Method, device and computer-readable storage medium for evaluating hospital operation status
The method and device evaluate hospital operation stability by analyzing hospital operation indicator data to construct a graph, providing accurate and scalable assessments of hospital operation stability, considering direct and indirect correlations.
Patent Information
- Application Number
- CN202111445563.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-30
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-11-30
AI Technical Summary
Existing methods for evaluating hospital operating conditions are not universal and require professional personnel to conduct it based on their experience and the evaluation methods are not accurate and not universal.
A method and device for evaluating hospital operation status by acquiring various hospital operation indicator data, determining correlation and curvature values, and constructing a graph to evaluate stability, which is automated and considers complex nonlinear characteristics.
The method provides a universal and accurate evaluation of hospital operation stability, considering direct and indirect correlations, unaffected by human subjectivity, with high scalability and applicability to different hospitals.
Smart Images

Figure CN114067982B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of hospital management, and specifically to a method, device and computer-readable storage medium for evaluating hospital operating conditions. Background Art
[0002] As the level of hospital intelligence increases, roles such as hospital managers and operators need to have an intuitive understanding of the overall operation of the hospital.
[0003] The evaluation of a hospital's operating conditions usually requires medical professionals to give an evaluation of the hospital's operating conditions based on their experience and many factors that may be involved.
[0004] However, each evaluation requires professional personnel to conduct it based on their experience, and its universality is not high. Summary of the invention
[0005] The main technical problem solved by this application is that the existing evaluation methods for hospital operating conditions are not universal.
[0006] According to the first aspect, an embodiment provides a method for evaluating hospital operation status, comprising:
[0007] Acquire various hospital operation indicator data within a current time period, wherein the current time period includes K time points, where K is an integer greater than 1;
[0008] Starting from the first time point among the K time points and ending at the K-s+1th time point among the K time points, each time point is used as an initial time point to determine a time series of s consecutive time points from the K time points, wherein K and s are both positive integers, and s is less than or equal to K;
[0009] For each initial time point, the correlation value between each two hospital operation indicator data is determined according to the two time series corresponding to each two hospital operation indicator data;
[0010] Determine the curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold;
[0011] According to the curvature value corresponding to each time series, the curvature correlation value corresponding to each initial time point is determined;
[0012] The evaluation content of hospital operation stability is obtained according to the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
[0013] Optionally, determining the curvature value of the connecting line between two types of hospital operation indicator data corresponding to the correlation value greater than or equal to a preset threshold includes:
[0014] Determine whether the correlation value corresponding to each two hospital operation indicator data is greater than or equal to a preset threshold;
[0015] When the correlation values corresponding to two hospital operation index data are greater than or equal to a preset threshold, the curvature value of the connecting line between the two hospital operation index data is obtained according to the correlation values respectively corresponding to the two hospital operation index data that are greater than or equal to the preset threshold.
[0016] Optionally, obtaining the curvature value of the connecting line between the two hospital operation indicator data according to the correlation values respectively corresponding to the two hospital operation indicator data and being greater than or equal to a preset threshold value includes:
[0017] The curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold is obtained according to the following formula:
[0018]
[0019] Among them, FR(E(n,m)) is the curvature value of the connecting line between the nth hospital operation index data and the mth hospital operation index data, R mn is the correlation value between the mth hospital operation index data and the nth hospital operation index data corresponding to an initial time point, R nk is the correlation value between the nth hospital operation index data and the kth hospital operation index data corresponding to the initial time point, and R nk Greater than or equal to the preset threshold, R im is the correlation value between the mth hospital operation index data and the ith hospital operation index data corresponding to the initial time point, and R im Greater than or equal to the preset threshold.
[0020] Optionally, determining the curvature-related value corresponding to each initial time point according to the curvature value corresponding to each time series includes:
[0021] The average value of all curvature values corresponding to each time series at the initial time point is obtained to obtain the curvature-related value corresponding to the initial time point.
[0022] Optionally, the evaluation content of hospital operation stability is obtained according to the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in a time period before the current time period, including:
[0023] Determine the sum of the curvature-related values corresponding to each initial time point within the current time period as the index value of the current time period;
[0024] Obtaining an index value of a time period before the current time period, wherein the index value of the time period before the current time period is the sum of curvature-related values corresponding to each initial time point of the time period before the current time period;
[0025] Determine a rate of change between the indicator value of the current time period and the indicator value of a previous time period of the current time period;
[0026] According to the change rate and the preset fluctuation threshold, the evaluation content of the hospital operation stability is obtained.
[0027] Optionally, there are multiple preset fluctuation thresholds, and the evaluation content of hospital operation stability obtained according to the change rate and the preset fluctuation threshold includes:
[0028] The relationship between the change rate and a plurality of preset fluctuation thresholds is compared to obtain evaluation content of hospital operation stability.
[0029] Optionally, the method further includes:
[0030] Displaying a graph corresponding to each initial time point, wherein the graph corresponding to each initial time point includes nodes and some or all of the connecting lines between the nodes, wherein the nodes are used to represent the hospital operation indicator data, and the connecting lines are used to represent that the correlation value between the hospital operation indicator data represented by the nodes at both ends of the connecting line is greater than or equal to a preset threshold;
[0031] Displaying a change graph of curvature-related values, wherein the change graph of curvature-related values includes curvature-related values corresponding to each initial time point of the current time period, or the change graph of curvature-related values includes curvature-related values corresponding to each initial time point of the current time period and a time period before the current time period;
[0032] Displays the evaluation content of the hospital's operational stability.
[0033] Optionally, the acquisition of multiple hospital operation indicator data within the current time period includes:
[0034] Obtain various original hospital operation indicator data within the current time period;
[0035] The various original hospital operation indicator data are pre-processed to obtain various hospital operation indicator data within a current time period, wherein the pre-processing includes at least one of data cleaning processing and data deduplication processing.
