Method and device for cascade generalization of non-steady water-sediment process under multi-parameter control conditions

Through the non-constant water-sand process step generalization method under multi-parameter control conditions, the boundary values ​​and deviation conditions of flow and sand content are set, and the steps are automatically divided, which solves the difficulty of water-sand step generalization method in the existing technology to reflect the flood The problems of dry fluctuation characteristics and low processing efficiency achieve accurate and efficient prediction and engineering support for riverbed evolution.

CN113868974BActive Publication Date: 2024-11-08WUHAN UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111106158.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-22
Publication Date
2024-11-08
Estimated Expiration
2041-09-22

AI Technical Summary

Technical Problem

The existing water-sand cascade generalization methods are difficult to accurately reflect the flood and fluctuation characteristics in non-constant water-sand processes, and are low in treatment efficiency and strong subjectivity, making it difficult to reflect the impact of riverbed deformation on water flow movement during large water and sand.

Method used

The non-constant water and sand process step generalization method under multi-parameter control conditions is adopted. By setting the dividing values ​​and deviation conditions of flow and sand content, the steps are automatically divided to ensure that the data of each step meets certain physical characteristics constraints, thus Achieve efficient generalization of the water and sand process.

Benefits of technology

It realizes accurate and efficient generalization of non-constant water and sand processes, can objectively and truly reflect the evolution of riverbeds in long river sections and long periods, improves computing efficiency, and provides reliable engineering support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113868974B_ABST
    Figure CN113868974B_ABST
Patent Text Reader

Abstract

The present invention provides a method and device for cascade generalization of non-constant water and sediment processes under multi-parameter control conditions, which can accurately and efficiently obtain non-constant water and sediment processes, and more objectively and truly reflect the evolution of riverbeds in actual long river sections and long periods of time. The method for cascade generalization of non-constant water and sediment processes includes: step 1. According to the water and sediment conditions of the river channel over the years, a daily water and sediment series containing at least daily flow, sediment content, and water level information is selected from the measured data to determine the total duration of the series; step 2. Determine the control conditions of each parameter for the generalization grouping of the water and sediment series; step 3. According to all eight control conditions described in step 2, the measured water and sediment data are cascaded and generalized, and the cascaded water and sediment data after generalization are output, including the duration of each cascade, the average flow, the average sediment content and grading, and the water level, to obtain the cascaded generalized multi-year river channel water and sediment process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of riverbed evolution prediction, and in particular relates to a method and a device for cascade generalization of a non-steady water-sediment process under multi-parameter control conditions. Background Art

[0002] River numerical simulation technology can simulate the movement of water and sediment in the river channel, as well as the riverbed deformation process caused by sediment movement. In engineering, river mathematical models are often used to predict the future evolution trend of the riverbed, thereby assisting in project site selection, scheme comparison and optimization, and serving the construction of water conservancy projects. For large and medium-sized water conservancy projects (such as the Three Gorges Water Conservancy Project), in order to understand the future riverbed evolution trend of the project river section, it is often necessary to conduct long-term and long-section water and sediment numerical simulations. Due to the huge amount of calculation required for long-term and long-section water and sediment numerical simulations, especially two-dimensional or three-dimensional water and sediment numerical simulations, in order to greatly improve the calculation efficiency, in engineering practice, non-constant water and sediment processes are usually generalized into step-by-step constant processes for calculation, that is, according to the flood and drought fluctuation trend of the water and sediment process line, several steps are set (each step process lasts for several days), and then a constant flow water and sediment numerical simulation is performed for each step process. At present, many models use this idea for water and sediment numerical simulation, such as the HEC-6 model of the Hydrological Engineering Center of the US Army Corps of Engineers and the SSIIM model of the Norwegian University of Science and Technology. It is worth noting that since the non-steady water-sediment process is difficult to control in the experiment, the current river engineering physical model test basically adopts the step-by-step constant process to replace the actual non-steady water-sediment process.

[0003] Since the water-sediment process after cascade generalization is an approximation of the actual non-steady water-sediment process, the results simulated based on the former will inevitably produce certain errors. Different cascade generalization results have different calculation efficiencies and errors. From the perspective of physical laws, when the amount of water and sediment is large (i.e., large water and large sediment), the riverbed evolution is usually more drastic. In order to reasonably reflect the impact of drastic riverbed deformation on water flow movement, the duration of the cascade process at this time should not be too long; but for the case where the riverbed changes little, the impact of riverbed deformation on water flow movement is small, so the duration of the cascade process at this time can be appropriately longer; a better cascade generalization method should be able to reflect the riverbed scouring and silting process under different sediment conditions and the interaction between the dynamic changes of the riverbed and the water flow. At present, the commonly used water-sediment cascade generalization methods include equal time division and manual classification. These generalization methods, such as the equal time division method, are difficult to reflect the flood and drought fluctuation characteristics of the actual non-steady water-sediment process, while the manual classification is highly subjective and the classification standards are different, and the processing efficiency is not high. In view of this, it is very necessary to develop a method that can reflect the physical characteristics of the fluctuation of water-sediment processes and can automatically, simply and efficiently generalize water-sediment cascade processes. Summary of the invention

[0004] The present invention is made to solve the above-mentioned problems, and its purpose is to provide a method and device for cascade generalization of non-constant water and sediment processes under multi-parameter control conditions, which can accurately and efficiently obtain the generalized cascade constant flow process of the non-constant water and sediment process, thereby more objectively and truly reflecting the actual long river section and long-term riverbed evolution, and providing reliable technical support for engineering construction.

