Method and apparatus for transmitting / receiving uplink control information in a wireless communication system
By using high-level signaling in a 5G wireless communication system to process PUSCH configuration information, identify and process HARQ-ACK and CG-UCI, the problem of low transmission and reception efficiency of uplink control channels is solved, and channel utilization efficiency is improved.
Patent Information
- Application Number
- CN202080051317.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-09-27
- Filing Date
- 2020-09-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-09-28
AI Technical Summary
In 5G wireless communication systems, it is difficult for the prior art to efficiently transmit or receive uplink control channels, especially during channel access in the unlicensed frequency band, resulting in low channel utilization efficiency.
Receive or send authorization information about the physical uplink shared channel (PUSCH) configuration from the base station via high-level signaling, including authorization uplink control information indicating whether to multiplex the hybrid automatic retransmission request acknowledgement (HARQ-ACK) information and configuration authorization uplink control information (CG-UCI) indicator identifies the transmission or reception of HARQ-ACK information, and when the indicator indicates multiplexing of HARQ-ACK and CG-UCI, the uplink data and HARQ-ACK information and CG-UCI are used to identify the transmission or reception of HARQ-ACK information and CG-UCI. Send or receive on PUSCH.
The reception efficiency of uplink control information is improved and the utilization efficiency of channels in wireless communication systems is enhanced, especially during channel access in non-licensed bands.
Smart Images

Figure CN114128189B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a wireless communication system, and more particularly, to a method and apparatus for transmitting or receiving uplink control information using an unlicensed frequency band in a wireless communication system. Background Art
[0002] In order to meet the increasing demand for wireless data services since the deployment of the 4th generation (4G) communication system, efforts have been made to develop an improved 5th generation (5G) or quasi-5G communication system. Therefore, 5G or pre-5G communication systems are also referred to as "beyond 4G networks" or "post-long term evolution (LTE) systems". 5G communication systems are considered to be implemented in higher frequency millimeter wave (mmWave) bands (e.g., 60GHz bands), thereby achieving higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple input multiple output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technology are discussed in 5G communication systems. In addition, in 5G communication systems, development of system network improvements is being carried out based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communications, wireless backhaul, mobile networks, collaborative communications, coordinated multi-point (CoMP), receiving-end interference elimination, etc. In 5G systems, hybrid frequency shift keying (FSK) and quadrature amplitude modulation (QAM) (FQAM) and sliding window superposition coding (SWSC) have been developed as advanced coded modulation (ACM), and filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA) as advanced access technologies.
[0003] The Internet, a human-centric network of connections where humans generate and consume information, is now evolving into the Internet of Things (IoT), where distributed entities exchange and process information without human intervention. The Internet of Everything (IoE) has emerged, which is a combination of IoT technology and big data processing technology through connection with cloud servers. Since IoT implementation requires technical elements such as "sensing technology", "wired / wireless communication and network infrastructure", "service interface technology" and "security technology", sensor networks, machine-to-machine (M2M) communication, machine-type communication (MTC), etc. have been recently studied. Such IoT environments can provide smart Internet technology services that create new value for human life by collecting and analyzing data generated between connected things. IoT can be applied to a variety of fields, including smart homes, smart buildings, smart cities, smart cars or connected cars, smart grids, health care, smart appliances, and advanced medical services, through the integration and combination between existing information technology (IT) and various industrial applications.
[0004] Therefore, various attempts have been made to apply 5G communication systems to IoT networks. For example, technologies such as sensor networks, machine type communications (MTC), and machine to machine (M2M) communications can be implemented through beamforming, MIMO, and array antennas. By applying a cloud radio access network (RAN) as described above, big data processing technology can also be considered as an example of the convergence between 5G technology and IoT technology.
[0005] Research is ongoing on methods and devices for transmitting traffic by using unlicensed frequency bands in 5G communication systems.
[0006] The above information is presented only as background information to assist in understanding the present disclosure. No determination has been made, and no assertion is made, as to whether any of the above may be used as prior art for the present disclosure. Summary of the invention
[0007] Technical issues
[0008] The present disclosure relates to a method and apparatus for transmitting or receiving an uplink control channel in a wireless communication system.
[0009] Solution to the problem
[0010] An aspect of the present disclosure is to address at least the above-mentioned problems and / or disadvantages and to provide at least the advantages described below.Accordingly, an aspect of the present disclosure is to provide a method and apparatus for transmitting or receiving an uplink control channel in a wireless communication system.
[0011] Another aspect of the present disclosure is to provide a method performed by a terminal in a communication system, the method comprising receiving configuration information about the authorization configured for a physical uplink shared channel (PUSCH) from a base station through higher layer signaling, the configuration information comprising an indicator indicating whether to multiplex hybrid automatic repeat request acknowledgment (HARQ-ACK) information and configured authorization uplink control information (CG-UCI); identifying that the transmission of the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information; and, in a case where the indicator indicates multiplexing of the HARQ-ACK and CG-UCI, sending uplink data as well as the HARQ-ACK information and the CG-UCI to the base station on the PUSCH configured by the configuration information.
[0012] Another aspect of the present disclosure is to provide a method performed by a base station in a communication system, the method comprising sending configuration information about the authorization configured for a physical uplink shared channel (PUSCH) to a terminal through high-layer signaling, the configuration information comprising an indicator indicating whether to multiplex hybrid automatic repeat request acknowledgment (HARQ-ACK) information and configured authorization uplink control information (CG-UCI); identifying that the reception of the HARQ-ACK information overlaps with the PUSCH reception configured by the configuration information; and receiving uplink data as well as the HARQ-ACK information and the CG-UCI from the terminal on the PUSCH configured by the configuration information when the indicator indicates multiplexing of the HARQ-ACK and CG-UCI.
[0013] Another aspect of the present disclosure is to provide a terminal in a communication system, which includes a transceiver; and a processor, which is coupled to the transceiver and configured to: receive configuration information about the authorization configured for a physical uplink shared channel (PUSCH) from a base station through high-layer signaling, the configuration information including an indicator indicating whether to multiplex hybrid automatic repeat request acknowledgment (HARQ-ACK) information and configured authorization uplink control information (CG-UCI); identify that the transmission of HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information; and, in a case where the indicator indicates multiplexing of HARQ-ACK and CG-UCI, send uplink data as well as the HARQ-ACK information and CG-UCI to the base station on the PUSCH configured by the configuration information.
[0014] Another aspect of the present disclosure is to provide a base station in a communication system, the base station including a transceiver; and a processor, which is coupled to the transceiver and configured to: send configuration information about the authorization configured for a physical uplink shared channel (PUSCH) to a terminal through high-layer signaling, the configuration information including an indicator indicating whether to multiplex hybrid automatic repeat request acknowledgment (HARQ-ACK) information and configured authorization uplink control information (CG-UCI); identify that the reception of HARQ-ACK information overlaps with the PUSCH reception configured by the configuration information; and, in a case where the indicator indicates multiplexing of HARQ-ACK and CG-UCI, receive uplink data as well as the HARQ-ACK information and the CG-UCI from the terminal on the PUSCH configured by the configuration information.
[0015] Additional aspects will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the presented embodiments.
[0016] Advantageous Effects of the Invention
[0017] According to one aspect of the present disclosure, in a wireless communication system, in a system and node receiving a downlink signal or a system and node sending a downlink signal, the reception efficiency of uplink control information can be improved via a method for including uplink control information in an uplink data channel.
[0018] Other aspects, advantages, and salient features of the disclosure will become apparent to those skilled in the art from the following detailed description, which, taken in conjunction with the annexed drawings, discloses various embodiments of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The above and other aspects, features and advantages of certain embodiments of the present disclosure will become more apparent through the following description in conjunction with the accompanying drawings, in which:
[0020] Figure 1 is a diagram showing an uplink / downlink time-frequency domain transmission structure in a New Radio (NR) system according to an embodiment of the present disclosure;
[0021] Figure 2 is a diagram illustrating a channel access process in an unlicensed band according to an embodiment of the present disclosure;
[0022] Figure 3 is a diagram showing a resource region and a downlink / uplink scheduling method in an NR system according to an embodiment of the present disclosure;
[0023] Figure 4 is a diagram showing an example of a control region configuration for a downlink control channel in NR according to an embodiment of the present disclosure;
[0024] Figure 5 is a diagram showing the structure of a downlink control channel in NR according to an embodiment of the present disclosure;
[0025] Figure 6 is a diagram showing an example of transmitting an uplink signal without uplink scheduling information in NR according to an embodiment of the present disclosure;
[0026] Figure 7 is a diagram showing an example of multiplexing uplink control information into an uplink data channel in NR according to an embodiment of the present disclosure;
[0027] Figure 8 is a diagram showing an example of generating uplink control information according to an embodiment of the present disclosure;
[0028] Figure 9a is a diagram illustrating an example of jointly encoding uplink control information according to an embodiment of the present disclosure;
[0029] Figure 9bis a diagram showing another example of jointly encoding uplink control information according to an embodiment of the present disclosure;
[0030] Fig.10 is a diagram showing an example of a Grant (CG)-Uplink Control Information (UCI) mapping configuration according to an embodiment of the present disclosure;
[0031] Fig.11 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0032] Fig.12 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0033] Fig.13 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0034] Fig.14 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0035] Fig.15 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0036] Fig.16 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure;
[0037] Fig.17 is a diagram showing an example of mapping UCI according to an embodiment of the present disclosure;
[0038] Fig.18 is a flow chart illustrating the operation of a base station according to an embodiment of the present disclosure;
[0039] Fig.19 is a flow chart illustrating the operation of a user equipment (UE) according to an embodiment of the present disclosure;
[0040] Fig. 20 is a block diagram showing the structure of a base station according to an embodiment of the present disclosure; and
[0041] Fig.21 is a block diagram showing the structure of a UE according to an embodiment of the present disclosure.
[0042] Throughout the drawings, it should be noted that like reference numbers are used to depict the same or similar elements, features, and structures. DETAILED DESCRIPTION
[0043] The following description is provided with reference to the accompanying drawings to assist in a comprehensive understanding of the various embodiments of the present disclosure as defined by the claims and their equivalents. The following description includes various specific details that are helpful for understanding, but these should be considered as exemplary only. Therefore, it will be appreciated by those of ordinary skill in the art that various changes and modifications may be made to the various embodiments described herein without departing from the scope and spirit of the present disclosure. In addition, for the sake of clarity and brevity, descriptions of well-known functions and configurations may be omitted.
[0044] The terms and words used in the following description and claims are not limited to the bibliographical meanings, but are merely used by the inventor to enable a clear and consistent understanding of the present disclosure. Therefore, it will be apparent to those skilled in the art that the following description of various embodiments of the present disclosure is provided for illustration purposes only and not for the purpose of limiting the present disclosure as defined by the appended claims and their equivalents.
[0045] It should be understood that the singular forms "a," "an," and "the" include plural referents unless the context clearly dictates otherwise. Thus, for example, reference to "a component surface" includes reference to one or more of such surfaces.
[0046] By referring to the embodiments described in detail below in conjunction with the accompanying drawings, the advantages and features of the present disclosure and the methods for achieving them will become apparent. However, the present disclosure is not limited to the embodiments set forth below, but can be implemented in various different forms. The following embodiments are provided only to fully disclose the present disclosure and inform those skilled in the art of the scope of the present disclosure, and the present disclosure is limited only by the scope of the attached claims. Throughout the entire specification, the same or similar reference numerals represent the same or similar elements.
[0047] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.
[0048] In the process of describing the embodiments of the present disclosure, descriptions related to technical contents well-known in the art and not directly related to the present disclosure will be omitted. Such unnecessary descriptions are omitted to prevent the main idea of the present disclosure from being obscured and to convey the main idea more clearly.
[0049] For the same reason, in the accompanying drawings, some elements may be exaggerated, omitted or schematically shown. In addition, the size of each element does not fully reflect the actual size. In the accompanying drawings, the same or corresponding elements have the same reference numerals.
[0050] By referring to the embodiments described in detail below in conjunction with the accompanying drawings, the advantages and features of the present disclosure and the methods for achieving them will become apparent. However, the present disclosure is not limited to the embodiments set forth below, but can be implemented in various different forms. The following embodiments are provided only to fully disclose the present disclosure and inform those skilled in the art of the scope of the present disclosure, and the present disclosure is limited only by the scope of the attached claims. Throughout the entire specification, the same or similar reference numerals represent the same or similar elements.
[0051] Here, it will be understood that each frame of the flowchart diagram and the frame combination in the flowchart diagram can be implemented by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device create a device for implementing the functions specified in one or more flowchart frames. These computer program instructions can also be stored in a computer-available or computer-readable memory, and the memory can instruct the computer or other programmable data processing device to operate in a particular manner, so that the instructions stored in the computer-available or computer-readable memory produce an article including an instruction device, and the instruction device implements the functions specified in one or more flowchart frames. The computer program instructions can also be loaded onto a computer or other programmable data processing device to cause a series of operations to be performed on the computer or other programmable device, thereby generating a computer-implemented process, so that the instructions executed on the computer or other programmable device provide operations for implementing the functions specified in one or more flowchart frames.
[0052] In addition, each frame of the flowchart diagram can represent a module, a code segment or a code portion, which includes one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions mentioned in the frame may not occur in order. For example, the two frames shown in succession can in fact be performed substantially simultaneously, or the frame can sometimes be performed in reverse order, depending on the functions involved.