[0036] According to the second aspect, an embodiment provides a device for evaluating hospital operation status, including:
[0037] A data collection module, used to obtain various hospital operation indicator data within a current time period, wherein the current time period includes a plurality of K time points, where K is an integer greater than 1;
[0038] A graph generation module is used to determine a time series including s consecutive time points from the K time points starting from the first time point among the K time points and ending at the K-s+1th time point among the K time points, taking each time point as an initial time point, wherein K and s are both positive integers, and s is less than or equal to K; for each initial time point, determine the correlation value between each two hospital operation indicator data according to the two time series corresponding to each two hospital operation indicator data;
[0039] The curvature calculation module is used to determine the curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold; according to the curvature value corresponding to each time series, determine the curvature correlation value corresponding to each initial time point;
[0040] The evaluation module is used to obtain evaluation content of hospital operation stability based on the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
[0041] According to the third aspect, an embodiment provides a computer-readable storage medium, on which a program is stored, and the program can be executed by a processor to implement the method as described in any one of the above-mentioned first aspects.
[0042] According to the evaluation method, device and computer-readable storage medium of the hospital operation status of the above embodiment, by obtaining multiple hospital operation index data involved in the hospital operation process, the initial time point is obtained in the current time period, and a graph is constructed for each initial time point. Each type of hospital operation index data in the graph is a node, and the correlation between each two types of hospital operation index data is determined. If the correlation is large, it means that the correlation between the two types of hospital operation index data is large. A connecting line is constructed between two nodes with relatively large correlations, and the curvature value of each connecting line in the graph is calculated. According to each curvature value, a curvature correlation value can be obtained to characterize the index obtained by the joint action of multiple hospital operation data at the current initial time point. According to the curvature correlation value of the current time period and the previous time period, the evaluation content of the hospital operation stability can be obtained. A graph structure is established based on data, and the curvature value is used to evaluate the stability of hospital operation. The interaction between directly related hospital operation index factors is considered, and the influence of indirectly related hospital operation index factors in the hospital operation system on the system is also considered. The complex nonlinear characteristics of the hospital operation system in the hospital operation index can be better extracted, so that the evaluation content is highly accurate. For hospitals of different types and levels, it is only necessary to obtain a variety of hospital operation indicator data of the hospital, so that the electronic device can automatically output the evaluation content, which has wide applicability and strong versatility. In addition, the evaluation content is not affected by human subjective factors, and fully considers the correlation between various hospital operation indicator data, with high accuracy. In addition, the hospital operation indicator data can be flexibly adjusted, so that the electronic device can quickly derive the evaluation content based on the adjusted hospital operation indicator data, which has strong scalability. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A flowchart of a method for evaluating hospital operation status provided in an embodiment of the present application;
[0044] Figure 2 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application;
[0045] Figure 3 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application;
[0046] Figure 4 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application;
[0047] Figure 5 A schematic diagram constructed based on the correlation between hospital operation indicator data provided for this application;
[0048] Figure 6 A schematic diagram of a curvature-related value variation diagram provided in the present application;
[0049] Figure 7 A schematic diagram of the structure of a device for evaluating hospital operating conditions provided in an embodiment of the present application. DETAILED DESCRIPTION
[0050] The present application is further described in detail below by specific embodiments in conjunction with the accompanying drawings. Wherein similar elements in different embodiments adopt associated similar element numbers. In the following embodiments, many detailed descriptions are intended to enable the present application to be better understood. However, those skilled in the art can easily recognize that some of the features can be omitted in different situations, or can be replaced by other elements, materials, and methods. In some cases, some operations related to the present application are not shown or described in the specification, in order to avoid the core part of the present application being overwhelmed by too much description, and for those skilled in the art, it is not necessary to describe these related operations in detail, and they can fully understand the related operations based on the description in the specification and the general technical knowledge in the art.
[0051] In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementations. At the same time, the steps or actions in the method description can also be interchanged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the various sequences in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a required sequence, unless otherwise specified that a certain sequence must be followed.
[0052] The serial numbers of the components in this document, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings).
[0053] In an embodiment of the present application, a variety of hospital operation indicator data involved in the hospital operation process are obtained, an initial time point is obtained within the current time period, a graph is constructed for each initial time point, each type of hospital operation indicator data in the graph is a node, the correlation between each two types of hospital operation indicator data is determined, if the correlation is large, it means that the correlation between the two types of hospital operation indicator data is large, a connecting line is constructed between two nodes with relatively large correlation, and the curvature value of each connecting line in the graph is calculated. According to each curvature value, a curvature correlation value can be obtained to characterize the index obtained by the joint action of multiple hospital operation data at the current initial time point. According to the curvature correlation values of the current time period and the previous time period, the evaluation content of the hospital operation stability can be obtained. For different hospitals, it is only necessary to obtain multiple hospital operation indicator data of the hospital, which has wide applicability. In addition, the evaluation content is not affected by human subjective factors, and fully considers the correlation between various hospital operation indicator data, and has high accuracy.
[0054] The technical solution of the present application is described in detail below with reference to specific embodiments.
[0055] Embodiment 1:
[0056] Please refer to Figure 1 , Figure 1 This is a flowchart of a method for evaluating hospital operation status provided in an embodiment of the present application. This embodiment is executed by an electronic device, which may be a server, a computer, a mobile phone, a tablet device, etc., and this application does not limit this. The method of this embodiment includes the following steps:
[0057] S101: Acquire various hospital operation indicator data within the current time period.
[0058] The current time period includes K time points, where K is an integer greater than 1.
[0059] The current time period may be a preset time period, which may be set according to the hospital's conditions. The time period may be 1 month, 3 months, 6 months, or a year, etc., which is not limited in this application.
[0060] Among them, K time points can be set according to the hospital operation indicator data. For example, assuming that the time period is 1 month (30 days in total), each day can be used as a time point to obtain the hospital operation indicator data for each day of the current 30 days.