[0005] In order to achieve the above object, the present invention adopts the following scheme:

[0006] <Method>

[0007] like Figure 1 As shown, the present invention provides a step-by-step generalization method for a non-steady water-sediment process under multi-parameter control conditions, which is characterized by comprising the following steps:

[0008] Step 1. According to the water and sediment conditions of the river channel over the years, select the daily water and sediment series containing at least the daily flow, sediment content and water level information in the measured data, and determine the total length of the series;

[0009] Step 2. Determine the parameter control (constraint) conditions for the generalized grouping of water and sand series:

[0010] According to the selected water and sediment series, set the boundary values ​​of large, medium and small water flow and sediment content, set the absolute deviation and relative deviation of flow under large, medium and small water flow levels, set the absolute deviation and relative deviation of sediment content under large, medium and small sediment content levels, set the absolute deviation and relative deviation of water level, set the daily average maximum sediment content and the maximum number of days for a single flow level, and these eight control conditions (used to divide each level) are shown in Table 1 below; the continuous water and sediment data for multiple days included in the same level must meet the above eight control conditions of this level at the same time. If any one of the conditions is not met, it will not be included in the list. can be classified into the same level; among them, the absolute deviation of flow and the relative deviation of flow respectively represent the absolute deviation and relative deviation of the average daily flow relative to the average flow of this group; the absolute deviation of sediment content and the relative deviation of sediment content respectively represent the absolute deviation and relative deviation of the average daily sediment content relative to the average sediment content of this group; the absolute deviation of water level and the relative deviation of water level respectively represent the absolute deviation and relative deviation of the average daily water level relative to the average water level of this group; the maximum number of days for a single flow level represents the maximum number of days allowed for a single flow level; the specific value can be adjusted in combination with the calculation accuracy requirements and the measured fluctuation amplitude of water and sediment series and the frequency of floods and dry seasons.

[0011] Table 1 Eight hierarchical control conditions

[0012]

[0013]

[0014] Step 3. According to the control conditions, the measured water and sediment data are generalized in stages:

[0015] Starting from the measured daily water and sediment data, starting from the first day's flow, sediment content, and water level data, compare whether the measured water and sediment data of this day meet all eight control conditions in step 2. If not, the data of this day is used as a ladder; if it is satisfied, add the flow, sediment content, and water level data of the next day to the ladder to determine whether the flow, sediment content, and water level information in the ladder after adding the data of this day meets all eight control conditions in step 2. If it is satisfied, continue to add the flow, sediment content, and water level data of the next day to continue to determine until the eight control conditions in step 2 are met. Until at least one of the conditions is not satisfied, the total duration of this cascade is obtained, and the average flow, sediment content and gradation, and water level of this cascade are obtained according to the cascade generalization calculation method. At this point, the generalization work of one cascade is completed, and the duration, average flow, sediment content and gradation, and water level information of this cascade are recorded; then the generalization work of the next cascade is entered according to the same principle until the total duration of the series is completed; the generalized cascade water and sediment data are output, including the duration of each cascade, average flow, average sediment content and gradation, and water level, and the multi-year river channel water and sediment process model after cascade generalization is obtained. According to the specific mathematical model calculation efficiency, the maximum acceptable number of cascades is set (usually the total calculation time is controlled at about one week). If it exceeds the set maximum number of cascades, the 8 control conditions are fine-tuned (appropriately reducing the constraints of each control condition) so that the total number of generalized cascades meets the requirements.

[0016] Preferably, the method for cascade generalization of non-steady water and sediment processes under multi-parameter control conditions provided by the present invention may also include: Step 4. Taking the measured topography of the river channel in recent years as the starting topography, using the multi-year river channel water and sediment process model after cascade generalization in Step 3, simulate and predict the riverbed evolution of the river channel in the next few years, and calculate the scouring and siltation thickness distribution map at the corresponding river section of the river channel in the next few years based on the predicted data.

[0017] Preferably, the cascade generalization method for non-steady water-sediment process under multi-parameter control conditions provided by the present invention may also have the following characteristics: In step 3, the cascade generalization calculation method used is:

[0018] Assume that a non-constant water-sediment series has N days of flow data and generalizes it into M constant steps, then:

[0019] S0=0

[0020]

[0021]

[0022] (i=1,2,…,M)

[0023] In the formula, Q jrepresents the flow rate on the jth day in the non-steady water and sediment process (j = 1, 2, ..., N); D i represents the number of days included in the i-th cascade, and indicators such as flow, sediment content, and water level should be used to constrain the cascade generalization process; S i Indicates the total number of days included in the 1st to the i-th level (i = 1, 2, ..., M); represents the average flow of the i-th stage after generalization;

[0024] The average sediment content of each step is solved according to the principle of equal sediment transport:

[0025]

[0026] (i=1,2,…,M)

[0027] In the formula, represents the average sediment content of the i-th terrace after generalization;

[0028] If non-uniform sand calculation is performed, the gradation of each group of sand after generalization is combined with the given daily (or monthly) average suspended sediment gradation. To solve:

[0029]

[0030] (i=1,2,…,M)

[0031] In the formula, C j,k is the sand content of the kth group of sand on the jth day.

[0032] Preferably, the method for cascade generalization of non-steady water-sediment process under multi-parameter control conditions provided by the present invention is characterized in that: for the cascade generalized water level process, the average flow rate of each cascade generalized as above is value, find the closest value in the corresponding non-steady water-sediment process period The water level value, or the closest The water level is determined by linearly interpolating the two measured flow values ​​of the station according to the flow size, or by interpolating the average flow of the cascade according to the water level-flow relationship of the station, as the water level of this cascade.

