Automatic voltage control method and device based on distribution network coordinated control area
By determining the logical busbar and coordination control area in the distribution network and automatically adjusting the reactive power equipment, the problem of insufficient coordination capability of the automatic voltage control system in the distribution network is solved, and the efficiency and stability of the power grid operation are improved.
Patent Information
- Application Number
- CN202111409799.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-11-25
AI Technical Summary
The automatic voltage control system in the existing distribution network lacks coordination and control capabilities, resulting in frequent operation of reactive voltage regulation equipment, which is unable to meet the coordinated reactive voltage control requirements of regional power supply networks and distribution networks, and is complex in operation and relies on manual intervention.
By obtaining the physical busbar according to the regional power supply network model, determining the logical busbar and the coordinated control area range, and automatically putting or cutting off the reactive power adjustment device to realize that the physical busbar voltage is within the normal range and avoiding manual operation.
The rationality of automatic voltage control and reactive voltage control efficiency are improved, the adaptive reconstruction of the coordinated control area is realized, manual intervention is reduced, and the stability and efficiency of power grid operation are improved.
Smart Images

Figure CN113991688B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of automatic voltage control of distribution networks, and in particular to an automatic voltage control method and device based on a coordinated control area of a distribution network. Background Art
[0002] The Automatic Voltage Control (AVC) system is an important means to achieve safe (improving voltage stability margin), economic (reducing network losses), and high-quality (improving voltage qualification rate) operation of the power grid. The AVC system can use the power grid model and real-time operation data to scientifically decide the best reactive voltage adjustment plan from the perspective of global power grid optimization, and achieve a reasonable distribution of reactive voltage in the power grid.
[0003] Generally, the voltage control of the substation busbar in the distribution network is done manually by power engineers, which is complicated and requires a lot of operations. Due to the lack of AVC coordinated control with the regional power supply network, reactive power supplement equipment and transformer taps are often frequently operated, which cannot meet the coordinated reactive power voltage control requirements of the regional power supply network and the distribution network. Summary of the invention
[0004] The present invention provides an automatic voltage control method and device based on a coordinated control area of a distribution network, which realizes adaptive reconstruction of the coordinated control area, improves the rationality of automatic voltage control, and improves the efficiency of reactive voltage control.
[0005] An embodiment of the present invention provides an automatic voltage control method based on a distribution network coordinated control area, comprising:
[0006] According to the operation status of the regional power supply network model, obtaining at least one physical bus;
[0007] Determine a logical bus for each of the physical buses;
[0008] Determine the range of the coordination control area where the logical bus is located according to the logical bus;
[0009] The reactive power regulation equipment in the coordinated control area is switched on or off according to the voltage on the physical bus within the coordinated control area so that the voltage on the physical bus is within a normal range.
[0010] Optionally, determining a logical bus for each physical bus includes:
[0011] Initialize each of the physical buses to an empty state, and determine one of them as an initial logical bus;
[0012] Detecting the connection status of the initial logical bus and other physical buses;
[0013] The logical bus is determined according to the connection status.
[0014] Optionally, determining the logical bus according to the connection state includes:
[0015] If the initial logical bus is connected to another physical bus through a closed tie switch, the other physical bus and the initial logical bus are determined to be the same logical bus.
[0016] Optionally, determining a range of a coordinated control area where the logical bus is located according to the logical bus includes:
[0017] Adding the physical bus included in the logical bus to the scope of the coordinated control area;
[0018] Adding conductive equipment in the distribution network to the scope of the coordinated control area according to the physical bus.
[0019] Optionally, adding conductive equipment in the distribution network to the scope of the coordinated control area according to the physical bus includes:
[0020] Acquire a distribution network model from a distribution automation system according to the physical bus;
[0021] Delete all loads and all disconnectors and circuit breakers in the distribution network model to form a distribution network model;
[0022] Performing topological coloring coding on the distribution network model to form at least one topological island, wherein the topological island includes electrically connected conductive devices;
[0023] The conductive device is added to the scope of the coordinated control area according to the topological island.
[0024] Optionally, adding the conductive device to the scope of the coordinated control area according to the topological island includes:
[0025] Acquire a topological relationship between at least one outgoing line in the topological island and the logical bus;
[0026] Adding the conductive devices in the topological island to the scope of the coordinated control area according to the topological relationship.
[0027] Optionally, adding the conductive device in the topological island to the coordinated control area according to the topological relationship includes:
[0028] If the outgoing lines in the topological island are connected to the same logical bus, the conductive devices of the topological island are added to the scope of the same coordinated control area;
[0029] If the outgoing lines in the topological island are connected to different logical buses, the topological island is divided into at least two sub-islands according to the connecting switches between the outgoing lines; and the conductive devices in the sub-islands are added to the scope of the coordinated control area corresponding to the logical bus according to the logical bus.
[0030] Optionally, according to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is put into operation or removed so that the voltage on the physical bus is within a normal range, including:
[0031] When the physical bus voltage exceeds the upper limit within the coordinated control area, one reactive power regulation device in the coordinated control area is selected to be removed or put into operation; if there is no device to be removed or put into operation, an alarm message is output;
[0032] When the physical bus voltage exceeds the lower limit within the coordinated control area, a reactive power regulation device in the coordinated control area is selected to be put into operation or removed; if there is no device to be put into operation or removed, an alarm message is output.
[0033] In a second aspect, an embodiment of the present invention provides an automatic voltage control device based on a distribution network coordinated control area, comprising:
[0034] An acquisition module, used for acquiring at least one physical bus according to the operating status of the regional power supply network model;
[0035] A logical bus determination module, used to determine the logical bus of each of the physical buses;
[0036] A coordination control area determination module, used to determine the range of the coordination control area where the logical bus is located according to the logical bus;
[0037] The detection control module is used to put the reactive power regulation equipment in the coordinated control area into or out according to the voltage on the physical bus within the coordinated control area, so that the voltage on the physical bus is within a normal range.