[0061] Among them, hospital operation index data are evaluation index data that affect the hospital operation status. Hospital operation indicator data may include but are not limited to the following indicator data: outpatient and emergency department visit growth rate, inpatient visit growth rate, outpatient and emergency department visit number, discharge number, proportion of key diseases in inpatients, number of surgeries, proportion of minimally invasive surgeries, proportion of interventional surgeries, proportion of experts, emergency critically ill patient rescue success rate, inpatient rescue success rate, service volume, drug proportion, patient satisfaction, number of patient complaints, average examination report time, average outpatient cost, average inpatient cost, average hospital stay, average daily discharges, average preoperative hospital stay, average hospital stay for cured patients, bed occupancy rate, unit fixed asset service volume, unit labor cost service volume, large equipment (project) utilization rate, unit special equipment service volume, admission and discharge diagnosis compliance rate, three-day admission diagnosis rate, pre-operative and post-operative diagnosis compliance rate, inpatient cure and improvement rate, hospital infection incidence rate, neonatal mortality rate, in-hospital mortality rate, medical insurance refusal rate, surgical success rate, proportion of new medical income in total income, number of new projects launched, number of scientific research results and published papers, staff turnover rate, number of employees on the job, bed-to-nurse ratio, medical staff ratio, etc.
[0062] Optionally, the multiple hospital operation indicator data obtained may be multiple hospital operation indicator data of one hospital, and the data obtained after processing may be evaluation content of the hospital operation stability; the multiple hospital operation indicator data obtained may also be multiple hospital operation indicator data of one department of the hospital, and the data obtained after processing may be evaluation content of the operation stability of the department.
[0063] Optionally, the various hospital operation index data may be acquired in a predetermined time period, or in a current data processing time period. For example, the various hospital operation index data may be acquired once a month.
[0064] Optionally, the hospital operation indicator data can be obtained through one or more hospital information systems connected to the electronic device. The hospital information system may include, but is not limited to, one or more of the following systems: hospital information system (HIS), human resource management system, financial management system, supply chain management system, scientific research management system, equipment management system, medical record system, electronic medical record system, surgical anesthesia system, laboratory information management system (LIS), picture archiving and communication system (PACS), etc.
[0065] S102: Starting from the first time point among the K time points and ending at the K-s+1th time point among the K time points, each time point is used as an initial time point to determine a time series including s consecutive time points from the K time points.
[0066] Wherein, K and s are both positive integers, and s is less than or equal to K.
[0067] For each initial time point, obtain the s consecutive time points after it as a time series. Since the time point after the K-s+1th time point among the K time points is taken as the initial time point, its time series cannot obtain s consecutive time points, which will make the length of the time series different in subsequent processing. Therefore, when obtaining the initial time point, it ends at the K-s+1th time point.
[0068] For example, assuming that the current time period is 1 month (31 days), K=31, s=7, then for 31 days of data, starting from the 1st day and ending at the 25th day, each day is an initial time point. For example, the time series corresponding to the 1st day is the 1st day to the 7th day.
[0069] S103: For each initial time point, determine the correlation value between each two types of hospital operation indicator data according to the two time series corresponding to each two types of hospital operation indicator data.
[0070] There may be certain correlations between different hospital operation indicator data. For example, there is a certain correlation between the rescue success rate of emergency critically ill patients and the rescue success rate of hospitalization; there is also a certain correlation between the average length of stay, the average daily discharges and the bed occupancy rate, etc. The above examples cannot cover all hospital operation indicator data with certain correlations. They are just examples to illustrate that there may be certain correlations between hospital operation indicator data, and they do not constitute a limitation on this application.
[0071] The time series corresponding to the hospital operation index data includes the hospital operation index data at each time point in the time series. For each initial time point, the time series corresponding to each of the two hospital operation index data corresponding to the initial time point is determined, and the correlation value between each of the two hospital operation index data corresponding to the two hospital operation index data is determined. The correlation value is calculated for each of the multiple types of hospital operation index data.
[0072] Among them, the correlation value is used to characterize the correlation between the time series corresponding to the two hospital operation indicator data.
[0073] Optionally, the correlation value may be an absolute value of the Pearson correlation coefficient.
[0074] S104: Determine the curvature value of the connection line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold.
[0075] The correlation value between each two hospital operation index data is compared with the preset threshold value. For each two hospital operation index data, it is determined whether the correlation value between the two hospital operation index data is greater than or equal to the preset threshold value. If so, the curvature value of the connecting line between the two hospital operation index data is determined, and the correlation value between the next pair of two hospital operation index data is determined to be greater than or equal to the preset threshold value. If not, it is determined whether the correlation between the next pair of two hospital operation index data is greater than or equal to the preset threshold value. Until each of the multiple hospital operation index data has completed the above processing.
[0076] Among them, for each initial time point, a graph can be established, and each hospital operation indicator is represented by a node in the graph. When the correlation value between two hospital operation indicator data is greater than or equal to the preset threshold, a connecting line is established between the two nodes corresponding to the two hospital operation indicator data. It can be understood that the curvature value of the connecting line is related to all connecting lines of the two nodes of the connecting line. Therefore, the correlation between the existing hospital operation indicator data is abstracted into a graph, and the direct and indirect correlations between multiple hospital operation indicator data are abstracted into the curvature value of the connecting line.
[0077] The preset threshold is pre-set, and the preset threshold is a value greater than 0 and less than 1. For example, the preset threshold may be 0.5, 0.7 or 0.8, etc. The preset threshold may be set according to the business scenario.
[0078] S105: Determine the curvature-related value corresponding to each initial time point according to the curvature value corresponding to each time series.
[0079] For each time series, one or more curvature values can be obtained according to the above step S104, then the curvature-related value of the initial time point corresponding to the time series is determined according to the one or more curvature values corresponding to the time series, that is, the curvature-related value corresponding to the starting time point of the time series. In this way, the curvature-related value corresponding to each initial time point can be obtained.
[0080] S106: Obtain evaluation content of hospital operation stability according to the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
[0081] The time length of the previous time period of the current time period is the same as the time length of the current time period.
[0082] The curvature-related values corresponding to each initial time point of the previous time period of the current time period may be obtained in a manner similar to the above method of obtaining the curvature-related values corresponding to each initial time point of the current time period.
