A work task management system and method

By designing a work task management system, including a task standard library and a point calculation module, the problem of lack of an objective management system in the existing technology is solved, and fair assessment and performance assessment of the completion of employees' work tasks is realized, and employees' enthusiasm is improved.

CN113837642BActive Publication Date: 2024-11-26BEIJING XINZE JIARUN TECHNOLOGY GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111160152.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-11-26
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

The existing companies lack an objective management system when managing employee work tasks, resulting in unfair performance appraisal and inability to effectively mobilize employees' enthusiasm.

Method used

A work task management system was designed, including a task standard library, task acquisition module, task query module, task assignment module, task confirmation module, task submission module, evaluation acquisition module and point calculation module, through these modules, the task standardized management of tasks is realized. , points calculation and performance appraisal.

Benefits of technology

It realizes objective assessment and points calculation of employee work tasks, ensures fairness of performance appraisal, and improves employees' work enthusiasm.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113837642B_ABST
    Figure CN113837642B_ABST
Patent Text Reader

Abstract

The work task management system and method of the present invention include: a task standard library stores the correspondence between task names, task standards and task work values; a supplier allocator obtains pending tasks sent by a demander; the task standard library is queried based on the task name of the pending task, and when the task name is queried, the supplier allocator assigns the pending task to the supplier staff, otherwise it is prompted that the pending task is not found in the task standard library; the supplier staff confirms whether to take over the pending task, and sends a confirmation message to the supplier allocator when confirming to take over; the supplier staff submits the completed pending task and obtains the corresponding task work value; obtains the demander's evaluation level of the completion of the pending task; calculates the work completion score = the task work value of the pending task * the score coefficient * the evaluation level of the pending task; and displays the work completion score obtained by the supplier staff for completing the pending task.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of work task management APP, and in particular to a work task management system and a work task management method. Background Art

[0002] When existing companies manage the work tasks of each employee, they generally do not have an objective management system for the completion of work tasks. Instead, they simply give an evaluation of the completion of work tasks based on the subjective impression of the employee's superiors on the employee's completion of work tasks, and conduct performance appraisals based on the evaluation. This management system is not conducive to objectively reflecting the completion of employees' work tasks and cannot mobilize employees' work enthusiasm. Summary of the invention

[0003] In view of the problems and shortcomings of the prior art, the present invention provides a new work task management system and method.

[0004] The present invention solves the above technical problems through the following technical solutions:

[0005] The present invention provides a work task management system, which is characterized in that it includes a task standard library, a task acquisition module, a task query module, a task assignment module, a prompt module, a task confirmation module, a task submission module, an evaluation acquisition module, a score calculation module and a score display module;

[0006] The task standard library stores the correspondence between task names, task standards and task work values;

[0007] The task acquisition module is used for the supplier to obtain the pending tasks sent by the demander, and the pending tasks include the task name and task deadline;

[0008] The task query module is used to query the task standard library based on the task name of the task to be processed, and call the task assignment module when the task name is found to exist, otherwise call the prompt module;

[0009] The task assignment module is used for the supplier assignor to assign the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline;

[0010] The prompt module is used to prompt that the task to be processed is not found in the task standard library;

[0011] The task confirmation module is used for the supplier staff to confirm whether to take over the pending task, and send confirmation information to the supplier assignor when confirming to take over, and send the reason information of not taking over to the supplier assignor when confirming not to take over;

[0012] The task submission module is used for the supplier staff to submit the completed task to be processed before the task deadline and obtain the corresponding task work value;

[0013] The evaluation acquisition module is used to obtain the evaluation grade given by the client to the completion status of the task to be processed;

[0014] The integral calculation module is used to calculate the work completion integral of the pending task = the task work value of the pending task * integral coefficient * evaluation level of the pending task;

[0015] The points display module is used to display the work completion points obtained by the supplier staff for completing the pending task.

[0016] Preferably, the work task management system also includes a task configuration module, which is used for the supplier to configure the task standard and task work value of the task to be processed, and store the configured correspondence between the task name, task standard and task work value of the task to be processed in the task standard library.