[0053] As used herein, "unit" refers to a software element or hardware element that performs a predetermined function, such as a field programmable gate array (FPGA) or an application specific integrated circuit (ASIC). However, "unit" does not always have a meaning limited to software or hardware. "Unit" can be constructed to be stored in an addressable storage medium or to execute one or more processors. Therefore, "unit" includes (for example) software elements, object-oriented software elements, class elements or task elements, processes, functions, attributes, programs, subroutines, program code fragments, drivers, firmware, microcodes, circuits, data, databases, data structures, tables, arrays and parameters. The elements and functions provided by "unit" can be combined into a smaller number of elements or "units", or divided into a larger number of elements or "units". In addition, elements and "units" can be implemented as one or more central processing units (CPUs) in a reproduction device or a secure multimedia card. In addition, "unit" in an embodiment can include one or more processors.
[0054] It is believed that more services are supported in the 5G system compared to the existing 4G system. For example, the most representative services may include enhanced mobile broadband (eMBB) communication services, ultra-reliable low-latency communication (URLLC) services, massive device-to-device communication (massive machine type communication (mMTC)) services, and next-generation broadcast services (evolved multimedia broadcast / multicast services (eMBMS)). A system that provides URLLC services may be referred to as a URLLC system, and a system that provides eMBB services may be referred to as an eMBB system. The terms "service" and "system" may be used interchangeably.
[0055] As described above, multiple services can be provided to users in a communication system. In order to provide multiple services to users, a method capable of providing each service to users according to characteristics within the same time interval and a device using the method are required.
[0056] In the case of 5G communication systems, various technologies such as retransmission in units of code block groups and uplink signal transmission without uplink scheduling information have been introduced to provide a variety of services and support high data rates. Therefore, when a communication device is to perform 5G communication via an unlicensed band, a more efficient channel access process taking into account various parameters is required.
[0057] Wireless communication systems have abandoned the original provision of voice-oriented services and have developed toward broadband wireless communication systems that provide high-speed and high-quality packet data services, such as communication standards such as 3rd Generation Partnership Project (3GPP) High Speed Packet Access (HSPA), Long Term Evolution (LTE) or Evolved Universal Terrestrial Radio Access (E-UTRA), Advanced LTE (LTE-A), 3GPP2 High Rate Packet Data (HRPD), Ultra Mobile Broadband (UMB), Institute of Electrical and Electronics Engineers (IEEE) 802.16e, etc. In addition, the communication standard of 5G or New Radio (NR) is generated on the basis of the fifth generation wireless communication system.
[0058] Therefore, in a wireless communication system including 5G, at least one of enhanced mobile broadband (eMBB), massive machine type communication (mMTC), and ultra-reliable low latency communication (URLLC) can be provided to the terminal. These services can be provided to the same terminal during the same time interval. eMBB can be a service for high-speed transmission of high-capacity data, mMTC can be a service for minimizing terminal power and accessing multiple terminals, and URLLC can be a service for high reliability and low latency. However, eMBB, mMTC, and URLLC are not limited to this. These three services can be the main scenarios in an LTE system or a system other than LTE such as 5G / new radio or next radio (NR).
[0059] When the base station schedules data corresponding to the eMBB service to a specific terminal within a specific transmission time interval (TTI), if a situation occurs in which URLLC data should be sent in the TTI, the generated URLLC data can be sent in the frequency domain where the eMBB data has been scheduled and sent, instead of sending part of the eMBB data in the frequency domain. The UE for which eMBB has been scheduled and the UE for which URLLC has been scheduled can be the same UE or different UEs. In this case, since the part of the eMBB data that has been scheduled and is being sent is not sent, the possibility of eMBB data being damaged increases. Therefore, in the above case, it is necessary to determine a signal processing method and a method for processing signals received from a UE for which eMBB has been scheduled or a UE for which URLLC has been scheduled.
[0060] Hereinafter, embodiments will be described in detail with reference to the accompanying drawings. In the description of the present disclosure, when it is determined that the detailed description of the relevant function or configuration will unnecessarily obscure the subject matter of the present disclosure, its detailed description will be omitted. The terms described below are defined in consideration of the functions in the present disclosure and may vary according to the intention or use of the user or operator. Therefore, it should be defined based on the content of the entire specification.
[0061] In the following, the base station is a subject that performs resource allocation to the terminal, and may include at least one of an evolved node B (eNodeB), a node B, a base station (BS), a radio access unit, a base station controller, or a node on a network. The terminal may include a user equipment (UE), a mobile station (MS), a cellular phone, a smart phone, a computer, or a multimedia system capable of performing a communication function. In the present disclosure, a downlink (DL) is a wireless transmission path for a signal sent from a base station to a terminal, and an uplink (UL) refers to a wireless transmission path for a signal sent from a terminal to a base station. Although the following is described with an LTE or LTE-A system as an example, the embodiment may also be applied to other communication systems with similar technical backgrounds or channel forms. For example, the fifth generation mobile communication technology (5G and new radio (NR)) developed after LTE-A may be included therein. In addition, according to the determination of those skilled in the art, without departing from the scope of the present disclosure, the embodiment may also be applied to other communication systems through partial modification.
[0062] As a representative example of a broadband wireless communication system, the NR system adopts an orthogonal frequency division multiplexing (OFDM) scheme in the downlink (DL), and adopts OFDM and single carrier frequency division multiple access (SC-FDMA) schemes in the uplink (UL). The uplink refers to the radio link via which a terminal (or user equipment (UE)) or a mobile station (MS) sends data or a control signal to a base station (BS or eNode B), and the downlink refers to the radio link via which a base station sends data or a control signal to a terminal. In this multiple access scheme, the data or control information of each user can generally be distinguished by allocating and operating the time-frequency resources for sending the data or control information of each user so as not to overlap with each other, that is, to establish orthogonality.
[0063] The NR system adopts a hybrid automatic repeat request (HARQ) scheme, in which the corresponding data is retransmitted in the physical layer when a decoding failure occurs in the initial transmission. In the HARQ scheme, when the receiver fails to correctly decode the data, the receiver sends a negative acknowledgement (NACK), thereby notifying the transmitter of the decoding failure by the receiver so that the transmitter can retransmit the data in the physical layer. The receiver improves the data reception performance by combining the data retransmitted by the transmitter with the data that failed to be decoded previously. In addition, when the receiver correctly decodes the data, the receiver can send information indicating successful decoding (acknowledgement (ACK)) to the transmitter to allow the transmitter to send new data.
[0064] Figure 1 2 is a diagram showing a basic structure of a time-frequency domain according to an embodiment of the present disclosure, where the time-frequency domain is a radio resource region for sending data or control channels in a downlink or uplink of an NR system or a similar system.
[0065] refer to Figure 1 , the horizontal axis represents the time domain, and the vertical axis represents the frequency domain. The minimum transmission unit in the time domain is an OFDM or discrete Fourier transform (DFT)-spread (s)-OFDM symbol, and N 符号 A number of OFDM or DFT-s-OFDM symbols 101 are aggregated to form a time slot 102. OFDM symbols are symbols used when sending or receiving signals using an OFDM multiplexing scheme, and DFT-s-OFDM symbols represent symbols used when sending or receiving signals using DFT-s-OFDM or SC-FDMA multiplexing. Hereinafter, in the present disclosure, for ease of explanation, OFDM symbols and DFT-s-OFDM symbols are collectively referred to as OFDM symbols without distinction, and an explanation will be provided based on downlink signal transmission / reception. However, this use can also be applied to uplink signal transmission and reception.
[0066] If the interval between subcarriers is 15kHz, one time slot is taken to form one subframe 103, and the length of each of the time slot and the subframe is 1ms. The number of time slots constituting one subframe 103 and the length of the time slot may vary according to the interval between subcarriers. For example, when the interval between subcarriers is 30kHz, two time slots may be aggregated to form one subframe 103. The length of the time slot is 0.5ms, and the length of the subframe is 1ms. The radio frame 104 is a time domain segment including 10 subframes. The minimum transmission unit in the frequency domain is a subcarrier, and the bandwidth of the entire system transmission bandwidth may include a total of N BW 105 number of subcarriers. Such a specific value may be applied variably. For example, in the case of the LTE system, the interval between subcarriers is 15kHz, but two time slots are aggregated to form one subframe 103, wherein the length of the time slot is 0.5ms and the length of the subframe is 1ms.
[0067] The basic unit of resources in the time-frequency domain is a resource element (RE) 106, which can be represented by an OFDM symbol index and a subcarrier index. A resource block 107 (RB or physical resource block (PRB)) can be represented by N in the time domain. 符号 101 consecutive OFDM symbols and N in the frequency domain SC RB Therefore, one RB 107 in one time slot may include N 符号 XN SC RB Usually, the minimum allocation unit of data in the frequency domain is RB 107. In the NR system, usually N 符号 =14 and N SC RB =12, where the number of RBs (NRB ) can vary according to the bandwidth of the system transmission band. In the LTE system, usually N 符号 =7 and N SC RB =12, and N RB Can vary depending on the bandwidth of the system transmission band.
[0068] In a wireless communication system such as an LTE system, an Advanced LTE (LTE-A) system, or a 5G New Radio (NR) system, the system may be configured such that a base station transmits downlink control information (DCI) including resource allocation information for transmission of a downlink signal, the information is transmitted by the base station to a UE via a downlink control channel (physical downlink control channel (PDCCH)), and the UE receives at least one downlink signal of the downlink control information (e.g., channel state information reference signal (CSI-RS)), a broadcast channel (physical broadcast channel (PBCH), or a downlink data channel (physical downlink shared channel (PDSCH)). For example, the base station may transmit downlink control information (DCI) indicating reception of a PDSCH in subframe n to the UE via the PDCCH in subframe n, and the UE having received the downlink control information (DCI) may receive the PDSCH in subframe n according to the received downlink control information.
[0069] The LTE, LTE-A or NR system may be configured such that the base station transmits downlink control information (DCI) including uplink resource allocation information to the UE via a downlink control channel (PDCCH), and the UE transmits uplink control information (e.g., sounding reference signal (SRS), uplink control information (UCI) or physical random access channel (PRACH)) or at least one uplink signal of an uplink data channel (physical uplink shared channel (PUSCH)) to the base station. For example, a UE that receives configuration information (or uplink DCI or UL grant) for uplink transmission from a base station via PDCCH in subframe n may perform uplink data channel transmission (hereinafter referred to as PUSCH transmission) according to a predefined time (e.g., n+4), a time configured via a higher layer signal (e.g., n+k), or uplink signal transmission time indicator information (e.g., n+k) included in the configuration information for uplink transmission.
[0070] Downlink control information may be transmitted in the first N number of OFDM symbols in a subframe. In general, N may be {1, 2, and 3}, and the UE may receive a configured number of symbols from the base station in which the downlink control information may be transmitted via higher signals. Depending on the amount of control information to be sent in the current time slot, the base station may change the number of symbols in which downlink control information may be transmitted in the time slot for each time slot, and may communicate information about the number of symbols to the UE via a separate downlink control channel.
[0071] In the NR or LTE system, DCI is defined according to various formats, and it can be determined according to each format whether DCI is scheduling information (UL grant) for uplink data or scheduling information (DL grant) for downlink data, whether DCI is compact DCI with small-size control information, whether control information of DCI indicates fallback DCI, whether spatial multiplexing using multiple antennas is applied, or whether DCI corresponds to DCI for power control. For example, a DCI format corresponding to scheduling control information (DL grant) for downlink data (e.g., DCI format 1_0 of NR) may include at least one of the following control information.
[0072] - Control Information Identifier (DCI Format Identifier): An identifier used to identify the format of the received DCI
[0073] - Frequency resource allocation (frequency domain resource allocation): indicates the RBs allocated for data transmission
[0074] -Time domain resource allocation (TDR): indicates the time slots and symbols allocated for data transmission
[0075] - Virtual Resource Block (VRB) to PRB mapping: Indicates whether the VRB mapping scheme is applied
[0076] Modulation and Coding Scheme (MCS): Indicates the modulation scheme used for data transmission and the size of the transport block as data to be sent
[0077] - New data indicator: indicates whether the transmission is a HARQ initial transmission or a retransmission
[0078] - Redundancy version: indicates the redundancy version of HARQ
[0079] -HARQ process number: indicates the HARQ process number
[0080] -PDSCH allocation information (downlink assignment index): indicates to the UE the number of PDSCH reception results to be reported to the base station (e.g. the number of HARQ-ACKs)
[0081] - Transmission Power Control (TPC) Command for Physical Uplink Control Channel (PUCCH): Indicates the transmission power control command for PUCCH as an uplink control channel
[0082] -PUCCH resource indicator: indicates the PUCCH resource used for HARQ-ACK reporting, which includes the reception result of the PDSCH based on the corresponding DCI configuration
[0083] -PUCCH transmission timing indicator (PDSCH-to-HARQ_feedback timing indicator): Information indicating the time slot or symbol in which the PUCCH for the HARQ-ACK report should be transmitted. The HARQ-ACK report includes the reception result for the PDSCH based on the corresponding DCI configuration.
[0084] DCI may be transmitted on a physical downlink control channel (PDCCH) (or control information, hereinafter used interchangeably) or an enhanced PDCCH (EPDCCH) (or enhanced control information, hereinafter used interchangeably) which is a downlink physical control channel through a channel coding and modulation process.