[0083] Among them, the evaluation content of hospital operation stability is used to indicate the stability of hospital operation status. Hospital operation stability can reflect whether there are risks in the current hospital operation.
[0084] The evaluation content may be in the form of pictures, text, or scores, etc. This application does not limit the form of the evaluation content.
[0085] In this embodiment, by obtaining a variety of hospital operation indicator data involved in the hospital operation process, the initial time point is obtained within the current time period, and a graph is constructed for each initial time point. Each type of hospital operation indicator data in the graph is a node, and the correlation between each two types of hospital operation indicator data is determined. If the correlation is large, it means that the correlation between the two types of hospital operation indicator data is large. A connecting line is constructed between two nodes with relatively large correlations, and the curvature value of each connecting line in the graph is calculated. According to each curvature value, a curvature correlation value can be obtained to characterize the index obtained by the joint action of a variety of hospital operation data at the current initial time point. According to the curvature correlation values of the current time period and the previous time period, the evaluation content of the stability of hospital operation can be obtained. A graph structure is established based on data, and the curvature value is used to evaluate the stability of hospital operation. The interaction between directly related hospital operation indicator factors is considered, and the influence of indirectly related hospital operation indicator factors in the hospital operation system on the system is also considered. The complex nonlinear characteristics of the hospital operation system in the hospital operation indicator can be better extracted, so that the evaluation content is highly accurate. For hospitals of different types and levels, it is only necessary to obtain a variety of hospital operation indicator data of the hospital, so that the electronic device can automatically output the evaluation content, which has wide applicability and strong versatility. In addition, the evaluation content is not affected by human subjective factors, and fully considers the correlation between various hospital operation indicator data, with high accuracy. In addition, the hospital operation indicator data can be flexibly adjusted, so that the electronic device can quickly derive the evaluation content based on the adjusted hospital operation indicator data, which has strong scalability.
[0086] On the basis of the above embodiment, further, in S104, it can be determined whether the correlation value corresponding to each two hospital operation index data is greater than or equal to the preset threshold. In the case where the correlation value corresponding to the two hospital operation index data is greater than or equal to the preset threshold, the curvature value of the connecting line between the two hospital operation index data is obtained according to the correlation values respectively corresponding to the two hospital operation index data that are greater than or equal to the preset threshold. Figure 2 The illustrated embodiment is described in detail.
[0087] See also Figure 2 , Figure 2 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application is provided in this embodiment. Figure 1 On the basis of the illustrated embodiment, further, S104 can be implemented by the following steps:
[0088] S1041: Combine multiple hospital operation indicator data in pairs, starting from the first combination and ending with the last combination, and traverse to obtain combinations whose corresponding correlation values are greater than or equal to a preset threshold.
[0089] Combine multiple hospital operation indicator data in pairs, starting from the first combination, determine whether the correlation values corresponding to the two hospital operation indicator data in the current combination are greater than or equal to the preset threshold, update the current combination to the next combination, and return to execute the determination of whether the correlation values corresponding to the two hospital operation indicator data in the current combination are greater than or equal to the preset threshold until all combinations are determined. In this way, all combinations whose corresponding correlation values are greater than or equal to the preset threshold are obtained.
[0090] S1042: Obtain a curvature value of a connection line between two types of hospital operation indicator data according to all correlation values respectively corresponding to the two types of hospital operation indicator data that are greater than or equal to a preset threshold.
[0091] Among them, the correlation values corresponding to the two hospital operation indicator data, which are respectively greater than or equal to the preset threshold, refer to the correlation values between the multiple hospital operation indicator data and the two hospital operation indicator data, which are respectively greater than or equal to the preset threshold, which is equivalent to the correlation values corresponding to all connecting lines between the two nodes represented by the two hospital operation indicator data in the graph corresponding to the initial time point established.
[0092] Exemplarily, assume that the various hospital operation indicator data are T1, T2, T3, and T4, and the preset threshold is 0.7. Take the hospital operation indicator data T1 and T2 as examples for illustration, assuming that the correlation values between T1 and T2 and T3 are respectively greater than 0.7, and the correlation values between T2 and T1 and T4 are respectively greater than 0.7, then according to the correlation values between T1 and T2, the correlation values between T1 and T3, and the correlation values between T2 and T4, the curvature value of the connecting line between T1 and T2 is determined.
[0093] Optionally, the curvature value of the connecting line between two hospital operation indicator data corresponding to the correlation value greater than the preset threshold can be obtained according to the following formula (1):
[0094]
[0095] Among them, FR(E(n,m)) is the curvature value of the connecting line between the nth hospital operation index data and the mth hospital operation index data, R mn is the correlation value between the mth hospital operation index data and the nth hospital operation index data corresponding to an initial time point, R nk is the correlation value between the nth hospital operation index data and the kth hospital operation index data corresponding to the initial time point, and R nk Greater than or equal to the preset threshold, R im is the correlation value between the mth hospital operation index data and the ith hospital operation index data corresponding to the initial time point, and R im Greater than or equal to the preset threshold.
[0096] In this embodiment, by judging whether the correlation value corresponding to each two hospital operation indicator data is greater than or equal to a preset threshold, when the correlation value corresponding to the two hospital operation indicator data is greater than or equal to the preset threshold, the curvature value of the connecting line between the two hospital operation indicator data is obtained according to the correlation values respectively corresponding to the two hospital operation indicator data that are greater than or equal to the preset threshold. In this way, the curvature value of the connecting line between the two hospital operation indicator data is determined not only by considering the correlation between the two hospital operation indicator data, but also by fully considering the correlation with other hospital operation indicator data, thereby considering the interaction between directly related hospital operation indicator factors, and also considering the impact of indirectly related hospital operation indicator factors in the hospital operation system on the system, so as to better extract the complex nonlinear characteristics of the hospital operation system in the hospital operation indicators, thereby making the evaluation content highly accurate.