[0017] Preferably, the task confirmation module is used for the supplier staff to confirm whether to take over the pending task. When confirming to take over, the supplier allocator is sent a confirmation message and the task submission module is started. When confirming not to take over, the supplier allocator is sent a reason for not taking over and the task submission module is not started but the task assignment module is started. The task assignment module is used for the supplier allocator to assign the pending task to other supplier staff.

[0018] Preferably, the work task management system also includes an extension module, which is used for the supplier staff to issue an extension instruction and receive information on whether to agree to the extension instruction. When the received information is information that agrees to the extension, the information on agreeing to the extension and the extension deadline are sent to the task submission module; when the received information is information that disagrees to the extension, the information on disagreeing to the extension is sent to the task submission module.

[0019] Preferably, the task submission module is used to determine the submission time of the pending task, and obtain the corresponding task work value when the submission time is before the task deadline or when the extension is agreed and the submission time is before the extension deadline; when the submission time is after the task deadline and the extension is not agreed, the task work value obtained = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

[0020] The present invention also provides a work task management method, which is characterized in that it includes the following steps:

[0021] S1. The supplier allocator obtains the pending tasks sent by the demander, wherein the pending tasks include the task name and task deadline;

[0022] S2, query the task standard library based on the task name of the task to be processed, and proceed to step S3 when the task name is found to exist, otherwise proceed to step S4, where the task standard library stores the correspondence between the task name, task standard and task work value;

[0023] S3. The supplier assignor assigns the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline;

[0024] S4, prompting that the pending task is not found in the task standard library;

[0025] S5, the supplier staff confirms whether to take over the pending task, and if confirmed to take over, proceeds to step S6, and if confirmed not to take over, proceeds to step S7;

[0026] S6, sending a confirmation message to the supplier allocator, and proceeding to step S8;

[0027] S7. Send the reason for not taking over to the supplier allocator;

[0028] S8. The supplier staff submits the completed pending task before the task deadline and obtains the corresponding task work value;

[0029] S9, obtaining the evaluation level given by the client to the completion status of the pending task;

[0030] S10, calculating the work completion score of the pending task = the task work value of the pending task * the integral coefficient * the evaluation level of the pending task;

[0031] S11. Display the work completion points obtained by the supplier staff for completing the pending task.

[0032] Preferably, after executing step S4, the following steps are entered: the supplier configures the task standard and task work value of the task to be processed, and stores the configured correspondence between the task name, task standard and task work value of the task to be processed in the task standard library.

[0033] Preferably, in step S6, a confirmation message of taking over is sent to the supplier allocator and task submission is initiated. In step S7, a reason message of not taking over is sent to the supplier allocator and task assignment is initiated instead of task submission. The supplier allocator assigns the pending task to other supplier staff.

[0034] Preferably, the following steps are included between steps S6 and S8: the supplier staff issues an extension instruction and receives information on whether to agree to the extension instruction; if the information received is that the extension is agreed, the supplier sends information on agreeing to the extension and the extension deadline; if the information received is that the extension is not agreed, the supplier sends information on not agreeing to the extension.

[0035] Preferably, in step S8, the submission time of the pending task is determined, and the corresponding task work value is obtained when the submission time is before the task deadline or when the extension is agreed and the submission time is before the extension deadline; the task work value obtained when the submission time is after the task deadline and the extension is not agreed = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

[0036] On the basis of being in accordance with the common sense in the art, the above-mentioned preferred conditions can be arbitrarily combined to obtain the preferred embodiments of the present invention.

[0037] The positive and progressive effects of the present invention are:

[0038] The present invention can not only objectively calculate the completion status of each work task of each employee, but also obtain the evaluation of the demander of each work task on the completion status of the employee's work task, thereby calculating the work completion points of each employee for completing each work task, and using the work completion points for the subsequent performance appraisal of the employee, which is conducive to achieving fairness in employee performance appraisal and can fully mobilize the enthusiasm of employees. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 This is a structural block diagram of a work task management system according to a preferred embodiment of the present invention.