[0085] In general, the DCI is independently scrambled using a specific radio network temporary identifier (RNTI) (or terminal identifier, C-RNTI) for each terminal, has a cyclic redundancy check (CRC) added to it, is channel-coded, and is then configured as each independent PDCCH for transmission. In the time domain, the PDCCH is mapped and transmitted in the control channel transmission period. The mapping position of the PDCCH in the frequency domain can be determined by the identifier (ID) of each UE and can be transmitted over the entire system transmission band.
[0086] Downlink data may be transmitted on a physical downlink shared channel (PDSCH), which is a physical channel for downlink data transmission. The PDSCH may be transmitted after a control channel transmission period, and scheduling information such as a specific mapping position, a modulation scheme, etc. in the frequency domain may be determined based on the DCI transmitted via the PDCCH.
[0087] The base station notifies the UE of the modulation scheme applied to the PDSCH to be transmitted and the size of the data to be transmitted (transport block size, TBS) via the MCS in the control information constituting the DCI. The MCS may include 5 bits or more, or less than 5 bits. The TBS corresponds to the size of a data transmission block (TB) to be transmitted by the base station before channel coding for error correction is applied to the TB.
[0088] The modulation schemes supported by the NR system include quadrature phase shift keying (QPSK), 16-quadrature amplitude modulation (QAM), 64QAM, and 256QAM, which correspond to modulation orders (Q m ). That is, for QPSK modulation, it is 2 bits per symbol, for 16QAM modulation, it is 4 bits per symbol, for 64QAM modulation, it is 6 bits per symbol, and for 256QAM modulation, it is 8 bits per symbol. In addition, according to system modification, a modulation scheme of 256QAM or greater can be used.
[0089] In the NR system, the downlink / uplink HARQ adopts an asynchronous HARQ scheme in which the data retransmission time is not fixed. For example, in the case of the downlink, when HARQ NACK feedback of the initial transmission data sent by the base station is received from the UE, the base station freely determines the transmission time of the retransmitted data through the scheduling operation. The UE can cache the data determined to be erroneous based on the result of decoding the received data for the HARQ operation, and then the cached data can be combined with the data retransmitted from the base station. The HARQ ACK / NACK information of the PDSCH sent in subframe nk can be sent from the UE to the base station via the PUCCH or PUSCH in subframe n.
[0090] In the case of a 5G communication system (such as NR), the value k may be included in the DCI for indicating or scheduling the reception of the PDSCH sent in subframe nk to send the value k, or the k value may be configured for the UE via high-level signaling. The base station may configure one or more k values via a higher signal and may be able to indicate a specific k value based on the DCI. The value k may be determined based on the HARQ-ACK processing capability of the UE, i.e., the shortest time required for the UE to receive the PDSCH and generate and report the HARQ-ACK for the PDSCH. Before the value of k is configured, the UE may use a default value or a predefined value as the value of k.
[0091] A description has been provided based on the NR system to describe the wireless communication system, method, and device proposed in the embodiments of the present disclosure. However, the content of the present disclosure is not limited to the NR system and can be applied to various radio communication systems such as LTE, LTE-A, LTE-A-Pro, and 5G. The content of the present disclosure describes a system and a device for sending or receiving a signal by using an unlicensed band, but the present disclosure can be applied to a system operating in a licensed band.
[0092] Hereinafter, in the present disclosure, a high-layer signaling or higher signal may correspond to a method for transmitting a signal from a base station to a UE by using a downlink data channel of a physical layer or a method for transmitting a signal from a UE to a base station by using an uplink data channel of a physical layer, wherein the method includes at least one of a radio resource control (RRC) signaling, a packet data convergence protocol (PDCP) signaling, or a method for transmitting a signal via a medium access control (MAC) control element (MAC CE). The high-layer signaling or higher signal may include system information, for example, a system information block (SIB), which is sent to multiple UEs in common.
[0093] In the case of a system that performs communication in an unlicensed band, a transmission device (base station or UE) that is to transmit a signal via the unlicensed band may perform a channel access procedure (or listen before talk (LBT)) with respect to the unlicensed band, in which communication is to be performed before transmitting a signal, and in the case of determining that the unlicensed band is idle, the transmission device may access the unlicensed band according to the channel access procedure and perform signal transmission. If it is confirmed that the unlicensed band is not idle according to the performed channel access procedure, the transmission device may not be able to perform signal transmission.
[0094] The channel access process in an unlicensed band may generally include: measuring, by a transmitting device, the strength of a signal received via the unlicensed band at a fixed time or time period calculated according to a predetermined rule (for example, a time calculated based on at least one random value selected by a base station or UE); and comparing the measured strength of the received signal with a predetermined threshold or a threshold calculated according to a function to determine the scale of the received signal strength (configured by at least one parameter of the channel bandwidth or signal bandwidth through which the signal to be transmitted is transmitted) and / or the scale of the intensity of the transmission power, thereby determining the idle state of the unlicensed band.
[0095] For example, the transmission device may measure the strength of the signal during Xus (e.g., 25us) immediately before the time when the signal is to be transmitted, and if the measured strength of the signal has a value less than a predefined or calculated threshold value T (e.g., -72dBm), the transmission device may determine that the unlicensed band is in an idle state and may transmit the configured signal. After the channel access process, the maximum time available for continuous signal transmission may be limited according to the maximum channel occupancy time defined for each country, region, and band according to each unlicensed band, and may also be limited according to the transmission device type (e.g., base station or UE, or master device or slave device). For example, in the case of Japan, in the unlicensed band of 5 GHz, relative to the unlicensed band determined to be in an idle state, the base station or UE may perform a channel access process, and may then occupy the channel for up to 4ms and transmit the signal without performing an additional channel access process.
[0096] When a base station or UE transmits a downlink or uplink signal in an unlicensed band, the channel access procedures that the base station or UE can perform can be classified into at least the following types:
[0097] - Type 1: Uplink / downlink signal transmission after a variable time period of channel access procedure
[0098] - Type 2: Uplink / downlink signal transmission after a fixed period of channel access
[0099] - Type 3: Uplink or downlink signal transmission without channel access procedure
[0100] Hereinafter, in the present disclosure, explanation will be provided using both the case where the base station sends a downlink signal to the UE via an unlicensed band and the case where the UE sends an uplink signal to the base station via an unlicensed band. However, the contents proposed in the present disclosure may also be applied in the same manner to the case where the UE sends an uplink signal to the base station via an unlicensed band, or the case where the base station sends a downlink signal to the UE via an unlicensed band, or may be partially modified and applied. Therefore, a detailed description of the sending or receiving of the downlink signal will be omitted. In the present disclosure, it is assumed that a downlink data message (codeword or TB) or uplink data message is sent or received between the base station and the UE. The contents proposed in the present disclosure may also be applied to the case where the base station sends a downlink signal to multiple UEs, or the case where multiple codewords or TBs are sent or received between the base station and the UE.
[0101] A transmission node (hereinafter referred to as a base station or UE) that will send a signal via an unlicensed band may determine a scheme for a channel access procedure according to the type of signal to be sent. For example, when a base station is to send a downlink signal including a downlink data channel via an unlicensed band, the base station may perform a channel access procedure of type 1. When a base station is to send a downlink signal that does not include a downlink data channel via an unlicensed band, such as when the base station is to send a synchronization signal or a downlink control channel, the base station may perform a channel access procedure of type 2 and send a downlink signal.
[0102] In this case, the scheme of the channel access process can be determined according to the transmission length of the signal to be sent via the unlicensed band or the length of the interval or time used to occupy the unlicensed band. Generally, in the type 1 scheme, the channel access process can be performed for a longer time than the channel access process performed in the type 2 scheme. Therefore, when the transmitting node is to send a signal within a short time interval or a time period equal to or less than the reference time (e.g., X ms or Y symbols), the type 2 channel access process can be performed. On the other hand, when the transmitting node is to send a signal within a longer time interval or a time period equal to or longer than the reference time (e.g., X ms or Y symbols), the type 1 channel access process can be performed. In other words, channel access processes of different schemes can be performed according to the usage time of the unlicensed band.
[0103] If the transmission node performs a channel access procedure of type 1 according to at least one of the described standards, the transmission node may determine a channel access priority level according to a service quality level identifier (QCI) of a signal to be transmitted via an unlicensed band, and may perform the channel access procedure by using at least one of the predefined values shown in Table 1 regarding the determined channel access priority level. For example, QCI 1, 2, and 4 refer to QCI values for services such as conversational voice, conversational video (real-time streaming), and non-conversational video (buffered streaming), respectively. When the transmission node is to transmit a signal of a service that does not match the QCI in Table 1 to an unlicensed band, the transmission node may select a service and QCI that are closest to the QCI in Table 1, and may select a channel access priority level for it.
[0104] Table 1 shows the mapping relationship between channel access priority levels and QCIs.
[0105] [Table 1]
[0106] Channel access priority QCI 1 1、3、5、65、66、69、70 2 2、7 3 4、6、8、9 4 -
[0107] For example, the delay duration, contention window value or size set (CW ) may be determined based on Table 2 according to the determined channel access priority (p). p ), the minimum and maximum values of the contention window (CW 最小,p , CW 最大,p ), the maximum channel occupancy available period (T mcot,p ) etc. In other words, the base station that wants to send a downlink signal via the unlicensed band must f +m p *T sl If the base station wants to perform a channel access procedure with a channel access priority level of 3 (p=3), it uses m p=3 to configure the delay duration required to perform the channel access process (T f +m p *T sl ). If it is determined that the unlicensed band is in all m p *T sl If both channels are idle, then N=N-1 may be true. At the time point when the channel access process is performed, N may be selected to be 0 and the value of the contention window (CW p ). In the case where the channel access priority level is 3, the minimum contention window value and the maximum contention window value are 15 and 63, respectively. If it is determined that the unlicensed band is idle during the delay duration and the duration of performing the additional channel access procedure, the base station may mcot,p The signal is transmitted via the unlicensed band within the time period (8 ms).
[0108] Table 2 is a table showing the channel access priority levels in the downlink. In the present disclosure, for the convenience of description, the description will be provided using the downlink channel access priority levels. However, in the case of the uplink, the channel access priority levels of Table 2 may be reused, or the channel access priority levels for uplink transmission may be defined and used.
[0109] [Table 2]
[0110]
[0111] Initial contention window value (CW p ) is the minimum value of the contention window (CW 最小,p ). The base station with the selected value N can sl The channel access process is performed in the interval T sl When the unlicensed band is determined to be idle during the channel access process performed in the unlicensed band, the value is changed so that N = N-1, and when N = 0, it can be used for up to T mcot,p The signal is transmitted via the unlicensed band during the period of time. sl If it is determined through the channel access procedure that the unlicensed band is not idle at the time, the base station can perform the channel access procedure again without changing the value N.
[0112] At the time point when the base station initiates the channel access procedure, at the time point when the base station selects the value N to perform the channel connection procedure, or shortly before that, the value of the contention window (CW p) can be changed based on the reception result of the downlink data channel transmitted in the reference time slot or reference subframe in the most recent transmission cycle (or MCOT) in which the downlink signal has been transmitted via the unlicensed band. In other words, the base station can receive a report on the reception result of the downlink data transmitted in the reference subframe or reference time slot by the UE, and can increase or minimize the CW according to the NACK ratio (Z) in the received reception result. p size.
[0113] Figure 2 is a diagram illustrating a channel access process in an unlicensed band according to an embodiment of the present disclosure.
[0114] refer to Figure 2 , at the time point 202 when the base station initiates the channel access procedure, at the time point when the base station selects the value N 222 to perform the channel access procedure, or shortly before that, the first transmission cycle 240 of the most recent transmission cycle 230 in which the downlink signal has been transmitted by the unlicensed band becomes the contention window change reference time slot for the channel access procedure 270. If the base station cannot receive a report of a reception result of a downlink data channel transmitted in the first time slot 240 (hereinafter referred to as a time slot or subframe) of the transmission cycle 230 (for example, if the time interval between the first subframe and the time point 202 when the base station initiates the channel access procedure is equal to or less than n time slot subframes, in other words, if the base station initiates the channel access procedure before the time when the UE can report the reception result of the downlink data channel with respect to the first subframe 240), the first subframe of the most recent transmission cycle in which the downlink signal has been transmitted before the downlink signal transmission cycle 230 becomes the reference subframe.
[0115] In other words, if the base station cannot receive the reception result of the downlink data transmitted in the reference subframe 240 from the UE at the time point 202 when the base station initiates the channel access procedure, at the time point when the value N is selected, or shortly before that, the base station can determine the first subframe of the most recent transmission cycle in which the downlink signal has been transmitted as the reference subframe from the reception result of the downlink data channel received from the UE. The base station can determine the size of the contention window for the channel access procedure 270 by using the downlink data reception result received from the UE regarding the downlink data transmitted via the downlink data channel in the reference subframe.
[0116] For example, if, in a downlink signal transmitted via an unlicensed frequency band, a reception result of 80% or more of the UEs is determined as NACK with respect to downlink data transmitted to the UE via a downlink data channel in a first subframe, the UE has been cleared through a channel access procedure (e.g., CW) according to a channel access priority level 3 (p=3). p=15) The base station sending the downlink signal can change the contention window from the default value (CW p =15) increases to the next contention window value (CW p =31).