[0097] On the basis of the above embodiment, further, in S105, the curvature-related values corresponding to each initial time point are obtained according to the curvature values corresponding to each time series, which can be implemented in multiple ways.
[0098] In a possible implementation, an average value of the curvature values corresponding to each time series may be obtained to obtain the curvature-related value corresponding to each initial time point.
[0099] For each initial time point, the average value of all curvature values calculated at the initial time point is taken to obtain the curvature-related value corresponding to the initial time point. In this way, the curvature-related values corresponding to all initial time points can be obtained.
[0100] In this implementation, the curvature-related value corresponding to each initial time point is obtained by obtaining the average value of the curvature value corresponding to each time series, which reduces the amount of subsequent calculations and saves processing resources. Taking the average value makes it easier for the curvature-related value to reflect the overall characteristics of the graph constructed at the initial time point, making the evaluation content of the entire hospital operation system more accurate.
[0101] In another possible implementation, the maximum value, minimum value or intermediate value of the curvature value corresponding to each time series may be obtained to obtain the curvature-related value corresponding to each initial time point.
[0102] For each initial time point, the maximum value, minimum value or middle value of all curvature values calculated from each time series acquired at the initial time point is taken to obtain the curvature-related value corresponding to the initial time point. In this way, the curvature-related values corresponding to all initial time points can be obtained.
[0103] In this implementation, by obtaining the maximum, minimum or intermediate value of the curvature value corresponding to each time series, the curvature-related value corresponding to each initial time point is obtained, which reduces the amount of subsequent calculations and saves processing resources. A variety of possibilities are proposed for calculating the curvature-related value, and users can choose according to actual needs.
[0104] On the basis of the above embodiment, further, in S106, an index value can be obtained according to all curvature-related values of the current time period, so as to compare the change rate of the index value of the current time period and the previous time period of the current time period, so as to determine the evaluation content.
[0105] The index value of the current time period is obtained in the same manner as the index value of the previous time period before the current time period.
[0106] In a possible implementation, the index value may be a maximum value, a minimum value, an average value, etc. of the curvature-related values corresponding to each initial time point within the time period.
[0107] In another possible implementation, the index value may be the sum of the curvature-related values corresponding to each initial time point within the time period. Figure 3 The illustrated embodiment is described in detail.
[0108] See also Figure 3 , Figure 3 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application is provided in this embodiment. Figure 1 or Figure 2 On the basis of the illustrated embodiment, further, S106 can be implemented by the following steps:
[0109] S1061: Determine the sum of the curvature-related values corresponding to each initial time point in the current time period as the index value of the current time period.
[0110] The current time period may include one or more initial time points, and the sum of the curvature-related values corresponding to each initial time point that has been obtained is obtained, thereby obtaining the index value of the current time period.
[0111] S1062: Obtain the index value of the previous time period of the current time period.
[0112] The index value of the previous time period of the current time period is the sum of the curvature-related values corresponding to each initial time point of the previous time period of the current time period.
[0113] The index value of the previous time period of the current time period can be obtained by calculation, or directly obtained after the calculation is completed. The calculation method of the index value of the previous time period of the current time period can be similar to that of S1061, which will not be repeated here.
[0114] It is understandable that there is no order in which S1061 and S1062 are executed. S1061 may be executed first, and then S1062; S1062 may be executed first, and then S1061; S1061 and S1062 may also be executed simultaneously, and this application does not limit this.
[0115] S1063: Determine the change rate between the indicator value of the current time period and the indicator value of the previous time period of the current time period.
[0116] Get the difference between the indicator value of the previous time period of the current time period and the indicator value of the current time period. Get the absolute value of the ratio of the difference to the indicator value of the previous time period of the current time period to obtain the change rate.
[0117] S1064: Based on the change rate and the preset fluctuation threshold, the evaluation content of the hospital operation stability is obtained.
[0118] The preset fluctuation threshold is preset and can be set according to the actual situation of the hospital. The preset fluctuation threshold is greater than 0. One or more preset fluctuation thresholds can be set.
[0119] If the preset fluctuation threshold is one, the preset fluctuation threshold divides the value range into two intervals. If the change rate is greater than the preset fluctuation threshold, it can be concluded that the current hospital operation is at a high risk. If the change rate is less than or equal to the preset fluctuation threshold, the evaluation content of the current stable operation of the hospital can be obtained.
[0120] If there are multiple preset fluctuation thresholds, the relationship between the change rate and the multiple preset fluctuation thresholds is compared to obtain the evaluation content of the hospital operation stability.
[0121] The preset fluctuation threshold divides the numerical range into multiple intervals, each interval corresponds to an evaluation content, and the interval to which the change rate belongs is determined, and the evaluation content is the evaluation content corresponding to the interval.
[0122] Taking two preset fluctuation thresholds of 0.1 and 0.5 as an example, if the change rate is greater than 0.5, the output evaluation content is that there is a great risk in the current hospital operation; if the change rate is less than or equal to 0.5 and greater than 0.1, the output evaluation content is that there is a certain risk in the current hospital operation; if the change rate is less than or equal to 0.1, the output evaluation content is that the current hospital operation is stable.
[0123] In this embodiment, the index value of the time period is obtained by obtaining the sum of the curvature related values corresponding to each initial time point within the time period. The processing method of the index value is simple and the processing speed is fast, which saves processing resources and improves the processing speed. The change rate between the index value of the current time period and the index value of the previous time period of the current time period is compared, and the evaluation content of the hospital operation stability is obtained according to the relationship between the change rate and the preset fluctuation threshold. The application range is wide and the accuracy is high.
[0124] See also Figure 4 , Figure 4 A flowchart of another method for evaluating hospital operation status provided in an embodiment of the present application is provided in this embodiment. Figure 1-Figure 3 On the basis of the embodiment shown, further, the method provided in this embodiment also includes S107, S108 and / or S109:
[0125] S107: Display the graph corresponding to the initial time point.