[0033] Preferably, the cascade generalization method of non-constant water and sediment process under multi-parameter control conditions provided by the present invention is characterized in that: in step 2, the large water flow is set to be the flood with a frequency of 20% to 10% in the river section, the medium water flow is set to be the multi-year average flow or flat beach flow of the river section, and the small water flow is set to be the minimum navigable flow of the river section.

[0034] Preferably, the step-by-step generalization method for a non-steady water-sediment process under multi-parameter control conditions provided by the present invention is characterized in that: for non-uniform sand calculation, in step 1, the suspended sediment grading information required in the measured data on a daily or monthly basis should also be obtained.

[0035] <Device>

[0036] Furthermore, the present invention also provides a cascade generalization device for non-steady water-sediment process under multi-parameter control conditions, which is characterized by comprising:

[0037] The information determination department selects a daily water and sediment inflow series that contains at least daily flow, sediment content, and water level information from the measured data based on the water and sediment inflow conditions of the river over the years, and determines the total duration of the series;

[0038] The control condition setting section sets the boundary values ​​of large, medium and small water flow and sediment content according to the selected water and sediment series, sets the absolute deviation and relative deviation of flow at large, medium and small water flow levels, sets the absolute deviation and relative deviation of sediment content at large, medium and small sediment content levels, sets the absolute deviation and relative deviation of water level, sets the maximum daily average sediment content and the maximum number of days for a single flow level, and other eight control conditions; the continuous multi-day water and sediment data included in the same level must meet the above eight control conditions of this level at the same time, and cannot be included in the same level if any one of the conditions is not met; among them, the absolute deviation of flow and the relative deviation of flow respectively represent the absolute deviation and relative deviation of the daily average flow relative to the average flow of this group; the absolute deviation of sediment content and the relative deviation of sediment content respectively represent the absolute deviation and relative deviation of the daily average sediment content relative to the average sediment content of this group; the absolute deviation of water level and the relative deviation of water level respectively represent the absolute deviation and relative deviation of the daily average water level relative to the average water level of this group; the maximum number of days for a single flow level represents the maximum number of days allowed for a single flow level;

[0039] The step generalization part starts with the measured daily water and sediment data, starting from the first day's flow, sediment content, and water level data, and compares whether the measured water and sediment data of this day meet all eight control conditions in the control condition setting part. If not, the data of this day is used as a step; if satisfied, the flow, sediment content, and water level data of the next day are added to the step to determine whether the flow, sediment content, and water level information in the step after adding the data of this day meet all eight control conditions. If satisfied, the flow, sediment content, and water level data of the next day are added to continue to determine until all eight control conditions are met. Until at least one of the control conditions is not satisfied, the total duration of this cascade is obtained, and the average flow, sediment content and gradation, and water level of this cascade are obtained according to the cascade generalization calculation method. At this point, the generalization work of a cascade is completed, and the duration, average flow, sediment content and gradation, and water level information of this cascade are recorded; then the generalization work of the next cascade is entered according to the same principle until the total duration of the series is completed; the generalized cascade water and sediment data are output, including the duration of each cascade, the average flow, the average sediment content and gradation, and the water level, and the multi-year river water and sediment process model after the cascade generalization is obtained;

[0040] The prediction department uses the measured topography of the river in recent years as the starting topography and adopts the multi-year river water and sediment process model generalized by the cascade generalization department to simulate and predict the riverbed evolution of the river in the next few years; and

[0041] The control unit is connected to the information determination unit, the control condition setting unit, the step generalization unit, the learning unit, and the prediction unit to control their operations.

[0042] Preferably, the device for cascade generalization of non-constant water-sand process under multi-parameter control conditions provided by the present invention may also include: an input display unit, which is communicatively connected with the information determination unit, the control condition setting unit, the cascade generalization unit, the learning unit, the prediction unit, and the control unit, allowing the user to input control instructions and perform corresponding display according to the control instructions.

[0043] Preferably, the device for generalizing the cascade of non-steady water and sediment processes under multi-parameter control conditions provided by the present invention may also include: a scouring and silting thickness distribution map generating unit, which calculates the scouring and silting thickness distribution at the corresponding river section in the next few years based on the riverbed evolution of the river channel predicted by the prediction unit, and then generates a corresponding scouring and silting thickness distribution map, wherein the input display unit is also communicatively connected with the scouring and silting thickness distribution map generating unit, and displays the scouring and silting thickness distribution map according to the control instruction.

[0044] Preferably, the device for cascade generalization of non-steady water and sediment processes under multi-parameter control conditions provided by the present invention may also have the following characteristics: wherein the input display unit can also display the multi-year river water and sediment process obtained by the cascade generalization unit in a graphical manner according to the control instructions, and dynamically display the riverbed evolution of the river in the next few years predicted by the prediction unit.

