A regional power regulation method based on demand response
By obtaining and analyzing power regulation events and historical power consumption data, determining the load volume of the supply side area and users, ensuring that all users participate in power regulation, solving the problem of unfair user participation in the existing technology, and realizing power consumption of the supply side users stability and fairness.
Patent Information
- Application Number
- CN202111215247.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-10-19
AI Technical Summary
In the prior art, the method of determining the adjustable power of users is not reasonable enough, resulting in some users being unable to participate in load adjustment. The more load the users participating in the adjustment, the larger the adjustment amount, which has unfair problems, affecting the power consumption of users on the supply side. stability.
By obtaining the power regulation event information and historical power consumption data on the demand side and supply side areas, the priority of the supply side area is determined, and the basic load and dispatchable load of users are calculated one by one, ensuring that all users participate in power regulation and adopting hierarchical The layered approach gradually approaches the maximum load to ensure stable electricity consumption of users on the supply side.
All users participate in power regulation, ensuring the stability and fairness of electricity consumption in the supply-side area to the greatest extent, ensuring that each user appropriately adjusts the load according to power consumption habits, and meeting the load amount required to be adjusted.
Smart Images

Figure CN113964824B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power control, and in particular to a regional power regulation method based on demand response. Background Art
[0002] Demand response refers to when the electricity market price rises (falls) significantly or there is a risk to the safety and reliability of the system, the electricity users change their electricity consumption behavior according to price signals or incentives, reduce (increase) electricity consumption, thereby promoting the balance of electricity supply and demand and ensuring the stable operation of the power grid. By implementing demand response and using economic levers, we can guide electricity users to improve the level of refined management of electricity, and by actively carrying out demand response, we can alleviate the pressure on the operation of the power grid, ensure industrial production, and optimize energy allocation.
[0003] At present, the existing technology is not reasonable enough for determining the adjustable power of users, which is extremely unfair to some users. For example, a "load control method and system based on demand response" disclosed in Chinese patent documents, with announcement number CN105932683B, discloses a load control method and system based on demand response. After receiving the load adjustment instruction, the load management system determines the adjustable load of each user by adjusting the total load before adjustment, the user's power consumption information, and the load baseline value, and then determines the users participating in the load adjustment according to the ratio between the load adjustment amount and the total load before adjustment. The priority of the power equipment participating in the adjustment is judged according to the type of power equipment, environmental information and historical data of user operations, and the corresponding load control strategy is generated, and the control instruction is sent to the power equipment to execute the control action. Through the above technical scheme, according to the user's adjustable load and operating habits of electrical equipment, combined with environmental factors, although it is possible to achieve intelligent adjustment of the user's electrical equipment, enriching the demand-side load control means, but in this invention, whether the user participates in load adjustment is determined based on the user's current total load and load baseline value. If the user's current total load is lower than the load baseline value, the user cannot participate in load adjustment, which is obviously an unreasonable loophole; and among the users participating in load adjustment, the more the current total load, the more urgent the user's need for electricity, and the greater the amount of participation in load adjustment, which is obviously unfair and unreasonable to the users. Summary of the invention
[0004] The present invention aims to overcome the problem in the prior art that some users cannot participate in load adjustment and the method for determining the user load adjustment amount is unscientific and unreasonable, thereby causing unstable power consumption of supply-side users, and to provide a regional power regulation method based on demand response.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A regional power regulation method based on demand response includes the following steps: S1: obtaining power regulation event information of a demand side region; S2: obtaining historical power consumption information of each supply side region; S3: determining the priority of each supply side region according to the power regulation event information of the demand side region and the historical power consumption information of each supply side region; S4: obtaining the historical power consumption information of each user in each supply side region, selecting the supply side region with the highest priority, and entering S5; S5: determining the basic load of each user one by one according to the historical power consumption information of each user in the selected supply side region; S6: determining the dispatchable load of the user according to the historical power consumption information of the user and the basic load of the user, and calculating the total dispatchable load W A ; S7: Send the power control strategy to the user, and control the control equipment to complete the power control. In the power control method of the present invention, the basic load of each user is determined one by one according to the historical power consumption information of each user in the selected supply side area, and then the user's dispatchable load is determined according to the user's historical power consumption information and the user's basic load. That is to say, as long as the area where the user is located is selected, no matter whether the power consumption is large or small, it must participate in the power control process, which makes the load on the demand side that needs to be regulated be borne by all users in the selected supply side area, instead of only selecting some users with high power consumption for load adjustment, which is conducive to maintaining the stability of power consumption of users in the supply side area; in the present invention, the dispatchable load of the user is determined, not by directly determining the maximum dispatchable load of the user at one time, but by grading and stratifying according to the power load curve, gradually approaching the dispatchable maximum load, so that all users can participate in power control as much as possible, and the stability of power consumption of each user in the supply side area can be guaranteed to the greatest extent, which is very scientific and reasonable.
