Method and apparatus for wireless communication
By using the minimum scheduling offset value in wireless communications to optimize downlink scheduling under multi-carrier and multi-bandwidth configurations, the problems of low efficiency and high signaling overhead in the existing technology are solved, and more efficient resource management and Power consumption optimization.
Patent Information
- Application Number
- CN202080053758.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-08-13
- Filing Date
- 2020-08-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2040-08-14
AI Technical Summary
Existing wireless communication technology has problems of low efficiency and high signaling overhead in downlink control signaling scheduling. Especially in multi-carrier and multi-bandwidth partial configurations, it is difficult to effectively manage scheduling offsets, resulting in increased power consumption and Communication delays.
The minimum scheduling offset value is used to determine the downlink triggering event under multi-carrier and/or multi-bandwidth configuration, and the scheduling offset is dynamically adjusted to optimize resource allocation and reduce signaling by transmitting control signaling between the user equipment and the base station. Order overhead.
It achieves more efficient resource management and power consumption optimization in wireless communications, reduces base station signaling overhead, and improves communication efficiency and delay performance.
Smart Images

Figure CN114175808B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This patent application claims priority to U.S. Application No. 16 / 992,920, filed on August 13, 2020, which claims priority to and the benefit of U.S. Provisional Application No. 62 / 888,269, filed on August 16, 2019, which is assigned to the assignee of this application and is expressly incorporated herein by reference in its entirety. Background Art Technical Field
[0003] Aspects of the present disclosure relate to wireless communications and, more particularly, to minimum scheduling offsets with respect to downlink control signaling. Background Art
[0005] Wireless communication systems are widely deployed to provide a variety of telecommunication services, such as telephony, video, data, messaging, broadcast, etc. These wireless communication systems may employ multiple access technologies capable of supporting communication with multiple users by sharing available system resources (e.g., bandwidth, transmit power, etc.). Examples of these multiple access systems include 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) systems, LTE Advanced (LTE-A) systems, Code Division Multiple Access (CDMA) systems, Time Division Multiple Access (TDMA) systems, Frequency Division Multiple Access (FDMA) systems, Orthogonal Frequency Division Multiple Access (OFDMA) systems, Single Carrier Frequency Division Multiple Access (SC-FDMA) systems, and Time Division Synchronous Code Division Multiple Access (TD-SCDMA) systems, to name just a few.
[0006] These multiple access technologies have been adopted in various telecommunication standards to provide a common protocol that enables different wireless devices to communicate at a city, country, region, or even global level. New radio (e.g., 5G NR) is an example of an emerging telecommunication standard. NR is a set of enhancements to the LTE mobile standard released by 3GPP. NR is designed to better support mobile broadband Internet access by improving spectral efficiency, reducing costs, improving services, utilizing new spectrum, and better integrating with other open standards using OFDMA and cyclic prefixes (CP) on downlink (DL) and uplink (UL). To this end, NR supports beamforming, multiple-input multiple-output (MIMO) antenna technology, and carrier aggregation.
[0007] However, as the demand for mobile broadband access continues to increase, there is a need for further improvements to NR and LTE technologies. Preferably, these improvements should be applicable to other multi-access technologies and telecommunication standards that employ these technologies. Summary of the invention
[0008] The systems, methods, and devices of the present disclosure each have several aspects, no one of which is solely responsible for its desirable attributes. Without limiting the scope of the present disclosure as expressed by the appended claims, some features will now be briefly discussed. After considering this discussion, and particularly after reading the section entitled "Detailed Description of the Invention," it will be understood how the features of the present disclosure provide advantages including desirable wireless communication scheduling.
[0009] Certain aspects provide a method for wireless communication by a user equipment. The method generally includes: receiving one or more configurations from a base station indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); receiving control signaling from the base station, the control signaling indicating a scheduling offset for communicating with the base station via at least one BWP within at least one CC; determining a value of the scheduling offset based at least in part on a minimum scheduling offset value; and, in response to the determination, taking at least one action.
[0010] Certain aspects provide a method for wireless communication by a user equipment. The method generally includes: determining one or more configurations for indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); sending the one or more configurations to a user equipment (UE); determining a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one BWP within at least one CC; and configuring the UE with the minimum scheduling offset value.
[0011] Certain aspects provide an apparatus for wireless communication. The apparatus generally includes: a receiver configured to receive one or more configurations indicating wireless communication resources from a base station, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs), and, receiving control signaling from the base station, the control signaling indicating a scheduling offset for communicating with the base station via at least one BWP within at least one CC. The apparatus also includes: a processor coupled to a memory, wherein the processor and the memory are configured to determine a value of the scheduling offset based at least in part on a minimum scheduling offset value, and, in response to the determination, take at least one action. The apparatus also includes a memory coupled to the processor.
[0012] Certain aspects provide an apparatus for wireless communication. The apparatus generally includes: a processor coupled to a memory, wherein the processor and the memory are configured to determine one or more configurations for indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs), and determine a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one BWP within at least one CC. The apparatus also includes: a transmitter configured to send the one or more configurations and the minimum scheduling offset value to a user equipment (UE). The apparatus also includes a memory coupled to the processor.
[0013] Certain aspects provide an apparatus for wireless communication. The apparatus generally includes: means for receiving from a base station one or more configurations indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); means for receiving control signaling from the base station, the control signaling indicating a scheduling offset for communicating with the base station via at least one BWP within at least one CC; means for determining a value of the scheduling offset based at least in part on a minimum scheduling offset value; and means for taking at least one action in response to the determination.
[0014] Certain aspects provide an apparatus for wireless communication. The apparatus generally includes: means for determining one or more configurations indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); means for sending the one or more configurations to a user equipment (UE); means for determining a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one BWP within at least one CC; and means for configuring the UE with the minimum scheduling offset value.
[0015] Certain aspects provide a computer-readable medium having stored thereon instructions for: receiving from a base station one or more configurations indicating wireless communication resources, the wireless communication resources comprising at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); receiving from the base station control signaling indicating a scheduling offset for communicating with the base station via at least one BWP within at least one CC; determining a value of the scheduling offset based at least in part on a minimum scheduling offset value; and, in response to the determination, taking at least one action.
[0016] Certain aspects provide a computer-readable medium having stored thereon instructions for determining one or more configurations indicating wireless communication resources, the wireless communication resources comprising at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs); sending the one or more configurations to a user equipment (UE); determining a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one BWP within at least one CC; and configuring the UE using the minimum scheduling offset value.
[0017] To achieve the foregoing and related ends, one or more aspects include features fully described below and particularly pointed out in the claims. The following description and the accompanying drawings set forth in detail certain illustrative features of one or more aspects. However, these features are only indicative of some of the various ways in which the principles of the various aspects can be employed.
[0018] BRIEF DESCRIPTION OF THE DRAWINGS
[0019] So, the manner in which the above-mentioned features of the present disclosure can be understood in detail, a more particular description of what has been briefly summarized above can be made by reference to various aspects, some of which are illustrated in the accompanying drawings. It should be noted, however, that the accompanying drawings illustrate only certain typical aspects of the present disclosure and are therefore not to be considered limiting of its scope, as the description may admit to other equally effective aspects.
[0020] Figure 1 is a block diagram conceptually illustrating an example telecommunications system in accordance with certain aspects of the present disclosure.
[0021] Figure 2 is a block diagram conceptually illustrating designs of exemplary base stations (BSs) and user equipment (UEs) in accordance with certain aspects of the present disclosure.
[0022] Figure 3 An example of a frame format for a telecommunications system in accordance with certain aspects of the present disclosure is shown.
[0023] Figure 4A Example cross-slot scheduling of downlink communications in accordance with certain aspects of the present disclosure is illustrated.
[0024] Figure 4B Intra-slot scheduling of example uplink communications in accordance with certain aspects of the present disclosure is illustrated.
[0025] Figure 5 Example cross-bandwidth part (BWP) scheduling of downlink communications in accordance with certain aspects of the present disclosure is illustrated.
[0026] Fig. 6AExample intra-BWP scheduling of downlink communications in accordance with certain aspects of the present disclosure is illustrated, wherein a minimum scheduling offset is defined according to a digital scheme of an active BWP.
[0027] Figure 6B Example cross-BWP scheduling and intra-BWP scheduling of downlink communications are shown, wherein the active BWP provides a minimum scheduling offset, in accordance with certain aspects of the present disclosure.
[0028] Figure 7 An exemplary table illustrating various BWP switching delay values in accordance with certain aspects of the present disclosure.
[0029] Fig. 8A Example intra-BWP scheduling of downlink communications according to certain aspects is illustrated, where a target BWP may provide a minimum scheduling offset.
[0030] Figure 8B Example cross-BWP scheduling of downlink communications according to certain aspects is illustrated, where a target BWP may provide a minimum scheduling offset.
[0031] Figure 8C Another example intra-BWP scheduling of downlink communications in accordance with certain aspects is illustrated, wherein a minimum scheduling offset is based on a BWP switching delay.
[0032] Fig. 9 is a flow chart illustrating example operations for wireless communications by a UE in accordance with certain aspects of the present disclosure.
[0033] Fig.10 is a flow chart illustrating example operations of wireless communications by a BS in accordance with certain aspects of the present disclosure.
[0034] Fig.11 A communication device (eg, UE) according to aspects of the present disclosure is shown that may include various components configured to perform operations of the techniques disclosed herein.
[0035] Fig.12 A communication device (eg, a BS) according to aspects of the present disclosure is shown that may include various components configured to perform operations of the techniques disclosed herein.
[0036] To facilitate understanding, identical reference numerals have been used, where possible, to designate identical elements that are common to the figures. It is contemplated that elements disclosed in one aspect may be beneficially utilized on other aspects without specific recitation. DETAILED DESCRIPTION
[0037] Aspects of the present disclosure provide apparatus, methods, processing systems, and computer-readable media for wireless communication scheduling, including, for example, a framework for determining a minimum scheduling offset on a downlink trigger event under a multi-carrier and / or multi-BWP configuration. Such a scheduling framework can provide desired power consumption at a user equipment and reduce signaling overhead at a base station.
[0038] The following description provides an example of wireless communication scheduling in a communication system, and does not limit the scope, applicability or examples set forth in the claims. Without departing from the scope of the present disclosure, the functions and arrangements of the elements discussed may be changed. Various examples may omit, replace or add various processes or components as appropriate. For example, the described method may be performed in an order different from the order described, and various steps may be added, omitted or combined. Moreover, the features described for some examples may be combined in some other examples. For example, any number of aspects set forth herein may be used to implement a device or a method may be practiced. In addition, the scope of the present disclosure is intended to cover such devices or methods implemented by other structures, functions, or structures and functions as supplements or substitutes for the various aspects of the present disclosure set forth herein. It should be understood that any aspect of the disclosure disclosed herein may be embodied by one or more elements of the claims. The word "exemplary" is used herein to mean "used as an example, instance or illustration". Any aspect described as "exemplary" herein is not necessarily to be interpreted as being more preferred or more advantageous than other aspects.