[0117] If it is not determined that 80% or more of the reception results are NACK, the base station may maintain the existing value as the value of the contention window, or may change the value of the contention window to a default value. In this case, the change of the contention window may be applied to all channel access priority levels in common, or may be applied only to the channel access priority level used for the channel access process. A method for determining that a reception result is valid from a reception result of downlink data sent by a UE or reported to a base station regarding downlink data sent via a downlink data channel in a reference subframe or a reference time slot (i.e., a method for determining a value Z) is as follows, which determines a change in the size of the contention window.
[0118] If the base station sends one or more codewords or TBs to one or more UEs in a reference subframe or reference time slot, the base station may determine a value Z based on a ratio of NACKs in the reception results of the TBs received in the reference subframe or reference time slot, which is sent or reported by the UE. For example, when two codewords and two TBs are sent to one UE in a reference subframe or reference time slot, the UE may send or report the reception results of the downlink data signals of the two TBs to the base station. If the ratio of NACKs in the two reception results (Z) is equal to or greater than a threshold value (e.g., Z=80%) predefined or configured between the base station and the UE, the base station may change or increase the size of the contention window.
[0119] If the UE bundles the reception results of downlink data of one or more subframes (e.g., M subframes) containing the reference subframe or time slot, and transmits or reports the bundled reception results to the base station, the base station can determine that the UE has transmitted the M reception results. Further, the base station can determine the value Z based on the ratio of NACKs among the received M results, and can change, maintain, or initialize the size of the contention window.
[0120] If the reference subframe corresponds to the second of two time slots constituting one subframe, the value Z can be determined based on the NACK ratio in the reception results of downlink data received in the reference subframe (ie, the second time slot) and subsequent subframes sent or reported by the UE to the base station.
[0121] In a case where scheduling information or downlink control information for a downlink data channel sent by a base station is sent in the same cell or frequency band as the cell or frequency band in which the downlink data channel is sent, or in a case where scheduling information or downlink control information for a downlink data channel sent by a base station is sent via an unlicensed band but in a cell or frequency band different from the cell or frequency band in which the downlink data channel is sent, if it is determined that the UE does not send a reception result of the downlink data received in a reference subframe or a reference time slot, and if a specific reception result among the reception results of the downlink data sent by the UE is determined to be DTX (a state indicating that PDSCH reception is not performed), NACK / DTX, or any state, the base station can determine the value Z by determining the specific reception result of the UE as NACK.
[0122] In the case where the scheduling information or downlink control information for the downlink data channel transmitted by the base station is transmitted via the licensed frequency band, if a specific reception result among the reception results of the downlink data transmitted by the UE is determined as DTX, NACK / DTX, or any state, the base station may not include the specific reception result of the UE in the reference value Z of the contention window change. In other words, the base station may determine the value Z without considering the reception result of the UE.
[0123] In the case where the base station sends scheduling information or downlink control information for a downlink data channel via a licensed band, if the UE does not actually transmit downlink data (no transmission), this indicates that in the downlink data reception result of the reference subframe or reference time slot sent or reported by the UE to the base station, the base station can determine the value Z of the downlink data without considering the reception result sent or reported by the UE.
[0124] In the 5G system, it is necessary to flexibly define and operate the frame structure considering various services and requirements. For example, each service can be considered to have a different subcarrier spacing according to requirements. The current 5G communication system supports multiple subcarrier spacings, and the subcarrier spacing can be determined using Equation 1 as follows.
[0125] [Equation 1]
[0126] Δf=f 0 2 m
[0127] Here, f 0 is the basic subcarrier spacing of the system, and m is an integer scaling factor. For example, if we assume that f 0If the subcarrier spacing is 15kHz, the set of subcarrier spacings that the 5G communication system can have may include 3.75kHz, 7.5kHz, 15kHz, 30kHz, 60kHz, 120kHz, 240kHz, 480kHz, etc. The set of available subcarrier spacings may vary depending on the frequency band. For example, 3.75kHz, 7.5kHz, 15kHz, 30kHz, and 60kHz may be used for frequency bands below 6GHz, and 60kHz, 120kHz, and 240kHz may be used for frequency bands above 6GHz.
[0128] The length of an OFDM symbol can vary according to the subcarrier spacing that constitutes the OFDM symbol. This is because, based on the characteristics of the OFDM symbol, the subcarrier spacing and the length of the OFDM symbol have an inverse relationship with each other. For example, if the subcarrier spacing is doubled, the symbol length is shortened by half, and conversely, if the subcarrier spacing is reduced to 1 / 2, the symbol length is doubled.
[0129] Next, the resource region for sending data channels in the 5G communication system will be described.
[0130] Figure 3 is a diagram showing a resource area for sending a data channel in a 5G communication system according to an embodiment of the present disclosure.
[0131] refer to Figure 3 , the UE may monitor and / or search for a PDCCH 310 in a downlink control channel (hereinafter, referred to as a PDCCH) region (hereinafter, referred to as a control resource set (CORESET) or a search space (SS)) configured from a base station via a higher signal. The downlink control channel region may include information 314 on a time domain and information 312 on a frequency domain, and the time domain 314 information may be configured in units of symbols and the frequency region 312 information may be configured in units of RBs or RB groups. If the UE detects the PDCCH 310 in the time slot i 300, the UE may acquire downlink control information (DCI) transmitted via the detected PDCCH 310. The UE may acquire scheduling information for a downlink data channel or scheduling information for an uplink data channel based on the received downlink control information (DCI). The DCI may include at least information about a resource region (or PDSCH transmission region) where the UE should receive a downlink data channel (hereinafter referred to as PDSCH) from the base station, or information about a resource region allocated by the base station to the UE for uplink data channel (PUSCH) transmission.
[0132] A case where the UE is scheduled for uplink data channel (PUSCH) transmission will be described below. The UE that has received the DCI may acquire the offset information K or the slot index for PUSCH reception based on the DCI, and may determine the PUSCH transmission slot index. For example, the UE may determine that the UE is scheduled to transmit the PUSCH in slot i+K 305 based on the slot index i 300 of the received PDCCH via the received offset information K. The UE may also determine the PUSCH start symbol or time in slot i+K 305 or slot i+K via the received offset information K based on the CORESET that has received the PDCCH 310.
[0133] The UE can obtain information related to the PUSCH transmission time-frequency resource region 340 in the PUSCH transmission time slot 305 from the DCI. The PUSCH transmission frequency resource region information can be PRB or group unit information of PRB. The frequency resource 330 indicated by the PUSCH transmission frequency resource region information is a region included in the initial uplink bandwidth (BW) 335 or the initial uplink bandwidth part (BWP) determined or configured by the UE via the initial access process. If the UE is configured with an uplink bandwidth (BW) or an uplink bandwidth part (BWP) via a higher signal, the frequency resource 330 indicated by the PUSCH transmission frequency resource region information is a region included in the uplink bandwidth (BW) or the uplink bandwidth part (BWP) configured via the upper layer signal.
[0134] The PUSCH transmission time resource region information 325 may be symbol or group unit information of symbols, or may be information indicating absolute time information. The PUSCH transmission time resource region information 325 may be expressed as a combination of a PUSCH transmission start time or symbol, a length of the PUSCH, or a PUSCH end time or symbol, and may be included in the DCI as a field or value. The PUSCH transmission time resource region information 325 may be included in the DCI as a field or value indicating each of the PUSCH transmission start time or symbol, the length of the PUSCH, or the PUSCH end time or symbol. The UE may send the PUSCH in the PUSCH transmission resource region 340 determined based on the DCI.
[0135] Hereinafter, a downlink control channel in a 5G communication system will be described in more detail with reference to the accompanying drawings.
[0136] Figure 4 is a diagram showing an example of a control resource set (CORESET) for transmitting a downlink control channel in a 5G wireless communication system according to an embodiment of the present disclosure.
[0137] Figure 4An example is shown in which a bandwidth portion 410 of a UE is configured on the frequency axis and one time slot 420 having two control regions (control region #1 401 and control region #2 402) is configured on the time axis. The control regions 401 and 402 may be configured for specific frequency resources 403 in the entire UE bandwidth portion 410 on the frequency axis. One or more OFDM symbols defined as a control resource set duration 404 may be configured on the time axis. Figure 4 , control region #1 401 is configured as a control region length of 2 symbols, and control region #2 402 is configured as a control region length of 1 symbol.
[0138] The control region in the above 5G system can be configured to the UE by the base station via high-level signaling (e.g., system information, master information block (MIB), and radio resource control (RRC) signaling). Configuring the control region for the UE means providing information such as an identifier (identification) of the control region, a frequency location of the control region, and a symbol length of the control region. For example, the following information may be included.
[0139] [Table 3]
[0140] ControlResourceSet::=SEQUENCE{
[0141] --Corresponds to the L1 parameter 'CORESET-ID'
[0142] controlResourceSetId,
[0143] (Control Area Identifier (ID)
[0144] frequencyDomainResources BIT STRING(SIZE(45)),
[0145] (Frequency axis resource allocation information)
[0146] Duration INTEGER(1..maxCoReSetDuration),
[0147] (Timeline resource allocation information)
[0148] cce-REG-MappingType CHOICE{
[0149] (CCE to REG mapping scheme)
[0150] Interleaved SEQUENCE
[0151] reg-BundleSize ENUMERATED{n2,n3,n6},
[0152] (REG bundle size)
[0153] precoderGranularity ENUMERATED{sameAsREG-bundle,allContiguousRBs},
[0154] interleaverSize ENUMERATED{n2,n3,n6}
[0155] (Interleaver size)
[0156] shiftIndex INTEGER(0..maxNrofPhysicalResourceBlocks-1)OPTIONAL
[0157] (Interleaver Shift)
[0158] },
[0159] nonInterleaved NULL
[0160] },
[0161] tci-StatesPDCCH SEQUENCE(SIZE(1..maxNrofTCI-StatesPDCCH))
[0162] OF TCI-StateId OPTIONAL,
[0163] (QCL (Quasi Co-Location) configuration information)
[0164] tci-PresentInDCI ENUMERATED{enabled}OPTIONAL,--Need S
[0165] }
[0166] In Table 3, the tci-StatesPDCCH (referred to as TCI state) configuration information may include information on one or more synchronization signal (SS) / physical broadcast channel (PBCH) block indices or information on channel state information reference signal (CSI-RS) indices having a quasi-co-location (QCL) relationship with a demodulation reference signal (DMRS) transmitted in the corresponding control region. Further, the frequencyDomainResources configuration information configures the frequency resources of the corresponding CORESET via a bitmap. Each bit represents a group of 6 non-overlapping PRBs. The first group refers to a group with a first PRB index of A group of 6 PRBs, where Represents the BWP starting point. The highest bit in the bitmap represents the first group and is configured in ascending order.
[0167] Figure 5 is a diagram showing an example of basic units of time and frequency resources constituting a downlink control channel that can be used in a 5G system according to an embodiment of the present disclosure.
[0168] refer to Figure 5 The basic unit of time and frequency resources constituting the control channel is called a resource element group (REG) 503, and the REG 503 can be defined as having 1 OFDM symbol 501 on the time axis and 1 physical resource block (PRB) 502 on the frequency axis (i.e., 12 subcarriers). The downlink control channel allocation unit can be configured by cascading REGs 503.
[0169] refer to Figure 5 , when the basic unit for allocation of a downlink control channel in a 5G system is a control channel element (CCE) 504, one CCE 504 may include a plurality of REGs 503. Figure 5 As an example, REG 503 shown in FIG. 5A , REG 503 may include 12 REs, and if 1 CCE 504 includes 6 REGs 503, it means that 1 CCE 504 may include 72 REs. After the downlink control region is configured, the region may include multiple CCEs 504, and a specific downlink control channel may be mapped to one or more CCEs 504 and transmitted according to an aggregation level (AL) within the control region. CCEs 504 in the control region are classified by numbers, and these numbers may be allocated according to a logical mapping scheme.
[0170] Figure 5 The basic unit of the downlink control channel shown (ie, REG 503) may include both the RE to which the DCI is mapped and the area to which the demodulation reference signal (DMRS) 505 (a reference signal used to decode the RE) is mapped. Figure 5 As shown, three DMRS 505 may be transmitted in one REG 503 .
[0171] Depending on the aggregation level (AL), the number of CCEs required to send the PDCCH can be 1, 2, 4, 8, 16, and different numbers of CCEs can be used to achieve link adaptation of the downlink control channel. For example, if AL=L, a downlink control channel can be sent via L number of CCEs. The UE needs to detect the signal without knowing the information about the downlink control channel, and a search space representing a set of CCEs is used to assist in this blind decoding. The search space is a combination of downlink control channel candidates including CCEs that the UE should attempt to decode at a given aggregation level. Since there are various aggregation levels that constitute bundles with 1, 2, 4, 8, and 16 CCEs, the UE has multiple search spaces. A search space set can be defined as a set of search spaces at all set aggregation levels.
[0172] The search space can be classified into a common search space or a UE-specific search space. In order to receive public control information for dynamic scheduling such as paging messages or system information, a group of UEs or all UEs can check the common search space of the PDCCH. For example, PDSCH scheduling allocation information for transmitting SIBs including cell operator information, etc. can be received by checking the common search space of the PDCCH. In the case of a common search space, a group of UEs or all UEs need to receive the PDCCH and can therefore be defined as a set of predetermined CCEs. UE-specific scheduling allocation information for PDSCH or PUSCH can be received by checking the UE-specific search space of the PDCCH. The UE-specific search space can be UE-specifically defined based on the UE's identity and the function of various system parameters.