[0126] Among them, the graph corresponding to the initial time point contains nodes and part or all of the connecting lines between the nodes, the nodes are used to represent hospital operation indicator data, and the connecting lines are used to indicate that the correlation value between the hospital operation indicator data represented by the nodes at both ends of the connecting line is greater than or equal to a preset threshold.
[0127] Below Figure 5 Take an example to illustrate the form of a graph corresponding to an initial time point. Figure 5 A schematic diagram provided for this application is constructed based on the correlation between hospital operation indicator data. Figure 5 Each node in is used to represent a type of hospital operation indicator data, and the connecting line is used to represent that the correlation value between the hospital operation indicator data represented by the nodes at both ends of the connecting line is greater than or equal to a preset threshold.
[0128] That is, the above-mentioned graph established for each initial time point can be displayed, so as to more intuitively understand the relationship between different hospital operation indicators.
[0129] Optionally, when the evaluation content indicates that the current hospital operation risk is relatively high, a warning message is output, and the warning message may include but is not limited to: a graph corresponding to an initial time point.
[0130] S108: Displaying a graph showing changes in curvature-related values.
[0131] The curvature correlation value variation graph includes the curvature correlation values corresponding to each initial time point of the current time period, or the curvature correlation value variation graph includes the curvature correlation values corresponding to each initial time point of the current time period and the previous time period of the current time period.
[0132] Optionally, the curvature-related values corresponding to each initial time point in multiple time periods may be obtained, so that the curvature-related value variation graph may display the curvature-related values corresponding to each initial time point in the multiple time periods, that is, the curvature-related value variation graph includes the curvature-related values of a set time series.
[0133] Below Figure 6 The curvature-related value change diagram shown in the figure is used as an example to illustrate. Figure 6 A schematic diagram of a curvature-related value variation diagram provided in this application, Figure 6 The horizontal axis represents time, and the vertical axis represents the value of the curvature-related value. Figure 6 It can be seen that around October 18, 2007, the curvature-related value fluctuated greatly, and the corresponding evaluation content may output that the current operation has a greater risk.
[0134] S109: Displays the evaluation content of hospital operation stability.
[0135] The evaluation content may be in the form of text or charts.
[0136] In this embodiment, by displaying various data, the hospital operation status and the correlation between different hospital operation indicator data can be more intuitively and effectively understood, so as to more intuitively understand the stability of the hospital's current operation.
[0137] On the basis of the above embodiment, S101 can be further implemented by the following steps:
[0138] Step 1011: Acquire various original hospital operation indicator data within the current time period.
[0139] Optionally, the original hospital operation indicator data can be obtained through one or more hospital information systems connected to the electronic device. Among them, the hospital information system may include but is not limited to the following systems: Hospital Information System (HIS), Human Resources Management System, Financial Management System, Supply Chain Management System, Scientific Research Management System, Equipment Management System, Medical Record System, Electronic Medical Record System, Surgical Anesthesia System, Laboratory Information Management System (LIS), Picture Archiving and Communication Systems (PACS), etc.
[0140] Step 1012: Preprocess the various original hospital operation indicator data to obtain various hospital operation indicator data within the current time period.
[0141] The preprocessing may include but is not limited to at least one of data cleaning processing and data deduplication processing.
[0142] Optionally, each data item in the preprocessed hospital operation indicator data may be stored in the database as a time series in the form of a database table.
[0143] Optionally, in S106, the hospital operation index data required to be used for the curvature-related values corresponding to each initial time point in the previous time period of the current time period may be obtained by preprocessing a plurality of original hospital operation index data in the previous time period of the current time period.
[0144] In this embodiment, the original hospital operation indicator data can be preprocessed, and the preprocessed multiple hospital operation indicator data can be used for subsequent processing to obtain evaluation content, so that the hospital operation indicator data is more accurate, and thus the evaluation content obtained based on the hospital operation indicator data is more accurate.
[0145] The method of the above embodiment is described below with reference to a specific embodiment.
[0146] For example, suppose there are N hospital operation indicators for evaluating hospital operation status, which are denoted as X1, X2, …, X N , where X1 represents the first hospital operation index, X2 represents the second hospital operation index, ..., X N Represents the Nth hospital operation indicator.
[0147] Each hospital operation indicator data corresponds to a single time series in the current time period, recorded as T1, T2, …, T N, where T1 represents the first type of hospital operation index data in the current time period, T2 represents the second type of hospital operation index data in the current time period, ..., T N Represents the Sth type of hospital operation indicator data in the current time period.
[0148] Assuming that the time unit of the time series is day and the length of each time period is K, then the nth hospital operation indicator data T n It can be expressed by the following formula (2):
[0149] T n =(t n (1),t n (2),…,t n (K)) Formula (2)
[0150] Among them, the kth value t of the time series n (k) represents the nth hospital operation indicator data at the kth time point.
[0151] Starting from the first time point among the K time points and ending at the K-s+1th time point among the K time points, each time point l is taken as the initial time point. For each initial time point l, a graph can be established. Each hospital operation indicator X n Or each hospital operation indicator data T n It is a node in the graph. It can be understood that there is no essential difference between understanding the node in the graph as an indicator or the data corresponding to the indicator.
[0152] In each time period, using the preset time series length s (assuming s = 7 below, i.e., the time series length is one week), starting from the initial time point l, the data corresponding to the time series of the nth hospital operation indicator is (t n (l),t n (l+1),…t n (l+s-1)), the corresponding time series data of the mth hospital operation indicator is (t m (l),t m (l+1),…t m (l+s-1)), determine the correlation value R between the two time series data of length s at the initial time point l nm (l), where l = 1, 2,…, K-s+1.
[0153] The preset threshold of the correlation value is represented by D, and it is assumed here that D = 0.7. nm (l)|≥D, the two nodes X in the graph at the initial time point l n and X m Establish a connection line between Rnm (l) As the connection weight between two nodes X in the graph at this time point n and X m ; when |R nm (l)| < D, there is no connection between the two nodes X n and X m .
[0154] Thus, K - s + 1 graphs related to the initial time point l are established, denoted as G(l), and stored in the database.