[0039] Generally, any number of wireless networks can be deployed in a given geographic area. Each wireless network can support a specific radio access technology (RAT) and can operate on one or more frequencies. RAT can also be referred to as radio technology, air interface, etc. Frequency can also be referred to as carrier, subcarrier, frequency channel, tone, subband, etc. Each frequency can support a single RAT in a given geographic area to avoid interference between wireless networks of different RATs. In some cases, 5G NR RAT networks can be deployed.
[0040] Figure 1 An exemplary wireless communication network 100 is shown in which aspects of the present disclosure may be performed. The wireless communication network 100 may be a NR system (e.g., a 5G NR network). Figure 1As shown in , according to aspects of the present disclosure, UE 120a includes a scheduling manager 122, which determines a value of a scheduling offset (e.g., for DL / UL resource grant) based at least in part on a minimum scheduling offset value. According to aspects of the present disclosure, BS 110a includes a scheduling manager 112, which determines a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating with the UE.
[0041] NR is an emerging wireless communication technology developed in conjunction with the 5G Technology Forum (5GTF). NR access (e.g., 5G NR) can support a variety of wireless communication services, such as enhanced mobile broadband (eMBB) for wide bandwidth (e.g., 80MHz or higher), millimeter wave (mmWave) for high carrier frequencies (e.g., 25GHz or higher), massive machine type communications MTC (mMTC) for non-backward compatible MTC technologies, and / or mission-critical services for ultra-reliable low latency communications (URLLC). These services may include latency and reliability requirements. These services may also have different transmission time intervals (TTIs) to meet corresponding quality of service (QoS) requirements. In addition, these services can coexist in the same subframe.
[0042] like Figure 1 As shown in , the wireless communication network 100 may include multiple base stations (BSs) 110a-z (each also individually referred to as BS110 or collectively referred to as BS110 in this document) and other network entities. BS 110 can provide communication coverage for a specific geographic area (sometimes referred to as a "cell"), which can be stationary or can move according to the location of the mobile BS 110. In some examples, BS110 can be interconnected with each other and / or to one or more other BSs or network nodes (not shown in the figure) in the wireless communication network 100 through various types of backhaul interfaces (e.g., direct physical connections, wireless connections, virtual networks, etc.) using any suitable transmission network. Figure 1 In the example shown, Figure 1As shown, BS110a, BS110b, and BS110c may be macro BSs corresponding to macrocell 102a, macrocell 102b, and macrocell 102c, respectively. BS110x may be a pico BS corresponding to picocell 102x. BS110y and 110z may be femto BSs corresponding to femtocells 102y and 102z, respectively. A BS may support one or more cells. In the wireless communication network 100, BS110 communicates with user equipment (UE) 120a-y (each also individually referred to as UE 120 or collectively referred to as UE 120 herein). UE 120 (e.g., 120x, 120y, etc.) may be dispersed throughout the wireless communication network 100, and each UE 120 may be stationary or mobile.
[0043] The wireless communication network 100 may also include a relay station (e.g., relay station 110r), also referred to as a relay station, etc., which receives transmissions of data and / or other information from an upstream station (e.g., BS110a or UE 120r) and sends transmissions of data and / or other information to a downstream station (e.g., UE 120 or BS110), or relays transmissions between UEs 120 to facilitate communication between devices.
[0044] A network controller 130 may couple to a set of BSs 110 and provide coordination and control for these BSs 110. The network controller 130 may communicate with the BSs 110 via a backhaul. The BSs 110 may also communicate with each other (eg, directly or indirectly) via a wireless or wired backhaul.
[0045] Figure 2 It is shown (for example, Figure 1 1 and 2. Exemplary components of a BS 110a and a UE 120a in a wireless communication network 100 of the present invention, which may be used to implement aspects of the present disclosure.
[0046] At BS 110a, a transmit processor 220 may receive data from a data source 212 and control information from a controller / processor 240. The control information may be for a physical broadcast channel (PBCH), a physical control format indicator channel (PCFICH), a physical hybrid ARQ indicator channel (PHICH), a physical downlink control channel (PDCCH), a group common PDCCH (GC PDCCH), etc. The data may be for a physical downlink shared channel (PDSCH), etc. The processor 220 may process (e.g., encode and symbol map) the data and the control information to obtain data symbols and control symbols, respectively. The transmit processor 220 may also generate reference symbols, e.g., for a primary synchronization signal (PSS), a secondary synchronization signal (SSS), and a cell-specific reference signal (CRS). A transmit (TX) multiple-input multiple-output (MIMO) processor 230 may perform spatial processing (e.g., precoding) on data symbols, control symbols, and / or reference symbols (if applicable), and may provide output symbol streams to modulators (MODs) 232a-232t. Each modulator 232 may process a corresponding output symbol stream (e.g., for OFDM, etc.) to obtain an output sample stream. Each modulator may further process (e.g., convert to analog, amplify, filter, and upconvert) the output sample stream to obtain a downlink signal. The downlink signals from modulators 232a-232t may be transmitted via antennas 234a-234t, respectively.
[0047] At UE 120a, antennas 252a-252r can receive downlink signals from BS110a and can provide received signals to demodulators (DEMODs) in transceivers 254a-254r, respectively. Each demodulator 254 can adjust (e.g., filter, amplify, downconvert, and digitize) a corresponding received signal to obtain input samples. Each demodulator can further process the input samples (e.g., for OFDM, etc.) to obtain received symbols. MIMO detector 256 can obtain received symbols from all demodulators 254a-254r, perform MIMO detection on the received symbols (if applicable), and provide detected symbols. Receive processor 258 can process (e.g., demodulate, deinterleave, and decode) the detected symbols, provide decoded data for UE 120a to data sink 260, and provide decoded control information to controller / processor 280.
[0048] On the uplink, at the UE 120a, a transmit processor 264 may receive and process data from a data source 262 (e.g., for a physical uplink shared channel (PUSCH)) and control information from a controller / processor 280 (e.g., for a physical uplink control channel (PUCCH)). The transmit processor 264 may also generate reference symbols for reference signals (e.g., for a sounding reference signal (SRS)). The symbols from the transmit processor 264 may be precoded by a TX MIMO processor 266 (if applicable), further processed by a demodulator in a transceiver 254a-254r (e.g., for SC-FDM, etc.), and transmitted to the BS 110a. At the BS 110a, the uplink signal from the UE 120a may be received by the antenna 234, processed by the modulator 232, detected by the MIMO detector 236 (if applicable), and further processed by the receive processor 238 to obtain decoded data and control information transmitted by the UE 120a. The receive processor 238 may provide decoded data to a data sink 239 and decoded control information to a controller / processor 240 .
[0049] Memories 242 and 282 may store data and program codes for BS 110a and UE 120a, respectively.A scheduler 244 may schedule UEs for data transmission on the downlink and / or uplink.
[0050] The controller / processor 280 and / or other processors and modules at the UE 120a may perform or direct the execution of processes for the techniques described herein. Figure 2 As shown in, according to the described aspects, the controller / processor 280 of the UE 120a has a scheduling manager 281, which determines the value of the scheduling offset (e.g., for DL / UL resource grant) based at least in part on the minimum scheduling offset value. According to aspects described herein, the controller / processor 240 of the BS 110a has a scheduling manager 241, which determines the minimum scheduling offset value for the scheduling offset, and the minimum scheduling offset value indicates the scheduling delay for communicating with the UE. Although shown at the controller / processor, other components of the UE 120a and the BS 110a can be used to perform the operations described herein.
[0051] Figure 3is a diagram showing an example of a frame format 300 for NR. The transmission timeline for each of the downlink and uplink may be divided into units of radio frames. Each radio frame may have a predetermined duration (e.g., 10 ms) and may be divided into 10 subframes, each of 1 ms and having indices 0 to 9. Each subframe may include a variable number of slots, depending on the subcarrier spacing. Each slot may include a variable number of symbol periods (e.g., 7, 12, or 14 symbols), depending on the subcarrier spacing. The symbol periods in each slot may be assigned indices. A mini slot, which may be referred to as a subslot structure, refers to a transmission time interval having a duration less than one slot (e.g., 2, 3, or 4 symbols).
[0052] Each symbol in a slot may indicate a link direction (e.g., DL, UL, or flexible) for data transmission, and the link direction for each subframe may be switched dynamically. The link direction may be based on the slot format. Each slot may include DL / UL data and DL / UL control information.
[0053] In NR, a synchronization signal (SS) block is transmitted. The SS block includes PSS, SSS, and two symbols PBCH. It can be sent at fixed time slot positions (e.g. Figure 3 SS blocks are sent in symbols 0-3 shown in . The UE can use PSS and SSS for cell search and acquisition. PSS can provide half-frame timing, and SS can provide CP length and frame timing. PSS and SSS can provide cell identity. PBCH carries some basic system information, such as downlink system bandwidth, timing information within a radio frame, SS burst set periodicity, system frame number, etc. SS blocks can be organized into SS bursts to support beam scanning. Other system information such as remaining minimum system information (RMSI), system information block (SIB), other system information (OSI) can be sent on the physical downlink shared channel (PDSCH) in certain subframes. For mmW, SS blocks can be sent up to 64 times, for example, with up to 64 different beam directions. Up to 64 transmissions of SS blocks are called SS burst sets. SS blocks in one SS burst set are sent in the same frequency region, while SS blocks in different SS burst sets can be sent at different frequency positions.
[0054] Example Minimum Scheduling Offset
[0055] In certain wireless communication networks (e.g., 5G NR), scheduling events (e.g., DL / UL resource grants or non-periodic triggers) may be supported on a cross-slot or intra-slot basis (i.e., the same slot). For example, under cross-slot scheduling, a UE may receive downlink control signaling (e.g., a downlink control information (DCI) message) in one slot for scheduling the UE to receive DL transmissions in another slot. Under intra-slot scheduling, a UE may receive a DCI in one slot that schedules the UE to receive DL transmissions in the same slot. Switching from intra-slot scheduling to cross-slot scheduling may enable the UE to reduce power consumption. For example, cross-slot scheduling may facilitate longer micro-sleep cycles (e.g., when the radio interface is temporarily disabled but signal processing is enabled), such as when PDCCH processing is not within a critical timeline. A longer scheduling offset under cross-slot scheduling may enable the UE to have enough time to wake up from sleep and enable the radio interface. Scheduling events via cross-slot scheduling or intra-slot scheduling may be applicable to DL / UL resource grants (eg, PDSCH / PUSCH) and other DCI-triggered events, such as aperiodic channel state information reference signal (A-CSI-RS) monitoring and reporting.
[0056] Figure 4A 402 may be a time slot in which a UE receives a DCI 402 from a BS via a control channel (eg, PDCCH). The DCI 402 may be a time slot in which a UE receives a DCI 402 from a BS via a control channel (eg, PDCCH). n is received and indicates a scheduling offset (eg, via parameter k0) for the time slot n+1 The DL scheduling offset parameter k0 is greater than zero and provides a delay between a DL grant (DCI 402) and corresponding DL data reception (e.g., via PDSCH). That is, the scheduling offset can be a specific duration (e.g., the number of time domain resources) away from a specific reference point (e.g., the time domain resource for receiving downlink signaling (e.g., DCI 402) or sending uplink signaling). In some cases, the delay between control signaling (DCI 402) and data transmission 404 can cause the UE to enter a micro-sleep state to reduce power consumption. In this example, in a time slot (e.g., time slot n+1 ), the UE may not wait for the PDCCH processing to complete before entering the micro-sleep state because the UE has already received the PDCCH from the previous time slot (e.g., time slot n ) to know whether the gNB will receive a PDCCH for this time slot (e.g., time slot n+1 ) sends PDSCH.
