Industrial microgrid demand response optimization method and device
By optimizing load power in industrial microgrids based on user satisfaction indicators and random chance constraint programming theory, the problem of user satisfaction not being considered in the existing technology is solved, user satisfaction and microgrid economy are improved, and optimal dispatching is achieved The interests of users are coordinated with the large power grid.
Patent Information
- Application Number
- CN202111526792.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-12-14
AI Technical Summary
The existing technology does not consider user satisfaction when formulating microgrid operation plans, resulting in insufficient user participation in demand response and reducing the economy and user satisfaction of industrial microgrids.
By determining the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, combined with the random chance constrained programming theory, the load power of different loads on the power side is optimized, and an industrial microgrid demand side management plan is formulated. and optimize operating plans.
It improves user satisfaction and the economy of the microgrid, ensures that the optimized dispatch results are in line with the interests of users, and coordinates user power consumption to adapt to the peak-shaving and valley-filling needs of the large power grid.
Smart Images

Figure CN114219148B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the field of smart grid technology, and in particular to an industrial microgrid demand response optimization method and device. Background Art
[0002] Micro-Grid refers to a small power generation and distribution system composed of distributed power sources, energy storage devices, energy conversion devices, loads, monitoring and protection devices, etc. The purpose of the micro-grid is to achieve flexible and efficient application of distributed power sources and solve the problem of grid connection of a large number of distributed power sources in various forms. The development and extension of micro-grids can fully promote the large-scale access of distributed power sources and renewable energy, realize the reliable supply of various energy forms to loads, and enable the transition from traditional power grids to smart grids.
[0003] At present, there are many optimization models for the optimal operation of microgrids. Some practices adopt demand-side management when formulating microgrid operation plans, and some studies have proposed evaluation models for user satisfaction. However, when formulating system operation plans and demand-side management plans, the impact on users is not considered, and user satisfaction is not applied to the operation optimization of microgrid demand-side response. Moreover, the way to establish user satisfaction indicators is usually not very comprehensive due to limited considerations, and it is impossible to fully motivate and guide users to participate in demand response, which reduces the economy of industrial microgrids and user satisfaction. Summary of the invention
[0004] The embodiments of the present invention provide an industrial microgrid demand response optimization method and device, so as to improve user satisfaction and the economy of the microgrid while formulating an industrial microgrid demand side management plan and an optimized operation plan.
[0005] In a first aspect, an embodiment of the present invention provides an industrial microgrid demand response optimization method, wherein the industrial microgrid includes a power supply side and a power consumption side; the industrial microgrid demand response optimization method includes:
[0006] Determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side;
[0007] The comprehensive operating cost of the industrial microgrid is calculated based on the operating cost of the power supply side, environmental conversion cost, start-up and shutdown cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network;
[0008] Determining an operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients;
[0009] Based on the random chance constrained programming theory, the load power of different loads on the power consumption side is optimized according to the operation objective function and combined with the constraint conditions of the industrial microgrid.
[0010] Optionally, before determining the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, the method further includes:
[0011] Constructing a total load power function on the power consumption side after the industrial microgrid implements demand management; wherein the load on the power consumption side includes a shiftable load, an interruptible load and a fixed load;
[0012] The user electricity consumption benefit and the user's average electricity purchase price are calculated respectively according to the total load power function on the electricity consumption side after the industrial microgrid implements demand management.
[0013] Optionally, the total load power function on the power consumption side after the industrial microgrid implements demand management is determined based on the following:
[0014]
[0015] in, The total load power on the power consumption side after implementing demand management for the industrial microgrid; Load power after implementing demand management for shiftable loads, Load power after implementing demand management for interruptible loads, Load power after implementing demand management for fixed loads;
[0016] For a translatable load, define is the load power that can be shifted from time period t1 to time period t2, then the load power of the load that can be shifted in time period t after the shift is As shown below:
[0017]
[0018] For interruptible loads, if power shortage occurs during period t and the interruptible load power is Then the load power that can be interrupted during period t is As shown below:
[0019]
[0020] For a fixed load, the load power of the fixed load during period t is as follows:
[0021]
[0022] in, Load power before implementing demand management for shiftable loads, Load power before implementing demand management for interruptible loads, Load power before implementing demand management for fixed loads.