[0173] In the 5G system, the parameters of the search space for PDCCH can be configured from the base station to the UE via high-level signaling (e.g., SIB, MIB, and RRC signaling). For example, the base station can configure the number of PDCCH candidates at each aggregation level L, the monitoring period of the search space, the monitoring timing by symbol within the time slot of the search space, the search space type (common search space or UE-specific search space), the combination of RNTI and DCI format to be monitored in the search space, the control area index for monitoring the search space, etc. For example, the following information may be included.
[0174] [Table 4]
[0175] SearchSpace::=SEQUENCE{
[0176] --Search space identification. SearchSpaceId = 0 indicates that SearchSpace is configured via PBCH (MIB) or ServingCellConfigCommon.
[0177] searchSpaceId SearchSpaceId,
[0178] (Search space identifier)
[0179] controlResourceSetId ControlResourceSetId,
[0180] (Control Area Identification)
[0181] monitoringSlotPeriodicityAndOffset CHOICE{
[0182] (Monitoring time slot level cycle)
[0183] sl1 NULL,
[0184] sl2 INTEGER(0..1),
[0185] sl4 INTEGER(0..3),
[0186] sl5 INTEGER(0..4),
[0187] sl8 INTEGER(0..7),
[0188] sl10 INTEGER(0..9),
[0189] sl16 INTEGER(0..15),
[0190] sl20 INTEGER(0..19)
[0191] }OPTIONAL,
[0192] monitoringSymbolsWithinSlot BIT STRING(SIZE(14))OPTIONAL,
[0193] (monitoring symbols in time slot)
[0194] nrofCandidates SEQUENCE{
[0195] (Number of PDCCH candidates per aggregation level)
[0196] aggregationLevel1 ENUMERATED{n0,n1,n2,n3,n4,n5,n6,n8},
[0197] aggregationLevel2 ENUMERATED{n0,n1,n2,n3,n4,n5,n6,n8},
[0198] aggregationLevel4 ENUMERATED{n0,n1,n2,n3,n4,n5,n6,n8},
[0199] aggregationLevel8 ENUMERATED{n0,n1,n2,n3,n4,n5,n6,n8},
[0200] aggregationLevel16 ENUMERATED{n0,n1,n2,n3,n4,n5,n6,n8}
[0201] },
[0202] searchSpaceType CHOICE{
[0203] (Search space type type)
[0204] --Configures this search space as common search space (CSS) and DCI formats to monitor.
[0205] common SEQUENCE{
[0206] (Common search space)
[0207] }
[0208] ue-Specific SEQUENCE{
[0209] (UE-specific search space)
[0210] --Indicates whether the UE monitors in this USS for DCI formats 0-0 and 1-0 or for formats 0-1 and 1-1.
[0211] Formats ENUMERATED{formats0-0-And-1-0,formats0-1-And-1-1}, ...
[0213] }
[0214] According to the configuration information, the base station may configure one or more search space sets for the UE. For example, the base station may configure search space set 1 and search space set 2 for the UE, may configure DCI format A scrambled with X-RNTI to be monitored in the common search space in search space set 1, and may configure DCI format B scrambled with Y-RNTI to be monitored in the UE-specific search space in search space set 2.
[0215] According to the configuration information, one or more search space sets may exist in a common search space or a UE-specific search space. For example, search space set #1 and search space set #2 may be configured as common search spaces, and search space set #3 and search space set #4 may be configured as UE-specific search spaces.
[0216] The following combinations of DCI formats and RNTIs may be monitored in the common search space:
[0217] - DCI format 0_0 / 1_0 with CRC scrambled by C-RNTI, CS-RNTI, SP-CSI-RNTI, RA-RNTI, TC-RNTI, P-RNTI, SI-RNTI
[0218] - DCI format 2_0 with CRC scrambled by SFI-RNTI
[0219] - DCI format 2_1 with CRC scrambled by INT-RNTI
[0220] -DCI format 2_2 with CRC scrambled by TPC-PUSCH-RNTI, TPC-PUCCH-RNTI
[0221] -DCI format 2_3 with CRC scrambled by TPC-SRS-RNTI
[0222] The following combinations of DCI formats and RNTIs may be monitored in the UE-specific search space:
[0223] - DCI format 0_0 / 1_0 with CRC scrambled by C-RNTI, CS-RNTI, TC-RNTI
[0224] -DCI format 1_0 / 1_1 with CRC scrambled by C-RNTI, CS-RNTI, TC-RNTI
[0225] The RNTI specified above can follow the following definitions and usages:
[0226] -Cell RNTI (C-RNTI): used for UE-specific PDSCH scheduling
[0227] -Temporary Cell RNT (TC-RNTI): used for UE-specific PDSCH scheduling
[0228] -Configured Scheduling RNTI (CS-RNTI): used for semi-statically configured UE-specific PDSCH scheduling
[0229] - Random Access RNTI (RA-RNTI): used for PDSCH scheduling in random access operation
[0230] - Paging RNTI (P-RNTI): used for scheduling PDSCH via which paging is sent
[0231] - System Information RNTI (SI-RNTI): used for scheduling of PDSCH via which system information is transmitted
[0232] -Interrupt RNTI (INT-RNTI): used to notify whether PDSCH is punctured
[0233] Transmit Power Control RNTI for PUSCH (TPC-PUSCH-RNTI): used to indicate the power control command for PUSCH
[0234] Transmit Power Control RNTI for PUCCH (TPC-PUCCH-RNTI): used to indicate the power control command for PUCCH
[0235] Transmit Power Control RNTI for SRS (TPC-SRS-RNTI): used to indicate the power control command for SRS
[0236] In a 5G system, multiple search space sets may be configured by different parameters (e.g., DCI formats), and thus the set of search spaces monitored by the UE at each time point may vary. For example, in the case where search space set #1 is configured as an X-slot period and search space set #2 is configured as a Y-slot period, where X and Y are different, the UE may monitor both search space set #1 and search space set #2 in a specific time slot, and may monitor one of search space set #1 and search space set #2 in another specific time slot.
[0237] When multiple search space sets are configured in the UE, the following conditions may be considered in a method of determining a search space set to be monitored by the UE.
[0238] Condition 1: Limit the maximum number of PDCCH candidates
[0239] The number of PDCCH candidates that can be monitored per time slot does not exceed M μ . M μ Can be configured as 15.2 μ The maximum number of PDCCH candidate groups per time slot in a cell with a subcarrier spacing of kHz is defined and can be defined by the following table.
[0240] [Table 5]
[0241]
[0242] Condition 2: Limiting the maximum number of CCEs
[0243] The number of CCEs that constitute the entire search space (the entire search space refers to the entire CCE set corresponding to the joint area of multiple search space sets) per time slot does not exceed C μ . C μ Can be configured as 15.2 μ The maximum number of CCEs per timeslot in a cell with a subcarrier spacing of kHz is defined and can be defined in the following table.
[0244] [Table 6]
[0245]
[0246]
[0247] For the convenience of description, a case where both condition 1 and condition 2 are satisfied at a certain point in time is defined as “condition A.” Therefore, not satisfying condition A may mean that at least one of the above conditions 1 and 2 is not satisfied.
[0248] Depending on the configuration of the search space set of the base station, there may be a situation where the above condition A is not satisfied at a specific time point. If condition A is not satisfied at a specific time point, the UE may select and monitor only some search space sets configured to satisfy condition A at the specific time point, and the base station may send the PDCCH to the selected search space set.
[0249] The method of selecting some search spaces from the entire configured search space set can follow the following method.
[0250] Method 1
[0251] If condition A for PDCCH is not met at a specific time point (time slot), the UE or base station may give priority to a search space set whose search space type is configured as a common search space from the existing search space set at the corresponding time point, relative to a search space set whose search space type is configured as a UE-specific search space.
[0252] If all search space sets configured with a common search space are selected (i.e., if condition A is satisfied even after all search spaces configured as a common search space are selected), the UE or base station may select a search space set configured with a UE-specific search space. If there are multiple search space sets configured with a UE-specific search space, a search space set with a lower search space set index may have a higher priority. In consideration of the priority, a UE-specific search space set may be selected within the range where condition A is satisfied.
[0253] In the NR system, the base station has a CSI framework for indicating the measurement and reporting of the channel state information (CSI) of the UE. The CSI framework of NR may include at least two elements, namely, resource settings and report settings, and the report settings may have an association relationship with the resource settings by referencing at least one ID of the resource settings. The base station may instruct the UE to report the channel state information (CSI) via higher signaling including radio resource control (RRC) signaling or media access control (MAC) control element (CE) signaling or via L1 signaling (e.g., common DCI, group common DCI, and UE-specific DCI).
[0254] For example, the base station may indicate a non-periodic channel information report (CSI report) to the UE via higher signaling or DCI using DCI format 0_1. For another example, the base station may indicate a semi-persistent CSI report via higher signaling or DCI using DCI format 0_1. The base station may activate or deactivate the semi-persistent CSI report via higher signaling including MAC CE signaling or DCI scrambled with semi-persistent (SP)-CSI-RNTI. When the semi-persistent CSI report is activated, the UE may periodically report channel information according to the configured time slot interval. When the semi-persistent CSI report is deactivated, the UE may stop the activated periodic channel information report. For another example, the base station may indicate the periodic CSI report to the UE via high-layer signaling. The base station may activate or deactivate the periodic CSI report via high-layer signaling including RRC signaling. When the periodic CSI report is activated, the UE may periodically report channel information according to the configured time slot interval. When the periodic CSI report is deactivated, the UE may stop the activated periodic channel information report.
[0255] In the case of an NR communication system, in order to provide various services and support high data rates, an uplink signal (configuration grant PUSCH or CG-PUSCH) may be transmitted without uplink scheduling information. When an uplink signal is transmitted without uplink scheduling information, information such as MCS and resource allocation for uplink transmission may be configured via RRC signaling or DCI of PDCCH, and uplink transmission that may be performed may be described by being classified into at least the following types according to an uplink transmission configuration reception scheme.
[0256] - Type 1: Uplink transmission configuration using RRC signaling
[0257] - Type 2: Uplink transmission configuration using the uplink data channel of the physical layer
[0258] Figure 6 is a diagram showing an example of transmitting an uplink signal in an unlicensed band without uplink scheduling information according to an embodiment of the present disclosure.
[0259] refer to Figure 6 , in an unlicensed band, a channel access procedure is performed to transmit an uplink signal without uplink scheduling information. When the UE accesses the unlicensed band by performing a variable-time channel access procedure, the UE may schedule downlink transmission in the last time slot 604 of time slots 601, 602, 603, and 604 or the last subframe 604 within the maximum channel occupancy time 612 via the channel occupancy time sharing indicator of the uplink control information 605. The base station determines whether to access the channel by performing a fixed-time channel access procedure, and the UE configures the last symbol of the subframe 608 or time slot 608 used for uplink transmission as a gap interval cleared by the channel access procedure of the base station. When transmitting a CG-PUSCH in an unlicensed band, the UE may add CG uplink control information (CG-UCI) to the CG-PUSCH, which includes HARQ ID, RV, and CG-PUSCH scheduling information of the CG-PUSCH, and transmit the CG-PUSCH, wherein all CG-PUSCHs may include at least one CG-UCI.
[0260] In the NR communication system, if the uplink control channel overlaps with the uplink data channel and meets the transmission time condition, or if the uplink control information is sent to the uplink data channel via L1 signaling or higher signaling, the uplink control information may be included in the uplink data channel for transmission. HARQ-ACK, CSI part 1, CSI part 2, these three uplink control information may be sent via the uplink data channel, and each uplink control information may be mapped to the PUSCH according to a predetermined multiplexing rule.
[0261] In the first operation, if the number of HARQ-ACK information bits to be included in the PUSCH is 2 bits or less, the UE reserves REs in advance to send the HARQ-ACK information. The method for determining the resources for reservation is the same as the second operation. In the second operation, if the number of HARQ-ACK information bits to be sent by the UE is greater than 2 bits, the UE may map the HARQ-ACK information from the first OFDM symbol that does not include DMRS after the first DMRS symbol of the PUSCH. In the third operation, the UE may map CSI part 1 to the PUSCH. CSI part 1 may be mapped from the first OFDM symbol of the PUSCH instead of the DMRS, and may not be mapped to the REs reserved in the first operation and the REs to which the HARQ-ACK is mapped in the second operation.
[0262] In the fourth operation, the UE may map CSI part 2 to PUSCH. CSI part 2 may be mapped from the first OFDM symbol of PUSCH instead of DMRS, and may not be mapped to the RE where CSI part 1 is located and the RE where the HARQ-ACK mapped to the RE in the second operation is located. In the fifth operation, if the HARQ-ACK is less than 2 bits, the UE may puncture the HARQ-ACK and map it to the RE reserved in the first operation. If the number of bits or modulation symbols of the uplink control information to be mapped to PUSCH is greater than the number of bits (or REs) that can be mapped to the corresponding OFDM symbol to be mapped, the frequency axis RE interval d between the modulation symbols of the uplink control information to be mapped may be configured so that d=1. If the number of bits or modulation symbols of the uplink control information to be mapped to the PUSCH by the UE is less than the number of bits (or REs) capable of mapping the uplink control information in the corresponding OFDM symbol to be mapped, the frequency-axis RE interval d between the modulation symbols of the uplink control information to be mapped may be configured such that d = rounded down (l-the number of available bits on the OFDM symbol / l-the number of unmapped UCI bits at the beginning of the OFDM symbol).