[0057] Figure 4B406 may be sent in a time slot. n+1 is received in, and indicates a scheduling offset (eg, via parameter k0) for the same time slot n+1 408 in the time slot in which the UL data transmission 408 is scheduled. In this case, the DL scheduling offset parameter k0 is zero and does not provide a delay between the DL grant (DCI 406) and the corresponding DL data transmission (e.g., via PDSCH). In order to enter the micro-sleep state within a time slot, the UE must wait for the PDCCH processing to complete to ensure that there is no PDSCH scheduled for the same time slot, while still keeping receiving and buffering Rx samples in the case where the DL scheduling DCI is decoded to indicate a PDSCH transmission by the BS in the same time slot. Therefore, compared with the cross-slot scheduling case (e.g., Figure 4A ) (which may result in less power savings), the portion of the timeslot allowed for micro-sleep is much smaller than that of an intra-timeslot (DCI 402) (which may result in less power savings). In some cases, intra-timeslot scheduling may enable the UE to communicate via a URLLC service due to the smaller delay between control signaling (DCI 402) and data transmission 404.
[0058] In some wireless communication networks (e.g., 5G NR), bandwidth parts (BWPs) provide a flexible framework for dividing frequency domain resources in a given carrier. Using bandwidth parts, a carrier can be subdivided into different bandwidth segments. For example, BWPs can overlap or be discontinuous with each other (i.e., separated from each other by guard bands, for example). BWPs can also be used for various purposes or functions. For example, during low data activity (e.g., low throughput requirements), the UE can communicate with a narrower BWP, while during high data activity (e.g., high throughput requirements), the UE can communicate with a wider BWP. Compared with a wider BWP, a narrower BWP can provide a more energy-efficient solution for wireless communication. That is, the UE can switch from a wider BWP to a narrower BWP so that power consumption for wireless communication can be reduced. As another example, different BWPs can be used for different services or functions, such as eMBB or URLLC transmission. In some cases, different BWPs can enable coexistence of other systems or networks.
[0059] Figure 5 5 shows an exemplary cross-BWP scheduling of downlink communications in accordance with certain aspects of the present disclosure. The UE may receive DCI 502 from the BS via a control channel on a first BWP (eg, a narrow BWP). The DCI 502 may be sent in a time slot m+1is received in and indicates a BWP identifier of a second BWP (eg, a wider BWP) and a scheduling offset (eg, via parameter k0) that is in the time slot of the second BWP m+2 The BWP identifier may be a value (integer value) used to refer to a BWP among a plurality of BWPs configured on the UE. For example, assuming that the UE is in time slot m+1 The previous time slot (e.g., time slot n+2 ) receives a small amount of data and in the time slot m+1 A large amount of data arrives for transmission to the UE. The BS can configure the UE to switch to a wider BWP, e.g. m+2 After a certain duration, the UE may, for example, x A DCI 506 is received instructing a switch to a first BWP (eg, a narrow BWP).
[0060] In certain wireless communication networks (e.g., 5G NR), the minimum scheduling offset can be used to determine various actions related to downlink scheduling events, such as DL / UL authorization, cross-BWP scheduling, or cross-carrier scheduling. In some aspects, the minimum scheduling offset can be the minimum applicable value for k0, k2, and A-CSI-RS triggering. In the case where k0 / k2 is lower than the minimum scheduling offset, the UE can invalidate the DCI based on the indicated k0 / k2, or adjust the indicated k0 / k2 according to the minimum scheduling offset. In other cases, when the UE receives an indication of the minimum scheduling offset k0 / k2, the UE does not expect the entry in the active DL (UL) time domain resource allocation (TDRA) table to have a k0 (k2) value smaller than the indicated minimum value.
[0061] One or more values of the minimum scheduling offset may be configured via downlink control signaling (e.g., radio resource control (RRC) signaling and / or DCI). For example, the minimum scheduling offset value may be directly assigned to the UE via DCI signaling. In other cases, the UE may receive an indication of the minimum scheduling offset value from one or more values pre-configured by RRC signaling. The L1-based adjustment of the minimum scheduling offset may be attached to the time domain resource allocation adjustment based on BWP switching. A non-zero A-CSI-RS trigger offset may be used for non-type D quasi-colocation (QCL) monitoring and reporting. The minimum A-CSI-RS trigger offset may be implicitly indicated based on the minimum value of k0. The L1-based adjustment of the minimum applicable value k0 may not be applicable to SI / RA / TC / P-RNTI in the type 0 / 0A / 1 / 2 common search space. The L1-based adjustment of the minimum applicable value k2 may not be applicable to PUSCH scheduled by MAC RAR for contention-based and non-contention-based RACH or PUSCH scheduled by TC-RNTI.
[0062] In a multi-carrier or multi-BWP configuration, the minimum scheduling offset value may be ambiguous based on different digital schemes associated with the carriers and / or BWPs. For example, when the target BWP has a different digital scheme than the active BWP on which the cross-BWP scheduling instruction is received, the UE configured with the minimum scheduling offset value may misunderstand the minimum scheduling offset value used for cross-BWP scheduling. Assume, for example, when the target BWP has a subcarrier spacing (SCS) of 30kHz, the active BWP has an SCS of 15kHz, and the minimum scheduling offset is defined from the perspective of the time slot. In this case, the time slot duration of the active BWP is 1ms, while the time slot duration of the target BWP is 0.5ms, which may cause the UE to attempt to apply the minimum scheduling offset for half of the expected duration. Therefore, the misunderstood minimum scheduling offset may cause transmission loss and / or increased power consumption. In other cases, the minimum scheduling offset can be updated to handle different digital schemes, but this scheme will result in increased downlink signaling / overhead.
[0063] Aspects of the present disclosure generally relate to a framework for determining a minimum scheduling offset on a downlink triggering event under a multi-carrier and / or multi-BWP configuration. Such a scheduling framework can provide efficient wireless communication, including desired power consumption and reduced overhead signaling. As an example, a minimum scheduling offset can be given in terms of time domain resources (e.g., the number of time slots) according to a digital scheme of an active BWP, a reference digital scheme, or a set of values associated with various BWPs. In other cases, the minimum scheduling offset can be set according to units of k0 or k2. As another example, the minimum scheduling offset can be set according to an absolute time value. With cross-BWP and / or cross-carrier scheduling, as further described herein, a minimum scheduling offset can be defined for each component carrier (CC) (e.g., across BWPs in a given CC) or for each BWP. The UE can be configured to various values of the minimum scheduling offset via downlink control signaling, including downlink control information (DCI), a media access control (MAC) control element (CE), or a radio resource control (RRC) configuration.
[0064] In the case where a minimum scheduling offset is defined for each CC, the minimum scheduling offset can be defined from the perspective of the digital scheme of the specified BWP (e.g., 15kHz SCS). In multiple aspects, the minimum scheduling offset can have a value associated with each BWP in the CC (e.g., minimum scheduling offset parameter, for 15kHz SCS, X=2 slots, and for 30kHz SCS, X=4 slots). In other aspects, the minimum scheduling offset can be defined from the perspective of an absolute time value, such as 2ms. When applied to k0 or k2, the minimum scheduling offset can be converted to the corresponding SCS of the PDSCH or PUSCH.
[0065] In some cases, where the BWP is for different data usage scenarios (e.g., a narrow BWP for low data usage and low power consumption), the minimum scheduling offset defined for each CC may not be appropriate. For example, when switching to a narrower BWP, it may also be desirable to change the minimum scheduling offset that helps save power (e.g., a longer minimum scheduling offset). As another example, when switching to a wider BWP, it may be desirable to have a shorter minimum scheduling offset to facilitate lower latency communications. If the minimum scheduling offset is universal across CCs, it may result in higher signaling overhead, for example, updating the minimum scheduling offset when switching BWPs. Instead, the minimum scheduling offset can be defined for each BWP to take into account changes in the digital scheme or functionality of the BWP.
[0066] In certain aspects, a minimum scheduling offset may be defined for each BWP according to various frameworks. For example, when the UE is instructed to switch from an active BWP to a target BWP (e.g., triggered by cross-BWP scheduling), the minimum scheduling offset may be defined according to the digital scheme of the active BWP. In other cases, the minimum scheduling offset may be defined according to the digital scheme of the target BWP. In various aspects, the minimum scheduling offset may be defined according to the maximum of the minimum value associated with the active BWP and the minimum value associated with the target BWP. In other aspects, the minimum scheduling offset may be defined according to the sum of the minimum value associated with the active BWP and the minimum value associated with the target BWP. In other aspects, the minimum scheduling offset may be defined for independently cross-BWP scheduling.
[0067] In case the minimum scheduling offset is defined according to the digital scheme of the active BWP, the minimum scheduling offset provides the same delay as scheduling within the same BWP before the BWP switch. If the current BWP has a different digital scheme than the target BWP, and if the minimum scheduling offset is defined in the number of slots of the digital scheme of the current BWP, then the conversion of the offset to the digital scheme of the target BWP can be applied for cross-BWP scheduling. For example, the minimum scheduling offset conversion can be given by the following expression:
[0068]
[0069] Where X' is the minimum schedule offset after the transition, X is the minimum schedule offset being transitioned, i.e., the minimum offset associated with the active BWP, and μ BWP,target is the numerical solution of the target BWP, μ BWP,curr It is the digital solution of the event BWP.
[0070] Fig. 6A An exemplary intra-BWP scheduling of downlink communications according to certain aspects is shown, wherein a minimum scheduling offset is defined according to a digital scheme of an active BWP. Assume that the BWP switching delay is configured to be 1 time slot according to a 15kHz SCS and 2 time slots according to a 30kHz SCS, the minimum scheduling offset (X) associated with BWP0 (15kHz SCS) is set to 2 time slots, the minimum scheduling offset (X) associated with BWP1 (30kHz SCS) is set to 0 time slots, and BWP0 and BWP1 can both have various k0 values configured. As shown, the UE can receive DCI 602 from the BS via a control channel (e.g., PDCCH). The DCI 602 can be in a time slot n is received and indicates that the n+2The scheduling offset (eg, k0=2) for scheduling cross-slot DL data transmission 604 is used in the scheduling. If the minimum scheduling offset associated with the active BWP (BWP0) is applied, the scheduling offset of k0=2 satisfies the minimum scheduling offset value of 2 slots.
