the probe card 32, the wafer W on the chuck top 36 can be removed from the probe card 32, and the wafer W can be delivered to the conveying mechanism 22.

[0063] When the wafer W is transported to the suction cup top 36 and mounted on the probe card 32, the suction cup top 36 on the aligner 28 receives the wafer from the transport mechanism 22, and then aligns the wafer W with respect to the probe card 32. Next, the suction cup top 36 is raised by the aligner 28, and after the wafer W contacts the probe 32a of the probe card 32, the suction cup top 36 is further raised to press the wafer W to the probe 32a. In this state, the space surrounded by the bellows 35 is evacuated, the support plate 33 adsorbs the suction cup top 36, and the state in which the wafer is pressed to the probe 32a is maintained. In this state, the electrical characteristic inspection is started by the tester 31. At this time, the Z block 45 of the aligner 28 is evacuated to the bottom. The aligner 28 is moved to another inspection unit 30 after the inspection is completed, and the suction cup top 36 after the inspection is lowered by the opposite action to the above, and the wafer W after the inspection on the suction cup top 36 is returned to the FOUP 18 by the transport mechanism 22.

[0064] The control unit 90 is composed of a computer, and controls the components constituting the inspection system 100, such as the tester 31 of each inspection unit 30, the vacuum suction mechanism, the aligner 28, the conveying mechanism 22, the heat exchanger 70, the heater 62, and the supply of the refrigerant gas from the refrigerant gas output unit 65. The control unit 90 includes a main control unit having a CPU, an input device (keyboard, mouse, etc.), an output device (printer, etc.), a display device (display, etc.), and a storage device (storage medium). The main control unit of the control unit 90 causes the inspection system 100 to perform a predetermined action based on, for example, a storage medium built into the storage device or a processing recipe stored in a storage medium provided in the storage device.

[0065] [Operation of the refrigerant supply unit]

[0066] Below, refer to Figure 2 and Figure 5 The operation of the refrigerant supply unit 200 of this embodiment will be described in detail. Figure 2 As shown, the refrigerant supply unit 200 supplies refrigerant gas to each inspection room row. The refrigerant supply unit 200 allows the refrigerant gas output from the refrigerant gas output unit 65 to flow into the refrigerant gas pipe 60 extending through the inspection room row of each layer through the heat exchanger 70.

[0067] The three-layer refrigerant gas piping 60 connects the four inspection units 30 of the upper inspection space 12a, the four inspection units 30 of the middle inspection space 12b, and the four inspection units 30 of the lower inspection space 12c in series. A heat exchanger 70 (equivalent to the first heat exchanger) is arranged on the refrigerant gas piping 60 connecting the adjacent inspection units 30. In addition, a heat exchanger 70 (equivalent to the second heat exchanger) is also arranged on the refrigerant gas piping 60 connecting the refrigerant gas output portion 65 and the first inspection unit 30.

[0068] Figure 5 It is a magnified representation Figure 2 FIG. 1 is a diagram of one layer of a three-layer inspection room row. The refrigerant gas piping 60 connects the chuck tops 36 of the four inspection units 30 provided in the inspection room row, and connects the four chuck tops 36 in series. The refrigerant gas piping 60 on the inlet side of each chuck top 36 is connected to a flow path 36a formed in each chuck top 36. Regarding the flow path 36a, in order to cool the wafer W on the chuck top 36, the refrigerant gas supplied from the refrigerant gas piping 60 on the inlet side is caused to flow in the flow path 36a. The flow path 36a is formed in a spiral shape, for example. The flow path 36a in the chuck top 36 is connected to the refrigerant gas piping 60 on the outlet side of each chuck top 36. The refrigerant gas flowing in the chuck top 36 is discharged from the refrigerant gas piping 60 on the outlet side of each chuck top 36.

[0069] Before the test, the temperature of the wafer W is adjusted to, for example, about 80°C, but during the test, the temperature rises to above 80°C due to the heat generated by the wafer W. The heat of the wafer W is removed (dissipated) by the refrigerant gas flowing through the flow path 36a disposed in the chuck top 36. As a result, the temperature of the refrigerant gas flowing through the flow path 36a rises.

