A hidden engineering management method for smart communities based on the combination of BIM and lightweight 3D engine

Through the combination of BIM and lightweight 3D engines, the hidden projects of smart communities are integrated into digital building models, which solves management problems, achieves real-time monitoring and rapid processing, and improves management efficiency.

CN114169061BActive Publication Date: 2024-10-15GUANGZHOU METRO DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111538099.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-15
Publication Date
2024-10-15
Estimated Expiration
2041-12-15

AI Technical Summary

Technical Problem

In the management of hidden projects in smart communities, there are problems such as difficulty in preserving equipment, facilities and pipeline file information, difficulty in centralized display, and difficulty in maintenance and positioning. As the years increase, relevant drawings and files are lost, which brings difficulties to management.

Method used

Using a method based on the combination of BIM and a lightweight 3D engine, architectural, structural and electromechanical models are constructed by drawing 2D drawings and combined into a 3D comprehensive model. The lightweight 3D engine is used for hardware and system access and space binding to realize intelligent control. Management of community concealed projects.

Benefits of technology

It achieves real-time monitoring and timely warning of hidden projects in smart communities, improves management efficiency, and enables rapid processing and rapid location and repair of equipment failures through spatial positioning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114169061B_ABST
    Figure CN114169061B_ABST
Patent Text Reader

Abstract

The present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine. The pipeline and equipment management method for a smart community includes: drawing 2D drawings of hidden engineering for a smart community; constructing an architectural model, a structural model and an electromechanical model of hidden engineering for a smart community based on the 2D drawings; combining the architectural model, the structural model and the electromechanical model to obtain a 3D comprehensive model; calling the 3D comprehensive model through a lightweight three-dimensional engine to access hardware and systems and perform spatial binding; and managing hidden engineering for a smart community based on a lightweight three-dimensional engine. The present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine, which integrates hidden engineering for a smart community into a digital architectural model, performs real-time monitoring and timely warning of hidden engineering for pipelines and equipment in a smart community, and uses spatial positioning to quickly process hidden engineering for a smart community, thereby improving the management efficiency of hidden engineering for a smart community.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering construction technology, and in particular to a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine. Background Art

[0002] Hidden projects in smart communities refer to buildings, structures, and physical objects that are covered and invisible after the building materials or components are buried in objects during construction. Such as house foundations, steel bars, water and electricity components, equipment foundations and other sub-projects. Hidden projects in smart communities combine equipment, pipes and pipelines of different types, specifications and functions according to the use functions of the buildings and design requirements to meet the various needs of the buildings and the coordination of the environment.

[0003] The management of hidden projects in smart communities involves multiple disciplines, the operation and maintenance management of various equipment, facilities and pipelines. In the management of hidden projects, the main problems faced are the difficulties in preserving the archival information of hidden equipment, facilities and pipelines, the difficulties in centralized display, and the difficulties in maintenance and positioning. In addition, with the increase of years, the loss of relevant drawings and files, and the replacement of technical management personnel have caused difficulties in the management of such hidden projects.

[0004] Therefore, the prior art still needs to be improved and developed. Summary of the invention

[0005] The main purpose of the present invention is to solve the technical problems of inconvenient management and low efficiency of hidden projects in existing smart communities.

[0006] The first aspect of the present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine, and the hidden engineering management method for a smart community includes:

[0007] Draw 2D drawings of hidden projects in smart communities;

[0008] Constructing the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings;

[0009] Combining the building model, the structural model and the electromechanical model to obtain a 3D comprehensive model;

[0010] Calling the 3D comprehensive model through the lightweight 3D engine to perform hardware, system access and space binding;

[0011] The hidden projects of the smart community are managed based on the lightweight three-dimensional engine.

[0012] Optionally, in a first implementation of the first aspect of the present invention, the step of constructing the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings includes:

[0013] Technical standards for building BIM models;

[0014] Build a collaborative model for BIM models.

[0015] Optionally, in a second implementation of the first aspect of the present invention, the technical standards include naming rules for BIM files, classification principles for BIM models, additional information for BIM models, precision division of BIM models, and parameter definitions for BIM models.

[0016] Optionally, in a third implementation of the first aspect of the present invention, the collaboration mode includes a workset mode and a link mode.

[0017] Optionally, in a fourth implementation of the first aspect of the present invention, the step of performing hardware and system access and spatial binding on the lightweight three-dimensional engine includes:

[0018] Analyze management requirements, including hidden equipment operation management and hidden pipeline management;

[0019] Based on the management requirements, the hardware is connected to the lightweight three-dimensional engine, the system is connected to the lightweight three-dimensional engine, and based on the lightweight three-dimensional engine, the equipment facilities and pipelines are spatially bound.