[0007] As a preferred solution of the present invention, the power regulation event information in S1 includes the time period, area and load required for power regulation. The power regulation event information of the demand side area is received, and the supply side area is prioritized and selected according to the power regulation event information.
[0008] As a preferred solution of the present invention, the historical electricity consumption information of each supply side area in S2 includes: the total power load of each supply side area in recent days and the total power load of each supply side area in the time period in which power regulation is required in recent days. The total power load of each supply side area in recent days and the total power load of each supply side area in the time period in which power regulation is required in recent days are used to determine the priority of the supply side area.
[0009] As a preferred solution of the present invention, the specific method for determining the priority of each supply-side area in S3 is: by averaging the total power load of each supply-side area in recent days, the daily basic load of each supply-side area is obtained; by averaging the total power load in the time period in which power regulation is required in recent days, the basic load of each supply-side area in the required time period is obtained; and the daily basic load of each supply-side area is compared with the basic load of each supply-side area in the required time period. The smaller the ratio, the higher the priority. The method of the present invention determines the priority according to the ratio by comparing the daily basic load of each supply-side area with the basic load of each supply-side area in the required time period. The smaller the ratio, the lower the power demand of the users in the area during the time period in which power regulation is required, and the smaller the impact of power regulation on the area, so the higher the priority of the area.
[0010] As a preferred solution of the present invention, the historical electricity consumption information of each user in S4 is specifically: the power load curve of each user in the time period where power regulation is required in the recent few days. The power load curve of each user in the time period where power regulation is required in the recent few days is used to calculate and determine the basic load of each user, and the power load curve of each user in the time period where power regulation is required in the recent day is used to calculate the dispatchable load of each user.
[0011] As a preferred solution of the present invention, the specific method for determining the basic load of each user in S5 is: integrating the power load curve of each user in the time period requiring power regulation in the recent several days to obtain the power load of each user in the time period requiring power regulation in the recent several days, and obtaining the basic load of each user by averaging the power load of each user in the time period requiring power regulation in the recent several days. Compared with directly selecting the average value of the power load calculated in the recent several days or several working days as the basic load of each user, the present invention adopts the average value of the power load of each user in the time period requiring power regulation in the recent several days as the basic load of each user, which is consistent with the time period requiring power regulation in terms of time period, has fewer interference items, and takes the average value of several days to eliminate accidental errors. The value of the basic load of each user obtained is more in line with the standard load of the user, and thus, it is used as the minimum standard for power regulation to better ensure the stability of the user's electricity consumption.