[0155] For each graph G(l) corresponding to the initial time point l, calculate the curvature value of each connection line. Calculate the average value of the curvature values of all connection lines in the current graph as the curvature - related value of this initial time point. Thus, a time series composed of the curvature - related values of each initial time point is obtained. Store this time series in the database.
[0156] Assume that the time period K = 28 and the preset fluctuation threshold θ = 15%. If the change rate of the sum of the curvature - related values in the current time period K (i.e., 28 days) compared to the sum of the curvature - related values in the previous time period exceeds 15%, it is considered that there is a greater risk in the current hospital experience; otherwise, it is considered that the current hospital operation status is relatively stable.
[0157] Embodiment 2:
[0158] Please refer to Figure 7 , Figure 7 , which is a schematic structural diagram of an evaluation device for hospital operation status provided by an embodiment of the present application. The device provided in this embodiment includes:
[0159] A data acquisition module 701, configured to obtain various hospital operation index data within the current time period. The current time period includes K time points, and K is an integer greater than 1;
[0160] A graph generation module 702, configured to start from the 1st time point among the K time points until the (K - s + 1)th time point among the K time points, and use each of these time points as an initial time point to determine a time series including s consecutive time points from the K time points. Here, both K and s are positive integers, and s is less than or equal to K; for each time series, determine the correlation value between every two hospital operation index data according to the corresponding two hospital operation index data of the time series;
[0161] A curvature calculation module 703, configured to determine the curvature value of the connection line between two hospital operation index data corresponding to the correlation value greater than or equal to the preset threshold; determine the curvature - related value corresponding to each initial time point according to the curvature values corresponding to each time series;
[0162] The evaluation module 704 is used to obtain evaluation content of hospital operation stability based on the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
[0163] Optionally, the curvature calculation module 703 is specifically used for:
[0164] Determine whether the correlation value corresponding to each two hospital operation indicator data is greater than or equal to a preset threshold;
[0165] When the correlation values corresponding to two hospital operation index data are greater than or equal to a preset threshold, the curvature value of the connecting line between the two hospital operation index data is obtained according to the correlation values respectively corresponding to the two hospital operation index data that are greater than or equal to the preset threshold.
[0166] Optionally, the curvature calculation module 703 is specifically used for:
[0167] The curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold is obtained according to the following formula:
[0168]
[0169] Among them, FR(E(n,m)) is the curvature value of the connecting line between the nth hospital operation index data and the mth hospital operation index data, R mn is the correlation value between the mth hospital operation index data and the nth hospital operation index data corresponding to an initial time point, R nk is the correlation value between the nth hospital operation index data and the kth hospital operation index data corresponding to the initial time point, and R nk Greater than or equal to the preset threshold, R im is the correlation value between the mth hospital operation index data and the ith hospital operation index data corresponding to the initial time point, and R im Greater than or equal to the preset threshold.
[0170] Optionally, the curvature calculation module 703 is specifically used for:
[0171] The average value of the curvature value corresponding to each time series is obtained to obtain the curvature-related value corresponding to each initial time point.
[0172] Optionally, the evaluation module 704 is specifically used for:
[0173] Determine the sum of the curvature-related values corresponding to each initial time point in the current time period as the index value of the current time period;
[0174] Obtaining an index value of a time period before the current time period, wherein the index value of the time period before the current time period is the sum of curvature-related values corresponding to each initial time point of the time period before the current time period;
[0175] Determine the rate of change between the indicator value of the current time period and the indicator value of the time period before the current time period;
[0176] Based on the change rate and the preset fluctuation threshold, the evaluation content of the hospital operation stability is obtained.
[0177] Optionally, there are multiple preset fluctuation thresholds, and the evaluation module 704 is specifically used to:
[0178] By comparing the relationship between the rate of change and multiple preset fluctuation thresholds, the evaluation content of the hospital operation stability is obtained.
[0179] Optionally, the device further comprises:
[0180] A display module, used to display a graph corresponding to an initial time point, wherein the graph corresponding to the initial time point includes nodes and some or all of the connecting lines between the nodes, wherein the nodes are used to represent hospital operation indicator data, and the connecting lines are used to represent that the correlation value between the hospital operation indicator data represented by the nodes at both ends of the connecting line is greater than or equal to a preset threshold;
[0181] Optionally, the display module is further used to display a change graph of the curvature-related values, wherein the change graph of the curvature-related values includes the curvature-related values corresponding to each initial time point of the current time period, or the change graph of the curvature-related values includes the curvature-related values corresponding to each initial time point of the current time period and the previous time period of the current time period;
[0182] Optionally, the display module is also used to display evaluation content of hospital operation stability.
[0183] Optionally, the data acquisition module 701 is specifically used for:
[0184] Obtain various original hospital operation indicator data within the current time period;
[0185] Preprocessing is performed on a plurality of original hospital operation indicator data to obtain a plurality of hospital operation indicator data within a current time period, wherein the preprocessing includes at least one of data cleaning processing and data deduplication processing.
[0186] The principles and beneficial effects of the device provided in this embodiment are similar to those of the method provided in Embodiment 1, and are not described in detail here.
[0187] Embodiment three:
[0188] This embodiment provides a computer-readable storage medium, on which a program is stored. The program can be executed by a processor to implement any method in the first embodiment.
[0189] Those skilled in the art will appreciate that all or part of the functions of the various methods in the above-mentioned embodiments can be implemented by hardware or by computer programs. When all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can be stored in a computer-readable storage medium, and the storage medium can include: read-only memory, random access memory, disk, optical disk, hard disk, etc., and the program is executed by a computer to implement the above-mentioned functions. For example, the program is stored in the memory of the device, and when the program in the memory is executed by the processor, all or part of the above-mentioned functions can be implemented. In addition, when all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can also be stored in a storage medium such as a server, another computer, disk, optical disk, flash disk or mobile hard disk, and can be downloaded or copied and saved in the memory of the local device, or the system of the local device is updated, and when the program in the memory is executed by the processor, all or part of the functions in the above-mentioned embodiments can be implemented.