[0020] Optionally, in a fifth implementation of the first aspect of the present invention, managing the hidden project of the smart community based on the lightweight three-dimensional engine includes:

[0021] Managing the hidden projects of the smart community based on the operational management rules of equipment, facilities and pipelines;

[0022] By collecting operation data, when abnormal operation of equipment is found, report and warn, and use the three-dimensional lightweight engine to quickly locate abnormal equipment and dispatch repair orders;

[0023] Using the sensor to sense the working environment of the equipment and pipelines;

[0024] Based on the three-dimensional lightweight engine, the locations where line breaks and pipeline ruptures may occur under abnormal pipeline conditions are deduced;

[0025] Beneficial effects:

[0026] The present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine, and the pipeline and equipment management method for the smart community includes: drawing 2D drawings of hidden engineering for the smart community; constructing the architectural model, structural model and electromechanical model of the hidden engineering for the smart community based on the 2D drawings; combining the architectural model, the structural model and the electromechanical model to obtain a 3D comprehensive model; calling the BIM model through the lightweight three-dimensional engine for hardware, system access and space binding; and managing the hidden engineering for the smart community based on the lightweight three-dimensional engine. The hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine integrates the hidden engineering for the smart community into a digital architectural model, performs real-time monitoring and timely warning of the hidden engineering for pipelines and equipment in the smart community, and uses spatial positioning to quickly process the hidden engineering for the smart community, thereby improving the management efficiency of the hidden engineering for the smart community. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of an embodiment of a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine according to the present invention. DETAILED DESCRIPTION

[0028] The embodiment of the present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine.

[0029] For ease of understanding, the specific process of the embodiment of the present invention is described below. Figure 1 In an embodiment of the present invention, a first aspect of the present invention provides a hidden engineering management method for a smart community based on BIM, and the hidden engineering management method for a smart community includes:

[0030] S100, draw 2D drawings of hidden projects in smart communities;

[0031] S200, constructing the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings;

[0032] S300, combining the building model, the structural model and the electromechanical model to obtain a 3D comprehensive model;

[0033] S400, concealing engineering hardware, system access and space binding through lightweight 3D engine;

[0034] S500: managing the hidden projects of the smart community based on the lightweight three-dimensional engine.

[0035] Optionally, in a first implementation of the first aspect of the present invention, the step of constructing the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings includes:

[0036] Technical standards for building BIM models;

[0037] Build a collaborative model for BIM models.

[0038] In an optional implementation of the first aspect of the present invention, the technical standards include naming rules for BIM files, classification principles for BIM models, additional information for BIM models, precision division of BIM models and parameter definitions for BIM models.

[0039] In this embodiment, the naming rules of BIM files are such as "professional-area-floor-sub-professional-feature-version". The classification principle of BIM models is such as establishing two types of BIM models in Revit: project model and family model. Designers of each unit should establish different types of models according to the requirements of different demand personnel for models. Additional information of BIM models, such as BIM model data, not only includes geometric shape data, but also should include auxiliary information of components and equipment. The parameter definition of BIM models, such as BIM model parameters, is mainly for the parameter definition of family type models. The specific content of the parameters is geometric size, material properties, installation time, etc.

[0040] In an optional implementation of the first aspect of the present invention, the collaboration mode includes a workset mode and a link mode.

[0041] In this embodiment, the biggest feature of BIM technology compared to traditional design is collaboration. When using BIM technology for design, there are multiple collaborative modes. Revit 3D design software is used. The collaborative design of Revit allows multiple designers to edit the same project file at the same time, which is also Revit work sharing.

[0042] Working set mode: Create an MEP central file and save it on a file server that can be accessed and read and written by engineers of all disciplines. Each electromechanical professional creates a local file of his or her own discipline. The number of local files is determined according to the specific situation. Engineers of all disciplines perform design work on local files. Local files are real-time mirror files of the MEP central file on the server. When local files change, the MEP central file changes accordingly.

[0043] Link mode: Link mode is suitable for large-scale projects. Each MEP discipline establishes its own central file. After each professional file is established, coordination is achieved through the Revit link function.

