A filling method for sidewall mining in open-pit mines
By setting up unmanned operations of filling units and filling material trucks at intervals, the problem of high filling costs and low efficiency of side tunnels in open-pit coal mines is solved, the stability and safety of the mining tunnels are improved, and the filling costs are reduced.
Patent Information
- Application Number
- CN202111175613.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-09
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-10-09
AI Technical Summary
The filling technology of side tunnels in open-pit coal mines has the problems of high cost, low filling efficiency, poor safety and large material consumption, making it difficult to achieve safe, efficient and green production.
The method of setting filling units at intervals is adopted, and partial filling is carried out in the mining tunnel through filling bags and skeleton structures. The filling material vehicle is used for remote unmanned operation to ensure the stability and filling efficiency of the mining tunnel.
It reduces the filling cost, improves the filling efficiency and safety of the mining tunnel, avoids the disassembly and assembly of pipelines and complete filling, and achieves the stability of the slope and the safety of coal mining.
Smart Images

Figure CN113847086B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of mining tunnel filling, and in particular to a filling method for a sidewall mining tunnel in an open-pit mine. Background Art
[0002] In recent years, my country's open-pit coal mine production and construction have developed rapidly, but some negative problems have also arisen, such as the gradual deepening of coal seams, the increase in mining and stripping ratios, and the sharp increase in coal pressure caused by the high and steep sides. According to relevant statistics, my country's new side-wall coal pressure exceeds 20 million tons each year. A large amount of side-wall coal pressure reduces the economic benefits of enterprises, wastes coal resources, seriously restricts safe and efficient production, and shortens the life cycle of mines. Therefore, a safe, efficient, and green open-pit side-wall mining method is urgently needed to ensure the medium- and long-term sustainable development of mines, improve overall economic benefits, and achieve green and efficient production.
[0003] At present, most of the coal mining and filling technologies are applied to underground mining. If they are directly applied to the sidewall mining of open-pit coal mines, it will be difficult to achieve. The main reasons include: 1. The filling cost is high. In most cases, the coal seams in open-pit coal mines have a low degree of metamorphism and a relatively low unit price, which cannot bear the cost of underground filling and mining; 2. Personnel cannot enter the mine. After exploratory mining, the mine has no support and personnel cannot enter. The filling pipeline is difficult to disassemble and assemble, the filling rate is low, and the roof connection effect is poor; 3. There is an imbalance between mining and filling. After the support link is omitted in exploratory mining, the output is greatly increased, but the filling is difficult to solve due to problems such as personnel safety restrictions on entering the mine, limited filling capacity of pump stations, difficulty in laying pipelines, and time-consuming material condensation; 4. The filling volume is huge, and the sidewall mining is advancing rapidly, forming a huge mined space, which requires a large amount of raw materials and increases the workload of procurement, transportation, processing, and filling. Summary of the invention
[0004] The present application aims to solve one of the technical problems in the related art at least to some extent.
[0005] To this end, the purpose of this application is to propose a filling method for the sidewall mining of an open-pit mine.
[0006] To achieve the above-mentioned purpose, the present application proposes a filling method for an open-pit mine sidewall mining shaft, comprising the following steps: arranging a plurality of filling units in the mining shaft in sequence along the length direction of the mining shaft, and leaving a spacing between adjacent filling units.
[0007] The filling unit includes a filling bag, and the filling unit is arranged in the mining tunnel, including: transporting the filling bag to a predetermined position in the mining tunnel; injecting filling material into the filling bag until the filling bag is tightly fitted with the mining tunnel.
[0008] The transporting of the filling bag to a predetermined position in the mining tunnel includes: transporting the filling monomer into the mining tunnel, and making the length direction of the filling bag perpendicular to the length direction of the mining tunnel.
[0009] The filling bag and the mining tunnel are tightly fitted together, including: the top surface, bottom surface and end surface of the filling bag are tightly fitted with the top surface, bottom surface and side surface of the mining tunnel respectively.
[0010] A material injection hole is provided at the top of the filling bag, and injecting the filling material into the filling bag comprises: injecting the filling material into the filling bag through the material injection hole.
[0011] The top of the filling bag is provided with an exhaust hole, and the step of filling the filling bag and the mining tunnel tightly fit includes: until the filling material is discharged from the exhaust hole.