[0045] Preferably, in the cascade generalization device for non-steady water-sediment process under multi-parameter control conditions provided by the present invention, the cascade generalization calculation method adopted in the cascade generalization part is:

[0046] Assume that a non-constant water-sediment series has N days of flow data and generalizes it into M constant steps, then:

[0047] S0=0

[0048]

[0049]

[0050] (i=1,2,…,M)

[0051] In the formula, Q j represents the flow rate on the jth day in the non-steady water and sediment process (j = 1, 2, ..., N); D i represents the number of days included in the i-th level; S i Indicates the total number of days included in the 1st to the i-th level (i = 1, 2, ..., M); represents the average flow of the i-th stage after generalization;

[0052] The average sand content of each step should meet the following requirements:

[0053]

[0054] (i=1,2,…,M)

[0055] In the formula, represents the average sediment content of the i-th terrace after generalization;

[0056] If non-uniform sand calculation is performed, the suspended sediment gradation of each group of sand after generalization is Should meet:

[0057]

[0058] (i=1,2,…,M)

[0059] In the formula, C j,k is the sand content of the kth group of sand on the jth day.

[0060] Functions and Effects of the Invention

[0061] The method and device for cascade generalization of non-steady water and sediment processes under multi-parameter control conditions provided by the present invention directly coordinate and constrain the generalization process based on multiple measured physical indicators according to historical data of water and sediment conditions in the river channel over the years, retain flood peak and sand peak data by reasonably arranging the density of the cascades, and reflect the strong interaction between large water and large sediment and riverbed deformation, so that the generalized cascade water and sediment process can accurately and reasonably reflect the flood and dry fluctuation trend of the water and sediment process, and can objectively and truly reflect and predict the riverbed evolution of long river sections and long periods of time. In addition, the present invention adopts simple control conditions, clear physical meaning, concise generalization ideas, small processing volume, and short processing time, so as to realize reasonable and efficient automatic generalization of non-steady water and sediment cascade processes, and can provide reliable data support for engineering construction, for example, to ensure the safety of project site selection, to be used for comparison and optimization of water conservancy project construction plans, and to predetermine construction reinforcement plans suitable for riverbed evolution. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1 It is a flow chart of the step-by-step generalization method of the non-steady water-sediment process under multi-parameter control conditions of the present invention;

[0063] Figure 2 This is a generalized result diagram of a 10-year water-sediment series involved in the first embodiment of the present invention, where (a) corresponds to the flow Q, (b) corresponds to the water level Z, and (c) corresponds to the sediment content S;

[0064] Figure 3 The scouring and silting thickness distribution map of the river section calculated in the next 20 years involved in the first embodiment of the present invention, wherein (a) is the next 5 years, (b) is the next 10 years, (c) is the next 15 years, and (d) is the next 20 years;

[0065] Figure 4 This is a generalized result diagram of a 10-year water-sediment series involved in the second embodiment of the present invention, where (a) corresponds to the flow Q, (b) corresponds to the water level Z, and (c) corresponds to the sediment content S;

[0066] Figure 5 The scouring and silting thickness distribution map of the river section calculated in the next 20 years involved in the second embodiment of the present invention, wherein (a) is the next 5 years, (b) is the next 10 years, (c) is the next 15 years, and (d) is the next 20 years;

[0067] Figure 6 It is a comparison chart of the generalized results of the multi-parameter control method and the equal time period equalization method involved in the comparative example of the present invention and the actual water and sediment process results, where (a) corresponds to the flow rate Q, (b) corresponds to the water level Z, and (c) corresponds to the sediment content S. DETAILED DESCRIPTION

[0068] The specific implementation scheme of the method and device for cascade generalization of non-steady water-sediment process under multi-parameter control conditions according to the present invention is described in detail below in conjunction with the accompanying drawings.

[0069] <Example 1> Simulation prediction of riverbed evolution in the upper Jingjiang River section from Shashi to Gong'an

[0070] The present invention is applied to predict the riverbed evolution of the upper Jingjiang River from Shashi to Gong'an in the next 20 years, and the method of the present invention is used to generalize the water and sediment process.

[0071] (1) Calculation of water and sand conditions

[0072] Considering that the water and sediment conditions of the Shashi to Gong'an River have changed after the Three Gorges Project was put into use, the selection of the test series years should take into account the actual conditions of the water and sediment conditions of the river after the Three Gorges were put into use. After comprehensive consideration, the selected series years are 10 years long, consisting of the measured water and sediment processes of the Shashi Station from 2010 to 2018 and the 1998 flood year and the Haoxue water level process; since the sediment was greatly reduced after the water was put into use, the sediment volume in 1998 was reduced according to the flow-sediment transport rate relationship from 2014 to 2018 after the Xiangjiaba and Xiluodu were put into use. The statistics of the series year combination and water and sediment characteristics are shown in Table 2. The series year is 10 years long, and the simulation period is 20 years, that is, the series year cycle is calculated twice.

[0073] Table 2 Series of annual water and sediment characteristics in Example 1

[0074] order years <![CDATA[Annual average flow (m 3 / s)]]> Annual sediment transport (billion tons) 1 2010 12100 0.480 2 2011 10600 0.181 3 2012 13400 0.618 4 2013 11200 0.402 5 2014 13100 0.276 6 1998 15100 0.480 7 2015 11600 0.142 8 2016 12600 0.209 9 2017 13000 0.162 10 2018 13700 0.495

[0075] (2) Generalization of water and sand cascades

[0076] The series of annual cycles were repeated twice to form a 20-year water-sediment series with a total of 7304 sets of data. The method of the present invention was used to generalize the cascade process. Combined with the characteristics of the water-sediment series, 8 control conditions were set as shown in Table 3, and finally 422 cascades were generalized. The generalization results of the flow, water level, and sediment content of 211 cascades in the first 10 years are shown in Table 3. Figure 2 shown.