[0070] Therefore, the refrigerant gas discharged from the refrigerant gas piping 60 is subjected to heat exchange by the heat exchanger 70 and cooled to a predetermined temperature before being supplied to the next suction cup top 36. In the refrigerant supply unit 200 of the present embodiment, the refrigerant gas flowing through the main body 72 of the heat exchanger 70 is cooled to a normal temperature of, for example, 25° C. by using the air sent from the fan 71, and then supplied to the next suction cup top 36. The air heated by the heat exchanger 70 is subjected to heat removal treatment. In addition, the refrigerant gas discharged from the last suction cup top 36 discharged from the inspection room is sent to the heat removal treatment unit 66 through the refrigerant gas piping 60, and is subjected to heat removal treatment by the heat removal treatment unit 66.

[0071] During the test, the temperature of the wafer W on the chuck top 36 needs to be controlled to be constant. Therefore, it is preferable that the refrigerant gas supplied to the four chuck tops 36 of the inspection chamber row has substantially the same temperature. By controlling the refrigerant gas supplied to each chuck top 36 to have the same temperature, the heat dissipation of the wafer W by the refrigerant gas can be kept constant among the chuck tops 36. In addition, the temperature distribution of the placement surface of the wafer W can be kept constant among the chuck tops 36.

[0072] For the above reasons, it is preferable to further provide a heat exchanger 70 in the inspection room 24 between the refrigerant gas output portion 65 and the chuck top 36. Even when the refrigerant gas output from the refrigerant gas output portion 65 is not at an appropriate temperature, the heat exchanger 70 can be used to control the temperature of the refrigerant gas supplied to the first chuck top 36 and the temperature of the refrigerant gas supplied to the second and subsequent chuck tops 36 to be the same.

[0073] Each chuck top 36 has a heater 62 and a temperature sensor 67 inside the chuck top 36. The heater 62 heats the chuck top 36. The temperature sensor 67 detects the temperature of the chuck top 36.

[0074] In the inspection method using the inspection system 100 having the above-described inspection chamber row, the wafer W is cooled by the refrigerant gas supplied from the refrigerant gas pipe 60 to the chuck top 36 for each inspection chamber row.

[0075] The temperature sensor 67 provided at each chuck top 36 detects the temperature of the chuck top 36. The control unit 90 controls the heater 62 of the corresponding chuck top 36 based on the temperature detected for each chuck top 36. Thus, even when the temperature of the wafer W is lower than the desired temperature to be controlled due to the refrigerant gas, the temperature can be raised by the heater 62, thereby controlling each wafer W to the desired temperature.

[0076] Since the refrigerant gas pipe 60 is connected in series with the chuck top 36, the temperature of the refrigerant gas changes while the refrigerant gas flows through the first, second, third, and fourth chuck tops 36 in sequence. Therefore, by heating the heater 62 based on the temperature detected for each chuck top 36, the temperature of the four chuck tops 36 can be controlled to be the same. Furthermore, even if the temperature and flow rate of the refrigerant gas supplied to the chuck top 36 are controlled to be the same, the heating value of the wafer W on the chuck top 36 under test may vary for each inspection chamber 24, and in this case, the temperature of each wafer W may be different. Even in this case, in this embodiment, the chuck top 36 can be appropriately heated by the heater 62 based on the temperature detected by the temperature sensor 67, and the temperature of the wafer W in each inspection chamber 24 can be controlled to be the same.

[0077] The temperature sensor 67 is preferably provided on the wafer W placement surface (wafer placement surface) of the chuck top 36 so as to be able to measure the temperature of the wafer. For example, the temperature sensor 67 is preferably arranged at the center or in the vicinity of the wafer placement surface of the chuck top 36 so as to be able to measure the average value of the temperature distribution within the surface of the wafer W. In addition, the temperature sensor 67 preferably measures the temperature of the placement surface of the wafer W. Thus, the temperature of the wafer W can be detected with high accuracy using the temperature sensor 67. However, the temperature sensor 67 may be provided at any position other than the wafer placement surface in the chuck top 36.