[0012] The filling unit further comprises a frame, which is arranged in the filling bag, and an expansion space is left between the frame and the filling bag.
[0013] The filling unit further includes: a tension anchor rod, which passes through the frame and the filling bag; and a tray, which is arranged at the end of the tension anchor rod and abuts against the outer end surface of the filling bag.
[0014] The filling unit is arranged in the mining tunnel, including: transporting the filling unit to a predetermined position in the mining tunnel by a filling material vehicle; injecting filling material into the filling unit by the filling material vehicle until the filling unit is tightly fitted with the mining tunnel.
[0015] The filling material vehicle includes: a traveling device; a storage device, which is arranged on the traveling device and stores the filling material; an injection device, which is arranged on the traveling device and injects the filling material in the storage device into the filling unit; and a lifting device, which is arranged on the traveling device and lifts the filling unit.
[0016] After adopting the above technical scheme, the advantages of the present application compared with the prior art are: partial filling of the mining shaft is achieved by arranging filling units at intervals, which can realize filling support for the mining shaft, ensure the stability of the slope, and improve the safety factor of coal mining. At the same time, it avoids disassembly and installation of pipelines and complete filling in the mining shaft, effectively reduces the filling cost, and improves the filling efficiency of the mining shaft.
[0017] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0019] Figure 1 It is a structural schematic diagram of a mining tunnel proposed in an embodiment of the present application;
[0020] Figure 2 It is a structural schematic diagram of a filling unit provided in a mining tunnel according to an embodiment of the present application;
[0021] Figure 3 is a schematic structural diagram of a filling monomer proposed in one embodiment of the present application;
[0022] Figure 4 is a schematic structural diagram of a filling monomer proposed in one embodiment of the present application;
[0023] Figure 5 is a schematic structural diagram of a filling material vehicle proposed in one embodiment of the present application;
[0024] As shown in the figure: 1. Coal seam, 2. Overlying rock strata, 3. Mining shaft, 4. Coal pillar, 5. Filling unit, 6. Filling bag, 7. Skeleton, 8. Tension anchor rod, 9. Pallet, 10. Sealed space, 11. Filling hole, 12. Exhaust hole, 13. Filling material vehicle, 14. Traveling device, 15. Storage device, 16. Filling device, 17. Lifting device. DETAILED DESCRIPTION
[0025] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be construed as limiting the present application. On the contrary, the embodiments of the present application include all changes, modifications and equivalents that fall within the spirit and connotation of the appended claims.
[0026] like Figure 1 As shown, above the coal seam 1 is an overlying rock layer 2, which forms a plurality of mining shafts 3 after mining, and between the mining shafts 3 are coal pillars 4.
[0027] like Figure 2As shown, an embodiment of the present application proposes a filling method for an open-pit mine side mining shaft 3, comprising the following steps: arranging a plurality of filling units 5 in the mining shaft 3 in sequence along the length direction of the mining shaft 3, and leaving a spacing between adjacent filling units 5, and realizing partial filling of the mining shaft 3 by arranging the filling units 5 at intervals, thereby realizing filling support for the mining shaft 3, ensuring the stability of the slope, and improving the safety factor of coal mining. At the same time, it avoids disassembly and assembly of pipelines and full filling in the mining shaft 3, effectively reducing the filling cost and improving the filling efficiency of the mining shaft 3.
[0028] In some embodiments, after the sidewall exploration mining is completed, a rectangular mining shaft 3 is formed. After lagging behind 1-2 mining shafts 3, the mining shaft 3 is filled with filling monomers 5 to ensure the balance of mining and filling.
[0029] In some embodiments, Figure 3 , Figure 4 As shown, the filling unit 5 includes a filling bag 6, which should have good flexibility and be able to ensure the barrier between the inside and the outside. In some embodiments, the filling bag 6 is made of a flexible sealing material such as a coated cloth.
[0030] In some embodiments, the filling unit 5 is arranged in the mining tunnel 3 and includes:
[0031] Transport the filling bag 6 to a predetermined position in the mining tunnel 3, so that after the filling material is injected into the filling bag 6, the mining tunnel 3 can be effectively filled and supported;
[0032] Filling material is injected into the filling bag 6 until the filling bag 6 fits tightly against the mining tunnel 3. The filling material is injected into the filling bag 6, causing the filling bag 6 to gradually expand. The expanded filling bag 6 fits tightly against the mining tunnel 3, so that after the filling material is solidified and formed, it can effectively support the mining tunnel 3. At the same time, the filling bag 6 can protect the filling material and reduce the problems of the filling material fading and softening when exposed to water. Moreover, the filling material is injected after the filling bag 6 is positioned, which facilitates the transportation and positioning of the filling bag 6.