[0077] Table 3 Generalized control conditions of water and sand cascade in Example 1

[0078]

[0079]

[0080] (3) Simulation results

[0081] Taking the measured topography of the study river section in 2019 as the starting topography, the 20-year cascade water and sediment process generalized in (2) was used to simulate the riverbed evolution of the study river section in the next 20 years. Figure 3The thickness distribution map of the scouring and silting of the calculated river section in the next 5 to 20 years is shown in the prediction results. The main river channel of the Shashi to Gong'an river section will continue to scour in the next 20 years, and the scouring will be mainly in the low-water river channel. The deep channel will be generally scoured down and widened. Under the protection of the embankment and bank protection project, the shoreline of the calculated river section is generally stable. The Jinchengzhou beach is silted up, the left branch of the protruding island is silted up, and the right branch is scoured, and the plane position of the beach is relatively stable. In general, the Jinchengzhou branch channel will continue to maintain the "left main and right branch" branching pattern, and the protruding island branch channel will continue to maintain the "left branch and right main" branching pattern.

[0082] <Example 2> Simulation prediction of riverbed evolution in the section from Gong'an to Xinchang on the Jingjiang River

[0083] The present invention is applied to predict the riverbed evolution of the river section from Gong'an to Xinchang on the upper Jingjiang River in the next 20 years, and the method of the present invention is adopted to generalize the water and sediment process.

[0084] (1) Calculation of water and sand conditions

[0085] The selection of the test series of this river section should take into account the actual conditions of the water and sediment conditions in the river channel after the Three Gorges reservoir is filled. After comprehensive consideration, the selected series of years is 10 years long, consisting of the water and sediment process of Shashi Station from 2011 to 2020 and the measured water level process of Xinchang (II). The series of year combinations and water and sediment characteristics are shown in Table 4. The series of years is 10 years long, and the simulation period is 20 years, that is, the series of years is calculated twice.

[0086] Table 4 Series of annual water and sediment characteristics in Example 2

[0087] order years <![CDATA[Annual average flow rate (m 3 / s)]]> Annual sediment transport (billion tons) 1 2011 10360 0.172 2 2012 13519 0.619 3 2013 11436 0.410 4 2014 12714 0.270 5 2015 11700 0.146 6 2016 12459 0.207 7 2017 12967 0.164 8 2018 13732 0.497 9 2019 12864 0.185 10 2020 15620 0.591

[0088] (2) Generalization of water and sand cascades

[0089] The series of annual cycles were repeated twice to form a 20-year water-sediment series with a total of 7306 sets of data. The method of the present invention was used to generalize the cascade process. Combined with the characteristics of the water-sediment series, 8 control conditions were set as shown in Table 5. The final generalization result was 289 cascades. The generalization results of the flow, water level, and sediment content of 145 cascades in the first 10 years are shown in Table 5. Figure 4 shown.

[0090] Table 5 Generalized control conditions of water and sand cascade in Example 2

[0091]

[0092]

[0093] (3) Simulation results

[0094] Taking the measured topography of the study river section in 2020 as the starting topography, the 20-year cascade water and sediment process generalized in (2) is used to simulate the riverbed evolution of the study river section in the next 20 years. Figure 5 The distribution map of scouring and silting thickness of the river section was calculated in order to predict the next 5 to 20 years. According to the prediction results, the riverbed of the river section from Gong'an to Xinchang will be dominated by erosion in the future, and the erosion will mainly occur in the low-water river channel. Some high beaches will be silted up, and the erosion of the river channel will develop from upstream to downstream year by year, which is consistent with the evolution trend of the river channel downstream of the dam observed in the prototype after the Three Gorges Dam was impounded.

[0095] <Example 3> Non-constant water-sand process cascade generalization device

[0096] The third embodiment provides a device for cascade generalization of non-steady water and sediment processes under multi-parameter control conditions, which can automatically implement the method of the present invention. The device includes an information determination unit, a control condition setting unit, a cascade generalization unit, a prediction unit, a scouring and silting thickness distribution map generation unit, an input display unit, and a control unit.

[0097] Based on the water and sediment conditions of the river over the years, the Information Determination Department selects a daily water and sediment series that contains at least daily flow, sediment content, and water level information from the measured data, and determines the total duration of the series.

[0098] The control condition setting part sets the boundary values ​​of large, medium and small water flow and sediment content according to the selected water and sediment series, sets the absolute deviation and relative deviation of flow under large, medium and small water flow levels, sets the absolute deviation and relative deviation of sediment content under large, medium and small sediment content levels, sets the absolute deviation and relative deviation of water level, sets the maximum daily average sediment content and the maximum number of days for a single flow level. The continuous multi-day water and sediment data included in the same level must meet the above eight control conditions of this level (as shown in Table 1) at the same time. If any one of the conditions is not met, it cannot be included in the same level. Among them, the absolute deviation of flow and the relative deviation of flow respectively represent the absolute deviation and relative deviation of the daily average flow relative to the average flow of this group; the absolute deviation of sediment content and the relative deviation of sediment content respectively represent the absolute deviation and relative deviation of the daily average sediment content relative to the average sediment content of this group; the absolute deviation of water level and the relative deviation of water level respectively represent the absolute deviation and relative deviation of the daily average water level relative to the average water level of this group; the maximum number of days for a single flow level represents the maximum number of days allowed for a single flow level.