[0040] Figure 2 Flow chart of a work task management system according to a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0042] like Figure 1As shown, this embodiment provides a work task management system, which includes a task configuration module 1, a task standard library 2, a task acquisition module 3, a task query module 4, a task assignment module 5, a prompt module 6, a task confirmation module 7, an extension module 8, a task submission module 9, an evaluation acquisition module 10, a points calculation module 11 and a points display module 12.

[0043] The task configuration module 1 is used for the supplier to configure the task name, task standard and task work value, and store the corresponding relationship between the configured task name, task standard and task work value in the task standard library.

[0044] The task standard library 2 stores the correspondence between task names, task standards and task work values.

[0045] The task acquisition module 3 is used for the supplier to acquire the pending tasks sent by the demander. The pending tasks include the task name and the task deadline.

[0046] The task query module 4 is used to query the task standard library 2 based on the task name of the task to be processed, and call the task assignment module 5 when the task name is found to exist, otherwise call the prompt module 6.

[0047] The task assignment module 5 is used for the supplier allocator to assign the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline.

[0048] The prompt module 6 is used to prompt that the pending task is not found in the task standard library. After receiving the prompt information, the supplier manager uses the task configuration module 1 to configure the task standard and task work value of the pending task, and stores the configured task name, task standard and task work value correspondence of the pending task in the task standard library 2.

[0049] The task confirmation module 7 is used for the supplier staff to confirm whether to take over the pending task. When confirming to take over, it sends a confirmation message to the supplier allocator and starts the task submission module 9. When confirming not to take over, it sends a reason for not taking over to the supplier allocator and does not start the task submission module 9, but starts the task assignment module 5 for the supplier allocator to assign the pending task to other supplier staff.

[0050] The extension module 8 is used for the supplier staff to issue an extension instruction and receive information on whether to agree to the extension instruction. When the information received is information on agreeing to the extension, the extension agreement information and the extension deadline are sent to the task submission module 9. When the information received is information on disagreeing to the extension, the extension disagreement information is sent to the task submission module 9.

[0051] The task submission module 9 is used to determine the submission time of the pending task, and obtain the corresponding task work value when the submission time is before the task deadline or when the extension is agreed and the submission time is before the extension deadline. When the submission time is after the task deadline and the extension is not agreed, the task work value obtained = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

[0052] The evaluation acquisition module 10 is used to obtain the evaluation level given by the client to the completion status of the task to be processed.

[0053] The integral calculation module 11 is used to calculate the work completion integral of the task to be processed = the task work value of the task to be processed * integral coefficient * evaluation level of the task to be processed.

[0054] The points display module 12 is used to display the work completion points obtained by the supplier staff for completing the pending task.

[0055] like Figure 2 As shown, this embodiment also provides a work task management method, which includes the following steps:

[0056] Step 101: The supplier allocator obtains pending tasks sent by the demander, wherein the pending tasks include task names and task deadlines.

[0057] Step 102, query the task standard library based on the task name to be processed, and go to step 103 when the task name is found to exist, otherwise go to step 104. The task standard library stores the correspondence between task names, task standards and task work values.

[0058] Step 103: The supplier assignor assigns the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline.

[0059] Step 104, prompting that the pending task is not found in the task standard library, the supplier configures the task standard and task work value of the pending task, and stores the configured corresponding relationship between the task name, task standard and task work value of the pending task in the task standard library.

[0060] Step 105 , the supplier staff confirms whether to take over the pending task, and proceeds to step 106 if confirmed to take over, and proceeds to step 107 if confirmed not to take over.

[0061] Step 106 , send a message of confirmation of taking over to the supplier assignor and start task submission, then go to step 108 .

[0062] Step 107: Send the reason information of not accepting to the supplier allocator, and start the task assignment instead of starting the task submission. The supplier allocator assigns the pending task to other supplier staff.

[0063] Step 108, the supplier staff issues an extension instruction and receives information on whether to agree to the extension instruction. If the information received is that the extension is agreed, the supplier staff sends information on agreeing to the extension and the extension deadline. If the information received is that the extension is not agreed, the supplier staff sends information on not agreeing to the extension.