[0033] In some embodiments, transporting the filling bag 6 to a predetermined position in the mining tunnel 3 includes: transporting the filling unit 5 into the mining tunnel 3, and making the length direction of the filling bag 6 perpendicular to the length direction of the mining tunnel 3, that is, the filling bag 6 is arranged in the horizontal direction in the mining tunnel 3. This not only improves the stability of the filling support for the mining tunnel 3 after the filling material is solidified and formed, but also makes the size of the filling bag 6 coordinated with the specifications of the mining tunnel, and the shape is easy to process and manufacture.
[0034] In some embodiments, the filling bag 6 fits tightly against the mining tunnel 3, including: the top surface, bottom surface and end surface of the filling bag 6 fit tightly against the top surface, bottom surface and side surface of the mining tunnel 3, respectively, so that adjacent filling bags 6 form a sealed space 10 in the mining tunnel 3, which not only ensures the filling support of the mining tunnel 3 after the filling material is solidified and formed, but also the sealed space 10 can block the air from circulating in the mining tunnel 3, thereby preventing the coal seam 1 from spontaneous combustion.
[0035] In some embodiments, the length of the filling bag 6 is greater than the width of the mining tunnel 3, and the height of the filling bag 6 is greater than the height of the mining tunnel 3, so as to ensure that after the filling material is injected into the filling bag 6, the filling bag 6 and the mining tunnel 3 can fit tightly.
[0036] In some embodiments, the spacing between the filling bags 6 is determined based on the covering conditions of the coal seam 1, the size of the mining tunnel 3, the initial setting time, final setting time, material strength, etc. of the filling material.
[0037] It should be noted that the end face of the filling bag 6 is a face on the filling bag 6 that is perpendicular or nearly perpendicular to its length direction, and the side face of the mining tunnel 3 is a face located between the top and bottom surfaces of the mining tunnel 3 and parallel or nearly parallel to the length direction of the mining tunnel 3.
[0038] In some embodiments, Figure 3 , Figure 4 As shown, an injection hole 11 is provided at the top of the filling bag 6. Injecting filling material into the filling bag 6 includes: injecting the filling material into the filling bag 6 through the injection hole 11. The setting of the injection hole 11 facilitates the injection of filling material into the filling bag 6 to expand the filling bag 6.
[0039] In some embodiments, Figure 4 As shown, an exhaust hole 12 is provided at the top of the filling bag 6. The exhaust hole 12 can discharge the air in the filling bag 6 when the filling material is injected into the filling bag 6, thereby ensuring the rapid injection of the filling material until the filling bag 6 is tightly fitted with the mining tunnel 3, including: until the filling material is discharged from the exhaust hole 12, as the filling material is continuously injected, the filling bag 6 expands and fits with the mining tunnel 3 so that the pressure therein rises, thereby causing the filling material to be discharged from the exhaust hole 12. The setting of the exhaust hole 12 makes it easy to judge the filling state of the filling bag 6 so as to stop the injection of the filling material in time.
[0040] In some embodiments, a pressure relief valve is provided on the exhaust hole 12 so that the filling material is discharged from the exhaust hole 12 only after a certain pressure is reached in the filling bag 6 .
[0041] In some embodiments, Figure 3As shown, the filling unit 5 also includes a skeleton 7, which is arranged in the filling bag 6, and an expansion space is left between the skeleton 7 and the filling bag 6. The skeleton 7 is used to support the filling bag 6 when no filling material is injected into the filling bag 6, so that the filling bag 6 can be easily transported to a predetermined position in the mining tunnel 3. At the same time, the skeleton 7 is also used to increase the strength of the filling bag 6 after the filling material is injected, and to enhance the filling support effect on the mining tunnel 3 after the filling material is solidified.