[0023] Optionally, the user electricity benefit is calculated based on the total load power function on the electricity consumption side after the industrial microgrid implements demand management based on the following determination:
[0024]
[0025] The average electricity purchase price of users is calculated based on the total load power function on the power consumption side after the industrial microgrid implements demand management based on the following determination:
[0026]
[0027] The power consumption rate on the power supply side is determined based on the following:
[0028]
[0029] in, P L,t is the total load power on the power consumption side before the industrial microgrid implements demand management; R1 is the user's power consumption benefit, R2 is the user's average power purchase price, and R3 is the microgrid wind power consumption rate; P AB,t P is the wind power abandoned by the wind turbine in period t; WT,t is the output of the wind turbine in period t.
[0030] Optionally, the user satisfaction index is determined based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, and is determined based on the following:
[0031] R=λ1R1+λ2R2+λ3R3
[0032] Among them, R is the user satisfaction index, λ1, λ2 and λ3 are the weight coefficients of user electricity efficiency, user average electricity purchase price and power consumption rate on the power supply side, respectively.
[0033] Optionally, the power supply side of the industrial microgrid includes distributed wind turbines, thermal power units and energy storage equipment;
[0034] The comprehensive operating cost of the industrial microgrid is calculated based on the operating cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network, and is determined based on the following:
[0035] C=C G +C G,OM +C EN +C GRID +C DP +C SB,OM
[0036] Among them, C Gis the operating cost of thermal power units, C G,OM is the operation and maintenance cost of thermal power units, C EN is the environmental protection cost-benefit of thermal power units, C GRID is the cost and benefit of exchanging power between thermal power units and external grid; C DP is the depreciation cost of the energy storage equipment, C SB,OM It is the operation and maintenance cost of the energy storage equipment.
[0037] Optionally, the determining of the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients is based on the following determination:
[0038] min F=η1(C G +C G,OM +C EN +C GRID +C DP +C SB,OM )+η2R
[0039] Where: F is the operation objective function; η1 and η2 are the conversion coefficients of the comprehensive operation cost and user satisfaction index in the objective function respectively.
[0040] Optionally, the optimization of the load power of different loads on the power consumption side based on the random chance constrained programming theory according to the operation objective function and in combination with the constraint conditions of the industrial microgrid includes:
[0041] Based on the uncertainty of wind power output, the operation objective function is reconstructed into the following form according to the random chance constrained programming theory:
[0042]
[0043] Among them, α is the confidence of the objective function; is the optimistic value of the running objective function under the confidence level α;
[0044] Under the constraints of the industrial microgrid, the load power of the shiftable load, the load power of the interruptible load and the load power of the fixed load after the implementation of demand management are calculated according to the reconstructed operation objective function.
[0045] Optionally, the constraints of the industrial microgrid include: system power balance constraints, thermal power unit output constraints, wind power unit operation constraints, thermal power unit start and stop constraints, energy storage operation constraints and unit climbing constraints.
[0046] In a second aspect, an embodiment of the present invention provides an industrial microgrid demand response optimization device, comprising:
[0047] A user satisfaction index determination module is used to determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side;
[0048] The comprehensive operation cost calculation module is used to calculate the comprehensive operation cost of the industrial microgrid based on the operation cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network;
[0049] An operation objective function establishment module, used to determine the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients;
[0050] The load power optimization module is used to optimize the load power of different loads on the power consumption side based on the random chance constrained programming theory, according to the operation objective function and in combination with the constraint conditions of the industrial microgrid.
[0051] The embodiment of the present invention provides an industrial microgrid demand response optimization method and device, wherein the industrial microgrid includes a power supply side and a power consumption side; the industrial microgrid demand response optimization method includes: determining a user satisfaction index based on the user's electricity consumption efficiency, the user's average electricity purchase price and the power consumption rate of the power supply side; calculating the comprehensive operating cost of the industrial microgrid according to the operating cost, environmental conversion cost, start-up and shutdown cost, operation and maintenance cost, and the cost-benefit of power exchange with the external network on the power supply side; determining the operating objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operating cost and their respective conversion coefficients; based on the random chance constrained programming theory, optimizing the load power of different loads on the power consumption side according to the operating objective function and in combination with the constraints of the industrial microgrid. The technical solution provided by the present invention determines the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, takes the comprehensive operating cost and the user satisfaction index as the objective function, and establishes an optimization model taking into account the system constraints. The established model fully takes into account the user satisfaction and pursues economy when formulating the industrial microgrid demand side management plan and the optimized operation plan; it achieves the improvement of user satisfaction and the economy of the microgrid while formulating the industrial microgrid demand side management plan and the optimized operation plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 is a flow chart of an industrial microgrid demand response optimization method provided by an embodiment of the present invention;
[0053] Figure 2 is a flow chart of another industrial microgrid demand response optimization method provided by an embodiment of the present invention;
[0054] Figure 3 It is a structural schematic diagram of an industrial microgrid provided by an embodiment of the present invention;
[0055] Figure 4 It is a structural block diagram of an industrial microgrid demand response optimization device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0057] The embodiment of the present invention provides an industrial microgrid demand response optimization method, wherein the industrial microgrid includes a power supply side and a power consumption side. Figure 1 is a flowchart of an industrial microgrid demand response optimization method provided by an embodiment of the present invention, with reference to Figure 1 , the industrial microgrid demand response optimization methods include:
[0058] S110. Determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side.
