Rapid furnace opening method
A fast and blast furnace technology, applied in the direction of furnaces, blast furnaces, furnace types, etc., can solve the problems of slow opening speed of full coke, space occupation, material collapse, and slow material movement speed, so as to reduce oven time and improve tapping efficiency , time-consuming effect
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2022-03-04
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to a blast furnace ironmaking process method, in particular to a rapid furnace opening method. Background technique
[0002] Large and medium-sized blast furnaces in ironworks in the metallurgical industry face multiple start-ups such as completion and commissioning, overhaul start-up, and intermediate repair start-up during the entire life cycle. Blast furnace opening is a complicated project and a relatively complicated operation process in ironmaking production. The status and conditions of blast furnace before starting the furnace are different, and the conditions of starting the furnace are also very different. At present, there are two main methods of starting the furnace, one is to start the furnace with sleepers filling the hearth, and the other is to use full-coke furnace. The traditional full-coke furnace is slow to start, coke burns slowly, and the material moves slowly. The slag made of limestone is easy to pulverize...
Examples
Embodiment Construction
[0031] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings and embodiments. Apparently, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0032] This embodiment specifically includes the following steps:
[0033] (1) Iron port pre-buried air supply pipeline: see figure 1 A ductile iron pipe 1 with an inner diameter of 30-35mm is embedded in the iron gate, part of the air supply pipe goes deep into the hearth 6 center of the blast furnace, and the gas supply pipe is located in half of the blast furnace hearth to be protected by a refractory mud bag Layer 5, the gas supply pipeline is located outside the blast furnace and is equi...