[0038] Optionally, the logic bus determination module includes:
[0039] An initialization unit, used for initializing each of the physical buses to an empty state, and determining one of them as an initial logical bus;
[0040] A detection unit, used for detecting the connection status of the initial logical bus and other physical buses;
[0041] A logical bus determining unit is used to determine the logical bus according to the connection state.
[0042] The technical solution provided by the embodiment of the present invention determines the logical bus for each physical bus, and then determines the scope of the coordinated control area corresponding to the logical bus according to the logical bus, and adds the connecting lines and equipment in the distribution network to the scope of the coordinated control area according to the logical bus. When changing different grid operation modes, the logical bus of each physical bus also changes accordingly. According to the updated logical bus, the connecting lines and equipment in the distribution network are added to the scope of the coordinated control area, and adaptive reconstruction of the coordinated control area can be achieved. Thereby, the rationality of automatic voltage control in the coordinated control area is improved, and manual operation of power engineers can be avoided, thereby improving the efficiency of reactive voltage control in the coordinated control area. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A schematic flow chart of an automatic voltage control method based on a distribution network coordinated control area provided in an embodiment of the present invention.
[0044] Figure 2 A flowchart of another automatic voltage control method based on a distribution network coordinated control area is provided in an embodiment of the present invention.
[0045] Figure 3 A flowchart of another automatic voltage control method based on a distribution network coordinated control area is provided in an embodiment of the present invention.
[0046] Figure 4 A schematic diagram of a scope flow of adding conductive equipment in a distribution network to a coordinated control area according to a physical bus provided in an embodiment of the present invention.
[0047] Figure 5 A flowchart of another automatic voltage control method based on a distribution network coordinated control area is provided in an embodiment of the present invention.
[0048] Figure 6 A simplified schematic diagram of a regional power supply network model including a 110kV substation, a 35kV substation and a 10kV distribution network model is provided for an embodiment of the present invention.
[0049] Figure 7 A simplified schematic diagram of another regional power supply network model including a 110kV substation, a 35kV substation and a 10kV distribution network model is provided for an embodiment of the present invention.
[0050] Figure 8 The embodiment of the present invention also provides a structural schematic diagram of an automatic voltage control device based on a range domain of a distribution network coordinated control area. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] In my country's power system, it is generally divided into ultra-high voltage power grid, transmission network, power supply network and distribution network. The ultra-high voltage power grid includes 750kV, 500kV, 330kV and 220kV, which constitute the skeleton of the regional power grid and the interconnection lines between regional power grids; the transmission network includes 220kV and 110kV, which constitute a complex transmission network to transmit electric energy between regions; the power supply network includes 110kV, 66kV and 35kV, which is transmitted from the hub substation to the local substation near the load area; the distribution network includes 10kV and 380V civil electricity, and the local substation transmits electricity to the distribution transformer or distribution room in the residential area.
[0053] The AVC master station of the distribution network is implemented based on software programs in the power system control center. The control objects of the AVC master station of the distribution network include capacitors, voltage regulators, grid-connected new energy power stations, capacitors on the low-voltage side of the transformer, and distributed power sources (rooftop photovoltaics, energy storage batteries, etc.) connected to the 380V grid on the low-voltage side of the transformer. Among them, capacitors and voltage regulators can be directly controlled by issuing remote control or remote adjustment commands from the distribution network automation system to adjust the reactive power in the coordinated control area.
[0054] Usually, radial operation is adopted in the operation of distribution network, that is, one or several 10kV busbars of 110kV and 35kV substations in the regional power supply network carry out several 10kV outgoing lines in the distribution network, and open-loop operation is adopted between different 10kV outgoing lines (groups) without direct electrical connection.
[0055] In general, the 10kV busbar of 110kV in the regional power supply network leads to several 10kV outgoing lines in the distribution network, and these 10kV outgoing lines are respectively connected to reactive equipment such as capacitors and reactors. In reactive voltage control, the voltage regulation of the substation in the regional power supply network has a significant impact on the voltage of the substation in the distribution network, and the reactive regulation of the substation in the distribution network has a significant impact on the reactive power of the substation in the regional power supply network. In automatic voltage control, the coordinated control area needs to be considered as the object of voltage control as a whole.
[0056] Starting from the 10kV busbar, the area covered by the 10kV outgoing line (group) forms the basic calculation and control unit of the distribution network AVC - the coordinated control area of the distribution network. Without loss of generality, the coordinated control area is expressed as follows form.
[0057]
[0058] in:
[0059] 10kV busbar, one or multiple buses running in parallel, i.e., the power root node of the region, belonging to 110kV or 35kV substation, totaling N;
[0060] 10kV outgoing line, 1 or multiple lines in a ring, i.e., lines connected to a 10kV busbar, which are subordinate to a certain 10kV busbar, totaling M lines;
[0061] 10kV line segment, multiple 10kV distribution network feeder line segments connected from the 10kV outgoing line, with their ends connected to the upper 10kV line or other line segments, totaling H lines;
[0062] 10kV capacitor, reactive power compensation capacitor connected to the 10kV line segment, its endpoint is connected to a certain 10kV line segment node, totaling J units;
[0063] 10kV voltage regulator, a voltage regulator connected to a 10kV line segment, with its head end and end connected to the 10kV line segment node, totaling K units;
[0064] 10kV grid-connected new energy power station, through the 10kV grid-connected new energy station, acts as an adjustable equivalent generator in the distribution network, and its endpoints are connected to a certain 10kV line segment node, totaling P seats;
[0065] 10kV transformer, a transformer in the substation area connected to a 10kV line segment, with its high-voltage side winding connected to a certain 10kV line segment node, and its low-voltage side connected to loads or distributed adjustable reactive resources, totaling Q units;
[0066] Since the operation mode of the power grid often changes, the elements in the coordinated control area often change with the operation mode, and the coordinated control area cannot be manually set in advance. Therefore, in the AVC system, it is not possible to determine the coordinated control area in real time according to the operation mode of the power grid to meet the requirements of adaptively reconstructing the coordinated control area and performing automatic voltage control.