[0190] The above specific examples are used to illustrate the present application, which is only used to help understand the present application and is not intended to limit the present application. For technicians in the technical field to which the present application belongs, they can also make some simple deductions, deformations or substitutions based on the ideas of the present application.
Claims
1. A method for evaluating hospital operation status, characterized in that: include: Obtaining various hospital operation indicator data within a current time period, where the current time period includes K time points, where K is an integer greater than 1; Starting from the first time point among the K time points and ending at the K-s+1th time point among the K time points, each time point is used as an initial time point to determine a time series of s consecutive time points from the K time points, where K and s are both positive integers, and s is less than or equal to K; For each initial time point, determine the correlation value between each two hospital operation indicator data based on the two time series corresponding to each two hospital operation indicator data; Determine the curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold; wherein the curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold is obtained according to the following formula: Among them, FR(E(n,m)) is the curvature value of the connecting line between the nth hospital operation index data and the mth hospital operation index data, R mn is the correlation value between the mth hospital operation index data and the nth hospital operation index data corresponding to an initial time point, R nk is the correlation value between the nth hospital operation index data and the kth hospital operation index data corresponding to the initial time point, and R nk Greater than or equal to the preset threshold, R im is the correlation value between the mth hospital operation index data and the ith hospital operation index data corresponding to the initial time point, and R im Greater than or equal to a preset threshold; According to the curvature value corresponding to each time series, the curvature correlation value corresponding to each initial time point is determined; The evaluation content of the hospital operation stability is obtained according to the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
2. The method according to claim 1, wherein The step of determining the curvature value of the connecting line between the two hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold value includes: Determine whether the correlation value corresponding to each two hospital operation indicator data is greater than or equal to a preset threshold; When the correlation values corresponding to two hospital operation index data are greater than or equal to a preset threshold, the curvature value of the connecting line between the two hospital operation index data is obtained based on the correlation values greater than or equal to the preset threshold corresponding to the two hospital operation index data.
3. The method according to claim 1, wherein Determining the curvature-related value corresponding to each initial time point according to the curvature value corresponding to each time series includes: The average value of all curvature values corresponding to each time series at the initial time point is obtained to obtain the curvature-related value corresponding to each initial time point.
4. The method according to any one of claims 1 to 3, wherein The evaluation content of hospital operation stability is obtained based on the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period, including: Determining a sum of curvature-related values corresponding to each initial time point within the current time period as an index value for the current time period; Obtaining an index value of a time period previous to the current time period, wherein the index value of the time period previous to the current time period is a sum of curvature-related values corresponding to initial time points of the time period previous to the current time period; Determining a rate of change between the indicator value for the current time period and the indicator value for a time period immediately preceding the current time period; According to the change rate and the preset fluctuation threshold, the evaluation content of the hospital operation stability is obtained.
5. The method according to claim 4, wherein There are multiple preset fluctuation thresholds. The evaluation content of hospital operation stability obtained based on the change rate and the preset fluctuation thresholds includes: The relationship between the change rate and a plurality of preset fluctuation thresholds is compared to obtain evaluation content of the hospital operation stability.
6. The method according to any one of claims 1 to 3, wherein: The method further comprises: Displaying a graph corresponding to each initial time point, wherein the graph corresponding to each initial time point includes nodes and some or all connecting lines between the nodes, wherein the nodes are used to represent the hospital operation indicator data, and the connecting lines are used to indicate that the correlation value between the hospital operation indicator data represented by the nodes at both ends of the connecting line is greater than or equal to a preset threshold; Displaying a change graph of curvature-related values, wherein the change graph of curvature-related values includes curvature-related values corresponding to each initial time point of the current time period, or the change graph of curvature-related values includes curvature-related values corresponding to each initial time point of the current time period and a time period immediately preceding the current time period; Displays the evaluation content of the hospital's operational stability.
7. The method according to any one of claims 1 to 3, wherein: The acquisition of various hospital operation indicator data within the current time period includes: Obtain various original hospital operation indicator data within the current time period; The multiple original hospital operation indicator data are pre-processed to obtain multiple hospital operation indicator data within the current time period, wherein the pre-processing includes at least one of data cleaning processing and data deduplication processing.
8. A device for evaluating hospital operation status, characterized in that: include: A data acquisition module is used to obtain various hospital operation indicator data within a current time period, where the current time period includes K time points, where K is an integer greater than 1; A graph generation module is configured to determine, starting from the first of the K time points and ending at the K-s+1th time point among the K time points, a time series of s consecutive time points from the K time points, using each time point as an initial time point, wherein K and s are both positive integers and s is less than or equal to K; for each initial time point, determine a correlation value between each two hospital operation indicator data according to the two time series corresponding to each two hospital operation indicator data; The curvature calculation module is used to determine the curvature value of the connecting line between two types of hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold; and determine the curvature correlation value corresponding to each initial time point based on the curvature value corresponding to each time series. The curvature value of the connecting line between two types of hospital operation indicator data corresponding to the correlation value greater than or equal to the preset threshold is obtained according to the following formula: Among them, FR(E(n,m)) is the curvature value of the connecting line between the nth hospital operation index data and the mth hospital operation index data, R mn is the correlation value between the mth hospital operation index data and the nth hospital operation index data corresponding to an initial time point, R nk is the correlation value between the nth hospital operation index data and the kth hospital operation index data corresponding to the initial time point, and R nk Greater than or equal to the preset threshold, R im is the correlation value between the mth hospital operation index data and the ith hospital operation index data corresponding to the initial time point, and R im Greater than or equal to a preset threshold; The evaluation module is used to obtain evaluation content of hospital operation stability based on the curvature-related values corresponding to each initial time point in the current time period and the curvature-related values corresponding to each initial time point in the previous time period of the current time period.
9. A computer-readable storage medium, characterized in that The medium stores a program, which can be executed by a processor to implement the method according to any one of claims 1 to 7.