[0071] Figure 6B 606. Example cross-BWP scheduling and intra-BWP scheduling of downlink communications according to certain aspects of the present disclosure are shown, wherein the active BWP provides the minimum scheduling offset. As shown, the UE may receive DCI 606 from the BS via a control channel (e.g., PDCCH). DCI 606 may be in time slot n is received and indicates the BWP identifier of BWP1 and the time slot for BWP1 n+2 The scheduling offset of the cross-slot DL data transmission 608 is scheduled in (eg, from the perspective of BWP1, k0=2). Assume that Fig. 6A The same scheduling parameters described (BWP switching delay, k0, and x) apply in this example, and if the minimum scheduling offset associated with the active BWP (BWP0) is converted to the digital scheme of the target BWP, then, for example, according to equation (1), the conversion returns a minimum scheduling offset of 4 time slots in terms of BWP1. In this example, k0=2 is lower than the converted minimum scheduling offset, but not the effective DCI setting. In contrast, if DCI 606 indicates a time slot of BWP1, then the minimum scheduling offset associated with the active BWP (BWP0) is converted to the digital scheme of the target BWP. For example, according to equation (1), the conversion returns a minimum scheduling offset of 4 time slots in terms of BWP1. n+4 In the scheduling offset of scheduling cross-slot DL data transmission 610 (for example, in the BWP1 aspect, k0=4), the scheduling offset (k0=4) satisfies the minimum scheduling offset. In various aspects, the DL / UL grant parameters (k0, k2) can be checked according to the following expressions:
[0072]
[0073] If the DL / UL grant parameter (k0, k2) is less than or equal to the converted minimum scheduling offset (X'), the DL / UL grant parameter (k0, k2) may be considered an invalid parameter. In other words, the UE may not expect the DL / UL grant parameter (k0, k2) to be less than or equal to the converted minimum scheduling offset. If the DL / UL grant parameter (k0, k2) is greater than (or equal to) the converted minimum scheduling offset, the DL / UL grant parameter (k0, k2) may be considered a valid parameter.
[0074] Reference Figure 6B , the UE may receive DCI 612 for scheduling intra-slot DL data transmission 614. In this example, the UE may apply a minimum scheduling offset (BWP1) of an active BWP of 0 slots, which facilitates intra-slot scheduling.
[0075] In the case where the minimum scheduling offset is defined according to the digital scheme of the target BWP, the minimum scheduling offset provides a consistent k0 or k2 determination for cross-BWP scheduling, which takes into account the digital scheme changes as discussed previously in this article. For cross-BWP scheduling, the k0 / k2 scheduling offset parameter can be interpreted based on the TDRA table of the target BWP. In the case where the current BWP has a different digital scheme from the target BWP, the minimum scheduling offset of the target BWP and the indicated k0 / k2 can be based on the same digital scheme (of the target BWP). Because the UE can receive a cross-BWP grant at any time slot and does not know in advance which BWP will be the target, the minimum scheduling offset of all possible target BWPs can be considered, and it is likely that the PDCCH processing time budget will be driven by the minimum scheduling offset with the least number of all BWPs (i.e., the current target and possible targets). Such a framework may not be preferred for making the minimum scheduling offset dedicated to the BWP.
[0076] In certain aspects, in the case where the target BWP provides the minimum scheduling offset, the minimum scheduling offset of the current BWP can be added to the BWP switching delay as the overall delay required for switching across BWPs. Figure 7 An exemplary table of various BWP switching delay values (e.g., in terms of time slots) associated differently with the digital scheme (μ) is shown. In certain aspects, the indicated k0 or k2 (in the digital scheme of the target BWP) in the cross-BWP grant can be expected to meet the determined overall delay (the sum of the current BWP and the BWP switching delay), and can also be expected to meet the minimum scheduling offset of the target BWP.
[0077] The BWP switching delay may take into account various assumptions, for example, related to k0=0 and k2=0 scheduling (i.e., intra-slot scheduling). For example, the BWP switching delay may include time for PDCCH processing, RF switching delays, and other software-controlled delays. With non-zero minimum values k0 and k2, the PDCCH processing timeline may be relaxed. If the BWP switching delay is not updated accordingly, the relaxed PDCCH processing time may overlap with other time budgets, such as for RF switching. For cross-BWP scheduling (e.g., triggering BWP switching), the indicated k0 or k2 may be large enough to accommodate the sum of the minimum scheduling offset associated with the target BWP (converted to the digital scheme of the target BWP, if different) and the BWP switching delay. An adjustment entry (e.g., plus or minus 1 slot) may be added to the sum. Optionally, the added offset may be specifically configured and different from the minimum scheduling offset of the BWP.
[0078] In certain aspects, for DCI-based BWP switching, after the UE receives a BWP switching request at time slot n on the serving cell, the UE may receive a PDSCH (for a DL active BWP switching) or send a PUSCH (for an UL active BWP switching) on a new BWP on the serving cell no later than time slot n+T BWP切换延迟 If either of the minimum applicable values of k0 and k2 for the currently active DL and UL BWPs (e.g., the minimum scheduling offsets corresponding to k0 and k2) is greater than zero, the smaller of the two may be added to T BWP切换延迟 The UE may not expect to detect DCI format 1_1 or DCI format 0_1, which indicates that the active DL BWP or active UL BWP changes respectively with the corresponding time domain resource allocation field, which provides a time slot offset value for PDSCH reception or PUSCH transmission, which is less than the delay required by the UE for the active DL BWP change or UL BWP change and is added to the corresponding minimum scheduling offset.
[0079] Fig. 8A An exemplary intra-BWP scheduling of downlink communications according to certain aspects is shown, wherein a target BWP may provide a minimum scheduling offset. Assuming that the BWP switching delay is configured to be 1 time slot according to 15kHz SCS and 2 time slots according to 30kHz SCS, the minimum scheduling offset (X) associated with BWP0 (15kHz SCS) is set to 2 time slots, the minimum scheduling offset (X) associated with BWP1 (30kHz SCS) is set to 0 time slots, and BWP0 and BWP1 may be configured with various k0 values. As shown, the UE may receive DCI 802 from the BS via a control channel (e.g., PDCCH). The DCI 802 may be in the time slot n is received and indicates the time slot for n+2 The scheduling offset (eg, k0=2) for scheduling cross-slot DL data transmission 804 in BWP0 is used. If the minimum scheduling offset associated with the target BWP (BWP0) is applied, the scheduling offset k0=2 satisfies the minimum scheduling offset value of 2 slots.
[0080] Figure 8B 806 from the BS via a control channel (e.g., PDCCH). The DCI 806 may be sent in a time slot nis received and indicates the BWP identifier associated with BWP1 and the time slot of BWP1 n+2 The scheduling offset of the cross-slot DL data transmission 608 is scheduled in (eg, for BWP1, k0=2). Assume that Fig. 8A The same scheduling parameters described (BWP switching delay, k0, and X) apply to this example, and if the minimum scheduling offset associated with the target BWP (BWP0) is applied, then the scheduling offset k0=2 satisfies the minimum scheduling offset value (X) of 0 time slots and the BWP switching delay of 2 time slots. Fig. 8A Compared to the intra-BWP scheduling case depicted in , the potential PDCCH processing time budget is smaller. Since the UE does not know when it is scheduled with an intra-BWP grant or a cross-BWP grant, the UE must assume the worst-case (i.e., minimum) PDCCH processing time budget. In this case, considering Figure 8B In the case of cross-BWP grant processing depicted in , the larger minimum scheduling offset configured for BWP0 may not be able to fully relax the PDCCH processing timeline.
[0081] Figure 8C 810 is a diagram illustrating another exemplary intra-BWP scheduling of downlink communications according to certain aspects, wherein the minimum scheduling offset is based on the BWP switching delay. As shown, the UE may receive DCI 810 from the BS via a control channel (e.g., PDCCH). The DCI 810 may be in a time slot n is received and indicates the BWP identifier associated with BWP1 and the time slot for BWP1. n+6 The scheduling offset of the cross-slot DL data transmission 608 is scheduled in (eg, for BWP1, k0=6). Assume that Fig. 8A The same scheduling parameters described (BWP switching delay, k0, and X) apply to this example, and if the minimum scheduling offset is based on the BWP switching delay, then a scheduling offset of k0=6 satisfies the sum of the minimum scheduling offset value (X) associated with the active BWP (BWP0) of 2 time slots (in terms of BWP0) and the BWP switching delay of 2 time slots (in terms of BWP1). This solution solves the problem with Fig. 8A Problem associated with the scheme shown in : Since cross-BWP scheduling is also considered, the large minimum scheduling offset configured for BWP0 can be used to fully relax the PDCCH processing time budget.
[0082] In various aspects, the minimum scheduling offset can be defined based on the maximum of a minimum value associated with the active BWP and a minimum value associated with the target BWP. For example, if the minimum offset of the active BWP is 2 slots and the minimum offset of the target BWP is 1 slot, the cross-BWP scheduling can have a scheduling offset k0 / k2 of at least max(2,1), which is 2 slots in this example. If the BWPs have different digital schemes, the offset of the current BWP can be converted to the digital scheme of the target BWP before performing the max operation, for example, according to equation (1).
[0083] In certain aspects, a minimum scheduling offset may be defined based on a sum of parameters including a minimum value associated with an active BWP and a minimum value associated with a target BWP. For example, if the minimum offset of the active BWP is set to 2 slots and the minimum offset of the target BWP is set to 1 slot, then the cross-BWP schedule may have a scheduling offset k0 / k2 of 3 slots. An adjustment entry (e.g., plus or minus 1 slot) may be added to the sum. In some cases, the overall delay may be too large, resulting in increased delay. If the BWPs have different digital schemes, the offset of the current BWP may be converted to the digital scheme of the target BWP before performing the max operation, e.g., according to equation (1).
[0084] In certain aspects, a minimum scheduling offset may be defined for cross-BWP scheduling independently of other scheduling events. Because a UE may receive a cross-BWP grant at any timeslot, this effectively means that two minimum scheduling offsets may be considered at any timeslot. For example, the minimum scheduling offset for cross-BWP scheduling may be the minimum of the minimum value associated with the active BWP and the minimum value corresponding to cross-BWP scheduling.
[0085] Although the examples provided herein are described with respect to DL / UL scheduling grants regarding k0 / k2 to facilitate understanding, aspects of the present disclosure may also be applied to cross-BWP scheduling, cross-carrier scheduling, or other downlink control signaling event triggering (e.g., A-CSI-RS monitoring and reporting).
[0086] In certain aspects, the minimum scheduling offset may be set according to cross-carrier scheduling. The explicit configuration / signal of the minimum scheduling offset may be a unified mechanism that applies to both self-carrier scheduling and cross-carrier scheduling with the same or different digital schemes. For example, according to the various BWP-based mechanisms described herein, the minimum scheduling offset may be defined based on the configuration and digital scheme of the target BWP of the target CC. In other aspects, the minimum scheduling offset may be defined based on the configuration and digital scheme of the active BWP of the scheduling CC (i.e., the CC on which the scheduling is received). In this case, for example, according to the following expression, the minimum scheduling offset of the active BWP of the scheduling CC may be converted to the digital scheme of the PDSCH / PUSCH on the scheduling CC.
[0087]
[0088] In various aspects, the DL / UL grant parameters (k0, k2) may be checked according to the following expressions:
[0089]
[0090] As previously discussed, if the DL / UL grant parameter (k0, k2) is less than or equal to the converted minimum scheduling offset (X'), the DL / UL grant parameter (k0, k2) may be considered an invalid parameter. In other words, the UE may not expect the DL / UL grant parameter (k0, k2) to be less than or equal to the converted minimum scheduling offset. If the DL / UL grant parameter (k0, k2) is greater than (or equal to) the converted minimum scheduling offset, the DL / UL grant parameter (k0, k2) may be considered a valid parameter.