[0078] The refrigerant gas used in this embodiment is a gas, and no liquid refrigerant is supplied. During the inspection performed in the inspection room 24, the temperature in the inspection room 24 and the temperature of the wafer are, for example, about 80°C. Therefore, as an example of the refrigerant gas, any gas that can reduce the temperature of the wafer from, for example, about 80°C to about 25°C may be used, and may be air, an inert gas such as N2 gas, or other gas. The air may be dry air.

[0079] The amount of heat dissipated by the refrigerant gas varies depending on the maximum air volume per unit time of the gas that can be supplied from the fan 71 of the heat exchanger 70 and the temperature of the gas. The temperature of the gas supplied from the fan 71 depends on Figure 2 The temperature in the refrigerant piping arrangement space 27 is shown. Therefore, in order to lower the temperature of the refrigerant piping arrangement space 27 itself, the temperature in the refrigerant piping arrangement space 27 is made to be the temperature of the clean room 300, and the temperature of the refrigerant piping arrangement space 27 is made to be, for example, about 25°C, thereby making it possible to make the refrigerant gas a desired temperature (for example, 30°C).

[0080] So, if Figure 2As shown, windows 63a, 63b, 63c communicating with the refrigerant piping arrangement space 27 are provided in the casing 24b of the inspection room 24. The windows 63a, 63b, 63c are opened to communicate with the clean room 300, and serve as passages for taking air from the clean room 300 into the refrigerant piping arrangement space 27.

[0081] The window 63a connects the upper inspection space 12a with the outside of the inspection room row at the upper level, and takes the air of the clean room 300 (temperature adjusted to 25° C., for example) into the upper inspection space 12a and / or the refrigerant pipe arrangement space 27 at the upper level. The window 63b connects the middle inspection space 12b with the outside of the inspection room row at the middle level, and takes the air of the clean room 300 into the middle inspection space 12b and / or the refrigerant pipe arrangement space 27 at the middle level. The window 63c connects the lower inspection space 12c with the outside of the inspection room row at the lower level, and takes the air of the clean room 300 into the lower inspection space 12c and / or the refrigerant pipe arrangement space 27 at the lower level. Thus, the temperature in the upper inspection space 12a, the middle inspection space 12b, the lower inspection space 12c, and / or each refrigerant pipe arrangement space 27 can be lowered to the temperature of the air in the clean room 300 (for example, 25° C.). Thus, the air in the clean room 300 having a lower temperature than the temperature in the inspection room 24 (eg, 50° C.) can be used as the gas supplied from the fan 71 of the heat exchanger 70 .

[0082] [Function / Effect]

[0083] In the prior art, the heat of the wafer in the inspection chamber is removed by the coolant output from the cooling unit. In this case, the cooling unit and the pipes through which the coolant flows are large in size, resulting in an increase in the footprint and cost.

[0084] For example, when the temperature of the wafer W is set to a low temperature of about -30°C for inspection, a cooling unit is required to adjust the temperature of the wafer W before the test. In contrast, in the present embodiment, when the temperature of the wafer W is set to a high temperature of at least room temperature (25°C) (e.g., 50°C) for inspection, a refrigerant gas pipe 60 is arranged as a simpler method, and the wafer is cooled by the refrigerant gas supplied to the refrigerant gas pipe 60. That is, the chuck tops 36 are connected in series by the refrigerant gas pipe 60 for each inspection chamber row, and the wafer W on each chuck top 36 is cooled by the refrigerant gas. A heat exchanger 70 is arranged on the refrigerant gas pipe 60 arranged between the chuck tops 36, and the heat of the refrigerant gas passing through the heat exchanger 70 is removed. As a result, if the calorific value of each wafer is 200W or less, the heat of the wafer can be removed with a simpler structure as shown in the inspection system 100 of the present embodiment, and a cooling unit is not required, so that the occupied space can be reduced.

[0085] Furthermore, since the refrigerant gas is sequentially supplied to the plurality of chuck tops 36 connected in series by the refrigerant gas pipe 60 for each layer of the inspection room row, the amount of refrigerant gas can be reduced compared to the case where the refrigerant gas is separately supplied to each chuck top 36. Thus, the cost can be reduced.