[0099] The cascade generalization part starts with the measured daily water and sediment series data, starting from the first day's flow, sediment content, and water level data, and compares whether the measured water and sediment data of this day meet all eight control conditions in the control condition setting part. If not, the data of this day is used as a cascade; if satisfied, the flow, sediment content, and water level data of the next day are added to the cascade to determine whether the flow, sediment content, and water level information in the cascade after adding the data of this day meet all eight control conditions. If satisfied, the flow, sediment content, and water level data of the next day are added to continue to determine until all eight control conditions are met. The process continues until at least one of the conditions is not met. The total duration of this step is obtained, and the average flow, sediment content, gradation, and water level of the step are obtained based on the step generalization calculation method. From then on, the generalization work of one step is completed, and the duration, average flow, sediment content, gradation, and water level information of this step are recorded. Then, the generalization work of the next step is carried out according to the same principle until the total duration of the series is completed. The generalized step water and sediment data are output, including the duration of each step, average flow, average sediment content and gradation, and water level, to obtain a multi-year river water and sediment process model after step generalization.

[0100] The prediction department uses the measured topography of the river in recent years as the starting topography, and adopts the multi-year river water and sediment process model generalized by the cascade generalization department to simulate and predict the riverbed evolution of the river in the next few years.

[0101] The scouring and silting thickness distribution map generating unit calculates the scouring and silting thickness distribution at the corresponding river section in the next few years based on the riverbed evolution predicted by the prediction unit, and then generates the corresponding scouring and silting thickness distribution map.

[0102] The input display unit is connected to the information determination unit, the control condition setting unit, the step generalization unit, the learning unit, the prediction unit, the scouring and silting thickness distribution map generation unit, and the control unit to allow the user to input control instructions and to display accordingly. Specifically, the input display unit can display the multi-year river channel water and sediment process obtained by the step generalization unit in a graphical manner according to the control instructions, and can dynamically display the riverbed evolution of the river channel predicted by the prediction unit in the next few years, and can also display the scouring and silting thickness distribution map, and can display prompt information to allow the user to input the corresponding measured data according to the prompt.

[0103] The control unit is connected to the information determination unit, the control condition setting unit, the step generalization unit, the learning unit, the prediction unit, the erosion and siltation thickness distribution map generation unit, and the input display unit to control their operations.

[0104] <Comparative Example> Comparative Analysis of Different Generalization Methods

[0105] The following uses the measured water and sediment series of Shashi in 2020 for cascade generalization analysis. As a comparison, the equal-period averaging method is used here for comparison. Both methods generalize the 366-day water and sediment data of Shashi in 2020 into 27 tiers. Among them, the multi-parameter control method sets parameters according to the above generalization process. The program single-core operation generalizes the water and sediment process for one year in 0.32s. The equal-period averaging method uses manual generalization, and each tier contains 14 days of water and sediment data. Figure 2 This is a comparison chart between the two generalized results and the measured data, including three hydraulic elements: flow, water level and sediment content. Since there is a certain correlation between the water level and flow at the same hydrological station, the fluctuation trends of the two are basically the same in the same period. For the sake of simplicity, the following mainly analyzes the comparison of the two indicators of flow and sediment content.

[0106] from Figure 6 It can be seen that under the premise of a large and consistent number of steps, both generalization methods can reflect the fluctuation trend of the actual water and sediment process to a certain extent, but the large water and large sediment process generalized by the equal time period equalization method is flattened, so it is difficult to reflect the bed-forming effect of the flood on the river channel, and the large water step duration is long, which is difficult to reflect the effect of the strongly changing riverbed on the water flow; and in the period of small water and small sediment, since the same step duration is still used, it is not conducive to improving the calculation efficiency; the present invention realizes the automatic and reasonable distribution of the density of the steps through the coordinated constraint control of multiple parameters, limits the number of data groups contained in each step during the period of large water or large sediment, and appropriately relaxes the control conditions in the dry season, so as to more truly reflect the flood and drought fluctuation characteristics of the actual water and sediment process under certain calculation efficiency requirements.

[0107] The first six control conditions in Table 1 (absolute deviation and relative deviation of flow, water level, and sediment content) are selected to compare the results of the two generalization methods, and the indicators are defined as follows:

[0108] S0=0,

[0109] DDF_max=max i=1,M DDF i , (i=1,2,…,M),

[0110] In the formula, F represents flow rate Q, water level Z or sediment content C; D i represents the number of days included in the i-th level; M is the total number of generalized levels; S i Indicates the total number of days included in the 1st to the ith level; represents the average flow of the i-th stage after generalization Average water level Or average sand content DF_erri 、DF_rela_err i They represent the maximum absolute deviation and relative deviation of the flow, water level and sediment content of the i-th cascade after generalization from the mean of the cascade; DDF i Represents the absolute deviation DF_err of the i-th level variable F after generalization i Or relative deviation DF_rela_err i , DDF_avg represents the average value of DDF of M steps, and DDF_max represents the maximum value of DDF of M steps.

[0111] Tables 6 and 7 show the statistics of DDF_avg and DDF_max under the two generalization methods. From the data in the table, it can be seen that the average value DDF_avg and the maximum value DDF_max of the relative deviation of the flow and sediment content of the two generalization results are not much different, but the number of levels of the relative deviation of the equal time period averaging method exceeding a certain characteristic value (such as the relative deviation DQ_rela_err of the flow exceeds 30%, and the relative deviation DC_rela_err of the sediment content exceeds 100%) is much more than that of the patent method; at the same time, the absolute deviation DQ_err of the flow of each level generalized by the equal time period averaging method can reach up to 12550.00m 3 / s, the maximum absolute deviation of sediment content DC_err can reach 0.49kg / m 3 . From the generalization results, when the equal time period averaging method is used, the absolute deviations of the flow, water level and sediment content within the steps during the flood and sand period are too large, which makes it difficult to reflect the flood peak and sand peak processes. The multi-parameter control method overcomes this problem better. Moreover, the single-core operation of this method to generalize the water and sand process for one year only takes 0.32s. From the above analysis, it can be seen that: under the premise of a large number of steps, the multi-parameter control generalization of the present invention can not only reflect the water and sand fluctuation trend like the equal time period averaging generalization method, but also effectively generalize the flood peak and sand peak processes. In this way, the step duration can be reasonably arranged to reflect the interaction between the riverbed and the water flow during floods and sand, and the processing process is very efficient.