[0067] In view of this, Figure 1 A flow chart of an automatic voltage control method based on a distribution network coordinated control area provided by an embodiment of the present invention, see Figure 1The method can be performed by an automatic voltage control device, which can be implemented in hardware and / or software. The method specifically includes the following steps, including:
[0068] S110. Obtain at least one physical bus according to the operating status of the regional power supply network model.
[0069] Specifically, the physical bus refers to the bus line connected to the next level distribution network in the regional power supply network. In the regional power supply network, the substation may include one or more physical buses. The regional power supply network model can be obtained through the power grid energy management system, wherein the regional power supply network model includes real-time measurement data and real-time status data. The power grid energy management system is an existing power grid operation system.
[0070] S120, determining the logical bus of each physical bus.
[0071] Specifically, the operating status includes the connection status of each physical bus in the regional power supply network model. The logical bus refers to a bus that operates in parallel through a closed connecting switch. For example, it is assumed that the regional power supply network model includes a 110kV substation, wherein the 110kV substation includes two physical buses. If the first physical bus and the second physical bus are connected through a closed connecting switch, the first physical bus and the second physical bus are determined to be the same logical bus. If the first physical bus and the second physical bus are not connected through a closed connecting switch, the logical bus of the first physical bus is determined to be A, and the logical bus of the second physical bus is determined to be B.
[0072] S130. Determine the scope of the coordination control area where the logical bus is located according to the logical bus.
[0073] Specifically, the scope of the coordinated control area corresponding to each logical bus is determined according to the logical bus, and the physical bus associated with the logical bus is added to the scope of the coordinated control area, thereby generating a scope of a coordinated control area. Among them, the conductive equipment is a component of the power system, which is designed for transmitting current or related to conductive connection, and generally includes transmission lines, transformers, transformer windings, physical buses, disconnectors, circuit breakers, capacitors, reactors, etc. Exemplarily, if the first physical bus and the second physical bus are the same logical bus, the first physical bus and the second physical bus are added to the scope of the same coordinated control area. If the first physical bus and the second physical bus are not the same logical bus, the first physical bus is added to the scope of the first coordinated control area, and the second physical bus is added to the scope of the second coordinated control area.
[0074] S140. According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is switched on or off to make the voltage on the physical bus within the normal range.
[0075] Specifically, the physical bus voltage within the coordinated control area is checked. If the physical bus voltage exceeds the normal threshold, the distribution network AVC system sends a remote control or remote adjustment command to directly control the reactive power regulation equipment to be put into operation or removed. Among them, the reactive power regulation equipment includes capacitors and reactors. If the operation mode of the power grid changes, and the elements in the coordinated control area change with the operation mode, the range of the coordinated control area can be regenerated from step S110 and the voltage can be automatically controlled according to the range of the coordinated control area.
[0076] The technical solution provided by the embodiment of the present invention determines the logical bus for each physical bus, and then determines the scope of the coordinated control area corresponding to the logical bus according to the logical bus, and adds the connecting lines and equipment in the distribution network to the scope of the coordinated control area according to the logical bus. When changing different grid operation modes, the logical bus of each physical bus also changes accordingly. According to the updated logical bus, the connecting lines and equipment in the distribution network are added to the scope of the coordinated control area, and adaptive reconstruction of the coordinated control area can be achieved. Thereby, the rationality of automatic voltage control in the coordinated control area is improved, and manual operation of power engineers can be avoided, thereby improving the efficiency of reactive voltage control in the coordinated control area.
[0077] Based on the above embodiments, Figure 2 A flow chart of another automatic voltage control method based on a distribution network coordinated control area provided by an embodiment of the present invention is shown in FIG. Figure 2 The method steps include:
[0078] S210. Obtain at least one physical bus according to the operating status of the regional power supply network model.
[0079] S220, initializing each physical bus to an empty state, and determining one of them as an initial logical bus.
[0080] Specifically, the empty state refers to a state that is not assigned a value and is not pointed to, that is, a marking state. All physical buses are set to the empty state, and a physical bus is randomly selected to be set as the initial logical bus.
[0081] For example, assume that the regional power supply network model includes a 110kV substation, wherein the 110kV substation includes two physical buses, initialize all physical buses, and determine their logical buses to be in an empty state, respectively. At this time, the first physical bus and the second physical bus are in an empty state. Select the first physical bus to be determined as the initial logical bus and assign it a value of A.
[0082] S230, detecting the connection status of the initial logical bus and other physical buses.
[0083] Specifically, the topological relationship of the initial logical bus is continuously detected to determine whether the physical bus corresponding to the initial logical bus is connected to other physical buses through a closed tie switch. The operation status of the regional power supply network model includes the connection status of each physical bus in the regional power supply network model.
[0084] S240. Determine a logical bus according to the connection status.
[0085] Exemplarily, optionally, if the initial logical bus is connected to another physical bus through a closed connecting switch, that is, the physical bus corresponding to the initial logical bus has a closed connection relationship with a certain physical bus, then the physical bus with the connection relationship and the physical bus corresponding to the initial logical bus are set to the same logical bus. If the physical bus corresponding to the initial logical bus does not have a closed connection relationship with other physical buses, the physical bus corresponding to the initial logical bus is set as a logical bus separately. Exemplarily, if the first physical bus and the second physical bus are connected through a closed connecting switch, the first physical bus and the second physical bus are determined to be the same logical bus, and both are determined to be A. If the first physical bus and the second physical bus are not connected through a closed connecting switch, the logical bus of the first physical bus is determined to be A, and the logical bus of the second physical bus is determined to be B.
[0086] S250. Determine the scope of the coordination control area where the logical bus is located according to the logical bus.
[0087] S260. According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is switched on or off to ensure that the voltage on the physical bus is within a normal range.
[0088] Based on the above embodiments, Figure 3 A flow chart of another automatic voltage control method based on a distribution network coordinated control area provided by an embodiment of the present invention is shown in FIG. Figure 3 The method steps include:
[0089] S310. Obtain at least one physical bus according to the operating status of the regional power supply network model.
[0090] S320, initializing each physical bus to an empty state, and determining one of them as an initial logical bus.