[0059] Specifically, user satisfaction is a concept in power marketing. When the electricity price response is integrated into the optimal dispatch of household microgrids, the load curve of the next day will change under the interaction of the optimization objective function and the constraints. Due to the different impacts of user electricity consumption habits and electricity bills on them, if user satisfaction is not considered, the results of the optimal dispatch may harm the interests of users, make users feel dissatisfied, and it will be difficult to achieve the purpose of coordinating user electricity consumption to adapt to the peak load filling of the large power grid.
[0060] In the embodiment of the present invention, the satisfaction of microgrid users is affected by three main factors, namely, the electricity efficiency brought by the degree of demand-side management, the average electricity purchase price of users, and the wind power consumption level in the system. For the user's electricity efficiency, it can be understood that the economic value generated by electricity consumption is taken into account when calculating the user satisfaction index; for the user's average electricity purchase price, it can be understood that the electricity cost is taken into account when calculating the user satisfaction index; for the power consumption rate on the power supply side, it can be understood that the amount of electricity generated by the microgrid is taken into account when calculating the user satisfaction index. Demand-side management is carried out on the load side, and a user satisfaction index is established based on the loss of electricity efficiency, the average electricity purchase price of users, and the wind power consumption level in the system.
[0061] S120. Calculate the comprehensive operating cost of the industrial microgrid based on the operating cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and cost-benefit of exchanging power with the external network.
[0062] Specifically, the comprehensive operating cost of the industrial microgrid includes the operating cost of the power supply side, the environmental conversion cost, the start-up and shutdown cost, the operation and maintenance cost, and the cost and benefit of exchanging power with the external network. The power supply side may include power supply equipment such as power generation equipment and energy storage equipment. The operating cost can be determined by the power generation power and power generation cost of the power supply equipment, as well as the start-up and shutdown cost of the power supply equipment. The environmental conversion cost can be understood as the environmental protection conversion cost formed by the power supply equipment to protect the environment when generating electricity. The operation and maintenance cost is the cost caused by the operation and maintenance of the power supply equipment. The cost and benefit of exchanging power with the external network can be understood as a wind power subsidy. The application object is an industrial microgrid. As a wind storage system, the system includes distributed wind power, thermal power units and energy storage equipment for grid-connected operation. The system can operate in both grid-connected mode and off-grid mode. The comprehensive operating cost may include: the operating cost of the thermal power unit, the operating and maintenance cost of the thermal power unit, the environmental protection conversion cost benefit of the thermal power unit, and the cost and benefit of exchanging power between the thermal power unit and the external network; the depreciation cost of the energy storage equipment, and the operation and maintenance cost of the energy storage equipment.
[0063] S130, determining the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients.
[0064] Specifically, the operating objective function of the industrial microgrid includes comprehensive operating costs, such as the operating cost of thermal power units, environmental conversion cost, start-up and shutdown costs of thermal power units, wind turbine operation and maintenance, wind power subsidies, and battery costs, on the one hand, and user satisfaction indicators on the other hand, which are integrated using conversion coefficients.
[0065] S140. Based on the random chance constrained programming theory, the load power of different loads on the power consumption side is optimized according to the operating objective function and combined with the constraints of the industrial microgrid.