[0012] As a preferred solution of the present invention, the S6 specifically includes the following steps: S61: obtaining the extreme value points of the power load according to the power load curves of each user in the time period requiring power regulation in the most recent day; S62: retaining the extreme value points whose power values are greater than the average power of the basic load, and sorting the retained extreme value points from large to small according to power: P 1 , P 2 ,……,P i ; S63: Use the integral method to calculate the area enclosed by the straight line where the horizontal coordinates of the ith extreme point and the i+1th extreme point are located and the power load curve, which is the ith dispatchable load W of the user i , the initial value of i is 1; S64: Execute S61-S63 for each user in the selected supply side area to obtain the i-th dispatchable load W of each user in the selected supply side area i , and sum to get the total dispatchable load ∑W in the region i i , for the total dispatchable load ∑W of the region i that has been obtained i Sum and get the total dispatchable load W in the area A ; S65: If the total dispatchable load in the area is W A If the load is greater than the load to be regulated, then go to S7; otherwise, continue to execute S61-S64 until all the dispatchable loads of all users in the selected supply-side area are W i After all calculations are completed, enter S66; S66: select the next priority supply side area, repeat S5-S6 until the total dispatchable load W A If the load adjustment amount is greater than the load amount to be adjusted, enter S7. The present invention adopts hierarchical and hierarchical methods to gradually determine the load adjustment amount of the user, and classifies the load according to the extreme point where the power value on the power load curve of each user is greater than the basic load amount during the time period requiring power adjustment in the most recent day, and calculates and sums the load level by level. Since the classification is performed according to the extreme point, the i-th dispatchable load amount obtained each time is relatively small. When the first dispatchable load amounts of all users in the selected area are added and summed, the total first dispatchable load amount of the area obtained is usually very small, which does not meet the demand for the load amount to be adjusted. Therefore, it is necessary to continue to calculate the second, third, ..., dispatchable load amounts, so that each user in the selected area can be guaranteed to participate in the load adjustment to the greatest extent, and at the same time, when the total dispatchable load amount in the area meets the load amount to be adjusted, each user can make appropriate load adjustments according to his own electricity usage habits, thereby ensuring the overall stability of electricity consumption of all users in the supply side area.
[0013] As a preferred solution of the present invention, the power control strategy in S7 includes: user name, event name, control time period, total load to be controlled, user scheduled load and total available power charge of the user in the control time period. Sending the power control strategy to the user end, on the one hand, notifies each user of the relevant information of the power control event, so that the user can prepare for load adjustment in advance and use the total available power charge reasonably, and on the other hand, controls the operation of the control equipment at the user end to achieve power control.
[0014] As a preferred solution of the present invention, the control device in S7 is a smart meter. Smart meters are one of the basic devices for data collection in smart grids, especially smart distribution networks. They undertake the tasks of collecting, measuring and transmitting original electric energy data, and are the basis for realizing information integration, analysis optimization and information presentation. In addition to the basic electricity consumption metering function of traditional electric energy meters, in order to adapt to the use of smart grids and new energy, smart meters also have intelligent functions such as two-way multi-rate metering function, user-side control function, two-way data communication function of multiple data transmission modes, and anti-electricity theft function. In the present invention, smart meters are used to realize the metering and control functions of user-side electricity consumption.
[0015] As a preferred solution of the present invention, the historical electricity consumption information of each supply-side area and the historical electricity consumption information of each user are obtained from the measurement data management system on the power grid company side. The historical electricity consumption information obtained from the measurement data management system on the power grid company side has the advantages of high accuracy, comprehensive data coverage and high reliability.
[0016] Therefore, the present invention has the following beneficial effects: the present invention adopts step-by-step calculation and step-by-step summation to determine the user's load adjustment amount, which can ensure that every user in the selected area participates in the load adjustment to the greatest extent. While ensuring that the total amount of dispatchable load meets the load to be regulated, each user makes appropriate load adjustments according to his or her own electricity usage habits, thereby ensuring the overall stability of electricity usage for all users in the supply-side area. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 is a flow chart of the power control method of the present invention;
[0018] Figure 2 It is a flow chart of the power control method of the present invention for determining the load adjustment amount of the user and calculating the total amount of dispatchable load. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0020] like Figure 1As shown, a regional power regulation method based on demand response includes the following steps: S1: obtaining power regulation event information of the demand side area; S2: obtaining historical power consumption information of each supply side area; S3: determining the priority of each supply side area according to the power regulation event information of the demand side area and the historical power consumption information of each supply side area; S4: obtaining the historical power consumption information of each user in each supply side area, selecting the supply side area with the highest priority, and entering S5; S5: determining the basic load of each user one by one according to the historical power consumption information of each user in the selected supply side area; S6: determining the user's dispatchable load according to the user's historical power consumption information and the user's basic load, and calculating the total dispatchable load W A ; S7: Send the power control strategy to the user, and control the control equipment to complete the power control.