[0091] S330, detecting the connection status of the initial logical bus and other physical buses.
[0092] S340. Determine a logical bus according to the connection status.
[0093] S350. Add the physical bus included in the logical bus to the scope of the coordination control area.
[0094] Specifically, the physical buses contained in each logical bus are added to the scope of the corresponding coordination control area, that is, there is a corresponding relationship between each logical bus and the scope of the coordination control area. For example, the physical bus corresponding to the initial logical bus and the physical bus with a connection relationship are the same logical bus, so the physical bus corresponding to the initial logical bus and the physical bus with a connection relationship are added to the scope of the same coordination control area. Exemplarily, if the first physical bus and the second physical bus are the same logical bus, the first physical bus and the second physical bus are added to the scope of the same coordination control area. If the first physical bus and the second physical bus are not the same logical bus, the first physical bus is added to the scope of the first coordination control area, and the second physical bus is added to the scope of the second coordination control area.
[0095] S360. Add conductive equipment in the distribution network to the scope of the coordinated control area according to the physical bus.
[0096] Specifically, conductive equipment is a component of the power system, designed for transmitting current or related to conductive connections, and generally includes transmission lines, transformers, transformer windings, physical buses, disconnectors, circuit breakers, capacitors, reactors, voltage regulators, grid-connected new energy power stations, etc. The outgoing line in the distribution network is the transmission line through which the voltage of the upper-level physical bus enters the distribution network. The conductive equipment in the distribution network corresponding to the physical bus is added to the scope of the coordinated control area.
[0097] S370. According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is switched on or off to ensure that the voltage on the physical bus is within a normal range.
[0098] Based on the above embodiments, Figure 4 A schematic diagram of a flow chart of adding a conductive device in a distribution network to a coordinated control area according to a physical bus provided by an embodiment of the present invention, see Figure 4 The method steps include:
[0099] S410. Obtain a distribution network model from a distribution automation system according to the physical bus.
[0100] Among them, the distribution network model includes conductive equipment.
[0101] S420. Delete all loads and all disconnectors and circuit breakers in the distribution network model to form a distribution network model.
[0102] The split state refers to the disconnected state of the isolating switch and the circuit breaker.
[0103] S430: Perform topological coloring coding on the distribution network model to form at least one topological island, where the topological island includes electrically connected conductive devices.
[0104] Among them, the topological island is a subset of electrical connections in the distribution network model network, including electrically connected conductive devices, connection endpoints and connection nodes. The topological island will change with the change of the current network state (i.e., the state of the disconnector, circuit breaker, etc. changes). The connection endpoint is the electrical connection point of the conductive device. A conductive device can have one or more connection endpoints, for example, a disconnector and a circuit breaker have two connection endpoints. The connection node can contain any number of connection endpoints, indicating that the conductive devices to which these connection endpoints belong are connected together.
[0105] S440. Add the conductive equipment to the scope of the coordinated control area according to the topological island.
[0106] Exemplarily, if the physical buses to which the outgoing lines in the topology island are connected belong to the same logical bus, the conductive devices in the topology island are added to the scope of the coordination control area corresponding to the logical bus.
[0107] Based on the above embodiments, Figure 5 A flow chart of another automatic voltage control method based on a distribution network coordinated control area provided by an embodiment of the present invention is shown in FIG. Figure 5 The method steps include:
[0108] S510. Obtain at least one physical bus according to the operating status of the regional power supply network model.
[0109] S520, initializing each physical bus to an empty state, and determining one of them as an initial logical bus.
[0110] S530: Detect the connection status of the initial logical bus and other physical buses.
[0111] S540: Determine a logical bus according to the connection status.
[0112] S550. Add the physical bus included in the logical bus to the scope of the coordination control area.
[0113] S560. Obtain a distribution network model from a distribution automation system according to the physical bus.
[0114] S570. Delete all loads and all disconnectors and circuit breakers in the distribution network model to form a distribution network model.
[0115] S580: Perform topological coloring coding on the distribution network model to form at least one topological island, where the topological island includes electrically connected conductive devices.
[0116] S590: Obtain a topological relationship between at least one outgoing line in the topological island and the logical bus.
[0117] The topological relationship is the connection relationship between the outgoing line of the distribution network and the physical bus corresponding to the logical bus.
[0118] S600: Add the conductive devices in the topological island to the scope of the coordinated control area according to the topological relationship.
[0119] Optionally, if the outgoing lines in the topology island are connected to the same logical bus, the outgoing lines of the topology island and the conductive devices electrically connected to the outgoing lines are added to the scope of the same coordinated control area.
[0120] If the outgoing lines in the topological island are connected to different logical buses, the topological island is divided into at least two sub-islands according to the tie switches between the outgoing lines. The conductive devices in the sub-islands are added to the range of the coordination control area corresponding to the logical bus according to the logical bus.
[0121] Specifically, the physical bus connected to the outgoing line of the distribution network included in the topological relationship in the topological island is the same logical bus. The physical bus connected to the outgoing line in the distribution network is a different logical bus. For example, the topological island includes a first outgoing line and a second outgoing line, the first outgoing line is connected to the first physical bus, and the second outgoing line is connected to the second physical bus. If the logical bus of the first physical bus and the second physical bus is the same logical bus, the first outgoing line, the second outgoing line and the electrically connected conductive equipment in the topological island are added to the scope of the same coordinated control area. If the logical buses of the first physical bus and the second physical bus are different logical buses, the topological island is divided into two sub-islands according to the tie switch between the first outgoing line and the second outgoing line, and the conductive equipment in the first sub-island is added to the scope of the coordinated control area corresponding to the logical bus of the first physical bus, and the conductive equipment in the second sub-island is added to the scope of the coordinated control area corresponding to the logical bus of the second physical bus.
[0122] S610. According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is switched on or off to make the voltage on the physical bus within the normal range.