[0091] In certain wireless communication systems (e.g., 5G NR), the UE may determine when to apply an updated value of the minimum scheduling offset, as described herein. For example, for active DL and active UL BWPs, when the UE is instructed by L1-based signaling in slot n to change the minimum scheduling offset value k0 and / or k2, it may not be expected that the UE will apply the new minimum scheduling offset value before the slot value given by the following expression:
[0092]
[0093]
[0094] Where X=max(Y,Z), Y is the minimum scheduling offset value k0 before the indicated change, and Z is the minimum number of feasible non-zero application delays (e.g., 1). In another example, X=Y+Z is another way to ensure that X is at least as large as the minimum number of feasible non-zero application delays. In some cases, this mechanism for determining when to apply a new minimum scheduling offset may not be applicable to certain scheduling situations, or may result in inefficiencies, such as increased latency or inefficient power consumption.
[0095] Certain aspects of the present disclosure provide enhancements to a framework for updating a minimum scheduling offset based on an application delay. In general, the effective start time of the updated minimum value may not be earlier than the current minimum value. In certain aspects, Y with respect to equation (5) and equation (6) may be the minimum of the minimum scheduling offset value k0 and the minimum scheduling offset value k2. In other aspects, the application delay may be determined based on an absolute time value, a plurality of time domain resources (e.g., time slots), or a BWP switching delay value.
[0096] Fig. 9 900 is a flow chart illustrating example operations 900 for wireless communication according to certain aspects of the present disclosure. For example, the operations 900 may be performed by a UE (e.g., UE 120a in the wireless communication network 100). The operations 900 may be implemented as a processor (e.g., Figure 2 In addition, the UE may transmit and receive signals in operation 900, for example, through one or more antennas (e.g., Figure 2 In some aspects, the UE may transmit and / or receive signals via a bus interface of one or more processors (eg, controller / processor 280) for obtaining and / or outputting signals.
[0097] Operations 900 may begin at 902, where a UE may receive one or more configurations from a base station indicating wireless communication resources, the wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs). At 904, the UE may receive control signaling from the base station indicating a scheduling offset for communicating with the base station via at least one BWP within at least one CC. At 906, the UE may determine a value of the scheduling offset based at least in part on a minimum scheduling offset value. At 908, the UE may take at least one action in response to the determination.
[0098] At 904, a scheduling offset may provide a scheduling delay (e.g., a specific duration in terms of time domain resources) between the end of a reference point (e.g., a PDCCH transmission) and the start of a transmission or event scheduled by the PDCCH. For example, the scheduling offset may indicate a value for k0 and / or k2 for DL / UL resource grants. In other cases, the scheduling offset may provide a delay from a reference point (e.g., a PDCCH transmission) and the start of an event, such as cross-BWP scheduling, cross-carrier scheduling, or other downlink control signaling event triggering (e.g., A-CSI-RS monitoring and reporting).
[0099] The minimum scheduling offset value may be determined based on various reference units (e.g., digital schemes of SCS, time domain resources, reference parameters, or time units). For example, the minimum scheduling offset value may be given in terms of time domain resources (e.g., time slots) and converted to an absolute value of time based on a certain reference system. In various aspects, the minimum scheduling offset value may be determined based on a digital scheme of an active BWP in a plurality of BWPs. In other aspects, the minimum scheduling offset value may be determined based on a reference digital scheme such as a specified SCS. In some cases, the UE may be configured with a set of minimum scheduling offset values, and each value may correspond to a different BWP. For example, the minimum scheduling offset value may be selected from a plurality of minimum values, each of which corresponds to one of a plurality of BWPs. As an example, the minimum scheduling offset value in a plurality of minimum values may be selected from a value associated with a specific BWP (e.g., an active BWP or a target BWP) via an indication (e.g., a bitmap or a bit flag) received in a downlink control signaling (e.g., DCI). That is, the indication carried via downlink control signaling may be mapped to the minimum value configured for the specific BWP, and the UE may select the minimum scheduling offset based on the indication.Each value may be set in terms of the digital scheme of the corresponding BWP.
[0100] In other aspects, the minimum scheduling offset value may have the same units as the scheduling offset parameters k0 and / or k2. That is, the minimum scheduling offset value may be determined to have the same numerical scheme as the scheduling offset (e.g., k0 and / or k2). The minimum scheduling offset value may be set to an absolute time value (e.g., 1 ms). That is, the unit of the minimum scheduling offset value may be expressed in time units (e.g., milliseconds or microseconds).
[0101] In certain aspects, a minimum scheduling offset may be configured for each CC. That is, the same minimum scheduling offset may be applied across BWPs within a CC. As an example, at 904, control signaling may indicate communication with the base station via a target BWP different from the active BWP.
[0102] Alternatively or additionally, a minimum scheduling offset may be configured for each BWP. As an example, at 904, control signaling may indicate communication with the base station via a target BWP that is different from the active BWP. The minimum scheduling offset may be configured for each BWP under various schemes. In one aspect, some BWPs may be configured with one or more separate minimum scheduling offsets (e.g., via RRC signaling), and the value of the minimum scheduling offset may be determined or interpreted in terms of a numerical scheme for a specific BWP (e.g., an active BWP or a target BWP). For example, the minimum scheduling offset value may be set based on a minimum value (e.g., a minimum applicable value) associated with an active BWP, for example, as described herein with reference to Figure 6B as described. That is, one of the minimum values configured for the active BWP can be used as the minimum scheduling offset value for various scheduling. For example, the UE can receive downlink control signaling for selecting one of the minimum values associated with the active BWP, and the selected minimum value can represent the minimum scheduling offset for various scheduling, for example, in a BWP switching process from an active BWP to a target BWP (e.g., a new active BWP indicated in a BWP switching). In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP can be converted to the digital scheme of the minimum value associated with the target BWP. As an example, operation 900 can further include: the UE converts the minimum value associated with the active BWP into the digital scheme of the target BWP, and the minimum scheduling offset value can be set according to the converted minimum value.
[0103] In other cases, the minimum scheduling offset value may be set according to a minimum value associated with a target BWP. In cases where the minimum value associated with a target BWP may provide an insufficient delay, the minimum scheduling offset value may be set according to a sum of parameters including a minimum value associated with an active BWP and a BWP switching delay value, e.g., Figure 7 and Figure 8C In certain aspects, the sum of the parameters may also include an adjustment term (eg, a signed value of a time slot). That is, the minimum scheduling offset value may be equal to the sum of the minimum value associated with the active BWP, the BWP switching delay value, and the adjustment term.
[0104] In various aspects, the minimum scheduling offset value may be set according to a maximum of a first minimum value associated with the target BWP and a second minimum value associated with the active BWP. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. For example, operation 900 may further include: the UE converting the second minimum value associated with the active BWP to the digital scheme of the target BWP, and the minimum scheduling offset value may be set according to the maximum of the first minimum value associated with the target BWP and the converted second minimum value.
[0105] In some aspects, the minimum scheduling offset value may be set according to a sum of parameters including a first minimum value associated with a target BWP and a second minimum value associated with an active BWP. In some aspects, the sum of the parameters may also include an adjustment term (e.g., a signed value of a time slot). That is, the minimum scheduling offset value may be equal to the sum of the minimum value associated with the target BWP, the minimum value associated with the active BWP, and the adjustment term. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. For example, operation 900 may also include: the UE converts the second minimum value associated with the active BWP to the digital scheme of the target BWP, and the minimum scheduling offset value may be set according to the sum of parameters including the first minimum value associated with the target BWP and the converted second minimum value and an optional adjustment term.
[0106] In other aspects, a minimum scheduling offset value may be configured for each cross-BWP schedule. That is, a minimum scheduling offset may be independently defined for a cross-BWP scheduling event. The minimum scheduling offset for cross-BWP scheduling may be the minimum of a minimum value associated with an active BWP and a minimum value corresponding to a cross-BWP schedule. For example, the minimum scheduling offset value may be set based on the minimum of a first minimum value associated with a cross-BWP schedule and a second minimum value associated with an active BWP.
[0107] In some cases, the UE may receive an updated value for the minimum scheduling offset. In this case, the UE may determine when to apply the updated value. For example, operation 900 may further include the UE receiving additional control signaling from the base station indicating the updated minimum scheduling offset value. For example, as shown in FIG. Figure 7As described, the UE determines the application delay to apply the updated minimum scheduling offset value based on at least one of the absolute time value, the number of time domain resources (e.g., time slots), or the BWP switching delay value. The UE may apply the updated minimum scheduling offset value based on the application delay. That is, the UE may apply the updated minimum scheduling at the time indicated by the application delay. The application delay may be a delay between the control signaling carrying the updated value for the minimum scheduling offset and the time when the updated value is applied.
[0108] In certain aspects, the minimum scheduling offset may be configured for cross-carrier scheduling. In some cases, according to the various BWP-based mechanisms described herein, the minimum scheduling offset may be defined based on the configuration and digital scheme of the target BWP of the target CC. As an example, at 904, control signaling may be received on a first component carrier and indicate communication via a second component carrier, and the minimum scheduling offset value may be configured according to the digital scheme of the active BWP of the second component carrier. That is, the active BWP of the scheduled CC (i.e., the target CC) may provide a minimum scheduling offset and a digital scheme in which the minimum scheduling offset is explained. In other words, the minimum scheduling offset assigned to the active BWP of the scheduled CC may represent the minimum scheduling offset for various scheduling (e.g., cross-carrier scheduling). In other cases, the minimum scheduling offset value may be set according to the maximum value of the active BWP and the target BWP, the sum of the active BWP and the target BWP, or a specific minimum scheduling offset for cross-carrier scheduling.
[0109] In other aspects, the minimum scheduling offset may be defined based on the configuration and digital scheme of the active BWP of the scheduling CC (i.e., the CC on which the scheduling is received). For example, at 904, control signaling may be received on a first component carrier and indicate communication via a second component carrier, and the minimum scheduling offset value may be configured based on the digital scheme of the active BWP of the first component carrier. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (3), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. For example, operation 900 may further include: the UE converting the minimum value associated with the active BWP of the first component carrier to the digital scheme of the target BWP of the second component carrier, and the minimum scheduling offset value may be set based on the converted minimum value.
[0110] In the case where the scheduling offset is equal to or less than (e.g., less than or equal to) the minimum scheduling offset value, the UE may take various actions. For example, if the value of the scheduling offset is lower than the minimum scheduling offset value, the UE may treat the control signaling as invalid and ignore the control signaling. In some cases, in the case where the scheduling offset is lower than the minimum scheduling offset value, the UE may treat the scheduling offset as having a value with the minimum scheduling offset value. In other cases, if the value of the scheduling offset is equal to or greater than the minimum scheduling offset value, the UE may communicate with the base station at the time indicated by the scheduling offset. For example, the scheduling offset may be an uplink grant that enables the UE to send data to the base station. As another example, the scheduling offset may be a downlink grant that enables the UE to receive data from the base station.