[0112] Table 6 Traffic deviation statistics of two generalization methods

[0113]

[0114] Table 7 Deviation statistics of sediment content of two generalization methods

[0115]

[0116] The above embodiments and comparative examples are merely examples of the technical solutions of the present invention. The method and device for generalizing the non-constant water-sand process cascade under multi-parameter control conditions involved in the present invention are not limited to the contents described in the above embodiments, but are subject to the scope defined by the claims. Any modification, supplement or equivalent replacement made by a technician in the field of the present invention on the basis of the embodiment is within the scope of protection required by the claims of the present invention.

Claims

1. A cascade generalization method for non-steady water-sediment processes under multi-parameter control conditions, characterized in that: The following steps are involved: Step 1. According to the water and sediment conditions of the river channel over the years, select the daily water and sediment series containing at least daily flow, sediment content and water level information in the measured data, and determine the total length of the series; Step 2. Determine the control conditions of each parameter of the generalized grouping of water and sand series: According to the selected water and sediment series, set the boundary values ​​of large, medium and small water flow and sediment content, set the absolute deviation and relative deviation of flow under large, medium and small water flow levels, set the absolute deviation and relative deviation of sediment content under large, medium and small sediment content levels, set the absolute deviation and relative deviation of water level, set the maximum daily average sediment content and the maximum number of days for a single flow level, these eight control conditions; the continuous multi-day water and sediment data included in the same level must meet the above eight control conditions of this level at the same time, and any one of the conditions is not met and cannot be included in the same level; among them, the absolute deviation of flow and the relative deviation of flow respectively represent the absolute deviation and relative deviation of the daily average flow relative to the average flow of this group; the absolute deviation of sediment content and the relative deviation of sediment content respectively represent the absolute deviation and relative deviation of the daily average sediment content relative to the average sediment content of this group; the absolute deviation of water level and the relative deviation of water level respectively represent the absolute deviation and relative deviation of the daily average water level relative to the average water level of this group; the maximum number of days for a single flow level represents the maximum number of days allowed for a single flow level; Step 3. According to the control conditions, the measured water and sediment data are generalized in stages: Starting from the measured daily water and sediment series data, starting from the first day's flow, sediment content and water level data, compare whether the measured water and sediment data of this day meet all the eight control conditions described in step 2. If not, the data of this day is used as a ladder; if it is satisfied, add the flow, sediment content and water level data of the next day to the ladder, and judge whether the flow, sediment content and water level information in the ladder after adding the data of this day meets all the eight control conditions described in step 2. If it is satisfied, continue to add the flow, sediment content and water level data of the next day to continue judging until all eight control conditions in step 2 are met. The process continues until at least one of the control conditions is not satisfied. The total duration of this cascade is obtained, and the average flow, sediment content, gradation and water level of this cascade are obtained according to the cascade generalization calculation method. The generalization work of a cascade is completed, and the duration, average flow, sediment content, gradation and water level information of this cascade are recorded. Then, the generalization work of the next cascade is started according to the same principle until the total duration of the series is completed. The generalized cascade water and sediment data are output, including the duration of each cascade, the average flow, the average sediment content, gradation and water level, and the multi-year river water and sediment process model after the cascade generalization is obtained. Among them, in step 3, the ladder generalization calculation method used is: Assume that a non-constant water-sediment series has N days of flow data and generalizes it into M constant steps, then: S0=0 i=1,2,…,M In the formula, Q j represents the flow rate on the jth day in the non-steady water and sediment process, j = 1, 2, ..., N; D i represents the number of days included in the i-th level; S i Represents the total number of days from the 1st level to the i-th level, i = 1, 2, ..., M; represents the average flow of the i-th stage after generalization; The average sediment content of each step should meet the following requirements: i=1,2,…,M In the formula, represents the average sediment content of the i-th terrace after generalization; If non-uniform sand calculation is performed, the suspended sediment gradation of each group of sand after generalization is Should meet: i=1,2,…,M In the formula, C j,k is the sand content of the kth group of sand on the jth day.

2. The step-by-step generalization method for non-steady water-sediment process under multi-parameter control conditions according to claim 1 is characterized in that: Also includes: Step 4. Using the measured topography of the river in recent years as the starting topography, the multi-year river water and sediment process model generalized in step 3 is used to simulate and predict the riverbed evolution of the river in the next few years, and the scouring and silting thickness distribution map of the corresponding river section in the next few years is calculated based on the predicted data.

3. The step-by-step generalization method for non-steady water-sediment process under multi-parameter control conditions according to claim 2 is characterized in that: in, For the water level process after cascade generalization, the average flow of each cascade generalized above value, find the closest value in the corresponding non-steady water-sediment process period The water level value, or the closest The water level is determined by linear interpolation of the two measured flow values ​​at the station according to the flow size, or by interpolating the average flow of the cascade according to the water level-flow relationship of the station, as the water level of this cascade.