[0042] In some embodiments, the size of the skeleton 7 is smaller than the filling bag 6. When the filling material is injected into the filling bag 6 and it fits tightly against the mining tunnel 3, there should be a distance of 0.3-0.5m between the skeleton 7 and the mining tunnel 3. On the one hand, it can make the filling bag 6 easy to process and sew and convenient to transport in the mining tunnel 3. On the other hand, it can leave expansion space for the filling bag 6 to facilitate the tight fit between the filling bag 6 and the mining tunnel 3.
[0043] In some embodiments, Figure 3 As shown, the skeleton 7 includes a bottom plate and four side plates. The four side plates are fixedly arranged around the bottom plate to form a groove structure with an opening facing upward. At the same time, the injection hole 11 and the exhaust hole 12 are both located above the opening of the groove. Therefore, when the filling material is injected into the filling bag 6, the filling material first fills the groove and then fills the space between the groove and the filling bag 6, avoiding the formation of cavities in the filling material after it is solidified and formed, thereby ensuring the filling support of the mining tunnel 3 after the filling material is solidified and formed.
[0044] In some embodiments, Figure 3 , Figure 4 As shown, the filling unit 5 also includes a tension anchor rod 8 and a tray 9. The tension anchor rod 8 passes through the frame 7 and the filling bag 6. The tray 9 is arranged at the end of the tension anchor rod 8 and abuts against the outer end surface of the filling bag 6. The arrangement of the tension anchor rod 8 and the tray 9 provides a restraining force for the solidified filling material, and the confining pressure formed thereby effectively strengthens the supporting force of the filling material on the mining tunnel 3 after solidification.
[0045] In some embodiments, corresponding through holes are provided on the skeleton 7 and the filling bag 6, and the tension anchor rods 8 pass through the through holes on the skeleton 7 and the filling bag 6 in turn, and both ends of the tension anchor rods 8 are located outside the filling bag 6, and two trays 9 are respectively fixed at the ends of the tension anchor rods 8, and the distance between the two trays 9 is equal to the width of the filling bag 6.
[0046] At the same time, expansion space should be left between the bottom of the skeleton 7 and the bottom of the filling bag 6, so that when the filling material is injected into the filling bag 6, the filling material can enter between the bottom of the skeleton 7 and the bottom of the filling bag 6 under the action of the tension anchor rod 8.
[0047] In some embodiments, the filling material can be injected into the space between the bottom of the skeleton 7 and the bottom of the filling bag 6 by pressure injection, or by setting a support rod at the bottom of the skeleton 7 to allow the filling material to enter between the bottom of the skeleton 7 and the bottom of the filling bag 6.
[0048] In some embodiments, the tension anchor rod 8 is fixed to the through hole on the skeleton 7 by welding, and the tension anchor rod 8 is sealed and fixed to the through hole on the filling bag 6 by gluing, so that the relative position between the skeleton 7 and the filling bag 6 is fixed, and the filling material is prevented from leaking out of the through hole on the filling bag 6.
[0049] In some embodiments, the length direction of the tension anchor rod 8 is parallel to the width direction of the filling unit 5, and multiple tension anchor rods 8 and trays 9 are provided, and the multiple tension anchor rods 8 and trays 9 are evenly distributed along the length direction of the filling unit 5 to improve the strength of the filling material after consolidation.
[0050] In some embodiments, Figure 2 As shown, the filling unit 5 is arranged in the mining tunnel 3, including: transporting the filling unit 5 to a predetermined position in the mining tunnel 3 by the filling material vehicle 13; injecting the filling material into the filling unit 5 by the filling material vehicle 13 until the filling unit 5 is tightly fitted with the mining tunnel 3. The filling material vehicle 13 can realize the remote unmanned operation of filling the mining tunnel 3, and effectively improve the safety and efficiency of filling the mining tunnel 3.
[0051] In some embodiments, Figure 5 As shown, the filling material vehicle 13 includes a traveling device 14 , a material storage device 15 , a material injection device 16 and a lifting device 17 .
[0052] The walking device 14 is used for the overall movement of the filling material vehicle 13. In some embodiments, the walking device 14 includes a crawler chassis. The crawler walking mode of the crawler chassis can reduce the ground contact pressure and avoid damaging the bottom surface of the mining tunnel 3. The crawler chassis is a prior art and will not be described in detail here.
[0053] The material storage device 15 is arranged on the traveling device 14 and stores the filling material so that the filling material vehicle 13 can independently perform the filling material injection work, avoiding the need to set up pipelines, and enabling the traveling device 14 to remotely inject materials.
