A method for advanced support of return airway in fully mechanized mining face with large dynamic pressure
By setting up double rows of advance unit supports and remote pumping pillars in the coal mining tunnel, combined with the JSDB-25 winch, the problem of poor advance support effect in the existing coal mining tunnel is solved, and the safety and security of the coal mining working face are improved. Production efficiency to meet the needs of high-yield and efficient coal mining.
Patent Information
- Application Number
- CN202111570604.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-21
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-12-21
AI Technical Summary
Existing advance support methods for coal mining tunnels have problems such as unsatisfactory support effects, low safety factors, limited equipment movement, and large material waste, which are particularly difficult to meet the requirements in high-yield and efficient coal mining environments.
Double rows of advanced unit brackets are installed in the return air tunnel of the fully mechanized mining working face with high dynamic pressure. Together with the remote pumping pillar and JSDB-25 winch, the brackets can be recycled and moved forward to adapt to the undulations of the roof and floor to ensure coal mining efficiency. and safe passage.
It improves the safety and production efficiency of the coal mining working face, reduces manual labor intensity and material waste, enhances the support strength and ventilation section, solves the shortcomings of the traditional pillar method, and adapts to the needs of high-yield and efficient coal mining.
Abstract
Description
Technical Field
[0001] The present application relates to an advance support method, and in particular to an advance support method for a return air lane in a large dynamic pressure fully mechanized mining face. Background Art
[0002] The support of the return air chute roadway of the comprehensive mechanized coal mining face is very important. It is a prerequisite for ensuring the normal operation and ventilation of the coal mining face. In particular, the support of the working face with a roadway height of more than 3.8 meters is difficult. Due to the complex geological conditions of the underground roadway and the different distribution of horizontal and vertical stresses of the rock formation, the mining of the comprehensive mining face will cause the top plate of the chute roadway to fall off on a large scale, and the two sides of the roadway will also shrink inward, directly affecting the coal mining operation and personnel safety. Especially within 20 meters in front of the comprehensive mining face, the stress concentration is the most affected, so advance support is proposed. The existing methods of advance support for coal mining roadways have many shortcomings, and the support effect is not ideal. For example: multiple rows of wooden columns and wooden shed beams are often used for support. Wooden columns and top beams are often built manually 20 meters in front of the comprehensive mining face, which is time-consuming and labor-intensive, affecting ventilation, personnel passage and equipment movement, and the deformation of the two sides cannot be supported, resulting in poor support effect. For example: multiple rows of single hydraulic pillars are used to process steel beams for support, which can easily cause secondary loosening of the surrounding rock of the tunnel, damage the integrity of the tunnel rock, increase the pressure on the working face, and cause cross-section shrinkage in the case of broken surrounding rock. It is difficult to manage and even requires repeated repairs. The support is slow and the safety factor is low, which cannot match high-yield and high-efficiency coal mining. For example: the arched tunnel replacement support has insufficient support force. Due to the structural limitations of the arch, it is difficult to prevent stress concentration in the tunnel. The support effect is still not ideal, and it cannot be used in trapezoidal and rectangular tunnels. Therefore, a method for advanced support of the return air tunnel of a large dynamic pressure fully mechanized mining face is needed to solve the above problems. Summary of the invention
[0003] The present application provides a method for advance support of the return air channel of a large dynamic pressure fully mechanized mining working face, which solves the problem of inconvenience in using pillars for advance support of the return air channel of a large dynamic pressure fully mechanized mining working face in the prior art.
[0004] The present application provides an advance support method for the return air channel of a large dynamic pressure comprehensive mining working face, including arranging an advance unit bracket in the return air channel of the large dynamic pressure comprehensive mining working face, the advance unit bracket being in two rows, the vertical distance between the two rows of the advance unit bracket being greater than 1600mm, and the distance between adjacent advance unit brackets being 2500mm. The advance unit bracket is used in conjunction with a remote pumping support, and the rearmost advance unit bracket is removed after the remote pumping support is completed and moved forward to the frontmost end for recycling, and a winch is used to drive the advance unit bracket during the movement.
[0005] Furthermore, a method for advanced support of the return air channel of a large dynamic pressure fully mechanized mining face is provided, wherein the advanced unit support includes a base, two jacks are arranged on the base, and top beams are arranged on the two jacks.
[0006] Furthermore, a method for advance support of the return air channel of a large dynamic pressure fully mechanized mining face also includes an advance coal wall, and two rows of cuttable remote pumping pillars are used to support the roof within 10m of the advance coal wall.
[0007] Furthermore, a method for advanced support of the return airway of a large dynamic pressure fully mechanized mining face is provided, wherein the winch is a JSDB-25 winch. The JSDB-25 winch is used to move the advanced unit support forward.
[0008] Furthermore, a method for advanced support of the return air channel of a large dynamic pressure fully mechanized mining face is provided, wherein the row spacing of the remote pumping pillars is 2000mm.