[0021] The power regulation event information of the demand side area in S1 includes the time period, area and load required for power regulation. For example, the time period is: 14:00-20:00 on Tuesday, February 22, 2022, the area is: industrial area, and the load required for regulation is: 20MkWh. The power regulation event information of the demand side area is received, and the supply side area is prioritized and selected according to the power regulation event information. Except for the industrial area as the demand side area, other areas are supply side areas, such as commercial areas, residential areas, entertainment areas, etc.
[0022] The historical electricity consumption information of each supply-side area in S2 includes: the total power load of each supply-side area in recent days and the total power load of each supply-side area in the time period in which power regulation is required in recent days. For example, in the last 7 days, from February 15, 2022 to February 21, 2022, the total power load in the commercial area is: 700MkWh, the total power load in the residential area is: 350MkWh, and the total power load in the entertainment area is: 840MkWh; in the time period in which power regulation is required in the last 3 days, that is, Tuesday, February 15, 2022 14:00-20:00, Tuesday, February 8, 2022 14:00-20:00, Tuesday, February 1, 2022 14:00-20:00, the total power load in the commercial area is: 75MkWh, the total power load in the residential area is: 30MkWh, and the total power load in the entertainment area is: 120MkWh.
[0023] The total power load of each supply-side area in the past 7 days and the total power load of each supply-side area in the time period requiring power regulation in the past 3 days are used to determine the priority of the supply-side area.
[0024] The specific method for determining the priority of each supply-side area in S3 is as follows: the daily basic load of each supply-side area is obtained by averaging the total power load of each supply-side area in recent days, the basic load of each supply-side area in the required period is obtained by averaging the total power load of each supply-side area in the time period that requires power regulation in recent days, and the daily basic load of each supply-side area is compared with the basic load of each supply-side area in the required period. The smaller the ratio, the higher the priority. For example, in the last 7 days, from February 15, 2022 to February 21, 2022, the total power load in the commercial area is 700MkWh, the total power load in the residential area is 350MkWh, and the total power load in the entertainment area is 840MkWh; in the time periods when power regulation is required in the last 3 days, namely Tuesday, February 15, 2022 14:00-20:00, Tuesday, February 8, 2022 14:00-20:00, Tuesday, February 1, 2022 14:00-20:00, the total power load in the commercial area is 75MkWh, the total power load in the residential area is 30MkWh, and the total power load in the entertainment area is 120MkWh; then the daily basic load in the commercial area It is 700 / 7=100MkWh, the daily basic load of the residential area is 350 / 7=50MkWh, and the daily basic load of the entertainment area is 840 / 7=120MkWh; the basic load of the commercial area during the required period is 75 / 3=25MkWh, the basic load of the residential area during the required period is 30 / 3=10MkWh, and the basic load of the entertainment area during the required period is 120 / 3=40MkWh; compare the daily basic load of each supply-side area with the basic load of each supply-side area during the required period, that is, commercial area: 25 / 100=0.25, residential area: 10 / 50=0.2, entertainment area: 40 / 120=0.33; then the priorities of the three supply-side areas from high to low are: residential area, commercial area, entertainment area.
[0025] The method of the present invention determines the priority according to the ratio by comparing the daily basic load of each supply-side area with the basic load of each supply-side area during the required period. The smaller the ratio is, the lower the electricity demand of users in the area is during the time period requiring power regulation, and the smaller the impact of power regulation on the area is, so the higher the priority of the area is.
[0026] The historical electricity consumption information of each user in S4 is specifically: the power load curve of each user in the time period where power regulation is required in the recent few days. The power load curve of each user in the time period where power regulation is required in the recent few days is used to calculate and determine the basic load of each user, and the power load curve of each user in the time period where power regulation is required in the recent day is used to calculate the dispatchable load of each user.