[0054] In some embodiments, the storage device 15 includes a storage box, which is fixedly arranged on the carrier platform of the crawler chassis, has a filling port on the top, and has a discharge port on the bottom.
[0055] Before the filling material vehicle 13 is used, the filling material is injected from the filling port to fill the filling bag 6. In some embodiments, a stirring component is provided in the storage box, and the filling material in the storage box is stirred by the stirring component to avoid separation, precipitation and other problems of the filling material in the storage box.
[0056] The stirring component includes a spiral blade and a blade driving member, wherein the rotating shaft of the spiral blade is rotatably arranged in the storage box through a sealed bearing, and one end of the rotating shaft of the spiral blade extends to the outside of the storage box, and the blade driving member is fixedly arranged outside the storage box, and its output end is connected to the rotating shaft of the spiral blade. Thus, the spiral blade is driven by the blade driving member to rotate, thereby achieving stirring of the filling material in the storage box.
[0057] In some embodiments, the blade driving component includes a driving motor and a reducer. The reducer is fixedly mounted on a storage box, and its output end is coaxially fixedly connected to the rotating shaft of the spiral blade through a coupling. The driving motor is fixedly mounted on the storage box, and its output end is coaxially fixedly connected to the input end of the reducer through a coupling, thereby realizing a transmission connection between the driving motor and the spiral blade.
[0058] The injection device 16 is disposed on the walking device 14 , and injects the filling material in the storage device 15 into the filling monomer 5 . In some embodiments, the injection device 16 includes an injection pump and an injection pipe.
[0059] The injection pump is used to transport filling materials. It is fixedly arranged on the storage box, and its feed port is connected with the discharge port of the storage box, and its discharge port is connected with the feed port of the injection pipe. After the injection pump is turned on, it pressurizes and transports the filling material in the storage box to the injection pipe. In some embodiments, the injection pump is a mortar pump.
[0060] The injection pipe is used to connect the injection hole 11 on the filling bag 6. It is arranged on the storage box, and its discharge port faces the front end of the filling material vehicle 13. In some embodiments, the injection pipe is arranged on the storage box through a three-dimensional device so that the injection pipe can move three-dimensionally on the storage box to adapt to the position of the injection hole 11, wherein the three-dimensional device includes an X-axis platform, an X-axis drive, a Y-axis platform, a Y-axis drive, a Z-axis platform and a Z-axis drive.
[0061] The X-axis platform is slidably arranged on the top surface of the storage box along the X-axis direction, the X-axis driving member is fixedly arranged on the top surface of the storage box, and its output end is fixedly connected to the X-axis platform so that the X-axis driving member can drive the X-axis platform to move along the X-axis direction.
[0062] The Y-axis platform is slidably arranged on the X-axis platform along the Y-axis direction, the Y-axis driving component is fixedly arranged on the X-axis platform, and its output end is fixedly connected to the Y-axis platform, so that the Y-axis driving component can drive the Y-axis platform to move along the Y-axis direction.
[0063] The Z-axis platform is slidably arranged on the Y-axis platform along the Z-axis direction, the Z-axis driving component is fixedly arranged on the Y-axis platform, and its output end is fixedly connected to the Z-axis platform, so that the Z-axis driving component can drive the Z-axis platform to move along the Z-axis direction.
[0064] Therefore, the position of the injection tube in three-dimensional space can be adjusted through the coordinated actions of the X-axis driving member, the Y-axis driving member and the Z-axis driving member.
[0065] In some embodiments, the X-axis driving component, the Y-axis driving component, and the Z-axis driving component may be motors, cylinders, or hydraulic cylinders.
[0066] In some embodiments, the sliding arrangement of the X-axis platform on the top surface of the storage box, the sliding arrangement of the Y-axis platform on the X-axis platform, and the sliding arrangement of the Z-axis platform on the Y-axis platform are all structures in which guide rails and tracks cooperate.
[0067] It should be noted that the X-axis, Y-axis and Z-axis are perpendicular to each other, and the X-axis and Y-axis are both located on the top surface of the storage box. At the same time, the feed port of the injection pipe needs to be connected to the discharge port of the injection pump through a telescopic tube or a longer hose to accommodate the movement of the injection pipe.