[0123] Based on the above embodiment, optionally, according to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is put into operation or removed so that the voltage on the physical bus is within a normal range, including:
[0124] When the physical bus voltage exceeds the upper limit within the coordinated control area, a reactive power regulation device in the coordinated control area is selected to be removed or put into operation; if there is no device to be removed or put into operation, an alarm message is output;
[0125] When the physical bus voltage exceeds the lower limit within the coordinated control area, a reactive power regulation device in the coordinated control area is selected to be put into operation or removed; if there is no device to be put into operation or removed, an alarm message is output.
[0126] Specifically, reactive power regulation equipment includes capacitors and reactors. Check the physical bus voltage within the coordinated control area. If the physical bus voltage exceeds the upper limit, the distribution network AVC system will issue a remote control or remote adjustment command to control the capacitor to be removed or the reactor to be put into use. If there is no equipment to be removed or put into use, an alarm message will be output to remind the engineering staff to check. If the physical bus voltage exceeds the lower limit, the distribution network AVC system will issue a remote control or remote adjustment command to control the capacitor to be put into use or the reactor to be removed. If there is no equipment to be put into use or removed, an alarm message will be output to remind the engineering staff to check.
[0127] Figure 6 A simplified schematic diagram of a regional power supply network model including a 110kV substation, a 35kV substation and a 10kV distribution network model provided by an embodiment of the present invention, see Figure 6 In the regional power supply network, it includes a 110kV substation and a 35kV substation. The 110kV substation includes two 10kV busbars, namely the first physical bus Bus1 and the second physical bus Bus2, and the 35kV substation includes a 10kV busbar, which is recorded as the third physical bus Bus3.
[0128] In one control cycle, the scope of the coordinated control area based on the 10kV bus is generated, and the regional power supply network model is obtained from the power grid energy management system, wherein the regional power supply network model includes real-time measurement data and real-time status data. In the regional power supply network part, the first physical bus Bus1 and the second physical bus Bus2 are connected through the interconnecting switch Breaker1, and the interconnecting switch Breaker1 is in a closed state. Initialize all physical buses, and determine their logical buses to be in an empty state respectively. At this time, the first physical bus Bus1, the second physical bus Bus2 and the third physical bus Bus3 are all initialized to an empty state. Exemplary selection determines the first physical bus Bus1 as the initial logical bus, and assigns it a value of B1. Detect whether the first physical bus Bus1 is in a closed connection state with other physical buses, by Figure 6It can be seen that the first physical bus Bus1 and the second physical bus Bus2 are connected by a closed tie switch, so the first physical bus Bus1 and the second physical bus Bus2 are determined to be the same logical bus, both determined as B1. The logical bus of the third physical bus Bus3 is determined as B3. The first physical bus Bus1 and the second physical bus Bus2 included in the logical bus B1 of the first physical bus Bus1 and the second physical bus Bus2 are added to the range Z1 of the first coordinated control area 10 The third physical bus Bus3 included in the logical bus B3 of the third physical bus Bus3 is added to the range Z2 of the second coordination control zone 10 .
[0129] The distribution network model is obtained from the distribution automation system, where the distribution network model includes real-time measurement data and status data of the distribution network. Figure 6 The distribution network includes: the first 10kv outgoing line L1, the second 10kv outgoing line L2, the third 10kv outgoing line L3, the first capacitor C1, the second capacitor C2, the third capacitor C3, the first 10kV line segment S1, the second 10kV line segment S2, the third 10kV line segment S3, the fourth 10kV line segment S4, the fifth 10kV line segment S5, the sixth 10kV line segment S6, the first 10kV voltage regulator R1, the second 10kV voltage regulator R2, the third 10kV voltage regulator The first 10kV grid-connected new energy power station G1, the second 10kV grid-connected new energy power station G2, the third 10kV grid-connected new energy power station G3, the second switch Breaker2, the third switch Breaker3, the fourth switch Breaker4, are all in the closed state, the first 380V load Load1, the second 380V load Load2, the third 380V load Load3, the first transformer T1, the second transformer T2 and the third transformer T3. Delete the loads in the distribution network model, delete all the disconnectors and circuit breakers in the model that are in the disconnected state, and form a 10kV distribution network model.
[0130] according to Figure 6 The schematic diagram shown in the figure shows the following result after processing:
[0131] The first 10kV outgoing line L1 - the first capacitor C1 - the first 10kV line segment S1 - the first 10kV voltage regulator R1 - the first 10kV grid-connected new energy power station G1 - the second 10kV line segment S2 - the second switch Breaker2 - the first transformer T1.
[0132] The second 10kV outgoing line L2 - the second capacitor C2 - the third 10kV line segment S3 - the second 10kV voltage regulator R2 - the second 10kV grid-connected new energy power station G2 - the fourth 10kV line segment S4 - the third switch Breaker3 - the third transformer T2.
[0133] The third 10kV outgoing line L3 - the third capacitor C3 - the fifth 10kV line segment S5 - the third 10kV voltage regulator R3 - the third 10kV grid-connected new energy power station G3 - the sixth 10kV line segment S6 - the fourth switch Breaker4 - the third transformer T3.
[0134] The 10kV distribution network model is topologically colored and coded to form several topological islands, each of which includes conductive devices electrically connected together. The result obtained in this embodiment is:
[0135] Topological island 1: first 10kV outgoing line L1 - first capacitor C1 - first 10kV line segment S1 - first 10kV voltage regulator R1 - first 10kV grid-connected new energy power station G1 - second 10kV line segment S2 - second switch Breaker2 - first transformer T1.
[0136] Topological island 2: second 10kV outgoing line L2 - second capacitor C2 - third 10kV line segment S3 - second 10kV voltage regulator R2 - second 10kV grid-connected new energy power station G2 - fourth 10kV line segment S4 - third switch Breaker3 - third transformer T2.
[0137] Topological island 3: third 10kV outgoing line L3 - third capacitor C3 - fifth 10kV line segment S5 - third 10kV voltage regulator R3 - third 10kV grid-connected new energy power station G3 - sixth 10kV line segment S6 - fourth switch Breaker4 - third transformer T3.