[0064] Step 109, determine the submission time of the pending task, and obtain the corresponding task work value when the submission time is before the task deadline or when the submission time is agreed to be extended and before the extension deadline. When the submission time is after the task deadline and the extension is not agreed to, the task work value obtained = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

[0065] Step 110: Obtain the evaluation level given by the client to the completion status of the task to be processed.

[0066] Step 111, calculate the work completion score of the pending task = the task work value of the pending task * the integral coefficient * the evaluation level of the pending task.

[0067] Step 112: Display the work completion points obtained by the supplier staff for completing the pending task.

[0068] In this solution, the correspondence between the task name, task standard, and task work value is first configured, and this correspondence is stored in the task standard library. The demander sends a pending task to the supplier, and the supplier obtains this pending task. The deadline for the task in this pending task is 2021.9.20.

[0069] The task standard library is queried based on the task name of the pending task. When the task name is found to exist, the next step will be smoothly entered. When the task name is found to not exist, a prompt message is sent to the supplier manager, and the supplier manager configures the task standard and task work value of the pending task, and stores the configured correspondence between the task name, task standard and task work value of the pending task in the task standard library. The task name can be queried again later.

[0070] The supplier manager assigns the pending task to supplier staff A. After receiving the pending task, supplier staff A confirms whether to take over the pending task. When confirming to take over, he sends a confirmation message to the supplier manager and starts task submission. At this time, the task submission instruction on the interface changes from gray to bright, and the task submission instruction is started. Subsequently, supplier staff A clicks on the task submission instruction to submit the task; when confirming not to take over, he sends a reason for not taking over to the supplier manager. At this time, the task submission is not started but the task assignment is started. The supplier manager assigns the pending task to other supplier staff again.

[0071] After supplier staff A takes over the pending task, he starts to process the pending task. If the task cannot be completed in time before September 20, 2021, he can apply for an extension and give a reason for the extension. After review, the supplier manager will send a message whether to agree to the extension. If the extension is agreed, the extension deadline of September 22, 2021 will be given. When supplier staff A submits the pending task, the submission time of the pending task is determined. If the submission time is before the task deadline of September 20, 2021, or if the extension is agreed and the submission time is before the extension deadline of September 22, 2021, the corresponding task work value is obtained. If the submission time is after the task deadline and the extension is not agreed, the task work value obtained needs to be discounted from the original corresponding task work value, such as the task work value obtained at this time = the task work value corresponding to the pending task * the proportional coefficient.

[0072] After the task is submitted, the demander will give an evaluation grade based on the completion status of the pending task. For example, if the completion status of the pending task is good, the evaluation grade will be 1.2; if the completion status of the pending task is medium, the evaluation grade will be 1.1; if the completion status of the pending task is average, the evaluation grade will be 1.0; if the completion status of the pending task is poor, the evaluation grade will be 0.9.

[0073] Afterwards, the work completion score of the pending task is calculated = the task work value of the pending task * the score coefficient * the evaluation level of the pending task, and finally the work completion score obtained by the supplier staff for completing the pending task is displayed.

[0074] Although the specific embodiments of the present invention are described above, those skilled in the art should understand that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims

1. A work task management system, characterized in that: It includes a task standard library, a task acquisition module, a task query module, a task assignment module, a prompt module, a task confirmation module, a task submission module, an evaluation acquisition module, a score calculation module and a score display module; The task standard library stores the correspondence between task names, task standards and task work values; The task acquisition module is used for the supplier to obtain the pending tasks sent by the demander, and the pending tasks include the task name and task deadline; The task query module is used to query the task standard library based on the task name of the task to be processed, and call the task assignment module when the task name is found to exist, otherwise call the prompt module; The task assignment module is used for the supplier assignor to assign the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline; The prompt module is used to prompt that the task to be processed is not found in the task standard library, and call the task configuration module; The task confirmation module is used for the supplier staff to confirm whether to take over the pending task, and send confirmation information to the supplier assignor when confirming to take over, and send the reason information of not taking over to the supplier assignor when confirming not to take over; The task submission module is used for the supplier staff to submit the completed task to be processed before the task deadline and obtain the corresponding task work value; The evaluation acquisition module is used to obtain the evaluation grade given by the client to the completion status of the task to be processed; The integral calculation module is used to calculate the work completion integral of the pending task = the task work value of the pending task * integral coefficient * evaluation level of the pending task; The points display module is used to display the work completion points obtained by the supplier staff for completing the pending task; The work task management system also includes a task configuration module, which is used for the supplier to configure the task standard and task work value of the task to be processed, and store the configured task name, task standard and task work value correspondence of the task to be processed in the task standard library; The work task management system also includes an extension module, which is used for the supplier staff to issue an extension instruction and receive information on whether to agree to the extension instruction. When the received information is information on agreeing to the extension, the extension information and the extension deadline are sent to the task submission module, and when the received information is information on not agreeing to the extension, the extension information is sent to the task submission module; The task submission module is used to determine the submission time of the pending task, and obtain the corresponding task work value when the submission time is before the task deadline or when the extension is agreed and the submission time is before the extension deadline. When the submission time is after the task deadline and the extension is not agreed, the task work value obtained = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

2. The work task management system according to claim 1, characterized in that: The task confirmation module is used for the supplier staff to confirm whether to take over the pending task. When confirming to take over, it sends confirmation information to the supplier allocator and starts the task submission module. When confirming not to take over, it sends the reason for not taking over to the supplier allocator and does not start the task submission module but starts the task assignment module. The task assignment module is used for the supplier allocator to assign the pending task to other supplier staff.

3. A work task management method, characterized in that: It includes the following steps: S1. The supplier allocator obtains the pending tasks sent by the demander, wherein the pending tasks include the task name and task deadline; S2, query the task standard library based on the task name of the task to be processed, and proceed to step S3 when the task name is found to exist, otherwise proceed to step S4, where the task standard library stores the correspondence between the task name, task standard and task work value; S3. The supplier assignor assigns the pending task to the supplier staff, wherein the pending task includes the task name, task standard, task work value and task deadline; S4, prompting that the pending task is not found in the task standard library; S5, the supplier staff confirms whether to take over the pending task, and if confirmed to take over, proceeds to step S6, and if confirmed not to take over, proceeds to step S7; S6, sending a confirmation message to the supplier allocator, and proceeding to step S8; S7. Send the reason for not taking over to the supplier allocator; S8. The supplier staff submits the completed pending task before the task deadline and obtains the corresponding task work value; S9, obtaining the evaluation level given by the client to the completion status of the pending task; S10, calculating the work completion score of the pending task = the task work value of the pending task * the integral coefficient * the evaluation level of the pending task; S11. Displaying the work completion points obtained by the supplier staff for completing the pending task; After executing step S4, the following steps are entered: the supplier configures the task standard and task work value of the task to be processed, and stores the configured corresponding relationship between the task name, task standard and task work value of the task to be processed in the task standard library; The following steps are included between step S6 and step S8: the supplier staff issues an extension instruction and receives information on whether to agree to the extension instruction. If the information received is information on agreeing to the extension, the supplier sends information on agreeing to the extension and the extension deadline. If the information received is information on not agreeing to the extension, the supplier sends information on not agreeing to the extension. In step S8, the submission time of the pending task is determined, and the corresponding task work value is obtained when the submission time is before the task deadline or when the extension is agreed and the submission time is before the extension deadline. When the submission time is after the task deadline and the extension is not agreed, the task work value obtained = the task work value corresponding to the pending task * the proportional coefficient, and the proportional coefficient is less than 1.

4. The work task management method according to claim 3, characterized in that: In step S6, a message of confirmation of taking over is sent to the supplier allocator and task submission is initiated. In step S7, a reason for not taking over is sent to the supplier allocator and task assignment is initiated instead of task submission. The supplier allocator assigns the pending task to other supplier staff.