[0068] The lifting device 17 is disposed on the walking device 14 and lifts and lowers the filling unit 5. In some embodiments, the lifting device 17 includes a shovel, a shovel hydraulic cylinder, a support frame and a support frame hydraulic cylinder.
[0069] The support frame is hinged at the bottom of the front end of the carrier platform of the crawler chassis, the piston rod end of the support frame hydraulic cylinder is hinged to the middle part of the support frame, and its cylinder end is hinged to the carrier platform of the crawler chassis, thereby, the angle adjustment of the support frame is achieved by driving the support frame hydraulic cylinder.
[0070] The rear end of the shovel is slidably inserted into the front end of the support frame, and its length direction is located in the length direction of the support frame. The cylinder end of the shovel hydraulic cylinder is hinged in the support frame, and its piston rod end is hinged to the rear end of the shovel. Thus, the shovel can be extended and retracted on the support frame by driving the shovel hydraulic cylinder.
[0071] Therefore, the shovel plate can be rotated to a horizontal direction through the support hydraulic cylinder, and can also be rotated to an inclined direction abutting against the bottom surface of the mining tunnel 3, so as to facilitate the lifting and lowering of the filling bag 6. The shovel plate hydraulic cylinder can be telescopically moved to adjust the length to adapt to the size of the filling bag 6, making the lifting of the filling bag 6 more convenient.
[0072] In some embodiments, the filling material vehicle 13 further includes a visual camera probe and a control panel. The visual camera probe is fixedly arranged on the front top of the crawler chassis. The control panel is electrically connected to the visual camera probe, the injection pump, the crawler chassis, the X-axis drive, the Y-axis drive, the Z-axis drive, the shovel hydraulic cylinder and the support hydraulic cylinder. The visual camera probe converts the captured image into an electrical signal and sends it to the control panel. The control panel converts the electrical signal into a wireless transmission signal and sends it to the monitoring system. After receiving the signal, the monitoring system displays the captured image on the display screen so that the staff can watch the filling material in real time. The control panel can control the injection pump, crawler chassis, X-axis drive, Y-axis drive, Z-axis drive, shovel hydraulic cylinder and support frame hydraulic cylinder through the control signal sent by the monitoring system to realize remote control of lifting the filling bag 6, remote control of injection and remote control of walking. It can also automatically control the injection pump, crawler chassis, X-axis drive, Y-axis drive, Z-axis drive, shovel hydraulic cylinder and support frame hydraulic cylinder according to the signal sent by the visual camera probe to realize automatic lifting of the filling bag 6, automatic injection and automatic walking.
[0073] In some embodiments, the filling material vehicle 13 may use an inertial navigation system, which is disposed on a control panel. The control panel controls the forward direction and travel distance of the crawler chassis through the inertial navigation system.
[0074] When filling the mining tunnel 3, the filling material is first injected into the storage box of the filling material vehicle 13, and then the filling bag 6 is lifted by tilting and extending the shovel plate. Afterwards, the filling material vehicle 13 transports the filling bag 6 to a predetermined position in the mining tunnel 3 by moving the crawler chassis, and then lowers the filling bag 6 by tilting and extending the shovel plate.
[0075] Then, under the guidance of the visual camera probe, the filling material vehicle 13 connects the filling pipe to the filling hole 11 through manual remote control or automatic control, and starts the filling pump until the filling material is discharged from the exhaust hole 12, then closes the filling pump and exits the mining tunnel 3 by moving the crawler chassis.
[0076] The filling material vehicle 13 continuously repeats the above-mentioned actions, thereby being able to realize the sequential filling of multiple filling bags 6 in the mining tunnel 3 .
[0077] It should be noted that, in the description of this application, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of this application, unless otherwise specified, the meaning of "plurality" is two or more.