4. The step-by-step generalization method for non-steady water-sediment process under multi-parameter control conditions according to claim 1 is characterized in that: in, In step 2, the high water flow is set to be the flood with a frequency of 20% to 10% in the river section, the medium water flow is set to be the multi-year average flow or flat beach flow in the river section, and the low water flow is set to be the minimum navigable flow in the river section.

5. A cascade generalization device for non-steady water-sediment process under multi-parameter control conditions, characterized in that: include: The information determination department selects a daily water and sediment inflow series containing at least daily flow, sediment content and water level information from the measured data based on the water and sediment inflow conditions of the river over the years, and determines the total duration of the series; The control condition setting section sets the boundary values ​​of large, medium and small water flow and sediment content according to the selected water and sediment series, sets the absolute deviation and relative deviation of flow at large, medium and small water flow levels, sets the absolute deviation and relative deviation of sediment content at large, medium and small sediment content levels, sets the absolute deviation and relative deviation of water level, sets the maximum daily average sediment content and the maximum number of days for a single flow level, and other eight control conditions; the continuous multi-day water and sediment data included in the same level must meet the above eight control conditions of this level at the same time, and cannot be included in the same level if any one of the conditions is not met; among them, the absolute deviation of flow and the relative deviation of flow respectively represent the absolute deviation and relative deviation of the daily average flow relative to the average flow of this group; the absolute deviation of sediment content and the relative deviation of sediment content respectively represent the absolute deviation and relative deviation of the daily average sediment content relative to the average sediment content of this group; the absolute deviation of water level and the relative deviation of water level respectively represent the absolute deviation and relative deviation of the daily average water level relative to the average water level of this group; the maximum number of days for a single flow level represents the maximum number of days allowed for a single flow level; The step generalization part starts from the measured daily water and sediment series data, starting from the first day's flow, sediment content and water level data, and compares whether the measured water and sediment data of this day meet all the eight control conditions in the control condition setting part. If not, the data of this day is used as a step; if satisfied, the flow, sediment content and water level data of the next day are added to the step to determine whether the flow, sediment content and water level information in the step after adding the data of this day meet all the eight control conditions. If satisfied, the flow, sediment content and water level data of the next day are continued to be added to continue to determine until the eight control conditions are met. Until at least one of the eight control conditions is not satisfied, the total duration of this cascade is obtained, and the average flow, sediment content, gradation and water level of this cascade are obtained according to the cascade generalization calculation method. From then on, the generalization work of one cascade is completed, and the duration, average flow, sediment content, gradation and water level information of this cascade are recorded; then the generalization work of the next cascade is entered according to the same principle until the total duration of the series is completed; the generalized cascade water and sediment data are output, including the duration of each cascade, average flow, average sediment content and gradation and water level, and the multi-year river water and sediment process model after the cascade generalization is obtained; The prediction department uses the measured topography of the river in recent years as the starting topography and adopts the multi-year river water and sediment process model generalized by the cascade generalization department to simulate and predict the riverbed evolution of the river in the next few years; and A control unit, which is in communication with the information determination unit, the control condition setting unit, the step generalization unit, and the prediction unit, and controls their operations; Among them, in the step generalization part, the step generalization calculation method used is: Assume that a non-constant water-sediment series has N days of flow data and generalizes it into M constant steps, then: S0=0 i=1,2,…,M In the formula, Q j represents the flow rate on the jth day in the non-steady water and sediment process, j = 1, 2, ..., N; D i represents the number of days included in the i-th level; S i Represents the total number of days from the 1st level to the i-th level, i = 1, 2, ..., M; represents the average flow of the i-th stage after generalization; The average sediment content of each step should meet the following requirements: i=1,2,…,M In the formula, represents the average sediment content of the i-th terrace after generalization; If non-uniform sand calculation is performed, the suspended sediment gradation of each group of sand after generalization is Should meet: i=1,2,…,M In the formula, C j,k is the sand content of the kth group of sand on the jth day.

6. The device for generalizing the non-steady water-sediment process cascade under multi-parameter control conditions according to claim 5 is characterized in that: Also includes: The input display unit is connected to the information determination unit, the control condition setting unit, the step generalization unit, the prediction unit, and the control unit to allow the user to input control instructions and perform corresponding display according to the control instructions.

7. The device for generalizing the non-steady water-sediment process cascade under multi-parameter control conditions according to claim 6 is characterized in that: Also includes: The scouring and silting thickness distribution map generating unit calculates the scouring and silting thickness distribution at the corresponding river section in the next few years according to the riverbed evolution of the river channel predicted by the predicting unit, and then generates the corresponding scouring and silting thickness distribution map. Wherein, the input display unit is also connected to the scouring and silting thickness distribution map generating unit for communication, and displays the scouring and silting thickness distribution map according to the control instruction.

8. The device for generalizing the non-steady water-sediment process cascade under multi-parameter control conditions according to claim 6 is characterized in that: in, The input display unit can also display the multi-year river water and sediment process obtained by the cascade generalization unit in a graphical manner according to control instructions, and dynamically display the riverbed evolution of the river in the next few years predicted by the prediction unit.

Citation Information

Patent Citations

  • Nested dimension reduction algorithm-based cascade reservoir water-sediment joint optimization scheduling method

    CN107491635A

  • Numerical approximation-based generalization method for a cascade constant water and sand process

    CN109992929A

  • Cascade reservoir sediment real-time forecasting method

    CN111882116A