[0086] However, since the plurality of suction cup tops 36 are connected in series by the refrigerant gas piping 60 for each inspection room row, the resistance factor when the refrigerant gas flows is large, and the pressure drop of the refrigerant gas has a large effect. Therefore, it is necessary to increase the pressure of the refrigerant gas output from the refrigerant gas output portion 65. Therefore, in the present embodiment, the refrigerant gas piping 60 is a structure capable of withstanding the pressure of the refrigerant gas output from the refrigerant gas output portion 65.

[0087] As described above, according to the inspection apparatus and the inspection method of the present embodiment, it is possible to remove heat from the wafer in the inspection chamber with a simple configuration.

[0088] It should be considered that the inspection device and inspection method of one embodiment disclosed this time are illustrative and non-restrictive in all aspects. The above-mentioned embodiment can be modified and improved in various ways without exceeding the scope of the attached claims and their gist. The contents recorded in the above-mentioned multiple embodiments can be other structures within the scope of non-contradiction, and can be combined within the scope of non-contradiction.

Claims

1. An inspection device, characterized in that: include: A multi-layer inspection chamber row having a plurality of inspection chambers arranged therein, wherein the inspection chambers are capable of receiving a tester for inspecting an object to be inspected on top of the suction cup; a refrigerant supply unit for supplying refrigerant gas; and Control Department, The refrigerant supply unit comprises: A refrigerant gas pipe is provided for each of the inspection chamber rows, connecting the tops of the plurality of suction cups to allow the refrigerant gas to pass through; and A first heat exchanger is arranged at each of the refrigerant gas pipes between the tops of the plurality of suction cups to perform heat exchange with the refrigerant gas discharged from the tops of the suction cups. The tops of the plurality of suction cups are respectively provided with a heater and a temperature sensor for heating the object to be inspected. The control unit controls the heater based on the temperature detected by the temperature sensor. The plurality of inspection rooms each have a window in the shell of the inspection room that is connected to a refrigerant piping configuration space in which the refrigerant gas piping is provided. The window is opened to connect to an external clean room, forming a passage for taking air from the clean room into the refrigerant piping configuration space. Using the window, the first heat exchanger uses air from the clean room whose temperature is lower than the temperature inside the inspection room as gas that can be supplied from the fan of the first heat exchanger.

2. The inspection device according to claim 1, characterized in that: The temperature sensor is provided on a placement surface of the inspection object.

3. The inspection device according to claim 1 or 2, characterized in that: The refrigerant supply unit comprises: A refrigerant output portion; and The second heat exchanger is disposed in the refrigerant gas pipe connecting the refrigerant output portion and the top of the first suction cup for each of the inspection chamber rows, and performs heat exchange with the refrigerant gas output from the refrigerant output portion.

4. The inspection device according to claim 3, characterized in that: The refrigerant gas output from the second heat exchanger is supplied to the top of the suction cup connected to the refrigerant gas pipe at the first position in each of the inspection chamber rows.

5. The inspection device according to claim 1 or 2, characterized in that: The refrigerant gas output from the first heat exchanger is supplied to the top of the suction cup connected to the refrigerant gas pipe in sequence for each of the inspection chamber rows.

6. An inspection method, characterized in that: An inspection system having a multi-layer inspection chamber row is used, wherein the inspection chamber row is arranged with a plurality of inspection chambers capable of accommodating a tester for inspecting an object to be inspected on top of a suction cup, The inspection method comprises: Supplying refrigerant gas from a refrigerant supply unit to a refrigerant gas pipe, wherein the refrigerant gas pipe is provided for each of the inspection chamber rows and connects the tops of the plurality of suction cups; performing heat exchange with the refrigerant gas exhausted from the top of the chuck by using a first heat exchanger arranged in each of the refrigerant gas pipes between the tops of the plurality of chucks; and Based on the temperature detected by the temperature sensors respectively provided on the tops of the plurality of suction cups, the heaters respectively provided on the tops of the plurality of suction cups are controlled. In the inspection system, each of the plurality of inspection rooms has a window in the shell of the inspection room that is connected to a refrigerant pipe arrangement space in which the refrigerant gas pipe is installed, and the window is opened to connect to an external clean room to form a passage for taking air from the clean room into the refrigerant pipe arrangement space. The inspection method further includes a process of using the window to use air in the clean room having a lower temperature than the temperature inside the inspection room as gas that can be supplied from the fan of the first heat exchanger.