[0078] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0079] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0080] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A filling method for sidewall mining in an open-pit mine, characterized in that: The following steps are involved: Arrange a plurality of filling units in the mining tunnel in sequence along the length direction of the mining tunnel, and leave a distance between adjacent filling units; Wherein, the filling unit comprises a filling bag, and the filling unit is arranged in the mining tunnel, comprising: transporting the filling bag to a predetermined position in the mining tunnel; injecting filling material into the filling bag until the filling bag is tightly fitted with the mining tunnel; The transporting of the filling bag to the predetermined position in the mining tunnel comprises: transporting the filling monomer into the mining tunnel, and making the length direction of the filling bag perpendicular to the length direction of the mining tunnel; The filling bag is tightly fitted with the mining tunnel, including: the top surface, bottom surface and end surface of the filling bag are tightly fitted with the top surface, bottom surface and side surface of the mining tunnel respectively, the adjacent filling bags form a sealed space in the mining tunnel, and the filling bag is used to support the mining tunnel and to block air circulation; The filling unit further comprises a frame, which is arranged in the filling bag, and an expansion space is left between the frame and the filling bag. The frame comprises a bottom plate and four side plates, and the four side plates are fixedly arranged around the bottom plate to form a groove structure with an opening facing upwards. The filling unit further includes: a tension anchor rod and a tray, wherein the tension anchor rod passes through the frame and the filling bag, and the tray is arranged at the end of the tension anchor rod and abuts against the outer end surface of the filling bag to provide a restraining force for the filling material and to form a confining pressure on the filling bag; The filling unit is arranged in the mining tunnel, comprising: transporting the filling unit to a predetermined position in the mining tunnel by a filling material vehicle; injecting filling material into the filling unit by the filling material vehicle until the filling unit is tightly fitted with the mining tunnel; The filling material vehicle comprises: a traveling device, a material storage device, a material injection device and a lifting device, wherein the material storage device is arranged on the traveling device and stores the filling material, the material injection device is arranged on the traveling device and injects the filling material in the material storage device into the filling monomer, and the lifting device is arranged on the traveling device and lifts the filling monomer; The walking device comprises a crawler chassis, and the crawler chassis is used for walking; The material storage device comprises a storage box, which is fixedly arranged on the carrier platform of the crawler chassis, has a filling port at the top of the storage box, has a discharge port at the bottom of the storage box, and has a stirring component in the storage box, which is used to stir the filling material in the storage box; The injection device includes an injection pump and an injection pipe, the injection pump is fixedly arranged on the storage box, the feed port of the injection pump is communicated with the discharge port of the storage box, the discharge port of the injection pump is communicated with the feed port of the injection pipe, the injection pipe is arranged on the storage box through a three-dimensional device, and the three-dimensional device is used for the three-dimensional movement of the injection pipe on the storage box, the discharge port of the injection pipe faces the front end of the filling material vehicle, and the injection pipe is used to connect the injection hole on the filling bag; The lifting device includes a shovel plate, a shovel plate hydraulic cylinder, a support frame and a support frame hydraulic cylinder. The support frame is hinged to the bottom front end of the carrier platform of the crawler chassis, the piston rod end of the support frame hydraulic cylinder is hinged to the middle part of the support frame, the cylinder end of the support frame hydraulic cylinder is hinged to the carrier platform of the crawler chassis, the support frame hydraulic cylinder is used to drive the support frame to adjust the angle, the rear end of the shovel plate is slidably inserted into the front end of the support frame, and the length direction of the shovel plate is located in the length direction of the support frame, the cylinder end of the shovel plate hydraulic cylinder is hinged in the support frame, the piston rod end of the shovel plate hydraulic cylinder is hinged to the rear end of the shovel plate, and the shovel plate hydraulic cylinder is used to drive the shovel plate to extend and retract on the support frame; The filling material vehicle further comprises a visual camera probe and a control panel, wherein the visual camera probe is fixedly arranged at the front end top of the crawler chassis, and the control panel is electrically connected to the visual camera probe, the injection pump, the crawler chassis, the three-dimensional device, the shovel hydraulic cylinder and the support frame hydraulic cylinder respectively, so as to realize automatic lifting of the filling bag, automatic injection and automatic walking; The filling material vehicle adopts an inertial navigation system, and the inertial navigation system is arranged on the control panel. The control panel controls the forward direction and travel distance of the crawler chassis through the inertial navigation system.
2. The method for filling the sidewall of an open-pit mine according to claim 1, characterized in that: The top of the filling bag is provided with a material injection hole, and the filling material is injected into the filling bag including: The filling material is injected into the filling bag through the injection hole.
3. The method for filling the sidewall of an open-pit mine according to claim 2, characterized in that: The top of the filling bag is provided with an exhaust hole, and the method of making the filling bag fit tightly with the mining tunnel includes: Until the filling material is discharged from the exhaust hole.