[0066] Specifically, demand response (DR) refers to a kind of electricity consumption behavior in which users change their regular electricity consumption habits and alleviate the tight electricity supply after receiving the electricity price signal or incentive signal issued by the operator. DR can be divided into incentive DR and price DR. The introduction of demand response in microgrids will ensure that both the power supply side and the demand side meet the optimal operating conditions, which can improve the flexibility of the power grid to a certain extent, alleviate the impact of intermittent renewable energy, and help to establish a more economical and reliable microgrid. Taking into account the uncertainty of wind power output, the operation objective function is re-modeled using the random chance constraint programming theory, and the load power of different loads on the power consumption side is optimized in combination with the constraints of the industrial microgrid. The constraints of the industrial microgrid may include system power balance constraints, thermal power unit output constraints, wind turbine operation constraints, thermal power unit start and stop constraints, energy storage operation constraints, and unit climbing constraints. While formulating the demand side management plan and the optimization operation plan of the industrial microgrid, the embodiment of the present invention takes into account the user's satisfaction, so that the results of the optimized scheduling can guarantee the interests of the user and make the user feel satisfied, so as to achieve the purpose of coordinating the user's electricity consumption to adapt to the peak shaving and valley filling of the large power grid.
[0067] An industrial microgrid demand response optimization method provided by an embodiment of the present invention includes: determining a user satisfaction index based on user electricity benefits, user average electricity purchase price and power consumption rate on the power supply side; calculating the comprehensive operation cost of the industrial microgrid according to the operation cost, environmental conversion cost, start-stop cost, operation and maintenance cost, and cost-benefit of power exchange with the external network on the power supply side; determining the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients; optimizing the load power of different loads on the power consumption side according to the operation objective function and the constraint conditions of the industrial microgrid based on the random chance constraint programming theory. The technical solution provided by the present invention determines the user satisfaction index based on the user electricity benefits, user average electricity purchase price and power consumption rate on the power supply side, takes the comprehensive operation cost and user satisfaction index as the objective function, and establishes an optimization model taking into account the system constraint conditions. The established model fully takes into account the user satisfaction and pursues economy when formulating the demand side management plan and the optimized operation plan of the industrial microgrid; while formulating the demand side management plan and the optimized operation plan of the industrial microgrid, it improves the user satisfaction and the economy of the microgrid.
[0068] Figure 2 is a flowchart of another industrial microgrid demand response optimization method provided by an embodiment of the present invention, with reference to Figure 2 , the industrial microgrid demand response optimization methods include:
[0069] S210. Construct a total load power function on the power consumption side after the industrial microgrid implements demand management; the load on the power consumption side includes a shiftable load, an interruptible load and a fixed load.
[0070] Specifically, based on the different operating characteristics of industrial equipment such as usage time and power, loads are divided into three categories from the perspective of operation scheduling: shiftable loads, interruptible loads and fixed loads. Fixed loads refer to loads with relatively fixed usage time and power that cannot be scheduled; shiftable loads refer to loads whose usage time can be shifted to other time periods as needed, but whose power is relatively fixed; interruptible loads refer to loads whose power can be adjusted as needed, which can cause the load to interrupt work.
[0071] According to the load characteristics in the industrial microgrid, the system load in period t is divided into three categories as shown below, and different automatic demand response strategies are adopted for each type of load.
[0072]
[0073] Where: P L,t is the microgrid load level during period t; They correspond to Class I load, i.e., movable load, Class II interruptible load, and Class III fixed load. Load power before implementing demand management for shiftable loads, Load power before implementing demand management for interruptible loads, Load power before implementing demand management for fixed loads.
[0074] For translatable loads, define is the load that can be translated from period t1 to period t2, then there is a Class I load in period t after translation As shown in the following formula.
[0075]
[0076] For interruptible loads, suppose that power shortage occurs during period t and the interruptible load power is Then there is a class II interruptible load for period t As shown below:
[0077]
[0078] There is no demand side management for fixed loads, so for fixed loads, the load power of fixed loads in period t is as follows:
[0079]
[0080] in, The total load power on the power consumption side after implementing demand management for the industrial microgrid; Load power after implementing demand management for shiftable loads, Load power after implementing demand management for interruptible loads, Load power after implementing demand management for fixed loads.
[0081] Based on the above automatic demand response strategy, we can get the load level of the microgrid after implementing demand side management in period t. The total load power function of the power consumption side after the industrial microgrid implements demand management is determined based on the following:
[0082]
[0083] After substituting them respectively, we get:
[0084]
[0085] S220. Calculate the user's electricity efficiency and the user's average electricity purchase price based on the total load power function on the electricity consumption side after the industrial microgrid implements demand management.
[0086] Specifically, the user electricity benefit is calculated based on the total load power function on the electricity consumption side after the industrial microgrid implements demand management based on the following determination:
[0087]
[0088] The average electricity purchase price for users is calculated based on the total load power function on the power consumption side after the industrial microgrid implements demand management based on the following determination:
[0089]
[0090] The power consumption rate on the power supply side is determined based on the following:
[0091]
[0092] Among them, P L,t is the total load power on the power consumption side before the industrial microgrid implements demand management; R1 is the user's power consumption benefit, and the utility function uses the logarithm of the difference before and after the load curve response to measure the change in the user's power consumption utility; R2 is the average power purchase price of the user, R3 is the wind power consumption rate of the microgrid; P AB,t P is the wind power abandoned by the wind turbine in period t; WT,t is the output of the wind turbine in period t.