[0027] The specific method for determining the basic load of each user in S5 is: perform an integral operation on the power load curve of each user in the time period that requires power regulation in the recent few days to obtain the power load of each user in the time period that requires power regulation in the recent few days, and obtain the basic load of each user by averaging the power load of each user in the time period that requires power regulation in the recent few days. For example, there are 100 users in a residential area, and obtain the power load curve of each user in the time period that requires power regulation in the recent three days, that is, the power load curves of these 100 users in the time periods of 14:00-20:00 on Tuesday, February 15, 2022, 14:00-20:00 on Tuesday, February 8, 2022, and 14:00-20:00 on Tuesday, February 1, 2022. Perform an integral operation to obtain the power load of these 100 users in the time period that requires power regulation in the recent three days, such as user 1 in the time period of 14:00-20:00 on Tuesday, February 15, 2022. The power load is 10kWh, the power load in the time period from 14:00 to 20:00 on Tuesday, February 8, 2022 is 12kWh, and the power load in the time period from 14:00 to 20:00 on Tuesday, February 1, 2022 is 8kWh. The basic load of user 1 is (10+12+8) / 3=10kWh, and the average power of the basic load of user 1 is 10 / 6=1.67kW, where the number 6 represents the 6 hours in the time period from 14:00 to 20:00. Similarly, the basic load of the 100 users in the residential area and the average power of the basic load are obtained.
[0028] Compared with directly selecting the average value of the power load calculated in the recent several days or several working days as the basic load of each user, the present invention adopts the average value of the power load of each user in the time period requiring power regulation in the recent several days as the basic load of each user. The time period is unified with the time period requiring power regulation, there are fewer interference items, and the average value of several days is taken to eliminate accidental errors. The obtained value of the basic load of each user is more in line with the user's standard load. Therefore, using it as the minimum standard for power regulation can better ensure the stability of users' electricity consumption.
[0029] like Figure 2 As shown, it is a flow chart of determining the load adjustment amount of the user and calculating the total amount of the dispatchable load by the power control method of S6 of the present invention, and S6 specifically includes the following steps: S61: obtaining the extreme value points of the power load according to the power load curves of each user in the time period requiring power control in the most recent day; S62: retaining the average power extreme value points whose power values are greater than the basic load amount, and sorting the reserved extreme value points from large to small according to power: P 1 , P2 ,……,P i ; S63: Use the integral method to calculate the area enclosed by the straight line where the horizontal coordinates of the ith extreme point and the i+1th extreme point are located and the power load curve, which is the ith dispatchable load W of the user i , the initial value of i is 1; S64: Execute S61-S63 for each user in the selected supply side area to obtain the i-th dispatchable load W of each user in the selected supply side area i , and sum to get the total dispatchable load ∑W in the region i i , for the total dispatchable load ∑W of the region i that has been obtained i Sum and get the total dispatchable load W in the area A ; S65: If the total dispatchable load in the area is W A If the load is greater than the load to be regulated, then go to S7; otherwise, continue to execute S61-S64 until all the dispatchable loads of all users in the selected supply-side area are W i After all calculations are completed, enter S66; S66: select the next priority supply side area, repeat S5-S6 until the total dispatchable load W A If it is greater than the load to be regulated, enter S7. For example, according to the power load curve of user 1 in the time period of 14:00-20:00 on Tuesday, February 15, 2022, when power regulation is required in the most recent day, there are 10 extreme points of power load, and the power values are: 1kW, 1.8kW, 2.5kW, 0.9kW, 1.5kW, 3.0kW, 1kW, 2.8kW, 4.2kW, 0.5kW. The extreme points of 1.67kW with an average power greater than the basic load of user 1 are retained and sorted from small to large: 4.2kW, 3.0kW, 2.8kW, 2.5kW, 1.8kW, then the first dispatchable load of the user W is 1 The area enclosed by the straight line with the extreme point of 4.2kW and the extreme point of 3.0kW and the power load curve is calculated by the integral method. 1 , and so on to calculate the first dispatchable load W of each of the 100 users 1 , and sum to get the total amount of the first dispatchable load in the area ∑W 1 , at this time the total dispatchable load in the area is W A =∑W 1 , if the total dispatchable load in the area is W A If the total load that can be dispatched in this area is greater than or equal to the load that needs to be regulated, it means that the power after the first-level power regulation is sufficient, and the power regulation strategy can be directly sent to the user, and the regulation equipment can be controlled to complete the power regulation. AIf the load is less than the load to be regulated, it means that the power after the first-level power regulation is still sufficient, and the first-level power regulation is required for these 100 users. According to the above steps, the second dispatchable load W of each of these 100 users is calculated. 2 , and sum to get the second dispatchable load ∑W in the area 2 , at this time the total dispatchable load in the area is W A =W A +∑W 2 =W 1 +W 2 , and again compare the total dispatchable load W A The relationship between the load to be regulated and so on, until the total amount of schedulable load W A is greater than the load to be regulated; if the dispatchable load of all 100 users in the residential area is W i After all calculations are completed, the total dispatchable load W in this area is obtained. A If it is still less than the load to be regulated, the next priority area is selected to continue to adjust the total schedulable load W according to the above method. A Calculation until the total dispatchable load W A Greater than the load to be regulated.