[0263] Figure 7An example of mapping uplink control information to PUSCH according to an embodiment of the present disclosure is shown.
[0264] refer to Figure 7 , assuming that the number of HARQ-ACK symbols to be mapped to PUSCH is 5, and one resource block is configured or scheduled to PUSCH. First, Figure 7 As shown in part 750 of FIG. 1 , the UE may map the HARQ-ACK 701 having five symbols starting from the lowest RE index (or the highest RE index) of the first OFDM symbol 704 not including the DMRS after the first DMRS 700 at intervals of d=rounded down (12 / 5)=2 on the frequency axis. Next, as Figure 7 As shown in part 760 of FIG. 1 , the UE may map CSI-Part 1 702 from the first OFDM symbol 705 instead of the DMRS. Finally, as Figure 7 As shown in part 770 of , the UE may map CSI-Part 2 703 from OFDM symbol 706 not including DMRS to REs to which CSI-Part 1 and HARQ-ACK are not mapped.
[0265] If the CG-PUSCH to be transmitted configured in the unlicensed band includes the three existing UCIs mentioned above, a total of four UCIs (CG-UCI, HARQ-ACK, CSI-Part 1, and CSI-Part 2) can be configured or scheduled in the CG-PUSCH. However, in the NR system, the uplink data channel can contain up to three uplink control information for transmission, and therefore a method is required to generate or select three UCIs from the CG-UCI and the existing three UCIs (HARQ-ACK, CSI-Part 1, and CSI-Part 2) and add the generated or selected UCIs to the CG-PUSCH for transmission.
[0266] The present disclosure provides a method for transmitting uplink control information by a UE relative to a base station and a UE configured to receive or transmit a downlink signal or an uplink signal in an unlicensed frequency band. The present disclosure provides a method and a device, wherein the UE configures, adjusts or modifies uplink control information to be transmitted via an uplink data channel based on information configured or scheduled from a base station, so as to add the uplink control information to the uplink data channel.
[0267] Hereinafter, the method and apparatus proposed in the embodiment are not limited to or applied to each embodiment, and can be used for the method and apparatus for transmitting or adjusting uplink control information by using a combination of all or part of one or more embodiments proposed in the present disclosure. The embodiment can be described using the following case as an example: as shown in semi-persistent scheduling (SPS) or configuration authorization transmission, even if DCI is not received, the UE configures PUSCH transmission from the base station via a high signal configuration, and performs PUSCH transmission. However, even when the UE is scheduled by the base station to receive PDSCH or send PUSCH based on DCI, the embodiment can also be applied. In addition, the present embodiment can also be applied to the case of sending uplink control information in a broadband system, such as a broadband unlicensed band based on a subband or a multi-carrier or carrier aggregation transmission. In the embodiment, it will be described on the premise of a base station and a UE operating in an unlicensed band. However, the method and apparatus proposed in the embodiment can also be applied to base stations and UEs operating in licensed bands, shared bands (shared spectrum) or side links and unlicensed bands.
[0268] Example 1
[0269] The first embodiment includes, with respect to a base station and a UE operating in an unlicensed frequency band, a method for configuring, by a UE, uplink control information to be included in an uplink data channel. A method and apparatus are proposed, in which the UE determines the priority of the uplink control information based on information configured or indicated by the base station, thereby deciding or determining the uplink control information to be included in the uplink data channel.
[0270] Reference Figure 8 The operation of the first embodiment is described as follows.
[0271] Figure 8 is a diagram showing an example of separately encoding uplink control information according to an embodiment of the present disclosure.
[0272] In a base station and a UE that transmit or receive a signal in an unlicensed band, it is assumed that the UE is configured to perform PUCCH and / or PUSCH transmission in a plurality of time slots based on a configured grant configuration.
[0273] refer to Figure 8, the UE may perform separate encoding, including code block generation 801 and channel coding 802, for each payload corresponding to uplink control information 800 (e.g., CG-UCI, HARQ-ACK, CSI-Part 1, or CSI-Part 2) to be sent to the CG-PUSCH. Thereafter, the uplink control information is rate matched 803, code block concatenated 804, and multiplexed 805 to the PUSCH. Considering the CG-PUSCH resources configured or scheduled by the base station and the maximum X (e.g., X=3) pieces of uplink control information that can be included in the uplink data channel that can be pre-configured (or pre-determined) by the base station or configured via L1 or higher-layer signaling, the UE may decide or determine a method for configuring the uplink control information to be included in the uplink data channel. In the following, a method for deciding or determining the priority of uplink control information is specifically proposed.
[0274] Embodiment 1-1
[0275] The UE may determine that the CG-UCI is the uplink control information with the highest priority, and may add at least one uplink control information to the CG-PUSCH for transmission. The UE may send X pieces of uplink control information with the highest priority including the CG-UCI via the CG-PUSCH, and uplink control information other than the X pieces may not be included in the CG-PUSCH (or may be omitted or delayed). For example, if the maximum number of uplink control information that can be included in the CG-PUSCH is 3, the UE may add CG-UCI, HARQ-ACK, and CSI-Part 1 to the CG-PUSCH for transmission, and may omit (or delay) CSI-Part 2. As another method, the UE may only add the CG-UCI to the CG-PUSCH for transmission, and other uplink control information may not be included in the CG-PUSCH. Hereinafter, a more specific method for determining that the CG-UCI has the highest priority will be described.
[0276] Method 1
[0277] If the base station configures the semi-static HARQ-ACK codebook to be used via L1 signaling or higher signaling (or if the HARQ-ACK codebook size is fixed), the UE can determine that the CG-UCI has the highest priority.
[0278] Method 2
[0279] The base station can activate CG-PUSCH transmission through the UE by using downlink control information. Only during one or more CG-PUSCH transmissions activated via downlink control information, when the transmission is performed while the uplink control information is included in the first CG-PUSCH, can the UE determine that the CG-UCI has the highest priority.
[0280] Method 3
[0281] The base station (or UE) can instruct the UE (or base station) to add the information required for uplink control information generation (e.g., MCS, β offset, TBS, etc.) to the CG-UCI via default values (or predetermined information), L1 signaling, or higher signaling. Here, the UE can determine that the CG-UCI has the highest priority.
[0282] Embodiment 1-2
[0283] The UE may determine that HARQ-ACK is the highest priority uplink control information and may add at least one uplink control information to the CG-PUSCH for transmission. The UE may send X pieces of uplink control information with the highest priority including HARQ-ACK via the CG-PUSCH, and uplink control information other than the X pieces may not be included in the CG-PUSCH (or may be omitted or delayed).
[0284] For example, if the maximum number of uplink control information that can be included in the CG-PUSCH is 2, the UE can add HARQ-ACK and CG-UCI to the CG-PUSCH in order to send it, and CSI-Part 1 and CSI-Part 2 may not be included. As another method, the UE may add only HARQ-ACK to the CG-PUSCH in order to send the HARQ-ACK, or may send the HARQ-ACK by using the PUCCH without sending (or delaying or omitting) the CG-PUSCH. In this case, uplink control information other than the HARQ-ACK may not be sent. As another method, when the UE sends the HARQ-ACK by using the PUCCH without sending the CG-PUSCH, if a gap is generated between the transmission of the corresponding PUCCH and the transmission of the next CG-PUSCH due to the non-transmission of the CG-PUSCH, and a channel access process is required, the UE may puncture the CG-PUSCH by a symbol length corresponding to the PUCCH used to send the HARQ-ACK, and then send the HARQ-ACK.
[0285] Hereinafter, a more specific method in which HARQ-ACK may have the highest priority will be described.
[0286] Method 4
[0287] If the base station is configured to use a dynamic HARQ-ACK codebook (or if the HARQ-ACK codebook size is variable) (via L1 signaling or higher signaling), the UE can determine that HARQ-ACK has the highest priority.
[0288] Method 5
[0289] If the UE needs to send at least one HARQ-ACK information with multiple priorities (e.g., HARQ-ACK for URLLC data or HARQ-ACK for eMBB data), the UE can determine or change (or reconfigure) the uplink control information transmission scheme according to the priority of the HARQ-ACK. More specifically, the UE can determine that the HARQ-ACK with the highest priority (e.g., HARQ-ACK for URLLC data) has the highest priority compared to other uplink control information (e.g., CG-UCI, CSI part 1, or CSI part 2).
[0290] When applying Embodiment 1, the priority of the uplink control information may be configured via L1 signaling or higher signaling, or may be determined by a UE capability report. In the case of Embodiment 1, the UE may determine the uplink control information to be included in the CG-PUSCH by considering the priority of each uplink control information and the CG-PUSCH resources configured (or scheduled) by the base station, but there is a disadvantage that uplink control information beyond the maximum number of uplink control information that can be included in the CG-PUSCH cannot be sent.
[0291] Example 2
[0292] The embodiment proposes a method of configuring, by a UE, uplink control information to be included in an uplink data channel with respect to a base station and a UE operating in an unlicensed frequency band.
[0293] A more specific description is as follows. In a base station and a UE that sends or receives signals in an unlicensed band, it is assumed that the UE is configured to perform PUCCH and / or PUSCH transmissions in multiple time slots based on a configured authorization configuration. The UE can jointly encode a joint coded payload corresponding to X (e.g., X=2) pieces of uplink control information (e.g., CG-UCI, HARQ-ACK, CSI-Part 1, and CSI-Part 2) to be included in the CG-PUSCH and sent.
[0294] Figure 9a is a diagram showing an example of jointly encoding uplink control information according to an embodiment of the present disclosure.
[0295] refer to Figure 9a, the UE may generate a code block 902 by bundling the payload of the CG-UCI 900 and the HARQ-ACK 901, and may then perform channel coding 903. Thereafter, the coded uplink control information is rate matched 904, each of its code blocks is concatenated 905, and then the coded uplink control information is multiplexed 906 to the PUSCH.
[0296] Figure 9b is a diagram showing another example of jointly encoding uplink control information according to an embodiment of the present disclosure.
[0297] In another approach, reference Figure 9b , the UE may generate code blocks 908, 915 for CG-UCI 907 and HARQ-ACK 909, respectively, and may then perform joint channel coding 910, 911 on the corresponding generated code blocks. Thereafter, the encoded uplink control information is rate matched 912, each of its code blocks is concatenated 913, and then the encoded uplink control information is multiplexed 914 to the PUSCH. Figure 9b is a diagram illustrating another example of jointly coded uplink control information. The UE may determine that the jointly coded uplink control information has the highest priority and may add the jointly coded uplink control information to the CG-PUSCH 906, 914.
[0298] When applying Embodiment 2, the value of the X payloads for joint coding may be configured via L1 signaling or higher signaling, or may be determined by a UE capability report. An advantage of the embodiment is that the UE may add all uplink control information configured (or scheduled) within the CG-PUSCH resources to the CG-PUSCH configured (or scheduled) by the base station so that it may be sent, but a disadvantage of the embodiment is that if the CG-PUSCH resources for sending the uplink control information are insufficient, the uplink control information cannot be added to the CG-PUSCH.
[0299] Example 3
[0300] The embodiment proposes a method for configuring uplink control information to be included in an uplink data channel by a UE with respect to a base station and a UE operating in an unlicensed frequency band. More specifically, the embodiment proposes a method and an apparatus in which the UE decides or determines the uplink control information to be included in the uplink data channel by using information configured or indicated by the base station.
[0301] In a base station and a UE that transmit or receive signals in an unlicensed band, it is assumed that the UE is configured to perform PUCCH and / or PUSCH transmission in multiple time slots based on a configured authorization configuration. The UE can generate uplink control information (e.g., CG-UCI, HARQ-ACK, CSI-Part 1, and CSI-Part 2) to be sent to the CG-PUSCH based on information configured (or indicated) via L1 signaling or higher signaling from the base station or CG-PUSCH resource information configured (or scheduled) via L1 signaling or higher signaling from the base station by using one of a separate coding method and a joint coding method as a coding method. Separate coding refers to a method of encoding by applying channel coding to each payload corresponding to the uplink control information, and joint coding refers to a method of jointly encoding at least two payloads among the payloads corresponding to the uplink control information.
[0302] If the UE decides or determines a separate coding scheme as a coding method for generating uplink control information, the uplink control information to be included in the CG-PUSCH is decided or determined based on the first embodiment. If the UE determines a joint coding scheme as a coding method for generating uplink control information, the uplink control information to be included in the CG-PUSCH is decided or determined based on the second embodiment. Hereinafter, a method for deciding and determining whether to perform separate coding or joint coding based on information configured (or indicated) from a base station will be described in detail.
[0303] Example 3-1
[0304] The UE can determine the coding scheme of the uplink control information to be included in the CG-PUSCH based on the CSI reporting channel configured by the base station via L1 signaling or higher signaling. More specifically, if the base station instructs the UE to perform CSI reporting by using PUCCH (for example, semi-persistent CSI reporting or periodic CSI reporting using MAC CE), the UE can generate the uplink control information to be included in the CG-PUSCH by performing a separate encoding for generating the uplink control information. As another method, if the UE receives an uplink grant DCI scrambled with SP-CSI-RNTI from the base station, or if the base station instructs the UE to perform non-periodic CSI reporting based on the DCI, the UE can perform a joint coding method for generating uplink control information in order to generate the uplink control information to be included in the CG-PUSCH.