[0111] Fig.10 1 is a flow chart illustrating exemplary operations 1000 for wireless communication according to certain aspects of the present disclosure. For example, operations 1000 may be performed by a BS (e.g., BS 110a in wireless communication network 100). Operations 1000 may be complementary operations to operations 900 performed by a UE. Operations 1000 may be implemented as a processor (e.g., Figure 2 In addition, for example, the communication may be performed via one or more antennas (e.g., Figure 2 The BS may transmit and receive signals in operation 1000 using antenna 234. In some aspects, the BS may transmit and / or receive signals by obtaining and / or outputting signals through a bus interface of one or more processors (e.g., controller / processor 240).
[0112] Operations 1000 may begin at 1002, where a BS may determine one or more configurations for indicating wireless communication resources including at least one of a plurality of bandwidth parts (BWPs) or a plurality of component carriers (CCs). At 1004, the BS may send the one or more configurations to a user equipment (UE). At 1006, the BS may determine a minimum scheduling offset value for a scheduling offset for indicating a scheduling delay for communicating via at least one BWP within at least one CC. At 1008, the BS may configure the UE with the minimum scheduling offset value.
[0113] The base station may use the minimum scheduling offset value when determining a scheduling offset value for DL / UL scheduling grants (k0 / k2), cross-BWP scheduling, cross-carrier scheduling, or other downlink control signaling event triggers (e.g., A-CSI-RS monitoring and reporting). For example, when scheduling DL / UL resource grants, the base station may determine a value of k0 / k2 that satisfies a threshold associated with the minimum scheduling offset value (e.g., k0 ≥ minimum scheduling offset value).
[0114] At 1008, the BS may configure the minimum scheduling offset value to the UE, for example, by sending a configuration indicating one or more minimum scheduling offset values to the UE. For example, the BS may configure various values of the minimum scheduling offset to the UE via downlink control signaling, including DCI, MAC-CE, or RRC configuration.
[0115] The minimum scheduling offset value can be determined based on various reference units, such as a digital scheme of the SCS, a time domain resource, a reference parameter, or a time unit. For example, the minimum scheduling offset value can be given based on a time domain resource (e.g., a time slot) and converted to an absolute time value based on a certain reference system. In various aspects, the minimum scheduling offset value can be determined based on a digital scheme of an active BWP in a plurality of BWPs. In other aspects, the minimum scheduling offset value can be determined based on a reference digital scheme (e.g., a specified SCS). In some cases, the UE may be configured with a set of minimum scheduling offset values, and each value may correspond to a different BWP. For example, the minimum scheduling offset value may be selected from a plurality of minimum values, each of which corresponds to one of a plurality of BWPs. Each value may be set according to the digital scheme of the corresponding BWP.
[0116] In other aspects, the minimum scheduling offset value may have the same units as the scheduling offset parameters k0 and / or k2. That is, the minimum scheduling offset value may be determined to have the same numerical scheme as the scheduling offset (e.g., k0 and / or k2). The minimum scheduling offset value may be set to an absolute time value (e.g., 1 ms). That is, the unit of the minimum scheduling offset value may be expressed in time units (e.g., milliseconds or microseconds).
[0117] In certain aspects, a minimum scheduling offset may be configured for each CC. That is, the same minimum scheduling offset may be applied to all BWPs within a CC. As an example, a base station may send control signaling to a UE to indicate that the base station is to be communicated with via a target BWP different from the active BWP, and a minimum scheduling offset value may be configured for each component carrier.
[0118] Alternatively or additionally, a minimum scheduling offset may be configured for each BWP. As an example, the base station may send control signaling to the UE indicating communication with the base station via a target BWP different from the active BWP, and the minimum scheduling offset value may be configured for each BWP under various schemes. For example, the minimum scheduling offset value may be set according to a minimum value associated with, for example, an active BWP as described herein. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. As an example, operation 1000 may also include: the base station converts the minimum value associated with the active BWP into the digital scheme of the target BWP, and the minimum scheduling offset value may be set according to the converted minimum value to determine the scheduling offset.
[0119] In other cases, the minimum scheduling offset value may be set according to a minimum value associated with a target BWP. In cases where the minimum value associated with a target BWP may provide an insufficient delay, for example, as described herein with reference to Figure 7 and Figure 8C As described, the minimum scheduling offset value may be set based on a sum of parameters including a minimum value associated with an active BWP and a BWP switching delay value. In some aspects, the sum of the parameters may also include an adjustment term (e.g., a signed value of a time slot). That is, the minimum scheduling offset value may be equal to the sum of the minimum value associated with an active BWP, the BWP switching delay value, and the adjustment term.
[0120] In various aspects, the minimum scheduling offset value may be set according to a maximum of a first minimum value associated with the target BWP and a second minimum value associated with the active BWP. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. For example, operation 1000 may further include the base station converting the second minimum value associated with the active BWP to the digital scheme of the target BWP, and the minimum scheduling offset value may be set according to a maximum of the first minimum value associated with the target BWP and the converted second minimum value.
[0121] In some aspects, the minimum scheduling offset value may be set according to a sum of parameters including a first minimum value associated with a target BWP and a second minimum value associated with an active BWP. In some aspects, the sum of the parameters may also include an adjustment term (e.g., a signed value of a time slot). That is, the minimum scheduling offset value may be equal to the sum of the minimum value associated with the target BWP, the minimum value associated with the active BWP, and the adjustment term. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (1), the digital scheme of the minimum value associated with the active BWP may be converted to a digital scheme of the minimum value associated with the target BWP. For example, operation 1000 may further include: the base station converts the second minimum value associated with the active BWP to the digital scheme of the target BWP, and the minimum scheduling offset value may be set according to the sum of parameters including the first minimum value associated with the target BWP and the converted second minimum value, and an optional adjustment term.
[0122] In other aspects, a minimum scheduling offset value may be configured for each cross-BWP schedule. That is, a minimum scheduling offset may be independently defined for a cross-BWP scheduling event. The minimum scheduling offset for a cross-BWP schedule may be a minimum of a minimum value associated with an active BWP and a minimum value corresponding to a cross-BWP schedule. For example, the minimum scheduling offset value may be set based on a minimum of a first minimum value associated with a cross-BWP schedule and a second minimum value associated with an active BWP.
[0123] In some cases, the base station may configure an updated value for the minimum scheduling offset for the UE. For example, operation 1000 may further include: the base station determines an updated minimum scheduling offset value, and sends a control signaling indicating the updated minimum scheduling offset value to the UE. The base station may determine an application delay to apply the updated minimum scheduling offset value based on at least one of an absolute time value, a plurality of time domain resources, or a BWP switching delay value. The base station may apply the updated minimum scheduling offset value based on the application delay. That is, the base station may apply the updated minimum scheduling at a time indicated by the application delay.
[0124] In certain aspects, a minimum scheduling offset may be configured for cross-carrier scheduling. In some cases, according to the various BWP-based mechanisms described herein, the minimum scheduling offset may be defined based on the configuration and digital scheme of the target BWP of the target CC. For example, a base station may send control signaling to a UE on a first component carrier to indicate communication via a second component carrier, and the minimum scheduling offset value is configured according to the digital scheme of the active BWP of the second component carrier.
[0125] In other aspects, the minimum scheduling offset may be defined based on the configuration and digital scheme of the active BWP of the scheduling CC (i.e., the CC on which the scheduling is received). For example, the base station may send control signaling to the UE on the first component carrier to indicate communication via the second component carrier, and the minimum scheduling offset value may be configured according to the digital scheme of the active BWP of the first component carrier. In a case where the digital scheme of the active BWP is different from the digital scheme of the target BWP, for example, according to equation (3), the digital scheme of the minimum value associated with the active BWP may be converted to the digital scheme of the minimum value associated with the target BWP. For example, operation 1000 may further include: the base station converts the minimum value associated with the active BWP of the first component carrier to the digital scheme of the target BWP of the second component carrier, and the minimum scheduling offset value may be set according to the converted minimum value.
[0126] Fig.11 1 shows a communication device 1100 (eg, UE 120a), which may include various components (eg, corresponding to functional module components) configured to perform operations of the techniques disclosed herein, such as Fig. 9 The communication device 1100 includes a processing system 1102 coupled to a transceiver 1108 (e.g., a transmitter and / or a receiver). The transceiver 1108 is configured to send and receive signals for the communication device 1100 via an antenna 1110, such as the various signals described herein. The processing system 1102 can be configured to perform processing functions for the communication device 1100, including processing signals received and / or to be transmitted by the communication device 1100.
[0127] The processing system 1102 includes a processor 1104 coupled to a computer-readable medium / memory 1112 via a bus 1106. In some aspects, the computer-readable medium / memory 1112 is configured to store instructions (e.g., computer-executable code) that, when executed by the processor 1104, cause the processor 1104 to perform Fig. 9 , or other operations for performing various techniques related to minimum scheduling offsets discussed herein. In some aspects, the computer-readable medium / memory 1112 stores code 1114 for receiving, code 1116 for sending, code 1118 for determining, code 1120 for taking action, and / or code 1122 for converting. In some aspects, the processor 1104 has circuits configured to implement the code stored in the computer-readable medium / memory 1112. The processor 1104 includes circuit systems 1124 for receiving, circuit systems 1126 for sending, circuit systems 1128 for determining, circuit systems 1130 for taking action, and / or circuit systems 1122 for converting.
[0128] Fig.12 1. The communication device 1200 (eg, BS 110a) is shown. The communication device 900 may include various components (eg, corresponding to functional module components) configured to perform operations of the techniques disclosed herein, such as Fig.10 The communication device 1200 includes a processing system 1202 coupled to a transceiver 1208 (e.g., a transmitter and / or a receiver). The transceiver 1208 is configured to send and receive signals for the communication device 1200 via an antenna 1210, such as the various signals described herein. The processing system 1202 can be configured to perform processing functions for the communication device 1200, including processing signals received and / or to be transmitted by the communication device 1200.
[0129] The processing system 1202 includes a processor 1204 coupled to a computer-readable medium / memory 1212 via a bus 1206. In some aspects, the computer-readable medium / memory 1212 is configured to store instructions (e.g., computer-executable code) that, when executed by the processor 1204, cause the processor 1204 to perform Fig.10 , or other operations for performing various techniques related to minimum scheduling offsets discussed herein. In some aspects, the computer-readable medium / memory 1212 stores code 1214 for sending, code 1216 for receiving, code 1218 for determining, code 1220 for configuring, code 1222 for applying, and / or code 1224 for converting. In some aspects, the processor 1204 has circuits configured to implement the code stored in the computer-readable medium / memory 1212. The processor 1204 includes circuit systems 1226 for sending, circuit systems 1228 for receiving, circuit systems 1230 for determining, circuit systems 1232 for configuring, circuit systems 1234 for applying, and / or circuit systems for converting.