[0030] The present invention adopts a hierarchical and graded method to gradually determine the load adjustment amount of the user. The classification is performed according to the extreme point where the power value on the power load curve of each user in the time period where power regulation is required in the most recent day is greater than the basic load amount. The calculation is performed step by step and the sum is added step by step. Since the classification is performed according to the extreme point, the i-th dispatchable load amount obtained each time is relatively small. When the first dispatchable load amounts of all users in the selected area are added and summed, the total first dispatchable load amount of the area obtained is usually very small and does not meet the demand for the load amount to be regulated. Therefore, it is necessary to continue to calculate the second, third, and (th) dispatchable load amounts, which can ensure that each user in the selected area participates in the load adjustment to the greatest extent. At the same time, it is ensured that when the total dispatchable load amount of the area meets the load amount to be regulated, each user performs appropriate load adjustment according to his own power consumption habits, thereby ensuring the overall stability of power consumption of all users in the supply side area.
[0031] The power control strategy in S7 includes: user name, event name, control time period, total load to be controlled, user's scheduled load, and total available power charge of the user in the control time period. For example, user name: user 1, event name: power control, control time period: Tuesday, February 22, 2022 14:00-20:00, total load to be controlled: 20MkWh, user 1's scheduled load: 4kWh, user 1's total available power charge in the time period of 14:00-20:00 on Tuesday, February 22, 2022: 6kWh.
[0032] Sending power control strategies to the user side, on the one hand, notifies each user of relevant information of power control events, so that the user can prepare for load adjustment in advance and reasonably use the total amount of available power charge; on the other hand, it controls the operation of the control equipment at the user side to achieve power control.
[0033] The control device in S7 is a smart meter. Smart meters are one of the basic devices for data collection in smart grids, especially smart distribution networks. They are responsible for collecting, measuring and transmitting raw electric energy data, and are the basis for realizing information integration, analysis optimization and information presentation. In addition to the basic electricity consumption metering function of traditional electric energy meters, in order to adapt to the use of smart grids and new energy, smart meters also have intelligent functions such as two-way multi-rate metering function, user-side control function, two-way data communication function in multiple data transmission modes, and anti-electricity theft function. In the present invention, smart meters are used to realize the metering and control functions of user-side electricity consumption.
[0034] The historical electricity consumption information of each supply-side area and each user is obtained from the measurement data management system on the power grid company side. The historical electricity consumption information obtained from the measurement data management system on the power grid company side has the advantages of high accuracy, comprehensive data coverage and high reliability.
[0035] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that are not conceived through creative work should be included in the protection scope of the present invention.