[0044] In an optional implementation of the first aspect of the present invention, the combining the building model, the structural model and the electromechanical model to obtain a 3D integrated model comprises:

[0045] Analyze model requirements, including model depth requirements and model component accuracy requirements;

[0046] Creating an architectural model, a structural model, and an electromechanical model based on the model requirements;

[0047] Elevations and axis grids are created, and graphic elements are drawn in layers, and the building model, the structural model and the electromechanical model are combined to obtain the 3D comprehensive model.

[0048] In this embodiment, the model will be different according to the specific stage. After the model completes the demand analysis, the model is created in a certain order according to the CAD drawings and construction organization design documents. Create elevations: In Revit, use the elevation tool in the building panel benchmark tab to select the correct elevation annotation form. The elevation positioning includes drawing and picking lines. Enter the elevation value and elevation name to create the elevation. Create an axis grid: Through settings, when creating an elevation in Revit, the floor plan corresponding to the elevation can be automatically generated. Element drawing: When drawing an element, first consider the order of drawing the element, and then enter all the parameters of the element according to the specific situation of the element.

[0049] In an optional implementation of the first aspect of the present invention, the concealed engineering hardware, system access and space binding are performed by the lightweight three-dimensional engine:

[0050] Based on the management requirements, the hardware is connected to the lightweight three-dimensional engine, the system is connected to the lightweight three-dimensional engine, and based on the lightweight three-dimensional engine, the equipment facilities and pipelines are spatially bound.

[0051] In this embodiment, hardware access refers to the access of intelligent gateways, audio and video equipment, and sensors in concealed projects to the lightweight 3D engine to obtain equipment operation data and environmental data. System access refers to the provision of an interface protocol by the equipment side to support the lightweight 3D engine to actively obtain real-time data of equipment in the system. In the 3D visual scene, the specific location and status of each device in space are displayed in a visual way. The status includes online, offline, and fault status of the device, realizing the spatial binding of equipment facilities and pipelines.

[0052] In summary, the present invention provides a hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine, and the pipeline and equipment management method for the smart community includes: drawing 2D drawings of hidden engineering for the smart community; constructing the architectural model, structural model and electromechanical model of the hidden engineering for the smart community based on the 2D drawings; combining the architectural model, the structural model and the electromechanical model to obtain a 3D comprehensive model; calling the BIM model through the lightweight three-dimensional engine for hardware, system access and space binding; and managing the hidden engineering for the smart community based on the lightweight three-dimensional engine. The hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine integrates the hidden engineering for the smart community into a digital architectural model, performs real-time monitoring and timely warning of the hidden engineering for pipelines and equipment in the smart community, and uses spatial positioning to quickly process the hidden engineering for the smart community, thereby improving the management efficiency of the hidden engineering for the smart community.

[0053] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A hidden engineering management method for a smart community based on the combination of BIM and a lightweight three-dimensional engine, characterized in that: The smart community hidden project management method includes: S100, draw 2D drawings of hidden projects in smart communities; S200, constructing the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings; S300, combining the building model, the structural model and the electromechanical model to obtain a 3D comprehensive model; S400, calling the 3D comprehensive model through the lightweight 3D engine to perform hardware, system access and space binding; S500, managing the hidden project of the smart community based on the lightweight three-dimensional engine; The construction of the architectural model, structural model and electromechanical model of the hidden project of the smart community based on the 2D drawings includes: Technical standards for building BIM models; Construct collaborative mode of BIM model; The technical standards include the naming rules of BIM files, the classification principles of BIM models, the additional information of BIM models, the precision division of BIM models and the parameter definition of BIM models; The collaboration mode includes a workset mode and a link mode; The combining of the building model, the structural model and the electromechanical model to obtain a 3D comprehensive model comprises: Analyze model requirements, including model depth requirements and model component accuracy requirements; Creating an architectural model, a structural model, and an electromechanical model based on the model requirements; Creating elevations and axis grids, and drawing graphic elements in layers, and combining the building model, the structural model, and the electromechanical model to obtain the 3D comprehensive model; Hardware, system access and space binding through lightweight 3D engine include: Analyze management requirements, including hidden equipment operation management and hidden pipeline management; Based on the management requirements, the hardware is connected to the lightweight three-dimensional engine, the system is connected to the lightweight three-dimensional engine, and based on the lightweight three-dimensional engine, the equipment facilities and pipelines are spatially bound.

2. According to claim 1, the method for managing hidden engineering projects in smart communities based on the combination of BIM and lightweight three-dimensional engine is characterized in that: Based on the real-time monitoring of the concealed project, abnormalities occurring in the concealed project are reported and warned, abnormal equipment is quickly located and repairs are dispatched, and the locations of line breaks and pipeline ruptures are deduced.