[0130] The technology described herein can be used for various wireless communication technologies, such as NR (e.g., 5GNR), 3GPP Long Term Evolution (LTE), Advanced LTE (LTE-A), Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single Carrier Frequency Division Multiple Access (SC-FDMA), Time Division Synchronous Code Division Multiple Access (TD-SCDMA), and other networks. The terms "network" and "system" are generally used interchangeably. A CDMA network can implement radio technologies such as Universal Terrestrial Radio Access (UTRA), cdma2000, etc. UTRA includes Wideband CDMA (WCDMA) and other variants of CDMA. cdma2000 covers IS-2000 standards, IS-95 standards, and IS-856 standards. A TDMA network can implement radio technologies such as Global System for Mobile Communications (GSM). OFDMA networks can implement radio technologies such as NR (e.g., 5G RA), Evolved UTRA (E-UTRA), Ultra Mobile Broadband (UMB), IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802.20, Flash-OFDMA, etc. UTRA and E-UTRA are part of Universal Mobile Telecommunications System (UMTS). LTE and LTE-A are versions of UMTS that use E-UTRA. UTRA, E-UTRA, UMTS, LTE, LTE-A, and GSM are described in documents from an organization named "3rd Generation Partnership Project" (3GPP). cdma2000 and UMB are described in documents from an organization named "3rd Generation Partnership Project 2" (3GPP2). NR is an emerging wireless communication technology under development.
[0131] The technology described herein can be used for the wireless networks and radio technologies described above as well as other wireless networks and radio technologies. For clarity, although terms commonly associated with 3G, 4G and / or 5G wireless technologies may be used herein to describe various aspects, various aspects of the present disclosure may be applied to communication systems based on other generations.
[0132] In 3GPP, the term "cell" can refer to the coverage area of a Node B (NB) and / or a NB subsystem serving the coverage area, depending on the context in which the term is used. In NR systems, the terms "cell" and BS, next-generation NodeB (gNB or gNodeB), access point (AP), distributed unit (DU), carrier or transmit receive point (TRP) can be used interchangeably. BSs can provide communication coverage for macro cells, pico cells, femto cells and / or other types of cells. Macro cells can cover a relatively large geographic area (e.g., a radius of several kilometers) and can allow unrestricted access to UEs with service subscriptions. Pico cells can cover a relatively small geographic area and can allow unrestricted access to UEs with service subscriptions. Femto cells can cover a relatively small geographic area (e.g., a home) and can allow UEs associated with femto cells (e.g., UEs in a closed subscriber group (CSG), UEs for users in the home) to have limited access, etc. A BS for a macro cell can be called a macro BS. A BS for a pico cell can be called a pico BS. A BS for a femto cell can be called a femto BS or a home BS.
[0133] UE may also be referred to as a mobile station, terminal, access terminal, subscriber unit, station, customer premises equipment (CPE), cellular phone, smart phone, personal digital assistant (PDA), wireless modem, wireless communication device, handheld device, laptop computer, cordless phone, wireless local loop (WLL) station, tablet computer, camera, gaming device, netbook, smartbook, ultrabook, appliance, medical device or medical apparatus, biometric sensor / device, wearable device such as smart watch, smart clothing, smart glasses, smart bracelet, smart jewelry (e.g., smart ring, smart bracelet, etc.), entertainment device (e.g., music device, video device, satellite radio, etc.), transportation tool component or sensor, smart meter / sensor, industrial manufacturing device, global positioning system device, or any other suitable device configured to communicate via wireless or wired medium. Some UEs may be considered as machine type communication (MTC) devices or evolved MTC (eMTC) devices. MTC and eMTC UEs include, for example, robots, drones, remote devices, sensors, meters, monitors, location tags, etc., which can communicate with a BS, another device (e.g., a remote device), or some other entity. A wireless node can provide connectivity to or to a network (e.g., a wide area network such as the Internet or a cellular network) via a wired or wireless communication link. Some UEs may be considered Internet of Things (IoT) devices, which may be narrowband IoT (NB-IoT) devices.
[0134] Some wireless networks (e.g., LTE) employ orthogonal frequency division multiplexing (OFDM) on the downlink and single carrier frequency division multiplexing (SC-FDM) on the uplink. OFDM and SC-FDM divide the system bandwidth into multiple (K) orthogonal subcarriers, which are also commonly referred to as tones, frequency bins, etc. Each subcarrier can be modulated with data. In general, modulation symbols are sent in the frequency domain using OFDM and in the time domain using SC-FDM. The spacing between adjacent subcarriers can be fixed, and the total number of subcarriers (K) can depend on the system bandwidth. For example, the spacing of the subcarriers can be 15kHz, and the minimum resource allocation (called a "resource block" (RB)) can be 12 subcarriers (or 180kHz). Therefore, for system bandwidths of 1.25, 2.5, 5, 10, or 20 megahertz (MHz), the nominal fast Fourier transform (FFT) size can be equal to 128, 256, 512, 1024, or 2048, respectively. The system bandwidth can also be divided into subbands. For example, a subband may cover 1.8 MHz (eg, 6 RBs), and there may be 1, 2, 4, 8, or 16 subbands for system bandwidths of 1.25, 2.5, 5, 10, or 20 MHz, respectively.In LTE, the basic transmission time interval (TTI) or packet duration is a 1 ms subframe.
[0135] NR can utilize OFDM with CP on both uplink and downlink, and includes support for half-duplex operation using TDD. In NR, a subframe is still 1ms, but the basic TTI is called a time slot. A subframe contains a variable number of time slots (e.g., 1, 2, 4, 8, 16, ... time slots), depending on the subcarrier spacing. NR RB is 12 continuous frequency subcarriers. NR can support a basic subcarrier spacing of 15KHz, and other subcarrier spacings can be defined for basic subcarrier spacing (e.g., 30kHz, 60kHz, 120kHz, 240kHz, etc.). Symbol and time slot lengths scale with subcarrier spacing. The CP length also depends on the subcarrier spacing. Beamforming can be supported, and the beam direction can be dynamically configured. MIMO transmission with precoding can also be supported. In some examples, the MIMO configuration in DL can support up to 8 transmit antennas, with up to 8 streams for multi-layer DL transmission and up to 2 streams per UE. In some examples, multi-layer transmission with up to 2 streams per UE can be supported.Up to 8 serving cells can support aggregation of multiple cells.
[0136] In some examples, access to the air interface can be scheduled. The scheduling entity (e.g., BS) allocates resources for communication between some or all devices and apparatuses within its service area or cell. The scheduling entity may be responsible for scheduling, allocating, reconfiguring, and releasing resources for one or more subordinate entities. That is, for scheduled communications, the subordinate entity adopts the resources allocated by the scheduling entity. The base station is not the only entity that can act as a scheduling entity. In some examples, the UE may be used as a scheduling entity and may schedule resources for one or more subordinate entities (e.g., one or more other UEs), and other UEs may utilize the resources scheduled by the UE for wireless communication. In some examples, the UE may be used as a scheduling entity in a point-to-point (P2P) network and / or in a mesh network. In the mesh network example, in addition to communicating with the scheduling entity, the UEs may also communicate directly with each other.
[0137] In some examples, two or more slave entities (e.g., UEs) can communicate with each other using side link signals. Practical applications of such side link communications may include public safety, nearby services, UE-to-network relays, vehicle-to-vehicle (V2V) communications, Internet of Everything (IoE) communications, IoT communications, mission-critical grids, and / or various other suitable applications. Typically, a side link signal may refer to a signal transmitted from one slave entity (e.g., UE1) to another slave entity (e.g., UE2) without relaying the communication through a scheduling entity (e.g., UE or BS), even if the scheduling entity can be used for scheduling and / or control purposes. In some examples, a licensed spectrum (unlike wireless local area networks, which typically use unlicensed spectrum) can be used to transmit side link signals.
[0138] The methods disclosed herein include one or more steps or actions for implementing these methods. Without departing from the scope of the claims, the method steps and / or actions can be interchangeable with each other. In other words, unless the specific order of steps or actions is specified, the order and / or use of specific steps and / or actions can be modified without departing from the scope of the claims.
[0139] As used herein, a phrase referring to "at least one of" a list of items refers to any combination of those items, including single members. For example, "at least one of a, b, or c" is intended to cover a, b, c, ab, ac, bc, and abc, as well as any combination with multiples of the same element (e.g., aa, aaa, aab, aac, abb, acc, bb, bbb, bbc, cc, and ccc, or any other order of a, b, and c).
[0140] As used herein, the term "determining" encompasses a wide variety of actions. For example, "determining" may include calculating, computing, processing, deriving, investigating, searching (e.g., searching in a table, database, or other data structure), determining, etc. Also, "determining" may include receiving (e.g., receiving information), accessing (e.g., accessing data in a memory), etc. Also, "determining" may include parsing, selecting, choosing, establishing, etc.
[0141] The previous description is provided to enable those skilled in the art to implement the various aspects described herein. Various modifications to these aspects are obvious to those skilled in the art, and the general principles defined herein can be applied to other aspects. Therefore, the claims are not intended to be limited to the several aspects shown herein, but to the full range consistent with the language of the claims, wherein, unless otherwise specified, references to singular elements are not intended to mean "one and only one", but "one or more". Unless otherwise specifically stated, the term "some" refers to one or more. All structural and functional equivalents of the elements throughout the various aspects described in this disclosure that are known or will be known to those of ordinary skill in the art are expressly incorporated herein by reference and are intended to be covered by the claims. In addition, regardless of whether such disclosure is explicitly stated in the claims, nothing disclosed herein is intended to be dedicated to the public. According to the provisions of 35 U.S.C., no claim content shall be interpreted. Any claim element shall not be interpreted in accordance with the provisions of 35 U.S.C. § 112 (f), unless the phrase "module for..." is used to expressly state the element, or in the case of a method claim, the phrase "step for..." is used to expressly state the element.
[0142] The various operations of the above method can be performed by any suitable unit capable of performing the corresponding functions. The unit may include various hardware and / or software components and / or modules, including but not limited to circuits, application specific integrated circuits (ASICs) or processors. Typically, in the case of the operations shown in the figure, those operations may have corresponding corresponding functional module components with similar numbers.
[0143] The various illustrative logical blocks, modules, and circuits described in conjunction with the present disclosure may be implemented or executed with a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device (PLD), discrete gate or transistor logic, discrete hardware components, or any combination thereof, designed to perform the functions described herein. A general purpose processor may be a microprocessor, but alternatively, the processor may be any commercially available processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices, for example, a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration.
[0144] If implemented in hardware, an exemplary hardware configuration may include a processing system in a wireless node. The processing system may be implemented using a bus architecture. The bus may include any number of interconnecting buses and bridges, depending on the specific application and overall design constraints of the processing system. The bus may link various circuits (including processors, machine-readable media, and bus interfaces) together. The bus interface may be used to connect a network adapter, etc., to the processing system via the bus. The network adapter may be used to implement the signal processing functions of the PHY layer. In the case of user equipment 120 (see Figure 1 ), a user interface (e.g., keyboard, display, mouse, joystick, etc.) may also be connected to the bus. The bus may also link various other circuits, such as timing sources, peripherals, voltage regulators, power management circuits, etc., which are well known in the art and will not be described further. The processor may be implemented using one or more general and / or special purpose processors. Examples include microprocessors, microcontrollers, DSP processors, and other circuits capable of executing software. Those skilled in the art will recognize how to best implement the described functionality for the processing system depending on the specific application and the overall design constraints imposed on the entire system.