Claims
1. A regional power control method based on demand response, characterized in that: The following steps are involved: S1: Obtain power regulation event information in the demand side area; S2: Obtain historical electricity consumption information of each supply-side area; S3: Determine the priority of each supply-side area based on the power regulation event information of the demand-side area and the historical power consumption information of each supply-side area; S4: Obtain historical electricity consumption information of each user in each supply-side area, select the supply-side area with the highest priority, and enter S5; S5: determining the basic load of each user one by one according to the historical electricity consumption information of each user in the selected supply-side area; S6: Filter the extreme points of the user power load curve that are greater than the average power of the basic load, and arrange them in descending order; The area enclosed by the straight line where the abscissas of the ith extreme point and the i+1th extreme point are located and the power load curve is the user's ith dispatchable load W i ; For each user's W i The sum is the total dispatchable load ∑W of the ith load i , for the obtained ∑W i The total dispatchable load W is obtained by summing A ; If W A If it is greater than the load to be regulated, then go to S7; otherwise, repeat the above steps until the schedulable loads of all users are calculated; Select the next priority supply side area and repeat S5-S6 until W A Greater than the load to be regulated; S7: Send the power control strategy to the user, and control the control equipment to complete the power control.
2. According to the regional power control method based on demand response according to claim 1, it is characterized in that: The power control event information in S1 includes the time period, area and load required to be controlled during which power control is required.
3. The regional power control method based on demand response according to claim 1 is characterized in that: The historical electricity consumption information of each supply-side area in S2 includes: the total power load of each supply-side area in recent days and the total power load of each supply-side area in the time period in which power regulation is required in recent days.
4. A regional power control method based on demand response according to claim 1 or 3, characterized in that: The specific method for determining the priority of each supply-side area in S3 is as follows: the daily basic load of each supply-side area is obtained by averaging the total power load of each supply-side area in recent days, the basic load of each supply-side area in the required period is obtained by averaging the total power load of each supply-side area in the time period that requires power regulation in recent days, and the basic load of each supply-side area in the required period is compared with the daily basic load of each supply-side area. The smaller the ratio, the higher the priority.
5. The regional power control method based on demand response according to claim 1 is characterized in that: The historical electricity consumption information of each user in S4 is specifically: the power load curve of each user in the time period requiring power regulation in the recent days.
6. A regional power control method based on demand response according to claim 1 or 5, characterized in that: The specific method for determining the basic load of each user in S5 is: performing an integral operation on the power load curve of each user in the time period requiring power regulation in the recent few days to obtain the power load of each user in the time period requiring power regulation in the recent few days, and obtaining the basic load of each user by performing an average calculation on the power load of each user in the time period requiring power regulation in the recent few days.
7. According to claim 1 or a method for regional power regulation based on demand response, it is characterized in that: The S6 specifically comprises the following steps: S61: Obtaining the extreme value point of the power load according to the power load curve of each user in the time period requiring power regulation in the most recent day; S62: Retain the extreme points whose power values are greater than the average power of the basic load, and sort the extreme points retained by power from large to small: P1, P2, ..., P i ; S63: Use the integral method to calculate the area enclosed by the straight line where the horizontal coordinates of the ith extreme point and the i+1th extreme point are located and the power load curve, which is the ith dispatchable load W of the user. i , the initial value of i is 1; S64: Execute S61-S63 for each user in the selected supply side area to obtain the i-th dispatchable load W of each user in the selected supply side area. i , and sum to get the total dispatchable load ∑W in the region i i , for the total dispatchable load ∑W of the region i that has been obtained i Sum and get the total dispatchable load W in the area A ; S65: If the total dispatchable load in the area is W A If the load is greater than the load to be regulated, then go to S7; otherwise, continue to execute S61-S64 until all the dispatchable loads of all users in the selected supply-side area are W i All calculations are completed, and the process goes to S66; S66: Select the next priority supply side area, and repeat S5-S6 until the total dispatchable load W A If it is greater than the load to be regulated, the system enters S7.
8. The regional power control method based on demand response according to claim 1 is characterized in that: The power control strategy in S7 includes: user name, event name, control time period, total load to be controlled, user scheduled load and total available power charge of the user in the control time period.
9. The regional power control method based on demand response according to claim 1 is characterized in that: The control device in S7 is a smart meter.
10. The regional power control method based on demand response according to claim 1 is characterized in that: The historical electricity consumption information of each supply-side area and the historical electricity consumption information of each user are obtained from the measurement data management system on the power grid company side.