[0093] S230. Determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side.
[0094] The user satisfaction index is determined based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, and is determined based on the following:
[0095] R=λ1R1+λ2R2+λ3R3
[0096] Among them, R is the user satisfaction index, λ1, λ2 and λ3 are the weight coefficients of user electricity efficiency, user average electricity purchase price and power consumption rate on the power supply side, respectively.
[0097] S240. Calculate the comprehensive operating cost of the industrial microgrid based on the operating cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and cost-benefit of exchanging power with the external network.
[0098] Figure 3 This is a schematic diagram of the structure of an industrial microgrid provided by an embodiment of the present invention, with reference to Figure 3 The power supply side of the industrial microgrid includes a wind turbine group consisting of a plurality of distributed wind turbines 101, a thermal power group consisting of a plurality of thermal power generators 102, and a plurality of energy storage devices 103. Figure 3 In the figure, two wind turbines 101, two thermal turbines 102, and two energy storage devices 103 are shown as examples. The wind turbine 101 is connected to the busbar via an AC / AC converter, and the energy storage device 103 is connected to the busbar via an AC / DC converter. The AC busbar is used to supply power to the AC load 104. A tie switch K is provided on the AC busbar, and the AC busbar is connected to the upper distribution network 200 via a common connection point (PCC).
[0099] The comprehensive operating cost of the industrial microgrid is calculated based on the operating cost of the power supply side, environmental conversion cost, start-up and shutdown cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network. It is determined based on the following:
[0100] C=C G +C G,OM +C EN +C GRID +C DP +C SB,OM
[0101] Among them, C G is the operating cost of thermal power units, C G,OM is the operation and maintenance cost of thermal power units, C EN is the environmental protection cost-benefit of thermal power units, C GRID is the cost and benefit of exchanging power between thermal power units and external grid; C DP is the depreciation cost of the energy storage equipment, C SB,OM It is the operation and maintenance cost of the energy storage equipment.
[0102] In the above formula,
[0103]
[0104] Where: T is the number of microgrid dispatching periods; N g is the number of thermal power units; represents the output power of thermal power unit i in period t; u i,t is the start / stop status of thermal power unit i in period t, 0 means shutdown, 1 means startup; is the power generation cost of thermal power unit i in period t, and the calculation formula is as follows:
[0105]
[0106] Where: a i , b i ,c i is the cost function coefficient of generator i, S i,t u (i,t) (1-u i(t-1) ) is the start-up and shutdown cost of thermal power unit i in period t, and the calculation of this cost is shown in the following formula:
[0107]
[0108] Where: C HSi , C CSi are the hot and cold startup costs of unit i respectively; T CSi is the cold start time of generator i; It represents the shortest allowable downtime of unit i; represents the number of periods that unit i has been running or shut down continuously. For hot start-up cost, Indicates the number of periods that unit i has been running continuously; for the cold start cost, Indicates the number of consecutive periods that unit i has been shut down.
[0109]
[0110] Where: M is the set of equipment that needs to be maintained, F OM,t (·) is the operation and maintenance cost function of the i-th equipment; P i (t) is the output of the i-th device in period t. The equipment with operation and maintenance costs includes wind turbines, thermal power units and energy storage equipment.
[0111]
[0112] Where: is the emission coefficient of the i-th pollutant of the unit; θ is the pollutant category, with a total of N pollutants; c θ is the θth environmental cost reduction coefficient.
[0113]
[0114] Where: P GRID,t is the power purchased and sold between the microgrid and the external grid during period t; p t is the time-of-use electricity price level during period t.
[0115]
[0116] Where: M is the amount of energy storage in the microgrid; C az,i is the installation cost per unit capacity of the i-th energy storage device; k i is the capacity factor of the i-th energy storage, i.e. k i = annual charge and discharge capacity of the i-th energy storage unit / (8760×rated power of the i-th energy storage unit); r is the annual interest rate of social capital; n i is the economic life of the i-th energy storage unit (in the later period of the equipment material life, the losses caused by frequent equipment failures increase sharply. After the equipment is purchased, the more years it is used, the less the annual investment is allocated, but the more the equipment maintenance and operation costs are. The average annual cost of the equipment is the lowest in the most suitable years of use, which is the economic life); P ESS,i (t) is the charging and discharging power of the i-th energy storage unit in period t. ESS,i (t)>0 is the discharge state. ESS,i When (t)<0, it is in charging state.