[0009] It can be seen from the above technical scheme that the present application provides a method for advance support of the return air channel of a large dynamic pressure comprehensive mining working face. By setting up double rows of advance unit brackets, compared with the traditional method of driving pillars, it can effectively save labor, speed up work efficiency, reduce the number of workers, and reduce the labor intensity of employees. The recycling of the advance unit brackets can reduce material waste. The advance unit brackets are moved forward by the JSDB-25 winch, which reduces the labor intensity of employees, reduces the risk factor, and is safer and more convenient to use. DETAILED DESCRIPTION
[0010] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below.
[0011] Example 1
[0012] From the above technical scheme, it can be known that a method for advance support of the return air channel of a large dynamic pressure comprehensive mining working face includes setting an advance unit bracket in the return air channel of the large dynamic pressure comprehensive mining working face, the advance unit bracket is in two rows, the vertical distance between the two rows of the advance unit bracket is greater than 1600mm, and the distance between adjacent advance unit brackets is 2500mm. When in use, the advance unit bracket is cooperated with a remote pumping support. After the remote pumping support is completed, the rearmost advance unit bracket is removed and moved forward to the frontmost end for recycling. A winch is used to drive the advance unit bracket during the movement.
[0013] When setting up and distributing the advance unit supports, they can adapt to the undulating situation of the top and bottom plates and be adjusted according to the specific environment. In addition, when arranging, the vertical distance between the two rows of the advance unit supports is 2000mm, and the distance between adjacent advance unit supports is 2500mm. The reasonable gap between the coal mining machines ensures the coal mining efficiency. When the coal mining machine runs to one end of the working face and mines, only one advance unit support needs to be moved to ensure the coal mining space.
[0014] The advance support unit changes the shortcomings of traditional pillars and meets the advance support distance, support strength and other safety clearances of the coal mining face. It is also quick and convenient to use, with smooth safety passages and large ventilation sections, which is conducive to the rapid advancement of the working face. The use of advance unit supports has greatly improved the safety of production, broken through the bottleneck that limits the maximum efficiency of comprehensive mining equipment, and solved the long-standing problem of tunnel support. With the rapid increase in the mechanization degree and unit yield of comprehensive mining faces, ventilation, transportation and mining processes have increasingly greater requirements for the cross-sectional dimensions of the drift. The traditional single-pillar support method cannot meet the requirements of advance support for this high-yield and high-efficiency comprehensive mining face in terms of support capacity, support height, support speed, degree of automation, and operational safety.
[0015] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face is provided, wherein the advance unit support comprises a base, two jacks are provided on the base, and top beams are provided on the two jacks.
[0016] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face also includes an advance coal wall, wherein two rows of cuttable remotely pumped pillars are used to support the roof within 10m of the advance coal wall.
[0017] Preferably, a method for advance support of the return air channel of a large dynamic pressure fully mechanized mining face is provided, wherein the winch is a JSDB-25 winch, and the JSDB-25 winch is used to move the advance unit bracket forward.
[0018] Preferably, in a method for advanced support of the return airway of a large dynamic pressure fully mechanized mining face, the row spacing of the remote pumping pillars is 2000mm.
[0019] Example 2
[0020] From the above technical scheme, it can be known that a method for advance support of the return air channel of a large dynamic pressure comprehensive mining working face includes setting an advance unit bracket in the return air channel of the large dynamic pressure comprehensive mining working face, the advance unit bracket is in two rows, the vertical distance between the two rows of the advance unit bracket is greater than 1600mm, and the distance between adjacent advance unit brackets is 2500mm. When in use, the advance unit bracket is cooperated with a remote pumping support. After the remote pumping support is completed, the rearmost advance unit bracket is removed and moved forward to the frontmost end for recycling. A winch is used to drive the advance unit bracket during the movement.
[0021] When setting up and distributing the advance unit supports, they can adapt to the undulating situation of the top and bottom plates and be adjusted according to the specific environment. In addition, when arranging, the vertical distance between the two rows of the advance unit supports is 1800mm, and the distance between adjacent advance unit supports is 2500mm. The reasonable gap between the coal mining machines ensures the coal mining efficiency. When the coal mining machine runs to one end of the working face and mines, only one advance unit support needs to be moved to ensure the coal mining space.
[0022] The advance support unit changes the shortcomings of traditional pillars and meets the advance support distance, support strength and other safety clearances of the coal mining face. It is also quick and convenient to use, with smooth safety passages and large ventilation sections, which is conducive to the rapid advancement of the working face. The use of advance unit supports has greatly improved the safety of production, broken through the bottleneck that limits the maximum efficiency of comprehensive mining equipment, and solved the long-standing problem of tunnel support. With the rapid increase in the mechanization degree and unit yield of comprehensive mining faces, ventilation, transportation and mining processes have increasingly greater requirements for the cross-sectional dimensions of the drift. The traditional single-pillar support method cannot meet the requirements of advance support for this high-yield and high-efficiency comprehensive mining face in terms of support capacity, support height, support speed, degree of automation, and operational safety.
[0023] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face is provided, wherein the advance unit support comprises a base, two jacks are provided on the base, and top beams are provided on the two jacks.