[0138] If each topological island only contains 10kV outgoing lines connected to the same logical bus, all 10kV line segments of the topological island 10kV capacitor 10kV voltage regulator 10kV grid-connected new energy power station 10kV transformer Add the scope of the coordinated control area where the corresponding logical bus is located. In this embodiment, topological island 1 only includes the first 10kV outgoing line L1 connected to the same logical bus, and topological island 1 is added to the scope of the first coordinated control area. Topological island 2 only contains the second 10kV outgoing line L2 connected to the same logical bus. Topological island 2 is added to the scope of the first coordinated control area. Topological island 3 only contains the third 10kV outgoing line L3 connected to the same logical bus. Topological island 3 is added to the scope of the second coordinated control area.
[0139] Therefore, the partition results of the coordinated control area can be obtained as follows:
[0140] The scope of the first coordinated control area The first physical bus Bus1-the first 10kV outgoing line L1-the first capacitor C1-the first 10kV line segment S1-the first 10kV voltage regulator R1-the first 10kV grid-connected new energy power station G1-the second 10kV line segment S2-the second switch Breaker2-the first transformer T1.
[0141] The second physical bus Bus2-the second 10kV outgoing line L2-the second capacitor C2-the third 10kV line segment S3-the second 10kV voltage regulator R2-the second 10kV grid-connected new energy power station G2-the fourth 10kV line segment S4-the third switch Breaker3-the third transformer T2.
[0142] The scope of the second coordinated control area The third physical bus Bus3-the third 10kV outgoing line L3-the third capacitor C3-the fifth 10kV line segment S5-the third 10kV voltage regulator R3-the third 10kV grid-connected new energy power station G3-the sixth 10kV line segment S6-the fourth switch Breaker4-the third transformer T3.
[0143] The scope of the first coordinated control area The voltage of the first physical bus Bus1 and the second physical bus Bus2 is checked. If the bus voltage exceeds the limit, the controllable capacitor in the area is selected for switching. If there is no controllable device, an alarm message is output. The scope of the second coordinated control area The voltage of the third physical bus Bus3 is checked. If the bus voltage exceeds the limit, the controllable capacitor in the area is selected for switching. If there is no controllable equipment, an alarm message is output. When the next control cycle arrives, if the operation mode of the power grid changes, the elements in the coordinated control area change with the operation mode, the range of the coordinated control area can be regenerated from the beginning step and the voltage can be automatically controlled according to the range of the coordinated control area.
[0144] Figure 7 A simplified schematic diagram of a regional power supply network model including a 110 kV substation, a 35 kV substation and a 10 kV distribution network model provided by an embodiment of the present invention is shown in FIG. Figure 7 In the regional power supply network, it includes a 110kV substation and a 35kV substation. The 110kV substation includes two 10kv busbars, namely the fourth physical bus Bus11 and the fifth physical bus Bus22, and the 35kV substation includes a 10kv busbar, recorded as the sixth physical bus Bus33.
[0145] In one control cycle, the scope of the coordinated control area based on the 10kV bus is generated, and the regional power supply network model is obtained from the power grid energy management system, wherein the regional power supply network model includes real-time measurement data and real-time status data. In the regional power supply network part, the fourth physical bus Bus11 and the fifth physical bus Bus22 are connected through the first connecting switch Breaker11, and the first connecting switch Breaker11 is in the disconnected state. Initialize all physical buses, and determine their logical buses to be in the empty state respectively. At this time, the fourth physical bus Bus11, the fifth physical bus Bus22 and the sixth physical bus Bus33 are all initialized to the empty state. Exemplarily, the fourth physical bus Bus11 is selected to be determined as the initial logical bus and assigned the value B11. Detect whether the fourth physical bus Bus11 is in a closed connection state with other physical buses, by Figure 7 It can be seen that the fourth physical bus Bus11 is connected to the fifth physical bus Bus22 through the disconnected first tie switch Breaker11, so the logical bus of the fourth physical bus Bus11 is determined to be B11, and the logical bus of the fifth physical bus Bus22 is determined to be B22. The logical bus of the sixth physical bus Bus33 is determined to be B33. The fourth physical bus Bus11 included in the logical bus B11 of the fourth physical bus Bus11 is added to the scope of the first coordinated control area. Add the fifth physical bus Bus22 contained in the logical bus B22 of the fifth physical bus Bus22 to the scope of the second coordination control zone Add the sixth physical bus Bus33 contained in the logical bus B33 of the sixth physical bus Bus33 to the scope of the third coordination control zone
[0146] Obtain the distribution network model from the distribution automation system, where the distribution network model includes real-time measurement data and status data of the distribution network. Figure 7The distribution network includes: the fourth 10kV outgoing line L11, the fifth 10kV outgoing line L22, the sixth 10kV outgoing line L33, the fourth capacitor C11, the fifth capacitor C22, the sixth capacitor C33, the seventh 10kV line segment S11, the eighth 10kV line segment S22, the ninth 10kV line segment S33, the tenth 10kV line segment S44, the eleventh 10kV line segment S55, the twelfth 10kV line segment S66, the thirteenth 10kV line segment S77, the fourteenth 10kV line segment S88, the fourth 10kV voltage regulator R11, the fifth 10kV voltage regulator R22, the sixth 10kV voltage regulator R33, the fourth 10kV grid-connected new energy Source power station G11, the fifth 10kV grid-connected new energy power station G22, the sixth 10kV grid-connected new energy power station G33, the fifth switch Breaker22, the sixth switch Breaker33, the second contact switch Breaker44, the seventh switch Breaker55, the fifth switch Breaker22, the second contact switch Breaker44 and the seventh switch Breaker55 are all in a closed state, the fourth 380V load Load11, the fifth 380V load Load22, the sixth 380V load Load33, the fourth transformer T11, the fifth transformer T22 and the sixth transformer T33. Delete the loads in the distribution network model, delete all the disconnectors and circuit breakers in the model that are in a divided state, and form a 10kV distribution network model.
[0147] according to Figure 7 The schematic diagram shown in the figure shows the following result after processing:
[0148] The fourth 10kV outgoing line L11 - the fourth capacitor C11 - the seventh 10kV line segment S11 - the fourth 10kV voltage regulator R11 - the fourth 10kV grid-connected new energy power station G11 - the eighth 10kV line segment S22 - the fifth switch Breaker22 - the fourth transformer T11.