[0117]
[0118] Where: u i,1 (t) and u i,2 (t) is the energy storage charge and discharge coefficient, which characterizes the energy storage operation state. When charging, there is u i,1 (t) = 1 and u i,2 (t)=0, when discharging, there is u i,1 (t) = 0 and u i,2 (t) = 1; k ch,i k is the operation and maintenance cost coefficient when charging the i-th energy storage power station; dis,i is the operation and maintenance cost coefficient when the i-th energy storage is discharged.
[0119] S250, determining the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients.
[0120] Specifically, the operation objective function of the industrial microgrid is determined according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients, based on the following determination:
[0121] min F=η1(C G +CG,OM +C EN +C GRID +C DP +C SB,OM )+η2R
[0122] Where: F is the operation objective function; η1 and η2 are the conversion coefficients of the comprehensive operation cost and user satisfaction index in the objective function respectively.
[0123] S260. Based on the random chance constrained programming theory, the load power of different loads on the power consumption side is optimized according to the operating objective function and combined with the constraints of the industrial microgrid.
[0124] Specifically, based on the random chance constrained programming theory, the load power of different loads on the power consumption side is optimized according to the operation objective function and combined with the constraints of the industrial microgrid, including:
[0125] Considering the uncertainty of wind power output, the operation objective function is reconstructed into the following form according to the random chance constrained programming theory:
[0126]
[0127] Among them, α is the confidence of the objective function; is the optimistic value of the objective function under the confidence level α; through the objective function in the form of probability, the model actually needs to optimize the optimistic value The actual operating cost of the microgrid is less than The probability reaches α.
[0128] Under the constraints of the industrial microgrid, the load power of the shiftable load, the load power of the interruptible load and the load power of the fixed load after the implementation of demand management are calculated according to the reconstructed operation objective function.
[0129] Among them, the constraints of industrial microgrids include: system power balance constraints, thermal power unit output constraints, wind turbine unit operation constraints, thermal power unit start and stop constraints, energy storage operation constraints and unit climbing constraints.
[0130] The system power balance constraint is as follows:
[0131]
[0132] Where: P loss,t is the network loss power in period t. δ is the allowable limit of unbalanced power deviation, and β is the confidence of the constraint condition. In the random model, there is no absolute power balance due to the forecast deviation of wind power output. When the probability of system imbalance within δ reaches β, the model considers that the power balance constraint is established.
[0133] The output constraints of thermal power units are as follows:
[0134]
[0135] Where: P i,min and P i,max are the minimum output and maximum output of thermal power unit i respectively.
[0136] The constraints on the abandoned wind power of wind turbines are as follows:
[0137] 0≤P AB,t ≤P WT,t
[0138] The start and stop constraints for thermal power units are as follows:
[0139]
[0140] Where: Indicates the continuous start-up time and continuous shutdown time of unit i until the period t-1.
[0141] The operating constraints of energy storage equipment are as follows:
[0142]
[0143] Where: Δt is the length of the scheduling period; μ ch and μ dis is the energy storage state coefficient, μ ch1 is 1 and μ dis is 0, when discharging μ ch is 0 and μ dis is 1; is the maximum charge and discharge power; Q ESS is the energy storage capacity; η ch and η dis They are the energy storage charging efficiency and discharging efficiency respectively.
[0144] The unit climbing constraints are as follows:
[0145]
[0146] Where: DR i and UR i They represent the descent rate and ascent rate of unit i in minutes respectively.
[0147] The technical solution provided by the embodiment of the present invention takes into account the user satisfaction of the wind-storage type industrial microgrid source-load coordinated optimization operation model. Taking a microgrid including a wind-storage power station connected to the grid as an example, demand-side management is performed on the load side, and a user satisfaction index is established based on the loss of electricity efficiency, the user's balanced electricity purchase price and the wind power consumption level in the system. On this basis, considering the uncertainty of wind power output, the random chance constrained programming theory is used to establish a model. The established model takes the operating cost of thermal power units, environmental conversion cost, energy storage operating cost and other costs as the objective function, and considers the system power balance constraint, unit operation constraint, energy storage charging and discharging constraint and other constraints. The system's operating indicators in the grid-connected operation mode are better than those in the off-grid operation mode, and the operating indicators when taking into account the demand-side management are better than those when not taking into account; the higher the model confidence level in terms of uncertainty, the lower the system economic indicators.