[0145] If implemented in software, these functions can be stored or transmitted as one or more instructions or codes through a computer-readable medium. Software should be broadly interpreted as representing instructions, data, or any combination thereof, whether it refers to software, firmware, middleware, microcode, hardware description language, or other. Computer-readable media include computer storage media and communication media, including any media that helps to transfer a computer program from one place to another. The processor can be responsible for managing the bus and general processing, including executing software modules stored on a machine-readable storage medium. The computer-readable storage medium can be coupled to the processor so that the processor can read information from the storage medium and write information to the storage medium. In an alternative, the storage medium can be an integral part of the processor. As an example, the machine-readable medium can include a transmission line, a carrier modulated by data, and / or a computer-readable storage medium on which instructions separated from a wireless node are stored, all of which can be accessed by the processor through a bus interface. Alternatively or in addition, the machine-readable medium or any part thereof can be integrated into the processor, for example, in the case of a cache and / or a general register file. As an example, examples of machine-readable storage media may include, for example, RAM (random access memory), flash memory, ROM (read only memory), PROM (programmable read only memory), EPROM (erasable programmable read only memory), EEPROM (electrically erasable programmable read only memory), registers, magnetic disks, optical disks, hard drives or any other suitable storage media, or any combination thereof. The machine-readable medium may be embodied in a computer program product.
[0146] A software module may include a single instruction or many instructions, and may be distributed over several different code segments, different programs, and multiple storage media. A computer-readable medium may include multiple software modules. A software module includes instructions that cause a processing system to perform various functions when executed by a device such as a processor. A software module may include a sending module and a receiving module. Each software module may reside in a single storage device or may be distributed over multiple storage devices. For example, when a triggering event occurs, a software module may be loaded into a RAM from a hard drive. During the execution of a software module, a processor may load some instructions into a cache to increase access speed. Then, one or more caches may be loaded into a general register file for execution by the processor. When referring to the functions of the following software modules, it should be understood that these functions are implemented by the processor when instructions are executed from the software module.
[0147] Additionally, any connection is properly termed a computer-readable medium. For example, if the software is transmitted from a website, server or other remote source using a coaxial cable, fiber optic cable, twisted pair, digital subscriber line (DSL), or wireless technologies such as infrared (IR), radio and microwave, then the definition of medium includes the coaxial cable, fiber optic cable, twisted pair, DSL, or wireless technologies such as infrared, radio and microwave. Disk and disc, as used herein, include compact disc (CD), laser disc, optical disc, digital versatile disc (DVD), floppy disk and Optical disks, where magnetic disks typically reproduce data magnetically, and optical disks reproduce data optically with lasers. Thus, in some aspects, computer-readable media may include non-transitory computer-readable media (e.g., tangible media). Additionally, for other aspects, computer-readable media may include transient computer-readable media (e.g., signals). Combinations of the above should also be included within the scope of computer-readable media.
[0148] Thus, certain aspects may include a computer program product for performing the operations presented herein. For example, such a computer program product may include a computer-readable medium having instructions stored (and / or encoded) thereon, the instructions being executable by one or more processors to perform the operations described herein. For example, the instructions are for performing the operations described herein and Fig. 9 and / or Fig.10 The operations shown in .
[0149] In addition, it should be understood that the modules and / or other appropriate units for performing the methods and techniques described herein can be downloaded and / or otherwise obtained by the user terminal and / or base station when appropriate. For example, such a device can be coupled to a server to facilitate the transmission of units for performing the methods described herein. Alternatively, the various methods described herein can be provided via a storage device (e.g., RAM, ROM, a physical storage medium such as a compact disc (CD) or a floppy disk), so that the user terminal and / or base station can obtain the various methods when the storage unit is coupled or provided to the device. In addition, any other suitable technology for providing the methods and techniques described herein to the device can be used.
[0150] It is to be understood that the claims are not limited to the precise configuration and components illustrated above. Various modifications, changes and variations may be made in the arrangement, operation and details of the methods and apparatus described above without departing from the scope of the claims.
Claims
1. A method for wireless communication by a user equipment, comprising: receiving, from a base station, one or more configurations indicating wireless communication resources, the wireless communication resources comprising at least one of a plurality of bandwidth parts BWP or a plurality of component carriers CC; receiving control signaling from the base station on a first component carrier in the plurality of CCs, the control signaling indicating a scheduling offset for communicating with the base station via at least one of the BWPs via a second component carrier in the plurality of CCs; determining a value of the scheduling offset based at least in part on a minimum scheduling offset value, the minimum scheduling offset value being configured according to a digital scheme of an active BWP of the second component carrier in the plurality of CCs; and Responsive to the determination, at least one action is taken.
2. The method according to claim 1, wherein: The minimum scheduling offset value is determined based on a digital scheme of an active BWP among the plurality of BWPs.
3. The method according to claim 1, wherein: The minimum scheduling offset value is selected from a plurality of minimum values, each of the minimum values corresponding to one of the plurality of BWPs.
4. The method according to claim 1, wherein: The minimum scheduling offset value is determined to have the same numerical scheme as the scheduling offset.
5. The method according to claim 1, wherein: The control signaling indicates communication with the base station via a target BWP different from an active BWP; and The minimum scheduling offset value is configured for each BWP.
6. The method according to claim 5, wherein: The minimum scheduling offset value is set according to the minimum value associated with the active BWP.
7. The method according to claim 6, further comprising: The minimum value associated with the active BWP is converted into a digital version of the target BWP, and the minimum scheduling offset value is set according to the converted minimum value.
8. The method according to claim 1, further comprising: receiving, from the base station, additional control signaling indicating an updated minimum scheduling offset value; determining an application delay to apply the updated minimum scheduling offset value based on at least one of an absolute time value, a time domain resource quantity, or a BWP switching delay value; as well as The updated minimum scheduling offset value is applied based on the application delay.
9. The method according to claim 1, further comprising: A digital scheme for converting a minimum value associated with the active BWP of the first component carrier to a target BWP of the second component carrier, wherein the minimum scheduling offset value is set according to the converted minimum value.
10. The method according to claim 1, wherein: The at least one action includes considering the control signaling invalid if the value of the scheduling offset is lower than the minimum scheduling offset value.
11. A method for wireless communication by a base station, comprising: determining one or more configurations for indicating wireless communication resources including at least one of a plurality of bandwidth parts BWP or a plurality of component carriers CC; Sending the one or more configurations to a user equipment UE; Sending control signaling to the UE on a first component carrier among the multiple CCs, the control signaling indicating that communication is to be performed via a second component carrier among the multiple CCs; determining a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one of the BWPs, wherein the minimum scheduling offset value is configured according to a digital scheme of an active BWP of the second component carrier of the plurality of CCs; as well as The UE is configured using the minimum scheduling offset value.
12. The method according to claim 11, wherein: The minimum scheduling offset value is determined based on a digital scheme of an active BWP among the plurality of BWPs.
13. The method according to claim 11, wherein: The minimum scheduling offset value is selected from a plurality of minimum values, each of the minimum values corresponding to one of the plurality of BWPs.
14. The method according to claim 11, wherein: The minimum scheduling offset value is determined to have the same numerical scheme as the scheduling offset.
15. The method according to claim 11, further comprising: sending control signaling to the UE for instructing communication with the base station via a target BWP different from an active BWP; as well as The minimum scheduling offset value is configured for each BWP.
16. The method according to claim 15, wherein: The minimum scheduling offset value is set according to the minimum value associated with the active BWP.
17. The method according to claim 16, further comprising: The minimum value associated with the active BWP is converted into a digital version of the target BWP, and the minimum scheduling offset value is set according to the converted minimum value.
18. The method according to claim 11, further comprising: determining an updated minimum scheduling offset value; Sending control signaling indicating an updated minimum scheduling offset value to the UE; determining an application delay to apply the updated minimum scheduling offset value based on at least one of an absolute time value, a time domain resource quantity, or a BWP switching delay value; as well as The updated minimum scheduling offset value is applied based on the application delay.
19. The method according to claim 11, further comprising: A digital scheme for converting a minimum value associated with the active BWP of the first component carrier to a target BWP of the second component carrier, wherein the minimum scheduling offset value is set according to the converted minimum value.
20. An apparatus for wireless communication, comprising: A receiver configured to: receiving one or more configurations indicating wireless communication resources from a base station, the wireless communication resources comprising at least one of a plurality of bandwidth parts BWP or a plurality of component carriers CC, and receiving control signaling from the base station on a first component carrier in the plurality of CCs, the control signaling indicating a scheduling offset for communicating with the base station via at least one of the BWPs via a second component carrier in the plurality of CCs; Memory; as well as a processor coupled to the memory, the processor and the memory being configured to: determining a value of the scheduling offset based at least in part on a minimum scheduling offset value, the minimum scheduling offset value being configured according to a digital scheme of an active BWP of the second component carrier in the plurality of CCs, and Responsive to the determination, at least one action is taken.
21. The device according to claim 20, wherein: The minimum scheduling offset value is selected from a plurality of minimum values, each of the minimum values corresponding to one of the plurality of BWPs.
22. The apparatus of claim 20, wherein: The control signaling indicates communication with the base station via a target BWP different from an active BWP; and The minimum scheduling offset value is configured for each BWP.
23. The device according to claim 22, wherein: The processor is further configured to convert a minimum value associated with the active BWP into a digital version of the target BWP, the minimum scheduling offset value being set according to the converted minimum value.
24. An apparatus for wireless communication, comprising: Memory; a processor coupled to the memory, the processor and the memory being configured to: determining one or more configurations for indicating wireless communication resources, the wireless communication resources comprising at least one of a plurality of bandwidth parts BWP or a plurality of component carriers CC, and determining a minimum scheduling offset value for a scheduling offset, the minimum scheduling offset value indicating a scheduling delay for communicating via at least one of the BWPs within at least one of the CCs; as well as A transmitter is configured to send the one or more configurations and the minimum scheduling offset value to a user equipment UE, and send control signaling to the UE on a first component carrier in the multiple CCs, the control signaling indicating that communication is to be performed via a second component carrier in the multiple CCs, wherein the minimum scheduling offset value is configured according to a digital scheme of an active BWP of the second component carrier in the multiple CCs.
25. The device according to claim 24, wherein: The minimum scheduling offset value is selected from a plurality of minimum values, each of the minimum values corresponding to one of the plurality of BWPs.
26. The apparatus of claim 24, further comprising: sending control signaling to the UE for instructing communication with the device via a target BWP different from an active BWP; as well as The minimum scheduling offset value is configured for each BWP.
27. The device according to claim 26, wherein: The minimum scheduling offset value is set according to the minimum value associated with the active BWP.
28. The device according to claim 27, wherein The processor is further configured to: The minimum value associated with the active BWP is converted into a digital version of the target BWP, and the minimum scheduling offset value is set according to the converted minimum value.
29. The apparatus of claim 24, further comprising: determining an updated minimum scheduling offset value; Sending control signaling indicating an updated minimum scheduling offset value to the UE; determining an application delay to apply the updated minimum scheduling offset value based on at least one of an absolute time value, a time domain resource quantity, or a BWP switching delay value; as well as The updated minimum scheduling offset value is applied based on the application delay.
30. The device according to claim 24, wherein: The processor is further configured to: A digital scheme for converting a minimum value associated with the active BWP of the first component carrier to a target BWP of the second component carrier, wherein the minimum scheduling offset value is set according to the converted minimum value.