[0149] Fifth 10kV outgoing line L22-fifth capacitor C22-ninth 10kV line segment S33-fifth 10kV voltage regulator R22-fifth 10kV grid-connected new energy power station G22-tenth 10kV line segment S44-eleventh 10kV line segment S55-second connecting switch Breaker44-twelfth 10kV line segment S66-sixth 10kv outgoing line L33-sixth capacitor C33-thirteenth 10kV line segment S77-sixth 10kV voltage regulator R33-sixth 10kV grid-connected new energy power station G33-fourteenth 10kV line segment S88-seventh switch Breaker55-sixth transformer T33.
[0150] The 10kV distribution network model is topologically colored and coded to form several topological islands, each of which includes conductive devices electrically connected together. The result obtained in this embodiment is:
[0151] Topological island 1: fourth 10kV outgoing line L11 - fourth capacitor C11 - seventh 10kV line segment S11 - fourth 10kV voltage regulator R11 - fourth 10kV grid-connected new energy power station G11 - eighth 10kV line segment S22 - fifth switch Breaker22 - fourth transformer T11.
[0152] Topological island 2: fifth 10kV outgoing line L22-fifth capacitor C22-ninth 10kV line segment S33-fifth 10kV voltage regulator R22-fifth 10kV grid-connected new energy power station G22-tenth 10kV line segment S44-eleventh 10kV line segment S55-second connecting switch Breaker44-twelfth 10kV line segment S66-sixth 10kv outgoing line L33-sixth capacitor C33-thirteenth 10kV line segment S77-sixth 10kV voltage regulator R33-sixth 10kV grid-connected new energy power station G33-fourteenth 10kV line segment S88-seventh switch Breaker55-sixth transformer T33.
[0153] In this embodiment, topology island 1 only includes the fourth 10kv outgoing line L11 connected to the same logical bus, and topology island 1 is added to the scope of the first coordinated control area. Topological island 2 includes the fifth 10kv outgoing line L22 and the sixth 10kv outgoing line L33 connected to different logic buses. The second contact switch Breaker44 divides the topological island into two sub-islands, namely sub-island 1: the fifth 10kv outgoing line L22-the fifth capacitor C22-the ninth 10kV line segment S33-the fifth 10kV voltage regulator R22-the fifth 10kV grid-connected new energy power station G22-the tenth 10kV line segment S44-the eleventh 10kV line segment S 55 and sub-island 2: 12th 10kV line segment S66-6th 10kv outgoing line L33-6th capacitor C33-13th 10kV line segment S77-6th 10kV voltage regulator R33-6th 10kV grid-connected new energy power station G33-14th 10kV line segment S88-7th switch Breaker55-6th transformer T33, add the fifth 10kv outgoing line L22 of sub-island 1 to the scope of the second coordination control area where the logic bus is located Add the sixth 10kv outgoing line L33 to sub-island 2, corresponding to the scope of the third coordination control area where the logical bus is located
[0154] Therefore, the partition results of the coordinated control area can be obtained as follows:
[0155] The scope of the first coordinated control area The first physical bus Bus1-the fourth 10kV outgoing line L11-the fourth capacitor C11-the seventh 10kV line segment S11-the fourth 10kV voltage regulator R11-the fourth 10kV grid-connected new energy power station G11-the eighth 10kV line segment S22-the fifth switch Breaker22-the fourth transformer T11.
[0156] The scope of the second coordinated control area Second physical bus Bus2 - fifth 10kV outgoing line L22 - fifth capacitor C22 - ninth 10kV line segment S33 - fifth 10kV voltage regulator R22 - fifth 10kV grid-connected new energy power station G22 - tenth 10kV line segment S44 - eleventh 10kV line segment S55
[0157] The scope of the third coordinated control area The third physical bus Bus3-the twelfth 10kV line segment S66-the sixth 10kv outgoing line L33-the sixth capacitor C33-the thirteenth 10kV line segment S77-the sixth 10kV voltage regulator R33-the sixth 10kV grid-connected new energy power station G33-the fourteenth 10kV line segment S88-the seventh switch Breaker55-the sixth transformer T33
[0158] The scope of the first coordinated control area The voltage of the first physical bus Bus1 is checked. If the bus voltage exceeds the limit, the controllable capacitor in the area is selected for switching. If there is no controllable equipment, an alarm message is output. The voltage of the second physical bus Bus2 is checked. If the bus voltage exceeds the limit, the controllable capacitor in the area is selected for switching. If there is no controllable equipment, an alarm message is output. The voltage of the third physical bus Bus3 is checked. If the bus voltage exceeds the limit, the controllable capacitor in the area is selected for switching. If there is no controllable equipment, an alarm message is output. When the next control cycle arrives, the range of the coordinated control area can be regenerated from the starting step and the voltage can be automatically controlled according to the range of the coordinated control area. If the operation mode of the power grid changes, the elements in the range of the coordinated control area change with the operation mode, the range of the coordinated control area can be regenerated from the starting step and the voltage can be automatically controlled according to the range of the coordinated control area.
[0159] Figure 8 The embodiment of the present invention further provides a structural schematic diagram of an automatic voltage control device based on a range domain of a distribution network coordinated control area, including:
[0160] The acquisition module 810 is used to acquire at least one physical bus according to the operating status of the regional power supply network model.
[0161] The logical bus determination module 820 is used to determine the logical bus of each physical bus.
[0162] The coordinated control area determination module 830 is used to determine the range of the coordinated control area where the logical bus is located according to the logical bus.
[0163] The detection control module 840 is used to activate or remove reactive power regulation equipment within the coordinated control area according to the voltage on the physical bus within the coordinated control area, so that the voltage on the physical bus is within a normal range.