[0148] The embodiment of the present invention further provides an industrial microgrid demand response optimization device, which is used to execute the industrial microgrid demand response optimization method described in any of the above embodiments. Figure 4 This is a structural block diagram of an industrial microgrid demand response optimization device provided by an embodiment of the present invention, with reference to Figure 4 , the industrial microgrid demand response optimization device includes:
[0149] A user satisfaction index determination module 10 is used to determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side;
[0150] The comprehensive operation cost calculation module 20 is used to calculate the comprehensive operation cost of the industrial microgrid based on the operation cost of the power supply side, the environmental conversion cost, the start-stop cost, the operation and maintenance cost, and the cost-benefit of exchanging power with the external network;
[0151] An operation objective function establishing module 30, for determining an operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients;
[0152] The load power optimization module 40 is used to optimize the load power of different loads on the power consumption side based on the random chance constrained programming theory, according to the operation objective function and in combination with the constraint conditions of the industrial microgrid.
[0153] Specifically, the satisfaction of microgrid users is affected by three main factors, namely, the electricity efficiency brought by the degree of demand-side management, the average electricity purchase price of users, and the wind power consumption level in the system. The user's electricity efficiency can be understood as the economic value generated by electricity consumption when calculating the user satisfaction index, the average electricity purchase price of users can be understood as the electricity cost considered when calculating the user satisfaction index, and the power consumption rate on the power supply side can be understood as the amount of electricity generated by the microgrid that is used when calculating the user satisfaction index. Demand-side management is performed on the load side, and the user satisfaction index determination module 10 establishes a user satisfaction index based on the loss of electricity efficiency, the average electricity purchase price of users, and the wind power consumption level in the system.
[0154] The application object is the industrial microgrid. The system is a wind storage system, which includes distributed wind power, thermal power units and energy storage equipment connected to the grid. The system can operate in both grid-connected mode and off-grid mode. The comprehensive operating cost may include: the operating cost of the thermal power unit, the operating and maintenance cost of the thermal power unit, the environmental protection conversion cost benefit of the thermal power unit, and the cost benefit of exchanging power between the thermal power unit and the external network; the depreciation cost of the energy storage equipment, and the operating and maintenance cost of the energy storage equipment. The comprehensive operating cost calculation module 20 calculates the comprehensive operating cost of the industrial microgrid based on the operating cost of the power supply side, the environmental conversion cost, the start-stop cost, the operation and maintenance cost, and the cost benefit of exchanging power with the external network.
[0155] The operation objective function of the industrial microgrid includes comprehensive operation costs, such as the operation cost of thermal power units, environmental conversion cost, start-up and shutdown cost of thermal power units, wind turbine operation and maintenance, wind power subsidies, and battery costs, on the one hand, and user satisfaction indicators on the other hand. The operation objective function establishment module 30 uses the conversion coefficient to integrate the comprehensive operation cost and user satisfaction index to establish the operation objective function.
[0156] Taking into account the uncertainty of wind power output, the load power optimization module 40 uses random chance constraint programming theory to re-model the operation objective function, and optimizes the load power of different loads on the power consumption side in combination with the constraints of the industrial microgrid. The constraints of the industrial microgrid may include system power balance constraints, thermal power unit output constraints, wind power unit operation constraints, thermal power unit start and stop constraints, energy storage operation constraints, and unit climbing constraints. While formulating the demand side management plan and the optimization operation plan of the industrial microgrid, the embodiment of the present invention takes into account the user's satisfaction, so that the results of the optimized scheduling can guarantee the interests of the users, make the users feel satisfied, and achieve the purpose of coordinating the user's electricity consumption to adapt to the peak shaving and valley filling of the large power grid.