[0024] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face also includes an advance coal wall, wherein two rows of cuttable remotely pumped pillars are used to support the roof within 10m of the advance coal wall.
[0025] Preferably, a method for advance support of the return air channel of a large dynamic pressure fully mechanized mining face is provided, wherein the winch is a JSDB-25 winch, and the JSDB-25 winch is used to move the advance unit bracket forward.
[0026] Preferably, in a method for advanced support of the return airway of a large dynamic pressure fully mechanized mining face, the row spacing of the remote pumping pillars is 2000mm.
[0027] Example 3
[0028] From the above technical scheme, it can be known that a method for advance support of the return air channel of a large dynamic pressure comprehensive mining working face includes setting an advance unit bracket in the return air channel of the large dynamic pressure comprehensive mining working face, the advance unit bracket is in two rows, the vertical distance between the two rows of the advance unit bracket is greater than 1600mm, and the distance between adjacent advance unit brackets is 2500mm. When in use, the advance unit bracket is cooperated with a remote pumping support. After the remote pumping support is completed, the rearmost advance unit bracket is removed and moved forward to the frontmost end for recycling. A winch is used to drive the advance unit bracket during the movement.
[0029] When setting up and distributing the advance unit supports, they can adapt to the undulating situation of the top and bottom plates and be adjusted according to the specific environment. In addition, when arranging, the vertical distance between the two rows of the advance unit supports is 2500mm, and the distance between adjacent advance unit supports is 2500mm. The reasonable gap between the coal mining machines ensures the coal mining efficiency. When the coal mining machine runs to one end of the working face and mines back, only one advance unit support needs to be moved to ensure the coal mining space.
[0030] The advance support unit changes the shortcomings of traditional pillars and meets the advance support distance, support strength and other safety clearances of the coal mining face. It is also quick and convenient to use, with smooth safety passages and large ventilation sections, which is conducive to the rapid advancement of the working face. The use of advance unit supports has greatly improved the safety of production, broken through the bottleneck that limits the maximum efficiency of comprehensive mining equipment, and solved the long-standing problem of tunnel support. With the rapid increase in the mechanization degree and unit yield of comprehensive mining faces, ventilation, transportation and mining processes have increasingly greater requirements for the cross-sectional dimensions of the drift. The traditional single-pillar support method cannot meet the requirements of advance support for this high-yield and high-efficiency comprehensive mining face in terms of support capacity, support height, support speed, degree of automation, and operational safety.
[0031] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face is provided, wherein the advance unit support comprises a base, two jacks are provided on the base, and top beams are provided on the two jacks.
[0032] Preferably, a method for advance support of a return air channel in a large dynamic pressure fully mechanized mining face also includes an advance coal wall, wherein two rows of cuttable remotely pumped pillars are used to support the roof within 10m of the advance coal wall.
[0033] Preferably, a method for advance support of the return air channel of a large dynamic pressure fully mechanized mining face is provided, wherein the winch is a JSDB-25 winch, and the JSDB-25 winch is used to move the advance unit bracket forward.
[0034] Preferably, in a method for advanced support of the return airway of a large dynamic pressure fully mechanized mining face, the row spacing of the remote pumping pillars is 2000mm.
[0035] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the application disclosed herein. The present application is intended to cover any variations, uses or adaptations of the present application, which follow the general principles of the present application and include common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope of the present application is indicated by the claims.
[0036] It should be understood that the present application is not limited to what has been described above, and various modifications and changes can be made without departing from its scope. The above-described embodiments of the present application do not constitute a limitation on the scope of protection of the present application.
Claims
1. A method for advanced support of return airway in a fully mechanized mining face with large dynamic pressure, characterized in that: It includes setting an advance unit bracket in the return air lane of the large dynamic pressure fully mechanized mining working face, the advance unit bracket is in two rows, the vertical distance between the two rows of the advance unit bracket is greater than 1600mm, the distance between adjacent advance unit brackets is 2500mm, the advance unit bracket is used in conjunction with a remote pumping support, the rearmost advance unit bracket is removed after the remote pumping support is completed and moved forward to the frontmost end for recycling, and a winch is used to drive the advance unit bracket during the movement; The advance unit support comprises a base, two jacks are arranged on the base, and top beams are arranged on the two jacks; It also includes an advanced coal wall, in which two rows of cuttable remotely pumped pillars are used to support the roof within 10m of the advanced coal wall.
2. The method for advanced support of return airway in fully mechanized mining face with large dynamic pressure according to claim 1 is characterized in that: The winch is a JSDB-25 type winch, and the JSDB-25 type winch is used to move the advance unit bracket forward.
3. The method for advanced support of return airway in fully mechanized mining face with large dynamic pressure according to claim 1 is characterized in that: The row spacing of the remote pumping struts is 2000mm.
Citation Information
Patent Citations
Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN101775991A
Improved method of abandoned roadway pumping pillar supporting in area affected by overconcentrated coal pillars
CN109404020A
End head and tail advance support bracket for fully-mechanized caving face
CN201982125U
Circulatory advancing forepoling
CN202745906U
Combined forepoling rack for comprehensive mining return
CN2833112Y