[0305] Embodiment 3-2
[0306] If the UE receives DCI format 0_1 from the base station, the method for encoding the uplink control information may be configured using the "UL-SCH indicator" field value included in the DCI. More specifically, if the "UL-SCH indicator" field value included in the DCI format 0_1 received from the base station indicates 0, the UE may generate the uplink control information by using a joint coding method. This value is only an example. In other cases, the UE may generate the uplink control information using a separate coding method.
[0307] Embodiment 3-3
[0308] The UE can determine the coding method for generating uplink control information based on the amount of resources of the CG-PUSCH configured or scheduled by the base station. More specifically, if the UE is unable to add uplink control information generated using joint coding to the CG-PUSCH due to insufficient resources for transmitting the uplink control information of the CG-PUSCH configured or scheduled by the base station (for example, if the following equation 2 is satisfied, if the resources occupied by the calculated UCI to be sent are greater than the resources (for example, REs) capable of UCI transmission in the configured PUSCH, or if the number of UCI bits to be sent is greater than the number of UCI bits capable of transmission in the configured PUSCH), the UE can generate the uplink control information by using a separate coding method. If the UE is able to add uplink control information generated using at least joint coding to the CG-PUSCH due to sufficient resources for transmitting uplink control information of the CG-PUSCH configured or scheduled by the base station (for example, if the following Equation 2 is not satisfied, if the resources occupied by the calculated UCI to be sent are equal to or less than the resources (for example, REs) capable of UCI transmission in the configured PUSCH, or if the number of UCI bits to be sent is equal to or less than the number of UCI bits capable of transmission in the configured PUSCH), the UE can generate the uplink control information by using a joint coding method. Equation 2 is only an example, and whether separate coding should be applied or whether joint coding should be applied can be determined by the UE and / or the base station based on at least one of the parameters in Equation 2.
[0309] [Equation 2]
[0310]
[0311]
[0312] Here, O CG-UCI and O ACK denotes the number of bits of the payload of CG-UCI and HARQ-ACK, respectively, and L CG-UCI,ACK Indicates the number of CRC bits. K ris the rth code block size, and represents the number of subcarriers in OFDM symbol l in PUSCH that can be used for UCI transmission configured or scheduled by the base station. α and N is a value configured by the base station and determined via higher signaling or L1 signaling. symb,all PUSCH represents the total number of OFDM symbols of the configured or scheduled PUSCH, and C UL_SCH represents the number of code blocks used for PUSCH transmission. Finally, l 0 Indicates the first OFDM symbol index that does not include DMRS after the first DMRS symbol during PUSCH transmission.
[0313] When applying Embodiment 3, the base station can selectively determine the coding scheme when generating an uplink by instructing the UE via L1 signaling, higher signaling, or UE capability report. According to Embodiment 3, the advantage is that the UE determines the coding method for generating uplink control information differently according to the importance of the uplink control information and the resources of the CG-PUSCH configured or scheduled by the base station, and thus the UE can add the uplink control information to the CG-PUSCH so as to send the uplink control information more flexibly.
[0314] Example 4
[0315] The fourth embodiment proposes a method for mapping uplink control information generated by a UE to an uplink data channel with respect to a base station and a UE operating in an unlicensed frequency band. More specifically, this embodiment proposes a method and a device in which the UE determines the priority of the uplink control information based on information configured or indicated by the base station, and adds (or maps) the uplink control information generated using a separate coding scheme to the CG-PUSCH based on the determined priority.
[0316] Example 4-1
[0317] Fig.10 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure.
[0318] If the UE sends a CG-PUSCH including only the CG-UCI, the UE may add the CG-UCI to the CG-PUSCH based on the aforementioned multiplexing rule of the HARQ-ACK.
[0319] More specifically, refer to Fig.10, the UE may map the CG-UCI 1001 to the CG-PUSCH from the first OFDM symbol 1002 not including the DMRS after the first DMRS symbol 1000. Here, the RE interval between uplink control information symbols on the frequency axis may be determined in the same manner as described above.
[0320] Embodiment 4-2
[0321] Fig.11 is a diagram showing another example of mapping CG-UCI according to an embodiment of the present disclosure.
[0322] After deciding or determining the priority of the uplink control information in the above manner, the UE may add the uplink control information to the CG-PUSCH. If the UE decides or determines that the CG-UCI is the uplink control information with the highest priority, the UE may first map the CG-UCI 1103 to the CG-PUSCH based on the aforementioned HARQ-ACK multiplexing rule, and then may map the HARQ-ACK 1101 to the CG-PUSCH in the same manner, such as Fig.11 As shown in part (a) (1110) of . In other words, the UE may first map the CG-UCI 1103 to the CG-PUSCH from the first OFDM symbol 1104 that does not include DMRS after the first DMRS symbol 1100. The RE interval between the uplink control information symbols on the frequency axis may be determined in the same manner as described above. Subsequently, the UE may map the HARQ-ACK 1101 to the CG-PUSCH, based on the above-mentioned multiplexing rule of the HARQ-ACK, from the first DMRS symbol 1104 that does not include DMRS after the DMRS symbol 1100, regarding the RE to which the CG-UCI is not mapped. If the UE decides (or determines) that HARQ-ACK is the uplink control information with the highest priority, the UE may map the uplink control information to the CG-PUSCH in the same manner as described above, such as Fig.11 As shown in part (b)(1120).
[0323] Embodiment 4-3
[0324] Fig.12 is a diagram showing another example of mapping CG-UCI according to an embodiment of the present disclosure.
[0325] After deciding or determining the priority of the uplink control information in the above manner, the UE may add the uplink control information to the CG-PUSCH. If the UE decides (or determines) that the CG-UCI 1203 is the uplink control information with the highest priority, the UE may fix the RE interval between the uplink control information symbols on the frequency axis to 1, and then may map the CG-UCI to the CG-PUSCH, such as Fig.12 As shown in part (a) (1210) of . In other words, the UE may map the CG-UCI 1203 to the CG-PUSCH from the first OFDM symbol 1204 that does not include the DMRS after the first DMRS symbol 1200. Subsequently, the UE may map the HARQ-ACK 1201 to the CG-PUSCH from the first OFDM symbol 1204 that does not include the DMRS after the DMRS symbol, regarding the RE to which the CG-UCI is not mapped, based on the above-mentioned multiplexing rule of HARQ-ACK. The RE interval between HARQ-ACK symbols on the frequency axis may be fixed to 1, or may be determined based on the aforementioned multiplexing rule of HARQ-ACK (e.g., Equation 1). If the UE decides or determines that HARQ-ACK is the uplink control information with the highest priority, the UE may map the uplink control information to the CG-PUSCH in the same manner as described above, such as Fig.12 As shown in part (b)(1220).
[0326] Embodiment 4-4
[0327] If the base station configures or schedules multiple DMRS symbols in a CG-PUSCH for the UE via L1 signaling or higher signaling (or a combination thereof), the UE can change, adjust or reconfigure the OFDM symbol position to which the uplink control information contained in the CG-PUSCH is mapped according to the priority of the uplink control information.
[0328] Fig.13 is a diagram showing another example of mapping CG-UCI according to an embodiment of the present disclosure.
[0329] refer to Fig.13 After deciding or determining the priority of the uplink control information in the above manner, the UE may add the uplink control information to the CG-PUSCH. If the UE decides or determines that CG-UCI 1303 is the uplink control information with the highest priority, the UE may first map CG-UCI 1303 to CG-PUSCH based on the aforementioned HARQ-ACK multiplexing rule, such as Fig.13 As shown in part (a)(1310). Fig.13In part (a) (1310), the UE may map the CG-UCI to the CG-PUSCH from the first OFDM symbol 1304 that does not include the DMRS after the first DMRS symbol 1300. Subsequently, the UE may map the HARQ-ACK to the CG-PUSCH from the first OFDM symbol 1305 that does not include the DMRS after the second DMRS (or the last DMRS) symbol 1300 based on the multiplexing rule of the HARQ-ACK. As another method, such as Fig.13 As shown in part (b) (1320), the UE can map HARQ-ACK from the first OFDM symbol 1307 that does not include DMRS before the second DMRS (or the last DMRS) symbol to CG-PUSCH based on the multiplexing rule of HARQ-ACK.
[0330] If the UE decides or determines that HARQ-ACK is the uplink control information with the highest priority, the UE may map the uplink control information to the CG-PUSCH in the same manner as described above, such as Fig.13 section (c)(1330) or Fig.13 As shown in part (d)(1340).
[0331] Embodiment 4-5
[0332] Fig.14 is a diagram showing another example of mapping CG-UCI according to an embodiment of the present disclosure.
[0333] refer to Fig.14 , after deciding or determining the priority of the uplink control information in the above manner, the UE can add the uplink control information to the CG-PUSCH.
[0334] refer to Fig.14, if the UE decides or determines that the CG-UCI is the uplink control information with the highest priority, the UE may map the CG-UCI 1403 from the first OFDM symbol 1404 that does not include DMRS before the first DMRS symbol 1400 to the CG-PUSCH according to the same rules as the above-mentioned HARQ-ACK multiplexing method. Regarding the RE to which the CG-UCI is not mapped, the UE may map the HARQ-ACK 1401 from the first OFDM symbol 1405 that does not include DMRS after the DMRS symbol to the CG-PUSCH based on the above-mentioned HARQ-ACK multiplexing rules. If the UE decides or determines that HARQ-ACK is the uplink control information with the highest priority, the UE may first map HARQ-ACK 1401 to CG-PUSCH in the same manner as the aforementioned HARQ-ACK multiplexing, and then, for the RE to which HARQ-ACK is not mapped, the UE may map CG-UCI 1403 to CG-PUSCH in the manner described in the embodiment with respect to the RE to which HARQ-ACK 1401 is not mapped.
[0335] Embodiment 4-6
[0336] Fig.15 is a diagram showing another example of mapping CG-UCI according to an embodiment of the present disclosure.
[0337] refer to Fig.15 , after deciding or determining the priority of the uplink control information in the above manner, the UE can add the uplink control information to the CG-PUSCH.
[0338] refer to Fig.15, if the UE decides (or determines) that the CG-UCI is the uplink control information with the highest priority, the UE may map the CG-UCI 1503 from the first OFDM symbol 1504 that is not DMRS to the CG-PUSCH according to the same rules as the above-mentioned HARQ-ACK multiplexing method. Subsequently, with respect to the RE to which the CG-UCI is not mapped, the UE may map the HARQ-ACK 1501 from the first OFDM symbol 1505 that does not include the DMRS after the DMRS symbol 1500 to the CG-PUSCH based on the aforementioned HARQ-ACK multiplexing rule. Then, with respect to the RE to which the CG-UCI 1503 and the HARQ-ACK 1501 are not mapped, the UE may map the CSI-Part 1 1502 from the first OFDM symbol 1504 that is not DMRS to the CG-PUSCH according to the same rules as the above-mentioned CSI-Part 1 multiplexing method. If the UE decides or determines that HARQ-ACK is the uplink control information with the highest priority, the UE may first map HARQ-ACK 1501 to CG-PUSCH in the same manner as the aforementioned HARQ-ACK multiplexing, and then, for the RE to which HARQ-ACK is not mapped, the UE may map CG-UCI to CG-PUSCH in the manner described in the embodiment with respect to the RE to which HARQ-ACK is not mapped.
[0339] Example 5
[0340] The fifth embodiment proposes a method for mapping uplink control information generated by a UE to an uplink data channel with respect to a base station and a UE operating in an unlicensed frequency band. More specifically, the fifth embodiment proposes a method and a device, wherein, when the UE generates uplink control information by using joint coding based on information configured or indicated by the base station, the UE maps the uplink control information to the CG-PUSCH.
[0341] Fig.16 is a diagram showing an example of mapping CG-UCI according to an embodiment of the present disclosure.
[0342] refer to Fig.16 , if the UE performs joint coding on CG-UCI and HARQ-ACK, and then the jointly coded uplink control information is included in CG-PUSCH, the UE can add the jointly coded uplink control information to CG-PUSCH based on the above-mentioned multiplexing rule of HARQ-ACK.
[0343] More specifically, the UE may map the jointly coded uplink control information 1603 to the CG-PUSCH from the first OFDM symbol 1605 not including a DMRS after the first DMRS symbol 1601. The RE interval between uplink control information symbols on the frequency axis may be determined in the same manner as described above.
[0344] Example 6
[0345] The sixth embodiment proposes a method of mapping uplink control information generated by a UE to an uplink data channel with respect to a base station and a UE operating in an unlicensed frequency band.
[0346] Fig.17 is a diagram showing an example of mapping UCI according to an embodiment of the present disclosure.
[0347] refer to Fig.17 , assuming that the UE is configured or scheduled by the base station to send multiple CG-PUSCHs 1705, 1706 in one time slot. If the uplink control channel to be sent by the UE overlaps with multiple CG-PUSCHs 1705, 1706 in one time slot, the UE may add the existing uplink control information (e.g., HARQ-ACK 1703, CSI part 1 1702, and CSI part 2) to the last CG-PUSCH 1706 overlapping with the uplink control channel so as to transmit it. The CG-UCI 1704 may be mapped to the first OFDM symbol 1707 that does not include a DMRS after the first DMRS symbol 1701. The method of configuring or generating uplink control information to be included in the last CG-PUSCH 1706 may include the application of the above-mentioned scheme or a combination thereof.