[0157] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. An industrial microgrid demand response optimization method, characterized in that: The industrial microgrid includes a power supply side and a power consumption side; include: Determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side; The comprehensive operating cost of the industrial microgrid is calculated based on the operating cost of the power supply side, environmental conversion cost, start-up and shutdown cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network; Determining an operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients; Based on the random chance constrained programming theory, the load power of different loads on the power consumption side is optimized according to the operation objective function and combined with the constraint conditions of the industrial microgrid; Before determining the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, it also includes: Constructing a total load power function on the power consumption side after the industrial microgrid implements demand management; wherein the load on the power consumption side includes a shiftable load, an interruptible load and a fixed load; According to the total load power function on the power consumption side after the industrial microgrid implements demand management, the user's power consumption benefit and the user's average power purchase price are calculated respectively; The total load power function of the power consumption side after the industrial microgrid implements demand management is determined based on the following: in, The total load power on the power consumption side after implementing demand management for the industrial microgrid; Load power after implementing demand management for shiftable loads, Load power after implementing demand management for interruptible loads, Load power after implementing demand management for fixed loads; For a translatable load, define is the load power that can be shifted from time period t1 to time period t2, then the load power of the load that can be shifted in time period t after the shift is As shown below: For interruptible loads, if power shortage occurs during period t and the interruptible load power is Then the load power that can be interrupted during period t is As shown below: For a fixed load, the load power of the fixed load during period t is as follows: in, Load power before implementing demand management for shiftable loads, Load power before implementing demand management for interruptible loads, Load power before implementing demand management for fixed loads; The calculation of the user's electricity benefit based on the total load power function on the electricity consumption side after the industrial microgrid implements demand management is based on the following determination: The average electricity purchase price of users is calculated based on the total load power function on the power consumption side after the industrial microgrid implements demand management based on the following determination: The power consumption rate on the power supply side is determined based on the following: in, P L,t is the total load power on the power consumption side before the industrial microgrid implements demand management; R1 is the user's power consumption benefit, R2 is the user's average power purchase price, and R3 is the microgrid wind power consumption rate; P AB,t P is the wind power abandoned by the wind turbine in period t; WT,t The output of the wind turbine in period t; The user satisfaction index is determined based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side, based on the following: R=λ1R1+λ2R2+λ3R3 Among them, R is the user satisfaction index, λ1, λ2 and λ3 are the weight coefficients of user electricity efficiency, user average electricity purchase price and power consumption rate on the power supply side respectively; The power supply side of the industrial microgrid includes distributed wind turbines, thermal power units and energy storage equipment; The comprehensive operating cost of the industrial microgrid is calculated based on the operating cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network, and is determined based on the following: C=C G +C G,OM +C EN +C GRID +C DP +C SB,OM Among them, C G is the operating cost of thermal power units, C G,OM is the operation and maintenance cost of thermal power units, C EN is the environmental protection cost-benefit of thermal power units, C GRID is the cost and benefit of exchanging power between thermal power units and external grid; C Dp is the depreciation cost of the energy storage equipment, C SB,OM The operation and maintenance costs of energy storage equipment; The operation objective function of the industrial microgrid is determined according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients, based on the following determination: minF=η1(C G +C G,OM +C EN +C GRID +C DP +C SB,OM )+η2R Where: F is the operation objective function; η1 and η2 are the conversion coefficients of the comprehensive operation cost and user satisfaction index in the objective function respectively; The method based on random chance constrained programming theory, according to the operation objective function and combined with the constraint conditions of the industrial microgrid, optimizes the load power of different loads on the power consumption side, including: Based on the uncertainty of wind power output, the operation objective function is reconstructed into the following form according to the random chance constrained programming theory: Among them, α is the confidence of the objective function; is the optimistic value of the running objective function under the confidence level α; Under the constraints of the industrial microgrid, the load power of the shiftable load, the load power of the interruptible load and the load power of the fixed load after the implementation of demand management are calculated according to the reconstructed operation objective function.
2. The industrial microgrid demand response optimization method according to claim 1, characterized in that: The constraints of the industrial microgrid include: system power balance constraints, thermal power unit output constraints, wind power unit operation constraints, thermal power unit start and stop constraints, energy storage operation constraints and unit climbing constraints.
3. An industrial microgrid demand response optimization device, characterized in that: The method for optimizing the industrial microgrid demand response according to claim 1 or 2 comprises: A user satisfaction index determination module is used to determine the user satisfaction index based on the user's electricity efficiency, the user's average electricity purchase price and the power consumption rate on the power supply side; The comprehensive operation cost calculation module is used to calculate the comprehensive operation cost of the industrial microgrid based on the operation cost of the power supply side, environmental conversion cost, start-stop cost, operation and maintenance cost, and the cost-benefit of exchanging power with the external network; An operation objective function establishment module, used to determine the operation objective function of the industrial microgrid according to the user satisfaction index, the comprehensive operation cost and the respective conversion coefficients; The load power optimization module is used to optimize the load power of different loads on the power consumption side based on the random chance constrained programming theory, according to the operation objective function and in combination with the constraint conditions of the industrial microgrid.