[0164] Specifically, the acquisition module 810 acquires the regional power supply network model through the power grid energy management system, wherein the regional power supply network model includes real-time measurement data and real-time status data. The power grid energy management system is an existing power grid operation system. The logical bus determination module 820 determines the logical bus of each physical bus according to the connection status of each physical bus in the regional power supply network model. The coordination control area determination module 830 determines the scope of the coordination control area corresponding to each logical bus according to the logical bus, and adds the conductive equipment associated with the logical bus to the scope of the coordination control area, thereby generating a scope of a coordination control area. The detection control module 840 checks the physical bus voltage within the scope of the coordination control area. If the physical bus voltage exceeds the normal threshold, the distribution network AVC system sends a remote control or remote adjustment command to directly control the reactive power regulation equipment to be put into operation or removed. Among them, the reactive power regulation equipment includes capacitors and reactors.
[0165] The technical solution provided by the embodiment of the present invention determines the logical bus for each physical bus, and then determines the scope of the coordinated control area corresponding to the logical bus according to the logical bus, and adds the connecting lines and equipment in the distribution network to the scope of the coordinated control area according to the logical bus. When changing different grid operation modes, the logical bus of each physical bus also changes accordingly. By adding the connecting lines and equipment in the distribution network to the scope of the coordinated control area according to the logical bus, the scope of the coordinated control area can be adaptively reconstructed. Thereby, the rationality of automatic voltage control within the scope of the coordinated control area is improved, and manual operation of power engineers can be avoided, thereby improving the efficiency of reactive voltage control within the scope of the coordinated control area.
[0166] Optionally, the logic bus determination module includes:
[0167] The initialization unit is used to initialize each physical bus to an empty state and determine one of them as an initial logical bus.
[0168] The detection unit is used to detect the connection status of the initial logical bus and other physical buses.
[0169] The logic bus determination unit is used to determine the logic bus according to the connection status.
[0170] The automatic voltage control device provided in the embodiment of the present invention and the automatic voltage control method provided in any embodiment of the present invention belong to the same inventive concept and have corresponding beneficial effects. For technical details not detailed in this embodiment, please refer to the automatic voltage control method provided in any embodiment of the present invention.
[0171] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Although the present invention has been described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some of the technical features can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An automatic voltage control method based on a coordinated control area of a distribution network, characterized in that: include: According to the operation status of the regional power supply network model, obtaining at least one physical bus; Determining a logical bus for each of the physical buses; Determine the range of the coordination control area where the logical bus is located according to the logical bus; According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is switched on or off, so that the voltage on the physical bus is within a normal range; Determining, according to the logical bus, a range of a coordinated control area where the logical bus is located, comprising: Adding the physical bus included in the logical bus to the scope of the coordinated control area; Adding conductive equipment in the distribution network to the scope of the coordinated control area according to the physical bus; Adding conductive equipment in the distribution network to the scope of the coordinated control area according to the physical bus includes: Acquire a distribution network model from a distribution automation system according to the physical bus; Delete all loads and all disconnectors and circuit breakers in the distribution network model to form a distribution network model; Performing topological coloring coding on the distribution network model to form at least one topological island, wherein the topological island includes electrically connected conductive devices; adding the conductive device to the scope of the coordinated control area according to the topological island; If the outgoing lines in the topological island are connected to the same logical bus, the conductive equipment of the topological island is added to the scope of the same coordinated control area; If the outgoing lines in the topological island are connected to different logical buses, the topological island is divided into at least two sub-islands according to the connecting switches between the outgoing lines; and the conductive devices in the sub-islands are added to the scope of the coordinated control area corresponding to the logical bus according to the logical bus.
2. The automatic voltage control method based on the coordinated control area of the distribution network according to claim 1 is characterized in that: Determine the logical bus for each physical bus, including: Initialize each of the physical buses to an empty state, and determine one of them as an initial logical bus; Detecting the connection status of the initial logical bus and other physical buses; The logical bus is determined according to the connection status.
3. The automatic voltage control method based on the coordinated control area of the distribution network according to claim 2 is characterized in that: Determining the logical bus according to the connection state includes: If the initial logical bus is connected to another physical bus through a closed tie switch, the other physical bus and the initial logical bus are determined to be the same logical bus.
4. The automatic voltage control method based on the coordinated control area of the distribution network according to claim 1 is characterized in that: Adding the conductive device to the scope of the coordinated control area according to the topological island includes: Acquire a topological relationship between at least one outgoing line in the topological island and the logical bus; Adding the conductive devices in the topological island to the scope of the coordinated control area according to the topological relationship.
5. The automatic voltage control method based on the coordinated control area of the distribution network according to claim 1 is characterized in that: According to the voltage on the physical bus within the coordinated control area, the reactive power regulation equipment within the coordinated control area is put into operation or removed so that the voltage on the physical bus is within a normal range, including: When the physical bus voltage exceeds the upper limit within the coordinated control area, one reactive power regulation device in the coordinated control area is selected to be removed or put into operation; if there is no device to be removed or put into operation, an alarm message is output; When the physical bus voltage exceeds the lower limit within the coordinated control area, a reactive power regulation device in the coordinated control area is selected to be put into operation or removed; if there is no device to be put into operation or removed, an alarm message is output.
6. An automatic voltage control device based on a coordinated control area of a distribution network, characterized in that: The automatic voltage control method according to claim 1 is executed by the automatic voltage control device, wherein the automatic voltage control device comprises: An acquisition module, used for acquiring at least one physical bus according to the operating status of the regional power supply network model; A logical bus determination module, used to determine the logical bus of each of the physical buses; A coordination control area determination module, used to determine the range of the coordination control area where the logical bus is located according to the logical bus; The detection control module is used to put the reactive power regulation equipment in the coordinated control area into or out according to the voltage on the physical bus within the coordinated control area, so that the voltage on the physical bus is within a normal range.
7. The automatic voltage control device based on the coordinated control area of the distribution network according to claim 6 is characterized in that: The logic bus determination module includes: An initialization unit, used for initializing each of the physical buses to an empty state, and determining one of them as an initial logical bus; A detection unit, used for detecting the connection status of the initial logical bus and other physical buses; A logical bus determining unit is used to determine the logical bus according to the connection state.