[0348] Fig.18 is a diagram illustrating the operation of a base station according to an embodiment of the present disclosure.
[0349] refer to Fig.18In operation 1800, the base station may send configurations related to PDCCH, PDSCH, PUCCH and PUSCH transmission / reception to the UE via a higher signal. For example, the base station may send a PDCCH resource region for receiving downlink or uplink scheduling information, CORESET configuration, search space configuration, etc. to the UE via a higher signal. The base station may send configurations related to PDSCH / PUSCH transmission / reception to the UE via a higher signal, including offset information between a PDCCH reception time slot and a PDSCH reception time slot or a PUSCH transmission time slot, information about the number of repeated transmissions of PDSCH or PUSCH, etc. In operation 1810, the base station may additionally send configuration information related to the configured grant, such as the configured grant transmission period and offset information. In operation 1810, the base station may additionally send configuration information related to CSI reporting, such as resources, reporting methods and reporting periods for CSI reporting. The configured grant and CSI report configuration information sent to the UE in operation 1810 may also be sent in operation 1800.
[0350] In operation 1820, when UCI is included in the CG-PUSCH, the base station may indicate necessary information such as a CSI reporting scheme to the UE by using downlink control information. In operation 1830, the base station may receive and decode the CG-PUSCH and uplink control information included in the CG-PUSCH based on information configured by the base station to the UE.
[0351] Fig.19 is a diagram illustrating the operation of a UE according to an embodiment of the present disclosure.
[0352] refer to Fig.19In operation 1900, the UE receives configuration regarding PDCCH / PDSCH / PUCCH / PUSCH transmission / reception from the base station via a higher signal, and performs configuration regarding PDCCH / PDSCH / PUCCH / PUSCH transmission / reception according to the received configuration information. For example, the UE may receive a PDCCH resource region for receiving downlink or uplink scheduling information, CORESET configuration, search space configuration, etc. from the base station via a higher signal. In operation 1910, the UE may additionally receive configured grant-related configuration information, such as configured grant transmission period and offset information. In operation 1910, the UE may additionally receive CSI reporting-related configuration information, such as resources, reporting methods, and reporting periods for CSI reporting. The configured grant-related configuration information and CSI reporting-related configuration information in operation 1910 may also be included in the higher signal configuration information transmitted in operation 1900. In operation 1920, when the CG-PUSCH includes UCI, the UE may receive downlink control information in order to receive necessary information such as a CSI reporting scheme from the base station.
[0353] In operation 1930, the UE determines whether to apply separate coding. If the UE determines in operation 1930 not to generate UCI to be included in the CG-PUSCH based on separate coding, the UE may generate UCI by using joint coding and then multiplex the UCI to the CG-PUSCH so as to transmit the CG-PUSCH in operation 1940. If the UE determines in operation 1930 to generate UCI to be included in the CG-PUSCH based on separate coding, the UE may generate UCI by using separate coding, multiplex the UCI to the CG-PUSCH based on the priority of the UCI configured by the base station, and then transmit the CG-PUSCH in operation 1950.
[0354] refer to Fig.19 , the UE determines whether to perform separate coding. However, whether to perform separate coding or joint coding may be predetermined or may be configured by the base station, and in this case, operation 1930 may be omitted.
[0355] Fig. 20 is a block diagram showing the internal structure of a base station according to an embodiment of the present disclosure.
[0356] refer to Fig. 20According to an embodiment of the present disclosure, a base station may include a base station receiver 2000, a base station transmitter 2010, and a base station processor 2020. The base station receiver 2000 and the base station transmitter 2010 may be collectively referred to as a transceiver. The transceiver may send a signal to a UE or receive a signal from a UE. The signal may include control information and data. To this end, the transceiver may include an RF transmitter configured to perform up-conversion and amplify the transmitted signal, an RF receiver configured to perform low-noise amplification of the received signal and perform down-conversion of the frequency of the received signal, etc. In addition, the transceiver may receive a signal via a radio channel, may output a signal to the base station processor 2020, and may send a signal output from the base station processor 2020 via a radio channel. The base station processor 2020 may control a series of processes so that the base station operates according to the above-mentioned embodiment of the present disclosure. In addition, the base station processor 2020 may perform a channel access process for an unlicensed frequency band. The base station receiver 2000 may receive a signal transmitted via an unlicensed band, and the base station processor 2020 may determine whether the unlicensed band is in an idle state by comparing the strength of the received signal with a predetermined threshold value that is predefined or a function of a parameter such as bandwidth, etc. The base station processor 2020 may determine, change, or reconfigure a multiplexing scheme of UCI to be received by the base station, and a signal including information indicating the multiplexing scheme may be transmitted by the base station transmitter 2010 via a downlink control channel or a data channel.
[0357] Fig.21 is a block diagram showing the internal structure of a UE according to an embodiment of the present disclosure.
[0358] refer to Fig.21, the UE of the present disclosure may include a UE receiver 2100, a UE transmitter 2110, and a UE processor 2120. In an embodiment, the UE receiver 2100 and the UE transmitter 2110 may be collectively referred to as a transceiver. The transceiver may send a signal to a base station or receive a signal from a base station. The signal may include control information and data. To this end, the transceiver may include an RF transmitter configured to perform up-conversion and amplify the transmitted signal, an RF receiver configured to perform low-noise amplification of the received signal and perform down-conversion of the frequency of the received signal, etc. In addition, the transceiver may receive a signal via a radio channel and output the signal to the UE processor 2120, and may send a signal output from the UE processor 2120 via a radio channel. The UE processor 2120 may control a series of processes so that the UE operates according to the above-mentioned embodiment. For example, the UE receiver 2100 may receive a data signal including a control signal, and the UE processor 2120 may determine the reception result of the data signal. Thereafter, when a signal reception result including data reception is to be sent to the base station at a timing, the UE transmitter 2110 sends the signal reception result to the base station at a timing determined by the processor. For another example, when the UE receiver 2100 receives configuration information about a method for generating and multiplexing UCI to be included in the CG-PUSCH for transmission from the base station, the UE processor 2120 may generate the UCI accordingly and add the UCI to the CG-PUSCH, and the UE transmitter 211 may send an uplink data signal including uplink control information.
[0359] If necessary, the above corresponding embodiments can be used in combination. For example, the method proposed in the present disclosure can be partially combined to operate the base station and the terminal. In addition, although the above embodiments have been described by 5G and NR systems, other variations based on the technical aspects of the embodiments can be implemented in other systems such as LTE, LTE-A, LTE-A-Pro, and V2X systems.
[0360] While the disclosure has been shown and described with reference to various embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the disclosure as defined by the appended claims and their equivalents.
Claims
1. A method performed by a terminal in a communication system, the method include: receiving configuration information about a grant configured for a physical uplink shared channel PUSCH from a base station through a higher layer signaling; Identify the number of uplink control information UCI payloads to be jointly coded as configured by higher layer signaling; Identify whether joint encoding of hybrid automatic repeat acknowledgement HARQ-ACK information and configured grant uplink control information CG-UCI is configured based on the number of UCI payloads to be jointly encoded, wherein the HARQ-ACK information includes first HARQ information with a higher priority for the first service type and second HARQ information with a lower priority for the second service type; In a case where joint encoding of the HARQ-ACK information and the CG-UCI is configured and the HARQ-ACK information overlaps with PUSCH transmission configured by the configuration information, performing joint encoding of the HARQ-ACK information and the CG-UCI; Sending uplink data including jointly encoded HARQ-ACK information and CG-UCI to the base station via the PUSCH configured by the configuration information, wherein the second HARQ-ACK information is discarded; and In a case where the joint encoding of the HARQ-ACK information and the CG-UCI is not configured and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, the HARQ-ACK information is sent to the base station via the physical uplink control channel PUCCH and the sending of the PUSCH configured by the configuration information is skipped.
2. The method according to claim 1, in, The HARQ-ACK and the CG-UCI are mapped onto resource elements included in at least one orthogonal frequency division multiplexing OFDM symbol starting from a first OFDM symbol after a first OFDM symbol carrying a demodulation reference signal DMRS for the PUSCH.
3. The method according to claim 1, further comprising: include: In a case where joint coding of the HARQ-ACK information and the CG-UCI is configured and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, sending a physical uplink control channel PUCCH for the HARQ-ACK information is skipped.
4. A method performed by a base station in a communication system, the method include: Sending configuration information about the grant configured for the physical uplink shared channel PUSCH to the terminal through high-layer signaling; sending the number of uplink control information UCI payloads to be jointly encoded to the terminal; In the case where the joint encoding of hybrid automatic repeat acknowledgement HARQ-ACK information and the configured grant uplink control information CG-UCI is configured by the number of UCI payloads to be jointly encoded, the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, and the HARQ-ACK information includes first HARQ information with a higher priority for the first service type and second HARQ information with a lower priority for the second service type: receiving uplink data including jointly coded HARQ-ACK information and CG-UCI from the terminal via the PUSCH configured by the configuration information, and performing decoding of the jointly encoded HARQ-ACK information and CG-UCI, wherein the second HARQ-ACK information is discarded; and receiving the HARQ-ACK information from the terminal on a physical uplink control channel PUCCH in a case where joint coding of the HARQ-ACK information and the CG-UCI is not configured by the number of UCI payloads to be jointly coded and the HARQ-ACK information overlaps with a PUSCH transmission configured by the configuration information, The PUSCH configured by the configuration information is not received by the base station.
5. The method according to claim 4, in, The HARQ-ACK and the CG-UCI are mapped onto resource elements included in at least one orthogonal frequency division multiplexing OFDM symbol starting from a first OFDM symbol after a first OFDM symbol carrying a demodulation reference signal DMRS for the PUSCH.
6. The method according to claim 4, in, In a case where the joint encoding of the HARQ-ACK information and the CG-UCI is configured by the number of UCI payloads to be jointly encoded and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, the physical uplink control channel PUCCH for the HARQ-ACK information is not received by the base station.
7. A terminal in a communication system, the terminal include: Transceiver; as well as a processor coupled to the transceiver and configured to: receiving configuration information about a grant configured for a physical uplink shared channel PUSCH from a base station through a high-layer signaling, Identify the number of uplink control information (UCI) payloads to be jointly coded as configured by higher layer signaling, identifying whether joint encoding of hybrid automatic repeat acknowledgement HARQ-ACK information and configured grant uplink control information CG-UCI is configured based on the number of UCI payloads to be jointly encoded, wherein the HARQ-ACK information includes first HARQ information with a higher priority for the first service type and second HARQ information with a lower priority for the second service type, In a case where joint coding of the HARQ-ACK information and the CG-UCI is configured and the HARQ-ACK information overlaps with PUSCH transmission configured by the configuration information, performing joint coding of the HARQ-ACK information and the CG-UCI, sending uplink data including jointly encoded HARQ-ACK information and CG-UCI to the base station via the PUSCH configured by the configuration information, wherein the second HARQ-ACK information is discarded, and In a case where the joint encoding of the HARQ-ACK information and the CG-UCI is not configured and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, the HARQ-ACK information is sent to the base station via the physical uplink control channel PUCCH and the sending of the PUSCH configured by the configuration information is skipped.
8. The terminal according to claim 7, in, The HARQ and the CG-UCI are mapped on resource elements included in at least one orthogonal frequency division multiplexing OFDM symbol starting from a first OFDM symbol after a first OFDM symbol carrying a demodulation reference signal DMRS for the PUSCH.
9. The terminal according to claim 7, in, When joint encoding of the HARQ-ACK information and the CG-UCI is configured and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, the processor is also configured to skip sending a physical uplink control channel PUCCH for the HARQ-ACK information.
10. A base station in a communication system, the base station include: Transceiver; as well as a processor coupled to the transceiver and configured to: Sending configuration information about the grant configured for the physical uplink shared channel PUSCH to the terminal through high-layer signaling, sending the number of uplink control information UCI payloads to be jointly encoded to the terminal, In the case where the joint encoding of hybrid automatic repeat acknowledgement HARQ-ACK information and the configured grant uplink control information CG-UCI is configured by the number of UCI payloads to be jointly encoded, the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, and the HARQ-ACK information includes first HARQ information with a higher priority for the first service type and second HARQ information with a lower priority for the second service type: receiving uplink data including jointly coded HARQ-ACK information and CG-UCI from the terminal via the PUSCH configured by the configuration information, and performing decoding of the jointly encoded HARQ-ACK information and CG-UCI, wherein the second HARQ-ACK information is discarded, and receiving the HARQ-ACK information from the terminal on a physical uplink control channel PUCCH in a case where joint coding of the HARQ-ACK information and the CG-UCI is not configured by the number of UCI payloads to be jointly coded and the HARQ-ACK information overlaps with a PUSCH transmission configured by the configuration information, The PUSCH configured by the configuration information is not received by the base station.
11. The base station according to claim 10, in, The CG-UCI is mapped on resource elements included in at least one orthogonal frequency division multiplexing (OFDM) symbol starting from a first OFDM symbol after a first OFDM symbol carrying a demodulation reference signal (DMRS) for the PUSCH.
12. The base station according to claim 10, in, In a case where the joint encoding of the HARQ-ACK information and the CG-UCI is configured by the number of UCI payloads to be jointly encoded and the HARQ-ACK information overlaps with the PUSCH transmission configured by the configuration information, the physical uplink control channel PUCCH for the HARQ-ACK information is not received by the base station.
